1 PORT OF THE ISLANDS CID FIELD MANAGEMENT REPORT FOR OCTOBER 2016 Christopher Pepin PREMIER DISTRICT MANAGEMENT 1922 VICTORIA AVE. UNIT B. FORT MYERS, FL

2 Port of the Islands CID Premier District Management Field Management Report Site Inspection on 10/10/ Lake Management: a. Lake Maintenance: The lakes were overall in fair shape this month. Water levels are average for this time of year, torpedo grass was the only shoreline weed observed and algae was hardly present. Additional lake management details are provided below. b. Dissolved Oxygen (DO) Tests: The next tests are scheduled for January c. Littoral Plants: No issues observed this month. d. Shoreline Weeds: Weed issues this month included: i. Torpedo grass present in Lakes: Low to medium presence within all of the lakes. (Treatment needed). Torpedo Grass e. Submerged Weeds: None present. f. Algae: Minimally present. g. Fish: No concerns observed this month. h. Trash: Multiple plastic bags were observed floating in the pond across from Wilderness Cay and Windward Cay. i. Lake Aeration: No aeration present. j. Shoreline Landscaping: No concerns observed this month. k. Lake Bank Erosion: No new concerns observed this month. 1

3 2. Roadways: a. Asphalt: Minor alligatoring observed along Newport Drive and Cays Drive. b. Potholes: No issues observed this month. c. Curbing / Storm Water Gutters: Damaged curbing was observed across from 285 Cays Drive. d. Street Signage: i. The L on the Hotel / Marina sign on Newport Drive is broken and should be replaced. ii. The Cays Drive entrance sign is rotting out and needs to be replaced. iii. The Eveningstar Cay sign is dirty and should be pressure washed / painted. Green algae is growing on it. 2

4 iv. The stop sign at the Cays Drive / Windward Cay intersection is being blocked by oak tree branches which is creating a potential safety hazard. The branches should be cut back. v. Crosswalk lines and bike path lines are fading throughout the community. Restriping them is recommended. e. Roadway Landscaping: i. Exposed irrigation lines were observed on one of the center islands along Newport Drive. The pipes should be buried to prevent damage to them. The island was just before Sunrise Cay. ii. No issues observed with the potted cantus at the main entrance. Exposed Irrigation Lines f. Roadway Lighting: No concerns observed. 3

5 3. Sidewalks: a. A raised sidewalk panel was observed in front of 172 Venus Cay. This is a potential tripping/safety hazard and should be grinded down. b. Two raised sidewalk panels were observed close to the Cays Drive & Wilderness Cay intersection. This is a potential tripping/safety hazard and should be grinded down. 172 Venus Cay Cays Drive / Wilderness Cay 4. Storm Drainage System: a. Catch Basins: Roadway basins that were inspected only had minimal trash floating in them. b. Water Control Structures (WCS): Besides for some minor vegetation growth around several of the water control structures no other concerns were observed. c. Culverts: i. Many of the culverts along Newport Drive have silt in them. One particular large culvert between Sunrise Cay and Evengstar Cay is 50% full. To ensure that the storm water management system is fully functioning it s highly recommended to have these cleaned out. 4

6 ii. Some of the concrete tops are damaged. One of the worst ones observed was located at 119 Newport Drive. These 119 Newport Drive 254 Newport Drive d. Drain Pipes: i. The small drain pipes in front of 158 Windward Cay are 90% clogged and should be cleaned out. The concrete gutter in front of the pipes also needs to be cleaned. ii. A headwall was found disconnected from a drain pipe that feeds into the lake just south of Stella Maris Dr. S. Before conditions get worst it s highly recommended to get this repaired. Headwall is located on the North side of the pond 5

7 e. Drainage Swales / Dry Detention Ponds / Banks: Areas that were inspected appear to be properly working. 5. Wells: Need a gate key to access / inspect Union Road and the well equipment. The inspection will mostly consist of verifying that the landscaping is being cut and that no trees have fallen across the road or onto the equipment. 6. Front Entrance Monuments: The following issues were observed this month. a. Main Monument i. The main sign is dirty and needs to be cleaned. ii. The tile roof is in need of pressure washing. If the ospreys are no longer using it for a nest, I would recommend removing all the dead branches. b. Side Monuments: Both monument walls are in need of a pressure cleaning. 6

8 c. Landscaping: The landscaping in front of the monuments isn t being maintained. Weeds were throughout the landscaping, shrubs aren t being pruned and several dead plants were observed. 7. Residential Complaints/Concerns / Work Order Requests: None reported this month. 8. Non CDD Issues Observed: A reclaimed water sign was found lying on the ground just behind the POI Realty building. 9. Fish/Wildlife Observations: Bass Bream Catfish Gambusia Egrets Herons Coots Gallinules Anhinga Cormorant Osprey Ibis Woodstork Otter Alligator Snakes Turtles Other Species: Ducks 10. CDD Project Updates: None at this time. 11. Completed events in October: a. Conducted initial site inspection with field technician on 10/10/ Water Treatment Plant Report: Will be included once Florida Utilities has taken over the management of the water plant. 7

PORT OF THE ISLANDS CID

PORT OF THE ISLANDS CID PORT OF THE ISLANDS CID FIELD MANAGEMENT REPORT FOR NOVEMBER 2016 Christopher Pepin PREMIER DISTRICT MANAGEMENT 1922 VICTORIA AVE. UNIT B. FORT MYERS, FL 33901 WWW.CDDMANAGEMENT.COM 0 Port of the Islands

More information

Laguna Lakes CDD FIELD MANAGEMENT REPORT FOR NOVEMBER 2017

Laguna Lakes CDD FIELD MANAGEMENT REPORT FOR NOVEMBER 2017 Laguna Lakes CDD FIELD MANAGEMENT REPORT FOR NOVEMBER 2017 Christopher Pepin PREMIER DISTRICT MANAGEMENT 1922 VICTORIA AVE. UNIT B. FORT MYERS, FL 33901 0 Laguna Lakes CDD Premier District Management Field

More information

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection Riverwood CDD Severn Trent Services Field Management Report Site Inspection 03.08.2017 1. Lake Management: Water levels continue to recede. Overall clarity is good. No algae issues. Exotic and nuisance

More information

Riverwood CDD. 3/29/2017 Field Management Report Country Lakes Drive (239) Fort Myers, FL 33905

Riverwood CDD. 3/29/2017 Field Management Report Country Lakes Drive   (239) Fort Myers, FL 33905 Riverwood CDD 3/29/2017 Field Management Report 5911 Country Lakes Drive www.severntrentms.com (239) 245-7118 Fort Myers, FL 33905 1. Lake Management The water levels in the lakes continue to be down significantly

More information

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection 11/6 and 11/9/2015

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection 11/6 and 11/9/2015 Riverwood CDD Severn Trent Services Field Management Report Site Inspection 11/6 and 11/9/2015 1. Lake Management: The ponds are doing really well, in regards to vegetation or algae. During one visit,

More information

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection October 31, 2014

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection October 31, 2014 1. Lake Management: Riverwood CDD Severn Trent Services Field Management Report Site Inspection October 31, 2014 a. Lake Maintenance: Per the Beautiful Ponds Lake Management synopsis, the lakes look very

More information

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection October 1, 2015 and October 9, 2015*

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection October 1, 2015 and October 9, 2015* Riverwood CDD Severn Trent Services Field Management Report Site Inspection October 1, 2015 and October 9, 2015* The regular inspection occurred on October 1, 2015, however, additional items have been

More information

RIVERWOOD LAKE INSPECTION FIELD SHEET

RIVERWOOD LAKE INSPECTION FIELD SHEET 1. Lake Management: Riverwood CDD Severn Trent Services Field Management Report Site Inspection 05/02/2015 a. Lake Maintenance: Aquatic nuisance vegetation is being maintained and is under control. On

More information

RIVERWOOD LAKE INSPECTION FIELD SHEET

RIVERWOOD LAKE INSPECTION FIELD SHEET 1. Lake Management: Riverwood CDD Severn Trent Services Field Management Report Site Inspection September 2, 2015 a. Lake Maintenance: All the ponds are high from seasonal rains. Lake management details

More information

Tara Community Development District I Waterway Inspection Report

Tara Community Development District I Waterway Inspection Report Tara Community Development District I Waterway Inspection Report Inspection Date:12 Prepared for: Ms. Angel Montagna, CDD District Manager Rizzetta and Company 12750 Citrus Park Lane, Suite #115 Tampa,

More information

STANDARD DETAILS QUICK REFERENCE

STANDARD DETAILS QUICK REFERENCE STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)

More information

Ben Powell, Clemson Extension

Ben Powell, Clemson Extension Ben Powell, Clemson Extension The Nuts and Bolts Identify the need Define stormwater, BMPs, management concerns Describe the solutions BMPs (structural and behavioral) Improving efficiency and reducing

More information

STORMWATER - GENERAL NOTES

STORMWATER - GENERAL NOTES STORM DRAINAGE CONSTRUCTION NOTES. All storm sewer pipe shall be reinforced concrete. 2. Storm drainage pipes shall be a minimum of fifteen (5) inch diameter (5" for short lateral runs only - up to 75

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

Ponds of. Ballantrae

Ponds of. Ballantrae Ponds of Ballantrae December 2012 Assessments & Recommendations for Pond Management Assessments and Recommendations for management of each pond were made to the CDD Board by its district engineer and pond

More information

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres Wilbur Young Park Park Location: 1100 SE Adams Dairy Parkway Park Land Established: 1987 Park Size: 40 acres Developed Acres: 15 acres Undeveloped Acres: 25 acres Park Type: Community Park Amenities: Shelter

More information

Kittson Parkway / Watershed Park Parking Lot

Kittson Parkway / Watershed Park Parking Lot Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;

More information

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES BIO-RETENTION FACILITIES (for all basins / BMPs) Annually Prepare Operation and Maintenance Plan. Clearly outline how vegetation in the facility and its buffer area will be managed or harvested in the

More information

Maintaining Your Sparkle. Maintenance Issues. by Kathy Danforth

Maintaining Your Sparkle. Maintenance Issues. by Kathy Danforth Maintaining Your Sparkle Maintenance Issues by Kathy Danforth Whether it s a natural feature or a constructed retention pond, many communities are endowed with bodies of water for which they are the caretakers.

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

STORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500

STORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500 STORM DRAINAGE CONSTRUCTION NOTES 1. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE UNLESS APPROVED BY THE CITY ENGINEER. 2. STORM DRAINAGE PIPES SHALL BE A MINIMUM OF FIFTEEN (15) INCH DIAMETER (15"

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

VEHICULAR AND PEDESTRIAN CIRCULATION

VEHICULAR AND PEDESTRIAN CIRCULATION This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide

More information

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion: 3.0 SURVEY 3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects A. Prior to construction: 1. Public survey records are to be researched for the location of all possible survey

More information

This wetlands calendar was created by students in connection with their science

This wetlands calendar was created by students in connection with their science This wetlands calendar was created by students in connection with their science curriculum. This wetlands calendar was created by students in connection with their science curriculum. Students and teachers

More information

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS 2010 EDITION CITY OF OZARK, MISSOURI REVISIONS TO THE 2009 EDITION The following revisions have been made to the 2009 edition of the city

More information

NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES

NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES VERSION 1.6 August 2011 PREPARED BY: 900 Bland Boulevard Suite G Newport News, Virginia 23602 DESIGN AND SUSTAINABILITY

More information

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance

More information

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL

More information

Your Yard and Pond are Connected RYAN RYCZEK ENVIRONMENTAL SPECIALIST II

Your Yard and Pond are Connected RYAN RYCZEK ENVIRONMENTAL SPECIALIST II Your Yard and Pond are Connected RYAN RYCZEK ENVIRONMENTAL SPECIALIST II Pollution In Water Results In. Increased aquatic plant and algal growth Lower oxygen levels Harm to aquatic life Sedimentation Impaired

More information

Everglades Ecosystems Information Sheets

Everglades Ecosystems Information Sheets Everglades Ecosystems Information Sheets Slough What is it? Within the sawgrass marsh are channels and ponds of deeper water that contain water yearround, except in the driest years. The wider, deeper

More information

County of El Dorado Standard Plans

County of El Dorado Standard Plans County of El Dorado Standard Plans Table of Contents Section 1 General Standards GS-01 General Legend and Abbreviations Section 2 Roads and Streets RS-01 RS-02 RS-03 RS-04 RS-05 RS-06 RS-07 RS-08 RS-20

More information

Stormwater Management Report

Stormwater Management Report Stormwater Management Report Autumn Woods Community Naples, FL 7/7/2014 Prepared for: Autumn Woods Master Association 6720 Autumn Woods Boulevard Naples, FL 34109 Prepared by: Autumn Woods Lakes Committee

More information

Burrus Old Mill Park

Burrus Old Mill Park Burrus Old Mill Park Park Location: 112 NW Woods Chapel Rd. Park Land Established: 1969 Park Size: 14 acres Developed Acres: 14 acres Undeveloped Acres: 0 acres Park Type: Neighborhood Park Amenities:

More information

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details CITY OF LATHROP Department of Public Works DESIGN & CONSTRUCTION Standard Details January 2014 General G-1A Signature Blocks G-1B Signature Blocks G-2 Drafting Standards G-3 Drafting Standards G-4 Drafting

More information

Inventory and Assessment of Stormwater Infrastructure

Inventory and Assessment of Stormwater Infrastructure Inventory and Assessment of Stormwater Infrastructure Identifying and Assessing Stormwater Infrastructure Before an assessment can be completed, stormwater infrastructure must be located and identified

More information

ECOLOGICALLY-BASED CITY PARK MASTER PLAN

ECOLOGICALLY-BASED CITY PARK MASTER PLAN ECOLOGICALLY-BASED CITY PARK MASTER PLAN AUTHORED BY: KELSEY BLAHO CAYLA COTHRON MAY 12, 2016 Project Summary Table of Contents Existing Conditions Stormwater Management Circulation Wildlife Habitat and

More information

Green Infrastructure Overview

Green Infrastructure Overview Green Infrastructure Overview Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu Jeremiah Bergstrom, LLA, ASLA jbergstrom@envsci.rutgers.edu February 26, 2016 Water Resources Program NJDEP

More information

FFL Home Landscape Recognition Checklist

FFL Home Landscape Recognition Checklist FFL Home Landscape Recognition Checklist By recognizing specific landscapes as Florida-Friendly, the Florida Yards & Neighborhoods (FYN) branch of the Florida-Friendly Landscaping (FFL) Program honors

More information

City of Yelm. Public Works Department. July 29, Re: Stormwater Maintenance Re-Inspection Results

City of Yelm. Public Works Department. July 29, Re: Stormwater Maintenance Re-Inspection Results City of Yelm Public Works Department 901 Rhoton Road Mailing Address: 105 Yelm Ave W (360) 458-8406 Fax: (360) 458-8417 July 29, 2009 Re: Stormwater Maintenance Re-Inspection Results I have re-inspected

More information

Wetland Types. Grade Level: Basic. Duration: 30 minutes. Setting: Classroom

Wetland Types. Grade Level: Basic. Duration: 30 minutes. Setting: Classroom Wetland Types Adapted from: An original Creek Connections activity created by Cassandra Hamilton. Creek Connections, Box E, Allegheny College, Meadville, PA 16335 http://creekconnections.allegheny.edu

More information

Tampa Palms CDD. Board Of Directors September, 2017

Tampa Palms CDD. Board Of Directors September, 2017 Tampa Palms CDD Board Of Directors September, 2017 Agenda Roll Call / Pledge of Allegiance Strategic Planning Board Member Discussion Items Public Comments Consultant Report Other Business Public Comments

More information

Exhibit A Section 1: Commerce City Right Of Way Landscape Maintenance Scope of Service

Exhibit A Section 1: Commerce City Right Of Way Landscape Maintenance Scope of Service Exhibit A Section 1: Commerce City Right Of Way Landscape Maintenance Scope of Service A. Scope: (i) Services: At the City s direction, the Contractor shall provide programmatic and nonprogrammatic Right

More information

Mosquito Control Guidelines

Mosquito Control Guidelines Appendix F Mosquito Control Guidelines This appendix presents guidance from the Countywide Program s Vector Control Plan for designing and maintaining stormwater treatment measures to control mosquitoes.

More information

GATEWAY SERVICES COMMUNITY DEVELOPMENT DISTRICT (GSCDD) SURFACE WATER SYSTEM MAINTENANCE STANDARDS

GATEWAY SERVICES COMMUNITY DEVELOPMENT DISTRICT (GSCDD) SURFACE WATER SYSTEM MAINTENANCE STANDARDS GATEWAY SERVICES COMMUNITY DEVELOPMENT DISTRICT (GSCDD) SURFACE WATER SYSTEM MAINTENANCE STANDARDS Prepared jointly by: Pelican Preserve Ponds Workshop Group Gateway Ponds Workshop Group Severn Trent Management

More information

KINGS POINT AREA I LANDSCAPE INSPECTION March 26, 2012

KINGS POINT AREA I LANDSCAPE INSPECTION March 26, 2012 KINGS POINT AREA I LANDSCAPE INSPECTION March 26, 2012 ATTENDING: STACY TARACHEK CONTINENTAL GROUP SCOTT STINSON VALLEYCREST LANDSCAPE JOH N WAGNER VALLEYCREST LANDSCAPE TED KATINA VALLEYCREST LANDSCAPE

More information

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST City of Seminole 9199 113 th Street N. Seminole, FL 33772 Ph: (727) 392-1966 Fx: (727) 319-6583 SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST Note: This checklist is designed to aid designers in the review

More information

Tips for Maintaining and Enhancing Stormwater Management Areas

Tips for Maintaining and Enhancing Stormwater Management Areas 4 4 N. Second Street, Denton, Md. 21629 (410) 479-3625 (410) 479-3534 fax www.dentonmaryland.com Tips for Maintaining and Enhancing Stormwater Management Areas Information provided by the Town of Denton

More information

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18 City of Mt. Juliet Planning & Zoning Department Site Plan Checklist Site Plan approval is required for all specified community facilities, all commercial, industrial, and multi-family residential activities

More information

Maintaining Your Neighborhood Stormwater Facilities

Maintaining Your Neighborhood Stormwater Facilities Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working Layout by the Thurston County Storm and Surface Water Utility with thanks to the Delaware

More information

North Hutchinson Island 7.55 Acres Vacant Land Approved for 30 Townhome Units

North Hutchinson Island 7.55 Acres Vacant Land Approved for 30 Townhome Units OFFERING MEMORANDUM Contact: Yates & Company Realty, LLC 255 Alhambra Circle Suite 325, Coral Gables, FL 33134 Phone: 305-446-0406 Cell: 786-258-6500 Email: brendayates@bellsouth.net Website: www.yatesandcompany.net

More information

Module 1 ~ Silent Invaders (MS/HS) Emersed Plants Reading Activity

Module 1 ~ Silent Invaders (MS/HS) Emersed Plants Reading Activity Name: Class Period: Date: Directions: Read the passage and use the information you ve learned to answer the questions below using complete sentences. Emersed plants are rooted in shallow water with much

More information

Use of Best Management Practices

Use of Best Management Practices Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN OPPORTUNITIES AT OXBOW EXISTING WETLANDS Site is undeveloped and we can design a park that works well from the start. SAND BEACH Potential to eliminate invasive species. DEBRIS (CONCRETE, OLD CARS) VEGETATION

More information

VICINITY MAP 1" = 1000'

VICINITY MAP 1 = 1000' SITE PLAN - MINI U STORAGE LOCATED IN A PORTION OF THE SOUTHWEST QUARTER OF SECTION 15, TOWNSHIP 6 SOUTH, RANGE 66 WEST OF THE 6th P.M. 18901 LONGS WAY, PARKER, CO 80134 SITE DEVELOPMENT DATA: SITE ACREAGE:

More information

Conservation Modules. Stormwater Pond Volunteers

Conservation Modules. Stormwater Pond Volunteers Conservation Modules for Stormwater Pond Volunteers Ernie Franke Chairman of Wetlands Committee for The Shores of Long Bayou Condominiums FLMS, 10 June 2015 Session B1: Lake and Pond Volunteer Programs

More information

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition Park Name: Is Your Park an A or an F? Your Name: Contact Information Optional: Date: General Instructions: Phone: Email:

More information

PROJECTS UNDER CONSTRUCTION

PROJECTS UNDER CONSTRUCTION Project Name Project Status Project Funding Project Manager PJ 2144 Clayton Rd-Treat Blvd Intersection Improvements Widen the Clayton Road/Treat Blvd intersection and upgrade the traffic signal. Construction

More information

BRADENTON RIVERWALK EXPANSION MASTER PLAN

BRADENTON RIVERWALK EXPANSION MASTER PLAN BRADENTON RIVERWALK EXPANSION MASTER PLAN INTRODUCTION & AGENDA Process Update Community Engagement Summary Center for Active Design (CfAD) Recommendations Context and Existing Conditions Master Plan Alternatives

More information

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future. The Duck Pond Watershed is located in northern Hillsborough County in an area in which a number of land and water management issues are currently being addressed by citizen's action groups and state, regional

More information

CITY OF VALPARAISO STORMWATER MASTER PLAN

CITY OF VALPARAISO STORMWATER MASTER PLAN CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August

More information

Green City, Clean Waters

Green City, Clean Waters Green City, Clean Waters Green Infrastructure Maintenance Manual Consent Order & Agreement Deliverable VIII City of Philadelphia Combined Sewer Overflow Long Term Control Plan Update Submitted to The Commonwealth

More information

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for

More information

APPENDIX F: DETAIL DRAWINGS

APPENDIX F: DETAIL DRAWINGS APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900

More information

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield Design Considerations for Open Channel and Detention Pond Design Howard Redfearn, City of Mansfield Previous Experience/Criteria/Maintenance Issues New Criteria Discussion Overview Where is Mansfield?

More information

Things People Never Seem to Understand about Pond Management. Stew Metzler SEHAC October 5, 2011

Things People Never Seem to Understand about Pond Management. Stew Metzler SEHAC October 5, 2011 Things People Never Seem to Understand about Pond Management Stew Metzler SEHAC October 5, 2011 M a n a g i n g Y o u r L i q u i d A s s e t s Is it a pond or lake? Typically, ponds are manmade, lakes

More information

NAPA COUNTY PUBLIC WORKS Standards & Specifications

NAPA COUNTY PUBLIC WORKS Standards & Specifications Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6

More information

AWR Engineering, LLC

AWR Engineering, LLC AWR Engineering, LLC Alaska Water Resources Memorandum To: Kirsti Bischofberger, Watershed Manager, Municipality of Anchorage From: Janie Dusel, PE Date: February 3, 2017 Re: 2016 Low Impact Development/Green

More information

d Escoto, M. City of Chicago Streetscape and Urban Design Program, Chicago Department of Transportation. (2003). Streetscape Guidelines.

d Escoto, M. City of Chicago Streetscape and Urban Design Program, Chicago Department of Transportation. (2003). Streetscape Guidelines. WORKS CITED McCann, B., & Rynne, S. Planning Advisory Service, (n.d.). Complete streets: Best policies and implementation strategies (559). Retrieved from American Planning Association website: http://www.smartgrowthamerica.org/documents/cs/resources/cs-bestpractices-chapter5.pdf

More information

Cottage Grove Road Reconstruction. City of Madison Engineering

Cottage Grove Road Reconstruction. City of Madison Engineering Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs

More information

Green Street Challenges and Design Considerations. Watershed Revegetation Program Bureau of Environmental Services

Green Street Challenges and Design Considerations. Watershed Revegetation Program Bureau of Environmental Services Green Street Challenges and Design Considerations Watershed Revegetation Program Bureau of Environmental Services Jeremy Person, PLA, LEED AP March 2017 Presentation Outline Background Challenges and Considerations

More information

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS

More information

PLANNING BOARD HEARING Miami Shores Village Town Hall Council Chambers NE 2 nd Avenue Miami Shores Workshop Date April 24, 2014

PLANNING BOARD HEARING Miami Shores Village Town Hall Council Chambers NE 2 nd Avenue Miami Shores Workshop Date April 24, 2014 MIAMI SHORES VILLAGE DEPARTMENT OF PLANNING & ZONING 10050 NE 2 nd Avenue Miami Shores FL 33037-2304 www.miamishoresvillage.com David A. Dacquisto AICP, Director dacquistod@miamishoresvillage.com Main

More information

Mosquito Control Guidelines

Mosquito Control Guidelines Appendix F Mosquito Control Guidelines The Santa Clara Vector Control District (SCC VCD) has the responsibility for providing enforcement of mosquito control measures when public health is threatened.

More information

MAINTENANCE APPENDIX. G.1 Introduction. G.1.1 Goals and Objectives

MAINTENANCE APPENDIX. G.1 Introduction. G.1.1 Goals and Objectives APPENDIX G MAINTENANCE G.1 Introduction The maintenance of LID facilities is essential to ensure that designed stormwater management performance and other benefits continue over the full life cycle of

More information

Rotary Park / Railroad Lake

Rotary Park / Railroad Lake Rotary Park / Railroad Lake Park Location: 600 NW Vesper St. Park Land Established: 1975 Park Size: 12 acres Developed Acres: 12 acres Undeveloped Acres: 0 acres Park Type: Community Park Amenities: 2

More information

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements Coco Palms Community Development District Engineer s Report Infrastructure Improvements Prepared for Coco Palms Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School West Little Pimmit Storm Sewer & John Marshall Green Street Projects July 7, 2015 Nottingham Elementary School Project Timeline February 2015: Archeological study of island, including historic spring location,

More information

OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES

OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES THE CARMONY BUILDING PARAGON REALTY NORTH GREEN STREET BROWNSBURG, HENDRICKS COUNTY INDIANA 8365 Keystone Crossing, Suite 201 Indianapolis,

More information

STORMWATER CONTROL OPERATION AND MAINTENANCE PLAN

STORMWATER CONTROL OPERATION AND MAINTENANCE PLAN STORMWATER CONTROL OPERATION AND MAINTENANCE PLAN Subdivision 8939 Paulson Lane Lots 1-16 ,' SUMMARY OF STORMWATER TREATMENT FACILITIES The Paulson Lane Project contains 16 residences. The project is divided

More information

Ponds of. Ballantrae. Part 1 of 2: The Report. Prepared by the Ballantrae Community Development District Board of Supervisors

Ponds of. Ballantrae. Part 1 of 2: The Report. Prepared by the Ballantrae Community Development District Board of Supervisors Ponds of Ballantrae Part 1 of 2: The Report Prepared by the Ballantrae Community Development District Board of Supervisors September 2013 CDD Board implements pond management plan This two-page plan lays

More information

Benefits of Native Vegetation. Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician

Benefits of Native Vegetation. Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician Benefits of Native Vegetation Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician Turf to Prairie-why would I do that? Improved water quality Soil stabilization and absorption Goose

More information

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

WET PONDS INSPECTION & MAINTENANCE CHECKLIST WET PONDS INSPECTION & MAINTENANCE CHECKLIST INTRODUCTION Once construction is completed, periodic site inspections are essential in order to monitor the effectiveness and to anticipate the maintenance

More information

A. Site plan notes. Include the heading Site Plan Notes.

A. Site plan notes. Include the heading Site Plan Notes. Community Development and Neighborhood Services Planning Services 281 North College Ave. P.O. Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview The following City

More information

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT HUNTSVILLE PHYSICAL SERVICES DEPARTMENT URBAN DEVELOPMENT SITE PLAN CONTROL DRAWING DESIGN GUIDE April, 2000 (Revised June, 2003) TABLE OF CONTENTS Part A. General Information Page 1 Part B. Site Servicing

More information

City of Richmond. Engineering Design Specifications

City of Richmond. Engineering Design Specifications City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS

More information

Exhibit A. Scope of Work

Exhibit A. Scope of Work Exhibit A Scope of Work TURF / LAWNS Mowing Lawns shall be mowed weekly during growing season and as required during winter months. The height of mowing shall be maintained consistently to prevent scalping

More information

LANDSCAPE ORDINANCE 1. LANDSCAPE PLAN REVIEW REQUIREMENTS

LANDSCAPE ORDINANCE 1. LANDSCAPE PLAN REVIEW REQUIREMENTS LANDSCAPE ORDINANCE PURPOSE A. The purpose of this chapter is to protect and promote the public health, safety, general welfare and beautification through the City of Kalispell s authority to regulate

More information

Weekly Activity Log. About Cutting Edge Landscaping Ltd. and their services:

Weekly Activity Log. About Cutting Edge Landscaping Ltd. and their services: Weekly Activity Log The following is a running activity log provided by our service provider, Cutting Edge Landscaping Ltd., for the additional cutting, weeding and landscaping services they supply to

More information

TA B L E O F C ON T EN T S

TA B L E O F C ON T EN T S TA B L E O F C ON T EN T S Introduction 1 Site Analysis 2 EXISTING TREE ANALYSIS 3 Community Outreach 5 PUBLIC WORK SHOP #1 GENERAL PUBLIC 6 PUBLIC WORKSHOP #2 4 TH OF JULY CELEBRATION 9 PUBLIC WORKSHOP

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 27, 2007 DATE: January 12, 2007 SUBJECT: U-3101-04-2 Use Permit Review for drive-through facilities; premises known as 5222 Lee Highway

More information

Stormwater Low Impact Development - A Natural Solution

Stormwater Low Impact Development - A Natural Solution Stormwater Low Impact Development - A Natural Solution Sarah U Ren Program Director The Watershed Center of Grand Traverse Bay 231-935-1514, suren@gtbay.org Our Mission: The Watershed Center advocates

More information

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue 5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER Avenue 1. APPLICANT: Hoefer Wysocki Architects, L.L.C., is the applicant for this request. 2. REQUESTED ACTION: The applicant is requesting final

More information

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association GREEN ON THE HORIZON Challenges of Integrating LID into New Development Southeast Stormwater Association Annual Seminar, Charleston SC October 9, 2014 JENNIFER A. NUNN, PE THE BALMORAL GROUP Acknowledgments

More information

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres Blue Springs Park Park Location: 2204 SW South Ave. Park Land Established: 1975 Park Size: 14 acres Developed Acres: 12 acres Undeveloped Acres: 2 acres Park Type: Neighborhood Park Amenities: Softball

More information

Sediment and Particulate Control

Sediment and Particulate Control Sediment and Particulate Control April 14, 2016 In Collaboration With Pepe Lopez, Luis Girado & Orlando Diaz Everglades Research and Education Center BMP PTS DESCRIPTION NUTRIENT CONTROL : MINIMIZE MOVEMENT

More information

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION Project Background November 19, 2007 Executive Summary The Grand Canal is an important tidal waterway in the Venice community of Los Angeles, California,

More information

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013 Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN

More information

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES 4.1 INFILTRATION BASIN AND TRENCH Figure 4.1. Infiltration basin and trench (Source: Department of Civil, Construction, and Environmental Engineering,

More information