1 Page of ADDENDUM # DAE: November 7, 07 O CONRAC DOCUMENS ENILED: Memorial Student Union Maintenance Repairs & Second Floor Renovation to North Wing; Life Safety Upgrades to North, South, & AP Green Chapel PROJEC MANUAL FOR: Memorial Student Union Maintenance Repairs & Second Floor Renovation to North Wing; Life Safety Upgrades to North, South, & AP Green Chapel PROJEC NUMBER: CP570 ADVERISEMEN DAE: November 6, 07 PREPARED FOR: CONSULAN: he Curators of the University of Missouri he Lawrence Group 9 N. 4 th St. Ste 000 St. Louis, MO Drawings and Specifications for the above noted project and the work covered thereby are herein modified as follows, and except as set forth herein, otherwise remain unchanged and in full force and effect: SPECIFICAION CHANGES:. Section:.E.7 - Commissioning Log Description: Add Section.E.7 - Commissioning Log. Section: E Special Conditions Description: 0. D Delete from the list of no substitution items: Electric Meter Base Socket 77 JCI Control Systems 0900 Electric Water Cooler(Elkay) N/A. Section: 4 Roller Window Shades Description: Remove Manually Operated window shades. Revise to include Motorized window shades. See revised section Section: 8 - Digital, Addressable Fire Alarm System Description: Add the following under Part,. SYSEM DESCRIPION, A A. Source Limitations for Fire-Alarm System and Components: Components shall be compatible with, and operate as an extension of, existing system. Provide system manufacturer's certification that all components provided have been tested as, and will operate as, a system.. he existing Notifier NFS-640 fire alarm control panel may be reused and upgraded to add a voice Evac system at contractor s option to comply with the specifications and intent of the project for a fully functional voice system. Provide a new door to existing housing.

2 Page of a. he existing pull stations may be re-used since already part of the existing system. b. All of the notification devices, power supplies smoke detectors, heat detectors and batteries shall be replaced with new per the specifications and drawings. DRAWING CHANGES:. Sheet MVD0N: First Floor Plan - North Wing - Ventilation - Demo Description: REVISE ductwork demolition in kitchen area as indicated on reissued Sheet MVD0N.. Sheet MV00: Sub Basement Floor Plan - Ventilation Description: REVISE BCU tagging as shown on reissued Sheet MV00.. Sheet MV0N: First Floor Plan - North Wing - Ventilation Description: REVISE ductwork in kitchen area as shown on reissued Sheet MV0N. 4. Sheet MV0N: Second Floor Plan - North Wing - Ventilation Description: REVISE location of exhaust grilles in JAN N5, REMOVE Keynote from the perimeter of the building as indicated on reissued Sheet MV0N. 5. Sheet MV0N: Attic Floor Plan - North Wing - Ventilation Description: REVISE location of fan and ductwork to coordinate with existing tower light as shown on reissued Sheet MV0N. 6. Sheet MV04N: Roof Plan - North Wing - Ventilation Description: ADD ductwork in outside air hood as shown on reissued Sheet MV04N. 7. Sheet MV500: Ventilation Details Description: MODIFY roof mounted hood detail as shown on reissued Sheet MV Sheet MV60: Ventilation Schedules Description: MODIFY terminal air box schedule, diffuser schedule, unit heater schedule and blower coil unit schedule as shown on reissued Sheet MV Sheet MP000: Piping Cover Sheet Description: ADD Sheet MPD00.5N Ground Floor Plan - North Wing - Piping - Demo in piping sheet index. 0. Sheet MPD00: Sub Basement Floor Plan - Mechanical Piping - Demo Description: ADD note as shown on reissued Sheet MPD00.. Sheet MPD0N: First Floor Plan - North Wing - Piping - Demo Description: REVISE note as shown on reissued Sheet MPD0N.. Sheet MPD0N: Second Floor Plan - North Wing Piping - Demo Description: REVISE piping and note as shown on reissued Sheet MPD0N.. Sheet MP00: Sub Basement Floor Plan - Mechanical Piping Description: REVISE unit heater tagging, REVISE note for flushing and draining system as shown on reissued Sheet MP Sheet MP0N: First Floor Plan - North Wing - Piping Description: REVISE piping as shown on reissued Sheet MP0N.

3 Page of 5. Sheet MP0N: Second Floor Plan - North Wing - Piping Description: ADD tie-in valve, REVISE routing of steam relief vent pipe and REVISE Keynote as shown on reissued Sheet MP0N. 6. Sheet MP50: Mechanical Details Description: REVISE cabinet unit heater coil detail as shown on reissued Sheet MP Sheet MP600: Flow Diagram Description: REVISE chilled water flow diagram as shown on reissued Sheet MP Sheet P000: Plumbing Cover Sheet Description: MODIFY pressure drop of SP- from 0 to 0 feet. 9. Sheet P00.5N: Ground Floor Plan - North Wing - Plumbing Description: ADD check valves to sump pump drain pipes. 0. Sheet FA0S FIRS FLOOR SOUH WING FIRE ALARM Description: Vestibule VS00 Showed existing fire alarm panel to be reused. See attached drawing. Added note FA 04 and added existing smoke detector to be replaced. END OF ADDENDUM

4 Commissioning Items by CSI Division Building System Commissioning CP570 Memorial Union nd Flr Renovation Commissioning Check List Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required Commissioning Agent - Conduct pre-installation meetings per specifications. Meenting Minutes 49 Selective Demolition Do not start demolition until utility disconnect and sealing has been verified in writing 8 Friable and Non-Friable Asbestos Removal Develop & Post Emergency Protection Plan Emergency Protection Plan Maintain at least 0lb ABC fire extinguishers on site (one inside, one outside of abatement area) 00 Fiber Reinforced Polymer (FRP) Composite System Perform Inspection and esting section of specifications est Report 000 Cast-In-Place Concrete Provide a Copy Of Field Cured Concrete Cylinder est Report to Owner's Rep Prior to Stripping Any Load Bearing Formwork Submit concrete mix designs prepared by a qualified testing laboratory for approval prior to placement. est Report From Independent esting Lab mix design reports /7/07 COM of 6

5 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required 4000 Unit Masonry Provide mock-ups per specifications. Inspection Report 44 Anchored Stone Masonry Veneer Build Mockups as specified Inspection Report 4700 Cast Stone Masonry Provide mock-ups per specifications. Inspection Report 500 Structural Steel Framing Provide welder qualification report for each welder on site Welder Qualifications 500 Steel Joist Framing Provide welder qualification report for each welder on site Welder Qualifications 500 Steel Decking Provide welder qualification report for each welder on site Welder Qualifications Metal Fabrications Provide welder qualification report for each welder on site Welder Qualifications /7/07 COM of 6

6 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required 55 Pipe and ube Railings Provide welder qualification report for each welder on site Welder Qualifications 76 Self-Adhering Sheet Waterproofing Contact Owner's Representative prior to backfilling to allow for inspection of damp/waterproofing. Perform Field Quality Control section of specifications test report 776 Fluid-Applied Membrane and Air Barriers Build Mockup as specified Inspection Report Hold Preinstallation Meeting as specified Meeting Minutes Perform Field Quality Control section of specifications field report 76 Slate Shingles Build Mockups as specified Inspection Report Perform Manufacturers walkthru for warranty Inspection Report Provide Extra Material as specified ransmittal /7/07 COM of 6

7 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required 779 Manufactured Roof Expansion Joints Conduct a preinstallation conference at project site per specifications Document proceedings; provide copy to participants 7844 Joint and Penetration Firestopping Perform Field Quality Control section of specifications est Reports 7900 Joint Sealants Perform Adhesion ests per Field Quality Control section of specifications field report Put sealant in mockups as specified Inspection Report 8067 Door Hardware Sets Provide special tools as specified ransmittal 8 Hollw Metal Doors & Frames Check and readjust all operating finish hardware and doors itemized list of doors 8700 Door Hardware Perform Field Quality Control section of specifications est Report Provide Special ools as specified ransmittal /7/07 COM 4 of 6

8 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required Verify that all fire doors close and latch positively test report 9900 Gypsum Board Verify fire rating compliance is maintained, including all wall penetrations 90 Ceramic ile Provide Extra Material as specified ransmittal 95 Acoustical Panel Ceilings Hold Preinstallation Meeting as specified Meeting Minutes Provide Extra Material as specified ransmittal 965 Resilient Base and Accessories Provide Extra Material as specified ransmittal 9656 Resilient Sheet Flooring Install mockups as specified Inspection report Perform ph, Chloride (moisture) and bond tests per manufacturer. Do not proceed until all manufacturing requirements are met. est Report /7/07 COM 5 of 6

9 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required Provide Extra Material as specified ransmittal 968 ile Carpeting Conduct pre-installation meeting per specifications Meeting Minutes Provide Extra Material as specified ransmittal 9700 Wall Coverings Install mockups as specified Inspection Report Provide Extra Material as specified ransmittal 99 Exterior Painting Periodically Check Wet Film hickness o Assure Conformance With Manufacturer's Requirements o Achieve Dry Film hickness per Field Quality Control section of spec field report Provide Extra Material as specified ransmittal 99 Interior Painting Periodically Check Wet Film hickness o Assure Conformance With Manufacturer's Requirements o Achieve Dry Film hickness per Field Quality Control section of spec field report Provide Extra Material as specified ransmittal /7/07 COM 6 of 6

10 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required 0 Phenolic-Core oilet Compartment Furnish extra material as specified ransmittal 09 Folding Panel Partitions Furnish extra material as specified ransmittal Perform Demonstration Section of specifications Sign-in Sheet 4 Roller Window Shades Perform Demonstration section of specifications Sign-in Sheet Provide Extra Material as specified ransmittal 660 Soliid Surfacing Countertops Build Mockups as specified Inspection Report 400 Electric raction Elevators Perform Demonstration Section of specifications Sign-in Sheet Perform esting and Inspection Section of specifications Certification /7/07 COM 7 of 6

11 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required 00 Fire Protection Systems Flush, test and inspect stand piping per System Cleaning and esting Section of specifications test results report, NFPA Certification Provide Extra Stock as specified ransmittal Walk Owners Maintenance Personnel hru Sprinkler System Sign-in Sheet 055 Plumbing Identification Install valve tags on valves and control devices per specifications Valve Schedule framed/posted 000 Plumbing Piping Perform Plumbing Walkthru with Owners Maintenance Personnel Sign-in Sheet est piping per esting Piping section of specifications. Hold sanitary and storm drain tests for hour not 5 minutes est Reports 49 Sump Pumps Startup Sump pumps and take amp draw readings Startup Report 0505 HVAC Demolition for Remodeling Hold MEP pre-installation meeting(s). Meeting Minutes /7/07 COM 8 of 6

12 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required 05 Motors Verify basic motor requirements are in accordance with documents Inspection Report 055 HVAC Identification Install pipe markers per specifications 0594 esting, Adjusting, and Balancing Coordinate temperature control testing and adjusting with temperature controls contractor Ensure pre-test requirements as specified in paragraph.0 have been completed Hold Prebalancing Meeting as specified Meeting Minutes Mark equipment settings including central positions, value indicators, fan speed control levers, etc. Notify Owner's Representative 4 days prior to the scheduled date for balancing the system. written notification 0900 Control Systems Ensure Control I/O drawings have been submitted to EMO I/O Drawings Ensure shipping material has been removed from thermostats and other control devices /7/07 COM 9 of 6

13 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required Post laminated control diagram in mechanical room Verify power to all EMCS panels and equipment is complete Verify systems are completely operable and ready for testing and balancing 00 Hydronic Piping Pressure test piping per esting Piping section of specifications test report Hydronic Pumps Align pumps to conform with manufacturer's published tolerances test report Startup Pumps with Factory rained personnel Start-up report 00 Steam and Condensate Piping Clean Piping per Cleaning Piping section of specifications Cleaning Report est Piping per esting Piping section of specifications est Report 500 Chemical (Water) reatment Provide Extra Stock as specified ransmittal /7/07 COM 0 of 6

14 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required 00 Ductwork test for duct leakage per "esting" section of spec. Ducts shall meet leakage requirement prior to testing and balancing test report 00 Ductwork Accessories Demonstrate Proper Operation of All Fire Dampers per NFPA-90A. test report 46 Centrifugal Fans Provide Extra Stock as specified ransmittal Verify fan rotates freely, align pulleys and install fan guards 600 Air erminal Units Notify owner's rep after fully installing a representative unit (in-place mockup) for approval. Coordinate and cooperate with owner's commissioning of the boxes. Inspection Reports 5700 Heat Exchangers Pull Pressure Vessel permit if applicable Pressure Vessel Permit 7 Indoor Modular Air Handling Units Provide Extra Stock as specified ransmittal /7/07 COM of 6

15 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required 6050 hrough Penetration Firestopping Verify that every penetration through fire walls (re: life safety plans) has been properly firestopped per Inspection section of spec. certification 605 Wires and Cables Ensure wires are color coded per specifications Perform independent tests per "Field Quality Control" section of spec, including megohm/high pot tests test report 6055 Medium-Voltage Cable and Accessories Perform independent tests per "Field Quality Control" section of spec, including megohm/high pot tests test report 6056 Grounding and Bonding Perform resistance test as described in "Field Quality Control" section of spec test report 6055 Electrical Identification Verify all equipment, panels, conduits and conductors are correctly labeled Power Systems Study Factory certified technician to set electronic overcurrent devices to approved coordination study setpoints Inspection Report Place arcflash labels on equipment as specified /7/07 COM of 6

16 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required SKM data to be ed to MU Commissioning SKM Data rain owners representatives in setting of overcurrent devices Sign-up Sheet 609 Lighting Control Devices Perform Field Quality Control and Factory Commissioning sections of specifications field report Provide factory training per Demonstration Sign-in Sheet 600 Dry ype ransformers Perform checks and tests as noted in "Field Quality Control" section of spec test report 64 Switchboards Perform checks per "Field Quality Control" section of spec test reports 646 Panelboards Perform checks per "Field Quality Control" section of spec test reports 649 Motor Control Provide Spare Parts as specified ransmittal /7/07 COM of 6

17 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required 68 Fuses Provide Spare Parts as specified ransmittal 69 Variable Frequency Drives Perform Factory esting section of specifications est Report Perform Startup and Commissioning section of specifications Commissioning Report Provide Extra Material as specified ransmittal 659 LED Interior Lighting Furnish Extra Material as specified ransmittal Perform Field Quality Control section of specifications test reports 659 Emergency and Exit Lighting Illuminate emergency lights for 90 minutes on battery power. est Report Perform Field Quality Control section of specifications est Report Perform Startup Service section of specifications Startup Report /7/07 COM 4 of 6

18 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required 7056 Communications Bonding Perform Field Quality Control section of specifications est Report Perform System raining section of specifications Sign-up Sheet Perform esting section of specifications est Report 8 Digital, Addressable Fire-Alarm System Perform Field Quality Control section of specifications NFPA Certification Provide factory training Sign-in Sheet est system operation of pull stations horns/strobes by factory trained representative Pre-est Checklist 00 Excavation and Fill Perform Quality Control section of specifications est Report Aggregate Base Courses Perform Field Quality Control section of specifications est Report /7/07 COM 5 of 6

19 Commissioning Items by CSI Division Verified by: Name Firm Date compl Coord Initial Documentation Required Owner Witness Required Concrete Paving Perform Quality Control section of specifications est Report 7 Medium-Voltage ransformers Perform Field Quality Control section of specifications est Report /7/07 COM 6 of 6

20 4//00 Construction Management Checklist for Energizing Utilities (Contractor to initial each item upon completion and provide completed form to the Owner s Representative prior to energizing utility) Water turned on to the first valve past Energy Management s last valve. Review all piping and equipment being turned on for proper installation and completed testing. Insulation installed (preferred but not required) Meter properly installed, working, and in readable location. Contractor has swabbed out with chlorine all piping from the backflow preventer to the source while installing. All bacteriological tests have been completed and passed. Backflow preventer installed and tested. (will need water pressure to test) Pressure test completed in piping being turned on. Contractor has method to communicate Services On to other contractor personnel and Owner s personnel. Steam turned on to the first valve past Energy Management s last valve. Review all piping, equipment, valves, reducing stations, relief valves, etc. for proper installation and complete testing. Piping protected from the weather. Insulation must be installed. All hangers and bolts have been installed. Meter installed, working and in readable location. (Don t need metasys to turn on.) All needed traps are installed and able to be tested as they are turned on. Condensate system is installed and operating including the pumping system. Pressure test completed in piping being turned on. Contractor has method to communicate Services On to other contractor personnel and Owner s personnel. Condensate turned on to the first valve past Energy Management s last valve. Review all piping and equipment being turned on for proper installation and completed testing. Piping protected from the weather. Insulation installed (preferred but not required) Pressure test completed in piping being turned on. Contractor has method to communicate Services On to other contractor personnel and Owner s personnel. Electric turned on to the first breaker past.8kv transformer. Review all wiring and equipment being turned on for proper installation and completed testing GFCI set and tested. Breakers set and tested. All needed permanent grounds are installed. Meter installed, working and in readable location. Main switchgear protected from the weather. Contractor has method to communicate Services On to other contractor personnel and Owner s personnel. Chilled Water turned on to the first valve inside of building. Review all piping and equipment being turned on for proper installation and completed testing. Pressure test completed in piping being turned on. Insulation must be installed. Meter installed, working and connected to Metasys. Building pump and automatic isolation/control valve must be installed and under control. If chillers are installed, automatic loop pump isolation must be installed. Control valves must be installed and automatically controlled on all loads. Contractor has method to communicate Services On to other contractor personnel and Owner s personnel.

21 Please see following website for suggested commissioning forms: forms.html

22 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 ADDENDUM # SECION 4 - ROLLER WINDOW SHADES PAR - GENERAL. RELAED DOCUMENS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 Specification Sections, apply to this Section.. SUMMARY A. Section Includes:. Manually ELECRICALLY (ADD #) operated roller shades with single rollers. B. Related Requirements:. Section "Rough Carpentry" for wood blocking and grounds for mounting roller shades and accessories.. Section "Joint Sealants" for sealing the perimeters of installation accessories for light-blocking shades with a sealant.. ACION SUBMIALS A. Product Data: For each type of product.. Include construction details, material descriptions, dimensions of individual components and profiles, features, finishes, and operating instructions for roller shades. B. Shop Drawings: Show fabrication and installation details for roller shades, including shadeband materials, their orientation to rollers, and their seam and batten locations. C. Samples: For each exposed product and for each color and texture specified, 0 inches (50 mm) long. D. Samples for Initial Selection: For each type and color of shadeband material.. Include Samples of accessories involving color selection..4 INFORMAIONAL SUBMIALS A. Qualification Data: For Installer. B. Product Certificates: For each type of shadeband material. ROLLER WINDOW SHADES 4 -

23 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 ADDENDUM #.5 CLOSEOU SUBMIALS A. Operation and Maintenance Data: For roller shades to include in maintenance manuals..6 MAINENANCE MAERIAL SUBMIALS A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.. Roller Shades: Full-size units equal to 5 percent of quantity installed for each size, color, and shadeband material indicated, but no fewer than two units..7 QUALIY ASSURANCE A. Installer Qualifications: Fabricator of products. B. Mockups: Build mockups to verify selections made under Sample submittals, to demonstrate aesthetic effects, and to set quality standards for fabrication and installation.. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion..8 DELIVERY, SORAGE, AND HANDLING A. Deliver roller shades in factory packages, marked with manufacturer, product name, and location of installation using same designations indicated on Drawings..9 FIELD CONDIIONS A. Environmental Limitations: Do not install roller shades until construction and finish work in spaces, including painting, is complete and dry and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use. B. Field Measurements: Where roller shades are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication and indicate measurements on Shop Drawings. Allow clearances for operating hardware of operable glazed units through entire operating range. Notify Architect of installation conditions that vary from Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work. ROLLER WINDOW SHADES 4 -

24 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 ADDENDUM # PAR - PRODUCS. MANUFACURERS A. Source Limitations: Obtain roller shades from single source from single manufacturer.. MANUALLY OPERAED SHADES WIH SINGLE ROLLERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:. BX Window Automation Inc.. CACO, Inc., Window Fashions.. DFB Sales Inc. 4. Draper Inc. 5. Hunter Douglas Contract. 6. Insolroll Window Shading Systems. 7. Lutron Electronics Co., Inc. 8. MechoShade Systems, Inc. 9. OEM Shades Inc. 0. Qmotion Shades.. Silent Gliss.. SM Automatic, Inc.. Springs Window Fashions; SWFcontract. B. Chain-and-Clutch Operating Mechanisms: With continuous-loop bead chain and clutch that stops shade movement when bead chain is released; permanently adjusted and lubricated.. Bead Chains: Nickel-plated metal. a. Loop Length: Full length of roller shade. b. Limit Stops: Provide upper and lower ball stops. c. Chain-Retainer ype: Chain tensioner, jamb mounted. C. Rollers: Corrosion-resistant steel or extruded-aluminum tubes of diameters and wall thicknesses required to accommodate operating mechanisms and weights and widths of shadebands indicated without deflection. Provide with permanently lubricated drive-end assemblies and idleend assemblies designed to facilitate removal of shadebands for service.. Direction of Shadeband Roll: Regular, from back (exterior face) of roller.. Shadeband-to-Roller Attachment: Manufacturer's standard method. D. Mounting Hardware: Brackets or endcaps, corrosion resistant and compatible with roller assembly, operating mechanism, installation accessories, and mounting location and conditions indicated. E. Roller-Coupling Assemblies: Coordinated with operating mechanism and designed to join up to three inline rollers into a multiband shade that is operated by one roller drive-end assembly. F. Shadebands:. Shadeband Material: Light-blocking fabric. ROLLER WINDOW SHADES 4 -

25 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 ADDENDUM #. Shadeband Bottom (Hem) Bar: Steel or extruded aluminum. a. ype: Enclosed in sealed pocket of shadeband material. b. Color and Finish: As selected by Architect from manufacturer's full range. G. Installation Accessories:. Front Fascia: Aluminum extrusion that conceals front and underside of roller and operating mechanism and attaches to roller endcaps without exposed fasteners. a. Shape: L-shaped. b. Height: Manufacturer's standard height required to conceal roller and shadeband assembly when shade is fully open, but not less than 4 inches (0 mm).. Endcap Covers: o cover exposed endcaps.. Installation Accessories Color and Finish: As selected from manufacturer's full range.. MOOR-OPERAED, SINGLE-ROLLER SHADES A. MANUFACURERS: SUBJEC O COMPLIANCE WIH REQUIREMENS, PROVIDE PRODUCS BY ONE OF HE FOLLOWING:. BX WINDOW AUOMAION INC.. CACO, INC., WINDOW FASHIONS.. DRAPER INC. 4. HUNER DOUGLAS CONRAC. 5. LURON ELECRONICS CO., INC. 6. MECHOSHADE SYSEMS, INC. 7. SILEN GLISS INC. B. MOORIZED OPERAING SYSEM: PROVIDE FACORY-ASSEMBLED, SHADE- OPERAOR SYSEM OF SIZE AND CAPACIY AND WIH FEAURES, CHARACERISICS, AND ACCESSORIES SUIABLE FOR CONDIIONS INDICAED, COMPLEE WIH ELECRIC MOOR AND FACORY-PREWIRED MOOR CONROLS, POWER DISCONNEC SWICH, ENCLOSURES PROECING CONROLS AND OPERAING PARS, AND ACCESSORIES REQUIRED FOR RELIABLE OPERAION WIHOU MALFUNCION. INCLUDE WIRING FROM MOOR CONROLS O MOORS. COORDINAE OPERAOR WIRING REQUIREMENS AND ELECRICAL CHARACERISICS WIH BUILDING ELECRICAL SYSEM.. ELECRICAL COMPONENS: LISED AND LABELED AS DEFINED IN NFPA 70, BY A QUALIFIED ESING AGENCY, AND MARKED FOR INENDED LOCAION AND APPLICAION.. ELECRIC MOOR: MANUFACURER'S SANDARD UBULAR, ENCLOSED IN ROLLER. a. ELECRICAL CHARACERISICS: VERIFY WIH ELECRICAL ENGINEER. b. MAXIMUM OAL SHADE WIDH: AS REQUIRED O OPERAE ROLLER SHADES INDICAED. c. MAXIMUM SHADE DROP: AS REQUIRED O OPERAE ROLLER SHADES INDICAED. ROLLER WINDOW SHADES 4-4

26 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 ADDENDUM # d. MAXIMUM WEIGH CAPACIY: AS REQUIRED O OPERAE ROLLER SHADES INDICAED.. REMOE CONROL: ELECRIC CONROLS WIH NEMA ICS 6, YPE ENCLOSURE. PROVIDE HE FOLLOWING FOR REMOE-CONROL ACIVAION OF SHADES: a. KEYED CONROL SAION: KEYED, MAINAINED-CONAC, HREE- POSIION, SWICH-OPERAED CONROL SAION WIH OPEN, CLOSE, AND OFF FUNCIONS. PROVIDE WO KEYS PER SAION. 4. CRANK-OPERAOR OVERRIDE: CRANK AND GEARBOX OPERAE SHADES IN EVEN OF POWER OUAGE OR MOOR FAILURE. 5. LIMI SWICHES: ADJUSABLE SWICHES INERLOCKED WIH MOOR CONROLS AND SE O SOP SHADES AUOMAICALLY A FULLY RAISED AND FULLY LOWERED POSIIONS. 6. OPERAING FEAURES: a. GROUP SWICHING WIH INEGRAED SWICH CONROL; SINGLE FACEPLAE FOR MULIPLE SWICH CUOUS. b. CAPABLE OF INERFACE WIH AUDIOVISUAL CONROL SYSEM. c. CAPABLE OF ACCEPING INPU FROM BUILDING AUOMAION CONROL SYSEM. d. OVERRIDE SWICH. C. ROLLERS: CORROSION-RESISAN SEEL OR EXRUDED-ALUMINUM UBES OF DIAMEERS AND WALL HICKNESSES REQUIRED O ACCOMMODAE OPERAING MECHANISMS AND WEIGHS AND WIDHS OF SHADEBANDS INDICAED WIHOU DEFLECION. PROVIDE WIH PERMANENLY LUBRICAED DRIVE-END ASSEMBLIES AND IDLE-END ASSEMBLIES DESIGNED O FACILIAE REMOVAL OF SHADEBANDS FOR SERVICE.. DIRECION OF SHADEBAND ROLL: REGULAR, FROM BACK (EXERIOR FACE) OF ROLLER.. SHADEBAND-O-ROLLER AACHMEN: MANUFACURER'S SANDARD MEHOD. D. MOUNING HARDWARE: BRACKES OR ENDCAPS, CORROSION RESISAN AND COMPAIBLE WIH ROLLER ASSEMBLY, OPERAING MECHANISM, INSALLAION ACCESSORIES, AND MOUNING LOCAION AND CONDIIONS INDICAED. E. ROLLER-COUPLING ASSEMBLIES: COORDINAED WIH OPERAING MECHANISM AND DESIGNED O JOIN UP O HREE INLINE ROLLERS HA ARE OPERAED BY ONE ROLLER DRIVE-END ASSEMBLY. F. SHADEBANDS:. SHADEBAND MAERIAL: LIGH-BLOCKING FABRIC.. SHADEBAND BOOM (HEM) BAR: SEEL OR EXRUDED ALUMINUM. a. COLOR AND FINISH: AS SELECED BY ARCHIEC FROM MANUFACURER'S FULL RANGE. G. INSALLAION ACCESSORIES: ROLLER WINDOW SHADES 4-5

27 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 ADDENDUM #. FRON FASCIA: ALUMINUM EXRUSION HA CONCEALS FRON AND UNDERSIDE OF ROLLER AND OPERAING MECHANISM AND AACHES O ROLLER ENDCAPS WIHOU EXPOSED FASENERS. a. SHAPE: L-SHAPED. b. HEIGH: MANUFACURER'S SANDARD HEIGH REQUIRED O CONCEAL ROLLER AND SHADEBAND ASSEMBLY WHEN SHADE IS FULLY OPEN, BU NO LESS HAN 4 INCHES (0 MM).. ENDCAP COVERS: O COVER EXPOSED ENDCAPS. (ADD #).4 SHADEBAND MAERIALS A. Shadeband Material Flame-Resistance Rating: Comply with NFPA 70. esting by a qualified testing agency. Identify products with appropriate markings of applicable testing agency. B. Light-Filtering Fabric: Woven fabric, stain and fade resistant.. ype: See Room Finish Legend. PAR - EXECUION. EXAMINAION A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, operational clearances, and other conditions affecting performance of the Work. B. Proceed with installation only after unsatisfactory conditions have been corrected.. ROLLER SHADE INSALLAION A. Install roller shades level, plumb, and aligned with adjacent units according to manufacturer's written instructions.. Opaque Shadebands: Located so shadeband is not closer than inches (5 mm) to interior face of glass. Allow clearances for window operation hardware. B. Roller Shade Locations: As indicated on Drawings.. ADJUSING A. Adjust and balance roller shades to operate smoothly, easily, safely, and free from binding or malfunction throughout entire operational range..4 CLEANING AND PROECION A. Clean roller shade surfaces, after installation, according to manufacturer's written instructions. ROLLER WINDOW SHADES 4-6

28 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 SECION 8 - DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM PAR - GENERAL. RELAED DOCUMENS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 Specification Sections, apply to this Section.. SUMMARY A. Section Includes:. Fire-alarm control unit.. Manual fire-alarm boxes.. System smoke detectors. 4. Heat detectors. 5. Notification appliances. 6. Magnetic door holders. 7. Remote annunciator. 8. Addressable interface device. 9. Digital alarm communicator transmitter.. DEFINIIONS A. EM: Electrical Metallic ubing. B. FACP: Fire Alarm Control Panel. C. NICE: National Institute for Certification in ing echnologies. D. PC: Personal computer..4 ACION SUBMIALS A. Product Data: For each type of product, including furnished options and accessories.. Include construction details, material descriptions, dimensions, profiles, and finishes.. Include rated capacities, operating characteristics, and electrical characteristics. B. Shop Drawings: For fire-alarm system.. Comply with recommendations and requirements in the "Documentation" section of the "Fundamentals" chapter in NFPA 7.. Include plans, elevations, sections, details, and attachments to other work.. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and locations. Indicate conductor DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8 -

29 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 sizes, indicate termination locations and requirements, and distinguish between factory and field wiring. 4. Detail assembly and support requirements. 5. Include voltage drop calculations for notification-appliance circuits. 6. Include battery-size calculations. 7. Include input/output matrix. 8. Include statement from manufacturer that all equipment and components have been tested as a system and meet all requirements in this Specification and in NFPA Include performance parameters and installation details for each detector. 0. Verify that each duct detector is listed for complete range of air velocity, temperature, and humidity possible when air-handling system is operating.. Provide program report showing that air-sampling detector pipe layout balances pneumatically within the airflow range of the air-sampling detector.. Include plans, sections, and elevations of heating, ventilating, and air-conditioning ducts, drawn to scale; coordinate location of duct smoke detectors and access to them. a. Show critical dimensions that relate to placement and support of sampling tubes, detector housing, and remote status and alarm indicators. b. Show field wiring required for HVAC unit shutdown on alarm. c. Locate detectors according to manufacturer's written recommendations.. Include voice/alarm signaling-service equipment rack or console layout, grounding schematic, amplifier power calculation, and single-line connection diagram. 4. Include floor plans to indicate final outlet locations showing address of each addressable device. Show size and route of cable and conduits and point-to-point wiring diagrams. C. General Submittal Requirements:. Submittals shall be approved by authorities having jurisdiction prior to submitting them to Architect.. Shop Drawings shall be prepared by persons with the following qualifications: a. rained and certified by manufacturer in fire-alarm system design. b. NICE-certified, fire-alarm technician; Level III minimum..5 INFORMAIONAL SUBMIALS A. Qualification Data: For Installer. B. Seismic Qualification Certificates: For fire-alarm control unit, accessories, and components, from manufacturer.. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements. C. Field quality-control reports. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8 -

30 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570.6 Sample Warranty: For special warranty..7 CLOSEOU SUBMIALS A. Operation and Maintenance Data: For fire-alarm systems and components to include in emergency, operation, and maintenance manuals.. In addition to items specified in Section 078 "Operation and Maintenance Data," include the following: a. Comply with the "Records" section of the "Inspection, esting and Maintenance" chapter in NFPA 7. b. Provide "Fire Alarm and Emergency Communications System Record of Completion Documents" according to the "Completion Documents" Article in the "Documentation" section of the "Fundamentals" chapter in NFPA 7. c. Complete wiring diagrams showing connections between all devices and equipment. Each conductor shall be numbered at every junction point with indication of origination and termination points. d. Riser diagram. e. Device addresses. f. Air-sampling system sample port locations and modeling program report showing layout meets performance criteria. g. Record copy of site-specific software. h. Provide "Inspection and esting Form" according to the "Inspection, esting and Maintenance" chapter in NFPA 7, and include the following: ) Equipment tested. ) Frequency of testing of installed components. ) Frequency of inspection of installed components. 4) Requirements and recommendations related to results of maintenance. 5) Manufacturer's user training manuals. i. Manufacturer's required maintenance related to system warranty requirements. j. Abbreviated operating instructions for mounting at fire-alarm control unit and each annunciator unit. B. Software and Firmware Operational Documentation:. Software operating and upgrade manuals.. Program Software Backup: On magnetic media or compact disk, complete with data files.. Device address list. 4. Printout of software application and graphic screens..8 QUALIY ASSURANCE A. Installer Qualifications: Personnel shall be trained and certified by manufacturer for installation of units required for this Project. B. Installer Qualifications: Installation shall be by personnel certified by NICE as fire-alarm Level II technician. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8 -

31 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 C. NFPA Certification: Obtain certification according to NFPA 7 by a UL-listed alarm company..9 PROJEC CONDIIONS A. Interruption of Existing Fire-Alarm Service: Do not interrupt fire-alarm service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary guard service according to requirements indicated:. Notify Owner no fewer than seven days in advance of proposed interruption of fire-alarm service.. Do not proceed with interruption of fire-alarm service without Owner's written permission. B. Use of Devices during Construction: Protect devices during construction unless devices are placed in service to protect the facility during construction..0 SEQUENCING AND SCHEDULING A. Existing Fire-Alarm Equipment: Maintain existing equipment fully operational until new equipment has been tested and accepted. As new equipment is installed, label it "NO IN SERVICE" until it is accepted. Remove labels from new equipment when put into service, and label existing fire-alarm equipment "NO IN SERVICE" until removed from the building. B. Equipment Removal: After acceptance of new fire-alarm system, remove existing disconnected fire-alarm equipment and wiring.. WARRANY A. Special Warranty: Manufacturer agrees to repair or replace fire-alarm system equipment and components that fail in materials or workmanship within specified warranty period.. Warranty Extent: All equipment and components not covered in the Maintenance Service Agreement.. Warranty Period: Five years from date of Substantial Completion. PAR - PRODUCS. SYSEM DESCRIPION A. Source Limitations for Fire-Alarm System and Components: Components shall be compatible with, and operate as an extension of, existing system. Provide system manufacturer's certification that all components provided have been tested as, and will operate as, a system.. he existing Notifier NFS-640 fire alarm control panel may be reused and upgraded to add a voice Evac system at contractor s option to comply with the specifications and intent of the project for a fully functional voice system. Provide a new door to existing housing. a. he existing pull stations may be re-used since already part of the existing system. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-4

32 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 A.b. All of the notification devices, power supplies smoke detectors, heat detectors and batteries shall be replaced with new per the specifications and drawings. [ADDENDUM ] B. Noncoded, UL-certified addressable system, with multiplexed signal transmission and voice/strobe evacuation. C. Automatic sensitivity control of certain smoke detectors. D. All components provided shall be listed for use with the selected system. E. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.. SYSEMS OPERAIONAL DESCRIPION A. Fire-alarm signal initiation shall be by one or more of the following devices and systems:. Manual stations.. Heat detectors.. Smoke detectors. 4. Combustible gas detectors. 5. Automatic sprinkler system water flow. 6. Fire standpipe system. B. Fire-alarm signal shall initiate the following actions:. Continuously operate alarm notification appliances, including voice evacuation notices.. Identify alarm and specific initiating device at fire-alarm control unit, and remote annunciators.. ransmit an alarm signal to the remote alarm receiving station. 4. Unlock electric door locks in designated egress paths. 5. Release fire and smoke doors held open by magnetic door holders. 6. Activate voice/alarm communication system. 7. Switch heating, ventilating, and air-conditioning equipment controls to fire-alarm mode. 8. Close smoke dampers in air ducts of designated air-conditioning duct systems. 9. Recall elevators to primary or alternate recall floors. 0. Activate elevator power shunt trip.. Activate emergency lighting control.. Activate emergency shutoffs for gas and fuel supplies.. Record events in the system memory. 4. Record events by the system printer. C. Supervisory signal initiation shall be by one or more of the following devices and actions:. Valve supervisory switch.. Elevator shunt-trip supervision.. User disabling of zones or individual devices. 4. Loss of communication with any panel on the network. 5. Duct smoke detectors. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-5

33 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 D. System trouble signal initiation shall be by one or more of the following devices and actions:. Open circuits, shorts, and grounds in designated circuits.. Opening, tampering with, or removing alarm-initiating and supervisory signal-initiating devices.. Loss of communication with any addressable sensor, input module, relay, control module, remote annunciator, printer interface, or Ethernet module. 4. Loss of primary power at fire-alarm control unit. 5. Ground or a single break in internal circuits of fire-alarm control unit. 6. Abnormal ac voltage at fire-alarm control unit. 7. Break in standby battery circuitry. 8. Failure of battery charging. 9. Abnormal position of any switch at fire-alarm control unit or annunciator. 0. Voice signal amplifier failure.. Hose cabinet door open. E. System Supervisory Signal Actions:. Identify specific device initiating the event at fire-alarm control unit and remote annunciators.. Record the event on system printer.. ransmit system status to building management system.. PERFORMANCE REQUIREMENS A. Seismic Performance: Fire-alarm control unit and raceways shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.. he term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified.".4 MANUFACURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:. Fire Control Instruments, Inc.; a Honeywell company.. NOIFIER; a Honeywell company..5 FIRE-ALARM CONROL UNI A. General Requirements for Fire-Alarm Control Unit:. Field-programmable, microprocessor-based, modular, power-limited design with electronic modules, complying with UL 864. a. System software and programs shall be held in nonvolatile flash, electrically erasable, programmable, read-only memory, retaining the information through failure of primary and secondary power supplies. b. Include a real-time clock for time annotation of events on the event recorder and printer. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-6

34 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 c. Provide communication between the FACP and remote circuit interface panels, annunciators, and displays. d. he FACP shall be listed for connection to a central-station signaling system service. e. Provide nonvolatile memory for system database, logic, and operating system and event history. he system shall require no manual input to initialize in the event of a complete power down condition. he FACP shall provide a minimum 500-event history log.. Addressable Initiation Device Circuits: he FACP shall indicate which communication zones have been silenced and shall provide selective silencing of alarm notification appliance by building communication zone. a. he alarm initiating zone boards in the FACP shall consist of plug-in cards. b. Each loop shall have a software disable Disconnect switch mounted at the panel to disable the circuit during maintenance. his switch shall cause a rouble LED to light at the panel.. Addressable Control Circuits for Operation of Notification Appliances and Mechanical Equipment: he FACP shall be listed for releasing service. B. Alphanumeric Display and System Controls: Arranged for interface between human operator at fire-alarm control unit and addressable system components including annunciation and supervision. Display alarm, supervisory, and component status messages and the programming and control menu.. Annunciator and Display: Liquid-crystal type, two line(s) of 40 characters, minimum.. Keypad: Arranged to permit entry and execution of programming, display, and control commands and to indicate control commands to be entered into the system for control of smoke-detector sensitivity and other parameters. C. Initiating-Device, Notification-Appliance, and Signaling-Line Circuits:. Pathway Class Designations: NFPA 7, Class B.. Pathway Survivability: Level.. Install no more than 50 addressable devices on each signaling-line circuit. a. If more than 50 devices per floor: Provide isolation modules to provide groups of 50 devices within each loop. (ISO-X module or equal) b. Each loop card shall have a minimum of 0% spare capacity for any future devices. 4. Serial Interfaces: a. One dedicated RS 485 port for remote station operation using point ID DAC. b. One RS 485 port for remote annunciators, Ethernet module, or multi-interface module (printer port). c. One USB port for PC configuration. d. One RS port for voice evacuation interface. D. Notification-Appliance Circuit:. Audible appliances shall sound in a three-pulse temporal pattern, as defined in NFPA 7.. Where notification appliances provide signals to sleeping areas, the alarm signal shall be a 50-Hz square wave with an intensity 5 db above the average ambient sound level or 5 db above the maximum sound level, or at least 75 dba, whichever is greater, measured at the pillow. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-7

35 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570. Visual alarm appliances shall flash in synchronization where multiple appliances are in the same field of view, as defined in NFPA 7. E. Elevator Recall:. Elevator recall shall be initiated only by one of the following alarm-initiating devices: a. Elevator lobby detectors except the lobby detector on the designated floor. b. Smoke detector in elevator machine room. c. Smoke detectors in elevator hoistway.. Elevator controller shall be programmed to move the cars to the alternate recall floor if lobby detectors located on the designated recall floors are activated.. Water-flow alarm connected to sprinkler in an elevator shaft and elevator machine room shall shut down elevators associated with the location without time delay. a. Water-flow switch associated with the sprinkler in the elevator pit may have a delay to allow elevators to move to the designated floor. F. Door Controls: Door hold-open devices that are controlled by smoke detectors at doors in smoke-barrier walls shall be connected to fire-alarm system. G. Remote Smoke-Detector Sensitivity Adjustment: Controls shall select specific addressable smoke detectors for adjustment, display their current status and sensitivity settings, and change those settings. Allow controls to be used to program repetitive, time-scheduled, and automated changes in sensitivity of specific detector groups. Record sensitivity adjustments and sensitivityadjustment schedule changes in system memory, and print out the final adjusted values on system printer. H. ransmission to Remote Alarm Receiving Station: Automatically transmit alarm, supervisory, and trouble signals to a remote alarm station. I. Voice/Alarm Signaling Service: Central emergency communication system with redundant microphones, preamplifiers, amplifiers, and tone generators provided as a special module that is part of fire-alarm control unit.. Indicate number of alarm channels for automatic, simultaneous transmission of different announcements to different zones or for manual transmission of announcements by use of the central-control microphone. Amplifiers shall comply with UL 7. a. Allow the application of, and evacuation signal to, indicated number of zones and, at the same time, allow voice paging to the other zones selectively or in any combination. b. Programmable tone and message sequence selection. c. Standard digitally recorded messages for "Evacuation" and "All Clear." d. Provide custom messages as requested by owner for Storm and Lockdown to be initiated manually at main fire alarm control panel and annunciator panel. e. Generate tones to be sequenced with audio messages of type recommended by NFPA 7 and that are compatible with tone patterns of notification-appliance circuits of fire-alarm control unit. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-8

36 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570. Status Annunciator: Indicate the status of various voice/alarm speaker zones and the status of firefighters' two-way telephone communication zones.. Preamplifiers, amplifiers, and tone generators shall automatically transfer to backup units, on primary equipment failure. J. Addressable control circuits for operation of mechanical equipment. K. Control panel/unit shall have 5% spare capacity to account for future buildout of third floor. L. Primary Power: 4-V dc obtained from 0-V ac service and a power-supply module. Initiating devices, notification appliances, signaling lines, trouble signals, supervisory and digital alarm communicator transmitters shall be powered by 4-V dc source.. Alarm current draw of entire fire-alarm system shall not exceed 80 percent of the powersupply module rating. M. Secondary Power: 4-V dc supply system with batteries, automatic battery charger, and automatic transfer switch.. Batteries: Sealed lead calcium. N. Instructions: Computer printout or typewritten instruction card mounted behind a plastic or glass cover in a stainless-steel or aluminum frame. Include interpretation and describe appropriate response for displays and signals. Briefly describe the functional operation of the system under normal, alarm, and trouble conditions..6 MANUAL FIRE-ALARM BOXES A. General Requirements for Manual Fire-Alarm Boxes: Comply with UL 8. Boxes shall be finished in red with molded, raised-letter operating instructions in contrasting color; shall show visible indication of operation; and shall be mounted on recessed outlet box. If indicated as surface mounted, provide manufacturer's surface back box.. Double-action mechanism requiring two actions to initiate an alarm, pull-lever type; with integral addressable module arranged to communicate manual-station status (normal, alarm, or trouble) to fire-alarm control unit.. Station Reset: Key- or wrench-operated switch.. Indoor Protective Shield: Factory-fabricated, clear plastic enclosure hinged at the top to permit lifting for access to initiate an alarm. Lifting the cover actuates an integral batterypowered audible horn intended to discourage false-alarm operation..7 SYSEM SMOKE DEECORS A. General Requirements for System Smoke Detectors:. Comply with UL 68; operating at 4-V dc, nominal.. Detectors shall be two-wire type.. Base Mounting: Detector and associated electronic components shall be mounted in a twist-lock module that connects to a fixed base. Provide terminals in the fixed base for connection to building wiring. 4. Self-Restoring: Detectors do not require resetting or readjustment after actuation to restore them to normal operation. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-9

37 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP Integral Visual-Indicating Light: LED type, indicating detector has operated and poweron status. 6. Remote Control: Unless otherwise indicated, detectors shall be digital-addressable type, individually monitored at fire-alarm control unit for calibration, sensitivity, and alarm condition and individually adjustable for sensitivity by fire-alarm control unit. a. Rate-of-rise temperature characteristic of combination smoke- and heat-detection units shall be selectable at fire-alarm control unit for 5 or 0 deg F per minute. b. Fixed-temperature sensing characteristic of combination smoke- and heatdetection units shall be independent of rate-of-rise sensing and shall be settable at fire-alarm control unit to operate at 5 or 55 deg F. c. Multiple levels of detection sensitivity for each sensor. B. Photoelectric Smoke Detectors:. Detector address shall be accessible from fire-alarm control unit and shall be able to identify the detector's location within the system and its sensitivity setting.. An operator at fire-alarm control unit, having the designated access level, shall be able to manually access the following for each detector: a. Primary status. b. Device type. c. Present average value. d. Present sensitivity selected. e. Sensor range (normal, dirty, etc.). C. Duct Smoke Detectors: Photoelectric type complying with UL 68A.. Detector address shall be accessible from fire-alarm control unit and shall be able to identify the detector's location within the system and its sensitivity setting.. An operator at fire-alarm control unit, having the designated access level, shall be able to manually access the following for each detector: a. Primary status. b. Device type. c. Present average value. d. Present sensitivity selected. e. Sensor range (normal, dirty, etc.).. Weatherproof Duct Housing Enclosure: NEMA 50, ype 4X; NRL listed for use with the supplied detector for smoke detection in HVAC system ducts. 4. Each sensor shall have multiple levels of detection sensitivity. 5. Sampling ubes: Design and dimensions as recommended by manufacturer for specific duct size, air velocity, and installation conditions where applied. 6. Relay Fan Shutdown: Fully programmable relay rated to interrupt fan motor-control circuit. 7. Each sensor shall have a remote mounted test switch..8 HEA DEECORS A. General Requirements for Heat Detectors: Comply with UL 5. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-0

38 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570. emperature sensors shall test for and communicate the sensitivity range of the device. B. Heat Detector, Combination ype: Actuated by either a fixed temperature of 5 deg F or a rate of rise that exceeds 5 deg F per minute unless otherwise indicated.. Mounting: wist-lock base interchangeable with smoke-detector bases.. Integral Addressable Module: Arranged to communicate detector status (normal, alarm, or trouble) to fire-alarm control unit. C. Heat Detector, Fixed-emperature ype: Actuated by temperature that exceeds a fixed temperature of 90 deg F.. Mounting: wist-lock base interchangeable with smoke-detector bases.. Integral Addressable Module: Arranged to communicate detector status (normal, alarm, or trouble) to fire-alarm control unit..9 NOIFICAION APPLIANCES A. General Requirements for Notification Appliances: Connected to notification-appliance signal circuits, zoned as indicated, equipped for mounting as indicated, and with screw terminals for system connections.. Combination Devices: Factory-integrated audible and visible devices in a single-mounting assembly, equipped for mounting as indicated, and with screw terminals for system connections. B. Visible Notification Appliances: Xenon strobe lights complying with UL 97, with clear or nominal white polycarbonate lens mounted on an aluminum faceplate. he word "FIRE" is engraved in minimum -inch- high letters on the lens.. Rated Light Output: a. 5/0/75/0 cd, selectable in the field.. Mounting: Wall mounted unless otherwise indicated.. For units with guards to prevent physical damage, light output ratings shall be determined with guards in place. 4. Flashing shall be in a temporal pattern, synchronized with other units. 5. Strobe Leads: Factory connected to screw terminals. 6. Mounting Faceplate: Factory finished, white. C. Voice/one Notification Appliances:. Comply with UL Speakers for Voice Notification: Locate speakers for voice notification to provide the intelligibility requirements of the "Notification Appliances" and "Emergency Communications Systems" chapters in NFPA 7.. Low-Range Units: Rated to W. 4. Mounting: Flush, semirecessed or surface mounted and bidirectional. 5. Matching ransformers: ap range matched to acoustical environment of speaker location. D. Exit Marking Audible Notification Appliance: DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8 -

39 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570. Exit marking audible notification appliances shall meet the audibility requirements in NFPA 7.. Provide exit marking audible notification appliances at the entrance to all building exits.. Provide exit marking audible notification appliances at the entrance to areas of refuge with audible signals distinct from those used for building exit marking..0 MAGNEIC DOOR HOLDERS A. Description: Units are equipped for wall or floor mounting as indicated and are complete with matching doorplate.. Electromagnets: Require no more than W to develop 5-lbf holding force.. Wall-Mounted Units: Flush mounted unless otherwise indicated.. Rating: 4-V ac or dc. B. Material and Finish: Match door hardware.. REMOE ANNUNCIAOR A. Description: Annunciator functions shall match those of fire-alarm control unit for alarm, supervisory, and trouble indications. Manual switching functions shall match those of fire-alarm control unit, including acknowledging, silencing, resetting, and testing.. Mounting: Surface cabinet, NEMA 50, ype. B. Display ype and Functional Performance: Alphanumeric display and LED indicating lights shall match those of fire-alarm control unit. Provide controls to acknowledge, silence, reset, and test functions for alarm, supervisory, and trouble signals.. ADDRESSABLE INERFACE DEVICE A. General:. Include address-setting means on the module.. Store an internal identifying code for control panel use to identify the module type.. Listed for controlling HVAC fan motor controllers. B. Monitor Module: Microelectronic module providing a system address for alarm-initiating devices for wired applications with normally open contacts. C. Integral Relay: Capable of providing a direct signal to elevator controller to initiate elevator recall.. Allow the control panel to switch the relay contacts on command.. Have a minimum of two normally open and two normally closed contacts available for field wiring. D. Control Module:. Operate notification devices. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8 -

40 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570. Operate solenoids for use in sprinkler service.. DIGIAL ALARM COMMUNICAOR RANSMIER A. Digital alarm communicator transmitter shall be acceptable to the remote central station and shall comply with UL 6. B. Functional Performance: Unit shall receive an alarm, supervisory, or trouble signal from firealarm control unit and automatically transmit through a (digital cellular communicator) data/cell phone dialer to a remote central station. When contact is made with central station(s), signals shall be transmitted. If service on the data/cell dialer is interrupted for longer than 45 seconds, transmitter shall initiate a local trouble signal and transmit the signal indicating loss of telephone line to the remote alarm receiving station over the remaining line. ransmitter shall automatically report telephone service restoration to the central station. If service is lost on both telephone lines, transmitter shall initiate the local trouble signal. C. Local functions and display at the digital alarm communicator transmitter shall include the following:. Verification that both telephone lines are available.. Programming device.. LED display. 4. Manual test report function and manual transmission clear indication. 5. Communications failure with the central station or fire-alarm control unit. D. Digital data transmission shall include the following:. Address of the alarm-initiating device.. Address of the supervisory signal.. Address of the trouble-initiating device. 4. Loss of ac supply. 5. Loss of power. 6. Low battery. 7. Abnormal test signal. 8. Communication bus failure. E. Secondary Power: Integral rechargeable battery and automatic charger. F. Self-est: Conducted automatically every 4 hours with report transmitted to central station. G. Provide with a Digital Cellular Communicator with wo-way Voice ransport Capability via AlarmNet. Similar to Honeywell GSMV or pre-approved equal. Digital Cellular Communicator shall be tied into the dual line Digital Dialer..4 SYSEM PRINER A. Printer shall be listed and labeled as an integral part of fire-alarm system. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8 -

41 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 PAR - EXECUION. EXAMINAION A. Examine areas and conditions for compliance with requirements for ventilation, temperature, humidity, and other conditions affecting performance of the Work.. Verify that manufacturer's written instructions for environmental conditions have been permanently established in spaces where equipment and wiring are installed, before installation begins. B. Examine roughing-in for electrical connections to verify actual locations of connections before installation. C. Proceed with installation only after unsatisfactory conditions have been corrected.. EQUIPMEN INSALLAION A. Comply with NFPA 7, NFPA 0, and requirements of authorities having jurisdiction for installation and testing of fire-alarm equipment. Install all electrical wiring to comply with requirements in NFPA 70 including, but not limited to, Article 760, "Fire Alarm Systems.". Devices placed in service before all other trades have completed cleanup shall be replaced.. Devices installed but not yet placed in service shall be protected from construction dust, debris, dirt, moisture, and damage according to manufacturer's written storage instructions. B. Install wall-mounted equipment, with tops of cabinets not more than 78 inches above the finished floor.. Comply with requirements for seismic-restraint devices specified in Section "Seismic Controls for Electrical Systems." C. Manual Fire-Alarm Boxes:. Install manual fire-alarm box in the normal path of egress within 60 inches of the exit doorway.. Mount manual fire-alarm box on a background of a contrasting color.. he operable part of manual fire-alarm box shall be between 4 inches and 48 inches above floor level. All devices shall be mounted at the same height unless otherwise indicated. D. Smoke- or Heat-Detector Spacing:. Comply with the "Smoke-Sensing Fire Detectors" section in the "Initiating Devices" chapter in NFPA 7, for smoke-detector spacing.. Comply with the "Heat-Sensing Fire Detectors" section in the "Initiating Devices" chapter in NFPA 7, for heat-detector spacing.. Smooth ceiling spacing shall not exceed 0 feet. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-4

42 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP Spacing of detectors for irregular areas, for irregular ceiling construction, and for high ceiling areas shall be determined according to Annex A or Annex B in NFPA HVAC: Locate detectors not closer than 6 inches from air-supply diffuser or return-air opening. 6. Lighting Fixtures: Locate detectors not closer than inches from any part of a lighting fixture and not directly above pendant mounted or indirect lighting. E. Install a cover on each smoke detector that is not placed in service during construction. Cover shall remain in place except during system testing. Remove cover prior to system turnover. F. Duct Smoke Detectors: Comply with NFPA 7 and NFPA 90A. Install sampling tubes so they extend the full width of duct. ubes more than 6 inches long shall be supported at both ends.. Do not install smoke detector in duct smoke-detector housing during construction. Install detector only during system testing and prior to system turnover. G. Elevator Shafts: Coordinate temperature rating and location with sprinkler rating and location. Smoke detectors are only required in sprinklered elevator shafts. H. Remote Status and Alarm Indicators: Install in a visible location near each smoke detector, sprinkler water-flow switch, and valve-tamper switch that is not readily visible from normal viewing position. I. Audible Alarm-Indicating Devices: Install not less than 6 inches below the ceiling. Install speakers on flush-mounted back boxes with the device-operating mechanism concealed behind a grille. Install all devices at the same height unless otherwise indicated. J. Visible Alarm-Indicating Devices: Install adjacent to each alarm bell or alarm horn and at least 6 inches below the ceiling. Install all devices at the same height unless otherwise indicated. K. Device Location-Indicating Lights: Locate in public space near the device they monitor.. PAHWAYS A. Pathways shall be installed in EM. B. Exposed EM shall be painted red enamel..4 CONNECIONS A. For fire-protection systems related to doors in fire-rated walls and partitions and to doors in smoke partitions, comply with requirements in Section "Door Hardware." Connect hardware and devices to fire-alarm system.. Verify that hardware and devices are listed for use with installed fire-alarm system before making connections. B. Make addressable connections with a supervised interface device to the following devices and systems. Install the interface device less than 6 inches from the device controlled. Make an addressable confirmation connection when such feedback is available at the device or system being controlled. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-5

43 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570. Smoke dampers in air ducts of designated HVAC duct systems.. Magnetically held-open doors.. Electronically locked doors and access gates. 4. Alarm-initiating connection to elevator recall system and components. 5. Alarm-initiating connection to activate emergency lighting control. 6. Alarm-initiating connection to activate emergency shutoffs for gas and fuel supplies. 7. Supervisory connections at valve supervisory switches. 8. Supervisory connections at low-air-pressure switch of each dry-pipe sprinkler system. 9. Supervisory connections at elevator shunt-trip breaker. 0. Data communication circuits for connection to building management system.. Data communication circuits for connection to mass notification system.. Supervisory connections at fire-extinguisher locations..5 IDENIFICAION A. Identify system components, wiring, cabling, and terminals. Comply with requirements for identification specified in Section 6055 "Identification for Electrical Systems." B. Install framed instructions in a location visible from fire-alarm control unit..6 GROUNDING A. Ground fire-alarm control unit and associated circuits; comply with IEEE 00. Install a ground wire from main service ground to fire-alarm control unit. B. Ground shielded cables at the control panel location only. Insulate shield at device location..7 FIELD QUALIY CONROL A. Field tests shall be witnessed by authorities having jurisdiction. B. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections. C. Perform tests and inspections. D. Perform the following tests and inspections with the assistance of a factory-authorized service representative:. Visual Inspection: Conduct visual inspection prior to testing. a. Inspection shall be based on completed record Drawings and system documentation that is required by the "Completion Documents, Preparation" table in the "Documentation" section of the "Fundamentals" chapter in NFPA 7. b. Comply with the "Visual Inspection Frequencies" table in the "Inspection" section of the "Inspection, esting and Maintenance" chapter in NFPA 7; retain the "Initial/Reacceptance" column and list only the installed components.. System esting: Comply with the "est Methods" table in the "esting" section of the "Inspection, esting and Maintenance" chapter in NFPA 7. DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-6

44 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570. est audible appliances for the public operating mode according to manufacturer's written instructions. Perform the test using a portable sound-level meter complying with ype requirements in ANSI S est audible appliances for the private operating mode according to manufacturer's written instructions. 5. est visible appliances for the public operating mode according to manufacturer's written instructions. 6. Factory-authorized service representative shall prepare the "Fire Alarm System Record of Completion" in the "Documentation" section of the "Fundamentals" chapter in NFPA 7 and the "Inspection and esting Form" in the "Records" section of the "Inspection, esting and Maintenance" chapter in NFPA 7. E. Reacceptance esting: Perform reacceptance testing to verify the proper operation of added or replaced devices and appliances. F. Fire-alarm system will be considered defective if it does not pass tests and inspections. G. Prepare test and inspection reports. H. Maintenance est and Inspection: Perform tests and inspections listed for weekly, monthly, quarterly, and semiannual periods. Use forms developed for initial tests and inspections. I. Annual est and Inspection: One year after date of Substantial Completion, test fire-alarm system complying with visual and testing inspection requirements in NFPA 7. Use forms developed for initial tests and inspections..8 MAINENANCE SERVICE A. Initial Maintenance Service: Beginning at Substantial Completion, maintenance service shall include months' full maintenance by skilled employees of manufacturer's designated service organization. Include preventive maintenance, repair or replacement of worn or defective components, lubrication, cleaning, and adjusting as required for proper operation. Parts and supplies shall be manufacturer's authorized replacement parts and supplies.. Include visual inspections according to the "Visual Inspection Frequencies" table in the "esting" paragraph of the "Inspection, esting and Maintenance" chapter in NFPA 7.. Perform tests in the "est Methods" table in the "esting" paragraph of the "Inspection, esting and Maintenance" chapter in NFPA 7.. Perform tests per the "esting Frequencies" table in the "esting" paragraph of the "Inspection, esting and Maintenance" chapter in NFPA 7..9 SOFWARE SERVICE AGREEMEN A. Comply with UL 864. B. echnical Support: Beginning at Substantial Completion, service agreement shall include software support for two years. C. Upgrade Service: At Substantial Completion, update software to latest version. Install and program software upgrades that become available within two years from date of Substantial DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-7

45 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 Completion. Upgrading software shall include operating system and new or revised licenses for using software.. Upgrade Notice: At least 0 days to allow Owner to schedule access to system and to upgrade computer equipment if necessary..0 DEMONSRAION A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain fire-alarm system. END OF SECION 8 DIGIAL, ADDRESSABLE FIRE-ALARM SYSEM 8-8

46 UNIVERSIY OF MISSOURI 65 MEMORIAL SUDEN UNION - MAINENANCE REPAIRS AND ND FLOOR RENOVAION MU PROJEC #CP570 ADDENDUM # B. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer, that ensure that roller shades are without damage or deterioration at time of Substantial Completion. C. Replace damaged roller shades that cannot be repaired, in a manner approved by Architect, before time of Substantial Completion..5 DEMONSRAION A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain motor-operated roller shades. END OF SECION 4 ROLLER WINDOW SHADES 4-7

47 C:\Revit Local Files\MEP7_ _MU Memorial Student /7/07 8:7:6 PM LINE YPE KEY: BUILDING CODE: FIRE CODE: PLUMBING CODE: MECHANICAL CODE: ELECRICAL CODE: LIFE SAFEY CODE: NEW WORK BY HIS CONRACOR (DARK SOLID LINE) EXISING O BE REMOVED BY HIS CONRACOR (DARK SHOR DASHED LINE) APPLICABLE CODES CONRACOR SHALL COMPLY WIH APPLICABLE CODES AND LOCAL AMENDMENS. IBC 05 EDIION IFC 05 EDIION IPC 05 EDIION IMC 05 EDIION NFPA 70 (NEC) 04 EDIION NFPA 0 0 EDIION ENERGY CONSERVAION CODE: ASHRAE SYMBOL: CWR CWS D HWR HWS LPC S(5) FM P -* M C O -* DESCRIPION: PIPE CAP PIPE DOWN PIPE UP OR UP/DOWN PIPING SYMBOL LIS CHILLED WAER REURN CHILLED WAER SUPPLY DRAIN HEAING WAER REURN HEAING WAER SUPPLY LOW PRESSURE CONDENSAE PICH PIPE IN DIRECION DIRECION OF FLOW IN PIPE DIELECRIC CONNECION UNION/FLANGE SHUOFF VALVE NORMALLY OPEN SHUOFF VALVE NORMALLY CLOSED AUOMAIC BALANCING VALVE CONROL VALVE (WO-WAY) CHECK VALVE SAFEY/RELIEF VALVE PRESSURE REDUCING VALVE (LIQUID/GAS) PRESSURE REDUCING VALVE (SEAM) PUMP VACUUM BREAKER "WYE" -SRAINER "WYE" - SRAINER W/SHUOFF VALVE AND HOSE CONNECION WIH CAP FLEXIBLE CONNECION PRESSURE/EMPERAURE ES PLUG REDUCER - REFERENCE SPECIFICAION FOR CONCENRIC/ECCENRIC AND FO/FOB PRESSURE GAUGE (FURNISHED WIH BALL VALVE) SUCION DIFFUSER WIH SUPPOR FOO AUOMAIC AIR VEN MANUAL AIR VEN DRAIN VALVE WIH HOSE CONNECION AND CAP HERMOMEER WIH WELL (DIAL YPE) HERMOMEER WIH WELL (FILLED YPE) FLOW MEER SEAM RAP (REFER O SCHEDULE) F& SEAM RAP (REFER O SCHEDULE) ALIGNMEN GUIDE PIPE ANCHOR EXPANSION JOIN MEER HERMOSA/SENSOR NO ALL SYMBOLS MAY APPLY. SEAM- NO. INDICAES PRESSURE IN PSI ### ERMINAL AIR BOX w/rehea COIL (REFER O SCHEDULE) CARBON DIOXIDE SENSOR OCCUPANCY SENSOR NEW CONNECION ABBR: AD AFF CO CS CR DPS E-UH LPS5 LPC PS YP MECHANICAL RENOVAION NOES: HESE NOES APPLY O ALL MECHANICAL SHEES AND RADES, INCLUDING BU NO LIMIED O, FIRE PROECION, PLUMBING, VENILAION, PIPING AND EMPERAURE CONROL.. EXISING CONDIIONS ARE SHOWN BASED ON INFORMAION OBAINED FROM FIELD SURVEYS, EXISING BUILDING DOCUMENS, AND SAFF. VERIFY EXISING CONDIIONS AND REPOR ANY CONFLICS BEFORE PROCEEDING.. NO ALL EXISING DUCWORK AND PIPING IS SHOWN. VERIFY EXISING CONDIIONS BEFORE SARING WORK. NOIFY ENGINEER OF ANY CONFLICS WIH NEW WORK.. FIELD VERIFY HE AVAILABLE CLEARANCES FOR DUCWORK AND PIPING BEFORE FABRICAION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISING FIELD CONDIIONS. 4. EACH CONRACOR SHALL FIELD VERIFY ACCESSIBILIY O HE AREA OF HIS WORK AND SHALL NOIFY HE GENERAL CONRACOR PRIOR O BIDDING IF OHER UILIIES ARE REQUIRED O BE REMOVED OR RELOCAED O ALLOW ACCESS O HIS AREA OF WORK. 5. HE GENERAL CONRACOR IS RESPONSIBLE FOR CUING, REMOVAL AND PACHING OF ROOFS, WALLS, AND FLOORS ASSOCIAED WIH WORK BY ALL CONRACORS. CONRACORS SHALL NOIFY HE GC OF AFFECED AREAS PRIOR O BIDDING. 6. HE GENERAL CONRACOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMEN OF CEILINGS, CEILING ILES, AND CEILING GRIDS ASSOCIAED WIH AREAS OF WORK BY ALL CONRACORS. NOIFY HE GENERAL CONRACOR OF AFFECED AREAS PRIOR O BIDDING. 7. WHERE EXISING MECHANICAL SYSEMS ARE LOCAED IN AREAS HA CONFLIC WIH NEW EQUIPMEN, PIPING, OR DUCWORK O BE INSALLED, EACH CONRACOR SHALL EIHER ARRANGE NEW EQUIPMEN, PIPING, OR DUCWORK IN SUCH A FASHION HA I DOES NO CONFLIC WIH EXISING SYSEMS, OR REWORK EXISING MECHANICAL SYSEMS O ALLOW FOR INSALLAION OF NEW EQUIPMEN, PIPING, OR DUCWORK. 8. OBAIN PERMISSION FROM OWNER BEFORE SHUING DOWN ANY SYSEM FOR ANY REASON. MAINAIN SERVICE O ALL COMPONENS HA ARE O REMAIN UNIL NEW SYSEMS ARE INSALLED. 9. DISCONNEC AND REMOVE MECHANICAL DEVICES AND EQUIPMEN SERVING EQUIPMEN HA HAS BEEN REMOVED. PIPING ABBREVIAION KEY DESCRIPION: ACCESS DOOR ABOVE FINISHED FLOOR CLEANOU CONDENSER WAER SUPPLY CONDENSER WAER REURN DIFFERENIAL PRESSURE SWICH EXISING UNI HEAER LOW PRESSURE SEAM- NO. INDICAES PRESSURE IN PSI LOW PRESSURE CONDENSAE PRESSURE SWICH EXISING RADIAOR YPICAL PIPING SHEE INDEX MP000 PIPING COVER SHEE MPD00 SUB BASEMEN FLOOR PLAN - MECHANICAL PIPING - DEMO MPD00.5N GROUND FLOOR PLAN - NORH WING - PIPING - DEMO MPD0N FIRS FLOOR PLAN - NORH WING - PIPING - DEMO MPD0N SECOND FLOOR PLAN - NORH WING - PIPING - DEMO MPD0N AIC FLOOR PLAN - NORH WING - PIPING - DEMO MP00 SUB BASEMEN FLOOR PLAN - MECHANICAL PIPING MP00.5N GROUND FLOOR PLAN - NORH WING - PIPING MP0N FIRS FLOOR PLAN - NORH WING - PIPING MP0N SECOND FLOOR PLAN - NORH WING - PIPING MP0N AIC FLOOR PLAN - NORH WING - PIPING MP400 AIC ENLARGED PLAN MP500 MECHANICAL DEAILS MP50 MECHANICAL DEAILS MP600 FLOW DIAGRAM MP60 HEAING SYSEM FLOW DIAGRAM MP700 PIPING SCHEDULE PIPING GENERAL NOES:. HE SIZE OF BRANCH PIPING O ERMINAL HEAING DEVICES AND COILS SHALL BE /4" UNLESS NOED OHERWISE.. PIPE DRAIN LINES FROM EQUIPMEN O NEARES FLOOR DRAIN. IN SUB BASEMEN, UNLESS NOED OHERWISE. DO NO ROUE PIPE IN CENER OF ROOM O AVOID RIP HAZARD.. INSALL ALL REFRIGERAN LIQUID AND SUCION PIPING AND SIZED PER EQUIPMEN MANUFACURER RECOMMENDAIONS. MECHANICAL GENERAL NOES: HESE NOES APPLY O ALL MECHANICAL SHEES AND RADES, INCLUDING BU NO LIMIED O, FIRE PROECION, PLUMBING, VENILAION, PIPING AND EMPERAURE CONROL.. DRAWINGS SHOWING LOCAIONS OF EQUIPMEN, DUCWORK, PIPING, EC. ARE DIAGRAMMAIC AND MAY NO ALWAYS REFLEC EXAC INSALLAION CONDIIONS. DRAWINGS SHOW HE GENERAL ARRANGEMEN OF DUCWORK, PIPING, EQUIPMEN, EC., AND MAY NO INCLUDE ALL OFFSES AND FIINGS REQUIRED FOR COMPLEE INSALLAION. HE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACUAL BUILDING CONSRUCION AND HE WORK OF OHERS WILL PERMI.. DO NO SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHIECURAL, SRUCURAL, SUBMIALS, AND OHER APPROPRIAE DRAWINGS OR PHYSICALLY A SIE. REVIEW ALL DRAWINGS, INCLUDING HOSE OF OHER RADES.. COORDINAE ALL WORK WIH ALL OHER RADES PRIOR O INSALLAION O PROVIDE CLEARANCES REQUIRED FOR OPERAION, MAINENANCE, CODE COMPLIANCE, AND O VERIFY NON-INERFERENCE WIH OHER WORK. DO NO FABRICAE PRIOR O VERIFICAION OF NECESSARY CLEARANCES FOR ALL RADES. BRING ANY INERFERENCES OR CONFLICS O HE AENION OF HE ARCHIEC/ENGINEER BEFORE PROCEEDING WIH FABRICAION OR EQUIPMEN ORDERS. 4. REVIEW SPACE REQUIREMENS OF EQUIPMEN SPECIFIED OR SUBSIUED AND MAKE REASONABLE ACCOMMODAIONS IN LAYOU AND POSIIONING O PROVIDE PROPER ACCESS. 5. ANY CHANGES REQUIRED O ELIMINAE CONFLICS OR HA RESUL FROM A FAILURE O COORDINAE SHALL BE MADE BY HE CONRACOR WIHOU ADDIIONAL COS OR EXPENSE O OHERS. 6. EACH CONRACOR IS RESPONSIBLE FOR ALL COSS ASSOCIAED WIH ELECRICAL CHANGES REQUIRED FOR EQUIPMEN PROPOSED HA DIFFERS FROM HE BASIS OF DESIGN. 7. REFER O ARCHIECURAL REFLECED CEILING PLAN, ELECRICAL, ECHNOLOGY AUDIO/VISUAL, AND OHER MECHANICAL PLANS FOR EXAC LOCAIONS OF ALL CEILING MOUNED DEVICES, OHER HAN SPRINKLERS. 8. EACH CONRACOR IS RESPONSIBLE FOR DAMAGE CAUSED BY HEIR ACIONS O WALLS, FLOORS, CEILINGS, AND ROOFS. HE CONRACOR WHOSE WORK CAUSES DAMAGE IS RESPONSIBLE FOR PACHING O MACH ORIGINAL CONSRUCION, FIRE RAING, AND FINISH. 9. IN AREAS WIH DRYWALL CEILINGS COORDINAE LOCAIONS OF ACCESS PANELS WIH HE GC FOR ACCESS O VALVES, DUCWORK ACCESSORIES, DAMPERS, EC. COORDINAE PANEL YPE AND COLOR WIH ARCHIEC. NOIFY HE GC OF HE REQUIRED ACCESS PANELS PRIOR O BIDDING. 0. SEAL ALL FLOOR, WALL, AND ROOF PENERAIONS AIRIGH WHERE CONDUIS, PIPING, AND DUCS PENERAE.. CAULK ALL PIPE AND DUC PENERAIONS OF FULL HEIGH NON-FIRE RAED WALL, PARIION, FLOOR, AND ROOF ASSEMBLIES. HIS IS ESSENIAL O PREVEN NOISE RANSMISSION FROM ONE ROOM O ANOHER AND O PROVIDE HE DESIRED NC LEVELS WIHIN ROOMS.. WHERE PIPES AND DUCS ARE SHOWN O PENERAE FLOORS, PROVIDE SLEEVED OPENINGS WIH HE OP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WIH ALL RELEVAN SPEC SECIONS. SEAL SLEEVE PERIMEER O BE WAERIGH.. EQUIPMEN SIZES AND SERVICE CLEARANCE REQUIREMENS VARY BEWEEN DIFFEREN MANUFACURERS. CONSUL APPROVED SHOP DRAWINGS FOR EQUIPMEN SIZES AND REQUIRED SERVICE CLEARANCES. COORDINAE WIH LAYOU OF EQUIPMEN PADS, PIPING, DUCWORK, EC. 4. DO NO BLOCK UBE PULL OR EQUIPMEN SERVICE CLEARANCES. 5. MAINAIN MINIMUM '-6 CLEARANCE IN FRON OF ALL ELECRICAL PANELS, MOOR SARERS, SWICHES, AND DISCONNECS. 6. PROVIDE CONCREE EQUIPMEN PAD FOR ALL FLOOR MOUNED EQUIPMEN. PAD SHALL EXEND MINIMUM 6 BEYOND ALL SIDES OF EQUIPMEN. 7. DO NO SUPPOR EQUIPMEN, PIPING, OR DUCWORK FROM MEAL DECKING OR OHER NON-SRUCURAL BUILDING ELEMENS. ANCHORS EMBEDDED IN CONCREE SHALL BE CRACKED CONCREE APPROVED IN ACCORDANCE WIH SPECIFICAIONS. MECHANICAL PHASING NOES: HESE NOES APPLY O ALL MECHANICAL SHEES AND RADES, INCLUDING BU NO LIMIED O, FIRE PROECION, PLUMBING, VENILAION, PIPING AND EMPERAURE CONROL.. REFER O ARCHIECURAL DRAWINGS FOR GENERAL DESCRIPION OF SCHEDULING REQUIREMENS. REFER O ARCHIECS INSRUCIONS FOR MORE DEAILS, SCHEDULES AND FOR CONCURREN WORK. MECHANICAL, ELECRICAL AND ECHNOLOGY DRAWINGS DEPIC HE INEN OF HE FINAL DESIGN. HE MECHANICAL, ELECRICAL, AND ECHNOLOGY DRAWINGS DO NO DEPIC HE MEANS AND MEHODS O MEE HE REQUIREMENS OF HE SCHEDULING CRIERIA.. REVIEW PROJEC SCHEDULING REQUIREMENS O COORDINAE DEMOLIION WORK, OUAGES, EC. WIH AFFECED ADJACEN AREAS.. PROVIDE EMPORARY DUCWORK, PIPING, SHUOFF VALVES, ZONE VALVES, ZONE ALARMS, EC. AS NEEDED O MAINAIN SERVICE O ALL AREAS DURING ALL PHASES OF PROJEC. 4. PHASE DEMOLIION WORK O MINIMIZE DOWNIME. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil Professional Seal: Project itle: 9 N. 4th Street Suite 000 St. Louis, MO 60 p f Memorial Student Union KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO 0" MAX. INSALL ABOVE COUNER DEVICE A 44" ABOVE FINISHED FLOOR. 48" MAX. 0"-5" MAX. INSALL ABOVE COUNER DEVICE A 40" ABOVE FINISHED FLOOR. 44" MAX. ADA GUIDELINES -FRON ACCESS INSALL DEVICE A 8" ABOVE FINISHED FLOOR. 5" MIN. 48" MAX. 48" MAX. 0" MAX. 0"-4" MAX. INSALL DEVICE A 44" ABOVE FINISHED FLOOR. INSALL DEVICE A 4" ABOVE FINISHED FLOOR. ADA GUIDELINES -SIDE ACCESS 46" MAX. he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 ADA SANDARDS FOR ACCESSIBLE DESIGN 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E Sheet itle: LGA.5 REFERENCE SCALE IN INCHES 0 PIPING COVER SHEE Project Number: Sheet Number: 65 MP000 Drawn By: ASHMIS Author Issue Date:.6.7

48 A B C D E F G H J K GENERAL NOES: C:\Revit Local Files\MEP7_ _MU Memorial Student Union_Central_mishraas@kjww.com.rvt /7/07 8:7:6 PM " LPC UP " S(5) UP " LPC UP " S(5) UP /4" LPC UP EXISING CONROL PANEL FOR CHILLED WAER PUMP. REMOVE PORION OF PIPE AS INDICAED AND PREPARE FOR NEW CONNECION 86 sf 0 sf 77 sf /4" S(5) UP EXISING SERVICE SINK EXISING HEA EXCHANGER 659 sf 8"CWS 8"CWR REMOVE PORION OF PIPE AS INDICAED AND PREPARE FOR NEW CONNECION. 8"CWS BUILDING CHILLED WAER PUMP 75 sf REMOVE PORION OF PIPE AS INDICAED AND PREPARE FOR NEW CONNECION. 8" CONDENSER WAER SUPPLY 8" CONDENSER WAER REURN 8" SEAM RELIEF VEN UP EXISING LPC GOES O UNNEL REMOVE PORION OF PIPE AS INDICAED AND PREPARE FOR NEW CONNECION. EXISING 4"S(5) FROM UNNEL. CWS & CWR PIPING FROM UILIY UNNEL 8"CWR 8"CWS /" LPC UP " S(5) UP 0" S(5) 8"CWS 8"CWS 904 sf sf 8" S(5) 4" S(5) 8"CWR 8"CWS /"LPC 8"CWR 6"CWS 6"CWR 4"CWS 4"CWR 8"CWS 8"CS 8"CR EXISING LPC FROM BUILDING. EXISING LPC FROM BUILDING. " LPC DN REMOVE EXISING DUPLEX VACUUM CONDENSAE PUMP " LPC DN /" LPC DN " LPC DN " LPC DN EXISING " LPC FROM UNNEL. /4" LPC UP /4" S(5) UP /4" LPC UP /4" S(5) UP BUILDING CONROL VALVE ALERNAE 6: REMOVE EXISING CONDENSER WAER SUPPLY AND REURN PIPING. CWS & CWR PIPING O SERVE GROUND FLOOR AND SOUH WING 8" CWS UP & DN 8" CWR UP & DN " LPC UP & DN 8" S(5) UP & DN /4" LPC UP /4" S(5) UP /4" LPC UP /4" S(5) UP /4" LPC UP /4" S(5) UP /4" LPC UP /4" S(5) UP /4" LPC UP /4" LPC UP /4" S(5) UP /" S(5) UP /4" LPC UP " S(5) UP /4" LPC UP /" S(5) UP /4" LPC UP /" S(5) UP /4" LPC UP /" S(5) UP /4" LPC UP /4" S(5) UP " LPC UP " S(5) UP /4" LPC UP /" S(5) UP. VACUUM CONDENSAE PUMP SHALL BE INSALLED DURING SUMMER.. COORDINAE REMOVAL OF MEASYS CONROL WIH MU ENERGY MANAGEMEN. ENERGY MANAGEMEN WILL SALVAGE CONROLS PRIOR O DO DEMOLIION. PHASING KEYNOES: #. ALL RENOVAION WORK RELAED O REPLACING CHILLED WAER PUMP AND CHILLED WAER PIPING SHALL HAPPEN DURING SR- PER HE ARCHIECURAL SCOPE SEQUENCING PLANS, O AVOID CHILLED WAER OUAGE.. REPLACE VACUUM CONDENSAE PUMP (VCP-) IN BEWEEN MAY O AUGUS. CONRACOR SHOULD KEEP IME BEWEEN DEMO OF EXISING AND INSALLAION OF NEW PUMP O MINIMUM. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil Professional Seal: Project itle: 9 N. 4th Street Suite 000 St. Louis, MO 60 p f Memorial Student Union KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO /" S(5) UP he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. " LPC UP " S(5) UP his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 /" S(5) UP /" S(5) UP /" S(5) UP /" S(5) UP /4" LPC UP /4" LPC UP /4" LPC UP /4" LPC UP LGA.5 N OR H SUB BASEMEN FLOOR PLAN - MECHANICAL PIPING - DEMO /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: SUB BASEMEN FLOOR PLAN - MECHANICAL PIPING - DEMO Project Number: Sheet Number: 65 MPD00 Drawn By: ASHMIS Issue Date:.6.7

49 A B C D E F G H J K GENERAL NOES:. ALL WORK ON HIS SHEE SHALL BE PAR OF ALERNAE 4. WORK ON HIS SHEE SHALL HAPPEN DURING MAY O AUGUS. C:\Revit Local Files\MEP7_ _MU Memorial Student Union_Central_mishraas@kjww.com.rvt /4" LPC UP /" S(5) UP /" LPC UP & DN " S(5) UP & DN " S(5) UP & DN /4" LPC UP /" S(5) UP KEYNOES: #. REMOVE PORION OF PIPE AND PREPARE FOR NEW CONNECION. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /7/07 8:9:44 PM Professional Seal: 9 /4" LPC UP /" S(5) UP " S(5) UP Project itle: " LPC UP " S(5) UP " LPC UP " S(5) UP " LPC UP " S(5) UP /4" LPC UP " S(5) UP 8" SEAM RELIEF VEN UP 8" SEAM RELIEF VEN DN 8" S(5) UP & DN " LPC UP & DN 8" CWR UP & DN 8" CWS UP & DN /4" LPC UP /" S(5) UP /4" LPC UP /4" S(5) UP " LPC UP " S(5) UP /4" LPC UP /" S(5) UP /" S(5) DN /4" LPC DN Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO /4" S(5) UP /4" S(5) UP " LPC UP " S(5) UP /4" LPC UP /" S(5) UP he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date /7/07 /" S(5) UP /" S(5) UP /4" LPC UP /" S(5) UP /4" LPC UP /" S(5) UP /4" LPC UP /4" LPC UP LGA.5 NOR H GROUND FLOOR PLAN - NORH WING - PIPING - DEMO /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: GROUND FLOOR PLAN - NORH WING - PIPING - DEMO Project Number: Sheet Number: 65 MPD00.5N Drawn By: Author Issue Date:.6.7

50 GENERAL NOES: A B C D E F G H J K. COORDINAE REMOVAL OF MEASYS CONROLS WIH MU ENERGY MANAGEMEN. ENERGY MANAGEMEN WILL SALVAGE CONROLS PRIOR O DEMOLIION. C:\Revit Local Files\MEP7_ _MU Memorial Student Union_Central_mishraas@kjww.com.rvt /4" LPC UP & DN /" S(5) UP & DN E-UH " S(5) UP & " S(5) DN " LPC UP & /" LPC DN EXISING CONINUOUS CONVECOR " S(5) UP & DN E-UH EXISING CONINUOUS CONVECOR /4" LPC UP & DN /" S(5) UP & DN KEYNOES: #. REMOVE PORION OF PIPE AKE OFF SERVING RADIAORS, AND PREPARE FOR NEW CONNECION O PLACE NEW CONROL VALVE. HIS WORK SHOULD HAPPEN BEWEEN MAY O AUGUS. PHASING KEYNOES: #. ALL RENOVAION WORK ON HIS AREA SHALL HAPPEN DURING SR- PER HE ARCHIECURAL SCOPE SEQUENCING PLANS.. ALL RENOVAION WORK ON HIS AREA SHALL HAPPEN DURING SR-5 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. 4. ALL RENOVAION WORK ON HIS AREA SHALL HAPPEN DURING SR-4 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /7/07 8:7:8 PM RADIAOR IN WALL W/GRILLE ON SILL Professional Seal: /4" LPC UP & DN 9 /" S(5) UP & DN /" S(5) UP & " S(5) DN /4" LPC UP & " LPC DN /" S(5) UP & " S(5) DN /4" LPC UP & " LPC DN /4" S(5) UP & /" S(5) DN /4" LPC UP & DN /4" LPC UP & " LPC DN /4" S(5) UP & " S(5) DN /4" LPC UP /4" S(5) UP & DN 8" SEAM RELIEF VEN DN 4 REMOVE PORION OF PIPE AS INDICAED IN BEWEEN MAY-4 O AUGUS-0 AND PREPARE FOR NEW CONNECION. CONRACOR NEEDS O COORDINAE WIH SHU-DOWN OF SEAM SYSEM 8" SEAM RELIEF VEN UP 8" CWS UP 8" CWR UP " LPC UP 8" S(5) UP 8" CWS DN 8" CWR DN " LPC DN 8" S(5) DN CUH-E /4" LPC UP & DN /" S(5) UP & DN /4" LPC UP & DN /4" S(5) DN " LPC UP & DN " S(5) UP & DN /4" LPC UP & DN /4" S(5) UP & /" S(5) DN Project itle: Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO /4" S(5) UP & DN /4" LPC UP & " LPC DN /" S(5) UP & " S(5) DN /4" LPC UP & DN /4" S(5) UP & /" S(5) DN he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 /4" LPC UP /4" LPC UP /4" S(5) UP /" S(5) UP & /" S(5) DN /4" S(5) UP /" S(5) UP & DN /4" LPC UP & DN /" S(5) UP & DN /4" LPC UP & DN /" S(5) UP & DN /4" LPC UP & DN /4" LPC UP & DN LGA.5 N OR H FIRS FLOOR PLAN - NORH WING - PIPING - DEMO /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: FIRS FLOOR PLAN - NORH WING - PIPING - DEMO Project Number: Sheet Number: 65 MPD0N Drawn By: ASHMIS Issue Date:.6.7

51 GENERAL NOES: C:\Revit Local Files\MEP7_ _MU Memorial Student A B C D E F G H J K /4" LPC UP & DN /" S(5) UP & DN DEMOLISH ALL HVAC, PIPING, ACCESSORIES, HANGERS, EC. INSIDE HIS BOUNDARY, UNLESS SHOWN OHERWISE. REFER O MEMORIAL UNION ORIGINAL CONSRUCION DOCUMENS PROVIDED BY UNIVERSIY OF MISSOURI AS A REFERENCE FOR DEMOLIION OF EXISING CONDIIONS.. COORDINAE REMOVAL OF MEASYS CONROLS WIH MU ENERGY MANAGEMEN. ENERGY MANAGEMEN WILL SALVAGE CONROLS PRIOR O DEMOLIION. PHASING KEYNOES: #. REMOVE PIPE IN BEWEEN MAY 4 O AUGUS 0.. REMOVE PIPE PRIOR O APRIL. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /7/07 8:7:9 PM /4" LPC DN /" S(5) DN DEMO PIPE UP O HE FLOOR AND CAP Professional Seal: 9 /" S(5) DN /4" LPC DN /" S(5) DN DEMO PIPE UP O HE FLOOR AND CAP /4" LPC DN 8" SEAM RELIEF VEN Project itle: 8 /" S(5) DN /4" LPC DN /4" S(5) DN /4" LPC DN /4" LPC DN /4" S(5) DN /4" LPC DN DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP /4" S(5) DN DEMO PIPE UP O HE FLOOR AND CAP /4" S(5) DN DEMO PIPE UP O HE FLOOR AND CAP /4" LPC DN /" S(5) DN /4" LPC DN /" S(5) DN /4" S(5) DN 8" CWS UP "LPC 8" CWR UP 8" S(5) UP /" S(5) DN /4" LPC DN REMOVE EXISING SEAM RELIEF VEN PIPE IN BEWEEN MAY-4 O AUGUS-0. CONRACOR NEEDS O COORDINAE WIH SHU-DOWN OF SEAM SYSEM /" S(5) DN /4" LPC DN 8" CWS DN 8" CWR DN " LPC DN 8" S(5) DN /" S(5) DN /4" LPC DN /4" LPC DN /4" LPC DN /4" S(5) DN /4" LPC DN /" S(5) DN /4" LPC DN /" S(5) DN /4" LPC DN DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP " LPC DN " S(5) UP & DN DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP /4" LPC DN /4" S(5) DN Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP DEMO PIPE UP O HE FLOOR AND CAP LGA.5 N OR H SECOND FLOOR PLAN - NORH WING - PIPING - DEMO /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: SECOND FLOOR PLAN - NORH WING - PIPING - DEMO Project Number: Sheet Number: 65 MPD0N Drawn By: ASHMIS Issue Date:.6.7

52 GENERAL NOES: C:\Revit Local Files\MEP7_ _MU Memorial Student /7/07 8:57:8 PM A B C D E F G H J K Stairs SNB00E UH-B0 EXISING CONROL PANEL FOR CHILLED WAER PUMP. 8"CWS 8"CWR Mechanical Room EXISING 0"S5 FROM BUILDING. EXISING LPC FROM BUILDING. /4"CWS 8"CWS CHILLED WAER PIPES FROM UILIY UNNEL 8"CWR 8"CWS /" LPC UP " LPS UP 8"CWS 8"CWS 6"CWS CWP- CWP- 6"CWS CWP- 8"CWS 8"CWR 8"CWS Pipe rench /4" LPC UP /4" LPS UP /4" LPC UP /4" LPS UP MODULAING BUILDING CONROL VALVE /4" LPC UP /4" LPS UP /4" LPC UP /4" LPS UP 4"S(5) /"LPC "LPC /4" LPC UP /4" LPS UP /4" LPC UP /4" LPS UP /4" LPC UP /4" LPC UP /4" LPS UP " LPS UP "LPC 4"S(5) /4" LPC UP /" LPS UP /4" LPC UP. VACUUM CONDENSAE PUMP SHALL BE INSALLED DURING SUMMER.. INSALL MANUAL AIR VEN A ALL HIGH POIN OF SYSEM. HE VENS SHOULD HAVE /4" MALE HOSE BIB FIING.. RUN SEAM SYSEM, SERVING HE NEW HEA EXCHANGER, A PSI. PHASING KEYNOES: #. ALL RENOVAION WORK RELAED O REPLACING CHILLED WAER PUMP AND CHILLED WAER PIPING SHALL HAPPEN DURING SR- PER HE ARCHIECURAL SCOPE SEQUENCING PLANS, O AVOID CHILLED WAER OUAGE... REPLACE VACUUM CONDENSAE PUMP (VCP-) IN BEWEEN MAY O AUGUS. CONRACOR SHOULD KEEP IME BEWEEN DEMO OF EXISING AND INSALLAION OF NEW PUMP O MINIMUM. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f Professional Seal: KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /4"D BCU-B0 "CWR "CWS MODULAING CWP- SUMMER ISOLAION VALVE "LPC /"LPC VCP- /" LPS UP Project itle: /4" D DOWN, ROUE O NEARES FLOOR DRAIN. " LPC UP " LPS UP " LPC UP " LPS UP /4" LPC UP BCU-B0 /"S(5) "LPC ELECRICAL PANEL /4" LPS UP Mechanical & Electrical Room Pipe rench EXISING SERVICE SINK "LPC UH-B0 /4" D DN, ROUE O SERVICE SINK. EXISING HEA EXCHANGER "CWS "CWR /4"HWS /4"HWR /4"D O SERVE GROUND FLOOR EXISING LPC GOES O UNNEL EXISING 4"S(5) FROM UNNEL. 0"S(5) 8"CWS 8"CWR Mechanical Room "LPC 8"S(5) 4"S(5) /4"CWR /4"CWS 6"CWS 6"CWR 4"CWS 4"CWR 8"CWS 8"CWR " LPC DN /" LPC DN " LPC DN " PC DN " LPC DN 8" SEAM RELIEF VEN UP /"LPC 8" CWS UP & DN 8" CWR UP & DN " LPC UP & DN 8" S(5) UP & DN PROVIDE CLOSED SHUOFF VALVE AND CAP FOR DRAINING SYSEM AND FLUSHING. EXISING " LPC FROM UNNEL. "LPC "S(5) /"LPC /4" LPC UP /" LPS UP /4" LPC UP /4" LPS UP " LPC UP " LPS UP /4" LPC UP /" LPS UP Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO 4"S(5) "LPC /"LPC /"S(5) " LPC UP /" LPS UP he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 " LPS UP 4"S(5) "S(5) /"LPC /" LPS UP /" LPS UP /" LPS UP /" LPS UP /4" LPC UP /4" LPC UP /4" LPC UP /4" LPC UP LGA.5 N OR H SUB BASEMEN FLOOR PLAN - MECHANICAL PIPING /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: SUB BASEMEN FLOOR PLAN - MECHANICAL PIPING Project Number: Sheet Number: 65 MP00 Drawn By: ASHMIS Issue Date:.6.7

53 GENERAL NOES: C:\Revit Local Files\MEP7_ _MU Memorial Student /7/07 8:9:4 PM A B C D E F G H J K /4" LPC UP & DN /" S(5) UP & DN Stairs SN00E Vest. VN0 Stor N7B N7A PROVIDE NEW ELECRIC CONROL VALVE AND HERMOSA COMPAIBLE WIH DDC. Storage N Freezer N4A VAV-5-0 Food Serv. N /" LPC UP & DN " S(5) UP & DN E-UH PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-5-0 SA. Starbucks N VAV-5-08 VAV-5-0 /4"HWR /4"HWS /"HWS /"HWR VAV-5-0 /4"HWR /4"HWS /4"HWR /4"HWS /4"HWS /4"HWR EXISING CONINUOUS CONVECOR INSALL BYPASS FOR SYSEM FLUSHING, AFER FINISHED WIH FLUSHING, INSALL " AUOMAIC BALANCING VALVE. BALANCE FOR GPM. Seating Area N6 " S(5) UP & DN E-UH PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-5-0 SA. EXISING CONINUOUS CONVECOR PROVIDE NEW ELECRIC CONROL VALVE, CONROLLED FROM VAV-5-0. /4" LPC UP & DN /" S(5) UP & DN PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-5-08 SA. RADIAOR IN WALL W/GRILLE ON SILL /4" LPC UP & DN. CONROL WIRING FOR NEW RADIAOR CONROL VALVE SHALL ROUE ALONG HE WALL BASEBOARD OWARDS HE EXISING RACEWAYS AND COME UP O HE CEILING. COORDINAE WIH ARCHIEC FOR EXAC LOCAION.. INSALL MANUAL AIR VEN A ALL HIGH POIN OF SYSEM. HE VENS SHOULD HAVE /4" MALE HOSE BIB FIING. PHASING KEYNOES: #. ALL RENOVAION WORK ON HIS AREA SHALL HAPPEN DURING SR- PER HE ARCHIECURAL SCOPE SEQUENCING PLANS.. ALL RENOVAION WORK ON HIS AREA SHALL HAPPEN DURING SR-5 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS.. ALL RENOVAION WORK ON HIS AREA SHALL HAPPEN DURING SR-4 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f Professional Seal: KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-04 SA. /4" LPC UP & " LPC DN /" S(5) UP & " S(5) DN PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-04 SA. CONRACOR NEEDS O COORDINAE ROUING OF HIS PIPE WIH SHU- DOWN OF SEAM SYSEM. 8" SEAM RELIEF VEN UP /4" LPC UP & " LPC DN /4" S(5) UP & /" S(5) DN PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. PROVIDE NEW DDC CONROL VALVE AND - SA FOR HIS HEAER. /4" LPC UP & DN /4" LPC UP & " LPC DN /4" S(5) UP & " S(5) DN PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. /4" LPC UP INSALL BYPASS FOR SYSEM FLUSHING, AFER FINISHED WIH FLUSHING, INSALL " AUOMAIC BALANCING VALVE. BALANCE FOR GPM. /4" S(5) UP & DN Vest. VN05 JAN. N SAIRS SN00C CUH- /" S(5) UP & " S(5) DN N6 Storage N VAV-4-A 8" SEAM RELIEF VEN DN Women N08 NEW SEAM PIPE SHALL BE INSALLED DURING MAY O AUGUS VAV-5-04 PROVIDE NEW ELECRIC CONROL VALVE AND HERMOSA COMPAIBLE WIH DDC. Men N07 /"HWR /"HWS Kitchen 8 VAV-5-05B "HWR "HWS VAV-5-05A VAV-5-0 " HWR UP " HWS UP VAV-4-B VAV-4-C VAV-4-C DP "HWS "HWR DIFFERENIAL PRESSURE SENSOR FIELD SE A 6 PSI. "HWS VAV-5-07 "HWR VAV " CWS DN 8" CWR DN " LLPC 8" DNS(5) DN 8" CWS UP 8" CWR UP " LLPC 8" UPS(5) UP Lounge N06A "HWS VAV-4- "HWR VAV-4-B /4"HWS Seating Area N06 VAV-5-09 /4" HWS UP /4" HWR UP /4"HWR VAV-4-A PROVIDE NEW ELECRIC CONROL VALVE AND HERMOSA COMPAIBLE WIH DDC. SAIRS SN00B Elec. Mech. N9A Lobby LN0 PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. PROVIDE NEW CONROL VALVE. CUH-E Vestibule VN00 /" S(5) UP & DN PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-5-07 SA. /4" LPC UP & DN /" S(5) UP & DN PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-5-07 SA. /4" LPC UP & DN /4" S(5) DN PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-5-06 SA. PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. " LPC UP & DN " S(5) UP & DN /4" LPC UP & DN /4" S(5) UP & /" S(5) DN PROVIDE NEW ELECRIC CONROL VALVE AND HERMOSA COMPAIBLE WIH DDC. DN DN Project itle: Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-4- A & B SA. /4" S(5) UP & DN PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-4- A & B SA. Stotler Lounge N0 PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-4- A & B SA. Stotler Lounge N0B PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-4-C & CSA. PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-4-C & CSA. Stotler Lounge N0A PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-4-B & A SA. PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-5-09 SA. PROVIDE CONROL VALVE FOR RADIAION PANEL A AKEOFF. CONROL FROM VAV-5-09 SA. /4" LPC UP & " LPC DN /" S(5) UP & " S(5) DN /4" LPC UP & DN /4" S(5) UP & /" S(5) DN he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 /4" LPC UP /4" LPC UP /4" S(5) UP /" S(5) UP & /" S(5) DN /4" S(5) UP /" S(5) UP & DN /4" LPC UP & DN /" S(5) UP & DN /4" LPC UP & DN /" S(5) UP & DN /4" LPC UP & DN /4" LPC UP & DN LGA.5 N O R H FIRS FLOOR PLAN - NORH WING - PIPING /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: FIRS FLOOR PLAN - NORH WING - PIPING Project Number: Sheet Number: 65 MP0N Drawn By: ASHMIS Issue Date:.6.7

54 A B C D E F G H J K GENERAL NOES :. INSALL MANUAL AIR VEN A ALL HIGH POIN OF SYSEM. HE VENS SHOULD HAVE /4" MALE HOSE BIB FIING. C:\Revit Local Files\MEP7_ _MU Memorial Student Union_Central_mishraas@kjww.com.rvt /4" PC UP & DN /" S(5) UP & DN CONROLLED FROM VAV-5-0 SA. RAD-9 CONROLLED FROM VAV-4- SA. RAD-8 RAD-7 CONROLLED FROM VAV-4- SA. CONROLLED FROM VAV-4-0 SA. RAD-6 CONROLLED FROM VAV-4-0 SA. RAD-5 CONROLLED FROM VAV-4-09 SA. RAD-4 CONROLLED FROM VAV-4-09 SA. RAD- PHASING KEYNOES:. ROUE PIPE IN BEWEEN MAY 4 O AUGUS 0.. INSALL PORION OF PIPE IN HIS AREA AND IE- IN VALVES PRIOR O APRIL. # Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /7/07 8:7: PM Stairs SN00E Meeting Room 8 N4D "HWS RAD- CONROLLED FROM VAV-4-09 SA. Professional Seal: "HWR 9 8 INSALL BYPASS FOR SYSEM FLUSHING, AFER FINISHED WIH FLUSHING, INSALL " AUOMAIC BALANCING VALVE. BALANCE FOR GPM. Corridor CN04 VAV-5-0 VAV-5-0 "HWS "HWR Meeting Room 9 N4E INSALL BYPASS FOR SYSEM FLUSHING, AFER FINISHED WIH FLUSHING, INSALL " AUOMAIC BALANCING VALVE. BALANCE FOR GPM. Meeting Room 7 N4C Meeting Room 6 N4B Meeting Room 5 N4A "HWR "HWS RAD- CONROLLED FROM VAV-4-09 SA. Project itle: " SEAM RELIEF VEN PIPE UP CONROLLED FROM VAV-4-05 SA. VAV-5-0 Catering N RAD- VAV-5-04 Storage N "HWS Stair SN00D Men NA Jan N5 C C Meeting Room N0A VAV-4-05 "HWR Corridor CN0 INSALL BYPASS FOR SYSEM FLUSHING, AFER FINISHED WIH FLUSHING, INSALL " AUOMAIC BALANCING VALVE. BALANCE FOR GPM. "HWR "HWS IE-IN VALVE (YP.4) CONNEC PIPE WIH IE- IN VALVE BEFORE SWICH OVER. Clos. N0 Vest N 8" CWS UP 8" CWR UP "HWR "HWS "HWS "HWR Meeting Room N0B - Women NA 6" S(5) 8"CWR 8"CWS Corridor CN00 VAV-4-06 C Corridor CN0 "LPC Vest N "HWR VAV-4- VAV-4-0 VAV " CWS DN 8" CWR DN Elec/AV " LPC DN N4 8" S5 DN I.. N4A "HWS "HWR "HWS Family N "HWS "HWR "HWS 6" S(5) /4"HWR /4"HWS Pre-function CN0A " HWS DN " HWR DN VAV-4-07 /4"HWS /4"HWR /4"HWS /4"HWR "HWR "LPC C Meeting Room N0C VAV-4- VAV-4-4"HWR 4"HWS C VAV-4-4 Corridor CN0 - VAV-4-5 4"HWR "HWR "HWS 6" S(5) "LPC - Room SN00B Stair SN00B VAV-4-08 /4" HWS DN /4" HWR DN 6" S(5) UP " LPC UP 4" HWS UP 4" HWR UP C C Elevator EN00W Meeting Room 4 N04 Break N47 RAD-0 " S(5) UP & DN Stairs SN00C Storage N05 CONROLLED FROM VAV-4-09 SA. Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. CONROLLED FROM VAV-4-05 SA. RAD- "HWR "HWS "HWR "HWS "HWR "HWS RAD-9 CONROLLED FROM VAV-4-08 SA. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 RAD- RAD-4 RAD-5 RAD-6 RAD-7 RAD-8 CONROLLED FROM VAV-4-05 SA. CONROLLED FROM VAV-4-05 SA. CONROLLED FROM VAV-4-06 SA. CONROLLED FROM VAV-4-06 SA. CONROLLED FROM VAV-4-07 SA. CONROLLED FROM VAV-4-07 SA. INSALL CONROL VALVE OVER HE LAY IN CEILING. (YP. ALL) LGA.5 N OR H SECOND FLOOR PLAN - NORH WING - PIPING /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: SECOND FLOOR PLAN - NORH WING - PIPING Project Number: Sheet Number: 65 MP0N Drawn By: ASHMIS Issue Date:.6.7

55 C:\Revit Local Files\MEP7_ _MU Memorial Student MANUAL AIR VEN A HIGH POIN OF PIPING NEX O COIL. PRESSURE INDEPENDEN CONROL VALVE CWR CWS COIL AIR FLOW DRAIN LINE DRAIN PAN EXISING CONDENSAE PIPE EXISING SEAM RAP EXISING SEAM CONENSAE GOING DOWN O FLOOR BELOW. EXISING SEAM PIPE FROM FLOOR BELOW. EXISING SEAM RADIAORS EXISING WALL SEAM CONROL VALVE EXISING S(5) PIPE HWS HWR PRESSURE/EMPERAURE ES PLUG (YP.) MANUAL AIR VEN W/ BALL VALVE. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /7/07 8:7:4 PM UNION (YP.) /4" DRAIN VALVE WIH HOSE HREAD ADAPER AND CAP. BLOWER COIL UNI PIPING - WO PIPE NO SCALE NOES:. HIS GENERAL DEAIL APPLIES O ALL SEAM RADIAORS WHERE WE ARE PLACING NEW ELECRIC CONROL VALVE ON FIRS FLOOR. LOOK A HE FLOOR PLAN FOR EXAC NUMBER OF RADIAORS AND HEIR LOCAIONS. SEAM RADIAOR PIPING DEAIL NO SCALE CABINE UNI HEAER COIL DRAIN WIH HOSE CONNECION, CAP AND BALL VALVE CABINE UNI HEAER COIL DEAIL NO SCALE Professional Seal: Project itle: HIGH CAPACIY FLOA YPE AIR VEN FROM BOILER OR HX AIR SEPARAOR 4 PRESSURE GAGE PRE-CHARGING AIR CONNECION ASME PRESSURIZED DIAPHRAGM EXPANSION ANK NOES: AIR VEN P PRESURE REDUCING VALVE W/ CHECK COLD WAER FILL 5 DRAIN AL. MIN. /4" PIPING OR ANK SYSEM CONNECION IF LARGER. EXPANSION ANK VERICAL BLADDER NO SCALE. CONNEC O SIDE OF MAIN.AVOID OP OR BOOM CONNECION O PREVEN AIR OR DEBRIS FROM ENERING PIPE O ANK.. SHU-OFF VALVE RECOMMENDED. DRAIN VALVE ALSO REQUIRED O PROPERLY PRE-CHARGE ANK.. ANK CONNECION LOCAIONS MAY VARY DEPENDING ON ANK SIZE AND MODEL. 4. PROVIDE ANI-HERMO-SYPHON LOOP O PREVEN GRAVIY HEAING OF ANK. " MIN. DROP. 5. INSER EE HERE FOR SYSEM WAER CONNECION OF PARALLEL ANKS (IF USED). 4 COPPER UNION HD X C DIELECRIC COUPLING BRONZE BALL VALVE HREAD-O-LE COPPER UNION HD X C BRONZE BALL VALVE HD X HD DIELECRIC WAERWAY FIING VICAULIC SYLE 47- HREAD-O-LE 5 COPPER UBE SERVICE BRANCH BRASS NIPPLE BRASS NIPPLE BRASS NIPPLE MAIN SERVICE SEEL PIPE COPPER UBE SERVICE BRANCH BRASS NIPPLE-X PIPE DIA. SERVICE BRANCH MAIN SERVICE SEEL PIPE DI ELECRIC COUPLING NO SCALE IN EIHER APPLICAION, DO NO SOLDER DIRECLY O HE BALL VALVE, WAERWAY OR COUPLING. EXCESS HEA WILL DAMAGE HE EFLON COMPONENS. 6 HO PIPE INSULAION EXEND UP O OP OF MEAL COLLAR MEAL COLLAR (8 GA. GALV. SEEL) NEOPRENE FLASHING WIH LAP SPLICE INSULAION REAED WOOD NAILER NOES:. MAINAIN A MINIMUM " CLEARANCE ABOVE FLASHING COLLAR O ALLOW FOR VENILAION OF HEA.. SEALAN GOOD O 50 ALL EMPS HIGHER SHALL BE SOLDER OR BRAZED.. "MIN. "MIN. HEA RAED SEALAN (NOE ) SAINLESS SEEL BAND CLAMP RAIN HOOD (NOE ) (8 GAUGE GALV. SEEL) " MINIMUM "MIN. /" MIN. EPDM MEMBRANE CONCREE ROOF DECK. HO PIPE FLASHING (MEMBRANE ROOF) NO SCALE Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E Sheet itle: LGA.5 REFERENCE SCALE IN INCHES 0 MECHANICAL DEAILS Project Number: Sheet Number: 65 MP50 Drawn By: ASHMIS Author Issue Date:.6.7

56 # KEYNOES C:\Revit Local Files\MEP7_ _MU Memorial Student VEN (YP.) REFER O DEAIL 8/MP500 FOR COOLING COIL DEAIL. VEN (YP.) REFER O DEAIL 8/MP500 FOR COOLING COIL DEAIL.. RESSURE GAUGE WIH SNUBBER PER SPECIFICAIONS. MOUN ON WALL, SAND, OR VIBRAION-FREE PIPE BRACKE ABOVE PUMP. INSALL FLEXIBLE COPPER UBING O PIPING CONNECIONS O AVOID VIBRAION DAMAGE O HE GAUGE. GAUGE SHALL BE GLYCERIN FILLED. PREFERRED CONNECION LOCAIONS ARE: (a) JUS UPSREAM OF SRAINER, (b) GAUGE POR ON SUCION DIFFUSER OR BEWEEN SRAINER & PUMP INLE, (c) GAUGE APPING ON PUMP INLE FLANGE, (d) GAUGE APPING ON PUMP OULE FLANGE.. REMOVE AND REAIN EMPORARY SRAINER FROM SUCION DIFFUSER A END OF CONSRUCION. PROVIDE SUPPOR LEG AS REQUIRED BY MANUFACURER.. PRESSURE GAUGES SHALL BE GLYCERIN FILLED. 4. DIFFERENIAL PRESSURE SENSOR FIELD SE A 7 PSI. (ADJUSABLE) FLOW DIAGRAM SYMBOLS LIS SYMBOL: DESCRIPION: CW CWR CWS M P COLD WAER - POABLE CHILLED WAER REURN CHILLED WAER SUPPLY DIRECION OF FLOW IN PIPE MEER PRESSURE GAUGE (FURNISHED WIH BALL VALVE) Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /7/07 8:7:4 PM DIFFERENIAL PRESSURE SENSOR FIELD SE A 7 PSI. (ADJUSABLE) 4 4"CWR 4"CWS COOLING COIL AHU- 4"CWR 4"CWS COOLING COIL AHU- EMPERAURE SENSOR WIH WELL HERMOMEER WIH WELL (FILLED YPE) "WYE" -SRAINER "WYE" -SRAINER W/SHUOFF VALVE AND HOSE CONNECION WIH CAP FLEXIBLE CONNECION Professional Seal: 8" CWS 8" CWR AIC SHUOFF VALVE NORMALLY OPEN SHUOFF VALVE NORMALLY CLOSED 4"CWR 4"CWS SHUOFF VALVE A BOOM OF RISER (YP.). SHUOFF VALVE A BOOM OF RISER (YP.). HROLING VALVE CHECK VALVE UNION/FLANGE REDUCER - REFERENCE SPECIFICAION FOR CONCENRIC/ECCENRIC AND FO/FOB SUCION DIFFUSER WIH SUPPOR FOO Project itle: PRESSURE/EMPERAURE ES PLUG AUOMAIC BALANCING VALVE CHILLED WAER SUPPLY AND REURN FROM UILIY UNNEL. MANUAL AIR VEN INSALL A ALL HIGH POINS OF SYSEM. PIPE O AN ACCESSIBLE AREA SEE 00. 8" CWR 8" CWS EXISING BUILDING CONROL VALVE. -POSIION VALVE. CWP- VFD PUMP CWP- (50) GPM VFD PUMP CWP- (50) GPM 6" CWS 6" CWS 8" CWS 8" CWS FLEXIBLE PIPE IS O BE BRAIDED SS WIH HE SUPPLY FLEX HAVING HE FLOW SRAIGHENER IN I (YP.) /4" CWR /4" CWS O SERVE SUB-BASEMEN ELECRICAL ROOM AND ELEVAOR EQUIPMEN ROOM IN WINER 6" CWR 6" CWS 8" CWR IN SHAF 8" CWS IN SHAF /4" MALE HOSE BIB FIING AND CAP FOR SYSEM DRAIN AND FLUSHING. 4" CWR 4" CWS CAP FOR FUURE AHU SIZES FOR 88 GPM 4" CWS 4" CWR O SERVE AHU OF GROUND FLOOR. O SERVE AHU OF SOUH WING SUB BASEMEN FLOOR SECOND FLOOR FIRS FLOOR GROUND FLOOR Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 CHILLED WAER DIAGRAM NO SCALE 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E Sheet itle: LGA.5 REFERENCE SCALE IN INCHES 0 FLOW DIAGRAM Project Number: Sheet Number: 65 MP600 Drawn By: ASHMIS Issue Date:.6.7

57 C:\Revit Local Files\MEP7_ _MU Memorial Student /7/07 8:8: PM A B C D E F G H J K Stairs SN00E 7 6x8 EA UP 0x8 0x8 SAIRS SN00C Vest. VN05 JAN. N 6x4 Vest. VN0 Stor N7B N7A N6 Storage N x0 x0 0/00 8ø 8/75 4x8 ø /00 6x8 /45 EG-E x/50 4/45 (YP.4) 6x8 6x8 MOD-E 7 x8 SG-E 8x8/75 8x8 x0 4x4 4x8 6x4 Stotler Lounge N0 6x8 MOD-E 4x6 x0 6x0 Storage N Freezer N4A 8x8 6x8 6x8 8x6 8/75 50 CFM EG-E 8x8 4x4/50 EG-E 4x4/50 4x8 EG-E 6x4/55 EG-E 6x4/55 8x8 SG-E 6x/90 8ø 6x8 0/90 /00 x8 Women N08 8x 8x 8x8 x0 x0 x8 SD /400 4x8 x0 SD 4/400 x0 x 6x 6x8 SD 4/400 6x8 Men N07 Food Serv. N x8 6x8 4x0 6x8 6x8 6x8 6x8 4x8 8ø Kitchen 8 9X8 SA UP 8X8 SA UP 4x0 6x8 48X8 RA UP 40X8 SA UP EG-E 6x6/50 4x6 4x8 6x8 4x0 4x8 x0 x0 6x6 8/0 4x0 8x8 E-UH 8x 8x8 SG-E 8x8/75 6x SG-E 6x4/50 (YP.4) 54x 6x8 8x6/900 x4 x4 Stotler Lounge N0B 6x8 6x8 6x8 6x8 4/45 (YP.4) EG-E 4x4/50 4 SG-E 6x/90 EG-E 4x4/840 SD 4/400 0/70 8x6/75 8x4/95 8x4/860 EG-E x/400 4x0 4/45 (YP.4) 0x 7x8 8x0 MOD-E 56x 9x8 7x8 8x8 8x /90 0/50 0/50 58x8 RA UP 4 8x4/860 4/45 (YP.4) SG-E 6x/90 56x x0 x0 Starbucks N x0 56x8 4x8 0ø 4x 4x MOD-E 0ø 0/50 0/50 48x8 0/50 MOD-E 4x8 8/50 56x 48x4 8ø 6x8 8/50 6x8 6x 48x MOD-E 48x x6 6x8 6x8 /90 0/50 Lounge N06A 4x8 48x 8x8 RA UP 7x8 SA UP 56x8 RA UP 8x0 EA UP Stotler Lounge N0A Seating Area N06 6x 4x8 4/80 6x8 6x8 6x SAIRS SN00B Seating Area N6 6x8 48x 6x 6x 6x8 48x 6x 6x 6x8 8x8 48x8 8x 8x x/50 (YP.) 8x6/900 8x4/860 6x8 6x8 6x8 48x8 8/50 0/70 0/70 x6 x x0 x0 8/50 0/70 4x D x6 4x8 x6 6x8 6x8 SG-E 6x/90 x6 x0 8x 8x 4/80 4x D 0/0 6x8 4 4/45 (YP.4) 6x8 x4 0ø x4 0/50 0/0 (YP.5) x0 x0 8x0 0x0 6 6x8 8ø SG-E 6x/90 6x8 8x6/900 6x8 4/45 (YP.4) SG-E 0x6/95 8/65 4/80 6x8 6x8 Elec. Mech. N9A 8/40 0x6 6x8 6X8 EA UP 6X8 EA DN 4/85 8x6 6x8 4/80 4/80 0x6 4x 6x8 6x8 Lobby LN0 x 4/80 4/80 4x6 6x8 4x6 4/80 8x6 x6 8x 0x6 8/40 4x8 x x 4x5 4/85 6x8 4/45 6x8 4/45 4x6 E-UH DO NO DEMOLISH DUC UNIL NEW EF- HAS BEEN INSALLED AND READY O OPERAE. CONRACOR SHOULD KEEP IME BEWEEN DEMO OF EXISING AND INSALLAION OF NEW DUC O MINIMUM. 4x8 8x5 X8 RA UP X8 SA UP Vestibule VN00 4 6x6 CUH-E /65 /5 7 EXISING GRILL BALANCE FOR 00 CFM DN DN GENERAL NOES:. COORDINAE REMOVAL OF MEASYS CONROLS WIH MU ENERGY MANAGEMEN. ENERGY MANAGEMEN WILL SALVAGE CONROLS PRIOR O DEMOLIION.. ALL COPPER UBING ASSOCIAED WIH OLD PNEUMAIC -SAS SHALL BE REMOVED ENIRELY FROM HE CONSRUCION AREA. MAIN SUPPLY AIR UBING SHALL BE PERMANENLY CAPPED WIH A COMPRESSION FIING A HE MAIN.. COORDINAE REMOVAL/RECONNECION OF N BUS WIH OWNER. N BUS IN AREAS NO IN CONRAC MUS REMAIN IN AC DURING CONSRUCION. PENHOUSE N MUS REMAIN IN AC UNIL CONVERSION O NEW AHU. KEYNOES: #. REMOVE DUC BACK O MAIN. SEAL MAIN AIRIGH. PACH INSULAION O MACH EXISING INSULAION YPE.. REMOVE PORION OF DUC AS INDICAED AND PREPARE FOR NEW CONNECION.. SURVEY IS ALREADY COMPLEED BY ONWER. REFER O HE REPOR O DEERMINE IF HERE IS ANY ACM. 4. EXISING 8X4 UNDER 8X6 REURN AIR GRILLE. PHASING KEYNOES: # 6. ALL RENOVAION WORK ON HIS AREA SHALL HAPPEN DURING SR- PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. 7. ALL WORK ON HIS AREA SHALL HAPPEN DURING SR-5 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. 8. ALL WORK ON HIS AREA SHALL HAPPEN DURING SR-4 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil Professional Seal: Project itle: 9 N. 4th Street Suite 000 St. Louis, MO 60 p f Memorial Student Union KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 LGA.5 N OR H FIRS FLOOR PLAN - NORH WING - VENILAION - DEMO /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: FIRS FLOOR PLAN - NORH WING - VENILAION - DEMO Project Number: Sheet Number: 65 MVD0N Drawn By: ASHMIS Issue Date:.6.7

58 PHASING KEYNOES: #. ALL RENOVAION WORK ON HIS AREA SHALL HAPPEN DURING SR- PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. C:\Revit Local Files\MEP7_ _MU Memorial Student A B C D E F Pipe rench Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /7/07 8:7:4 PM 0.5 Professional Seal: 0 Stairs SNB00E Mechanical Room 4x0 SG- x8/50 Project itle: SG- x8/50 COORDINAE ELEVAION WIH EXISING PIPING BCU-B0 BCU- Mechanical & Electrical Room 4x4 BCU-B0 4x4 SG- 4x4/400 Pipe rench BCU- 4x0 SG- x8/50 4x0 SG- x8/50 Mechanical Room Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 N OR H SUB BASEMEN FLOOR PLAN - VENILAION /8" = '-0" LGA.5 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: SUB BASEMEN FLOOR PLAN - VENILAION Project Number: Sheet Number: 65 MV00 Drawn By: ASHMIS Issue Date:.6.7

59 C:\Revit Local Files\MEP7_ _MU Memorial Student /7/07 8:7:45 PM A B C D E F G H J K REMOVE CONROLS AND HAVE HEM LOCK IN FINAL BALANCING POSIION ADD HANDLE FOR BALANCING PURPOSES. REMOVE CONROLS AND HAVE HEM LOCK IN FINAL BALANCING POSIION ADD HANDLE FOR BALANCING PURPOSES. Stairs SN00E 6X8 EA UP /00 CD- 0/400 4x CD- 0/ x8 6x4 ø x8 EG-E x/00 /00 SAIRS SN00C Vest. VN05 JAN. N VAV-4-A&B 6x8 6x8 6x8 6x8 4/45 (YP.4) /60 CUH- 6x8 7 Vest. VN0 Stor N7B N7A N6 Storage N R 0x8 VAV-04 x0 x0 8x8/75 8x8 x0 4x8 SG-E 6x/90 x0 x0 D 4x6 x0 8/75 4x8 8x75 8x8 Stotler Lounge N0 Storage N Freezer N4A 6x4 8x8 EG-E 6x4/55 4x8 EG-E 6x4/55 SG-E 6x/70 VAV-0 VAV-4-A R EG-E 4x4/50 EG-E 4x4/50 0/904x8 6x8 6x8 8ø 50 CFM VAV-5-0 4x VAV-4-B x8 6x8 Women N08 x0 x0 x8 4x8 EG-E 4x4/50 8x4/860 8x 8x x0 4x0 8x8 Men N07 6x8 6x8 6x8 6x8 Food N Serv. x8 Kitchen 8 4x0 6x8 8X8 SA UP 48X8 RA UP 40X8 SA UP 4x6 4x8 x0 x0 x0 8x E-UH 6x6 8x8 SG-E 8x8/75 8x8 Stotler Lounge N0B 9X8 SA UP 6x4 SA 8x0 6x8 6x8 6x8 4/45 (YP.4) 6x8 CD- 0/490 (YP.4) VAV x6 R /95 8x6 CD- 0/400 6x4 x0 x0 x0 x x0 D CD- 6/65 VAV-5-0 x0 D 6x6 4x8 D R x EG- 8/00 VAV-5-05A & B 6x4 8x6/80 (YP.) VAV-4-C VAV- 4-C &C 6x8 R x0 EG-E 4x4/840 x VAV-5-05B VAV-5-05A x4 x0 x EG-E x/400 EG-E 6x6/50 8x8 x0 VAV-5-0 8/85 D R R VAV x6 CD- 0/40 (YP.5) 0x0 54x 6x8 6x4 4/45 (YP.4) VAV-5-0 x6 46x8 7x8 9x8 VAV-4-C 6x8 4/45 (YP.4) R 8x8 48x8 8x x0 8x6/900 /55 SP 6x4 6x4 SG-E 6x/70 (YP.) D 4x6 x0 56x8 4x8 VAV-5-07 R 4x 4x Starbucks N 0/50 4x6 x0 0/50 56x8 0/70 (YP.6) 0/50 0/50 D R /55 x 6x 6x8 4x8 48x 48x 48x4 6x8 6x8 6x8 x0 6x8 0x4 4x/80 (YP.) 0/50 48x 8x8 Lounge N06A 6x4 7x8 48x8 8x 8x 6x8 4x8 48x VAV-4-B 6x8 4x8 x0 x0 SP 8X8 RA UP 7X8 SA UP 56X8 RA UP 8X0 EA UP 0/0 6x Seating Area N06 Stotler Lounge N0A 4x8 6x8 6x8 SAIRS SN00B 6x Seating Area N6 6x8 48x 6x 6x 6x8 D R R 48x x0 x0 5 4x D VAV /0 4x8 6x VAV-4- SG-E 6x/70 8x 6x8 x 6x4 4x8 D 4x D VAV-5-0 VAV-5-0 4x6 6x8 INSALL VAV BOX OVER LAY-IN CEILING (YP.) 0x8 0x0 0x8 8x4/860 (YP.) x0 8x x0 x0 6x8 6x8 6x8 6x 6x 6x8 8ø VAV-4-A x0 CONNEC WIH EXISING DUC COMING FROM GROUND FLOOR RESROOM CARRIES 450 CFM 4/45 (YP.4) R 0/0 0x0 CD- 8/0 x0 4/400 x4 8x0 6x8 VAV-5-06,07,08 VAV-4-0x0 VAV-5-09 x4 D R SG-E 6x/90 8x6/900 4/45 (YP.4) R 0/00 (YP.5) 6x8 6x8 6x8 4/400 8/65 4/400 x4 6x8 6x8 Elec. Mech. N9A VAV-4-A & B 8/40 6X8 EA DN 8x6 6x8 4x 6x8 6x8 SG-E 0x6/95 0x6 x Lobby LN0 CONROL EXISING RADIAOR. 4x6 6x8 4x6 0x6 0x6 VAV X8 EA UP 4/05 4/400 4/400 4/400 4/400 8x6 x6 8x 4/400 VAV-5-0 8/40 x x 4x5 4/05 4/400 6x8 4/400 6x8 4x8 8x5 X8 RA X8 SA UP 6x6 Vestibule VN00 /5 CONROL EXISING UNI HEAER. /400 4 EXISING GRILL BALANCE FOR 00 CFM DN DN KEYNOES: #. CONNEC WIH EXISING DIFFUSER.. EXISING 8x4 LOW REURN GRILLE AND 8x6 HIGH REURN GRILLE... BALANCE EXISING DIFFUSER FOR CFM NOED. PHASING KEYNOES: # 4. ALL WORK ON HIS AREA SHALL HAPPEN DURING SR-5 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. 5. ALL RENOVAION WORK ON HIS AREA SHALL HAPPEN DURING SR- PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. 6. ALL RENOVAION WORK ON HIS AREA SHALL HAPPEN DURING SR-4 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil Professional Seal: Project itle: 9 N. 4th Street Suite 000 St. Louis, MO 60 p f Memorial Student Union KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 LGA.5 N OR H FIRS FLOOR PLAN - NORH WING - VENILAION /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: FIRS FLOOR PLAN - NORH WING - VENILAION Project Number: Sheet Number: 65 MV0N Drawn By: ASHMIS Issue Date:.6.7

60 GENERAL NOES : PHASING KEYNOES: # C:\Revit Local Files\MEP7_ _MU Memorial Student Union_Central_mishraas@kjww.com.rvt A B C D E F G H J K 6X8 EA DN 4x8 EA UP COORDINAE REPLACEMEN OF FAN WIH HE CAMPUS DINING SERVICES. CONNEC O EXISING DUC PROVIDE NEW KICHEN EXHAUS FAN EF-. REFER O ELECRICAL POWER DRAWING FOR OCCUPENCY SENSORS LOCAION.. RESROOMS EXHAUS DUC AND FAN SHALL BE INSALLED PRIOR O INSALLING NEW SUPPLY AND REURN DUC.. CONNEC NEW DUCWORK WIH HE EXISING DUC IN SHAF, WHICH IS SERVING FIRS FLOOR, DURING SR-6 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /7/07 8:7:5 PM Stairs SN00E COORDINAE WIH SRUCURAL HANGERS. ROUE IN BEWEEN WO HANGERS. REFER O SRUCURAL PLAN FOR MORE INFOMRAION. VAV-5-0 VAV-5-0 VAV-5-0 6x VAV-5-04 CD- 8/00 4x8 VAV-5-0 0x8 0x8 D VAV-5-0 CD- 8/40 RG- 58x6 RA UP 60x6 SA UP 4x8 RA UP 0x0 8x8 Catering N RG- Corridor 8/50 CN04 8x4 58x6 CD- CD- 8/50 0x0 VAV-4-05 Storage N 60x6 0x0 Stair SN00D Men NA Jan N5 Women NA VAV-4-06 C C Meeting Room N0A 8x4 Meeting Room 8 N4D 0x8 Meeting Room 9 N4E RG- CD- 8/45 VAV-5-0 CD- 8/45 VAV-4-05 RG- 8x8 40x8 Corridor CN0 4x8 8x8 8x8 8X8 SA DN 40X8 Clos. SA DN 48X8 N0RA DN 56X8 RA DN 0x4 RG- 7X8 SA DN. 8X8 RA DN. 9X8 SA DN. Vest N Meeting Room 7 N4C 9x8 0x0 6x Meeting Room N0B 4x8 Corridor CN00 6x4 4x4 C 6x Corridor CN0 56x8 x4 Vest N VAV-4-06 RG- VAV-4-0x D VAV-4- Elec/AV N4 I.. N4A VAV-4- RG- 8x4 8x 56x8 Family N VAV x4 SA UP VAV-5-04 VAV-4- VAV-4-5 4x6 8x 5x8 56x8 8X0 EA DN SG- 0x8 0x8/940 VAV-4-4 SG- 0x/85 0x R x RG- RG- RG- RG- RG- 4x R R D CD- 8/80 6x4 CD- 6/40 CD- 0/00 4x8 CD- 8/80 EG- 8x6/50 EG- 8x6/50 CD- 0/95 (YP.9) R EG- 8x6/50 0x8 R CD- 8/5 (YP.9) CD- 8/05 EG- 6x6/50 D RG- x D 0x8 D 0x8 D x0 EG- 8x6/50 CD- 8/80 PROVIDE ACCESS PANEL IN CEILING. COORDINAE WIH ARCHIEC R 8x4 RG- R R CD- 0/65 (YP.9) 6x4 D 6x CD- 6/50 EG- 8x6/50 R 4x 4x VAV-4-07 CD- 8/70 Meeting Room 6 N4B Pre-function CN0A CD- 8/70 CD- 8/80 x4 6x4 0x x0 R C D R 6x Meeting Room N0C VAV-4-0 VAV-4-09 x4 VAV x4 6x8 CD- 8/05 (YP.9) D 4x RG- C 44x4 Corridor CN0 0x8 D D VAV-4- RG- R 60x0 44x6 56x8 4x 6x8 CD- 0/75 (YP.9) VAV-4-0 x RG- SG- x8/40 Room SN00B CD- 6/50 x8 VAV-4-4 x0 Stair SN00B VAV-4-4x x4 EA UP x 4x 58x6 6x VAV x6 RA UP 4x0 6x8 EA DN 0x0 BALANCE FOR 450 CFM RG- 4x C C Meeting Room 4 N04 8x8 Meeting Room 5 N4A RG- RG- x6/40 Elevator EN00W 4x0 CD- 8/80 R Break N47 58X6 RA UP 60X0 SA UP VAV-4-08 RG- 8x0 CD- 0/00 (YP.9) 4x4 D VAV-4-09 x6 D RG- 8x8 CD- 8/40 (YP.6) 4x4 D SG- 8x8/0 Stairs SN00C RG- 8x8/0 Storage N05 Professional Seal: Project itle: Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 LGA.5 N OR H SECOND FLOOR PLAN - NORH WING - VENILAION /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: SECOND FLOOR PLAN - NORH WING - VENILAION Project Number: Sheet Number: 65 MV0N Drawn By: ASHMIS Issue Date:.6.7

61 A B C D E F G H J K GENERAL NOES:. ALL DUCWORK EXPOSED ON ROOF SHALL BE KOOL DUC C:\Revit Local Files\MEP7_ _MU Memorial Student Union_Central_mishraas@kjww.com.rvt Stairs SN00E Elev Lobby N0A PHASINGKEYNOES: #. INSALL NEW DUCWORK DURING SR-6 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS.. INSALL NEW AHU IN HE AIC DURING SR-7 PER HE ARCHIECURAL SCOPE SEQUENCING PLANS.. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /7/07 8:7:54 PM Elev. Eq. N0B Professional Seal: 8 Project itle: 7 60x0 SA DN 58x6 RA DN x6 ROUE DUC APPROXIMAELY 6" ABOVE ROOF LEVEL 58x6 60x6 SPACE FOR FUURE AHU 4x8 58x6 RA DN 60x6 SA DN 4x8 RA DN REF- 46x4 58x6 60x6 Mechanical N0 ROUE DUC APPROXIMAELY A '-0" ABOVE ROOF LEVEL. CONSRUC A OULE PLENUM BOX O KEEP HE WAER AND DEBRIS OU OF HE FAN. DUC ANGLE DOWN. PROVIDE BIRD SCREEN ROUE DUC APPROXIMAELY A 0'-6" ABOVE ROOF LEVEL. ROUE DUC ABOVE DOOR A 0"-0" CLOSE O HE WALL. 60x6 ROUE DUC APPROXIMAELY 6" ABOVE ROOF LEVEL. ROUE DUC APPROXIMAELY A 0'-6" ABOVE ROOF LEVEL. DS-4 DS- 60x40 6x6 60x40 60x0 44x8 58x6 60x4 REF- ROUE DUC APPROXIMAELY A 0'-6" ABOVE ROOF LEVEL. 58x6 60x4 Attic Storage N04 EXISING OWER FLOOD LIGH EXISING OWER FLOOD LIGH PROVIDE BIRD SCREEN CONSRUC A OULE PLENUM BOX O KEEP HE WAER AND DEBRIS OU OF HE FAN. DUC ANGLE DOWN. ROUE DUC APPROXIMAELY 6" ABOVE ROOF LEVEL. Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. MP400 his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 LGA.5 N OR H AIC FLOOR PLAN - NORH WING - VENILAION /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: AIC FLOOR PLAN - NORH WING - VENILAION Project Number: Sheet Number: 65 MV0N Drawn By: ASHMIS Issue Date:.6.7

62 A B C D E F G H J K C:\Revit Local Files\MEP7_ _MU Memorial Student Union_Central_mishraas@kjww.com.rvt Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO /7/07 8:7:58 PM Professional Seal: 8 Project itle: PLACE FOR FUURE OA HOOD IAH- x4 EA DN PROVIDE GOOSENECK AND BIRD SCREEN Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 LGA.5 N OR H ROOF PLAN - NORH WING - VENILAION /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: ROOF PLAN - NORH WING - VENILAION Project Number: Sheet Number: 65 MV04N Drawn By: ASHMIS Issue Date:.6.7

63 C:\Revit Local Files\MEP7_ _MU Memorial Student KOOL DUC 9/6" DIA. BOL HOLES (YP) LOWER PORION OF DUC SUPPOR SHOWN IN POSIION. 0 GA PAIN GRIP GALVANIZED BEN PLAE BAND ABOVE DUC. WELD BOOM BAND O OP OF CHANNELS. R Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO R /7/07 8:8:00 PM 9/6" DIA. x 8" LONG SLO (YP) /" DIA. ZINC-PLAED BOL, NU AND WASHERS (YP.) SEE DRAWING FOR ACUAL ELEVAION OF DUC. 45 GUSSE ON EACH SIDE. SEE NOE. W W W r R R R R Professional Seal: NOMINAL 4x CHANNEL, 0 GA, PAIN GRIP GALVANIZED, BEN PLAE DUCWORK SUPPOR. CONINUOUS WELDED. SPRAY ALL WELDS AND HOLES WIH COLD GALVANIZING. (YP.) /8" ZINC-PLAED LAG SCREWS. (YP.) A VERICAL LEG OVAL / ROUND RADIUS ELBOW SMOOH OR 5 GORE (MINIMUM) R/W =.5 (MINIMUM) RECANGULAR RADIUS ELBOW YPE RE R/W =.0 (MINIMUM) R/W <.0 SHALL BE YPE RE RECANGULAR RADIUS ELBOW WIH VANES YPE RE REFER O SMACNA HVAC SYSEMS DUC DESIGN MANUAL, FOURH EDIION, SECION 5.4 "SPLIER VANES" AND SMACNA HVAC DUC CONSRUCION SANDARDS, HIRD EDIION, FIGURES 4- AND 4-9 AND CHARS 4- AND 4-M. ELBOW SHALL HAVE HREE SPLIER VANES AND r/w = 0.0 (R/W = 0.60) UNLESS NOED OHERWISE. " O.C. (MAX.) Project itle: BOOM OF SLO INSULAION AND ROOFING " MIN., 6" MAX. (NOE ) W W W SRUCURE ROOF SRUCURE PREFABRICAED EQUIPMEN SUPPOR CURB. VERIFY ROOFING MAERIAL AND PROVIDE WIH OR WIHOU CAN AS REQUIRED. NEW CURBS SHALL NO PREVEN WAER ON ROOF FROM DRAINING O EXISING ROOF DRAIN. NOES: PREFABRICAED ROOFCURB FURN. WIH FAN. (WIH WOOD NAILER AND INSULAED LINER.) FLASH ROOF MEMBRANE O CURB. (NOE ). MAINAIN HE OP OF HE GUSSE JUS BELOW HE SLO AND A A 45 ANGLE. AS HE SUPPOR HEIGH INCREASES, AND HE GUSSE MEE IN HE MIDDLE OF HE BASE, PROVIDE ONE DIAGONAL BRACE BEWEEN HE VERICAL LEGS.. DUC ROOF SUPPOR SHALL BE RAED FOR 0 PSF SNOW LOAD AND 0 PSF WIND LOAD.. PAIN RAIN COVER AND DUC SUPPORS O MACH DUC. 4. CROSS BRACE SUPPORS AS INDICAED ON HE PLAN. CROSS BRACING SHALL BE INSALLED FROM BASE OF SUPPOR O OP OF HE ADJACEN SUPPOR O LIMI LAERAL MOVEMEN. OP OF CURB " MIN. ROOF CUING AND PACHING SHALL BE PERFORMED BY A CERIFIED CONRACOR O MAINAIN EXISING ROOF WARRANY. DUC ROOF SUPPOR DEAIL (RECANGULAR) NO SCALE. INAKE HOOD, MAXIMUM 9.5" HOOD HEIGH CADMIUM PLAED LAG SCREWS. PER MANUFACURERS RECOMMENDAIONS 8" CURB AIR ERMINAL UNI. PROVIDE A MINIMUM OF X HE INLE DIAMEER OF SRAIGH DUC UPSREAM OF HE INLE FLOW SENSOR FOR ALL VAV BOXES. W RECANGULAR MIERED ELBOW YPE RE6 EXCEED NO O 0 USE ONLY AS PAR OF OFFSES AND RANSIIONS PER FIGURE 4-7 YPE OR AS SHOWN ON DRAWINGS. OFFSES ABOVE 0 SHALL BE YPE RE. REHEA COIL NOES: DUC ACCESS DOOR. W RECANGULAR MIERED ELBOW WIH VANES YPE RE ELBOW CONSRUCION NO SCALE. BEAD, CROSSBREAK, AND REINFORCE FLA SURFACES AS IN SRAIGH DUC.. REFER O SPECIFICAIONS FOR ADDIIONAL INFORMAION.. DEFAUL ELBOW SHALL BE YPE "RE". 4. ELBOW YPES SHALL BE INSALLED AS SHOWN AND NO BE SUBSIUED WIHOU PERMISSION. EXCEPION: RE OR RE MAY BE SUBSIUED FOR RE. 90 W RECANGULAR / OVAL / ROUND MIERED ELBOW WIHOU VANES YPE RE4 SUPPLY AIR NO ALLOWED 90 WRAP HE REHEA COIL INCLUDING REURN BENDS WIH EXERNAL INSULAION AS INDICAED IN SPECIFICAION SECION 07 - DUCWORK INSULAION. RECANGULAR RADIUS ELBOW WIH SQUARE HROA NO ALLOWED MAXIMUM 5' FLEXIBLE DUC R = DUC DIA. DIFFUSER NOES: SHEEMEAL ELBOW INSULAION CEILING DIFFUSER CONNECION DEAIL NO SCALE. O AACH FLEX DUC O HE HARD DUC, APE HE INNER LINER O HE HARD DUC HEN AACH WIH WO NYLON IE WRAPS; ONE FOR HE INNER LINER AND ONE FOR HE OUER SHELL. FOLD HE OUER SHELL INSIDE ISELF SO I HAS NEA EDGES PRIOR O IE WRAPPING. Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO FRAME, ROOF, & ROOFING BY GENERAL CONRACOR. he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. FACORY SUPPLIED BACKDRAF DAMPER. MOORIZED OR GRAVIY AS SCHEDULED. 4 NO SCALE NOES: DUCWORK ROOF MOUNED HOOD (MEMBRANE ROOF) PROVIDE A LEAS 4" OF CLEARANCE ON CONROLLER SIDE OF AIR ERMINAL UNI. HE CLEARANCE AREA SHALL EXEND HE FULL LENGH OF HE AIR ERMINAL UNI. (YPICAL FOR VAV AND FAN POWERED UNIS.) 5 SUPPLY AIR ERMINAL UNI WIH REHEA COIL NO SCALE his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7. ALL ROOF FLASHING SHALL BE PER ROOFING MANUFACURERS RECOMMENDAIONS. 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E Sheet itle: LGA.5 REFERENCE SCALE IN INCHES 0 VENILAION DEAILS Project Number: Sheet Number: 65 MV500 Drawn By: ASHMIS Issue Date:.6.7

64 SCHEDULE GENERAL NOES: AIR HANDLING SCHEDULE C:\Revit Local Files\MEP7_ _MU Memorial Student /7/07 8:8:07 PM A. DISCONNEC AND CONROLLER SARER FURNISHED AND INSALLED BY: MFR = MANUFACURER EC = ELECRICAL CONRACOR. MC = FURNISHED BY MECHANICAL CONRACOR, INSALLED BY ELECRICAL CONRACOR. MFR/EC = FURNISHED LOOSE BY MANUFACURER INSALLED BY ELECRICAL CONRACOR... B. DISCONNEC YPE: F = FUSED NF = NON-FUSED C. CONROLLER SARER YPE: FV = FULL VOLAGE WYE = WYE-DELA SS = SOLID SAE (SOF SAR) MS = MANUAL SARER VFD = VARIABLE FREQUENCY DRIVE VFD/B = VARIABLE FREQUENCY DRIVE WIH BYPASS D. FAN RPM SHALL NO EXCEED 0% OF SCHEDULED VALUE, WIH HE SCHEDULED WHEEL YPE. E. NO EQUIPMEN SHALL BE SELECED ABOVE 90% OF MOOR NAME PLAE RAING. F. MUS BE WIHIN +/- 0% OF SCHEDULED RPM. G. CURB YPE: MFR = SANDARD CURB BY MANUFACURER GC = BY GENERAL CONRACOR SAC = SOUND AENUAOR CURB SUPPLY FAN HEAING COIL - WAER COOLING COIL FILER CONROLLER/ DISCONNEC SARER SOUND (DB) MINIMUM MAX. W.P.D. EA MAX. W.P.D. PRE-FILER FINAL-FILER AG AREA EX. RPM BHP MHP BY YPE BY YPE K K 4 K 8 K OUSIDE AIR HEAING MCA EA EW LW A.P.D. FEE EA WB LA LA EW LW OAL A.P.D. FEE PRESSURE PRESSURE NAME SERVED CFM S.P. YPE (NOE D) (NOE E) (NOE E) (NOE A) (NOE B) (NOE A) (NOE C) 6 HZ HZ HZ HZ HZ HZ HZ HZ CFM CFM VOLAGE PHASES (A) F LA F F F GPM MBH IN. W.C. HEAD DB F F DB F WB F F F GPM MBH IN. W.C. HEAD YPE DROP YPE DROP MANUFACURER MODEL REMARK AHU-4 LEVEL & BAI 5 60 EC NF EC VFD , MERV MERV 0.77 rane CLIMAE CHANGER, 80 NOE,, & 4 AHU-5 LEVEL & BAI EC NF EC VFD , MERV MERV 0.7 rane CLIMAE CHANGER, 66 NOE,, & 4 NOES: ) PROVIDE SHAF GROUNDING AS REQUIRED IN HE MOOR SPECIFICAION 05. ) BHP LISED IS OAL FOR HE UNI. ) MHP LISED IS OAL FOR HE UNI. 4) SEE SPECIFICAION SECION FOR VIBRAION ISOLAION SCHEDULE. 5) COOLING COIL SHALL BE MAXIMUM 8 ROWS AND 0 FINS PER FOO, AND SHALL HAVE SAINLESS SEEL COIL CASING AND DRAIN PAN. 6) HEAING COIL SHALL BE MAXIMUM 8 ROWS AND 0 FINS PER FOO. FAN SCHEDULE ELECRICAL S.P. IN. WHEEL DIA. FAN RPM DRIVE MAX. AMCA BACKDRAF CURB YPE DISCONNEC CONROLLER/ SARER AG NAME AREA SERVED CFM W.C. INCHES (NOE F) YPE SONES DAMPER YPE (NOE G) BHP MHP VOLAGE PHASES BY (NOE A) YPE (NOE B) BY (NOE A) YPE (NOE C) MANUFACURER MODEL NOES EF- RES ROOM DIREC 9.4 MOORIZED MFR MFR NF EC FV COOK SQN-B EF- FIRS FLOOR KICHEN BEL. MOORIZED MFR. 460 MFR NF EC FV COOK CPA NOE REF- AHU BEL NA NA MFR NF EC VFD COOK CPA REF- AHU BEL NA NA MFR NF EC VFD COOK CPA NOES: ) PROVIDE SHAF GROUNDING AS REQUIRED IN HE MOOR SPECIFICAION 05. ) PROVIDE ECM MOOR. BLOWER COIL UNI SCHEDULE - HYDRONIC EA COOLING COIL ELECRICAL EX. DISCONNEC CONROLLER/ SARER AG NAME AREA SERVED CFM S.P. IN W.C. DB F WB F OAL MBH SENSIBLE MBH GPM EW F LW F W.P.D. F. HD HP VOLAGE PHASES BY (NOE A) YPE (NOE B) YPE (NOE A) MANUFACURER MODEL NOES BCU-B0 SUB BASEMEN MECHANICAL AND ELECRICAL ROOM EC - MFR RANE BCHD BCU-B0 SUB- BASEMEN EC - MFR RANE BCHD MOOR OPERAED DAMPER SCHEDULE Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f Professional Seal: KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO CONDENSING UNI SCHEDULE AG NAME CU- AREA SERVED ELEVAOR MACHINE ROOM ELECRICAL CONROLLER/ DISCONNEC SARER NOMINAL DESIGN ONS REFRIGERAN AMBIEN EMP F VOLAGE PHASES RLA MCA MOCP BY (NOE A) YPE (NOE B) BY (NOE A) MANUFACURER MODEL (NOE ) R-40A MFR F MFR DAIKIN RZQ4PVJU AG AREA SIZE CFM BLADE ACUAOR YPE POWER FAILURE POSIIVE POSIION NAME SERVED WIDH HEIGH MAX. MIN. CONFIGURAION BLADE ORIENAION INSULAED (NOE ) ACUAOR SYLE POSIION FEEDBACK REQUIRED NOES MOD- AHU OPPOSED HORIZONAL Yes ELECRIC WO POSIION NORMALLY CLOSED Yes A OUSIDE AIR DUC MOD- AHU OPPOSED HORIZONAL Yes ELECRIC WO POSIION NORMALLY CLOSED Yes A OUSIDE AIR DUC MOD- AHU OPPOSED HORIZONAL Yes ELECRIC WO POSIION NORMALLY CLOSED Yes A OUSIDE AIR DUC MOD-4 AHU OPPOSED HORIZONAL Yes ELECRIC WO POSIION NORMALLY CLOSED Yes A OUSIDE AIR DUC MOD-5 AHU OPPOSED HORIZONAL Yes ELECRIC WO POSIION NORMALLY CLOSED Yes A RELIEF DUC MOD-6 AHU OPPOSED HORIZONAL Yes ELECRIC WO POSIION NORMALLY CLOSED Yes A RELIEF DUC Project itle: NOES: ) SINGLE POIN POWER CONNECION UNI. SPLI SYSEM UNI SCHEDULE NOES: ) COORDINAE DAMPER ACUAOR LOCAION AND MOUNING REQUIREMENS WIH EMPERAURE CONROL CONRACOR. CABINE HEAER SCHEDULE - HO WAER AG NAME AREA SERVED CONFIGURAION CUH- VESIBULE VN-05 HORIZONAL RECESSED NOES: ) COORDINAE COLOR SELECION WIH ARCHIEC. ) PROVIDE FRON DUC COLLAR OULE AND BOOM SAMPED LOUVER INLE ) CONNEC O MEASYS. REFER O DEAIL 4/M70. UNI HEAER SCHEDULE - HO WAER W.P.D. F. HEAD INAKE HOOD SCHEDULE INDOOR UNI COOLING AG NAME AREA SERVED CFM MCA VOLAGE PHASE MBH MANUFACURER SSU- ELEVAOR MACHINE ROOM DAIKIN ELECRICAL CONROLLER/ DISCONNEC SARER BY YPE (NOE A) (NOE B) BY (NOE A) AG NAME AREA SERVED CONFIGURAION CFM MBH GPM EW F LW F HP RPM VOLAGE PHASES MANUFACURER MODEL UH-0 AIC HORIZONAL EC - MFR RANE S-56 UH-0 AIC HORIZONAL EC - MFR RANE S-96 UH-B0 SUB- BASEMEN HORIZONAL EC - MFR RANE S-48 UH-B0 SUB- BASEMEN HORIZONAL EC - MFR RANE S-48 NOES: ) CONNEC O MEASYS, REFER O DEAIL 4/M70. NOES: ) UNI NEEDS O BE CONROLLED BY MEASYS.. HROA SIZE HROA SAIC MAX. HEIGH (OP OF AG NAME AREA SERVED CFM WIDH (INCH) LENGH (INCH) VELOCIY (FPM) PRESSURE DROP CONFIGURAION CURB O OP OF EQUIP.) CURB YPE MANUFACURER MODEL IAH- AHU-& GRAVIY HOOD 6 MFR Greenheck FGI CABINE (NOE ) ELECRICAL NOMINAL EW LW MAX W.P.D. CONROL DISCONNEC CONROLLER/ SARER CFM MBH GPM F F F. HD YPE HEIGH WIDH DEPH FAN HP RPM VOLAGE PHASES BY (NOE A) YPE (NOE B) BY (NOE A) MANUFACURER MODEL NOES SA 0" 78" 0" MFR NF MFR RANE FFEB NOES DUC SILENCER SCHEDULE DIMENSIONS (INCHES) ACOUSICAL PERFORMANCE A +000 FPM AG AREA VELOCIY MAX. S.P. DROP IN. W.C. MINIMUM DYNAMIC INSERION LOSS IN DB OCAVE BAND CENER FREQUENCY NAME SERVED WIDH HEIGH LENGH CFM (FPM) (NOE ) MANUFACURER MODEL NOES DS- AHU VIBRO ACOUSICS RD-UHV-F-L068 NOE,, DS- AHU VIBRO ACOUSICS RD-UHV-F-L068 NOE,, DS- AHU VIBRO ACOUSICS RED-UHV-F-L068 NOE,, DS-4 AHU VIBRO ACOUSICS RED-UHV-F-L068 NOE,, NOES:. PRESSURE DROP VALUES LISED ARE PER ASM E ES PROCEDURE AND DO NO INCLUDE SYSEM EFFECS.. WIH FIBERGLASS CLOH SEPARAING MEDIA FROM AIRSREAM.. SILENCER SHALL BE CONSRUCED O KEEP HE BREAKOU NOISE CONRIBUION O HE AFFECED ROOM BELOW 40 Dba. SILENCER SHALL BE FACORY MANUFACURED AND ALL EXPOSED SURFACES SHALL BE SHEEMEAL (EXCEP FOR SPECIFIED EXERNAL DUC INSULAION FOR UNIS HA DO REQUIRE DUAL-WALL CONSRUCION.) ERMINAL AIR BOX SCHEDULE - SINGLE DUC CFM HEAING COIL (NOES 5, 6) MIN. INLE SIZE (IN.) AG NAME AREA SERVED COOLING MAX. HEAING MAX. MIN. EA F LA F EW F LW F # ROWS MAX. GPM MIN. INLE SIZE (IN.) DIA. WIDH HEIGH CONROL YPE MANUFACURER MODEL (NOES, ) NOES VAV-4- LOUNGE " NOE IUS DESV NOES,, 7 VAV-4-A SOLER LOUNGE " NOE IUS DESV NOES,, 7 N0 VAV-4-B SOLER LOUNGE " NOE IUS DESV NOES,, 7 N0 VAV-4-C SOLER LOUNGE " NOE IUS DESV NOES,, 7 N0 VAV-4-A SOLER LOUNGE " NOE IUS DESV NOES,, 7 N0A VAV-4-B SOLER LOUNGE " NOE IUS DESV NOES,, 7 N0A VAV-4-C SOLER LOUNGE N0A " NOE IUS DESV NOES,, 7 VAV MG ROOM " NOE IUS DESV NOES,, 8 VAV MG ROOM " NOE IUS DESV NOES,, 8 VAV MG ROOM " NOE IUS DESV NOES,, 8 VAV MG ROOM " NOE IUS DESV NOES,, 8 VAV MG ROOM " NOE IUS DESV NOES,, 8 VAV MG ROOM " NOE IUS DESV NOES,, 8 VAV-4-07 MG ROOM " NOE IUS DESV NOES,, 8 VAV-4- ELEC AV " NOE IUS DESV NOES, VAV-4- I " NOE IUS DESV NOES, VAV-4-4 LOBBY " NOE IUS DESV NOES, VAV-4-5 CORRIDOR " NOE IUS DESV NOES, VAV-4-0 AIC NOE IUS DESV NOES, VAV-5-0 SEAING NOE IUS DESV NOES, VAV-5-0 MGR OFFICE " NOE IUS DESV NOES, VAV-5-0 SARBUCKS NOE IUS DESV NOES, VAV-5-04 ASS MGR OFFICE " NOE IUS DESV NOES, VAV-5-05A KICHEN " NOE IUS DESV NOES, VAV-5-05B KICHEN " NOE IUS DESV NOES, VAV-5-06 DINING NOE IUS DESV NOES, VAV-5-07 DINING NOE IUS DESV NOES, VAV-5-08 DINING NOE IUS DESV NOES, VAV-5-09 SAFF OFFICE " NOE IUS DESV NOES, VAV-5-0 CORRIDOR " NOE IUS DESV NOES, VAV MG ROOM " NOE IUS DESV NOES, VAV MG ROOM " NOE IUS DESV NOES, VAV-5-0 SORAGE " NOE IUS DESV NOES, VAV-5-04 CORRIDOR " NOE IUS DESV NOES, NOES: ) NEIHER RADIAED NOR DISCHARGE SOUND LEVELS SHALL EXCEED NC 5 A.5" INLE SAIC PRESSURE WHEN ESED PER AHRI SANDARD USING 5/8" 0-LB DENSIY MINERAL FIBER CEILING ILE. ) OAL AIR PRESSURE DROP OF AB AND REHEA COIL SHALL NO EXCEED 0.50" WC. ) SEE SPECIFICAION SECION FOR DESCRIPION OF CONROL YPE. 4) SENSOR YPES: -SENSOR ONLY, -SENSOR WIH ADJUSMEN, -SENSOR WIH OVERRIDE, 4 -SENSOR WIH ADJUSMEN AND OVERRIDE. 5) HEAING COIL IS BASED ON HEAING AIR FLOW. WAER PRESSURE DROP OF REHEA COILS SHALL NO EXCEED 5'. PROVIDE REHEA COILS SEPARAE FROM BOXES IF REQUIRED O MEE WAER PRESSURE DROP REQUIREMENS. WHEN LA F, EW F, AND GPM VALUES ARE BLANK, HEAING COIL IS NO REQUIRED FOR AB. 6) HEAING COIL SELECION SHALL BE BASED ON A FIXED LEAVING AIR EMPERAURE AND VARIABLE FLOW (GPM). PROVIDE FINAL MAXIMUM FLOW RAE (GPM) O ES & BALANCE ERMPERAURE CONROLS CONRACORS. 7) HIS VAV HAS OCCUPANCY SENSOR IN ROOM. 8) HIS VAV HAS CO SENSOR IN ROOM. GRILLES REGISERS & DIFFUSERS SCHEDULE AG NAME MAERIAL CONFIGURAION MARGIN (NOE ) INLE SIZE (IN.) (NOE ) FACE SIZE (IN.) VOLUME DAMPER REQUIRED FINISH MANUFACURER MODEL NOES CD- SEEL PANEL FACE LAY-IN SEE DWG. 4x4 NO WHIE IUS OMNI EG- SEEL 5 DEGREE DEFLECION /4" SEE DWG. INLE + YES WHIE IUS 50R EG- SEEL ALUMINUM PANEL PERFORAED FACE FACE LAY-IN SEE DWG. 4x4 NO WHIE IUS OMNI PAR-AA RG- ALUMINUM EGGCRAE LAY-IN NA 4x4 NO WHIE IUS 50F RG- SEEL 5 DEGREE /4" SEE DWG. INLE + NO WHIE IUS 50R DEFLECION SG- SEEL DOUBLE DEFLECION /4" SEE DWG. INLE + NO WHIE IUS 00R FRON BLADES VERICAL UNLESS NOED OHERWISE Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 07//7 NOES: ) CONRACOR SHALL DEERMINE PROPER MARGIN SYLE O MACH CEILING CONSRUCION. ) ALL RUN OU DUCWORK O DIFFUSERS SHALL BE NECK SIZE UNLESS OHERWISE NOED. ) 0x0 GRILLE WIH LAY-IN BORDER FOR 4X4 GRID. PROVIDE W/ 6" DEEP SQUARE PLENUM 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E Sheet itle: LGA.5 REFERENCE SCALE IN INCHES 0 VENILAION SCHEDULES Project Number: Sheet Number: 65 MV60 Drawn By: ASHMIS Issue Date:.6.7

65 C:\Revit Local Files\MEP7_ _MU Memorial Student Union_Central_dhruv.m.shah.rvt /7/07 :08:4 PM PLUMBING FIXURE SCHEDULE GENERAL NOES HE SYMBOLS AND HE MAERIAL LIS ARE FOR HE CONVENIENCE OF HE CONRACOR. CONRACOR SHALL VERIFY QUANIIES AND FURNISH ALL MAERIALS REQUIRED FOR FULLY OPERAIONAL SYSEMS, WHEHER SPECIFIED OR NO. CAALOG NUMBERS SHALL NO BE CONSIDERED COMPLEE, BU ARE GIVEN AS AN AID O HE CONRACOR AND O INDICAE HE QUALIY REQUIRED. CONRACOR IS RESPONSIBLE FOR COMPLEE DESCRIPION OF MAERIAL ON HESE DRAWINGS AND IN HE SPECIFICAIONS BEFORE ORDERING. HE DESCRIPION OF HE MAERIAL AKES PRECEDENCE OVER HE CAALOG NUMBER. HE FIRS MANUFACURER LISED IS HE BASIS OF DESIGN. CONRACOR SHALL VERIFY HA FIXURES SUPPLIED ARE APPROVED PER ALL APPLICABLE SAE, LOCAL AND GOVERNING AUHORIIES. ALL FIXURES SHALL CONFORM O FEDERAL AC S.874 PLUMBING FIXURE SCHEDULE AG NAME DESCRIPION MANF. & MODEL BFP- BACK FLOW PREVENER - REDUCED PRESSURE ZONE, LEAD FREE BRONZE OR SAINLESS SEEL CONSRUCION, SIZE SAME AS PIPE, NON-CORROSIVE INERNAL PARS, SAINLESS SEEL SPRINGS, DIFFERENIAL PRESSURE RELIEF VALVE BEWEEN SPRING-LOADED CHECK VALVES, SHU-OFF VALVES ON INLE AND OULE OF UNI, BALL SYLE SHUOFF VALVES FOR /4"-" AND GAE SYLE VALVES FOR /"-0", AIR GAP DRAIN FIING, ES PORS WIH SHU-OFF VALVES, RAED FOR 75 PSI A F O 40 F, 5 PSI (MAXIMUM) PRESSURE DROP A 0 FPS, FACORY ESED, ALL PARS O BE SERVICEABLE WIHOU REMOVING UNI FROM LINE, APPROVED BY USC FCCC & HR, AWWA C5-9, ASSE 0, IAPMO AND SBCCI LISED. WAS (LF99), WILKINS, ZURN EWC- FD- FS- GI- HB- MOUN WIHIN 60" OF FINISHED FLOOR. PROVIDE AND INSALL BRONZE OR EPOXY COAED SRAINER UPSREAM OF EACH UNI AND ADDIIONAL VALVE UPSREAM OF EACH SRAINER. FLOW PRESSURE DROP CURVES SHALL BE SUBMIED. ELECRIC WAER COOLER - WALL HUNG, RECESSED ELKAY (EZWS-EDFPBM7K) CHILLER, WO SAINLESS SEEL ROUND BASIN WIH SAINLESS SEEL FINISH, PERFORAED DRAIN, SREAM PROJECOR WIH PROECIVE HOOD, PUSH BAR OR LEVER OPERAING CONROLS ON FRON AND SIDES, BUIL-IN FLOW REGULAOR, PLASIC P-RAP ASSEMBLY, ADJUSABLE HERMOSA, MOUNING ACCESSORIES, ANK DRAIN AND ANGLE SOPS, HERMEIC COMPRESSOR O OPERAE ON HFC-4a REFRIGERAN. COMPLIAN O LAES ANSI A7. AND ADA SANDARDS. BOLE FILLING SAION - UNI MOUNED, SAINLESS SEEL CONSRUCION AND FINISH, INEGRAL DRAIN, SENSOR OPERAED WIH AUOMAIC SHUOFF, BOLE COUNER, FILER REPLACEMEN INDICAOR. UNI SHALL PROVIDE 8.0 GPH OF WAER FROM 80 F O 50 F A 90 F AMBIEN. WAER SYSEM SHALL BE OF LEAD FREE CONSRUCION. ANK SHALL BE ESED O 5 PSIG. ORIFICE SHALL BE A 6" (MAXIMUM) ABOVE FINISHED FLOOR. BOOM OF APRON SHALL BE A 7" ABOVE FINISHED FLOOR IN COMPLIANCE WIH LAES ADA SANDARDS. ELECRICAL REQUIREMENS - 5V- PHASE, CORD AND PLUG, /5 HP MOOR FLOOR DRAIN - CAS IRON BODY, NICKEL BRONZE ADJUSABLE OP, 6" ROUND, " BOOM OULE, FLASHING COLLAR,SURFACE MEMBRANE CLAMP, DEEP SEAL RAP. RAP SEAL - ", PLASIC HOUSING WIH FLEXIBLE DIAPHRAGM, SEALING GASKES, RECLOSES AND SEALS WHEN DISCHARGE IS COMPLEED, ASSE 07. FLOOR SINK - CAS IRON BODY, NICKEL BRONZE RIM AND GRAE, " SQUARE, " BOOM OULE, 6" DEEP RECEPOR WIH ALUMINUM DOME SRAINER, ACID RESISAN COAED INERIOR, SEEPAGE FLANGE WIH CLAMP, DEEP SEAL RAP. GREASE INERCEPOR - RECESSED, POLYEHYLENE, FIBERGLASS REINFORCED POLYESER, OR EPOXY COAED SEEL CONSRUCION, REMOVABLE OR CLEANABLE INAKE AND DISCHARGE BAFFLES, INERNAL FLOW CONROL FIING IF NECESSARY FOR OPERAION, GASKEED COVER, PDI G0 COMPLIAN, PDI APPROVED AND LISED FOR USE, 0 YEAR WARRANY. PROVIDE RISERS FOR EXENDING COVER O GRADE. PROVIDE WO-WAY CLEANOUS UPSREAM AND DOWNSREAM OF GREASE INERCEPOR. 00 GPM FLOW,,076 LB. GREASE CAPACIY, 75 GALLONS HOLDING CAPACIY, 4" PIPE INLE AND OULE. HOSE BIBB - FOR INDOOR USE, BRASS CONSRUCION, SANDARD FINISH, ASSE APPROVED VACUUM BREAKER, /4" MALE HOSE HREAD, MEAL WHEEL HANDLE. MOUN A 8" ABOVE FINISHED FLOOR. L- LAVAORY - UNDER COUNER MOUNED, OVAL, SELF-RIMMING, WHIE VIREOUS CHINA, 9"x6", SINGLE FAUCE HOLE, FRON OVERFLOW MB- OD- LAVAORY RIM - SENSOR ACIVAED NON-MIXING FAUCE, BAERY POWERED, BRASS CONSRUCION, CHROME-PLAED FINISH, SPOU WIH AERAOR, SINGLE HOLE INSALLAION, INEGRAL CHECK VALVES, PERFORAED GRID SRAINER WIH -/4" 7 GAUGE AILPIECE, EXERNAL ADJUSABLE EMPERAURE, FAUCE MOUNED CONROLS AND BAERIES. MAXIMUM FLOW O BE 0.5 GPM IN COMPLIANCE WIH ENERGY POLICY AC OF 005 AND ASME/ANSI SANDARD A.8.M. FAUCE SHALL COMPLY WIH FEDERAL AC S.874. PROVIDE RESRICIVE DEVICE AND ESCUCHEON PLAE AS REQUIRED. INSULAION KI - PRE-MANUFACURED FOR P-RAP, SOP VALVES, AND SUPPLY LINES. ACCESSORIES - QUARER-URN /8" CHROME PLAED HEAVY BRASS ANGLE SUPPLY LOOSE KEY SOPS, CHROME PLAED SOF COPPER SUPPLY LINES, -/4" 0 GAUGE CAS BRASS P-RAP. MOP BASIN - PRECAS ERRAZZO, 4"x4"x0", SAINLESS SEEL INEGRAL DRAIN WIH REMOVABLE SRAINER, " OULE, CONINUOUS SAINLESS SEEL CAP ON ALL EDGES. RIM - EXPOSED WO HANDLE MIXING FAUCE, BRASS CONSRUCION, CHROME-PLAED FINISH, SINGLE WING HANDLES, /4 URN CERAMIC DISC CARRIDGE, /4" HOSE HREAD SPOU WIH INEGRAL VACUUM BREAKER, WALL BRACE, PAIL HOOK, CHECK SOPS OR INLINE CHECK VALVES O PREVEN HERMAL CROSSOVER. FAUCE SHALL COMPLY WIH FEDERAL AC S.874. ACCESSORIES - MOP HANGER, HOSE AND HOSE BRACKE, DEEP SEAL RAP OVERFLOW DRAIN - CAS IRON BODY, SECURED CAS IRON DOME, 5" ROUND, BOOM OULE, FLASHING CLAMP, GRAVEL SOP, UNDERDECK CLAMP, BEARING PAN, ADJUSABLE EXENSION O MACH INSULAION HICKNESS, " ALL EXERNAL WAER DAM,OULE SIZE AS LISED ON DRAWINGS. FLOOR DRAIN - ZURN (Z-45B), SMIH, WADE, JOSAM, WAS, MIFAB, SUN RAP SEAL - SURE SEAL (SS), PROVEN, SMIH, LIQUID BREAKER ZURN (Z90), SMIH, WADE, JOSAM, WAS, SIOUX CHIEF, SUN SCHIER (GB-50) PRIER, WOODFORD, CHICAGO FAUCE, ACORN, &S BRASS, MIFAB LAVAORY - AMERICAN SANDARD, KOHLER, SLOAN, OO, ZURN (Z50) LAVAORY RIM - SLOAN, ZURN(Z6950) INSULAION KI - RUEBRO (LAV-GUARD), BROCAR PRODUCS, MCGUIRE, PLUMBEREX MOP BASIN - FIA, ACORN, CREAIVE INDUSRIES, WILLIAMS, ZURN(Z996-4) RIM - DELA, AMERICAN SANDARD (844.0), CHICAGO FAUCES, MOEN, SPEAKMAN, SYMMONS, ZURN ZURN (Z-00), SMIH, WADE, JOSAM, WAS, MIFAB, SUN PLUMBING FIXURE SCHEDULE AG NAME DESCRIPION MANF. & MODEL RD- ROOF DRAIN - CAS IRON BODY, SECURED CAS IRON DOME, 5" ROUND, BOOM OULE, FLASHING CLAMP, GRAVEL SOP, UNDERDECK CLAMP, BEARING PAN, ADJUSABLE EXENSION O MACH INSULAION HICKNESS, OULE SIZE AS LISED ON DRAWINGS. ZURN (Z-00), SMIH, WADE, JOSAM, WAS, MIFAB, SUN RDO- SI- SK- SP- SP- SP- ROOF DRAIN OULE - LAMBS ONGUE DOWNSPOU NOZZLE, BRONZE BODY, INEGRAL ANCHORING FLANGE, REMOVABLE SAINLESS SEEL SCREEN, OULE SIZE AS LISED ON DRAWINGS. SOLIDS INERCEPOR - HIGH DENSIY POLYEHYLENE OR ACID RESISAN COAED SEEL BODY, FLOOR MOUNED INSALLAION, REMOVABLE SAINLESS SEEL SEDIMEN BASKE WIH COARSE FILER, GASKEED COVER, " SIDE INLE AND OULE. MINIMUM CAPACIY 5 GALLONS MAINAIN REQUIRED CLEARANCE ABOVE INERCEPOR FOR REMOVAL OF SEDIMEN BUCKE. PROVIDE COVER AND BASKE HANDLE EXENSIONS AS REQUIRED FOR IN-FLOOR INSALLAIONS. SINK - SELF-RIMMING SINGLE COMPARMEN WIH FAUCE DECK AND OVERFLOW, 8 GAUGE YPE 04SAINLESS SEEL, 9" SIDE-O-SIDE x 8" FRON-O-BACK OVERALL SIZE, 6" x.5" x 6.5" DEEP BOWL, COMPLEELY UNDERCOAED, -/" DIAMEER DRAIN OULE LOCAION CENERED IN BOWL, PERFORAED YPE 04 SAINLESS SEEL GRID SRAINER. REMOVABLE YPE 04 SAINLESS SEEL BASKE SRAINER WIH NEOPRENE SOPPER. SINK RIM - SINGLE HANDLE MIXING FAUCE, BRASS CONSRUCION, CHROME-PLAED FINISH, NOMINAL 0" HIGH-RISE SWING SPOU, CERAMIC CARRIDGE, NOMINAL 9" REACH, PULL DOWN SPRAY HOSE WIH AERAOR SREAM / SPRAY SELECOR, LEVER HANDLE. MAXIMUM FLOW O BE. GPM IN COMPLIANCE WIH ENERGY POLICY AC OF 005 AND ASME/ANSI SANDARD A.8.M.FAUCE SHALL COMPLY WIH FEDERAL AC S.874. PROVIDE RESRICIVE DEVICE AND ESCUCHEON PLAE AS REQUIRED. ACCESSORIES - -/" 7 GAUGE CHROME-PLAED BRASS AILPIECE AND P-RAP, QUARER-URN BALL VALVE YPE /8" CHROME-PLAED BRASS ANGLE SUPPLIES WIH SOPS, CHROME-PLAED SOF COPPER SUPPLY LINES. INSULAION KI - PRE-MANUFACURED FOR P-RAP, SOP VALVES, AND SUPPLY LINES. SUMP PUMP - SIMPLEX SUBMERSIBLE, SINGLE-SAGE, SINGLE SEAL, CENRIFUGAL, END-SUCION PUMP, SAINLESS SEEL FASENERS, GUARDS AND HANDLES, UL LISED. CASING - CAS IRON, INEGRAL SUPPOR FEE, MINIMUM " VERICAL DISCHARGE. IMPELLER: CAS IRON SAICALLY AND DYNAMICALLY BALANCED, SEMIOPEN NONCLOG DESIGN, KEYED AND SECURED O SHAF, PASSES /4" SOLIDS MINIMUM. SHAF - SEEL OR SAINLESS SEEL WIH FACORY SEALED, GREASE-LUBRICAED SLEEVE OR BALL BEARINGS, CARBON AND CERAMIC SEAL. MOOR RPM, OIL OR AIR-FILLED, HERMEICALLY SEALED WIH AUO HERMAL OVERLOAD PROECION, HREE CONDUCOR WAERPROOF POWER CABLE OF SUFFICIEN LENGH WIH GROUNDING PLUG. CAPACIY: 50 GPM, 5 FEE OF HEAD. ELECRICAL REQUIREMENS - / HP, 0V, PHASE. FLOAS SHALL BE SAINLESS SEEL. CONROLS - INEGRAL FLOA SWICH OR PIGGY-BACK FLOA/DIAPHRAM SWICH. BASIN - 6" DIAMEER x 4" DEEP FORMED CONCREE PI BY OHERS. PROVIDE CONROL PANEL WIH HIGH WAER AND OIL PRESEN ALARM. REFER O DRAWINGS FOR LOCAION. SUMP PUMP - SIMPLEX SUBMERSIBLE, SINGLE-SAGE, SINGLE SEAL, CENRIFUGAL, END-SUCION PUMP, SAINLESS SEEL FASENERS, GUARDS AND HANDLES, UL LISED. CASING - CAS IRON, INEGRAL SUPPOR FEE, MINIMUM " VERICAL DISCHARGE. IMPELLER: CAS IRON SAICALLY AND DYNAMICALLY BALANCED, SEMIOPEN NONCLOG DESIGN, KEYED AND SECURED O SHAF, PASSES /4" SOLIDS MINIMUM. SHAF - SEEL OR SAINLESS SEEL WIH FACORY SEALED, GREASE-LUBRICAED SLEEVE OR BALL BEARINGS, CARBON AND CERAMIC SEAL. MOOR RPM, OIL OR AIR-FILLED, HERMEICALLY SEALED WIH AUO HERMAL OVERLOAD PROECION, HREE CONDUCOR WAERPROOF POWER CABLE OF SUFFICIEN LENGH WIH GROUNDING PLUG. CAPACIY: 50 GPM, 5 FEE OF HEAD. ELECRICAL REQUIREMENS - / HP, 0V, PHASE. FLOAS SHALL BE SAINLESS SEEL. CONROLS - INEGRAL FLOA SWICH OR PIGGY-BACK FLOA/DIAPHRAM SWICH. BASIN - 6" DIAMEER x 4" DEEP FORMED CONCREE PI BY OHERS. PROVIDE CONROL PANEL WIH HIGH WAER AND OIL PRESEN ALARM. REFER O DRAWINGS FOR LOCAION. SUMP PUMP - SIMPLEX SUBMERSIBLE, SINGLE-SAGE, SINGLE SEAL, CENRIFUGAL, END-SUCION PUMP, SAINLESS SEEL FASENERS, GUARDS AND HANDLES, UL LISED. CASING - CAS IRON, INEGRAL SUPPOR FEE, MINIMUM " VERICAL DISCHARGE. IMPELLER: CAS IRON SAICALLY AND DYNAMICALLY BALANCED, SEMIOPEN NONCLOG DESIGN, KEYED AND SECURED O SHAF, PASSES /4" SOLIDS MINIMUM. SHAF - SEEL OR SAINLESS SEEL WIH FACORY SEALED, GREASE-LUBRICAED SLEEVE OR BALL BEARINGS, CARBON AND CERAMIC SEAL. MOOR RPM, OIL OR AIR-FILLED, HERMEICALLY SEALED WIH AUO HERMAL OVERLOAD PROECION, HREE CONDUCOR WAERPROOF POWER CABLE OF SUFFICIEN LENGH WIH GROUNDING PLUG. CAPACIY: 50 GPM, 0 FEE OF HEAD. ELECRICAL REQUIREMENS - / HP, 0V, PHASE. FLOAS SHALL BE SAINLESS SEEL. CONROLS - INEGRAL FLOA SWICH OR PIGGY-BACK FLOA/DIAPHRAM SWICH. BASIN - 6" DIAMEER x 4" DEEP FORMED CONCREE PI BY OHERS. PROVIDE CONROL PANEL WIH HIGH WAER AND OIL PRESEN ALARM. REFER O DRAWINGS FOR LOCAION. ZURN (Z-99) SRIEM (PS-5-S) SINK - ELKAY (LRADQ9855), JUS, FRANKE SINK RIM - AMERICAN SANDARD (485.00), ZURN, SLOAN INSULAION KI - MCGUIRE (PROWRAP), JUS, PLUMBEREX, RUEBRO PUMP - ZOELLER (60 SERIES), GOULDS PUMP - ZOELLER (60 SERIES), GOULDS PUMP - ZOELLER (60 SERIES), GOULDS PLUMBING FIXURE SCHEDULE AG NAME DESCRIPION MANF. & MODEL UR- URINAL - NON- ACCESSIBLE, WALL MOUNED, WHIE VIREOUS CHINA, FLUSH VALVE YPE, SIPHON JE, LOW CONSUMPION, EXENDED FRON, /4" OP SPUD, " OULE. URINAL - AMERICAN SANDARD ( ), KOHLER FLUSH VALVE - ZURN (ZER600AV), SLOAN UR- WC- WC- WCO- WHA- WHA- FLUSH VALVE - EXPOSED, SENSOR OPERAION, BAERY POWERED, 0.50 GALLONS PER FLUSH, -/" ROUGH-IN, CHROME-PLAED, /4" I.P.S. SCREWDRIVER SOP-CHECK VALVE WIH VANDAL RESISAN CAP, HIGH BACK PRESSURE VACUUM BREAKER, NON-HOLD-OPEN HANDLE, ADJUSABLE AILPIECE, SPUD COUPLING AND FLANGE, WALL FLANGE WIH SE SCREW, MANUAL OVER-RIDE, LOW BAERY INDICAOR LIGH, RANGE ADJUSMEN SCREW, CHLORAMINE RESISAN MAERIALS, -YEAR WARRANY. CONRACOR OPION: COMBINAION URINAL/FLUSH VALVE PACKAGED SYSEM BY AMERICAN SANDARD, KOHLER, SLOAN, OR ZURN ACCESSORIES - SUPPOR CARRIER WIH OP AND BOOM BEARING PLAES. MOUN WIH CARRIER BOLED SECURELY O FLOOR. OP OF BOWL RIM SHALL BE A 7" (MAXIMUM) ABOVE FLOOR IN COMPLIANCE WIH LAES ADA SANDARDS. VERIFY EQUIPMEN REQUIREMENS AND ROUGH-IN LOCAIONS. URINAL - ACCESSIBLE, WALL MOUNED, WHIE VIREOUS CHINA, FLUSH VALVE YPE, SIPHON JE, LOW CONSUMPION, EXENDED FRON, /4" OP SPUD, " OULE. FLUSH VALVE - EXPOSED, SENSOR OPERAION, BAERY POWERED, 0.50 GALLONS PER FLUSH, -/" ROUGH-IN, CHROME-PLAED, /4" I.P.S. SCREWDRIVER SOP-CHECK VALVE WIH VANDAL RESISAN CAP, HIGH BACK PRESSURE VACUUM BREAKER, NON-HOLD-OPEN HANDLE, ADJUSABLE AILPIECE, SPUD COUPLING AND FLANGE, WALL FLANGE WIH SE SCREW, MANUAL OVER-RIDE, LOW BAERY INDICAOR LIGH, RANGE ADJUSMEN SCREW, CHLORAMINE RESISAN MAERIALS, -YEAR WARRANY. CONRACOR OPION: COMBINAION URINAL/FLUSH VALVE PACKAGED SYSEM BY AMERICAN SANDARD, KOHLER, SLOAN, OR ZURN ACCESSORIES - SUPPOR CARRIER WIH OP AND BOOM BEARING PLAES. MOUN WIH CARRIER BOLED SECURELY O FLOOR. OP OF BOWL RIM SHALL BE A 7" (MAXIMUM) ABOVE FLOOR IN COMPLIANCE WIH LAES ADA SANDARDS. VERIFY EQUIPMEN REQUIREMENS AND ROUGH-IN LOCAIONS. WAER CLOSE - NON-ACCESSIBLE, WALL MOUNED, FLUSH VALVE YPE, WHIE VIREOUS CHINA, SIPHON JE, WAER SAVING, ELONGAED BOWL, -/" OP SPUD. FLUSH VALVE - EXPOSED, SENSOR OPERAION, BAERY POWERED,.6 GALLONS PER FLUSH, -/" ROUGH-IN, CHROME PLAED, " I.P.S. SCREWDRIVER SOP-CHECK VALVE WIH VANDAL RESISAN CAP, HIGH BACK PRESSURE VACUUM BREAKER, ADJUSABLE AILPIECE, SPUD COUPLING AND FLANGE, WALL FLANGE WIH SE SCREW, MECHANICAL OVER-RIDE BUON, CHLORAMINE RESISAN MAERIALS, ADA COMPLIAN, YEAR WARRANY. SEA - WHIE, EXRA HEAVY, OPEN FRON, INJECION MOLDED SOLID ANI-MICROBIAL PLASIC, CHECK HINGE, SAINLESS SEEL OR PLAED SEEL POSS AND NUS. CONRACOR OPION: COMBINAION WAER CLOSE/FLUSH VALVE PACKAGED SYSEM BY AMERICAN SANDARD, KOHLER, SLOAN, OR ZURN ACCESSORIES - WAER CLOSE SUPPOR CARRIER RAED FOR 500 LBS. MOUN WAER CLOSE WIH CARRIER BOLED SECURELY O FLOOR. OP OF SEA SHALL BE A 7"-9" ABOVE FINISHED FLOOR (VERIFY EXAC MOUNING HEIGH WIH MANUFACURER). VERIFY EQUIPMEN REQUIREMENS AND ROUGH-IN LOCAIONS. WAER CLOSE - ACCESSIBLE, WALL MOUNED, FLUSH VALVE YPE, WHIE VIREOUS CHINA, SIPHON JE, WAER SAVING, ELONGAED BOWL, -/" OP SPUD. FLUSH VALVE - EXPOSED, SENSOR OPERAION, BAERY POWERED,.6 GALLONS PER FLUSH, -/" ROUGH-IN, CHROME PLAED, " I.P.S. SCREWDRIVER SOP-CHECK VALVE WIH VANDAL RESISAN CAP, HIGH BACK PRESSURE VACUUM BREAKER, ADJUSABLE AILPIECE, SPUD COUPLING AND FLANGE, WALL FLANGE WIH SE SCREW, MECHANICAL OVER-RIDE BUON, CHLORAMINE RESISAN MAERIALS, ADA COMPLIAN, YEAR WARRANY. SEA - WHIE, EXRA HEAVY, OPEN FRON, INJECION MOLDED SOLID ANI-MICROBIAL PLASIC, CHECK HINGE, SAINLESS SEEL OR PLAED SEEL POSS AND NUS. CONRACOR OPION: COMBINAION WAER CLOSE/FLUSH VALVE PACKAGED SYSEM BY AMERICAN SANDARD, KOHLER, SLOAN, OR ZURN ACCESSORIES - WAER CLOSE SUPPOR CARRIER RAED FOR 500 LBS. MOUN WAER CLOSE WIH CARRIER BOLED SECURELY O FLOOR. OP OF SEA SHALL BE A 7"-9" ABOVE FINISHED FLOOR (VERIFY EXAC MOUNING HEIGH WIH MANUFACURER). VERIFY EQUIPMEN REQUIREMENS AND ROUGH-IN LOCAIONS. WALL CLEANOU - END CAP, CAS IRON ACCESS BODY, GAS AND WAERIGH BRONZE OR BRASS HREADED PLUG, ROUND SAINLESS SEEL ACCESS COVER, EXENDED MACHINE SCREW. WAER HAMMER ARRESER - BELLOWS YPE, PRE-CHARGED, ALL LEAD FREE SAINLESS SEEL CONSRUCION, ASSE 00 APPROVED, PDI CERIFIED, RAED FOR - FIXURE UNIS. INSALL PER MANUFACURER'S RECOMMENDAIONS. WAER HAMMER ARRESER - BELLOWS YPE, PRE-CHARGED, ALL LEAD FREE SAINLESS SEEL CONSRUCION, ASSE 00 APPROVED, PDI CERIFIED, RAED FOR - & -60 FIXURE UNIS. INSALL PER MANUFACURER'S RECOMMENDAIONS. URINAL - AMERICAN SANDARD ( ), KOHLER FLUSH VALVE - ZURN (ZER600AV), SLOAN WAER CLOSE - AMERICAN SANDARD, KOHLER (K-45), FLUSH VALVE - ZURN (ZR6000AV), SLOAN WAER CLOSE - AMERICAN SANDARD, KOHLER (K-45), FLUSH VALVE - ZURN (ZR6000AV), SLOAN ZURN (Z-44), SMIH, WADE, JOSAM, WAS ZURN (Z700), JR SMIH, WADE, JOSAM, WAS, MIFAB ZURN (Z700), JR SMIH, WADE, JOSAM, WAS, MIFAB SYMBOL: DESCRIPION: CW D GSAN HW HWR SPD SW S(,000) SS SV RD- 6"(000) AD AFF BFP CO DF E EWC FCO FD GI HB I.E. LAV MB NC NIC RD SK P UR VR WC WCO GPM ABBR: CB CI YP WM UNO FD LINE YPE KEY: PIPE CAP PIPE DOWN PLUMBING SYMBOL LIS COLD WAER - POABLE DRAIN ILE SANIARY DRAINAGE (GREASE LADEN) HO WAER - POABLE HO WAER RERUN- POABLE SUMP PUMPED DISCHARGE SANIARY DRAINAGE SORM DRAINAGE (ROOF SQUARE FOOAGE) SORM DRAINAGE (SECONDARY) VEN PIPE UP OR UP/DOWN PIPE SERVING FIXURE ON FLOOR ABOVE (EXAMPLE: FD = FLOOR DRAIN) PICH PIPE IN DIRECION DIRECION OF FLOW IN PIPE ROOF DRAIN PROPERIES SYMBOL SIZE (ROOF SQ. F.) DIELECRIC CONNECION UNION/FLANGE SHUOFF VALVE NORMALLY OPEN SHUOFF VALVE NORMALLY CLOSED BALANCING VALVE (NUMBER INDICAES GPM) CHECK VALVE SOLENOID VALVE SAFEY/RELIEF VALVE NO ALL SYMBOLS MAY APPLY. INDICAES POIN OF CONNECION BEWEEN NEW AND EXISING REDUCER - REFERENCE SPECIFICAION FOR CONCENRIC/ECCENRIC AND FO/FOB NEW WORK BY HIS CONRACOR (DARK SOLID LINE) EXISING O BE REMOVED BY HIS CONRACOR (DARK SHOR DASHED LINE) PLUMBING FIXURE ROUGH-IN SCHEDULE NOES: ) SANIARY RISER UP IN WALL O FIXURE SHALL BE A MINIMUM OF ". ) BRANCH PIPING O VERICAL RISE-DROP SHALL BE A MINIMUM OF /4" UNLESS NOED OHERWISE. ) SIZES SHOWN ARE MINIMUMS. SIZES SHOWN ON HE DRAWING HA ARE LARGER HAN HE SIZES LISED IN HE SCHEDULE SHALL DICAE HE ROUGH-IN SIZE. FIXURE DESCRIPION ELECRIC WAER COOLER PLUMBING ABBREVIAION KEY DESCRIPION: ACCESS DOOR ABOVE FINISHED FLOOR BACKFLOW PREVENER CACH BASIN CAS IRON CLEANOU DRINKING FOUNAIN EXISING ELECRIC WAER COOLER FLOOR CLEANOU FLOOR DRAIN GREASE INERCEPOR HOSE BIBB INVER ELEVAION (FOR REFERENCE ONLY) LAVAORY MOP BASIN NEW CONNECION NO IN CONRAC ROOF DRAIN SINK DOMESIC CW (NOE ) RAP PRIMER YPICAL URINAL VEN HROUGH ROOF WAER CLOSE WALL CLEANOU WAER MEER DOMESIC HW (NOE ) SANIARY VEN (NOE ) (NOE ) REMARKS /" - " /" NOE & FLOOR DRAIN - - " /" NOE FLOOR SINK - - " /" NOE HOSE BIBB /4" NOE LAVAORY /" - " /" NOE & MOP BASIN /4" /4" " /" NOE & SINK /4" /4" " /" NOE & URINAL " - " /" NOE & WAER CLOSE " - 4" " NOE & UNLESS NOED OHERWISE NO ALL SYMBOLS MAY APPLY. PLUMBING GENERAL NOES:. HE SYMBOLS AND HE MAERIAL LIS ARE FOR HE CONVENIENCE OF HE CONRACOR. CONRACOR SHALL VERIFY QUANIIES AND FURNISH ALL MAERIALS REQUIRED FOR FULLY OPERAIONAL SYSEMS, WHEHER SPECIFIED OR NO.. CAALOG NUMBERS SHALL NO BE CONSIDERED COMPLEE, BU ARE GIVEN AS AN AID O HE CONRACOR AND O INDICAE HE QUALIY REQUIRED. CONRACOR IS RESPONSIBLE FOR COMPLEE DESCRIPION OF MAERIAL ON HESE DRAWINGS AND IN HE SPECIFICAIONS BEFORE ORDERING. HE DESCRIPION OF HE MAERIAL AKES PRECEDENCE OVER HE CAALOG NUMBER. HE FIRS MANUFACURER LISED IS HE BASIS OF DESIGN.. CONRACOR SHALL VERIFY HA FIXURES SUPPLIED ARE APPROVED PER ALL APPLICABLE SAE, LOCAL AND GOVERNING AUHORIIES. 4. INVER ELEVAIONS ARE FROM EXISING DRAWINGS AND MAY NO BE ACCURAE. VERIFY ALL ELEVAIONS BEFORE BEGINNING WORK. 5. VERIFY UNDERGROUND PIPE SIZES, INVER ELEVAIONS, AND LOCAIONS PRIOR O BEGINNING ANY WORK. 6. REFER O HE PLUMBING ROUGH-IN SCHEDULE FOR HE SIZES OF BRANCH PIPES O PLUMBING FIXURES. 7. EXISING CONDIIONS ON DEMOLIION PLANS ARE PROVIDED O INDICAE HE GENERAL SCOPE OF IEMS O BE REMOVED. SEE SPECIFICAION SECION FOR ADDIIONAL DEMOLIION INFORMAION. 8. P.C. SHALL CU AND PACH EXISING AS REQUIRED FOR NEW OR DEMOLIION WORK UNLESS NOED OHERWISE. SEE SPECIFICAION SECION FOR ADDIIONAL INFORMAION. 9. DRAWINGS SHOWING LOCAIONS OF PIPING ARE DIAGRAMMAIC AND MAY NO ALWAYS REFLEC EXAC INSALLAION CONDIIONS. DRAWINGS SHOW HE GENERAL ARRANGEMEN OF PIPING MAY NO INCLUDE ALL OFFSES AND FIINGS REQUIRED FOR COMPLEE INSALLAION. HE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACUAL BUILDING CONSRUCION AND HE WORK OF OHERS WILL PERMI. 0. DO NO SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHIECURAL, SRUCURAL, SUBMIALS, AND OHER APPROPRIAE DRAWINGS OR PHYSICALLY A SIE. REVIEW ALL DRAWINGS, INCLUDING HOSE OF OHER RADES.. COORDINAE ALL WORK WIH ALL OHER RADES PRIOR O INSALLAION O PROVIDE CLEARANCES REQUIRED FOR OPERAION, MAINENANCE, CODE COMPLIANCE, AND O VERIFY NON-INERFERENCE WIH OHER WORK. DO NO FABRICAE PRIOR O VERIFICAION OF NECESSARY CLEARANCES FOR ALL RADES. BRING ANY INERFERENCES OR CONFLICS O HE AENION OF HE ARCHIEC/ENGINEER BEFORE PROCEEDING WIH FABRICAION OR EQUIPMEN ORDERS.. REVIEW SPACE REQUIREMENS OF EQUIPMEN SPECIFIED OR SUBSIUED AND MAKE REASONABLE ACCOMMODAIONS IN LAYOU AND POSIIONING O PROVIDE PROPER ACCESS.. ANY CHANGES REQUIRED O ELIMINAE CONFLICS OR HA RESUL FROM A FAILURE O COORDINAE SHALL BE MADE BY HE CONRACOR WIHOU ADDIIONAL COS OR EXPENSE O OHERS. 4. EACH CONRACOR IS RESPONSIBLE FOR ALL COSS ASSOCIAED WIH ELECRICAL CHANGES REQUIRED FOR EQUIPMEN PROPOSED HA DIFFERS FROM HE BASIS OF DESIGN. 5. REFER O ARCHIECURAL REFLECED CEILING PLAN, ELECRICAL, ECHNOLOGY AUDIO/VISUAL, AND OHER MECHANICAL PLANS FOR EXAC LOCAIONS OF ALL CEILING MOUNED DEVICES, OHER HAN SPRINKLERS. 6. EACH CONRACOR IS RESPONSIBLE FOR DAMAGE CAUSED BY HEIR ACIONS O WALLS, FLOORS, CEILINGS, AND ROOFS. HE CONRACOR WHOSE WORK CAUSES DAMAGE IS RESPONSIBLE FOR PACHING O MACH ORIGINAL CONSRUCION, FIRE RAING, AND FINISH. 7. IN AREAS WIH DRYWALL CEILINGS COORDINAE LOCAIONS OF ACCESS PANELS WIH HE GC FOR ACCESS O VALVES, DUCWORK ACCESSORIES, DAMPERS, EC. COORDINAE PANEL YPE AND COLOR WIH ARCHIEC. NOIFY HE GC OF HE REQUIRED ACCESS PANELS PRIOR O BIDDING. 8. SEAL ALL FLOOR, WALL, AND ROOF PENERAIONS AIRIGH WHERE PIPING PENERAE. PENERAIONS HROUGH ROOF SHALL BE SEALED AIRIGH WIH WAERPROOFING MAERIALS RECOMMENDED BY MANUFACURER FOR OUDOOR USE. 9. CAULK ALL PIPE PENERAIONS OF FULL HEIGH NON-FIRE RAED WALL, PARIION, FLOOR, AND ROOF ASSEMBLIES. HIS IS ESSENIAL O PREVEN NOISE RANSMISSION FROM ONE ROOM O ANOHER AND O PROVIDE HE DESIRED NC LEVELS WIHIN ROOMS. 0. WHERE PIPES ARE SHOWN O PENERAE FLOORS, PROVIDE SLEEVED OPENINGS WIH HE OP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WIH ALL RELEVAN SPEC SECIONS. SEAL SLEEVE PERIMEER O BE WAERIGH.. DO NO SUPPOR EQUIPMEN, PIPING, OR DUCWORK FROM MEAL DECKING OR OHER NON-SRUCURAL BUILDING ELEMENS. ANCHORS EMBEDDED IN CONCREE SHALL BE CRACKED CONCREE APPROVED IN ACCORDANCE WIH SPECIFICAIONS.. NEW VERICAL PLUMBING CONCREE CORES O AVOID EXISING CONCREE SLAB RIBS. IN EVEN HA A SLAB RIB IS CU, REFER O SRUCURAL DOCUMENS FOR SRUCURAL MIIGAION REQUIREMENS. PLUMBING RENOVAION NOES:. EXISING CONDIIONS ARE SHOWN BASED ON INFORMAION OBAINED FROM FIELD SURVEYS, EXISING BUILDING DOCUMENS. VERIFY EXISING CONDIIONS AND REPOR ANY CONFLICS BEFORE PROCEEDING.. NO ALL EXISING PIPING IS SHOWN. VERIFY EXISING CONDIIONS BEFORE SARING WORK. NOIFY ENGINEER OF ANY CONFLICS WIH NEW WORK.. FIELD VERIFY HE AVAILABLE CLEARANCES FOR DUCWORK AND PIPING BEFORE FABRICAION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISING FIELD CONDIIONS. 4. EACH CONRACOR SHALL FIELD VERIFY ACCESSIBILIY O HE AREA OF HIS WORK AND SHALL NOIFY HE GENERAL CONRACOR ARCHIEC/ENGINEER PRIOR O BIDDING IF OHER UILIIES ARE REQUIRED O BE REMOVED OR RELOCAED O ALLOW ACCESS O HIS AREA OF WORK. 5. HE GENERAL CONRACOR IS RESPONSIBLE FOR CUING, REMOVAL AND PACHING OF ROOFS, WALLS, AND FLOORS ASSOCIAED WIH WORK BY ALL CONRACORS. CONRACORS SHALL NOIFY HE GC OF AFFECED AREAS PRIOR O BIDDING. 6. HE GENERAL CONRACOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMEN OF CEILINGS, CEILING ILES, AND CEILING GRIDS ASSOCIAED WIH AREAS OF WORK BY ALL CONRACORS. NOIFY HE GENERAL CONRACOROF AFFECED AREAS PRIOR O BIDDING. 7. WHERE EXISING MECHANICAL SYSEMS ARE LOCAED IN AREAS HA CONFLIC WIH NEW EQUIPMEN, PIPING, OR DUCWORK O BE INSALLED, EACH CONRACOR SHALL EIHER ARRANGE NEW EQUIPMEN, PIPING, OR DUCWORK IN SUCH A FASHION HA I DOES NO CONFLIC WIH EXISING SYSEMS, OR REWORK EXISING MECHANICAL SYSEMS O ALLOW FOR INSALLAION OF NEW EQUIPMEN, PIPING, OR DUCWORK. 8. PROVIDE EMPORARY CONNECIONS O MAINAIN EXISING SYSEMS IN SERVICE DURING CONSRUCION. MAINAIN ACCESS O EXISING MECHANICAL INSALLIONS WHICH REMAIN ACIVE. 9. OBAIN PERMISSION FROM OWNER BEFORE SHUING DOWN ANY SYSEM FOR ANY REASON. MAINAIN SERVICE O ALL COMPONENS HA ARE O REMAIN UNIL NEW SYSEMS ARE INSALLED. 0. MAINAIN EXISING SYSEM IN SERVICE UNIL NEW SYSEM IS COMPLEE AND READY FOR IE IN AND SWICHOVER. DRAIN SYSEM ONLY O MAKE SWICHOVERS AND CONNECIONS. OBAIN PERMISSION FROM OWNER BEFORE PARIALLY OR COMPLEELY DRAINING SYSEM. MAKE CHANGEOVER O NEW SYSEMS WIH MINIMUM OUAGE.. DISCONNEC AND REMOVE MECHANICAL DEVICES AND EQUIPMEN SERVING EQUIPMEN HA HAS BEEN REMOVED. PLUMBING PHASING NOES:. REFER O ARCHIECURAL DRAWINGS FOR GENERAL DESCRIPION OF SCHEDUALING REQUIREMENS. REFER O ARCHIECS INSRUCIONS FOR MORE DEAILS, SCHEDULES AND FOR CONCURREN WORK. MECHANICAL, ELECRICAL AND ECHNOLOGY DRAWINGS DEPIC HE INEN OF HE FINAL DESIGN. HE MECHANICAL, ELECRICAL, AND ECHNOLOGY DRAWINGS DO NO DEPIC HE MEANS AND MEHODS O MEE HE REQUIREMENS OF HE SCHEDUALING CRIERIA.. REVIEW PROJEC SCHEDUALING REQUIREMENS O COORDINAE DEMOLIION WORK, OUAGES, EC. WIH AFFECED ADJACEN AREAS.. PROVIDE EMPORARY PIPING, SHUOFF VALVES, ZONE VALVES, ZONE ALARMS, EC. AS NEEDED O MAINAIN SERVICE O ALL AREAS DURING ALL PHASES OF PROJEC. 4. INSALL EMPORARY PIPING, SHUOFF VALVES, EC. AS NECESSARY O KEEP ALL OCCUPIED SPACES OPERAIONAL HROUGHOU ALL PHASES OF HE PROJEC 5. PHASE DEMOLIION WORK O MINIMIZE DOWNIME. P600A P000 PD00 PD00.5N PD0N PD0N PD0N PD04N P00 P00.5N P00.5S P0N P0N P0N P04N P400 P500 P600 P60 PLUMBING SHEE INDEX PLUMBING RISER DIAGRAM AL PLUMBING COVER SHEE SUB BASEMEN FLOOR PLAN - PLUMBING - DEMO GROUND FLOOR PLAN - NORH WING - PLUMBING - DEMO FIRS FLOOR PLAN - NORH WING - PLUMBING - DEMO SECOND FLOOR PLAN - NORH WING - PLUMBING - DEMO AIC FLOOR PLAN - NORH WING - PLUMBING - DEMO ROOF PLAN - NORH WING - PLUMBING - DEMO SUB BASEMEN FLOOR PLAN - PLUMBING GROUND FLOOR PLAN - NORH WING - PLUMBING GROUND FLOOR PLAN - SOUH WING - PLUMBING FIRS FLOOR PLAN - NORH WING - PLUMBING SECOND FLOOR PLAN - NORH WING - PLUMBING AIC FLOOR PLAN - NORH WING - PLUMBING ROOF PLAN - NORH WING - PLUMBING PLUMBING - ENLARGED PLANS PLUMBING DEAILS PLUMBING RISER DIAGRAM PLUMBING RISER DIAGRAM Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil Professional Seal: Project itle: 9 N. 4th Street Suite 000 St. Louis, MO 60 p f Memorial Student Union KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E Sheet itle: LGA.5 REFERENCE SCALE IN INCHES 0 PLUMBING COVER SHEE Project Number: Sheet Number: 65 P000 Drawn By: DHRSHA Issue Date:.6.7

66 A B C D E F G H J K GENERAL SHEE NOES:. REFER O P000 FOR GENERAL INFORMAION. PHASING KEYNOES: # C:\Revit Local Files\MEP7_ _MU Memorial Student Union_Central_dhruv.m.shah.rvt /7/07 :08:5 PM Stairs SN000E I.E.95.6 I.E CO Dry Food Storage N09 N05F4 GI- CO 4"SW N05F5 Custodial Storage N00 GREASE INERCEPOR BELOW GRADE LEVEL I.E.95.6 CONRACOR O SAW CU OR DIRECIONAL BORE DOCK AND LOADING DRIVE FOR INSALLING PIPES AND GREASE INERCEPOR AS SHOWN. I.E "GSAN Dry Food Stor N0 N05F6 Cust. Stor. N0 Storage N05F7 Break Rm. N05J N05I N05H N05G N05K CONNEC O EXISING PIPE. CONNEC O EXISING GROUND FLOOR SANIARY PIPE. N05L N05M N05 N05N N05O Conference N05P Vest. 9. WORK FOR GROUND FLOOR WILL BE PAR OF SCHEDULING REQUIREMEN SR-5. REFER O ARCHIECURAL PLANS FOR MORE DEAILS. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f Professional Seal: KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO N05D N05C N05B " CW UP & DN " HW UP & DN " HWR UP & DN Mech. N6G Corridor CN7 Freezer N08A Computer Lab N06 Wood Shop N0G N5- Inact. N08 Corridor CN06 N5- Inact. N09 N08B /Study N08 Lab N0D N5- Inact. N0 N05E N05E Conference N08A Lab N0H 4" SPD DN Conference N049B N5B N5A Storage N0I N0B N049A N049C 4" SPD MU Veterans N5 Gallery N0 N0A Reception N049 /Study Room N05 SP- Men N007 Lobby LN050 N0 SUMP PUMP CONROL PANEL. Stairs SN000B " SPD Women N007A ELEVAOR PI LOCAION O BE PROVIDED BY ELEVAOR MFR. REFER O SHEE P00.5S CONINUAION Project itle: Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO Kiln N0F Lab NE Lab N0D Mechanical N N7 N7A ele. N06 Storage N6 Mech N6B Storage he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. his drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect. No. Description Date ADDENDUM /7/07 N7B LGA.5 N O R H GROUND FLOOR PLAN - NORH WING - PLUMBING /8" = '-0" 78 WES RD S, SUIE 0 OVERLAND PARK, KS FAX: PROJEC # Missouri State Certificate of Authority E REFERENCE SCALE IN INCHES 0 Sheet itle: GROUND FLOOR PLAN - NORH WING - PLUMBING Project Number: Sheet Number: 65 P00.5N Drawn By: DHRSHA Issue Date:.6.7

67 F /7/07 5:7:0 PM C:\Users\Monica.Santos\Documents\A5-5 ELEC v7_monica.santos.rvt L 5cd F L F5cd ED00 F F LIM05-EOL L 5cd F FIRE ALARM GENERAL NOES ALL FIRE ALARM CABLING O BE INSALLED IN CONDUI WHERE CONCEALED AND SPECIFICALLY NOED. REFER O HE FLOOR PLANS FOR ALL FIRE ALARM DEVICE LOCAIONS. ALL VISUAL NOIFICAION DEVICES SHALL BE SYNCHRONIZED. 4 CONRACOR SHALL LIMI HE AMOUN OF WIREMOLD RUN IN PUBLIC SPACES SUCH AS CORRIDORS. WHERE POSSIBLE, FEEDER FROM INSIDE ROOMS AND POKE HROUGH. WHERE NO POSSIBLE, WIREMOLD MAY BE USED. OBAIN PRIOR APPROVAL FROM ARCHIEC FOR ROUING OF WIREMOLD PRIOR O ROUGH-IN. 5 WHERE WALLS ARE EXISING AND I IS NO POSSIBLE O CONCEAL WIRING, DEVICES SHALL BE FED WIH WIREMOLD. CONRACOR PROVIDE PROPOSED ROUING FOR APPROVAL PRIOR O ROUGH-IN. FA00 FA008 FA07 FA08 FA09 FA00 FA0 FA0 FA0 FA09 FA04 PLAN NOES REPLACE WIH NEW DUC DEECOR WIH INEGRAL RELAY BASE O SHU UNI DOWN UPON DEECION OF SMOKE. PROVIDE QUANIIES O MACH EXISING PROVIDE WIH REMOE ES SWICH AND LABEL ACCORDING O UNI SERVED. FEED CORRIDOR DEVICES FROM HE ROOM SIDE WIH WIREMOLD. PROVIDE PROPOSED ROUING FOR APPROVAL PRIOR O ROUGH-IN. FEED DEVICE FROM BACK ROOM. HERE SHALL BE NO EXPOSED WIREMOLD IN CHAPEL. FEED DEVICE FROM CORRIDOR SIDE. HERE SHALL BE NO WIREMOLD IN CHAPEL SIDE. DEVICE MOUNED ON ILE. COORDINAE PACHING OF ILE ONCE DEVICE IS REMOVED. PACH WOOD WRAPPED COLUMN ONCE EXISING DEVICE IS REMOVED. COORDINAE INSALLAION OF WIREMOLD WIH HORIZONAL WOOD RIM FOR A CLEAN INSALLAION. FEED DEVICES HROUGH OHER SIDE OF WALL O MINIMIZE EXPOSED WIREMOLD IN PUBLIC SPACES. CONRACOR SHALL REPLACE AMPER/FLOW SWICH WIH NEW AND IE INO NEW FIRE ALARM SYSEM. IF EXISING IS COMPAIBLE WIH NEW SYSEM AND FULLY FUNCIONAL, CONRACOR MAY RE-USE. HIDE WIRING IN WOOD WRAPPED COLUMN SO HERE IS NO EXPOSED WIREMOLD. HE EXISING NOIFIER NFS-640 FIRE ALARM CONROL PANEL MAY BE REUSED AND UPGRADED O ADD A VOICE EVAC SYSEM A CONRACOR S OPION O COMPLY WIH HE SPECIFICAIONS AND INEN OF HE PROJEC FOR A FULLY FUNCIONAL VOICE SYSEM. PROVIDE A NEW DOOR O EXISING HOUSING. ED00 ED008 ED009 DEMO NOES EXISING FIRE ALARM DEVICE O REMAIN OPERAIONAL DURING CONSRUCION AND INSALLAION OF NEW FIRE ALARM VOICE SYSEM. CONRACOR SHALL PROVIDE SIGNAGE O INDICAE EXISING DEVICE IS OPERAIONAL. ONCE NEW FIRE ALARM SYSEM IS FULLY INSALLED AND ACIVAED, RANSFER SIGNAGE O NEW DEVICES AND HEN REMOVE EXISING DEVICE AND ALL ASSOCIAED APPURENANCES. EXISING SMOKE DEECOR O REMAIN OPERAIONAL DURING CONSRUCION AND INSALLAION OF NEW FIRE ALARM VOICE SYSEM. ONCE HE NEW INSALLAION HAS BEEN COMPLEED, HE EXISING DEVICE SHALL BE REMOVED. EXISING DUC DEECOR O REMAIN OPERAIONAL DURING CONSRUCION AND INSALLAION OF NEW FIRE ALARM VOICE SYSEM. ONCE HE NEW INSALLAION HAS BEEN COMPLEED, HE EXISING DEVICE SHALL BE REMOVED. Austin Carolinas New York St. Louis : Project eam: Structural MPFP Electrical Civil 9 N. 4th Street Suite 000 St. Louis, MO 60 p f Professional Seal: KPFF Consulting s 60 Des Peres Road, Suite 00 St. Louis, MO IMEG Corp. 78 W. rd St., Suite 0 Overland Park, KS Antella Consulting s, Inc 600 Genesee Street, Suite 60 Kansas City, MO Civil Design, Inc. 55 South 7th Street St. Louis, MO F 75cd FA07 L Project itle: MONICA S. SANOS - ELECRICAL MO# E NAC ED00 SHEE FA0N MACHLINE DN DN LIM06 NAC FA04 EXISING FACP PEPE F F ED008 Vestibule VS00 ED00 L 5cd F L F 5cd LIM064 ED00 L 5cd F F F S06 FA08 ED00 Elevator F F L 0cd F LIM064 LIS097 PE PE ED008 Corridor CS00 L F F 5cd F 5cd L LIS097 FA008 ED00 S06A L L 5cd F 5cd ED00 NAC5 L F NAC PE FA09 FA09 Men S L NAC5 L 5cd F ED00 S06A Women S 5cd FA0 L Meeting Room S0 75cd FA008 L F ED00 ED00 L 5cd F L NAC 5cd F L S0 NAC FA00 F S FA00 LIM064 F NAC F L 5cd FA0 AHU- PE D AHU- PE D PE L AHU- D ED009 5cd F F L 5cd ED00 ED00 Lobby LS00 FA09 FA0 Mech Room S07B 5cd PE L F FA0 L 75cd EXISING POWER PANEL FA0 Auditorium S07 75cd F L NAC ED00 PE Memorial Student Union Second Floor Renovations and Deferred Maintenance MU Project #CP Hitt Street, Columbia, MO he Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal. SHEE FA0N MACHLINE S0C Meeting S0B L 0cd F FA0 S0A FA0 75cd ED00 L NAC F PE 5cd L F F F PE ED00 LIM064-EOL No. Description Date ADDENDUM /7/07 LGA.5 NORH FIRS FLOOR PLAN - SOUH WING - FIRE ALARM SCALE: /8" = '-0" 0 4' 8' 6' 600 Genessee, Suite 60 ele Kansas City, Missouri antella@antella-inc.com Antella Consulting s, inc. - Missouri Certificate of Authority #: E FIRS FLOOR PLAN - SOUH WING - FIRE ALARM Sheet itle: Project Number: 65 Drawn By: BPA, SAM Issue Date:.6.7 Sheet Number: FA0S

Hinesville First United Methodist Church SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Hinesville First United Methodist Church SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 28 3111 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Fire-alarm control unit. 2. Manual fire-alarm boxes. 3. System smoke detectors. 4. Heat detectors.

More information

DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM

DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 13852- PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

Lake County / Multi-Department Storage Facility / Project / December 12, 2016 SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Lake County / Multi-Department Storage Facility / Project / December 12, 2016 SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 283111 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

Michigan State University Construction Standards FIRE DETECTION AND ALARM PAGE

Michigan State University Construction Standards FIRE DETECTION AND ALARM PAGE PAGE 283100-1 SECTION 283100 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

IN2 Digital, Addressable Fire-alarm System

IN2 Digital, Addressable Fire-alarm System Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Digital, Addressable Fire-alarm System Illinois Mathematics and Science Academy Follow this and additional works at: http://digitalcommons.imsa.edu/facility_in2_manuals

More information

SECTION FIRE ALARM INTEGRATED AUDIO VISUAL EMERGENCY COMMUNICATION SYSTEM

SECTION FIRE ALARM INTEGRATED AUDIO VISUAL EMERGENCY COMMUNICATION SYSTEM SECTION 2 8 31 00 FIRE ALARM INTEGRATED AUDIO VISUAL EMERGENCY COMMUNICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Request For Proposal apply to this Section.

More information

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR SECTION 08734 COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL 1.1 SECTION INCLUDES A. Overhead

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July

More information

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016 Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting Prepared Especially for : OSFM TEC 2016 Acceptance Testing 11-2008 Agenda Before you begin Completing the

More information

A. Provide addressable fire alarm system throughout the facility and supervise wet and preaction fire sprinkler system.

A. Provide addressable fire alarm system throughout the facility and supervise wet and preaction fire sprinkler system. SECTION 283111 - PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R Region Project Page 1 PART 1 - GENERAL 1.1 REFERENCES.1 CAN/ULC-S524-2006, Standard for the Installation of Fire Alarm Systems..2 CAN/ULC-S525-2007, Audible Signal Device for Fire Alarm Systems..3 CAN/ULC-S526-2007,

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

SECTION COMMON WORK RESULTS FOR SAFETY AND SECURITY 1.1 RELATED SECTIONS

SECTION COMMON WORK RESULTS FOR SAFETY AND SECURITY 1.1 RELATED SECTIONS SECTION 280500 COMMON WORK RESULTS FOR SAFETY AND SECURITY PART 1 - GENERAL 1.1 RELATED SECTIONS A. All division 28 work shall, in addition to all division 1 specification sections, comply with all of

More information

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD PART 1 - GENERAL PURPOSE This Standard is intended to assure that fire detection/alarm systems at The University of Texas at Austin provide the highest level of fire safety possible. SCOPE This standard

More information

LEA COUNTY NEW MEXICO Page 1 of 8 JUDICIAL COMPLEX RFP NO.: 03-(16-17)

LEA COUNTY NEW MEXICO Page 1 of 8 JUDICIAL COMPLEX RFP NO.: 03-(16-17) LEA COUNTY NEW MEXICO Page 1 of 8 JUDICIAL COMPLEX RFP NO.: 03-(16-17) ADDENDUM #3 This addendum forms part of the Contract Documents and modifies the original Contract Documents. All other parts of the

More information

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used. PART 1 GENERAL 1.01 Scope of Standard A. This Standard is intended to assure that fire alarm and signaling systems at Sam Houston State University provide the highest level of life safety possible. This

More information

Port of Portland Conveying Equipment Guidelines

Port of Portland Conveying Equipment Guidelines Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

HARRIS COUNTY HOUSING AUTHORITY

HARRIS COUNTY HOUSING AUTHORITY HARRIS COUNTY HOUSING AUTHORITY 8933 Interchange Houston, Texas 77054 713.669-4514 P AMENDMENT OF SOLICITATION ADDENDUM # 3 DATE: 06-03-16 ISSUED BY: Harris County Housing Authority AMENDMENT TO SOLICITATION

More information

SECTION ENCLOSED CONTROLLERS

SECTION ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes ac,

More information

SECTION FIRE ALARM SYSTEMS

SECTION FIRE ALARM SYSTEMS SECTION 28 3100 PART 1 -GENERAL 1.01 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

Smoke Detector Activation of any smoke detector shall start the alarm verification mode.

Smoke Detector Activation of any smoke detector shall start the alarm verification mode. Description: The purpose of the section is to provide the UMCP Design Standards for the design and implementation of Fire Alarm Systems at the UMCP campus. Related Sections: TBD Effective Date: July 10,

More information

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the

More information

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline Moreno Valley Fire Department Guideline Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 8, 2017 Alarm & Signaling Systems PURPOSE Fire alarm and signaling systems are designed to

More information

Construction Standards Page

Construction Standards Page Construction Standards Page 236313-1 SECTION 236313 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved

More information

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - Systems and Equipment. Page 238239-1 SECTION 238239 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DONALD H. BERG, ARCHITECT

DONALD H. BERG, ARCHITECT DONALD H. BERG, ARCHITECT DVA PROJECT 632-CSI-402 PET/CT ROOM #A0-10 RENOVATION BASEMENT LEVEL, BUILDING 200 ARCHITECT S PROJECT No. 0917-02 ADDENDUM NO. 1 JUNE 25, 2018 Page 1 of 1 ARCHITECTURAL 1. Specifications:

More information

SECTION GAS-FIRED RADIANT HEATERS

SECTION GAS-FIRED RADIANT HEATERS SECTION 23 55 23 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening.

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening. DIVISION 8 OPENINGS SECTION 08 33 23 PART 1 GENERAL 1.1 SECTION INCLUDES A. Overhead coiling counter fire doors. 1.2 RELATED SECTIONS A. Section 05500 - Metal Fabrications: Support framing and framed opening.

More information

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories. SECTION 238113 - PACKAGED TERMINAL AIR CONDITIONERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018 SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 28 ELEC. SAFETY & SECURITY SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 28 ELEC. SAFETY & SECURITY SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Alarm System Plan Review 2009 International Fire Code and 2010 NFPA 72 Date of Review // BLD201 - Project Address: Project Name: _ Professional

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST FIRE AND LIFE SAFETY SYSTEMS FOR STRUCTURES FIVE OR MORE STORIES IN HEIGHT AND LESS THAN 75 FEET IN HEIGHT FROM THE POINT

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating

More information

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS SECTION 23 34 16 CENTRIFUGAL HVAC FANS PART 1 - GENERAL 1.01 RELATED DOCUMENT A. Drawings and general provisions of the contract, including General and Special Conditions and Division 01 Specification

More information

Fire Alarm System Fundamentals

Fire Alarm System Fundamentals Fire Alarm System Fundamentals Mircom is the largest and oldest privately owned fire alarm and life safety manufacturer in North America and 5th largest overall with 50 years of industry experience. Mircom

More information

SECTION GENERATOR PARALLELING CONTROLS

SECTION GENERATOR PARALLELING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

1.3 REFERENCE STANDARDS

1.3 REFERENCE STANDARDS SECTION 28 4600 FIRE DETECTION AND ALARM PART 1 -GENERAL 1.1 SECTION INCLUDES A. Fire alarm system design and installation, including all components, wiring, and conduit. B. Circuits from protected premises

More information

New Auburn University Veterinary Facility Gulf Shores, AL

New Auburn University Veterinary Facility Gulf Shores, AL SECTION 220405 - PLUMBING IDENTIFICATION PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following plumbing identification materials and their installation: 1. Pipe markers. 2. Stencils. 3. Valve

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION IBAS LIGHTING CONTROL

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION IBAS LIGHTING CONTROL PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS A. Minimum lighting control (base scope of work) shall include all corridors. The lighting in all the corridors shall be turned on (if not already on) if

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 2400CA - CLEAN AGENT CHEMICAL SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION ISOLATED POWER SYSTEMS

SECTION ISOLATED POWER SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

SECTION DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM SECTION 283111 DIGITAL, ADDRESSABLE FIRE ALARM PART 1 - GENERAL 1.1 GENERAL A. This Section includes the following: 1. Fire-alarm control panel. 2. Manual fire-alarm boxes. 3. Smoke detectors. 4. Heat

More information

DIVISION 26 ELECTRICAL SECTION FIRE ALARM SYSTEM

DIVISION 26 ELECTRICAL SECTION FIRE ALARM SYSTEM DIVISION 26 ELECTRICAL SECTION 26 81 11 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install all equipment and accessories for a complete local, analog addressable, manually and automatically actuated,

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES Page 226119-1 SECTION 226119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

2. HVAC and smoke control systems; fire, smoke, and combination fire/smoke dampers. 5. Central control and monitoring system.

2. HVAC and smoke control systems; fire, smoke, and combination fire/smoke dampers. 5. Central control and monitoring system. PART 1 GENERAL 1.01 Scope of Standard A. This Standard is intended to assure that fire detection/alarm systems at The University of Texas at Austin provide the highest level of fire safety possible.. This

More information

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System. SMOKE GUARD SYSTEM MODEL 600 REV. 3 SPECIFICATION Smoke Guard, Inc 287 Maple Grove Boise, ID 83704 Toll Free: 800.574.0330 Fax: 208.639.7851 e-mail: info@smokeguard.com website: http://www.smokeguard.com/

More information

Full Service Central Station Fire Alarm Listing Evaluation

Full Service Central Station Fire Alarm Listing Evaluation Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm

More information

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE Effective Date: 11/01/02 Purpose: MECKLENBURG COUNTY To establish a set of guidelines for performance testing of all newly installed or upgraded fire alarm systems in order to ensure that all devices and

More information

The following information shall become and form part of the contract documents.

The following information shall become and form part of the contract documents. October 4, 206 To: Attention: Re: All Bidders All Bidders JCBE Gymnasium HVAC Upgrades BC#: 206433 Edmonds Project No.: BHM6090 All bidders, The following information shall become and form part of the

More information

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Fire Alarm Systems Plan Review Checklist Date: Permit Number: Business Name: Address: Fire Alarm System Submittal

More information

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work. Buchtel/Perkins Community Learning Center GPD -2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 SECTION 15513 CONDENSING BOILERS PART I- GENERAL 1.1 RELATED

More information

SECTION : FIRE ALARM & DETECTION SYSTEMS

SECTION : FIRE ALARM & DETECTION SYSTEMS SECTION 28 31 10: FIRE ALARM & DETECTION SYSTEMS 1. GENERAL A. This section applies to fire detection/alarm system and carbon monoxide system components and equipment installed during new construction

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

SECTION FIRE ALARM

SECTION FIRE ALARM SECTION 16740 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials. B B11.0 DIVISION 08 - OPENINGS SECTION 08 17 00 INTEGRATED DOOR OPENING ASSEMBLIES Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section numbers and

More information

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION FIRE ALARM SYSTEM

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION FIRE ALARM SYSTEM OSU PROJECT NO. 30-04-15 PAGE 1 PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, and equipment required to provide a complete and operating system of manual and automatic detection devices,

More information

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System. SMOKE GUARD SYSTEM MODEL 400 SPECIFICATION Smoke Guard, Inc. 287 N. Maple Grove Boise, ID 83704 Toll Free: 800.574.0330 Fax: 208.376.1600 e-mail: info@smokeguard.com website: http://www.smokeguard.com/

More information

FIRE & LIFE SAFTEY STANDARD

FIRE & LIFE SAFTEY STANDARD Title: Effective Date: 01/01/14 Revised Date: 1/1/14 Code References: Title 16, Chapter 16.16 of the Roseville Municipal Code, NFPA 72 Note: This standard is a summary of Fire Department clarifications

More information

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1 GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and

More information

SECTION FAN COIL UNITS

SECTION FAN COIL UNITS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories. Page 238219-1 SECTION 238219 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION AIR DOORS

SECTION AIR DOORS SECTION 23 34 33 AIR DOORS Berner Series VSA air doors are designed for openings up to 12 ft for environmental separation and up to 10 ft for insect control. Berner Series VSB air doors are designed for

More information

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. 2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. Exception: Manual fire alarm boxes are not required where the building is

More information

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

DIVISION 28 ELECTRONIC SAFETY AND SECURITY 281300 - ACCESS CONTROL A. General DIVISION 28 ELECTRONIC SAFETY AND SECURITY At the beginning of the project, schedule a meeting with the Facilities Access/Maintenance Coordinator with questions and concerns.

More information

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES Part One General 1.01 Scope A. It is the intent of this specification to provide a medium voltage automatic transfer system. B. All components, testing and services specified and required for a complete

More information

CARD ACCESS CONTROL SYSTEM

CARD ACCESS CONTROL SYSTEM SECTION 13851 CARD ACCESS CONTROL SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete, operable, tested, integrated proximity access control system, to operate on a proximity principle where

More information

APPENDIX H (DESIGN SUBMISSION CRITERIA)

APPENDIX H (DESIGN SUBMISSION CRITERIA) APPENDIX H (DESIGN SUBMISSION CRITERIA) FIRE ALARM SYSTEM As per ACCORD standard Part 5, section 5.7 Fire Alarm System Design to be verified by ACCORD Chief Safety Inspector. Testing of the installation

More information

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax) FIRE DEPARTMENT SANTA CLARA COUNTY 14700 Winchester Blvd., Los Gatos, CA. 95032-1818 (408) 378-4010 (408) 378-9342 (fax) www.sccfd.org STANDARD DETAILS & SPECIFICATIONS Spec No C-4 Rev. Date 03/10/10 SUBJECT:

More information

SECTION ELECTRIC FLOOR HEATING AND SNOW MELTING EQUIPMENT

SECTION ELECTRIC FLOOR HEATING AND SNOW MELTING EQUIPMENT SECTION 15770 ELECTRIC FLOOR HEATING AND SNOW MELTING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Floor Heating Systems for the following applications: 1. Under Concrete. 2. Within Concrete. 3. Over

More information

SECTION INTRUSION DETECTION

SECTION INTRUSION DETECTION (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) SECTION 28 16 00 INTRUSION

More information

SECTION ROTARY-SCREW WATER CHILLERS

SECTION ROTARY-SCREW WATER CHILLERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Factory-assembled packaged chiller. B. Charge of refrigerant and oil. C. Controls and control connections. D. Chilled water connections. E. Electrical power connections.

More information

SECTION OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS

SECTION OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS SECTION 08331 OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft

More information

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Fike Micromist Water Mist Fire Suppression System with automatic detection and control. The work described in

More information

ONYX FirstVision Specification Interactive Firefighters Display

ONYX FirstVision Specification Interactive Firefighters Display ONYX FirstVision Specification Interactive Firefighters Display NOTIFIER is a registered trademark, and ONYX FirstVision, NOTI FIRE NET, and VeriFire are trademarks of Honeywell International Inc. Microsoft

More information

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS SECTION 236200 - PACKAGED COMPRESSOR AND CONDENSER UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply

More information

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS VALOUR COMMUNITY CENTRE FIRE ALARM SYSTEM Section 28 00 00 GYMNASIUM ADDITION & RENOVATION Page 1 of 3 28 00 00 FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS 1.2 SCOPE 1. The specification covering the General

More information

Bold items are particular to the City of Euless

Bold items are particular to the City of Euless EULESS FIRE DEPARTMENT FIRE MARSHAL S OFFICE INFORMATION LINE: Revised 8/2004 Fire Chief Lee Koontz Fire Marshal Paul Smith EFD-FMO 3-1 2003 International Fire & Building Code as Amended NFPA Standards

More information

Changes in NFPA

Changes in NFPA Changes in NFPA 72-2002 2002 Oregon Fire Code Committee November 25, 2003 Michael B. Baker, SET Automatic Fire Alarm Association MikeBaker@afaa.org 2003 Michael B. Baker 1 Table of Contents 1. Administration

More information

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features:

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features: PART 1 - GENERAL 1.1 SUMMARY A. This Section includes fast-transfer central battery inverters with the following features: 1. Emergency-only circuits. 1.2 DEFINITIONS A. LCD: Liquid-crystal display. B.

More information

GENERAL AREAS OF INSPECTION

GENERAL AREAS OF INSPECTION This information is intended to assist you in preparation for the annual high-rise inspection. This is not a complete list and the Inspector may identify other conditions or issues in the building that

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 3323 - CENTRAL BATTERY EQUIPMENT [for Evanston campus only] PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10 Belleville, Ontario Page 1 of 10 1 GENERAL 1.1 GENERAL REQUIREMENTS.1 The General Conditions of CCDC2-2008, and the General requirements of Division 1, form part of this Section and must read in conjunction

More information

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply

More information

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System. SMOKE GUARD SYSTEM MODEL 200 SPECIFICATION Smoke Guard inc. 287 N. Maple Grove Boise, ID 83704 Toll Free: 800.574.0330 Fax: 208.639.7851 e-mail: info@smokeguard.com website: http://www.smokeguard.com/

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC

More information

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint. (816) 373-4878 U1208-01/FAI29-029 (573) 751-2624 SECTION 2 105 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the

More information

15900 HVAC INSTRUMENTATION AND CONTROLS

15900 HVAC INSTRUMENTATION AND CONTROLS 15900 HVAC INSTRUMENTATION AND CONTROLS PART 1 GENERAL - Andover Controls BAS system is the standard for the University, and may be specified as a proprietary item. 1.0 RELATED DOCUMENTS A. Drawings and

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 28 31 00 FIRE ALARM AND SMOKE DETECTION SYSTEMS A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A.

More information