Maintenance Strategy for High Pressure Piping Systems. by Ewert Snyman
|
|
- Godwin Kelley
- 5 years ago
- Views:
Transcription
1 Maintenance Strategy for High Pressure Piping Systems by Ewert Snyman
2
3 Introduction Basic Design Principles Piping Inspections Maintenance Strategy Maintenance Methods Conclusion and Questions Content
4 Steinmüller Engineering Services specialise in High Energy Piping Systems High Temperatures normally between 500 C and 560 C but systems as high as 800 C has been analysed High Pressures normally between 5MPa and 30MPa Introduction
5 Introduction A specialized maintenance strategy is required on these piping systems due to the following: Limited system life Severe impact in case of failure Specialised testing requirements and methods Extraordinary long lead times on replacement material Specialised replacement or refurbishment methods
6 Basic Design Principles To understand the maintenance strategy the basic design principles must be understood: Material selection Piping layout Support system The implementation of these principles must first of all meet the design code requirements, but also have a direct impact on the long term health of the plant.
7 Basic Design Principles Before any maintenance activity can start, detailed information on the piping system must be available: The relevant piping design code The design conditions, i.e. design pressure and design temperature The operating conditions, i.e. originally anticipated operating pressure and operating temperature The piping material and the code to which it was ordered The piping dimensions, i.e. the outer diameter or inner diameter and wall thickness the piping was ordered to The piping layout, i.e. an isometric drawing showing the basic layout of the piping The cold pull dimensions A schedule indicating the support types, loads and travels, as well as clear indications on the isometric drawings where the supports are The isometric drawing must also indicate the locations of the piping welds The insulation specification, i.e. the thickness, density and conductive properties of the insulation
8 Piping Condition Evaluation To determine the maintenance strategy and maintenance activities the following information must be available: Material Condition Life Usage Factor As-built Flexibility Model Results Support System Condition Sloping and Drainage Thermal Insulation Condition
9 Piping Inspections and Testing The purpose of the inspection and testing of a piping system is two fold: Firstly to verify the integrity of the piping system, which is aimed at its short term operation and mostly consists of non destructive testing NDT to determine integrity of welds Pressure testing Replica taking to determine creep degradation Secondly to determine the condition of the system, which is aimed at its long term health Record operational data Perform dimensional tests Perform elevation surveys Survey support system Test and calibrate supports Perform infrared scanning Replica taking to determine creep degradation
10 Maintenance Strategy The maintenance strategy of the piping is thus forced into pure condition based maintenance.
11 Maintenance Activities Due to the inherent complexity in the configuration of the piping system, specialised methods are required for the replacement of components. With the replacement of piping components the originally installed cold pull must be retained: Re-instate the original cold pull as per the original installation method Restrain the piping movement local to the section to be replaced
12 Maintenance Activities Restraining the piping only maintains the cold pull for the sections not influenced by the refurbishment work - the installed cold pull influence the shape of the entire piping system, and thus the larger the portion being replaced the more cold pull will be lost. The restraining of the piping is achieved by the installation of the blocking frames. The loading on the blocking frames and the amount of cold pull that will be lost must be calculated.
13 Maintenance Activities Without restraining the piping or due to partial loss of cold pull, the piping must be balanced (balanced erection) during installation such that the piping is in it s neutral position when the piping is aligned for welding. The alignment for the final weld must be such that the piping ends are the required cold pull distances apart. This requires detailed planning upfront to take place since the last and second last weld locations must be specifically selected to achieve the required cold pull successfully.
14 Conclusion and Questions Thus to ensure the short and long term health of a high pressure and high temperature piping system, a specialized maintenance strategy is required. Questions?
Case Study. A Geothermal Energy Generation Facility Embraces Infrared. Polymer Window Inspections. Overview: iriss.com
A Geothermal Energy Generation Facility Embraces Infrared Polymer Window Inspections By Dominique Capili, Spectrum Scientific Corporation (An IRISS Distributor) Overview: A prominent geothermal energy
More informationINCREASED RELIABILITY / REDUCED RISK BY APPLYING INTELLIGENT PIGGING TECHNOLOGY TO INSPECT COILS IN PROCESS HEATERS
4th Middle East NDT Conference and Exhibition, Kingdom of Bahrain, Dec 2007 For all papers of this publication click: www.ndt.net/search/docs.php3?mainsource=57 INCREASED RELIABILITY / REDUCED RISK BY
More informationA Regional Research and Dissemination Programme. Phase III SOLAR BOX DRYER DESIGN, CONSTRUCTION AND OPERATION MANUAL
RENEWABLE ENERGY TECHNOLOGIES IN ASIA: A Regional Research and Dissemination Programme Phase III SOLAR BOX DRYER DESIGN, CONSTRUCTION AND OPERATION MANUAL Energy Field of Study School of Environment, Resources
More informationPOWERENERGY
Proceedings of the ASME 2015 Power & Energy Conversion Conference POWER2015 June 28-July 2, 2015, San Diego, CA, USA POWERENERGY2015-49418 IMPROVEMENTS IN THE PERFORMANCE OF A SUBCOOLING ZONE IN A FEEDWATER
More informationSUMMARY. On completion of all of the five tests, general body concentrations of ozone gas within the room monitored were less than 0.01 ppm.
SUMMARY The results indicated that the maximum general body concentration of ozone gas during trial operations of the Ozone Clean Limited OC1500 Ozone Generator-Destructor Machine was 2.65 ppm. On completion
More informationCode of Practice // For the installation, inspection and testing of electrical installations tel/fax:
Code of Practice // For the installation, inspection and testing of electrical installations tel/fax: 0870 241 7687 email: mpba@mpba.biz Introduction // This code of practice provides guidance for manufacturers,
More informationThe Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland
Available on CMS information server CMS CR -2016/298 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 28 October 2016 (v2, 25 November 2016)
More informationOctober 7, 2016 Meeting Landfill Liner Regulations with Conductive Backed Geomembranes by Doyin Adesokan B.Eng Msc. Technical Manager - Solmax
Covering the world. Protecting the earth. October 7, 2016 Meeting Landfill Liner Regulations with Conductive Backed Geomembranes by Doyin Adesokan B.Eng Msc. Technical Manager - Solmax Outline Quote What
More informationINSTRUCTIONS REHAU SILENT DIAL THERMOSTAT #
INSTRUCTIONS REHAU SILENT DIAL THERMOSTAT #236477-001 Specifications... 1 Overview Silent Dial Thermostat Art. 236477-001... 1 Mounting Location... 3 DIP Switch Configuration... 3 Calibration... 5 Setting
More informationFundamental of Heating
Address:4F-3, No.46,Sec.2, Zhong Shan N. Rd., 10448 Taipei,Taiwan 台北市中山北路二段 46 號 4F-3 Tel:886-2-25113207 Fax:886-2-25113201 Fundamental of Heating (1)Understanding of Heating Element Heating element is
More informationHPF 1.2 NEW INTERCONNECTION SYSTEM FOR EXTREME VIBRATION REQUIREMENTS IN THE VEHICLE
HPF 1.2 NEW INTERCONNECTION SYSTEM FOR EXTREME VIBRATION REQUIREMENTS IN THE VEHICLE Authors: Stefan Glaser Senior Manager Customer Engineering VWA Waldemar Stabroth Director Technical Marketing Contact:
More informationOgnjen Čaldarović, PhD, professor of sociology, Zagreb University Urban Renewal and Transitional Society
Ognjen Čaldarović, PhD, professor of sociology, Zagreb University ognjen.caldarovic@ffzg.hr Urban Renewal and Transitional Society 1 content 1. Introduction 2. The Most important processes in urban renewal
More informationThe development of seat fire testing for EN Richard Nowell
The development of seat fire 2017 Introduction Introduction This presentation will examine the development of a new standard for complete seat fire testing that will plug into EN 45545-2 to replace Annexes
More informationCotswolds AONB Landscape Strategy and Guidelines. June 2016
Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction
More informationLightweight aggregates in Civil Engineering applications. Arnstein Watn Senior Scientist, SINTEF
Lightweight aggregates in Civil Engineering applications Arnstein Watn Senior Scientist, SINTEF SINTEF Independent Multiscience Research Institute About 1800 employees Closely linked to the Universities
More informationConstruction of BIOECODS for a Government Complex: A Case Study
Construction of BIOECODS for a Government Complex: A Case Study MOHD FAZLY YUSOF, Sceince Officer, River Eingineering and Urban Drainage Centre (REDAC), Universiti Sains Malaysia, Engineering Campus, Seri
More informationLaser Registration Requirements: EH&S must be notified after the purchase any class 3B or 4 lasers through the online Laser Registration Form.
Permit Holder: Laser Class: Class 3B Class 4 Manufacturer Model LASER SAFETY CONTACT FOR YOUR LAB Name Phone Email 1. LASER SAFETY GENERAL CAMPUS POLICIES Responsibilities of the laser operator(s): Operator
More informationTechnical Guidance CE Marking of Metal Chimneys and Flues
CE Marking of Metal Chimneys and Flues Steel Chimney Programme Schiedel is the leading producer of ceramic chimney systems in Europe, and are now regarded as the market leaders in prefabricated stainless
More informationFLEXIBLE CORRUGATED TUBE
Back To The Natur e S O L A R S Y S T E M SPRINKLER SYSTEM B O I L E R FLEXIBLE CORRUGATED TUBE INSULATED SOLAR HOSES S Y S T E M w w w. k a s. c o m. t r SOLAR SYSTEM System Definition of Corrugated
More informationPIR Occupancy & Motion Sensor
PIR Occupancy & Motion Sensor MOS-17C energy conservation - home and office Overview The MOS-17C is a wireless, energy harvesting, ceiling mount, Passive InfraRed (PIR) occupancy sensor. Used for indoor
More informationA CASE STUDY ON BOILER TUBE FAILURE AT JPL
A CASE STUDY ON BOILER TUBE FAILURE AT JPL Introduction: JPL has two no of super critical Boilers (Make: Harbin Boiler Company Limited). This boiler adopts low NOx burners with offset tangential combustion,
More informationThe Role of Market Surveillance
Certification and Marking for Europe The Role of Market Surveillance Jan Deconinck, M.Sc. PROSAFE Chairman 1. Marks 1. Marks 1. Marks - It is prohibited to affix other markings or marks which might be
More information9 January 2012 Satmohini Ray Senior Research Fellow
SUSTAINABLE URBAN FORM FOR INDIAN CITIES 9 January 2012 Satmohini Ray Senior Research Fellow RESEARCH STUDY Sustainable City Form in India Aim : The study aims at achieving sustainable development in rapidly
More informationActivity Residential Site Planning
Activity 2.3.7 Residential Site Planning Introduction When a building is designed apart from a specific site, an opportunity is lost to match the design to the strengths and weaknesses of the site. To
More informationMarcus Schütte (Product Management) Sebastian Prühl (R&D) Competitive Analysis Sterisart Universal Pump Symbio
Marcus Schütte (Product Management) Sebastian Prühl (R&D) Competitive Analysis Sterisart Universal Pump Symbio 20.05.2016 09.10.2014 Short Overview (1) Feature Sterisart Universal Pump Symbio Merck Millipore
More informationINSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS
INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS Prepared by TenCate Geosynthetics North America 365 South Holland Drive Pendergrass, GA 30567 Tel: (706) 693-2226 Fax:
More informationInstructions for use HYDROMETER Hydrometer GM-200 #071054
Instructions for use HYDROMETER Hydrometer GM-200 #071054 1.Introduction The hydrometer is used to measure the moisture content of concrete, plaster, cement and EPS. It is also possible to analyse of the
More informationNondestructive Testing of Geomembranes
From NDT Technician, Vol. 11, No. 2, pp: 1 5. Copyright 2012 The American Society for Nondestructive Testing, Inc. The American Society for Nondestructive Testing www.asnt.org FOCUS Nondestructive Testing
More informationSECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA
PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low voltage power panelboards 1.02 RELATED SECTIONS 1.03 REFERENCES
More informationWireless Alarm System. User Manual
Wireless Alarm System User Manual 1. Configuration List Wireless Alarm Receiver Solar& Wireless Photoelectric Beam Sensor English Manual 1 piece (includes 1 set installation accessories) 1 pairs (includes
More informationDevelopment Brief Ursuline Convent, Blackrock, Cork
Development Brief Ursuline Convent, Blackrock, Cork Comhairle Cathrach Chorcaí Cork City Council 2002 URSULINE CONVENT DEVELOPMENT BRIEF 1 INTRODUCTION AND MAIN OBJECTIVES... 3 1.1 The convent estate is
More information6 th Pipeline Technology Conference 2011
6 th Pipeline Technology Conference 2011 Pipeline Leak Detection and Theft Detection Using Rarefaction Waves Authors: Dr Alex Souza de Joode, VP International Operations; ATMOS International, UK. Andrew
More informationCreate Streets We can help you make better places
Create Streets We can help you make better places contact@createstreets.com www.createstreets.com Green wedges - are there alternatives to greenbelts? Mingfei Ma asks if there is a half-way house between
More informationJetstream Series HPLC - PELTIER COLUMN-THERMOSTATS 1. GENERALITIES
Generalities HPLC - PELTIER COLUMN-THERMOSTATS GENERALITIES This manual has been updated to the actual standard. It now covers all the features of the actual Jetstream series models. All rights concerning
More informationLocal pilot fact sheet: Via Rizzoli
Local pilot fact sheet: Via Rizzoli Project partner organisation name: Comune di Milano Name of contact person: Marco Parolin E-Mail of contact person: marco.parolin@comune.milano.it, marco.parolin@tiscali.it
More informationBEVERIDGE ASSOCIATES PARTNERSHIP LIMITED CAPABILITY STATEMENT CATERING AND RETAIL
BEVERIDGE ASSOCIATES PARTNERSHIP LIMITED CAPABILITY STATEMENT CATERING AND RETAIL 1.0 PRACTICE DETAILS 1.01 Name: Beveridge Associates Partnership Limited 1.02 Address: Regency House Station Road Harold
More informationSERVICE MANUAL. Ecoboiler Model range: T20 ( ) T30 ( )
SERVICE MANUAL Ecoboiler Model range: T20 (1000662) T30 (1000663) Marco Beverage Systems Ltd. 63d Heather Road, Sandyford Industrial Estate, Dublin 18, Republic of Ireland Ireland Tel: (01) 295 2674 Ireland
More information1 2 3 Licence No:
TRICS 2007(a) 06/05/07 Page 1 of 6 List of TRICS Research Publications TRICS Report 89/1 Traffic Generation Study of Offices & High Tech Sites London Borough of Hillingdon The report contains detailed
More informationOptical Techniques for Industrial Inspection
Optical Techniques for Industrial Inspection P. Cielo National Research Council of Canada Industrial Materials Research Institute Boucherville, Quebec, Canada ACADEMIC PRESS, INC. Harcourt Brace Jovanovich,
More informationLocal Growth Planning in North Central Green Line Communities
2018 April 30 Page 1 of 6 EXECUTIVE SUMMARY This report outlines a high-level scope for local growth planning for north central Green Line communities. The catalyst for this review is the significant investments
More informationTECHNICAL. Design Guide. Retaining walls made easy with this beautiful solution EARTH RETAINING WALLS
TECHNICAL Design Guide EARTH RETAINING WALLS Retaining walls made easy with this beautiful solution qro.com.au sales@qsolutionsco.com.au (07) 3881 0208 TDG-ERW-01 Sept 2017 1 RETAINING WALL SELECTION PROCEDURE
More informationCOMMISSIONING AND START-UP TESTS OF ALPHA-CONTAMINATED SOLID WASTE SORTING, CEMENTING, AND INTERIM STORAGE FACILITIES AT BELGOPROCESS (BELGIUM)
COMMISSIONING AND START-UP TESTS OF ALPHA-CONTAMINATED SOLID WASTE SORTING, CEMENTING, AND INTERIM STORAGE FACILITIES AT BELGOPROCESS (BELGIUM) R.C. GLIBERT G. NUYT G. LAMOTTE BELGONUCLEAIRE, 4 avenue
More informationThreats to the environment from high-efficiency condensing devices
Threats to the environment from high-efficiency condensing devices Authors: Sridhar Deivasigamani, Nithyanandhi Duraisamy www.intellihot.com 2900 W. Main Street, Galesburg IL 61401 309.473.8040 main 309.296.8984
More informationProduct Specifications. Vertical Floor Consoles By First Co.
NOW WITH 18 GAUGE CABINET AND FACTORY INSTALLED SERVICE SWITCH Product Specifications VFB Series VSB Series VCB Series Vertical Console Fan Coils 300-00 CFM Vertical Floor Consoles By First Co. VFB Series
More informationA new fully digital system for RT inspection of metal tube to tube sheet joints of heat exchangers
17th World Conference on Nondestructive Testing, 25-28 Oct 2008, Shanghai, China A new fully digital system for RT inspection of metal tube to tube sheet joints of heat exchangers Uwe ZSCHERPEL 1, Oleksandr
More informationWhite Paper. Reducing Arc Flash Risks with Electrical Maintenance. Safety Devices. Abstract: iriss.com
Reducing Arc Flash Risks with Electrical Maintenance By Martin Robinson, CMRP Level III Thermographer President, IRISS Inc. Abstract: Electrical accidents, such as arc flashes, happen daily; however, there
More informationThe Optical Time Domain Reflectometry and the Fusion Splicer Laboratory exercise
The Optical Time Domain Reflectometry and the Fusion Splicer Laboratory exercise 1 The purpose of the exercise...2 2 Background...2 2.1 Introduction to scattering and attenuation...2 2.2 Introduction to
More informationProgress in modern catering also owes a great deal to the Zanussi Professional System. Professionals in this sector identify the system as the
static preparation The System Progress in modern catering also owes a great deal to the Zanussi Professional System. Professionals in this sector identify the system as the driving force behind development
More informationSouth Seas Inspection (S) Pte Ltd
PRESENTATION October 2009 SSI, your essential business partner for comprehensive & professional Derrick Building, Inspection, Maintenance, Repair & Operational Services to the Oil & Gas, Marine & General
More informationApplicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code
Master Development Plan Application Community Development Department City of Redmond 411 SW 9 th Street Redmond, Oregon 97756 541-923-7721 541-548-0706 FAX Master Development Plan Fee $38,862.52 File Number
More informationMonitoring of Penetration System Performance due to ISO by using Test Panels due to ISO
19 th World Conference on Non-Destructive Testing 2016 Monitoring of Penetration System Performance due to ISO 3452-1 by using Test Panels due to ISO 3452-3 Andreas KINZEL 1, Wolfgang KÖNIG 1, Heide KÜHN
More informationVision Based Wheel Condition Monitoring
Vision Based Wheel Condition Monitoring Kambiz Nayebi Beena Vision Systems, Inc. 1 Beena Vision Systems Inc. YOUR LOGO Condition Based Maintenance Benefits for the Industry High Availability of Rolling
More informationthe perfect space guide to workspace fitouts and refurbishments
the perfect space guide to workspace fitouts and refurbishments Outline Design is a leading commercial interior design firm, specialising in designs and fitouts for workspaces within the corporate, hospitality,
More informationHHS-WWH HOPPER HEATING SYSTEM WRAP-WOUND HEATER INSTALLATION INSTRUCTIONS DESCRIPTION. HHS-WWH PRODUCT SPECIfICATIONS
HHS-WWH HOPPER HEATING SYSTEM WRAP-WOUND HEATER INSTALLATION INSTRUCTIONS HHS-WWH PRODUCT SPECIfICATIONS Power density Standard wattages up to 4650 W/m² (3.0 W/in²) Voltage range (nominal) 120 to 600 VAC
More informationState-of-the-art Developments to Save Energy in Coating Drying
State-of-the-art Developments to Save Energy in Coating Drying Executive Summary Coating drying is expensive. A great deal of energy is needed to effectively evaporate sufficient water to dry the coating.
More informationSECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004
SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004 young heart easy living 1 Preface Industrial areas are a very important component of the economic well-being
More informationAir Entrainment Meter Type A CN025. Impact Test Equipment Ltd & User Guide. User Guide
Air Entrainment Meter Type A CN025 Impact Test Equipment Ltd www.impact-test.co.uk & www.impact-test.com User Guide User Guide Impact Test Equipment Ltd. Building 21 Stevenston Ind. Est. Stevenston Ayrshire
More informationMotion Detector. Installation and Usage Guide. Need help? Visit protectamerica.com/chat
Motion Detector Installation and Usage Guide The Motion Detector guards against intruders moving through your home, providing an additional layer of protection that is especially suited to guarding wide
More informationPLANNED UNIT DEVELOPMENT Date: April 5, 2018
PLANNED UNIT DEVELOPMENT Date: April 5, 2018 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Robert Myers Robert Myers 2955 and 2989 Dauphin Street (Southeast corner of Dauphin Street and Sage Avenue) CITY
More informationUtilizing Finite Element Analysis (FEA) for Flexible Heater Designs
Utilizing Finite Element Analysis (FEA) for Flexible Heater Designs Ryan Mohs, Process Engineer, All Flex. Flexible heaters are commonly utilized in many different heating applications. Generally, these
More informationZerio Plus EDA-R6000 Radio Combined Optical Smoke Detector and Sounder Installation Instructions
Zerio Plus EDA-R6000 Radio Combined Optical Smoke Detector and Sounder Installation Instructions EN54-3:2001+A1:2002+A2:2006 EN54-7:2000+A1:2002+A2:2006 EN54-25:2008 0359 Electro Detectors Ltd. Electro
More informationGEOMEMBRANE FIELD INSTALLATION
GEOMEMBRANE FIELD INSTALLATION CONTENTS Introduction Quality Control and Quality Assurance Types of lining systems Basic Lining Design Executive Lining Design Basic Lining Design Specification Executive
More informationDrawer Configuration Installation Guide
Configuration Guide IMPORTNT: Please read before you begin your drawer installation. The pages in this guide show you how to assemble the different drawer layouts available for Klëarvue Cabinetry. Look
More informationPlumber A Guide to Course Content
Plumber A Guide to Course Content Plumbers install, replace and maintain water and sewage systems, and hydronic heating systems in residential, commercial and industrial buildings. They may also be licensed
More informationIMPORTANT. PLEASE NOTE: The infrared beam path MUST be kept clear of obstructions at all times!
USER GUIDE English IMPORTANT PLEASE NOTE: The infrared beam path MUST be kept clear of obstructions at all times! Failure to comply may result in the Detector initiating a Fire or Fault signal. Contents
More informationDO YOU KNOW YOUR SOILS? (Rev. 10/11)
DO YOU KNOW YOUR SOILS? (Rev. 10/11) Circle all the correct answers. 1. What is the layer normally present on the surface of the soil in cropped fields? a. O c. Ap e. B g. R b. A d. E f. C 2. Available
More information1. Build the inner walls
3D-Papercraft Buildings of the World Series France Arc de Triomphe (section ) C D. Japan, Inc. Canon R is a registered trademark of Canon Inc.. Build the base 3. Build the arch Canon 3D-Papercraft Mini-book
More informationUrban Design of Historic districts Based on Action Planning
Urban Design of Historic districts Based on Action Planning College of Urban and Environmental Sciences,Northwest University, Xi'an 710127, China. 974702583@qq.com Abstract:Historical districts are faced
More informationOFFICE FURNITURE Desks & Conference Tables
OFFICE FURNITURE Desks & Conference Tables 01992 709 420 www.gbnofficefurniture.co.uk DESKING Contemporary Design CREATIVE & PRACTICAL DESKING The majority of work-space is still dedicated to independent
More informationFLIR Optical Gas Imaging Camera Helps Improve Environment And Safety At Borealis Stenungsund
FLIR Optical Gas Imaging Camera Helps Improve Environment And Safety At Borealis Stenungsund Many petrochemical plants handle invisible gaseous hydrocarbons. Most of these gases pose some sort of safety
More informationLIMITED LIFETIME WARRANTY
LIMITED LIFETIME WARRANTY To obtain Service, please contact or call Turn of the Century Service Department: 1-800-887-6326, 9 a.m.- 5 p.m. central time. Model No.: # 355-6782 The limited lifetime warranty
More informationGas & Water Monitor Installation Manual
Gas & Water Monitor Installation Manual English Version 1.0, as of 7/12/2016 2013-2016 Smappee NV. All rights reserved. Specifications are subject to change without notice. All product names are trademarks
More informationBlow Molding Machines for PC Water Bottles
Blow Molding Machines for PC Water Bottles KPC Series Blow Molding Machines for PC Water Bottles 1 2 Kautex Maschinenbau provides its customers with globally leading solutions in terms of quality, technology
More informationI] WHAT IS INFRARED? SW C FMW C MW C LW- upto 650 C
I] WHAT IS INFRARED? Infrared (IR) is a part of electromagnetic spectrum and lies just beyond red color of visible light. Infrared is invisible. However it has properties similar to light i.e. it travels
More informationEngineering canopy solutions that are built to last
Engineering canopy solutions that are built to last An inside guide to site-specific calculations www.canopiesuk.co.uk CONTENTS 1 2 3 4 5 Calculating quality - the Canopies UK way. What are site-specific
More informationAutomatic Detection of Defects on Radiant Heaters Based on Infrared Radiation
ECNDT 2006 - Poster 73 Automatic Detection of Defects on Radiant Heaters Based on Infrared Radiation Francisco J. MADRUGA, Daniel A. GONZÁLEZ, Jesús MIRAPEIX, José-Miguel LÓPEZ HIGUERA, Photonics Engineering
More informationCITY OF VANCOUVER ADMINISTRATIVE REPORT
CITY OF VANCOUVER ADMINISTRATIVE REPORT Date: October 20, 2004 Author: David Desrochers Phone No.: 604.873.7893 RTS No.: 4716 CC File No.: 5802 Meeting Date: December 14, 2004 TO: FROM: SUBJECT: Vancouver
More informationMetal Turbine Exhaust Joints An analysis of metal and fabric GTX expansion joints
The expansion joints, for a large Westinghouse turbine, are used between a hot turbine diffuser and cold HRSG inlet; the internal gas temperature is 1100ºF average. The two fabrics have thermal monitors
More informationEN l Senking Batch Transfer Drying Tumbler DT Senking Batch Transfer Drying Tumbler DT High performance with less energy
EN l Senking Batch Transfer Drying Tumbler DT 60 240 Senking Batch Transfer Drying Tumbler DT 60 240 High performance with less energy Single dryer with loading belt. directly side by side. The dryers
More informationIndustrial Fiberglass Specialties, Inc. 521 Kiser Street Dayton, OH Tel: Fax:
06-26-00 Page #1 of 6 This guide provides specific information about the material requirements, design criteria, assembly and testing methods recommended to assure a successful steam condensate return
More informationZerio Plus EDA-D6000 Radio Combined Heat Detector and Sounder Installation Instructions
Zerio Plus EDA-D6000 Radio Combined Heat Detector and Sounder Installation Instructions EN54-3:2001+A1:2002+A2:2006 EN54-5:2000+A1:2002 EN54-25:2008 0359 Electro Detectors Ltd. Electro House Edinburgh
More informationTe c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements
Te c h S p e c 3 Edge Restraints for Interlocking Concrete Pavements Introduction Edge restraints are an essential component of interlocking concrete pavements. Restraints hold the pavers tightly together,
More informationCOMPARING PLASTIC STAKING TECHNOLOGIES
COMPARING PLASTIC STAKING TECHNOLOGIES Jason Dornbos, Extol, Inc., Zeeland, MI Abstract Several thermoplastic staking technologies are available in the manufacturing industry. With many options to choose
More informationAir treatment units 0932EN October 2017 Dehumidifier unit for radiant systems Flush-mounting installation in false ceilings
0932EN October 2017 CHARACTERISTIC DATA Air flow rate [m 3 /h] 200 Pressure available (factory configuration) [Pa] 15 Moisture removed (26 C - 65% R.H. - inlet water 15 C) [l/24h] 24,7 Max. absorbed electric
More informationHIGH PRESSURE DOUBLE CASE PUMPS
HIGH PRESSURE DOUBLE CASE PUMPS Horizontally Split Inner Casing, Multi Stage For Boiler Feed, Process and Other High Pressure Services CS1860EE Models HSB/HDB API 610 HIGH PRESSURE DOUBLE CASE PUMPS Horizontally
More informationRIGID DC LIQUID CHILLER
RIGID DC LIQUID CHILLER Phone: +86-579-8837-9768 Email:info@rigidhvac.com Website: www.rigidchill.com 1 1. WHAT S LIQUID CHILLER? Liquid Chiller cooling refers to cooling by means of the convection or
More informationTHE MANUFACTURER RESERVES THE RIGHT TO ALTER THE SPECIFICATIONS OF THE PRODUCT WITHOUT PRIOR NOTIFICATION
No Touch Thermometer Instant INSTRUCTION MANUAL THE MANUFACTURER RESERVES THE RIGHT TO ALTER THE SPECIFICATIONS OF THE PRODUCT WITHOUT PRIOR NOTIFICATION FEATURES 1. The No Touch Thermometer Instant is
More informationGulfport, Mississippi 21 May 2007
G PLUMBING GENERAL REQUIREMENTS The D-BC shall design the plumbing system to comply with this criteria and the Plumbing Code. Piping shall be shown on the same plan as the fixtures being served. Pipe size
More informationREDUCING AMMONIA REFRIGERANT CHARGE IN SKATING RINK REFRIGERATION SYSTEMS
REDUCING AMMONIA REFRIGERANT CHARGE IN SKATING RINK REFRIGERATION SYSTEMS CLAUDE DUMAS, CITY OF MONTREAL COSTAS LABOS, CITY OF MONTREAL CONSTANTINE PETROPOULOS, PBA 2 VICTOR SANTANGELO, PBA The information
More informationLine Smoke Detector LRMX
Line Smoke Detector LRMX Motorized detector head User-friendly commissioning via automatic selfadjustment Disturbance-protected operation via automatic electromechanical tracking of the detector head during
More informationA new age in HEATING. ROTEX Monopex The natural way to save energy! The complete heating system
R A new age in HEATING R eco Systems - ROTEX EcoHybrid Heating for your home all from one source The complete heating system - Regenerative air-water Heating Pump - Modern burning Technique - Solar power
More informationLeakage detection in hydraulic and pneumatic systems through infrared thermography and CO2 as tracer gas
Leakage detection in hydraulic and pneumatic systems through infrared thermography and CO2 as tracer gas Borja Rodríguez 1, Rosario Fernández 1, Mario Lahera 2, Fernando Lasagni 1 1 Materials & Processes
More informationUrban regeneration vs. Urban sprawl Problems and prospects in the post-socialistic cities Piotr Lorens
Urban regeneration vs. Urban sprawl Problems and prospects in the post-socialistic cities Piotr Lorens Faculty of Architecture Gdansk University of Technology, Poland plorens@pg.gda.pl Presentation outline
More informationGeothermal ORC Systems Using Large Screw Expanders
Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 2014 Geothermal ORC Systems Using Large Screw Expanders Tim R. Biederman cyrq, United States
More informationProducts Solutions Services. Energy Solutions. Food & Beverage industry. Slide 2
Products Solutions Services Food & Beverage industry Slide 2 Why is energy management an important topic? Energy prices influence production costs, End-consumer looks for sustainable products, companies
More informationApollo Intelligent Auto Aligning Beam Detector. User Guide
Apollo Intelligent Auto Aligning Beam Detector User Guide EN 1. General Information 50cm 50cm 8-100m Ensure clear line of sight from Detector to Reflector Mount on solid surfaces (structural wall or girder)
More informationApplication Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES
FLAME AND GAS DETECTION FOR LNG FACILITIES Liquefied natural gas (LNG) is a generic name for liquefied hydrocarbon gas composed primarily of methane. When natural gas is cooled to approximately -260 F,
More informationKINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION
SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to
More informationC. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009.
SECTION 235100 - BREECHINGS, CHIMNEYS, AND STACKS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fabricated breechings. B. Manufactured chimneys for gas fired equipment. C. Manufactured double wall chimneys for