1 Assignment Name: The Proposed Design And Construction Supervision o f AVIC Town-Phase 1 Location within Country: Armani Beach Dar Es Salaam Name of Client: AVIC Town No of Staff: 5 Address: Longido Street Plot No. 406 Upanga Dar es Salaam March 2014 Name of Associated Consultans, If Any: Space- in- Space Architects Ltd Completion Date (Month/Year): on going Country: United Republic Of Tanzania Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers No of Staff Months; Duration of Assignment: : on going (in Current Tshs or US$): TSh 150 Billion No of Months of Professional Staff provided by Associated Consultants: 3 Eng. Sakina Mohamed Mohamedy Sakila The site is located thirty (25) kilometers from the Ferry. The project consists of 104 bangalows, and 58 double storey houses. The power will be distributed through underground cable. The main sources of water is boreholes which will be pumped to elevated tanks and distributed to the constructed house by gravity systerm. There are road construction ongoing works with expectation of a clear tarmac road reaching the site. The site is enclosed by two access roads leading to Changani Beach on the Western side and Amani beach on the Eastern side. (Caption 01). Designing and supervision of Electrical system 104 bungalows and 58 double storages houses and structured cabling and security installations Design and supervision of Mechanical system for 104 bungalows and 58 double storages houses, design of fire detection, alarm system, plumbing and drainage Design of the conference centres and solar water heating system.

2 Assignment Name: Tanzania National Re Insurance Corporation (TANRE) Location within Country: DAR ES SALAAM 3B. FIRM S REFERENCES Name of Client: Tanzania National Re Insurance Corporation (TANRE) Address: Longido Street Plot No. 406 Upanga Dar es Salaam March 2012 Completion Date (Month/Year): Dec 2015 Name of Associated Consultans, If Any: M/S Arqes Africa Architects And Interior Designers Ltd Country: United Republic Of Tanzania Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers No of Staff: 5 No of Staff Months; Duration of Assignment: : 36 Months (in Current Tshs or US$): TSh 18 Billion No of Months of Professional Staff provided by Associated Consultants: 18 Eng. W. Chiwawa Edson Ruangisa A multi-storey building (16 levels), two levels of basement for car parking, ground and other 13 floors with overall approximate gross floor area of 10,000 square meters. Associated external works, parking area, walkways, soft landscaping and boundary wall. Associated building engineering and services installations that is, Electrical, Airconditioning and Mechanical Ventilation, Structured Cabling, Lifts, Security and Plumbing and drainage system. In particular, electrical installation shall comprise inter alia supply, installation, testing and commissioning of distribution transformer, prime rated generator, LV switchboard, panel boards, distribution boards and cabling. Others include cable management systems, modern high efficacy lights, switching accessories and power outlets Designing and supervision of Electrical system and structured cabling and security installations Design and supervision of Mechanical system, design of fire detection, alarm system, plumbing and drainage Design if lifts and Air conditioning

3 Assignment Name: Proposed Construction Of Parrot Country: United Republic of Tanzania Hotel On Plot No. 48 Block 21 Kaloleni Arusha Location within Country: Arusha City Firm/Entity/(Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers Name of Client: Parrot HOTEL No. of Staff: 3 Address: ARUSHA March 2009 Completion Date (Month/Year): on going Assignment: on going TZS 20 BILLION Provided M/S Y&P Architects limited by Associated Consultants:- 3 Eng. W. Chiwawa Edson Ruangisa 126 rooms 15floors 3 Stars Hotel building is located on Plot No 48 Block 21 Kaloleni Arusha, the scope of the project include Designing and construction supervision of Electrical system, fire detection and alarm system, lift, Plumbing and drainage, Air conditioning, structured cabling, IPTV, music and security installations. The building meets all the requirements of British Standards and UK Building Regulations as well as of the rigorous developer s specification. Detailed engineering design and Supervision of building construction for electrical services which includes power, lighting and IPTV, music and security installations Detailed engineering design and Supervision of building construction for mechanical services includes Plumbing and drainage, Air conditioning and fire detection and alarm systems. Supervision of building services installations. Commissioning of all services

4 Assignment Name: Mnazi Bay and Songosongo Natural Gas Processing Plats Location within Country: Amani Beach-Mtwara Name of Client: TPDC and China Petroleum Engineering Company Limited Address: Manazi bay Gas field Camp March 2012 Completion Date (Month/Year): on going Name of Associated Consultans, If Any: China Petroleum Engineering Company Limited Country: United Republic Of Tanzania Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers No of Staff: 3 No of Staff Months; Duration of Assignment: : 2Months (in Current Tshs or US$): TSh 5 Billion No of Months of Professional Staff provided by Associated Consultants: Eng. Sakina Mohamed The site is located thirty (30) kilometers from the Ferry. The main road is tarmacked apart from five (5) km from the site. There are road construction ongoing works with expectation of a clear tarmac road reaching the site. The site is enclosed by two access roads leading to Changani Beach on the Western side and Amani beach on the Eastern side. Each site has 16 staff houses and include reaction area and dinning buildings. Water to the proposed buildings is from disallination process then pumped to the elevated tanks. The sorces of power to these houses are from diesel generators Detailed engineering design and Supervision of building construction for electrical services which includes power, lighting and IPTV, music and security installations Detailed engineering design and Supervision of building construction for mechanical services includes Plumbing and drainage, Air conditioning and fire detection and alarm systems.

5 Assignment Name: The Proposed apartments on Plot 1207 Masaki Msasani peninsula for Transcargo limited Location within Country: Dar es salaam regional Name of Client: Transcargo limited No of Staff: 5 Address: P.o.Box: dar es salaam March 2008 Completion Date (Month/Year): on going Name of Associated Consultans, If Any: Tharan Associates, P.O.Box:1008 dar es salaam Country: United Republic Of Tanzania Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers No of Staff Months; Duration of Assignment: : 18 Months (in Current Tshs or US$): TSh 15 Billion No of Months of Professional Staff provided by Associated Consultants: 18 Months Eng. Sakina Mohamed Edson Ruangisa The project is located along Plot No Yacht Club Road Msasani Peninsular Dar Es Salaam. It consists of five storeys (G+Mz+6) and is intended for both commercial and residential use. There are apartments and business areas. The project shall consist of a dedicated transformer, 11/0.4kV 200kVA and a diesel powered generator of the same capacity. Each apartment will have its own meter and distribution board. Lighting will be by modern compact fluorescent lights. Air-conditioners will be split units. The installation shall also include telephone, data and security systems.

6 Assignment Name: Proposed 50MW Diesel power plant Location within Country: Njiro Arusha Country: United Republic of Tanzania Professional staff provided by Your Firm/Entity/ (Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers Name of Client: Symbion Power (T) Ltd No. of Staff: 2 Address: DAR ES SALAAM Assignment: 6Month 2012 (Month/Year): COMPLETED TZS 100 BILLION Provided by Associated Consultants: 50 MW of diesel-fired temporary generators at installed at nyiro Arusha to provides power to the greater Arusha community. Detailed engineering design and Supervision of building construction. Supervision of building services installations. Commissioning of all services

7 Assignment Name: Proposed Construction of For VETA at SONGEA RUVUMA Location within Country: SONGEA RUVUMA REGIONAL Name of Client: No. of Staff: 5 Country: United Republic of Tanzania Professional staff provided by Your Firm/Entity/ (Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers Address: SONGEA RUVUMA REGIONAL 2011 (Month/Year): COMPLETED Sky Architects Consultants Assignment: 6Month TZS 450 MILLION Provided by Associated Consultants: Eng. W. Chiwawa Edson Ruangisa The Vocational Educational and Training Authority (VETA)- VETA songea is implementing a project in which it is undergoing new construction building by constructing a number of structures: Construction of buildings include computer class rooms and, Library and Computer laboratory,the building services include Sewerage system and storm water system Installation of services i.e. electrical and mechanical The Consultant was required to provide design and supervision services of the project. The aim is to provide assistance to the Client in designing works and ensuring that the construction works are carried out in accordance to standard requirements - Feasibility study, Prepare detailed design for building services and Preparation of bidding documents - Supervision of construction, Supervision of building services installations and Commissioning of all services

8 Assignment Name: Proposed Interior Design Of Azania Bank Country: United Republic of Limited- Arusha Branch Tanzania Location within Country: Arusha City Firm/Entity/(Profiles): Electrical & Mechanical Engineers Name of Client: AZANIA BANK LIMITED No. of Staff: 3 Address: DAR ES SALAAM OCTOBER 2011 (Month/Year): FEBRUARY 2012 Assignment: NINE WEEKS TZS 300 MILLION Provided by Associated Consultants: As part of their country wide modernization plan Azania Bank Ltd are carried out a major refurbishment of their Arusha Branch. The modernization includes complete new interiors, new IT backbones, the replacement for the electrical systems, replacement of the air conditioning systems and new security. On completion the branch met international retail standards. Designing of Electrical system, fire detection and alarm system and structured cabling and security installations Designing of plumbing and drainage Designing of air conditioning, Supervision of building services installations. Commissioning of all services

9 Assignment Name: Proposed Remodelling of Azania Bank Limited- Moshi Branch Location within Country: MOSHI URBAN Country: United Republic of Tanzania Firm/Entity/(Profiles): Electrical & Mechanical Engineers Name of Client: AZANIA BANK LIMITED No. of Staff: 5 Address: DAR ES SALAAM Assignment: NINE WEEKS OCTOBER 2011 (Month/Year): FEB, 2012 TZS 200 MILLION Provided by Associated Consultants As part of their country wide modernization plan Azania Bank Ltd are carried out a major refurbishment of their Moshi Branch in Kilimanjaro. The modernization included complete new interiors, new IT backbones, the replacement for the electrical systems, replacement of the air conditioning systems and new security. On completion the branch met international retail standards. Designing of Electrical system, fire detection and alarm system and structured cabling and security installations Designing of plumbing and drainage Designing of air conditioning, Supervision of building services installations. Commissioning of all services

10 Assignment Name: Proposed Rehabilitation NIDA Data Centre Location within Country: DAR ES SALAAM CITY Name of Client: National Identifications Authority Address: DAR ES SALAAM Country: United Republic of Tanzania Firm/Entity/(Profiles):Electrical Engineers No. of Staff:2 Assignment:3 OCT, 2011 (Month/Year):MAY 2012 TZS 1 BILLION Provided by Associated Consultants: - Eng. W. Chiwawa Centre Data Centre, printing and sorting unit for National Identities Authority (NIDA) is implementing a project which will be office building: Construction of buildings structures namely, Library and Computer Block,office, the services offered include Sewerage system and storm water system Installation of services i.e. electrical and mechanical The Consultant was required to provide design and supervision services of the project. The aim is to provide assistance to the Client in designing works and ensuring that the construction works are carried out in accordance to standard requirements Designing of Electrical system, fire detection and alarm system and structured cabling and security installations Designing of plumbing and drainage Designing of air conditioning, Supervision of building services installations. Commissioning of all services

11 Assignment Name: Proposed Praia Hotel Location within Country: Mtwara Municipality Country: United Republic of Tanzania Firm/Entity/(Profiles): Electrical & Mechanical Engineers Name of Client: Praia Hotel Limited No. of Staff: 5 Address: MTWARA Assignment: 8Months 2012 (Month/Year): OCTOBER 2012 TZS 750 MILLION Provided by Associated Consultants: - Eng. W. Chiwawa Edson Ruangisa Narrative description of Project 36 room hotel accommodation, service block and recreation facilities, viz: gym, swimming pool, Designing of Electrical system, fire detection and alarm system and structured cabling and security installations Designing of plumbing and drainage Building services co-ordination and supervision. Supervision of construction. Commissioning of all services.

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF APPLICATION FOR AMENDMENT OF AN ENVIRONMENTAL AUTHORISATION FOR THE HAASENDAL DEVELOPMENT ON PORTIONS 1, 11, 26, 30, 34, 58, AND 87 OF FARM HAASENDAL NO. 222,

More information

Shenzhen-Hong Kong International Center. Shenzhen, China

Shenzhen-Hong Kong International Center. Shenzhen, China Shenzhen-Hong Kong International Center Shenzhen, China Shenzhen-Hong Kong International Center Shenzhen, China Set between the foothills of Longcheng Park and the Dayun National Park, the tower is adjacent

More information

Support with Value. Electro-Mechanical Consultants Grade (A) Website:

Support with Value. Electro-Mechanical Consultants Grade (A)   Website: Electro-Mechanical Consultants Grade (A) Email: dmg@dmg-eg.com Website: www.dmg-eg.com 1 Introduction DMG (previously known as R&A Design Team) is a consultant office specialized in Electro-Mechanical

More information

PUBLIC. Ai + Architecture LLC., 90 Belknap Street, Concord, MA 01742, USA (t) (f)

PUBLIC. Ai + Architecture LLC., 90 Belknap Street, Concord, MA 01742, USA (t) (f) PUBLIC Ai + Architecture LLC., 90 Belknap Street, Concord, MA 01742, USA www.ai-architecture.com +1 978 369 2730 (t) +1 978 369 2731 (f) 2004 Olympic Sailing Center & Marina Village Agios Kosmas, Athens,

More information

May 3, 2010 MEMORANDUM. Dr. Douglas Palmer Chair, Council for the Built Environment. Proposed Lighting of New Recreational Sports Fields

May 3, 2010 MEMORANDUM. Dr. Douglas Palmer Chair, Council for the Built Environment. Proposed Lighting of New Recreational Sports Fields Council for the Built Environment technical subcommittee May 3, 2010 MEMORANDUM To: Subject: Dr. Douglas Palmer Chair, Council for the Built Environment Proposed Lighting of New Recreational Sports Fields

More information

Davron Equipment are the appointed agents for the Patterson range of pumps for fire protection in Sub Saharan Africa.

Davron Equipment are the appointed agents for the Patterson range of pumps for fire protection in Sub Saharan Africa. Davron Equipment was established in March 1990, with the aim of becoming the leading pump and solutions provider to the fire protection industry. Today, with more than 26 years experience, superior quality

More information

Vision.. A dedicated interior design team passionately creative, imaginative, attentive to details, cutting edge & innovative leaders in the interior

Vision.. A dedicated interior design team passionately creative, imaginative, attentive to details, cutting edge & innovative leaders in the interior Vision.. A dedicated interior design team passionately creative, imaginative, attentive to details, cutting edge & innovative leaders in the interior architectural design space CREATIVE STUDIOS LIMITED,

More information

Oil and Gas Sector one stop solution provider

Oil and Gas Sector one stop solution provider DPI SIMBA LTD Oil and Gas Sector one stop solution provider Specialised Engineering Services (SES) ISO CERTIFIED COMPANY www.dpisimba.com DPI SIMBA LTD ISO CERTIFIED COMPANY www.dpisimba.com Oil and Gas

More information

ELBOW BEACH (GOLF CLUB AND VILLAS, BELMONT HOTEL PROPERTY, WARWICK PARISH) SPECIAL DEVELOPMENT ORDER 1999 BR 25/1999 DEVELOPMENT AND PLANNING ACT 1974

ELBOW BEACH (GOLF CLUB AND VILLAS, BELMONT HOTEL PROPERTY, WARWICK PARISH) SPECIAL DEVELOPMENT ORDER 1999 BR 25/1999 DEVELOPMENT AND PLANNING ACT 1974 BR 25/1999 DEVELOPMENT AND PLANNING ACT 1974 1974 :51 THE ELBOW BEACH (GOLF CLUB AND VILLAS, BELMONT HOTEL PROPERTY, WARWICK PARISH) SPECIAL DEVELOPMENT In exercise of the power conferred upon the Minister

More information

FAIRWOOD DESIGN. Designing the Future. Delivering Today INDIA SINGAPORE VIETNAM INDONESIA

FAIRWOOD DESIGN. Designing the Future. Delivering Today INDIA SINGAPORE VIETNAM INDONESIA FAIRWOOD DESIGN INDIA SINGAPORE VIETNAM INDONESIA Designing the Future. Delivering Today Master Planning / Urban Design / Architecture / Engineering / Landscape / Interiors / Strategic Planning FAIRWOOD

More information

IDCANADA.ORG. Professional. Design Solutions. Working With an interior Designer. Nadège Patisserie Toronto nka Photo: Peter A.

IDCANADA.ORG. Professional. Design Solutions. Working With an interior Designer. Nadège Patisserie Toronto nka Photo: Peter A. IDCANADA.ORG Professional Design Solutions Working With an interior Designer Nadège Patisserie Toronto nka Photo: Peter A. Sellar ABOUT INTERIOR DESIGN TYPES OF PROJECTS Whether you re ready to evaluate,

More information

HARTENBOS NORTH (population: Census 2011)

HARTENBOS NORTH (population: Census 2011) 5.8 HARTENBOS NORTH (population: + 184 Census 2011) Figure 5.8.1.1 Hartenbos North: Aerial photograph CNdV africa (Pty) Ltd DRAFT CONCEPTUAL DEVELOPMENT FRAMEWORK REPORT page 439 5.8.1 SPATIAL ANALYSIS,

More information

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee Ninth Meeting Date: 5 October 2005 Time: 3:30pm Venue: Conference Room 15/F, North Point Government Offices, 333 Java Road, North

More information

6. REGIONAL AND COMMUNITY FACILITIES DESIGNATIONS 6.1. OBJECTIVES FOR REGIONAL AND COMMUNITY FACILITIES LAND USE DESIGNATIONS

6. REGIONAL AND COMMUNITY FACILITIES DESIGNATIONS 6.1. OBJECTIVES FOR REGIONAL AND COMMUNITY FACILITIES LAND USE DESIGNATIONS 6. REGIONAL AND COMMUNITY FACILITIES DESIGNATIONS INTRODUCTION The Regional and land use designations provide the primary locations for uses which satisfy the health, education and other service needs

More information

MASTER PLAN UPDATE Phase 1 of the Dubai Hills Estate Concept Masterplan was formally lodged with Dubai Municipality for approvals in September 2014 an

MASTER PLAN UPDATE Phase 1 of the Dubai Hills Estate Concept Masterplan was formally lodged with Dubai Municipality for approvals in September 2014 an DUBAI HILLS ESTATE AT MOHAMMED BIN RASHID CITY Envisaged as a premium lifestyle community, Dubai Hills Estate is a mixed-use development by Emaar Properties and Meraas Holding, which features a series

More information

TRIO SERVICES (E.A.) LIMITED

TRIO SERVICES (E.A.) LIMITED TRIO SERVICES (E.A.) LIMITED Technical People COMPANY PROFILE 2015 Tembo Sacco Plaza, Mukima Drive off Garden Estate Road, Nairobi. P.O. Box 13106-00100 Tel: 020 3569890 Email: info@trioservicesltd.co.ke

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

3.1 The hybrid planning application proposes the following description of development:

3.1 The hybrid planning application proposes the following description of development: CHAPTER 3: PROPOSED DEVELOPMENT 3.1 The hybrid planning application proposes the following description of development: Hybrid (part-outline/part-full) planning application for a single composite development

More information

Comprehensive Study N A G L E H A R T R A Y A R C H I T E C T U R E GILBANE BUILDING C O M P A N Y P R O J E C T M A N A G E M E N T A D V I S O R S

Comprehensive Study N A G L E H A R T R A Y A R C H I T E C T U R E GILBANE BUILDING C O M P A N Y P R O J E C T M A N A G E M E N T A D V I S O R S N A G L E H A R T R A Y A R C H I T E C T U R E GILBANE BUILDING C O M P A N Y P R O J E C T M A N A G E M E N T A D V I S O R S BOE COW Meeting October 6, 015 Comprehensive Study North Shore School District

More information

Palm Jebel Ali - Dubai, United Arab Emirates

Palm Jebel Ali - Dubai, United Arab Emirates Palm Jebel Ali - Dubai, United Arab Emirates LOCATION: CLIENT: Dubai Tony Perrin Senior Development Manager Dubai Waterfront Co LLC PROJECT SIZE: 1000 acres SCOPE OF WORK: Urban Design and Landscape Architecture

More information

Sustainable City of the Future LUSAIL

Sustainable City of the Future LUSAIL Sustainable City of the Future March 2013 1 2013 - Lusail Real Estates Development Company 2 CITY Lusail City Vision To build a strong social and cultural foundation into a technologically advanced modern

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED HAASENDAL DEVELOPMENT AND KUILS RIVER GOLF COURSE RE-DEVELOPMENT ON ERF 23580, ERF 23579, ERF 23582, ERF

More information

Domestic and Residential Fire Sprinklers Design Policy

Domestic and Residential Fire Sprinklers Design Policy Domestic and Residential Fire Sprinklers Design Policy Content Section Page No 1. Background: Fire Sprinklers 3 2. Scope 3 3. Types of Fire Sprinklers 3 4. Types of Supply 4 5. Operating pressures and

More information

Urban Design Site Assessment

Urban Design Site Assessment 1150 Great North Road/8 Parr Road North, Point Chevalier Urban Design Site Assessment (8th February 2017) 1. Introduction and Overview 0B It is proposed to develop land at 1150/1158 Great North Road and

More information

Graham Robert Taylor 48 Bachelor Road Harrogate HG1 3EQ Home phone number Mobile phone number

Graham Robert Taylor 48 Bachelor Road Harrogate HG1 3EQ Home phone number Mobile phone number Graham Robert Taylor 48 Bachelor Road Harrogate HG1 3EQ Home phone number 01423 569 492 Mobile phone number 0790 373 0044 grt@easy-designs.co.uk Personal statement I am used to meeting multiple deadlines

More information

2.18 MU Mixed Use District.

2.18 MU Mixed Use District. 2.18. Intent - The is established to promote the development of an urban residential environment. The regulations are intended to encourage single family urban residential use and development while allowing

More information

ENGINEERING CONSULTANTS (PVT.) LIMITED

ENGINEERING CONSULTANTS (PVT.) LIMITED ENGINEERING CONSULTANTS (PVT.) LIMITED Engineering Consultants (Pvt.) Limited ( ECL) is a multi-disciplinary independent consulting firm established in 1968 as a partnership and incorporated on 21 st April

More information

Retail solutions by Tenos. Value engineered fire safety solutions for landmark retail developments.

Retail solutions by Tenos. Value engineered fire safety solutions for landmark retail developments. retail expertise Retail solutions by Tenos In large open spaces, occupied by people who may be unfamiliar with their surroundings, retail properties can present a unique set of challenges when considering

More information

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018 Rezoning Petition 2018-018 Pre-Hearing Staff Analysis May 21, 2018 REQUEST Current Zoning: R-5 (single family residential), R-5 HD-O (single family residential, historic district overlay) and B-2(CD) HD-O

More information

WHERE OTHERS SEE EMPTY SPACE, WE SEE OPPORTUNITY

WHERE OTHERS SEE EMPTY SPACE, WE SEE OPPORTUNITY / WEYLANDTS SPACES - Overview WHERE OTHERS SEE EMPTY SPACE, WE SEE OPPORTUNITY TURNING EMPTY SPACES INTO LIVING SPACES Weylandts Spaces is the interior design and concept division of Weylandts - the leading

More information

Welcome to our second exhibition of our proposed plans for the future of Dolphin Square.

Welcome to our second exhibition of our proposed plans for the future of Dolphin Square. Welcome to our second exhibition of our proposed plans for the future of Dolphin Square. This exhibition explains why we need to update and refurbish the Estate to secure it for the next 100 years, how

More information

P.T. AGUNG PODOMORO Villa Serpong Resort

P.T. AGUNG PODOMORO Villa Serpong Resort P.T. AGUNG PODOMORO Villa Serpong Resort 1 DRAFT #4 (AND FINAL) Newton's Pty Ltd VIDEO DOCUMENTARY SCRIPT VISION 1 Reflection on the river of a boatman, poling his bamboo raft. A herd of cattle swim in

More information

THE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection gift from Extension Activities Unit Urban Council Public Libraries

THE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection gift from Extension Activities Unit Urban Council Public Libraries THE UNIVERSITY OF HONG KONG LIBRARIES Hong Kong Collection gift from Extension Activities Unit Urban Council Public Libraries Hong Kong Central Library Project The Urban Council provides free library

More information

Welcome to Nola Electrical

Welcome to Nola Electrical PROFILE Welcome to Nola Electrical Nola Electrical has over 25 years experience with jobs ranging from small to multi-storey buildings - including hospitals, offices, universities, schools, hotels, apartments

More information

COMPANY PROFILE Electrical & Instrumentation Contractor

COMPANY PROFILE Electrical & Instrumentation Contractor COMPANY PROFILE Electrical & Instrumentation Contractor Engineering I Supply I Installation I Testing I Commissioning Maintenance I Fabrication I Ship Repairing ABOUT US The year was 2003, where there

More information

The Ritz-Carlton, Paradise Valley

The Ritz-Carlton, Paradise Valley The Ritz-Carlton, Paradise Valley 7000 E. Lincoln Drive Keys to Success Community Conversation II June 4, 2015 RITZ-CARLTON PARADISE VALLEY Town Council Study Session June 4, 2015 General Plan 2012 Land

More information

BASIC INFRASTRUCTURE CONT. & TRAD.

BASIC INFRASTRUCTURE CONT. & TRAD. BASIC INFRASTRUCTURE CONT. & TRAD. Specialized in Electromechanical & General Contractors COMPANY PROFILE P.O. Box 10849,Al Saad, Doha, Qatar. Call : (001) ( +974) 444 2121 4, Fax : (001) ( +974) 444 2121

More information

THE GATEWAY TO YOUR EXCLUSIVE BUSINESS WORLD

THE GATEWAY TO YOUR EXCLUSIVE BUSINESS WORLD LIMASSOL - CYPRUS THE GATEWAY TO YOUR EXCLUSIVE BUSINESS WORLD THE HIGHGATE, LIMASSOL The Highgate is a new landmark building located in the vibrant business hub of Limassol. A space set to redefine the

More information

Vancouver Real Estate Forum. April 23, 2009

Vancouver Real Estate Forum. April 23, 2009 Vancouver Real Estate Forum April 23, 2009 Topic: Retail What Does the Future Hold for this Asset Class? How will the US retail story play out in Canada and BC? Panelists Michael Beattie, Grosvenor Americas

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

KONZA TECHNOPOLIS DEVELOPMENT AUTHORITY

KONZA TECHNOPOLIS DEVELOPMENT AUTHORITY KONZA TECHNOPOLIS DEVELOPMENT AUTHORITY 1.0 INVITATION FOR EXPRESSION OF INTEREST Konza Technopolis Development Authority is the implementing agency for the development of Konza Techno City,a flagship

More information

The community is now 10+ years old and 2000 plus residents.

The community is now 10+ years old and 2000 plus residents. May 2, 2014 The community is now 10+ years old and 2000 plus residents. General annual maintenance has helped keep items in good working condition but items are wearing out and some are broken. Replacement

More information

Guidelines for Integrated, Heat Pump Water Heaters in Multifamily Buildings. Rev. July 18, 2018

Guidelines for Integrated, Heat Pump Water Heaters in Multifamily Buildings. Rev. July 18, 2018 Guidelines for Integrated, Heat Pump Water Heaters in Multifamily Buildings Rev. July 18, 2018 Acknowledgments These guidelines were developed through a joint effort between Eversource and Steven Winter

More information

Baku White City Urban Development Project

Baku White City Urban Development Project Baku White City Urban Development Project Islamic Development Bank 35 th Investment conference on business opportunities in CIS and Azerbaijan Azerbaijan, Baku June 2010 The Black City throughout centuries

More information

NAGPUR METRO WORK RETAIL LEISURE CULTURE

NAGPUR METRO WORK RETAIL LEISURE CULTURE NAGPUR METRO WORK RETAIL LEISURE CULTURE NAGPUR WHERE INDIA CROSSES Best known as the Orange City of India, Nagpur is a major commercial, political, industrial and defence center in the Vidarbha region

More information

WELCOME TO YOULBURY. WELCOME TO YOULBURY EXISTING SITE

WELCOME TO YOULBURY. WELCOME TO YOULBURY EXISTING SITE WELCOME TO YOULBURY In Scouting, we believe that young people develop most when they are learning by doing, when they are given responsibility, work in teams, take acceptable risks and think for themselves.

More information

Integrated Building Environmental Design Case Study: Beijing Parkview Green

Integrated Building Environmental Design Case Study: Beijing Parkview Green Integrated Building Environmental Design Case Study: Beijing Parkview Green The 7th International Energy Agency Annex 44 Forum 24 October 2007 Dr Raymond Yau Director Ove Arup & Partners Hong Kong Ltd.

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

Dusseldorf Business Point, Al Barsha 1, Dubai Tel P.O. box: Mob

Dusseldorf Business Point, Al Barsha 1, Dubai Tel P.O. box: Mob Dusseldorf Business Point, Al Barsha 1, Dubai info@archiscope.org Tel. +971 4 443 5163 P.O. box:0553543 1 Mob. +971 55 716 5309 SR. 1 2 3 4 5 INDEX SUBJECT Company Introduction. Archiscope Competitive

More information

CHAPTER 21 NC-PUD NEIGHBORHOOD COMMERCIAL PUD DISTRICT

CHAPTER 21 NC-PUD NEIGHBORHOOD COMMERCIAL PUD DISTRICT CHAPTER 21 NC-PUD NEIGHBORHOOD COMMERCIAL PUD DISTRICT Section 21.1. Title and Purpose. The Neighborhood Commercial Planned Unit Development District, designated the, is intended for commercial uses of

More information

SALE BY AUCTION PREMISES OF THE LIEGE BRANCH OF THE NATIONAL BANK OF BELGIUM

SALE BY AUCTION PREMISES OF THE LIEGE BRANCH OF THE NATIONAL BANK OF BELGIUM SALE BY AUCTION PREMISES OF THE LIEGE BRANCH OF THE NATIONAL BANK OF BELGIUM A. GENERAL INFORMATION 1. Contact details and further information Sale by auction to be conducted by : Notary Philippe DUSART,

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION. Independence - Freedom - Happiness

SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION. Independence - Freedom - Happiness THE MINISTRY OF SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION Independence - Freedom - Happiness -------- ---------- No. 07/2008/TT-BXD Hanoi, April 7, 2008 CIRCULAR GUIDING THE ELABORATION, EVALUATION,

More information

CCTV Systems. Main suppliers:

CCTV Systems. Main suppliers: Analoque, HD-SDI and IP systems We use chiefly Full HD network cameras with progressive scan Our analogue cameras are mainly based on SONY Effio-E CCD sensor Network recorders supports up to 128 IP cameras

More information

Vivid Architects were appointed by Rabie Property Group as the lead Urban Designers

Vivid Architects were appointed by Rabie Property Group as the lead Urban Designers PROJECT NO 1 AND 3 BRIDGEWAY Century City PROPERTY DEVELOPERS & PROJECT MANAGERS Rabie Property Group ARCHITECTS & PRINCIPAL AGENTS Vivid Architects QUANTITY SURVEYORS B&L Quantity Surveyors CIVIL & STRUCTURAL

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

African urban fantasies

African urban fantasies African urban fantasies New generation urban master plans, produced by international architectural and engineering firms. Vanessa Watson School of Architecture, Planning and Geomatics, University of Cape

More information

Electrical Safety The Hidden Perils

Electrical Safety The Hidden Perils Electrical Safety The Hidden Perils Growing Steve Martin your fire Fire Head and and of security Security Specialist business... Business Groups E: steve.martin@eca.co.uk T: 020 7313 4807 M: 07866 487593

More information

Upcoming Projects and Emerging Issues

Upcoming Projects and Emerging Issues Upcoming Projects and Emerging Issues Strathcona County Working Together With The Consulting Engineers of Alberta http://www.strathcona.ca CEA Partnering with Industry Symposium January 18, 2018 Presentation

More information

GRADONARCHITECTURE. Jarrow Hub Redevelopment Design and Access Statement REV A September 2017

GRADONARCHITECTURE. Jarrow Hub Redevelopment Design and Access Statement REV A September 2017 GRADONARCHITECTURE Design and Access Statement REV A September 2017 Contents 1.0 Introduction 1.1 Statement 2.0 Assessment 2.1 Site Location 2.2 Site Analysis 3.0 Design 3.1 Use 3.2 Design Development

More information

Corporate Profile. Fujita Engineering Co., Ltd.

Corporate Profile. Fujita Engineering Co., Ltd. Corporate Profile Fujita Engineering Co., Ltd. Corporate Data Company Name Representative Directors FUJITA ENGINEERING Co., Ltd. Minoru Fujita, President and Chief Executive Officer (C.E.O.) Head Office

More information

Connecting Nine Buildings in Central Jakarta Together with the MRT. Mulyadi Janto, Director, PT Farpoint Prima

Connecting Nine Buildings in Central Jakarta Together with the MRT. Mulyadi Janto, Director, PT Farpoint Prima Connecting Nine Buildings in Central Jakarta Together with the MRT Mulyadi Janto, Director, PT Farpoint Prima SEQUIS: INTER-SITE CONNECTIVITY 30/10/17 3.45pm 5.15 pm SEQUIS: INTER-SITE CONNECTIVITY 1.

More information

Portfolio Gallery Concept. Design. Execution

Portfolio Gallery Concept. Design. Execution P r e s e n t i n g Portfolio Gallery Concept. Design. Execution Contact Internal Affairs Interiors Private Limited 13, Central Road, Jadavpur, Kolkata - 700032 Phone: 033 24296952, 98300 59421 Who We

More information

M07/11 CURRICULUM VITAE Kelly Tucker

M07/11 CURRICULUM VITAE Kelly Tucker Present Appointment Environmental Scientist Date of Birth 17 th April 1980 ID Number 8004170084085 Nationality South African Education Northcliff High School (1993 1997), Rand Afrikaans University (1998-2002):

More information

ERGON EQUIPMENT SA PRESENTATION

ERGON EQUIPMENT SA PRESENTATION ERGON EQUIPMENT SA PRESENTATION PRESENTATION Contents: 1. Brief company profile 2. Areas of expertise 3. Photos of installations BRIEF COMPANY PROFILE Company founded 1986 Rapid development in following

More information

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1 Environmental Statement Non-Techncial Summary 28.06.2017 Anthology Hale Works xx.xx.xx Document title 1 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description...

More information

SPANISH TOWN, ST. CATHERINE JAMAICA

SPANISH TOWN, ST. CATHERINE JAMAICA SPANISH TOWN, ST. CATHERINE JAMAICA This presentation is aimed at emphasizing the importance of an effective community flood alert component of Community Flood Warning Systems (CFWS) in vulnerable communities

More information

4155 Yonge Street Official Plan Amendment and Rezoning Application Preliminary Report

4155 Yonge Street Official Plan Amendment and Rezoning Application Preliminary Report STAFF REPORT ACTION REQUIRED 4155 Yonge Street Official Plan Amendment and Rezoning Application Preliminary Report Date: May 5, 2011 To: From: Wards: Reference Number: North York Community Council Director,

More information

Final Master Plan and Development Control Regulations

Final Master Plan and Development Control Regulations 1. INTRODUCTION CHECK LIST a. Introduction b. Table of contents c. Definitions. d. scope of works. 2. FINAL OVERALL MASTER PLAN a. SITE ANALYSIS and OVERVIEW: i. Existing and Proposed Site Plan Levels.

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC MEMORANDUM CHARLES PUTMAN & ASSOCIATES, INC. LAND DEVELOPMENT CONSULTANTS PLANNING ZONING PERMITTING 4722 NW Boca Raton Boulevard, Suite C-106 Boca Raton, Florida 33431 Phone: 561/994-6411 FAX: 561/994-0447

More information

Ministry of Petroleum Building, Riyadh. Commercial:

Ministry of Petroleum Building, Riyadh. Commercial: Commercial: Ministry of Petroleum Building, Riyadh Through our experienced teams of architects and interior designers, SAK is perfectly placed to deliver the complete workplace solution. Award winning

More information

Electrical design & installation. Electrical consultancy. Material & equipment sales KELTRON

Electrical design & installation. Electrical consultancy. Material & equipment sales KELTRON Electrical design & installation Electrical consultancy Material & equipment sales ORGANISATIONAL OVERVIEW Keltron is a wholly Ugandan-owned company, headquartered in Kampala. The company is Uganda s

More information

NAIROBI CITY COUNTY DEVELOPMENT PLANS AND POLICIES

NAIROBI CITY COUNTY DEVELOPMENT PLANS AND POLICIES NAIROBI CITY COUNTY DEVELOPMENT PLANS AND POLICIES SHOPPING CENTRE ASSOCIATION OF KENYA CONFERENCE ROSE MUEMA CHIEF OFFICER, URBAN PLANNING NAIROBI CITY COUNTY 13 th October,2016 LEGAL REFERENCE Article

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS for the City of Lake Forest Issue Date: September 23, 2015 Bid Due Date: October 19, 2015 The City of Lake Forest 800 N. Field Drive Lake Forest, Illinois 60045 THE CITY OF LAKE

More information

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF NORWICH

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF NORWICH ORDINANCE 1769 ADOPTED 7/2/2018 PUBLISHED 7/4/2018 AN ORDINANCE AMENDING THE ZONING REGULATIONS OF THE CITY OF NORWICH, CONTAINED IN THE COMPREHENSIVE PLAN BY ADDING REGULATIONS FOR A VILLAGE DISTRICT

More information

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0. Branham High School Budget Remaining 1 906030 Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765,473.00 $635,342.00 $635,342.00 $130,131.00 $0.00 2 970205 Branham Interim Housing - 12 Portable

More information

PROFILE. Background Our Customer Organisation Why Greenmax Lighting? Guaranteed Saving 2 Years Warranty Appendices: Brochure Catalogue

PROFILE. Background Our Customer Organisation Why Greenmax Lighting? Guaranteed Saving 2 Years Warranty Appendices: Brochure Catalogue PROFILE Background Our Customer Organisation Why Greenmax Lighting? Guaranteed Saving 2 Years Warranty Appendices: Brochure Catalogue Greenmax Lighting Pte Ltd, 9 Tagore Lane (S) 787472 t: 6482 6888 e:

More information

37, 39 & 41 FORE STREET

37, 39 & 41 FORE STREET 7, 9 & FORE STREET TIVERTON SECURELY LET LARGE STORE IN ATTRACTIVE SOUTH WEST MARKET TOWN 7, 9 & FORE STREET, TIVERTON Investment Summary Major store let to an undoubted covenant Argos Limited (on assignment

More information

PAN AFRICAN CEMETERIES & CREMATORIA CONFERENCE

PAN AFRICAN CEMETERIES & CREMATORIA CONFERENCE Background The South African Cemeteries Association (SACA) is an industry body for the cemeteries and crematoria industry throughout South Africa. The organisation s main objective is to be the leading

More information

4.8 LAND USE AND PLANNING

4.8 LAND USE AND PLANNING 4.8 LAND USE AND PLANNING 4.8.1 INTRODUCTION This section describes existing and planned land uses at the Hayward campus and analyzes the impact of implementation of the proposed Master Plan on land uses

More information

178 Carruthers Properties Inc.

178 Carruthers Properties Inc. 178 Carruthers Properties Inc. Planning Rationale for 178 Carruthers Avenue Site Plan Control Application June 2014 Table of Contents 1.0 Introduction 2.0 Overview of Subject Property 3.0 Current Zoning

More information

China Construction Curtain Wall Industry Report, July 2013

China Construction Curtain Wall Industry Report, July 2013 China Construction Curtain Wall Industry Report, 2012-2013 July 2013 STUDY GOAL AND OBJECTIVES This report provides the industry executives with strategically significant competitor information, analysis,

More information

NORTH CAROLINA. Downloaded (l) For each nursing unit, or fraction thereof on each floor, the following shall be provided:

NORTH CAROLINA. Downloaded (l) For each nursing unit, or fraction thereof on each floor, the following shall be provided: Housekeeping/Laundry/Maintenance NORTH CAROLINA Downloaded 01.15.11 (l) For each nursing unit, or fraction thereof on each floor, the following shall be provided: (3) a soiled utility room with counter,

More information

Paxton Access Ltd is a leading manufacturer of electronic access control systems.

Paxton Access Ltd is a leading manufacturer of electronic access control systems. Company Profile About Paxton Paxton Access Ltd is a leading manufacturer of electronic access control systems. Established in 1985, we are based in East Sussex in the UK. Our Group Chairman Tony Ratcliffe

More information

ASDAF Shopping Mall, Khamis Mushait. Retail & Showrooms:

ASDAF Shopping Mall, Khamis Mushait. Retail & Showrooms: , ASDAF Shopping Mall, Khamis Mushait ASDAF Real Estate Company invited SAK to propose a landmark design for a Shopping Mall to accommodate top local and international designer brands in Khamis Mushait

More information

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District STAFF REPORT December 20, 2005 To: From: Subject: North York Community Council Director, Community Planning, North York District Preliminary Report Application to Amend the Official Plan and Zoning By-law

More information

Integrated Planning for a Sustainable & Compact City: Singapore s Experience

Integrated Planning for a Sustainable & Compact City: Singapore s Experience Integrated Planning for a Sustainable & Compact City: Singapore s Experience World Bank, Washington DC 7 October 2010 Presenter: WONG Kai Yeng Urban Redevelopment Authority, Singapore 1 Singapore Today

More information

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

SPG 1. * the northern and western sections which are open fields used for pasture and grazing; SPG 1 1.0 INTRODUCTION This development brief is based on the allocation of the Priors Hall site for employment and countryside recreational purposes in the Corby Borough Local Plan. The brief is intended

More information

38 Alice Lane. This building was designed to form an important piece of an urban puzzle. The building PHASE ONE PROJECT

38 Alice Lane. This building was designed to form an important piece of an urban puzzle. The building PHASE ONE PROJECT PROJECT ALICE LANE PHASE ONE Sandton OWNERS Standard Bank, Pivotal Fund & the Alice Lane Trust DEVELOPERS & PROJECT MANAGERS Abland ARCHITECTS Paragon Architects QUANTITY SURVEYORS Quanticost CONSULTING

More information

CSL Projects Limited

CSL Projects Limited Company Profile October - 2015 Phone: +880 960 9000 501, Fax: +880-2-985 1584, E-mail: info@cslprojectsbd.com, Web: www.cslprojectsbd.com CSL Projects Limited is a recently formed sister company of Consolidated

More information

BRIDGES, FLYOVERS AND ELEVATED MRTS STRUCTURES

BRIDGES, FLYOVERS AND ELEVATED MRTS STRUCTURES 2016 Edition BRIDGES, FLYOVERS AND ELEVATED MRTS STRUCTURES Trends, Outlook and Projections Research Report Data-set (Excel) Four Quarterly Updates India Infrastructure Research www.indiainfrastructure.com

More information

REGENERATING WOKINGHAM CREATING A FUTURE REGENERATION:

REGENERATING WOKINGHAM CREATING A FUTURE REGENERATION: REGENERATING WOKINGHAM Uniquely Wokingham Town centres are at the heart of the community They are vibrant places to gather, socialise, and find the things you need in a convenient location. The modern

More information

4.11 Town Centre Secondary Plan (Former City of Cumberland)

4.11 Town Centre Secondary Plan (Former City of Cumberland) 4.11 Town Centre Secondary Plan (Former City of Cumberland) 4.11.1 Town Centre Objectives 4.11.1.1 Introduction The reason for the preparation of this Secondary Plan for the Town Centre is as follows:

More information

Shashe River AT (LTD) Shashe River AT (LTD)

Shashe River AT (LTD) Shashe River AT (LTD) Shashe River Advantage Technologies P.O Box 60217 Dar es salaam, Tanzania East Africa Sam Nujoma road, Opposite Tanzanite Tower Office contacts: TTCL: 0736 940 095 Airtel:0783 940 095 Tigo: 0716 197 897

More information

VEHICLE FIRE INVESTIGATION COURSES

VEHICLE FIRE INVESTIGATION COURSES COURSES AT HOME BASE IN NENAGH IRELAND BUT CAN BE RUN ANYWHERE ALL VEHICLES FROM CARS TO BUSES TYPES OF FIRE SMALL TO TOTAL SYSTEMATIC THE APPROACH TO INVESTIGATION VEHICLE FIRE INVESTIGATION COURSES Aims

More information

GREENFORD HALL & ADJOINING LAND

GREENFORD HALL & ADJOINING LAND GREENFORD HALL & ADJOINING LAND CONTENTS 1. Introduction 1. Introduction 2. Urban Context 2.1 The Site and Surroundings 2.2 Urban Context Map 2.3 Access and Movement 3. Planning Context 3.1 Planning History

More information

One County s Success in Linking Watershed Protection and Land Use Planning

One County s Success in Linking Watershed Protection and Land Use Planning One County s Success in Linking Watershed Protection and Land Use Planning Bob Thompson Porter County Plan Commission March 28, 2012 Indiana Watershed Leadership Academy Population 160,000 Approximately

More information

TOWN OF GOLDEN BEACH DRAINAGE COMPUTATION WORKSHEET Last Updated January 13th, 2017

TOWN OF GOLDEN BEACH DRAINAGE COMPUTATION WORKSHEET Last Updated January 13th, 2017 TOWN OF GOLDEN BEACH DRAINAGE COMPUTATION WORKSHEET Last Updated January 13th, 2017 In order to help the residential developments (single family units) the Town has developed a worksheet to aid applicants

More information

Company profile & prequalification Documents

Company profile & prequalification Documents Company profile & prequalification Documents Design Construction Consulting A Design Full solutions for different themes, purposes and styles Our design department works with a highly experienced and motivated