Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Size: px
Start display at page:

Download "Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification"

Transcription

1 Public Input No. 4-NFPA [ Section No ] Where When the enclosure has been opened or if the protective gas supply has failed to maintain the required positive pressure, the enclosure shall be purged. Editorial change. "Where" is a location, not a situation. The intent is that the enclosure will be purged after (time, not place) it has been opened. Submittal Date: Thu May 15 15:48:11 EDT 2014 Resolution: FR-2-NFPA Statement: Editorial change. "Where" is a location, not a situation. The intent is that the enclosure will be purged after (time, not place) it has been opened.

2 Public Input No. 6-NFPA [ Section No ] Components with a free internal volume less than 20 cm 3 (1.22 in. 3 ) shall not be required to be considered as internal compartments requiring protection, provided the total volume of all such components is not a significant portion not more than 10 per cent of the protected enclosure volume. "A significant portion" is unenforceable language, that is not in accordance with of the NFPA Manual of Style, and "significant" is even on of the words in Table AS NFPA 496 must be usable by first parties, second parties and third parties, an objective criterion for acceptance is needed. The Submitter freely admits not knowing if 10 per cent of the internal volume of an enclosure is "significant" enough to warrant protection of individual compartments or not, but 10 per cent gives the technical committee a starting point. The final number chosen may be higher or lower. Submittal Date: Thu May 15 15:59:40 EDT 2014 Resolution: FR-3-NFPA Statement: "A significant portion" is unenforceable language, that is not in accordance with of the NFPA Manual of Style, and "significant" is even on of the words in Table As NFPA 496 must be usable by first parties, second parties and third parties, an objective criterion for acceptance is needed. The committee opted to provide a methodology to evaluate the significant portion by calculation.

3 Public Input No. 5-NFPA [ Section No ] In applications where flammable mixtures shall be are permitted to be piped into the enclosure through the flammable gas or vapor system, precautions shall be taken to prevent propagation of an explosion back to the process equipment. Editorial change does not mandate (shall be permitted) that flammable mixtures be piped into the enclosure, it says what is to be done in the event the mixtures are piped in. "Shall be permitted" not the right term for this provision. Submittal Date: Thu May 15 15:53:03 EDT 2014 Resolution: FR-4-NFPA Statement: Editorial change does not mandate (shall be permitted) that flammable mixtures be piped into the enclosure, it says what is to be done in the event the mixtures are piped in. "Shall be permitted" is not the correct term for this provision.

4 Public Input No. 7-NFPA [ Section No ] Orifices or other flow-limiting devices shall be located outside and close to within 450 mm (18 in.) of the wall of the building or room. "Close to" is unenforceable language, and not in accordance with of the NFPA Style Manual. Because NFPA 496 is intended for use by first parties, second parties and third parties, an objective criterion for acceptance is needed. The recommended distance of 450 mm is consistent with the placement of conduit seals required by (A)(2) in the 2014 National Electrical Code. Submittal Date: Thu May 15 16:09:50 EDT 2014 Resolution: FR-5-NFPA Statement: "Close to" is unenforceable language, and not in accordance with of the NFPA Style Manual. Because NFPA 496 is intended for use by first parties, second parties and third parties, an objective criterion for acceptance is needed. The committee identified 10 feet as an appropriate distance to be consistent with the boundary seal requirement of (A)(4) of the NEC.

5 Public Input No. 8-NFPA [ New Section after A ] A NFPA 496 encompasses enclosures, rooms and buildings. It is not possible to specify acceptance criteria for many different constructions in a single standard. Construction criteria for electrical enclosures may be found in ANSI/UL 50. Construction criteria for pressurized rooms may be found in IEC Structural requirements for analyzer rooms and houses may be found in NFPA of NFPA 496 specifies that pressurized enclosures be so constructed as to be unlikely to be damaged under conditions of use. Because NPFA 496 encompasses electrical enclosures, rooms and buildings, there is no single set of criteria available to judge their suitability under this provision. An informative Annex to 4.3.1, and references in Annex B will identify suitable criteria, depending on the type of "enclosure" involved. Submittal Date: Fri May 16 09:41:52 EDT 2014 Resolution: The Committee resolves that the current wording in the standard provides a clear goal and the methods to achieve that is varied such that the committee cannot create a sufficient list of applicable standards. Since the annex was not created in accordance with PI-8 the additional references in PI-9, PI-10, and PI-11 are not required.

6 Public Input No. 9-NFPA [ New Section after B.1.1 ] NFPA 5000, Building Construction and Safety Code, 2012 Edition As stated in the substantiation for adding A.4.3.1, NFPA 496 needs criteria for judging enclosures, rooms and buildings. NFPA 5000 contains criteria for judging building construction. Submittal Date: Fri May 16 09:55:20 EDT 2014 Resolution: The Committee resolves that the current wording in the standard provides a clear goal and the methods to achieve that is varied such that the committee cannot create a sufficient list of applicable standards. Since the annex was not created in accordance with PI-8 the additional references in PI-9, PI-10, and PI-11 are not required.

7 Public Input No. 10-NFPA [ New Section after B ] ANSI/UL 50, Enclosures for Electrical Equipment, Non-Environmental Considerations, 2007, revised NFPA 496 does not include criteria for judging the suitability of electrical enclosures according to the provisions of Those criteria are contained in UL 50. Submittal Date: Fri May 16 10:01:23 EDT 2014 Resolution: The Committee resolves that the current wording in the standard provides a clear goal and the methods to achieve that is varied such that the committee cannot create a sufficient list of applicable standards. Since the annex was not created in accordance with PI-8 the additional references in PI-9, PI-10, and PI-11 are not required.

8 Public Input No. 12-NFPA [ Section No. B.2.1 ] B.2.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA ASTM E 659, Standard Test Method for the Autoignition Temperature of Liquid Chemicals, Update year date of standard. Submitter Full Name: Steve Mawn Organization: ASTM International Submittal Date: Mon Jul 07 12:15:18 EDT 2014 Resolution: FR-7-NFPA Statement: Update year date of standard.

9 Public Input No. 11-NFPA [ New Section after B.2.2 ] IEC , Explosive Atmospheres - Part 13: Equipment protection by pressurized room "p" of NFPA 496 does not contain criteria for judging pressurized rooms, and objective criteria are needed. They may be found in IEC Submittal Date: Fri May 16 10:44:46 EDT 2014 Resolution: The Committee resolves that the current wording in the standard provides a clear goal and the methods to achieve that is varied such that the committee cannot create a sufficient list of applicable standards. Since the annex was not created in accordance with PI-8 the additional references in PI-9, PI-10, and PI-11 are not required.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] 1.3 Application. 1.3.1 This standard shall apply to all systems for the movement of environmental air in structures that serve the following, except

More information

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

WORKING DRAFT OF COMMITTEE MEETING OUTPUT WORKING DRAFT OF COMMITTEE MEETING OUTPUT CONTENT NOT FINAL SUBJECT TO REVISION PRIOR TO LETTER BALLOT AND PUBLICATION OF SECOND DRAFT REPORT Document: NFPA 221 Revision Cycle: A2014 Meeting Date: 5/20/2013

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 1-NFPA 36-2013 [ Global Input ] Revise the document to eliminate the use of "Exception" text. The use of "Exception" text is inconsistent with the Manual of Style. Exception text should

More information

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ] 8 of 93 11/6/2015 7:41 AM Public Input No. 52-NFPA 30-2015 [ Section No. 21.2 [Excluding any Sub-Sections] ] For the purpose of this chapter, the term in this section shall have the definitions given.

More information

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

SAF-BCF SECOND REVISIONS WITH STATEMENTS

SAF-BCF SECOND REVISIONS WITH STATEMENTS Page 196 of 331 32.2.1.3 ] Second Revision No. 153-NFPA 101-2013 [ New Section after 32.2.1.4 Multiple-Level Buildings. For purposes of applying requirements of this chapter that utilize the term level

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] First Revision No. 1-NFPA 499-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this recommended practice

More information

Public Comment No. 1-NFPA [ Section No ]

Public Comment No. 1-NFPA [ Section No ] Page 1 of 7 Public Comment No. 1-NFPA 556-2014 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA, 19428-2959. ASTM D2859, Standard

More information

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 90A-2016 [ Section No. 2.3.2 ] 2.3.2 ASTM International Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM C411, Standard

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM 1 of 14 6/22/2016 3:15 PM Second Revision No. 1-NFPA 17A-2016 [ Section No. 4.3.3 ] 4.3.3 All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease vapors,

More information

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 214-2013 [ Section No. 4.2 ] 4.2 * Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the

More information

Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

Change all instances of flame resistant (hypobaric) to Limited-Combustible (material) in all instances in the document. 1 of 9 10/21/2015 1:22 PM First Revision No. 3-NFPA 99B-2015 [ Global Input ] Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification Public Comment No. 2-NFPA 73-2014 [ Section No. 4.1.3 ] 4.1.3 Unused Openings. 4.1.3.1 Unused openings, other than those intended for the operation of equipment, those intended for mounting purposes, or

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document National Fire Protection Association Report of 113 http://submittals.nfpa.org/terraviewweb/contentfetcher?commentpara... 2/9/2016 10:50 AM Public Input No. 1-NFPA 87-2015 [ Global Input ] Throughout standard

More information

Page 1 of 19 Committee Input No. 14-NFPA 33-2013 [ Global Input ] Type your content here... Supplemental Information File Name IndoorDraftforCI.docx Description This committee input would be added to new

More information

Page 1 of 13 Second Revision No. 1-NFPA 326-2014 [ Section No. 2.3.1 ] 2.3.1 ACGIH Publications. American Conference of Governmental Industrial Hygienists, 1330 Kemper Meadow Drive, Cincinnati, OH 45240-1634.

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

First Revision No. 20-NFPA [ Section No ]

First Revision No. 20-NFPA [ Section No ] of 25 7/15/2015 8:30 AM First Revision No. 20-NFPA 56-2015 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by NFPA

More information

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Second Revision No. 3-NFPA [ Section No. 2.3 ] Second Revision No. 3-NFPA 804-2014 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990. ASME Boiler

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

Public Comment No. 13-NFPA [ Section No ]

Public Comment No. 13-NFPA [ Section No ] Public Comment No. 13-NFPA 30-2013 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM A 395/A395M, Standard

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

Public Comment No. 16-NFPA 13D-2014 [ Section No ]

Public Comment No. 16-NFPA 13D-2014 [ Section No ] of 52 9/22/2014 9:20 AM Public Comment No. 16-NFPA 13D-2014 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 35 12/3/2015 7:13 AM Public Input No. 1-NFPA 90A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI/ASHRAE

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

Remove the "Exception" text to be consistent with direction provided in the MOS.

Remove the Exception text to be consistent with direction provided in the MOS. of 37 1/11/2017 7:38 AM Public Input No. 9-NFPA 88A-2015 [ Global Input ] Remove the "Exception" text to be consistent with direction provided in the MOS. The current language in 88A has numerous section

More information

NFPA 77 Public Inputs with Responses Page 1 of 15

NFPA 77 Public Inputs with Responses Page 1 of 15 Public Input No. 46-NFPA 77-2016 [ Global Input ] Type your content here... Make universal change from "bonding and grounding" to "bonding or grounding". While "grounding and bonding" is ok in some context

More information

Reference to the Smoke Damage Index (SDI) is needed as it is part of the test method.

Reference to the Smoke Damage Index (SDI) is needed as it is part of the test method. Public Input No. 4-NFPA 287-2014 [ Section No. 1.2.3.2 ] 1.2.3.2 Indices resulting from the test methods include critical heat flux (CHF), thermal response parameter (TRP), fire propagation index (FPI),

More information

NFPA 30 FLC-SWC First Revisions Page 1 of 10 11/6/2015 9:21 AM. First Revision No. 208-NFPA [ Section No ]

NFPA 30 FLC-SWC First Revisions Page 1 of 10 11/6/2015 9:21 AM. First Revision No. 208-NFPA [ Section No ] of 46 11/6/2015 9:21 AM First Revision No. 208-NFPA 30-2015 [ Section No. 9.3.3.1 ] 9.3.3.1 Storage of liquids shall not physically obstruct a means of egress. Submittal Date: Wed Sep 09 18:24:20 EDT 2015

More information

26 of 128 9/23/2014 9:25 AM

26 of 128 9/23/2014 9:25 AM 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA 72-2014 [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

Our Statement is not a problem - we are encouraging continuation of the standard as it is written without substantive changes.

Our Statement is not a problem - we are encouraging continuation of the standard as it is written without substantive changes. of 69 10/3/2016 2:09 PM Public Input No. 25-NFPA 652-2016 [ Global Input ] This standard was approved on September 7, 2015, less than one year ago. We believe this standard as written generally provides

More information

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference Matthews, Diane Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference http://nfpa.adobeconnect.com/rpbmeet/

More information

Public Comment No. 20-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 20-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item of 27 9/2/2014 9:27 AM Public Comment No. 20-NFPA 24-2014 [ Section No. 2.3.2 ] 2.3.2 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM First Revision No. 1-NFPA 1403-2015 [ Section No. 1.2.1 ] 1.2.1 The purpose of this standard shall be to provide a process for conducting live fire training evolutions to ensure that they are conducted

More information

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 4-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1 * This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

First Revision No. 82-NFPA [ Section No ] Submitter Information Verification. Committee Statement. 2 of /21/2013 1:03 PM

First Revision No. 82-NFPA [ Section No ] Submitter Information Verification. Committee Statement. 2 of /21/2013 1:03 PM 2 of 326 11/21/2013 1:03 PM First Revision No. 82-NFPA 72-2013 [ Section No. 2.3.4 ] 2.3.4 ISO Publications. International Organization for Standardization, 1, ch. de la Voie-Creuse, Case postale 56, CH-1211

More information

First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] 4.3.11.5.5 Materials within a raised floor plenum exposed to the airflow shall be (a) noncombustible or (b) exhibit a maximum flame spread index of 25

More information

Page 1 of 5 1/29/2016 4:08 PM. First Correlating Revision No. 3-NFPA [ Section No ] Submitter Information Verification

Page 1 of 5 1/29/2016 4:08 PM. First Correlating Revision No. 3-NFPA [ Section No ] Submitter Information Verification First Correlating Revision No. 3-NFPA 101-2016 [ Section No. 6.1.8.1.1 ] 6.1.8.1.1* Definition One- and Two-Family Dwelling Unit. A building that contains not more than two dwelling units, with independent

More information

Revise the metric values throughout the standard to follow the soft conversions provided by the metric task group

Revise the metric values throughout the standard to follow the soft conversions provided by the metric task group of 36 9/22/2014 9:37 AM Second Revision No. 14-NFPA 13D-2014 [ Global Comment ] Revise the metric values throughout the standard to follow the soft conversions provided by the metric task group Supplemental

More information

Report on Proposals June 2013 NFPA 70

Report on Proposals June 2013 NFPA 70 14-1 Log #1170m NEC-P14 Russell LeBlanc, The Peterson School In articles 90 through 830, if the wording is not already there, then add the words (or other structure(s)) after the word BUILDING(S) wherever

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Merchant Vessels

More information

Second Revision No. 1 NFPA [ Chapter 2 ]

Second Revision No. 1 NFPA [ Chapter 2 ] Second Revision No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be

More information

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement 1 of 7 3/4/2016 12:02 PM Second Revision No. 5-NFPA 56-2016 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by

More information

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 47 10/21/2015 9:37 AM First Revision No. 5041-NFPA 101-2015 [ Global Input ] Throughout the document, change electrically controlled egress door assemblies to door hardware-release of electrically locked

More information

Public Input No. 23-NFPA [ Section No. 1.1 [Excluding any

Public Input No. 23-NFPA [ Section No. 1.1 [Excluding any of 222 1/26/2017 2:37 PM Public Input No. 23-NFPA 86-2016 [ Section No. 1.1 [Excluding any Sub-Sections] ] This standard shall apply to Class A, Class B, Class C, and Class D ovens, dryers, and furnaces;

More information

Page 1 of 9 First Revision No. 2-NFPA 99B-2012 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 10, Standard for Portable

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Page 1 of 13 Public Comment No. 2-NFPA 703-2013 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, P.O. Box C700, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959. ASTM D 2898, Standard

More information

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM of 28 11/18/2016 2:25 PM First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] 1.6 Units and Formulas. 1.6.1 The units of measure in this standard are presented first in U.S. customary units (inch-pound

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 105 1/21/2016 7:49 AM Public Input No. 2-NFPA 30A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI

More information

NFPA 37 Public Comment Responses Page 1 of 32

NFPA 37 Public Comment Responses Page 1 of 32 of 30 11/4/2016 3:05 PM Public Comment No. 6-NFPA 37-2016 [ New Section after 1.6 ] TITLE OF NEW CONTENT Type your content here... 1.7 Pressure Measurement. All pressures expressed in this document are

More information

Page 1 of 126 First Revision No. 113-NFPA 45-2013 [ Global Input ] Change all references to Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS) Submittal Date: Thu May 09 11:40:44 EDT 2013 Response

More information

First Revision No. 6-NFPA [ Section No. 2.2 ]

First Revision No. 6-NFPA [ Section No. 2.2 ] Page 1 of 18 First Revision No. 6-NFPA 555-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 12, Standard on Carbon

More information

Public Input No. 140-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 140-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification of 142 1/31/2014 3:03 PM Public Input No. 140-NFPA 1221-2013 [ Global Input ] 1221 / 2013 - Entire Document The scope of this Technical Committee and this specific document are too vague and too broad

More information

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018) M EM O RA N D UM TO: FROM: DATE: SUBJECT: Correlating Committee on Combustible Dusts Yiu Lee, Project Administrator January 27, 2017 NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR6005 SAF-BCF (32.2.1.1.2) Recommendation: 32.2.1.1.2 Where there are sleeping accommodations for more than 16 residents are provided, the occupancy shall be classified as a large facility in accordance

More information

(a) Flame shall not spread to the outer extremities of the sample on the 8 ft 12 ft (2440 mm 3660 mm) wall. Flashover shall not occur.

(a) Flame shall not spread to the outer extremities of the sample on the 8 ft 12 ft (2440 mm 3660 mm) wall. Flashover shall not occur. First Revision No. 1-NFPA 501-2015 [ Section No. 5.3.1.3 ] 5.3.1.3 The following conditions shall be met when an interior finish material is tested using the test protocol of NFPA 286, Standard Methods

More information

Public Comment No. 32-NFPA 90A-2016 [ Section No ] Statement of Problem and Substantiation for Public Comment

Public Comment No. 32-NFPA 90A-2016 [ Section No ] Statement of Problem and Substantiation for Public Comment of 53 11/9/2016 9:07 AM Public Comment No. 32-NFPA 90A-2016 [ Section No. 2.3.2 ] 2.3.2 ASTM International Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA

More information

Page 1 of 15 Second Revision No. 8-NFPA 82-2013 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 13, Standard for the Installation

More information

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169 7471 Phone: 617 770 3000 Fax: 617 770 0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Furnishings

More information

6/9/ :58 PM. First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement

6/9/ :58 PM. First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement First Revision No. 1-NFPA 259-2016 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM D5865, Standard Test Method

More information

First Revision No. 1-NFPA 30A-2015 [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

First Revision No. 1-NFPA 30A-2015 [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement of 35 1/21/2016 7:56 AM First Revision No. 1-NFPA 30A-2015 [ Section No. 1.1.3 ] 1.1.3* This code shall not apply to those motor fuel dispensing facilities where only liquefied petroleum gas (LP-Gas),

More information

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN) 4 of 326 11/21/2013 1:03 PM First Revision No. 161-NFPA 72-2013 [ Section No. 3.3.11 ] 3.3.11 Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

More information

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input of 201 1/13/2014 12:51 PM Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating

More information

First Revision No. 106-NFPA [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 106-NFPA [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 106-NFPA 86-2012 [ Chapter NFPA ] 7.4.10.2* The number of safety shutoff valve cycles shall be determined by one of the following ways: (1) Counting of actual safety shutoff valve open-closed

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

NFPA 101 SAF-RES PUBLIC COMMENTS

NFPA 101 SAF-RES PUBLIC COMMENTS Page 134 of 195 Public Comment No. 3-NFPA 101-2013 [ Section No. 28.7.6.1 ] 28.7.6.1 New draperies, curtains, and other similar loosely hanging furnishings and decorations shall be flame resistant as demonstrated

More information

First Revision No. 36-NFPA [ Section No. 1.1 [Excluding any Sub-Sections] ]

First Revision No. 36-NFPA [ Section No. 1.1 [Excluding any Sub-Sections] ] of 71 6/11/2014 8:20 AM First Revision No. 36-NFPA 76-2014 [ Section No. 1.1 [Excluding any Sub-Sections] ] This standard provides requirements for fire protection of telecommunications facilities where

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

Public Input No. 107-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 107-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification of 123 7/30/2015 1:48 PM Public Input No. 107-NFPA 96-2014 [ Section No. 1.3.2 ] 1.3.2 The authority having jurisdiction shall determine compliance with this standard and authorize equivalent deviations

More information

Public Comment No. 10-NFPA [ Chapter 2 ]

Public Comment No. 10-NFPA [ Chapter 2 ] 1 of 46 12/9/2015 8:16 AM Public Comment No. 10-NFPA 130-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical on Laser Fire Protection Kimberly

More information

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 2-NFPA 259-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM D 5865, Standard Test Method

More information

Hazardous Area Classification in Oil & Gas Industry. A Fire Prevention Tool

Hazardous Area Classification in Oil & Gas Industry. A Fire Prevention Tool Hazardous Area Classification in Oil & Gas Industry A Fire Prevention Tool SFPE ENGINEERING TECHNOLOGY CONFERENCE Oct 4, 2010 New Orleans, LA 1 Overview Oil and gas plants handle flammable materials 2

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: NEC Code-Making Panel 14 From: Kimberly Shea, Project Administrator

More information

First Revision No. 82-NFPA [ Detail ] Submitter Information Verification Submitter Full Name: Organization:

First Revision No. 82-NFPA [ Detail ] Submitter Information Verification Submitter Full Name: Organization: of 176 1/25/2016 3:32 PM First Revision No. 82-NFPA 54-2015 [ Detail ] Title of 7.1: Installation of Underground Piping. Underground Title of 7.2: Installation of Aboveground Piping. Submittal Date: Thu

More information

MEMORANDUM. Technical Committee on Alternative Approaches to Life Safety. NFPA 101A First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Alternative Approaches to Life Safety. NFPA 101A First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Alternative Approaches to

More information

Second Revision No. 14-NFPA [ Global Comment ] Submitter Information Verification. Committee Statement 8/25/ :39 AM

Second Revision No. 14-NFPA [ Global Comment ] Submitter Information Verification. Committee Statement 8/25/ :39 AM of 36 8/25/2015 10:39 AM Second Revision No. 14-NFPA 664-2015 [ Global Comment ] Add the following statement to the begining of Chapter 10 and Chapter 11 - The provisions of this Chapter shall be applied

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000- Log #12 BLD-BSF Final Action: (55.2 (New) ) NOTE: This proposal appeared as Comment 5000-168 (Log #86) which was held from the A11 ROC on Proposal 5000-239. Submitter: Technical Correlating Committee

More information

Report on First Revision June 2014 NFPA 101

Report on First Revision June 2014 NFPA 101 101 FR500 SAF-FUR (10.2.1.2 and 10.2.1.3) Recommendation: 10.2.1.2 The provisions of Section 10.2.1.1 shall not apply to mmaterials having a total thickness of less than 1/28 in (0.9 mm) that are applied

More information

Page 1 of 10 Second Revision No. 8-NFPA 600-2014 [ Section No. 3.3.17 ] 3.3.17* Incident Management System (IMS). A system that defines the roles and responsibilities to be assumed by responders and the

More information

Committee Input No. 28-NFPA 13R-2013 [ Global Input ]

Committee Input No. 28-NFPA 13R-2013 [ Global Input ] Page 1 of 6 Committee Input No. 28-NFPA 13R-2013 [ Global Input ] 6.2.2 Outside Dwelling Units. 6.2.2.1 All sprinklers used outside of the dwelling units shall be in accordance with 6.2.2 7.2 and 7.3.

More information

First Revision No. 15-NFPA [ Chapter 2 ]

First Revision No. 15-NFPA [ Chapter 2 ] Page 1 of 28 First Revision No. 15-NFPA 91-2013 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical self-closing device

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR7040 SAF-MER (36.1.1.4) 36.1.1.4 The provisions of this chapter shall apply to life safety requirements for all new mercantile buildings. Specific requirements shall apply to suboccupancy groups,

More information

Page 1 of 31 Second Revision No. 1-NFPA 80-2014 [ Section No. 2.3.2 ] 2.3.2 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM A36/A36M,

More information

EZ Path System Addressing the Enclosure Integrity Issue Tim Lochner, P.Eng

EZ Path System Addressing the Enclosure Integrity Issue Tim Lochner, P.Eng EZ Path System Addressing the Enclosure Integrity Issue Tim Lochner, P.Eng Total flooding gaseous suppression systems rely on the tightness of the enclosure in order to provide maximum protection to the

More information