1 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION F6A PLATFORM SUPPLY OF ALARM SHUTDOWN & ANNUNCIATION SYSTEM DULANG SUPPLY WELLHEAD CONTROL PANEL 1989 MSE DULANG MASTER SHUTDOWN PANEL 1989 IJM NIIGATA CONST. SUPPLY OF FILTER SEPARATOR 1990 HYDBAY OIL MALACCA MSN PLATFORM SUPPLY OF SERVICES FOR COMPLETE DESIGN OF A FOUR PILE PLATFORM & TWO TRIPODS 1990 BNDP-J SUPPLY OF WELLHEAD CONTROL PANEL 1990 EPMI JERNEH SUPPLY OF WELLHEAD CONTROL PANEL 1990 EPMI JERNEH SUPPLY OF DCS PANEL 1990 DULANG SUPPLY OF DISTRIBUTION CONTROL PANEL 1990 SUPPLY OF MASONEILAN VALVES & SPARE PARTS 1992 METERING SYSTEM ON ACCEPTANCE OF MASS FLOW COMPUTERS - FP 1763/32/ /92 COMPRIMO MLNG SUPPLY OF ELECTRIC MOTOR OPERATED BUTTERFLY VALVES 1993 SMDS DESIGN, MANUFACTURER, TESTING INSPECTION AND DELIVERY OF ONE METERING SYSTEM 5% ON ACCEPTANCE OF MASS FLOW COMPUTER TEST - FP 1763/32/ /94 MLNG MLNG DUA PLANT GAS METERING STATION 1993/94 MTBE MALAYSIA SDN SUPPLY OF MASONEILAN VALVES & PARTS 1994 SUPPLY OF MASONEILAN VALVES & PARTS 1994 SSE MINOR MECHANICAL EQUIPMENT - PO. M /95 PGS(L) DESIGN,, FABRICATION, DELIVERY, INSTALLATION AND COMMISSIONING NATURAL GAS CUSTODY TRANSFER METERING STATION FOR PETRONAS GAS SUPPLY (L) TENDER NO: 9/3-002/11/ EPMI TAPIS-A & TIONG-A SUPPLY OF CUSTODY TRANSFER METERING SYSTEM FOR GLOBAL ARRANGEMENT 1995 KNDP-A FIRE & GAS DETECTION SYSTEM AND INSTRUMENTED PROTECTION SYSTEM FP EPMI SUPPLY OF MASONEILAN CONTROL VALVES & SPARE PARTS ITEMS 1996 BABCOCK K-W SDN KVDT FIRE FIGHTING, DETECTION & ALARM SYSTEM (MML/IF) FOR MULTI PRODUCT PIPELINE (MPP) 1996 BABCOCK K-W SDN KVDT WHESSO VAREC INTELLIGENT TANK GAUGE (ITG) 1996 Page 1 of 23

2 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION MMC SEGAMAT COMPRESSOR STATION FIRE PROTECTION SERVICES MMC ENG. GAS PRO (SCP). PO/4/5003/056 ROO 1997 KUMPULAN JURUTEKNIK SDN MULTI PRODUCT PIPELINE (MPP) FIRE FIGHTING DETECTION AND ALARM SYSTEM (MPP). PO NO: KNN/JV/S/PO/006 & KNN/JV/S/PO/ EPMI TAPIS-B SUPPLY OF TURBINE CONTROL SYSTEM PO NO: EPMI TAPIS-E SUPPLY OF SHUTDOWN SYSTEM PANEL. PO NO: MLNG FIELD INSTRUMENT/EQUIPMENT CONTRACT 1997/98 SAMARANG SUPPLY OF AUTOMATIC SHUTDOWN, FIRE & GAS AND PROCESS CONTROL SYSTEM (ASD, FGS & PCS) FOR SAMARANG NEW GAS COMPRESSOR & OIL/GAS SEPARATION. PO NO: DPM-DDE RESAK PHASE 1 SUPPLY OF ONSHORE METERING SYSTEM. PO NO: DPM-DRB RESAK SUPPLY OF ONSHORE METERING PACKAGE PO NO: DPM-DRB ANGSI SUPPLY OF DISTRIBUTED CONTROL SYSTEM (DCS) AND INFORMATION MANAGEMENT SYSTEM (IMS). PO NO: R-DPM-DAS TOYO CORPORATION SUPPLY OF FIRE ALARM EQUIPMENT SUPPLY OF FIRE FIGHTING EQUIPMENT. PO NO: BA MTBE MALAYSIA SDN PROPHANE DEHYDROGENATION SUPPLY OF FIRE AND GAS SYSTEM. PO NO: IK811-AA 1999 SHELL REFINING SUPPLY OF MASONEILAN CONTROL VALVE. PO NO: BROOKE DOCKYARD ENGR SUPPLY OF TEMPERATURE TRANSMITTER. PO NO: BROOKE DOCKYARD ENGR SUPPLY OF INSTRUMENT LEVEL TRANSMITTER. PO NO: FOSTER WHEELER/PGB SUPPLY & DELIVER OF FIRE FIGHTING EQUIPMENT FOR PGB/CUF GEBENG KERTIH. PO NO: 9018/ MSE LARUT-A CPP TOPSIDES SUPPLY OF WELLHEAD CONTROL PANEL. PO NO: /BK/ N/EPE 2000 MSE LARUT-A CPP TOPSIDES SUPPLY OF PRESSURE / LEVEL / TEMP. TRANSMITTER MSE SATELLITE SUPPLY OF WELLHEAD CONTROL PANEL. PO NO: /AG/ F/EPE 2000 MSE SATELLITE SUPPLY OF DIFF, PRESSURE, PRESSURE, LEVEL, FLOW TRANSMITTER AND TEMPERATURE TRANSMITTER. PO NO: /31/32/33/34/AD/ E 2000 PETRA RESOURCES ANGSI HTI (SELIGI-A) SUPPLY OF DCS 2001 Page 2 of 23

3 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION EPMI IRONG BARAT-A COMPRESSION SUPPLY OF DISTRIBUTED CONTROL SYSTEM. PO NO: , EPMI PROVISION OF TURNKEY, DESIGN, PROCUREMENT AND INSTALLATION OF TAP PROCESS CONTROL SYSTEM UPGRADE PENANG SHIPBUILDING CORP. SUPPLY OF CO2 ANALYZER 2001 TECHNIP GEOPRODUCTION LUNDIN BR-D WHRP SUPPLY OF WELLHEAD CONTROL PANEL & PNEUMATIC PANEL/FUSIBLE PLUG PANEL MSE SUPPLY OF ROTAMETERS. PO NO: /AG/ F/EPE 2001 ANGSI (PHASE III) DESIGN, MANUFACTURER, ASSEMBLE, TEST AND DELIVERY OF DISTRIBUTED CONTROL SYSTEM (DCS). PO NO: DPM-DAS BROOKE DOCKYARD ENGR BK-C & BR-C PLATFORM SUPPLY OF INSTRUMENT CONTROL PANEL. PO NO: BROOKE DOCKYARD ENGR BK-C & BR-C PLATFORM SUPPLY OF PRESSURE, DP LEVEL & TEMPERATURE TRANSMITTER. PO NO: MSE NORTH LUKUT & PENARA SUPPLY OF WHCP & ICP FOR SMALL FIELD PO NO: /AD/ K/EPE PO NO: /AD/ L/EPE 2002 MSE NORTH LUKUT & PENARA SUPPLY OF PRESSURE TRANSMITTERS 2002 BR-A SUPPLY OF ACTUATED BALL VALVES BROOKE DOCKYARD ENGR SERAI SUPPLY OF MANUAL BALL VALVES PM9 SUPPLY OF FIRE & GAS SYSTEM UPGRADING. SEPT MSE ERHA FPSO TOPSIDE SUPPLY OF KIDDE-FENWALL FM200 GAS FIRE EXTINGUISHING SYSTEM FOR MODULE A,B,E,G,K,M, P & Q SEPT HL (M) WEST NATUNA (PHASE II) SUPPLY OF DISTRIBUTED CONTROL SYSTEM (DELTA V). PO NO: C PO-013/03 (J) SEPT 2003 HL (M) WEST NATUNA (PHASE II) FABRICATION, HOO-UP AND COMMISSIONING OF DUYONG GAS COMPRESSION MODULE (DYG-GCM) AND ASSOCIATED MODIFICATION WORKS. PACKAGE FOR: LEVEL TRANSMITTERS, PRESSURE TRANSMITTERS, TEMPERATURE TRANSMITTER, FLOW TRANSMITTER. PO NO: CO-008-PO-080/03(J) DEC SSE GUNTONG-E TOPSIDE SUPPLY OF DP FLOW TRANSMITTER, PRESSURE TRANSMITTER, TEMP. TRANSMITTER, DP TRANSMITTER (SMART Type) RTD TEMP. ELEMENT & LEVEL TRANSMITTER JULY 2004 RANHILL ENGINEERS & CONST. MELUT BASIN OIL DEV. DESIGN, MANUFACTURER AND SUPPLY OF FOAM SKID PACKAGE SEPT Page 3 of 23

4 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION E8DR-A AND E11-PB PLATFORM DESIGN AND SUPPLY OF DISTRIBUTED CONTROL SYSTEM AND AUDIO VISUAL AID SYSTEM. PO NO: 2048/30/ SEPT RANHILL ENGINEERS MELUT BASIN OIL DEV. SUPPLY OF FIRE & GAS DETECTORS FOR AL-JABALYN CPF AND PALOGUE FPF AT SUDAN. SEPT RANHILL ENGINEERS & CONST. MELUT BASIN OIL DEV. SUPPLY OF SHUTDOWN & FIRE & GAS SYSTEM OCT RANHILL ENGINEERS & CONST. MELUT BASIN OIL DEV. SUPPLY OF FOAM SKID OCT RANHILL ENGINEERS MELUT BASIN OIL DEV. SUPPLY OF SAFETY RELIEF VALVES (PSV) FOR AL- JABALYN CPS AND PALOUGE FPF, OPERATIONS BASE CAMPS & PRODUCED WATER PIPELINE. PO NO: POMS/000245/RII NOV BR-E CO2 REMOVAL SUPPLY OF LOW TEMPERATURE CARBON STEEL BALL VALVE ( PO: TML/PJ/216/F/1696/04) DEC PETRA RESOURCES BSTAB SUPPLY & DELIVERY OF LOCAL CONTROL PANEL DEC BARAM SOUTH DESIGN, MANUFACTURER, ASSEMBLE TEST AND DELIVER OF CONTROL AND SAFETY SYSTEMS. TENDER NO: DPM3/PO04/DBA/001 S.O NO: PO NO: FEB.2005 SSE BR-E TEMP. INSTRUMENT, HART COMMUNICATOR, DP TRANSMITTER, DP LEVEL TRANSMITTER, PRESSURE TRANSMITTER & FLOW TRANSMITTER. MAC 2005 HL (M) BAJT-H DP LEVEL TRANSMITTER, TEMP. TRANSMITTER. C/W RTD THERMOWELL, DP FLOW TRANSMITTER, PRESSURE TRANSMITTER & DP PRESSURE TRANSMITTER. MAC 2005 SUPPLY LEVEL TRANSMITTER APR KAWASAKI HEAVY BAKP-B INTEGRATED COMP. MODULE SUPPLY OF PROCESS MONITORING CONTROL SYSTEM JUNE 2005 SUPPLY OF ROSEMOUNT PARTS JULY 2005 EXPANSION OF DELTA V CONTROL SYSTEM JULY 2005 GLOBAL PROCESS SUPPLY OF DP LEVEL TRANSMITTERS JULY 2005 BARAM SOUTH SUPPLY OF PLAT MONITORING CONTROL SYSTEM TENDER NO: PPM3/P004/DBA/001 AUG HL BARAM SOUTH (BAKP-B) SUPPLY OF BALL VALVE AUG HL BARAM SOUTH (BAKP-B) SUPPLY OF PRESSURE, DP PRESSURE, DP FLOW TRANSMITTERS AND TEMPERATURE. AUG.2005 SUPPLY & DELIVER OF DELTA-V SYSTEM AUG.2005 SUPPLY OF NITROGEN BOTTLE SKID AUG.2005 Page 4 of 23

5 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION TECHNIP FAR EAST KIKEH DRY TREE UNIT (DTU) SUPPLY OF WELLHEAD CONTROL PANEL & HYDRAULIC POWER UNIT. P.O. NO. : 4008G AMD. 0 / 0057 OCT BUNGA TULIP-A SUPPLY OF ICP. P.O. No. P50322 OCT.2005 SUPPLY OF PRESSURE TRANSMITTERS P.O. No NOV SCDR-A Platform SUPPLY OF DISTRIBUTED CONTROL SYSTEM (DCS) AND AUDIO VISUAL AID (AVA). P.O. NO. : TENDER NO. FP 0786/30/ DEC F13E(SC)DR-A platform SUPPLY OF DISTRIBUTED CONTROL SYSTEM (DCS) AND AUDIO VISUAL AID (AVA). P.O. NO. : TENDER NO. FP 0786/30/ DEC F13 Process Module SUPPLY OF DISTRIBUTED CONTROL SYSTEM (DCS) AND AUDIO VISUAL AID (AVA). P.O. NO. : TENDER NO. FP 0786/30/ DEC F13W(SC)DR-A Platform SUPPLY OF DISTRIBUTED CONTROL SYSTEM (DCS) AND AUDIO VISUAL AID (AVA). P.O. NO. : TENDER NO. FP 0786/30/ DEC ST. JOSEPH SUPPLY OF DCS/IPS SYSTEM JAN BROOKE DOCKYARD ENGR SFJT-E SUPPLY OF PRESSURE AND DIFF. PRESSURE TRANSMITTER FEB SUPPLY OF DIFFERENTIAL PRESSURE TRANSMITTER MAR.2006 SUPPLY OF DCS MODIFICATION WORK MAR.2006 BROOKE DOCKYARD ENGR SUPPLY OF TRANSMITTER & THERMOWELL MAR.2006 SUPPLY OF REMOTE TERMINAL UNIT APR SUPPLY OF DEW POINT ANALYZER APR SUPPLY OF CO2 ANALYZER APR BG EXPLORATION AND PRODUCTION INDIA NRPOD TAPTI SUPPLY OF WELLHEAD CONTROL PANEL (PKG NO PC-PR-702) MAY 2006 PETROTECH KNOWLEDGE SUPPLY OF DIFFERENTIAL PRESSURE TRANSMITTER JUNE 2006 SUPPLY OF TRANSMITTER JULY 2006 BK-C ANNEX SUPPLY OF WELLHEAD CONTROL PANEL P.O. No JULY 2006 UPGRADING FGS SYSTEM AT LGAST & WORKSCOPING OF SANCOP JULY 2006 TRACTOR MALAYSIA SUPPLY & DELIVERY OF FIRE & GAS DEVICES JULY 2006 Page 5 of 23

6 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION TRACTOR MALAYSIA SUPPLY & DELIVERY OF GAS DETECTOR JULY 2006 BROOKE DOCKYARD ENGR SFJT-E EXISTING INST. SYSTEMS MODIFICATION DCS. AUG SUPPLY OF RS3 FOUNDATION SUPPORT AUG SUPPLY OF PRESSURE TRANSMITTER AUG TUKAU PROVISION OF ENGR. SUPPLY, INSTALL, TEST & COMMISSIONING OR TMR / PLC FOR AUTOMATIC SHUTDOWN SYSTEM & MASTER FIRE ALARM PANEL AT TUKAU FIELD FOR PETRONAS. - LETTER OF AWARD DD 22/8/06 P.O. S05/J/182 AUG SUPPLY OF ROSEMOUNT TRANSMITTERS SEPT 2006 SUPPLY OF RACK 8-CHANNEL SEPT.2006, MIRI BAYAN D35 AND SCADA FISHER ROC AT D18MP- A PROVISION OF DISTRIBUTED CONTROL SYSTEM (DCS) UPGRADE AT BAYAN D35 AND SCADA FISHER ROC AT D18MP-A FOR PETRONAS CARIGALI, SARAWAK OPERATION (-SKO) ON A ONCE-OFF BASIS. P.O. NO: S06/J/167 OCT SUPPLY OF CARD ROSEMOUNT NOV E11DP-A SUPPLY OF WELLHEAD CONTROL PANEL. P.O. NO NOV INTRALINE TAPIS-F GAS FIELD SUPPLY OF WELLHEAD CONTROL PANEL NOV SUPPLY OF ROTAMETER NOV SUPPLY OF PRESSURE TRANSMITTER NOV SUMANDAK PHASE 2 SUPPLY OF TWO (2) UNITS OF PLANT MONITORING CONTROL SYSTEM. CONTRACT NO. : DPM3/PO06/DSK/015 NOV MURPHY SARAWAK OIL SUPPLY OF DP TRANSMITTERS DEC TECHNIP DUNG QUAT REFINERY (DQR) - VIETNAM SUPPLY OF FLAME DETECTOR DEC SUPPLY OF PRESSURE & LEVEL TRANSMITTERS DEC SUMANDAK SUPPLY OF SEAWATER LIFT PUMPS P.O. NO SUPPLY OF DELTA-V DCS I/O COMPONENTS JAN.2007 BKC ANNEX NEW FLOWLINE SUPPLY OF WELLHEAD CONTROL MODULE P.O. NO. P70018 JAN Page 6 of 23

7 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION MFAP AT TUKAU FIELD PROVISION OF, SUPPLY INSTALL, TEST AND COMMISSIONING OF TRIPLE MODULAR REDUNDANCY PROGRAMMABLE LOGIC CONTROLLER (TMR PLC) FOR AUTOMATIC SHUTDOWN SYSTEM AND MASTER FIRE ALARM PANEL. P.O. NO: JAN JGC SUPPLY OF FLAME DETECTOR. PO NO: PO JAN SUPPLY AND PROCESS CONTROL SYSTEM P.O. NO FEB SUPPLY OF PRESSURE TRANSMITTERS. P.O MAR SUPPLY OF COMBUSTIBLE GAS. PO NO MAC TO PROVIDE SYSTEM ENGINEER (DCS / IPS). P.O. NO MAC SUPPLY OF COMBUSTIBLE GAS P.O. NO APR SHELL REFINING SUPPLY OF DELTA-V DCS MAY 2007 SUPPLY OF DIFFERENCE TRANSMITTER. P.O. NO MAY 2007 PGB SUPPLY OF TMR SYSTEM. P.O MAY 2007 SERVICE ORDER FOR PMCS P.O JUNE 2007 SUPPLY OF RTU SYSTEM. P.O. NO JUNE 2007 PGB CONTRACT SERVICE FOR TMR AUGUST. P.O. NO JULY 2007 SUPPLY OF TRANSMITTERS. P.O. NO JULY 2007 SUPPLY OF ROSEMOUNT TRANSMITTERS. P.O. NO AUG PROVISION OF VENDOR SITE VISIT DUYONG DELTA-V UPGRADING. P.O. NO. P6/P5/FO14/2007/20 AUG SUPPLY OF RTU / DCS INTEGRATION. P.O. NO AUG DELIVERY OF DESIGNATED LABUAN SUPPLY BASE BUYER OF INSPECTION AND TESTING WHCP AND ALL OTHER ACCESSORIES AND COMM-SPARES. PO..NO AUG APPROVAL AND RECEIPT OF BUYER OF ALL FINAL DRAWINGS / DOC. PO NO AUG (EPCC) J4 DEV. SUPPLY OF WELLHEAD CONTROL PANEL (WHCP). P.O. NO. C07009-IN036-07NF AUG DELIVERY PMCS. P.O. NO. C07009-IN071-07NF AUG TUKAU-A REPLACEMENT OF EXISTING INSTR. ELECT CABLE FOR TMR PLC. AUG Page 7 of 23

8 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION SUPPLY OF DIFF. PRESSURE TRANSMITTER. P.O SEPT SUPPLY OF TRANSMITTER P.O. NO. CL/BOA/MT/ET/L01 SEPT SUPPLY OF ANNUBAR FLOWMETER P.O. NO. CL/BOA/MT/ANNUBAR/L01 SEPT BOKOR PHASE 2 RE SUPPLY OF WELLHEAD CONTROL PANEL (WHCP) TENDER NO. CHO/PO/2007/DBK/258 OCT BK-C & BR-C PLATFORM PROVISION OF DESIGN, FABRICATE, INSTALL, TESTING & COMMISSIONING OF NEW HYDRAULIC BOOSTER PUMP PANEL (HBPP). P.O. NO NOV EXACT CONTROL E-11DP-A SUPPLY OF WELLHEAD CONTROL PANEL (WHCP) P.O. EA/006/PRO/BW2, EA/007/PRO/BW2, EA/008/PRO/BW2 DEC PGB SUPPLY OF LEVEL, PRESSURE, DIFF PRESS SEGAMAT & KUANTAN TRANSMITTER, LIMIT SWITCH AND GAS DETECTOR. COMPRESSOR STATION LETTER OF AWARD: PGB/TOD/49/2007/0066 DEC SUPPLY OF PRESSURE TRANSMITTER P.O. NO. C07009-IN306-07NF DEC DULANG-B PLATFORM SUPPLY OF CENTRIFUGAL PUMP CARTRIDGE ASSEMBLY FOR WATER INJECTION PUMP. RELEASE ORDER # SUPPLY OF CONTROL MODULE, OIL PRODUCTION WELLHEAD (WHCP) P.O. NO JAN MURPHY SARAWAK OIL SK309 / SK-311 SUPPLY OF WELLHEAD CONTROL PANEL JAN SABAH SUPPLY OF LGAST WIRELESS TRANS. INSTALLATION P.O. NO JAN SUPPLY OF GAS CONTROL CARD P.O. NO JAN SUPPLY DCS INTEGRATION & RTU P.O. NO JAN SUPPLY OF LEVEL TRANSMITTER P.O. NO JAN SUPPLY OF PRESSURE TRANSMITTER P.O. NO FEB ANDR-A PLATFORM SUPPLY OF ADDITIONAL HARDWARE FOR PMCS / SIS / FGS. RO NO MAR SUPPLY OF DIFFERENTIAL PRESSURE TRANSMITTER. P.O. NO MAR MURPHY SARAWAK OIL SK309 / SK-311 SUPPLY OF WHCP FOR GOPA, GOPB, SEPA & MEPA PLATFORMS. P.O. NO. : POSO MAR PC4 GAS FIELD SUPPLY OF WELLHEAD CONTROL PANEL. P.O. NO APR PC4 GAS FIELD TANGGA BARAT CLUSTER SUPPLY OF PROCESS MONITORING & CONTROL SYSTEM (PMCS) P.O. NO SUPPLY OF 3 UNITS OF WHCP (TBDR-A, LHDP-A & MLDP- A) LA NO. : CHO/PO/2007/DPG/267 APR APR Page 8 of 23

9 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION SUPPLY OF TEMPERATURE. P.O. NO. : APR SUPPLY OF TEMPERATURE P.O. NO. : APR SUPPLY OF GAGE PRESSURE TRANSMITTER P.O. NO. : SUPPLY OF WELLHEAD CONTROL PANEL P.O. NO. : SUPPLY OF WHCP RE-BUILT CONTROL MODULE. P.O NO. : APR APR MAY 2008 SUPPLY OF DIFFERENTIAL PRESSURE P.O. NO. : MAY 2008 SUMANDAK SUPPLY OF (2) UNIT FOR PLANT MONITORING & PMCS. P.O. NO MAY 2008 TANGGA BARAT FOR LHDP-A PLATFORM SUPPLY OF RELIEF VALVE P.O. NO.: JULY 2008 TANGGA BARAT FOR MLDP-A PLATFORM SUPPLY OF RELIEF VALVE P.O. NO.: JULY 2008 SUPPLY OF CARD REGULATOR P.O.. NO JULY 2008 MODIFICATION FOR ANSI-TCOT PIPELINE P.O AUG BK-C ANNEX SUPPLY AND FABRICATE BKC ANNEX WELLHEAD CONTROL PANEL EXTENSION. P.O. NO. W AUG SUPPLY OF CARD REGULATOR. P.O. NO AUG SHELL SUPPLY OF TR MV MASS FLOW 3095W P.O. NO AUG EXACT AUTOMATION SUPPLY OF MULTIVARIABLE TRANSMITTER. P.O. NO. EA 0422 AUG SFJT-B SUPPLY OF SCADA - PLATFORM-A P.O. NO SEPT SUPPLY OF WELLHEAD CONTROL PANEL FOR KUMANG CLUSTER KUJT-A & F9JT-A DEVLOPMENT (PHASE 1) LOI REF NO. CL/KUMANG/NAM,MT,AKH/CP/086-LOI P.O. NO. PR & SEPT MURPHY SARAWAK OIL SUPPLY OF ROSEMOUNT TRANSMITTER P.O. NO. POS OCT SABAB SHELL SUPPLY OF ELECTRONIC TEMPERATURE TRANSMITTER P.O. NO NOV KAKG-A, KUJT-A & F9JT- A (KINABALU) SUPPLY OF ROTAMETER P.O. NO & NOV KAKG-A, KUJT-A & F9JT- A (KINABALU) SUPPLY OF LEVEL TRANSMITTER P.O. NO , & NOV KUJT-A & F9JT-A (KINABALU) SUPPLY OF SATELLITE PLATFORM SMART WIRELESS NETWORK. P.O. NO NOV KUMANG CLUSTER SUPPLY OF OF FUSIBLE PLUG LOOP PANEL FOR KUJT- DEVLOPMENT (PHASE 1) A, F9JT-A & KAKG-A NOV Page 9 of 23

10 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION SUPPLY OF GAGE PRESSURE TRANSMITTER P.O. NO NOV SUPPLY OF TEMPERATURE TRANSMITTER P.O. NO /DM/ P/EPE DEC GUMUSUT-KAKAP SUPPLY OF SEAWATER SOURCE PUMPS LOA (RMC PO# 1388) 2008 KUMANG SUPPLY OF SEA WATER LIFT PUMP P.O. NO KUMANG SUPPLY OF COOLING MEDIUM CIRCULATION PUMP P.O. NO SUPPLY OF DIFF. PRESSURE TRANSMITTER P.O. NO /CS/ JAN SUPPLY OF DP TRANSMITTER P.O. NO JAN KUMANG CLUSTER SUPPLY OF PMCS/SIS/FGSA/FGD DEVLOPMENT (PHASE 1) P.O. NO JAN PCPP OPERATING CO. SDN.. DI CLUSTER DEV. FOR D30 & DANA SUPPLY OF WELLHEAD CONTROL PANELS FEB' 2009 BWPPE IRONG BARAT SUPPLY OF DP TRANSMITTER P.O /VP SUPPLY OF CONTROL SYSTEM OPC CONNECTING UPGRADE. P.O. NO. FCD317/MNA FEB FEB SUPPLY OF AUTOCON MODULES FEB SUPPLY OF 2 S EBARA SPARES R0 OPN 0001 FEB SUPPLY OF CONSUMABLES EBARA SPARES RO OPN 0002 FEB VARIATION ORDER P.O. NO. FCC 337 FEB ST JOSEPH DESIGN & SUPPLY OF ONE UNIT DCS LOA NO FEB SODR-A & F13E(SC) DR- A SUPPLY OF DCS/AVA CHANGE ORDER NO. 4,5,6 TRDP P.O MAC MAC BOKOR-A, BARONIA-B, BARAMA & BARAM-B PLATFORM PROVISION FOR DESIGN, ENGR, SUPPLY, INSTALL, TEST AND COMM. OF SAFETY INSTRUMENTED SYSTEM AND FIRE & GAS SYSTEM. P.O. NO. S08/M6/126 MAY ANGSI PLATFORM SUPPLY OF DELTA-V (REP CARD MAY SHELL SARAWAK SUPPLY OF EBARA O-RING P.O. NO MAY SHELL SARAWAK MOB / DEMOB P.O. NO MAY TANGGA BARAT CLUSTER SUPPLY & DELIVERY OF WATER INCONDENSATE, HYDROCARBON ANALYZER & CO2 ANALYZER PACKAGES P.O. NO: TBA MAY GEMUSUT SUPPLY TRANSMITTER & ANALYZER P.O. NO. GKH-BWSB-VA-L-139 MAY 2009 Page 10 of 23

11 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION SUPPLY OF PRESSURE TRANSMITTER P.O. NO. L-PE-2039 / MAY PC VIETNAM LTD TOPAZ SUPPLY OF INSTRUMENTATION SYSTEM, FIELD TRANSMITTER AND FIRE & GAS DEVICES TENDER: OCV/TPDP-A/2008/412A JUNE, 2009 LOCATION E11 REFURBISH & UPGRADE OF DGS P.O. NO (EBARA PARTS) JUNE 2009 REFURBISHMENT & UPGRADE (EBARA) P.O. NO JUNE 2009 SUPPLY OF PROCESS MONITORING CONTROL P.O. NO JUNE 2009 GEMUSUT KAKAP SUPPLY OF HULL'S & ANALYZERS /PSD/GK/IH03/RFQ/049 /PSD/GK/IHO4/RFQ/050 /PSD/GK/IH08A/RFQ/051 /PSD/GK/IH08B/RFQ/052 /PSD/GK/IH08C/RFQ/053 /PSD/GK/IH15/RFQ/054 JUNE 2009 KINABALU (KNPG-B) DELIVERY OF PMCS & CBMS /PSD/KNPG-B/0002 JULY 2009 MURPHY SARAWAK OIL HIGH PRESSURE GAS LIGT COMPRESSOR P.O.SO JULY 2009 TECHNIP SUPPLY OF FLAME DETECTION SYSTEM P.O. NO. 8474LDQR PO JULY 2009 SUPPLY OF RING CARBON (EBARA PARTS) P.O. NO JULY 2009 SUPPLY OF COUPLING, HUB (EBARA PARTS) P.O. NO JULY 2009 SUPPLY OF EBARA PARTS P.O. NO JULY 2009 PC VIETNAM LTD TOPAZ LOA - SUPPLY OF TELECOMMUNICATION SYSTEM BLOCK 01 & 02 OFFSHORE VIETNAM PCV/TPDP-A/2008/411B JULY TANGGA BARAT CLUSTER SUPPLY OF ROTAMETER P.O. NO. C08005-IN ESZ JULY 2009 COMMISSIONING OF 2 S OPERATIONAL SPARE PARTS FOR CO2 ANALYZER P.O. NO /DQ/ R JULY WEST BELUMUT WELLHED PLATFORM PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF WELLHEAD CONTROL PANEL LETTER OF INTENT NO. (LOI) : C09010-IN AN AUG PETRONAS PENAPISAN MELAKA SUPPLY OF BEARING/COUPLING/SEAL RING P.O. NO AUG MURPHY SARAWAK OIL RENTAL OF ONE UNIT GASLIFT COMPRESSOR FOR WPPA POSO AUG MURPHY SARAWAK OIL RENTAUL OF HIGH PRESSURE GAS LIFT COMPRESSOR FOR WPPA POSO AUG Page 11 of 23

12 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION. CPDR-A TOPSIDE TO SUPPLY & DELIVER THE WELLHEAD CONTROL PANEL AND PHU ( 1 PAC) P.O. NO. C08015-IN ESZ AUG BARONIA-B UPGRADE SIS / FGS P.O. NO SEPT SUMANDAK SERVICE PMCS P.O SEPT TO SUPPLY OF O-RING EBARA PARTS PO. NO SEPT PROVISION OF MANPOWER, TO CARRY OUT WHCP P.O. NO SEPT DUYONG REVISIT SUPPLY OF WELLHEAD CONTROL PANEL P.O. NO SEPT SUPPLY OF GAS COMPRESSOR EBARA PARTS PO. NO OCT FIELD INSTRUMENT / PMCS P.O. NO OCT KINABALU SUPPLY & SERVICES OF 3 UNITS WHCP SUBSEA INSTALLATION. P.O NOV KINABALU SUPPLY & AUTOCON MODULES 3 UNITS OF WHCP MODULES. P.O NOV SUPPLY OF AUTOCON MODULES FOR 3 UNITS OF WHCP MODULES. P.O. NO NOV PACKAGE-EQUIPMENT/COMMISSIONING/1ST. OPERATION SPARE. P.O. NO: JAN 2010 BROOKE DOCKYARDS DISSOLVED OXYGEN ANALYSER C/W ACCESSORIES P.O. NO: FEB J4 TO DESIGN SUPPLY & UPGRADE EXISTING WHCP P.O. NO: FEB 2010 SUPPLY OF CALIBRATION GAS P.O MAR SHELL SUPPLY OF AUTOCON MODULE P.O MAR TO PROCESS CONTROL SYSTEM P.O. NO APR KINABALU NAG DEV. (KNPG-B) SUBMERSIBLE PUMPS LOI NO.:.PSO.KNPG-B/LOI/0022/ Z APR SUPPLY OF TEMPERATURE SWITCH / RING BACK-UP P.O. NO APR SUPPLY OF ERISON / SAND MONITORING SYSTEM P.O. NO. C08006-IN ESZ APR F28DR-A TOPSIDES SUPPLY OF WELLHEAD CONTROL PANEL & HPU P.O. CO8013-IN ESZ APR Page 12 of 23

13 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION SAMARANG RE (PHASE 1) SUPPLY AND SERVICES OF WELLHEAD CONTROL PANEL P.O. NO: CHO/2009/DSG/649 MAY 2010 ADDITIONAL WORK FOR AFC CHANGES FOR PMCS P.O. NO: MAY 2010 TBDR-A COMMISSIONING AND ASSISTANCE WCP P.O. NO MAY 2010 SUPPLY OF EBARA SPARE PARTS P.O. NO: MAY SUPPLY OF POEN PATH GAS DETECTOR P.O. NO:C0813-IN ESZ JUNE 2010 ERB WEST. PROVISION OF WELLHEAD CONTROL PANEL (WHCP) P.O. NO AUG PM329 EAST PIATU DEV. PROVISION PROCUREMENT & CONSTRUCTION FOR WHCP P.O. NO. : LOI-C1001-WHP-IN AN AUG SUPPLY OF WELLHEAD CONTROL PANEL P.O. NO AUG SUMANDAK PHASE 2 CHANGE ORDER NO. 1 FOR SEAWATER LIFT PUMP REPLACEMENT PARTS FOR CENTRIFUGAL PUMP (SUPPLY OF SUBMERSIBLE CENTRIFUGAL PUMP) P.O. NO AUG SUPPLY OF WELLHEAD CONTROL PANEL P.O. NO.: AUG SUPPLY OF ADAPTER UNITED TECHS P.O. NO SEPT SUPPLY OF EBARA SPARE PARTS P.O. NO.: OCT. 2O10 SUPPLY & SERVICE OF 1 UNIT OF WELLHEAD P.O. NO.: OCT PP (MELAKA) SB SUPPLY AND DELIVER OF RING BACK-UP P.O. NO.: OCT F13 FBE (SC) DR-A, DCS/AVA PLATFORM EAST DEV. P.O. NO.: NOV KNJT SERVICE REQUISITION FOR SUPPLYING VENDOR ASSISTANCE. P.O. NO.: NOV SDE KAKG-A, KUMANG CLUSTER DE. VENDOR ASSISTANCE PACKAGE: PMCS/SIS/FGSA/FGD P.O. NO. L-PE-2038 NOV B11 PRODUCTION PLATFORM A TWISTER TUBE REPAIR P.O. NO NOV NEW FIELD PENINSULA EAST BELUMUT SUPPLY OF 5 UNITS WELLHEAD CONTROL MODULE P.O. NO: NFX-PM323-F&C PO FEB DULANG RE PHASE 1 INFILL DRILLING PROVISION OF SUPPLY AND INSTALL OF WELLHEAD CONTROL PANEL. LETTER OF AWARD: CONTRACT NO: CHO/2011/DMC/040) MAR SFJT-E PLATFORM SUPPLY OF WELLHEAD CONTROL MODULE P.O. NO: MAY 2011 GOP-A & GOP-B PLATFORM SUPPLY OF WELLHEAD CONTROL MODULE P.O. NO: MAY SABAH SEMARANG (SMDP-E) PLATFORM PROVISION OF SUPPLY AND INSTALL OF WELLHEAD CONTROL PANEL. P.O. NO: JUNE 2011 Page 13 of 23

14 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION TELOK A & B TAPIS-B EOR AND REJUVENATION TAPIS-A FOR AND REJUVENATION TAPIS-C FOR AND REJUVENATION PROVISION OF SUPPLY WHCP + HPU P.O. NO SUPPLY OF WELLHEAD CONTROL PANELS. P.O. NO: JUNE 2011 JULY 2011 SUPPLY OF WELLHEAD CONTROL PANELS AUG SUPPLY OF WELLHEAD CONTROL PANEL P.O. NO AUG CENDOR PHASE 2 SUPPLY OF WELLHEAD CONTROL PANEL & FPLP LOA (PO NO: C IN MMS) AUG TAPIS-C FOR AND REJUVENATION SUPPLY OF PERMANENT REMOTE (WHCP) P.O. NO: AUG TKDP-A SUPPLY OF WELLHEAD CONTROL PANEL P.O. NO: SEPT MURPHY SARAWAK OIL KIKEH NEW FLOW SUPPLY OF WELLHEAD CONTROL PANEL CONTRACT NO: MURPHY/ZS1192 OCT PMO BEKOK-A & BEKOK-B PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT BEKOK PLATFORM CONTRACT NO.: P9A/V0/I560 P.O. NO: DEC PMO DUYONG A,B,C PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT DUYONG PLATFORM CONTRACT NO.: P9A/V0/I560 P.O. NO: DEC RANHILL WORLEY BINTANG & BINTANG-B INFILL DRILLING SUPPLY OF WELLHEAD CONTROL PANEL P.O. NO: (0)-PP-POD-7013 DEC.2011 KPOC SUPPLY OF WHCP FOR KBB TOPSIDES LOA CONTRACT NO. : CL/SDE/KPOC/TP/050/P-19 JAN TUKAU-MS2 & MS3 SUPPLY, PROCUREMENT, CONSTRUCTIONS & COMMISSIONING. P/O. NO: MAC CENDOR PHASE 2 ADDITIONAL SCOPE FOR WHCP P/O NO: C IN PB APR LAILA DESIGN AND SUPPLY OF WELLHEAD CONTROL PANEL & HYDRAULIC POWER FOR LAILA. TENDER NO: MY P.O. NO: APR D12 DESIGN AND SUPPLY OF WELLHEAD CONTROL PANEL & HYDRAULIC POWER. FOR D12. TENDER NO: MY P.O. NO: APR F14 DESIGN AND SUPPLY OF WELLHEAD CONTROL PANEL & HYDRAULIC POWER. FOR F14 TENDER NO: MY P.O. NO: APR NEWFIELD PENINSULAR MALAYSIA INC. PM329 EAST PIATU DEV. WELL CONTROL MODULE & MODIFICATION WORKS P.O. NO. NFX-PM329-F&C-PO SO1 MAY 2012 Page 14 of 23

15 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION -SBO SMDP-A SABAH OPERATIONS PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT SMDP-A PLATFORM CONTRACT NO. SBO/2012/SIE/009) PO NO: June.2012 PETRONAS CARIGALI SUPPLY FLARE IGNITION UPGRADE P.O. NO: AUG TAPIS-E PLATFORM REPAIR, REFURBISHMENT & REPLACEMENT OF WELL CONTROL MODULE SEPT SUPPLY OF REMOTE CONTROL P.O. NO: SEPT MALAYSIA MARINE & HEAVY ENGR. () DAMAR-A PLATFORM SUPPLY OF WELLHEAD CONTROL PANEL FOR DAMAR-A PLATFORM (TOPSIDE) TENDER NO: /SCM/DMR-A/0005 PO NO: 312M379H Sept Petrofac (Malaysia- PM304) Limited WEST DESARU FIELD (PM304) Spare Part (2 years operational, start-up & commissioning), Equipment and Manpower for WHCP Installation for WEST DESARU Field (PM304) Oct PMO DULANG-A PLATFORM PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT DULANG-A PLATFORM PO NO: CONTRACT NO.: P9A/V0/I560 Oct PMO DULANG-B PLATFORM PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT DULANG-B PLATFORM PO NO: CONTRACT NO.: P9A/V0/I560 Oct PMO DULANG-C PLATFORM PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT DULANG-C PLATFORM PO. NO: CONTRACT NO.: P9A/V0/I560 Nov PMO DULANG-D PLATFORM PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT DULANG-D PLATFORM PO NO: CONTRACT NO.: P9A/V0/I560 Nov PMO BEKOK-A & BEKOK-B ADDITIONAL - PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT BEKOK-A & BEKOK-B PLATFORM CONTRACT NO.: P9A/V0/I560 P.O. NO: NOV PMO DUYONG A,B,C ADDITIONAL - PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT DUYONG- A,B,C PLATFORM CONTRACT NO.: P9A/V0/I560 P.O. NO: NOV SBO WEST DESARU FIELD (PM304) PROVISION OF SUPPLY OF SPARE PART, START UP COMM, EQUIPMENT AND MANPOWER FOR WELLHEAD CONTROL PANEL INSTALLATION FOR WEST DESARU FIELD (PM304) PO NO: PM/WD/C/ REV.1 Dec Page 15 of 23

16 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION BRE PROVISION FOR REPAIR SERVICES INCLUSING PERFORMANCE TESTING AND SUPPLY OF PARTS FOR ARIEL COMPRESSOR P.O. NO. OPN-0009 DEC SBO SEMARANG PLATFORM (SMJT-C, D & E) SUPPLY AND DELIVERY OF WELLHEAD CONTROL PANEL (SMJT-C, D & E) FOR SAMARANG RE PHASE 2 SMRG PO NO: CONTRACT NO: CHO/2012/DSG/141 Dec SPARE PARTS FOR ARIEL COMPRESSOR P.O. NO: OPN-0009 DEC SUPPLY OF SEAL ASS'Y P.O. NO: FEB KENCANA HL PROVISION OF PRESSURE PILOT P.O. NO: C12/025 (SEMARANG) PO-012 FEB KENCANA HL SDN SMJT-E,SMDP-A, SMDP- B, SMJT-F, SMJT-G PRESSURE PILOT FOR SAMARANG SMJT-E,SMDP-A, SMDP-B, SMJT-F, SMJT-G PO NO: C12/025-[SAMARANG 2]-PO-012 R3 MAC 2013 CARIMIN SERVICE KINABALU GAS DEV. PROVISION OF HOOK UP AND COMMISSIONING SUPPLY AND DELIVERY OF WELLHEAD CONTROL PANEL (038B) FOR KINABALU GAS. PO NO. PO/CES/10148 MAC PMO BEKOK-A ADDITIONAL - PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT BEKOK-A PLATFORM CONTRACT NO.: P9A/V0/I560 P.O. NO: MAC 2013 RANHILL WORLEY Kongsberg KG2 (Semangkok-A & Irong Barat-A Supply of Fire & Gas Detector - SmA for Kongsberg KG2 (Semangkok-A) Fieldwire Replacement Project (0)-PP-POD-7012 (AFS 029) APR PMO DULANG A & B ADDITIONAL - PROVISION DESIGN, SUPPLY, FABRICATION, TESTING, DELIVERY, INSTALLATION, HOOK-UP AND COMMISSIONING OF WELLHEAD CONTROL PANEL (WHCP) UPGRADING AT DULANG-A & DULANG-B PLATFORM CONTRACT NO.: P9A/V0/I560 P.O. NO: MAC 2013 LABUAN SHIPYARD & SDN PERMAS PROVISION OF DESIGN, SUPPLY AND DELIVERY OF WHCP FOR PERMAS. 1ST. STAGE. P.O. NO. OG MAY NEWFIWLD PENINSULAR EAST PIATU PHASE III & IV WHCP for PM329 EAST PIATU Phase III & IV Flowline PO NO: NFX-PM329-F&C-PO MAY JUSTRITE CONSTRUCTION SUPPLY OF SOR ITEM P.O. NO: KRC/NMT/BWSB/PO-SO/ JUNR SHAPADU ENERGY & SDN TAPIC-C Provision for Purchase of SAND PROBE (PNEUMATIC) for TAPIS-C Platform (AFS003C P.O. NO: 8017-KL2-PSR-0254 Rev.0 JUNE SHAPADU ENERGY & SDN TAPIS-C Provision for Purchase of PRESSURE PILOTS for TAPIS-C Platform (AFS003C) P.O. NO: 8017-KL2-PSR-0248 Rev.1 JUNE SUPPLY OF EBAREA PARTS PO. NO: JUNE Page 16 of 23

17 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION LABUAN SHIPYARD & SDN PERMAS PROVISION OF DESIGN, SUPPLY AND DELIVERY OF WHCP + HPU FF FOR PERMAS - 2ND. STAGE P.O. NO. OG JUL PMO DUYONG-A,B,C WHCP UPGRADE AT DUYONG-A,B,C Platform (Additional cost for materials and Labour) P.O. No: JUL PMO DULANG A-A & B Wellhead Control Panel Upgrade At DULANG A & B Pneumatic/Hydraulic Controllers To Supply Manpower And Material P.O. NO: JUL SBO SMJT-C Provision for Design, Supply, Fabrication, Testing, Delivery, Installation, Hook-Up and Commissioning of WHCP Upgrading at SMJT-C for. P.O. NO AUG PT. PROSERV SOR ITEMS OCT.2013 EXXON MOBIL SOR ITEMS OCT.2013 PETRONAS CHEMICAL MTBE SDN SOR ITEMS NOV.2013 PETRONAS CARIGALI SOR Pressure Switch DEC.2013 Sabah Shell Petroleum Co. Ltd ARIEL PARTS DEC.2013 SS INNOVATION SDN BYDP-B, BYDP-C, TEJT- C, TEJT-CC & TEJT-W Platforms Provision of Chemical Injection System Control Panel for BYDP-B, BYDP-C, TEJT-C, TEJT-CC & TEJT-W Platform. PO No. SSI/PO/1010/14 JAN.2014 To supply EBARA Adapter & Hose JAN.2014 EBARA Mob for Troubleshooting & Materials. JAN.2014 SS INNOVATION SDN SOR Pneumatic Level Switch Float Type B11 K-2400 Filter Element JAN.2014 JAN.2014 F06 F06 Gas Turbine Air Filter Element JAN.2014 DESKTOP ANALYSIS JAN.2014 PT. PROSERV SOR PRESSURE SWITCH FEB.2014 PETRONAS PENAPISAN MELAKA EBARA PARTS FEB.2014 Repair EBARA Comp. MAR.2014 REPAIR Wellhead Control Panel Drawers MAR.2014 F9JT-A Drilling Project Supply of Three (3) units of WCM for F9JT-A Infill Drilling Project MAR.2014 BWB Relay Sand Probe MAR.2014 Page 17 of 23

18 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION PETRA RESOURCES BOKOR PHASE 3A SOR Level Pilot for BOKOR Phase 3A MAR.2014 NEWFIELD PENINSULAR MALAYSIA INC. CHERMINGAT SERVICES COMM FOR CHERMINGAT PANEL MAR.2014 MALAYSIA MARINE & HEAVY ENGR. () KINABALU BAG- Supply of Sigma Quick Exhaust Valve (QEV) Hook-Up and Offshore Installation for KINABALU NAG - PO No (Rev.1) APR.2014 KNDP-A KNDP-A Comp. Rotor Repair PO. No (#101945) APR.2014 THHE FABRICATORS BERTAM CHEMICAL INJECTION PACKAGE FOR BERTAM PO NO MAY.2014 LIMITED PRICE AGREEMENT FOR THE SUPPLY OF WELLHEAD CONTROL PANEL (WHCP) PARTS AND SERVICES CONTRACT NO.: /5/2014 HYUNDAI HEAVY INDUSTRIES CO. BERGADING WELLHEAD CONTROL PANEL FOR BERGADING CONTRACT NO.: QD542R1I02 23/5/2014 THHE FABRICATORS PERMAS IPF II Provision of Offshore Commissioning WHCP for PERMAS IPF II PO No JUN.2014 DULANG-C & D Platform Supply, Delivery & Commissioning of WCM for Dulang-C & D PO No JUN.2014 GREATER D18 Development Project and DULANG-C & D Platform Supply, delivery and commissioning of WHCP, Accessories and Simultaneous Production and Drilling (SIPROD) Panel for GREATER D18 Development Project PO No JUN.2014 MALAYSIA MARINE & HEAVY ENGR. () DAMAR-A PLATFORM Offshore Vendor Assistance for WHCP for DAMAR-A PO No JUN.2014 BRA & BOA ICP/WHCP for July 2014 Shutdown at BRA & BOA. PO No. RO RL011 JUN.2014 PETROFAC ENERGY SDN BERANTAI Provision of Wellhead Control Panel Module c/w Instrumentation for BERANTAI Operation. PO No. BONM/PO/14/1802 JUN.2014 PETROLEUM COMPANY LIMITED Axial Probes Purchase at Compressor Deck PO No Variation No. 1 JUN.2014 PETRA RESOURCES BARAM Infill Project Supply & Delivery of Instrument Control Panel for BARAM Infill Project. PO No. KPLO / JUN.2014 PETRA RESOURCES BARAM Infill Project Provision of Manpower, Installation & Commissioning for ICP - BARAM Infill Project. PO No. KLPO / JUN.2014 BR-B Wellhead AFA Project BWB Pressure Pilot for New Installation BR-B Wellhead AFA Project PO No. RO RL005 JUL.2014 MALAYSIA MARINE & HEAVY ENGR. () KINABALU NAG DEV. (KNPG-B) Offshore Vendor Assistance for PMCS Package for KINABALU NAG Topsides. PO No JUL.2014 Repair C911 Rotor & Bundle - EMEPMI PO No Rev.1 JUL.2014 Page 18 of 23

19 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION Tapis-A, E & F Repair and Rectification of WCM for Tapis-A, E & F Platform PO No JUL Repair JEA EBARA Rotor & Bundle Assy PO No JUL.2014 ANGSI-B Revisit Project Refurbishment of Wellhead Control Panel for ANGSI-B Revisit Project. PO No JUL.2014 ARIEL Parts ( PO No ) AUG.2014 PETROLEUM COMPANY LIMITED EBARA Spare Part of SJ HP Compressor EBARA Gear Box Part - SPC PO No Variation No. 5 AUG.2014 KNDP-A Mob Ram-Bytes to KNDP-A (Upgrade Work Scoping + Health Check) PO No. RO RL015 AUG PMO MASTER PRICE AND SERVICE AGREEMENT FOR WHCP AND WELL CONTROL MODULE (WCM) FOR PETRONAS CARIGALI FOR 2014 UNTIL /8/2014 HYUNDAI HEAVY INDUSTRIES CO. BERGADING WASTE HEAT RECOVERY SYSTEM (1Q63) FOR BERGADING 1/8/2014 Supply of TM Parts & Seals PO No. RO RL017 SEPT.2014 PR FSR for F23 (PO No ) SEPT.2014 Initial Inspection of EBARA 20MB6 Compressor Rotor - BIF PO No SEPT.2014 MALAYSIA MARINE & HEAVY ENGR. () DAMAR-A PLATFORM Offshore Vendor Assistance (2nd Campaign) for WHCP & HPU Package (DAMAR-A) PO No DGS Refurbishment for EBARA 20MB6 Compressor PO No EBARA K3630 Anti Surge PO No Rev. 1 THHE FABRICATORS PERMAS IPF & FF PERMAS IPF & FF: Wellhead Control Panel Variation Order PO No EBARA Service Commissioning at F06 Gas Compression Platform A. PO No IRONG BARAT Repair IBA Wellhead Cubicle for IRONG BARAT PO No Rev. 5 KNDP-A KNDP-A DGS Refurbishment PO No. RO RL020 KNDP-A KNDP-A Gearbox Spare Part PO No. RO RL021 MALAYSIAN REFINING CO. EBARA Parts PO No Procurement of Material/Services EBARA Comp/GB Part A & Payment. Location: F06 Gas Compression Platform A PO No Page 19 of 23

20 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION Procurement of Material/Service EBARA Comp/GB Part A & Payment. Location: E11 Gas Compressor Platform A PO No Procurement of Material/Service EBARA Comp/GB Part A & Payment. Location: Compressor Deck / F23 PO No EBARA Parts PO No EBARA Parts PO No EBARA Parts PO No EBARA Parts PO No E6 Field Development Design, Supply & Delivery of Wellhead Control Panel (WHCP) & Hydraulic Power Unit for E6 Field Development. PO No Change Order No. 1 PETROLEUM CO. LIMITED Manpower 2015 Major Overhaul Location: Compressor Deck PO No NOV.2014 PBJV GROUP SDN CENDOR - A Flushing Activity at CENDOR-A PO No. PBJV/00-121/PML/BSB/WO/14/02 NOV.2014 To Repair 20MB6 Rotor Centrifugal Compressor PO No NOV.2014 PBJV GROUP SDN Provision for 3rd. Party Services for Chemical Injection Skid PO No. CO-2307/LMBV/SO-008/14 NOV.2014 KENCANA HL SDN KEBABANGAN NORTHERN Provision for the Supply of Manpower Services for Wellhead Control Panel at KEBABANGAN NORTHERN HUB Dev. Project. PO No. C12/ SO-022 R1 NOV.2014 KENCANA HL SDN KBB / KPOC Provision of Supply Manpower Services & Purchase of Equipment for WHCP for KBB/KPOC (R-Pilot & PSV Calibrator) PO No. C12/ SO-118 R2 NOV.2014 MALAYSIA MARINE & HEAVY ENGR. () BESAR-A Supply & delivery of Wellhead Control Panel for BESAR-A Wellhead Topsides Project (BsDP-A) PO No NOV.,2014 CARIMIN SERVICE KNJT-C HUC (SBO) KINABALU-C, 3rd. Party / Special Services Provision for Vendor Assistance WHCP for KNJT-C PO No. PO/CES/09672 NOV.2014 E6 FIELD DESIGN, SUPPLY & DELIVERY OF WELLHEAD CONTROL PANEL & HYDRAULIC POWER UNIT PO NO: /11/2014 MALAYSIA MARINE AND HEAVY SDN BsDP-A (BESAR) SUPPLY, DELIVERY AND INSTALLATION OF WELLHEAD CONTROL PANEL FOR BsDP-A (BESAR) 3/11/2014 PETRONAS CARIGALI SMJT-C Upgrading WHCP at SMJT-C PO No DEC.2014 HYUNDAI HEAVY INDUSTRIES CO. BERGADING Pressure Pilot Bergading Project PO No. CONTRACT No. QD42R1I03 DEC.2014 Page 20 of 23

21 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION PETROLEUM COMPANY LIMITED SUPPLY OF EBARA PARTS PO No DEC.2014 Supply of K2400 DGS Spare Parts/Tools PO No.: JAN.2015 PETROLEUM COMPANY LIMITED Inspection of DGS PO No.: FEB.2015 Supply of BWB Items PO No.: FEB.2015 SAPURA KENCANA HL To Perform Temporary WHCP Commissioning Activities at TAPIS-C Platform. PO No.: C13/003 [AFS-P-043]-SO-003 Rev.3 FEB.2015 Air Filter Element PO No.: MAC.2015 PROSERVE SOR PRESSURE SWITCH PO No. PO APR.2015 Filter air intake HXA and PFA / Location F23 Gas Compression platform A PO No APR.2015 VIBRATION PROBES PO No MAY.2015 PETRONAS CARIGALI ANGSI PNEUMATIC / HYDRAULIC CONTROLLERS WHCP FOR ANGSI PO No MAY.2015 SAPURA KENCANA HL : EPCIC OF REMOTE WHPS FOR FULL FIELD NORTH MALAY BASIN (HESS RWHP) PACKAGE: HYDRAULIC POWER UNIT (HPU) KHL PO# C14009-IN ALH PACKAGE NAME: PR#25841 MAY.2015 BWB PRESSURE SENSOR & WELLHEAD CONTROL MODULE FOR BO-D & BR-D (OIL MODULE) PO NO. : 14103RL016 (BLANKET AGREEMENT #141037) MAY.2015 SAPURAKENCANA HL (1) EPCIC OF REMOTE WHPS FOR FULL FIELD NORTH MALAY BASIN (HESS RWHP) PACKAGE: HYDRAULIC POWER UNIT (HPU) 8/5/2015 PETRONAS CARIGALI MANPOWER FOR WORKSCOPING - PNEUMATIC/HYDRAULIC CONTROLLERS PO NO JUN.2015 SUPPLY OF CRITICAL SPARES FOR F6 K2400 COMPRESSOR PACKAGE PO NO JUN.2015 MURPHY SARAWAK OIL To purchase WHCP SCSSV / SSV parts for SEPA (Haskel Pump) PO No.: (POIV) JUN.2015 STEEL HAWKS ENGINEER Supply SOR Level Switch PO No. SHE/PO/ R.1 JUN.2015 MATERIAL PO No JUL.2015 SERVICES PO No. : RL019 (Blanket Agreement #141037) JUL.2015 Page 21 of 23

22 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION PETRONAS CARIGALI B11 PROVISION OF VENDOR SUPPORT SERVICE AND SPAREPARTS FOR TWISTER GAS DEHYDRATION SYSTEM FOR B11 FOR PETRONAS CARIGALI, CONTRACT NO.: SKO/2015/BRM4/ /7/2015 SAPURA KENCANA HL WHCP Panel Phase - Modification & X'mas Tree/Wellhead PO No AUG.2015 SOR Pressure Switch PO No Rev. 1 AUG.2015 MALAYSIA MARINE & HEAVY ENGR. () Supply and Delivery of WHCP for BESAR-A Wellhead Topsides project (BsDP-A) Project - Modification Works. PO No.: AUG.2015 PFCE TIMUR S/ Onsite Smoke, Testing of Fired Heaters F-22201/2/3 and UOP Platform F PO No.: PFCE AUG.2015 PFCE TIMUR SDN ONSITE SMOKE TESTING OF FIRED HEATERS F /2/3 AND UOP PLATFORMER F PURCHASE ORDER NO. PFCE /8/2015 MRCSB F Additional Tube Support PO No.: SEPT.2015 K2400 Vibration Probes Spares PO No.: Variation 1 SEPT.2015 PETRONAS GAS Provision of Engineering, Procurement Construction & Commissioning (EPCC) for Diverter Damper Box Replacement Work at Utilities GEBENG (UG) L.O.A. : SMSD/PGB-GPU/2015/0188 SEPT.2015 PETRONAS GAS GEBENG (UG) PROVISION OF PRODUCEMENT CONSTRUCTION & COMMISSIONING (EPCC) FOR DIVERTER DAMPER BOX REPLACEMENT WORK AT UTILITIES GEBENG (UG) CONTRACT NO.: SMSO/PGB-GPU/2015/0188 PGB PO NO. : (Services) 1/9/2015 PETRONAS GAS GEBENG (UG) PROVISION OF PRODUCEMENT CONSTRUCTION & COMMISSIONING (EPCC) FOR DIVERTER DAMPER BOX REPLACEMENT WORK AT UTILITIES GEBENG (UG) CONTRACT NO.: SMSO/PGB-GPU/2015/0188 PGB PO NO (Materials) 1/9/2015 PETRONAS CARIGALI Manpower & Equipment for October TA - Pneumatic / Hydraulic Controller. PO No.: OCT.2015 WOODGROUP Modification and Upgrade of WHCP at GUNTONG-C Platform. PO No. : Rev.1 DEC.2015 WOODGROUP MUSTANG GUNTONG C MODIFICATION & UPGRADE OF WHCP 7PN-105A&B PO NO I /12/2015 SAPURA ENERGY SUPPLY OF CABINET, WELLHEAD CONTROL PANEL PURCHASE ORDER NO: # /12/2015 SK ENERGY Supply of cabinet, WHCP JAN.2016 PGB Supply of Diverter Damper Replacement P.O. No.: JAN.2016 PGB Supply of Diverter Damper Replacement P.O. No.: JAN.2016 Page 22 of 23

23 LIST OF WORKS COMPLETED AND CURRENT BY BUMI WANGSA CUSTOMER DESCRIPTION OCEANMIGHT KINABALU SUPPLY OF WELLHEAD CONTROL PANEL P.O. NO.: #-2000F0215-INSTR-PO-108-RO 8/1/2016 TANJUNG OFFSHORE SUPPLY OF SOR PRESSURE SWITCH - ORIGINS FEB.2016 TURCOMP SUPPLY OF SOR LEVEL SWITCH DISPLACER MAR.2016 EPCC F12 Facilities WELLHEAD CONTROL PANEL & FUSIBLE PLUG LOOP PANEL PO: /3/2016 REPSOL OIL & GAS MALAYSIA LIMITED BUNGA PAKMA SUPPLY OF ONE UNIT OF ELECTRO-HYDRAULIC WHCP FOR BUNGA PAKMA DEV LOA 17/05/2016 SAPURAKENCANA SUPPLY SEWAGE TREATMENT PKG FOR SK310 B15 DEV JUL.2016 PNEUMATIC / HYDRAULIC CONTROLLERS WHCP FOR PUTERI PO No JUL.2016 CARIGALI HESS SUPPLY OF BWB ITEMS PO No.: AUG.2016 SAPURAKENCANA TAPIS B PROVISION OF SUPPLY COMPETENT MANPOWER, EQUIPMENT AND TOOLS FOR POST WELD HEAT TREATMENT (PWHT) SERVICES AT TAPIS B PLATFORM SEPT.2016 MURPHY SARAWAK OI DTU KIKEH PROVISION OF WHCP MAINTENANCE SUPPORT SERVICES OCT REPSOL OIL & GAS MALAYSIA LIMITED SUPPLY OF BWB ITEMS PO NO RL025 OCT SAPURAKENCANA HL PROVISION OF HOOK-UP &COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE SERVICES FOR AFS NO: P-181 (TAPIS-C) P.O. NO: C13/003-[AFS-P-181]-SO-007 NOV.2016 HYUNDAI HEAVY INDUSTRIES CO. BERGADING SUPPLY 2 S SPARE PART FOR WASTE HEAT RECOVERY SYSTEM (1Q63) - BERGADING P.O. NO. QD542BG1SP DEC SOR PRESSURE SWITCH P.O. NO JAN MURPHY SARAWAK OIL (GOPA / MEPA WHCP) PROVISION OF WHCP MAINTENANCE SUPPORT SERVICES P.O. NO.: JAN MURPHY SARAWAK OIL MODIFICATION OF PS-16 WELL FOR WHCP P.O. NO: JAN Page 23 of 23

COMPANY PROFILE BUMI WANGSA SDN BHD

COMPANY PROFILE BUMI WANGSA SDN BHD COMPANY PROFILE BUMI WANGSA SDN BHD NO. 112, JALAN DAMAI, OFF JALAN AMPANG, 55000, KUALA LUMPUR, WILAYAH PERSEKUTUAN, MALAYSIA TELEPHONE: +6 03 2141 6566 FACSIMILE: +6 03-2148 3228/2144 2816 WEBSITE: WWW.BUMIWANGSA.COM.MY

More information

Unit Concept (M) Sdn Bhd

Unit Concept (M) Sdn Bhd (M) Sdn Bhd 1 Chemtech Oiltek Plant Process Control System Specialty Fats Plant, scope of supply includes: Design, installation, and commissioning of the process control system, instrumentation, transmitter,

More information

266-CS-TMS-E-2008 Automation & Instrumentation Engineer. PERSONAL DATA Nationality : Egyptian Birth Date : 23/08/1986

266-CS-TMS-E-2008 Automation & Instrumentation Engineer. PERSONAL DATA Nationality : Egyptian Birth Date : 23/08/1986 266-CS-TMS-E-2008 Automation & Instrumentation Engineer Holds a B. Sc. in Industrial Electronics and Control Engineering and has about 3 years experience with deep understanding of Electrical Engineering,

More information

one stop HVACR OEM MANUFACTURER PROJECT REFERENCE

one stop HVACR OEM MANUFACTURER PROJECT REFERENCE one stop HVACR OEM MANUFACTURER PROJECT REFERENCE The Company PMT is an OEM manufacturing company for HVACR equipments and parts. Spread over 22,000 square-meter of manufacturing facility and operate by

More information

TECHNICAL SERVICES DIVISION

TECHNICAL SERVICES DIVISION TECHNICAL SERVICES DIVISION Electrical and Instrumentation new construction, installations, repairs & upgrades, and maintenance services Panel Design & Manufacturing electro/pneumatic, generator/control,

More information

Holds a B. Sc. in Electronics & Communication Engineering and has over 8 years hands-on experience working in I&C field.

Holds a B. Sc. in Electronics & Communication Engineering and has over 8 years hands-on experience working in I&C field. 102740-ICX-CMOS-E-2007 I&C Engineer Holds a B. Sc. in Electronics & Communication Engineering and has over 8 years hands-on experience working in I&C field. PERSONAL DATA Nationality : Egyptian Birth Date

More information

COMPANY PROFILE BUMI WANGSA SDN BHD

COMPANY PROFILE BUMI WANGSA SDN BHD COMPANY PROFILE BUMI WANGSA SDN BHD NO. 112, JALAN DAMAI, OFF JALAN AMPANG, 55000, KUALA LUMPUR, WILAYAH PERSEKUTUAN, MALAYSIA TELEPHONE: +6 03 2141 6566 FACSIMILE: +6 03-2148 3228/2144 2816 WEBSITE: WWW.BUMIWANGSA.COM.MY

More information

Emerson Automation Solutions Products & Services

Emerson Automation Solutions Products & Services Emerson Automation Products & Services The industry's broadest portfolio of technologies to measure, control, optimize and power manufacturing operations and the experience and expertise to solve their

More information

Size and rating wise typical Third Party Inspection certificates for the models of Valves

Size and rating wise typical Third Party Inspection certificates for the models of Valves For Item code star ting w i th 15 & 1 6 Control Valves: Supply references for valves supplies, for last three years, as per format A,B,C available in Annexure XVI (duly notarized/certified by statutory

More information

1) BWB CONTROLS INC., USA. 1.1 Pneumatic & Hydraulic Product Line. Master Relays Automatic Relays. Manual Relays. Pressure Sensors.

1) BWB CONTROLS INC., USA. 1.1 Pneumatic & Hydraulic Product Line. Master Relays Automatic Relays. Manual Relays. Pressure Sensors. 1) BWB CONTROLS INC., USA 1.1 Pneumatic & Hydraulic Product Line Master Relays Automatic Relays Manual Relays Indicators Accessories Pressure Sensors Hydraulic Controller Sand Probes Emergency Shutdown

More information

DRY BULK HANDLING SYSTEM

DRY BULK HANDLING SYSTEM DRY BULK HANDLING SYSTEM Parson Marine Equipment is established in Singapore since July 2005. Our team of engineers have more than 25 years of experiences in providing customised integrated dry and wet

More information

ICX-CMOS-E-2006 Senior I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ICX-CMOS-E-2006 Senior I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 100708-ICX-CMOS-E-2006 Senior I&C Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 9 years hands-on experience in Automation Systems, DCS, PLC, SCADA, Field Instruments,

More information

Client's Name. Duration (Months) ESD control system upgrading in SALAM CORE PLANT. Target Engineering had conducted detailed engineering in 1993.

Client's Name. Duration (Months) ESD control system upgrading in SALAM CORE PLANT. Target Engineering had conducted detailed engineering in 1993. Year Category Sub-Category Job description 1994 System Integration ESD 1997 System Integration PCS Client's Name End User Industry Country Duration (Months) ESD control system upgrading in SALAM CORE PLANT.

More information

Holds a B. Sc. in Communications & Electronics Engineering and has about 11 years hands-on experience working in I&C field.

Holds a B. Sc. in Communications & Electronics Engineering and has about 11 years hands-on experience working in I&C field. 102866-ICX-CMOS-E-2005 Lead I&C Commissioning / Maintenance Engineer Holds a B. Sc. in Communications & Electronics Engineering and has about 11 years hands-on experience working in I&C field. PERSONAL

More information

MAIN OFFICE PT 7876, RUMAH KEDAI 1 ½ TINGKAT, JALAN KEMAMAN-DUNGUN, KEMAMAN, TERENGGANU DARUL IMAN

MAIN OFFICE PT 7876, RUMAH KEDAI 1 ½ TINGKAT, JALAN KEMAMAN-DUNGUN, KEMAMAN, TERENGGANU DARUL IMAN www.rhstech.com MAIN OFFICE PT 7876, RUMAH KEDAI 1 ½ TINGKAT, JALAN KEMAMAN-DUNGUN, 24000 KEMAMAN, TERENGGANU DARUL IMAN WAREHOUSE & TRAINING CENTRE WAREHOUSE 22, DOOR 4 & 5, KEMAMAN SUPPLY BASE PHASE

More information

T urnk urnk y fabrica tion y fabrica Opera per tions and main tions and main enanc enanc services vic Subsea componen Subsea c

T urnk urnk y fabrica tion y fabrica Opera per tions and main tions and main enanc enanc services vic Subsea componen Subsea c Omega Natchiq, Inc. Overview Omega Natchiq, Inc. (Omega), an ASRC Energy Services Gulf Coast subsidiary, is a full service provider for the global energy, refining, chemical, power, utility, and manufacturing

More information

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE TYPE APPROVAL CERTIFICATE Certificate No: TAA0000120 Revision No: 1 This is to certify: That the Programmable Controller with type designation(s) Fail-safe Programmable Logic Controller and Fail-safe Modules

More information

Company PROFILE. Copyright 2017 Qasturi Network Solutions. All rights reserved. Sufian Latib

Company PROFILE. Copyright 2017 Qasturi Network Solutions. All rights reserved. Sufian Latib Company PROFILE Sufian Latib INTRODUCING Qasturi Network Solutions Qasturi Network Solutions is operates by experienced Automation Engineer and entrepreneur based in Pasir Gudang,Johor Malaysia. Qasturi

More information

P R O D U C T D ATA S H E E T

P R O D U C T D ATA S H E E T P R O D U C T D ATA S H E E T www.internationalgasdetectors.com Transmitters Control Systems Sensors Accessories TOCSIN 90 Wall, 19 Rack or Panel Mounting Units 110/30V 50/60Hz AC operation 50 Addressable

More information

Our Portfolio WINNER

Our Portfolio WINNER Our Portfolio 2015 WINNER Head Office 2475 Hogan Drive Mississauga, ON. Canada L5N 0E9 Phone: +1 (905) 412-0500 Sarnia Office 581 Vidal Street South Sarnia, ON. Canada N7T 2V8 Phone: +1 (519) 332-2300

More information

ELECTRICAL. Global Energy Partners & INSTRUMENTATION. Putting People First Since The Right Choice. The Right Solutions.

ELECTRICAL. Global Energy Partners & INSTRUMENTATION. Putting People First Since The Right Choice. The Right Solutions. Global Energy Partners ELECTRICAL & INSTRUMENTATION Putting People First Since 1948 Safety People Solutions Performance Choice ELECTRICAL & INSTRUMENTATION Putting People First Since 1948 ELECTRICAL CAPABILITIES

More information

Automations Controls Experts

Automations Controls Experts ACE Instrumentation Automations Controls Experts ABOUT US ACE Instrumentation is renowned as one of the best marine automation company in Singapore. Our offices are located conveniently near shipyards

More information

Dew point. Special features: Dew point monitoring DS 400. Technical data DS 400. Technical data FA 510

Dew point. Special features: Dew point monitoring DS 400. Technical data DS 400. Technical data FA 510 Dew point monitoring DS 400 for stationary dew point monitoring of refrigeration or desiccant driers. The touch screen graphic display enables an intuitive operation and shows the progress of the measured

More information

Rotary Screw Compressors SK Series

Rotary Screw Compressors SK Series Rotary Screw Compressors SK Series With the world-renowned SIGMA PROFILE Air delivery from.0 to.50 m /min, Pressure 5 bar SK SK Series Series SK: Long-term savings Discerning compressed air users expect

More information

MOL Group TECHNICAL SPECIFICATION INSTRUMENTATION. List of booklets MGS-M-REF-I-LI. Rev

MOL Group TECHNICAL SPECIFICATION INSTRUMENTATION. List of booklets MGS-M-REF-I-LI. Rev MOL HUNGRIN OIL ND GS PLC. MOL Group TECHNICL SPECIFICTION INSTRUMENTTION List of booklets MGS-M-REF-I-LI Rev 1.00.01 www.mol.hu This document is property of MOL Group. The use is only allowed with the

More information

Heat recovery systems. For hot air and hot water applications.

Heat recovery systems. For hot air and hot water applications. Heat recovery systems For hot air and hot water applications www.kaeser.com Heat recovery systems Why recover heat? The question should in fact be: Why not? Amazingly, practically 100 percent of the electrical

More information

Industrial Grade Gas Detection

Industrial Grade Gas Detection Industrial Grade Gas Detection DETECTING THE... Difference Catalog #CB 0112 detcon inc. an company www.detcon.com Houston Odessa Shanghai Dammam Del Carmen Europe Company Profile ISO 9001: 2008 Certified

More information

CURTISS-WRIGHT CONTROLS INTEGRATED SENSING (CAGE CODE: 03972).

CURTISS-WRIGHT CONTROLS INTEGRATED SENSING (CAGE CODE: 03972). Overhaul Manual REVISION STATUS, as of MAY 18, 2016 No changes to CMM document revisions for Curtiss-Wright Cage Code: 03972 - have occurred since the last revision of this CMM Revision Status List was

More information

DIPL Solutions and Services

DIPL Solutions and Services DIPL Solutions and Services Our Solutions... in Legacy of 27 years in Safety Business High End System Integration Capabilities 360 Solutions Engineering, Supply and Services Safety Solutions.. Portable

More information

Rosemount Analytical Solutions. Emerson Offshore Technology Day March 26th 2015 by Rune Damgaard, Account Manager - Measure & Analyze

Rosemount Analytical Solutions. Emerson Offshore Technology Day March 26th 2015 by Rune Damgaard, Account Manager - Measure & Analyze Rosemount Analytical Solutions Emerson Offshore Technology Day March 26th 2015 by Rune Damgaard, Account Manager - Measure & Analyze Innovation applied to Offshore Applications Well head analysis Process

More information

Explosion Protection Engineering Principles

Explosion Protection Engineering Principles Handbook of Fire and Explosion Protection Engineering Principles for Oil, Gas, Chemical and Related Facilities Second edition Dennis P. Nolan ELSEVIER AMSTERDAM BOSTON HEIDELBERG LONDON NEW YORK OXFORD

More information

AVAILABILITY AND RELIABILITY OF CERN CRYOPLANTS

AVAILABILITY AND RELIABILITY OF CERN CRYOPLANTS AVAILABILITY AND RELIABILITY OF CERN CRYOPLANTS on behalf of the Cryogenics for Accelerator Group Accelerator Technology Department CERN, Geneva, Switzerland Outline Introduction Cryogenic systems layout

More information

Oil & Gas Industry. Magnecraft Relay Solutions

Oil & Gas Industry. Magnecraft Relay Solutions This document is designed to help you understand and identify opportunities in the Oil & Gas market and to provide insight and advice on how to sell Magnecraft relays. The following information is included:

More information

COST REDUCTION BY REPLACING STEAM WITH COKE OVEN GAS FOR HOT AIR DRYER UNIT IN THE ELECTROLYTE CLEANING LINE

COST REDUCTION BY REPLACING STEAM WITH COKE OVEN GAS FOR HOT AIR DRYER UNIT IN THE ELECTROLYTE CLEANING LINE COST REDUCTION BY REPLACING STEAM WITH COKE OVEN GAS FOR HOT AIR DRYER UNIT IN THE ELECTROLYTE CLEANING LINE Manish Kumar Gupta 1, Dr. Archana Nema 2 1 M tech Scholar, Department of Mechanical Engineering,

More information

Rotary Screw Compressors SM Series

Rotary Screw Compressors SM Series Rotary Screw Compressors SM Series With the world-renowned SIGMA PROFILE Free air delivery 0. to.5 m³/min, Pressures / / 5 bar SM Series Quiet, dependable performance SM: Long-term savings Today s users

More information

Responsibility No. Item description CC TPI Owner 5. Instrument items 5.1 Installation of equipment 5.1.1 Pre-installation check 1) Foundation and setting bolts - Dimension - Visual check 2) Visuals check

More information

ICX-CMOS-E-2008 I&C Lead Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ICX-CMOS-E-2008 I&C Lead Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101765-ICX-CMOS-E-2008 I&C Lead Engineer Holds a B. Sc. in Electronics & Communication Engineering and has about 9 years hands-on experience working in I&C field and DCS systems. PERSONAL DATA Nationality

More information

Gas Value Chain Solutions. Randy Miller

Gas Value Chain Solutions. Randy Miller Value Chain Solutions Randy Miller Increasing Demand for Natural 2.2% global growth faster than other hydrocarbon Energy Security: Supply more regionally distributed than oil produces: Lower greenhouse

More information

Presenter Joe Pittman

Presenter Joe Pittman API RP 14C 8th EDITION Standards Certification Education & Training Publishing Conferences & Exhibits Recommended Practice for Analysis, Design, Installation, and Testing of Safety Systems for Offshore

More information

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE TYPE APPROVAL CERTIFICATE Certificate No: TAA00001CD This is to certify: That the Programmable Controller with type designation(s) SIPLUS Series Issued to Siemens AG Fürth, Germany is found to comply with

More information

By Dr. Maurice Stewart, PE, CSP Worldwide Petroleum Training

By Dr. Maurice Stewart, PE, CSP Worldwide Petroleum Training A 5 Day Course On Topic Production Safety Systems Incorporating The New 2017 8 th Edition of API RP 14C, API RP 14J, The New API RP 17V 1 st Edition, API RP 500/505, API RP 520/521/2000, IEC 61508-2 and

More information

Dew point set DS 400

Dew point set DS 400 set DS 400 Dew point set DS 400 for stationary dew point monitoring of refrigeration or adsorption dryers. The touch screen graphic display enables an intuitive operation and shows the progress of the

More information

Enraf Servo Gauge 854 XTG

Enraf Servo Gauge 854 XTG Enraf Servo Gauge 854 XTG Cut costs, not repeatability. Honeywell s 854 XTG servo gauge is a high performance alternative to other tank level measurement technologies such as radar tank level gauges. It

More information

OUR FOCUS SOLUTIONS & RESULTS

OUR FOCUS SOLUTIONS & RESULTS OUR FOCUS SOLUTIONS & RESULTS We will pursue and hold the commitment needed to deliver the results. The right people and qualities are already in place. Products Control Systems Integrated System System

More information

APPLICATION DATA SHEET

APPLICATION DATA SHEET APPLICATION DATA SHEET Wed : www.saenchotesei.com WWW.-..UK Control Systems Transmitters Sensors Accessories TOCSIN 920 - Wall, 19 Rack or Panel Mounting Units - 110/230V 50/60Hz AC operation - 250 Addressable

More information

Industrial Grade Gas Detection Detecting The Difference

Industrial Grade Gas Detection Detecting The Difference detcon inc. Industrial Grade Gas Detection Detecting The Difference PO Box 8067 The Woodlands, TX 77387 888-367-4286 (toll free) 713-559-9200 281-292-2860 (fax) sales@detcon.com Catalog #CB-0409 www.detcon.com

More information

Equipment ATA 12 April 2016

Equipment ATA 12 April 2016 05-00-01 Time limits and Maintenance Frequencies Various JUN 14 1 25-00-01 Charging Head Mk 2 & Accessories WKA26592 WKA26592A 25-60-15 Submersion Actuator K38215 58178-001 AUG 92 JAN 15 Initial Issue

More information

Procedure. for. Installation. of the P/N & P/N Voice Alert Systems. Procedure IP 1 Rev. 1. Date

Procedure. for. Installation. of the P/N & P/N Voice Alert Systems. Procedure IP 1 Rev. 1. Date Procedure for Installation of the P/N 2040 1 2 & P/N 2040 1 3 Voice Alert Systems Procedure IP 1 Rev. 1 Date 04 16 03 Approved By Aircraft Components inc. 1040 Harbor Lake Dr. Safety Harbor FL 34695 I.

More information

APPLICATION BULLETIN COMBUSTION TURBINE FACILITIES. Overview

APPLICATION BULLETIN COMBUSTION TURBINE FACILITIES. Overview Overview Modern combustion (or gas) turbine packages typically include an axial compressor, a combustion section and a turbine. Both compressor and turbine sections consist of one or more sets of fixed

More information

The benefits of modern Integrated Control and Safety Systems architectures for FPSO facilities.

The benefits of modern Integrated Control and Safety Systems architectures for FPSO facilities. The benefits of modern Integrated Control and Safety Systems architectures for FPSO facilities. P. Troianiello - Fores Engineering Rosetti Marino Group A. Gariboldi - Siemens Industry Sector IA/DT Topics

More information

2017 Petra Training Group

2017 Petra Training Group 2017 Petra Training Group Table of Contents Training Schedule 2015 7 Cement Industry 8 Electronics Data& Communication 10 Automotive 11 Business Skills 12 Construction Management 15 Drilling Engineering

More information

DIRECTORY OF REPRESENTATION &SERVICES

DIRECTORY OF REPRESENTATION &SERVICES Process Management Limited P.O. Box #5274, South-Western Corner, Caribbean & Pacific Avenue, Point Lisas Industrial Estate Tel: 636-1120/2170 or 679-0602 Fax: 636-8826 Sales. 636-0332 Service Website:

More information

Gulf Industrial Systems Co. Fire, Safety & Security Systems

Gulf Industrial Systems Co. Fire, Safety & Security Systems Gulf Industrial Systems Co. Fire, Safety & Security Systems To a Controlled, Safer & Secured Future 2 Introduction Gulf Industrial Systems Company (GISCO) is a market leader in Integrated Fire-Safety and

More information

Tank Gauging Products for Bulk Liquid Storage Tanks. Simple, Safe and Reliable Inventory Measurement

Tank Gauging Products for Bulk Liquid Storage Tanks. Simple, Safe and Reliable Inventory Measurement Products for Bulk Liquid Storage Tanks 2500 Automatic Tank Gauge The industry standard for float and tape tank gauging for over 50 years Provides a level accuracy of 0.2-1 inch (4-25 mm) Continuous level

More information

ClampOn DSP Pig Detector

ClampOn DSP Pig Detector ULTRASONIC INTELLIGENT SENSORS ClampOn DSP Pig Detector DIGITAL SIGNAL PROCESSING ULTRASONIC INTELLIGENT SENSORS ClampOn DSP Pig Detector A Pig Detector is a tool that is always used in pigging operations.

More information

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016 Facilities Planning & Construction Report 2016 17 2 nd Quarter Ending December 31, 2016 Overview District SRID Spending (MG100) Summary By College By Site District Program Overview Construction Design

More information

Rotary Screw Compressors ASD Series

Rotary Screw Compressors ASD Series www.hpccompressors.co.uk Rotary Screw Compressors ASD Series With the world-renowned SIGMA PROFILE Free air delivery 0.87 to 6.6 m³/min, Pressure 5.5 5 bar ASD series ASD: Long-term savings KAESER KOMPRESSOREN

More information

PROCESS CONTROL COURSES

PROCESS CONTROL COURSES PROCESS CONTROL COURSES To be a world class industrial training provider in Saudi Arabia. To provide world class industrial technical training to prepare a skilled and competent workforce for the hydrocarbon,

More information

CORPORATE PROFILE BRAZIL TRACK RECORDS 2014

CORPORATE PROFILE BRAZIL TRACK RECORDS 2014 CORPORATE PROFILE BRAZIL TRACK RECORDS 2014 CORPORATE PROFILE MARSHAL SYSTEMS BRAZIL REFERENCES LIST Founded in 1993, Marshal Systems is a wholly- owned subsidiary of Singapore Exchange- listed Viking

More information

Smarter Field Instrumentation Life Cycle Management. Ray Rogowski Global Marketing PMC Instruments

Smarter Field Instrumentation Life Cycle Management. Ray Rogowski Global Marketing PMC Instruments Smarter Field Instrumentation Life Cycle Management Ray Rogowski Global Marketing PMC Instruments Smart LifeCycle Management Pressure Temperature Radar Remote Seal Flange Mount User Interface Buttons Single

More information

Products Overview. Your trusted partner in process instrumentation

Products Overview. Your trusted partner in process instrumentation Products Overview Your trusted partner in process instrumentation Process monitoring, alarm and shutdown applications World class technical solutions proven technology meeting international standards Pressure

More information

since Our Mission NSK is strong systems interfacing and control industrially Provide Quality Products & Timely Services Our Vision

since Our Mission NSK is strong systems interfacing and control industrially Provide Quality Products & Timely Services Our Vision Our Mission since 2010. NSK is strong systems interfacing and control industrially Provide Quality Products & Timely Services Our Vision Global Partner to Marine & Offshore Customers in Control Solution

More information

LifeCycle Engineering & Field Services

LifeCycle Engineering & Field Services Process & Analytical Solutions LifeCycle Engineering & Field Services SafeGuarding Products & Systems Lead with Integrity and Success Follows Proudly serving and supporting western Canadian Industry for

More information

Rotary Screw Compressors. SM Series With the world-renowned SIGMA PROFILE Flow rate 0.39 to 1.64 m³/min, Pressure 5.5 to 15 bar COMPRESSORS

Rotary Screw Compressors. SM Series With the world-renowned SIGMA PROFILE Flow rate 0.39 to 1.64 m³/min, Pressure 5.5 to 15 bar COMPRESSORS COMPRESSORS Rotary Screw Compressors SM Series With the world-renowned SIGMA PROFILE Flow rate 0.39 to 1.64 m³/min, Pressure 5.5 to 15 bar www.hpccompressors.co.uk SM series Long-term savings Quiet and

More information

Certification Report of the ST 3000 Pressure Transmitter with HART 6

Certification Report of the ST 3000 Pressure Transmitter with HART 6 Certification Report of the ST 3000 Pressure Transmitter with HART 6 Revision No.: 2.4 Date: Report Number: 2010-Mar-18 SAS-190/2006T Product: ST 3000 Pressure Transmitter with HART 6 Customer: Order Number:

More information

Electronic Pressure Digest. Pressure and Temperature Transmitters

Electronic Pressure Digest. Pressure and Temperature Transmitters Electronic Pressure Digest Electronic Pressure Digest Pressure and Temperature Transmitters R General Purpose Pressure Transmitters Standard Industrial S-10 These rugged pressure transmitters are designed

More information

Product Data Sheet Adsorption Dryer DPS (A)

Product Data Sheet Adsorption Dryer DPS (A) Version: 1.0.5 Author: Tassilo Tappe Date:13.07.2012 Field of application Adsorption dryers of the DPS series are designed for drying compressed air and nitrogen to pressure dew points of -25 C to -70

More information

Product Data Sheet Adsorption Dryer DPS

Product Data Sheet Adsorption Dryer DPS Version: 1.6.0 Author: Tassilo Tappe Date : 05.07.2016 Field of application Adsorption dryers of the DPS series are designed for drying compressed air and nitrogen to pressure dew points of -25 C to -70

More information

Rotary Screw Compressors. SM Series With the world-renowned SIGMA PROFILE Flow rate 0.39 to 1.64 m³/min, Pressure 5.5 to 15 bar COMPRESSORS

Rotary Screw Compressors. SM Series With the world-renowned SIGMA PROFILE Flow rate 0.39 to 1.64 m³/min, Pressure 5.5 to 15 bar COMPRESSORS COMPRESSORS Rotary Screw Compressors SM Series With the world-renowned SIGMA PROFILE Flow rate 0.39 to 1.64 m³/min, Pressure 5.5 to 15 bar www.kaeser.com SM series Long-term savings Discerning compressed

More information

the product and service handbook.

the product and service handbook. about us. Energy Products Oilfields Equipment LLC was established with the objective of providing quality equipment, products and services to Oil and Gas, Petrochemical and Utilities industries within

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 3 Page 1 of 6 I. PURPOSE This policy establishes the steps required for performing the monthly fixed systems inspections and the semi-annual systems testing. Fixed systems include; wet chemical

More information

WLAC Facilities Committee Meeting. September 18, 2017

WLAC Facilities Committee Meeting. September 18, 2017 Campus Program Report WLAC Facilities Committee Meeting September 18, 2017 Page 1 DSA approved the plans on May 15, 2017. Notice to Proceed was issued June 8, 2017 and the project remains on schedule for

More information

Solar Heating Solutions

Solar Heating Solutions Solar Heating Solutions 30 25 TEMPERATURE GUIDE Month Unheated Heated (Solar) Jan 24.0 28.8 Feb 23.5 28.2 Mar 22.8 27.4 Apr 19.0 25.3 May 15.1 19.5 20 15 Heated (Solar) Unheated Jun 12.3 16.2 Jul 11.9

More information

Our Portfolio. Valve Automation Centre 18 Airpark Place Guelph, ON N1L 1B2 Canada Phone: +1 (519)

Our Portfolio. Valve Automation Centre 18 Airpark Place Guelph, ON N1L 1B2 Canada Phone: +1 (519) Our Portfolio Other Members of the Lakeside Group Valve Automation Centre 18 Airpark Place Guelph, ON N1L 1B2 Phone: +1 (519) 763-1451 www.valve-automation.com Arctic Combustion Limited 430 Industrial

More information

operations, Environmental & Instrumentation engineering solutions to the Commercial & Industrial segment in the Middle East. ARE

operations, Environmental & Instrumentation engineering solutions to the Commercial & Industrial segment in the Middle East. ARE COMPANY PROFILE We are a Customized Engineering Solution Provider in the field of Industrial & Spec Gases WHO operations, Environmental & Instrumentation engineering solutions to the Commercial & Industrial

More information

Rotary Screw Compressors SM Series

Rotary Screw Compressors SM Series Rotary Screw Compressors SM Series With the world-renowned SIGMA PROFILE Free air delivery 0.0 to.50 m³/min, Pressures / / 5 bar SM Series SM: Long-term savings Today s users expect maximum availability

More information

PTC Creo 2.0 Hardware Support Hewlett Packard

PTC Creo 2.0 Hardware Support Hewlett Packard PTC Creo 2.0 Hardware Support Hewlett Packard Last updated: December 11, 2017 The Desktop Virtualization Environment Support HP table displays at the end of this document, after the standard Creo certification

More information

Cleaver-Brooks Webinars

Cleaver-Brooks Webinars Cleaver-Brooks Webinars Today s Topic: Insights in Optimal Boiler Room Controls If you ve missed any of our previous live webinars You can view our archived webinars by going to www.cleaverbrooks.com/webinars

More information

Rotary Screw Compressors. ASD Series With the world-renowned SIGMA PROFILE Flow rate 0.89 to 6.39 m³/min, Pressure 5.5 to 15 bar COMPRESSORS

Rotary Screw Compressors. ASD Series With the world-renowned SIGMA PROFILE Flow rate 0.89 to 6.39 m³/min, Pressure 5.5 to 15 bar COMPRESSORS COMPRESSORS Rotary Screw Compressors ASD Series With the world-renowned SIGMA PROFILE Flow rate 0.89 to 6.39 m³/min, Pressure 5.5 to 15 bar www.kaeser.com ASD Series ASD Even more efficient KAESER KOMPRESSOREN

More information

Our Portfolio. Valve Automation Centre 18 Airpark Place Guelph, ON N1L 1B2 Canada Phone: +1 (519)

Our Portfolio. Valve Automation Centre 18 Airpark Place Guelph, ON N1L 1B2 Canada Phone: +1 (519) Our Portfolio Other Members of the Lakeside Group Valve Automation Centre 18 Airpark Place Guelph, ON N1L 1B2 Phone: +1 (519) 763-1451 www.valve-automation.com Arctic Combustion Limited 430 Industrial

More information

Refrigeration and Boil Off Compression Systems for NGL Export Facilities

Refrigeration and Boil Off Compression Systems for NGL Export Facilities Refrigeration and Boil Off Compression Systems for NGL Export Facilities February 2015 2015 Gas/Electric Partnership Conference IHS INTERNATIONAL: US POISED TO LEAD WORLD EXPORTS OF LPG From Oil and Gas

More information

Enraf Servo Gauge 854 ATG

Enraf Servo Gauge 854 ATG Enraf Servo Gauge 854 ATG Setting the standard in gauging. From the company that pioneered development of modern tank gauges, Honeywell s 854 Automatic Tank Gauge has become an industry standard all over

More information

Mahesh Joshi Oct 2 nd, Precision Measurement & Solutions

Mahesh Joshi Oct 2 nd, Precision Measurement & Solutions Mahesh Joshi Oct 2 nd, 2018 Precision Measurement & Solutions Best-in-Class Terminal Operation Solutions... Oil, Gas & Chemical storage, transportation and distribution Operational excellence Holistic

More information

P R O D U C T D ATA S H E E T

P R O D U C T D ATA S H E E T P R O D U C T D ATA S H E E T www.internationalgasdetectors.com Transmitters Control Systems Sensors Accessories TOCSIN 90 SYSTEM UPGRADE Use existing MK3 Pellistor Flammable Gas Sensors and upgrade to

More information

WLAC Facilities Committee Meeting. May 15, 2017

WLAC Facilities Committee Meeting. May 15, 2017 Campus Program Report WLAC Facilities Committee Meeting May 15, 2017 Page 1 DSA completed the initial review June 24, 2016 and the Design Builder is proceeding through the back check process. DSA reports

More information

An Introduction to KC Controls Ltd

An Introduction to KC Controls Ltd An Introduction to KC Controls Ltd KC Controls Ltd provides measurement and control instrumentation, along with fittings, filters, panels and a full range of accessories, to fulfil a wide range of process

More information

GENERAL COMPANY & PRODUCT PRESENTATION

GENERAL COMPANY & PRODUCT PRESENTATION GENERAL COMPANY & PRODUCT PRESENTATION API MARINE Acoustic Precise Instruments Development, design & production of advanced tank sensors and automation systems for marine applications ABOUT API MARINE

More information

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME:

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME: (For Vendor Registration Purpose) SHEET 1 of 6 1.00.00 GENERAL INFORMATION 1.01.00 The general guidelines as illustrated in the subsequent clauses of this section shall be applicable for air cooled condenser

More information

COMPANY PROFILE. Design, Development & Installation of Electrical & Automatic Control Systems

COMPANY PROFILE. Design, Development & Installation of Electrical & Automatic Control Systems COMPANY PROFILE Design, Development & Installation of Electrical & Automatic Control Systems MSB/ESB Main & Emergency Switchboards PMS Power Management Systems Engine Room Alarm Monitoring Systems Engine

More information

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Continuous Commissioning: A Valuable Partner to Retrofit Projects Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles

More information

For Complete Fire and Gas Solutions

For Complete Fire and Gas Solutions Industrial Fire For Complete Fire and Gas Solutions 2 The Total Package What do you need from an integrated fire and gas system? In industrial fire and gas environments it s important to have a reliable

More information

WON ENGINEERING. The energy to make - A whole new world!

WON ENGINEERING. The energy to make - A whole new world! WON ENGINEERING. The energy to make - A whole new world! The energy to make a whole new world! CONTENTS 04. CEO MESSAGE 05. HISTORY 06. Business Areas 06. partner 06. Organization 07. Automatic Control

More information

LC2200 Level Controller Installation and Maintenance Instructions

LC2200 Level Controller Installation and Maintenance Instructions 4025250/9 IM-P402-77 AB Issue 9 LC2200 Level Controller Installation and Maintenance Instructions LC2200 ALARM TEST >50% >100%

More information

Instrument Air Packages engineered for the desert and high temperature environements

Instrument Air Packages engineered for the desert and high temperature environements -5 C +55 C Instrument Air Packages engineered for the desert and high temperature environements Oil free and oil injected compressors and heatless dryers THE DETAILS MAKE THE DIFFERENCE DESIGNED FOR THE

More information

ENERGY, OIL & GAS. astsensors.com macrosensors.com. Transducer & Transmitter Capabilities. Your sensor business partner...

ENERGY, OIL & GAS. astsensors.com macrosensors.com. Transducer & Transmitter Capabilities. Your sensor business partner... Transducer & Transmitter Capabilities Your sensor business partner... astsensors.com macrosensors.com About Us AST The mission of American Sensor Technologies, Inc. is to be your sensor business partner...

More information

2015 Honeywell Users Group Europe, Middle East and Africa. Integrated Solutions for the Gas Value Chain Martin Bragg, Honeywell

2015 Honeywell Users Group Europe, Middle East and Africa. Integrated Solutions for the Gas Value Chain Martin Bragg, Honeywell 2015 Honeywell s Group Europe, Middle East and Africa Integrated Solutions for the Value Chain Martin Bragg, Honeywell The Industry Natural Energy Consumption at 23% of World Demand 2040 77% Industrial

More information

ENGINEERING SPECIFICATION ASU TYPE NITROGEN GENERATION UNIT FOR DIESEL HYDROTREATER UNIT FOR HINDUSTAN PETROLEUM CORPORATION LTD.

ENGINEERING SPECIFICATION ASU TYPE NITROGEN GENERATION UNIT FOR DIESEL HYDROTREATER UNIT FOR HINDUSTAN PETROLEUM CORPORATION LTD. ENGINEERING SPECIFICATION FOR DIESEL HYDROTREATER UNIT FOR HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT TEIL JOB NO. : 6261 DOCUMENT NO: 6261- A - 95-48 -051 A 16-March-09 For Client

More information

SAFETY MANAGER SC Ensure safety, simplify operations and reduce lifecycle costs

SAFETY MANAGER SC Ensure safety, simplify operations and reduce lifecycle costs SAFETY MANAGER SC Ensure safety, simplify operations and reduce lifecycle costs Meet Today s Cost and Complexity Challenges Industrial process plants are trying to reduce their process control and safety

More information

Multistage Centrifugal Blowers

Multistage Centrifugal Blowers Multistage Centrifugal Blowers Multistage Centrifugal Blowers In order to meet all the requirements for air and gas applications, Ingersoll Rand provides a new generation of Hibon Multistage Centrifugal

More information

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. M&V Real Results of High Performance Design Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. Overview Measurement & Verification (M&V) Plan for New

More information