1 COASTAL CONSERVANCY Staff Recommendation January 19, 2011 OCEAN BEACH MASTER PLAN File No Project Manager: Amy Hutzel RECOMMENDED ACTION: Authorization to disburse up to $400,000 to the San Francisco Planning and Urban Research Association to pursue implementation of recommendations in the Ocean Beach Master Plan by conducting a traffic circulation and access study, developing a joint coastal management framework, and developing a joint open space management agreement among the multiple management entities. LOCATION: Ocean Beach, City and County of San Francisco PROGRAM CATEGORY: San Francisco Bay Area Conservancy EXHIBITS Exhibit 1: Project Location Maps Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations Exhibit 3: Project Letters RESOLUTION AND FINDINGS: Staff recommends that the State Coastal Conservancy adopt the following resolution pursuant to Sections of the Public Resources Code: The State Coastal Conservancy hereby authorizes disbursement of up to $400,000 (four hundred thousand dollars) to the San Francisco Planning and Urban Research Association (SPUR) to pursue implementation of recommendations in the Ocean Beach Master Plan (Master Plan) by conducting a traffic circulation and access study, developing a joint coastal management framework, and developing a joint open space management agreement among the multiple management entities. This authorization is subject to the following conditions: 1. Prior to the disbursement of funds, SPUR shall submit for the review and approval of the Executive Officer of the Conservancy a final work program, schedule and budget; and the scopes of work and the roster of contractors to be employed in the project. 2. SPUR shall develop the project in consultation with the Golden Gate National Recreation Area and the City and County of San Francisco. Page 1 of 9

2 OCEAN BEACH MASTER PLAN Staff further recommends that the Conservancy adopt the following findings: Based on the accompanying staff report and attached exhibits, the State Coastal Conservancy hereby finds that: 1. The proposed project is consistent with the current Project Selection Criteria and Guidelines, last updated by the Conservancy on November 10, The proposed authorization is consistent with the purposes and objectives of the San Francisco Bay Area Conservancy Program, Chapter 4.5 of Division 21 of the Public Resources Code. 3. The San Francisco Planning and Urban Research Association is a non-profit organization existing under 501(c)(3) of the U.S. Internal Revenue Code, and whose purposes are consistent with Division 21 of the Public Resources Code. PROJECT SUMMARY: Staff recommends that the State Coastal Conservancy authorize disbursement of up to $400,000 (four hundred thousand dollars) to the San Francisco Planning and Urban Research Association (SPUR) to pursue implementation of recommendations in the Ocean Beach Master Plan (Master Plan) by conducting a traffic circulation and access study, developing a joint coastal management framework, and developing a joint open space management agreement among the multiple management entities. Ocean Beach lies within the Golden Gate National Recreation Area (GGNRA), along the west side of San Francisco (see Exhibit 1). It is jointly owned and managed by the GGNRA (the beach) and the City and County of San Francisco (the road and parking). At five-miles long, it is one of the longest urban beaches in the country. Ocean Beach has the potential to become one of the most spectacular metropolitan beaches in the world, but currently suffers from erosion, neglect and a lack of amenities. The Conservancy provided a $300,000 grant to SPUR in May of 2010 to develop a Master Plan for Ocean Beach. The Master Plan effort has, in less than 18 months, achieved an unprecedented level of cooperation and consensus among the management agencies and key stakeholders at Ocean Beach, after previous planning efforts that had faltered for various reasons. The Master Plan is nearing completion (the final report will be released in February or March of 2012), with draft recommendations presented to stakeholders in October of 2011 (Exhibit 2). The recommendations reflect a robust process involving many stakeholders and have received broad, enthusiastic support. The recommendations address major issues and processes at Ocean Beach, including climate change and sea level rise; erosion; natural resources protection; public access and recreation; vehicular, bicycle, and pedestrian access and circulation; and implementation, management and maintenance. There are six key recommendations, divided between the south, middle, and north reaches of Ocean Beach, as follows: South Reach (Skyline Blvd. to Sloat Blvd.): 1) Reroute the Great Highway behind the San Francisco Zoo via Sloat and Skyline Boulevards. 2) Introduce a multi-purpose coastal protection, restoration, and access system. Page 2 of 9

3 OCEAN BEACH MASTER PLAN Middle Reach (Sloat Blvd to south end of Golden Gate Park): 3) Reduce the width of the Great Highway to provide amenities and managed retreat. 4) Conduct native dune restoration in key locations. North Reach (south end of Golden Gate Park to the south end of Lands End): 5) Create a better connection between Golden Gate Park and Ocean Beach. 6) Implement bicycle and pedestrian improvements north of Balboa St. The Master Plan is a non-regulatory guidance document and its implementation will depend on sustained engagement of stakeholders and management agencies. This authorization would enable SPUR to pursue implementation of the recommendations in coordination with the appropriate partner agency while keeping the public engaged and political support high and working to secure implementation funding. Specifically, SPUR will conduct the following activities: Implementation Leadership and Coordination: For each of the implementation actions below, SPUR will serve as the coordinator and manager, providing continuity of leadership and maintaining the key relationships developed to date. SPUR will coordinate closely with partner agencies to pursue and secure additional funding, build political momentum, and maintain the focused engagement of all partners. SPUR will lead public communications and steward the core principles of the Master Plan through the full range of implementation efforts. SPUR will identify and seek funds for implementation of the Master Plan recommendations, including from the San Francisco County Transportation Authority, the San Francisco Public Utilities Commission (SFPUC), the Metropolitan Transportation Commission, the Cosco-Busan Oil Spill Settlement, the National Park Service, and the U.S. Army Corps of Engineers (USACE). Traffic Circulation and Access Study: The recommended approach to coastal management at Ocean Beach will require significant reconfiguration of roadways, in particular the closure of the Great Highway south of Sloat Blvd. and the rerouting of traffic via Sloat and Skyline Blvds. This will require the reconfiguration of several intersections and the redesign of Sloat Blvd. into a multi-modal coastal gateway. SPUR will 1) conduct traffic analysis of the Great Highway rerouting and associated roadway and intersection reconfigurations, 2) coordinate with ongoing city transportation plans and studies, including the 19 th Avenue Corridor Study, 3) plan for an extension of the L-Taraval rail line to the Zoo entrance, 4) develop an area-wide parking management plan, including a reconfigured access plan for the San Francisco Zoo parking lot, and 5) develop a roadway configuration and design. Joint Coastal Management Framework: The coastal management recommendations will require significant analysis and their implementation will depend on agreement among GGNRA, USACE, and SFPUC. A joint coastal management framework will define an agreed upon set of triggers and actions for adaptation to rising sea levels and associated coastal hazards at Ocean Beach. SPUR will facilitate the development of a Joint Coastal Management Framework, to provide the basis of a formal agreement among the agencies responsible for and affected by coastal management. Elements will include: coastal engineering studies, phasing plan with climate and erosion triggers, economic and cost benefit analysis, and coordination on capital project planning. Page 3 of 9

4 OCEAN BEACH MASTER PLAN Joint Open Space Management Agreement: Ocean Beach is experienced as a single place, but to date, management of Ocean Beach as an open space resource has been divided among several public agencies, namely GGNRA, San Francisco Department of Recreation and Parks, SFPUC, and the San Francisco Zoo. SPUR will facilitate the creation of a joint open space management agreement or similar structure, to both improve day-to-day operations and maintenance and allow for future improvements to public access and amenities, as recommended in the Master Plan. This effort will include drafting a management agreement and facilitating its execution, developing an open space and programming plan, developing a cost and revenue sharing framework, and doing a schematic design of public access improvements. SPUR is a long-standing 501(c)(3) nonprofit organization formed in 1910 as the San Francisco Planning and Housing Association, and changed to the San Francisco Planning and Urban Research Association in SPUR is a public policy think tank that seeks to promote good planning and good government through research, analysis, public education and advocacy. SPUR has extensive experience with planning, land use, transportation and economic issues in San Francisco, including revitalization of San Francisco as the Bay Area s urban core. SPUR has done excellent work developing the Ocean Beach Master Plan under the previous Conservancy grant. Site Description: Ocean Beach lies within GGNRA, along the west side of San Francisco. It is jointly owned and managed by GGNRA (the beach) and the City and County of San Francisco (the road and parking). At five-miles long, it is one of the longest urban beaches in the country. The project area is bounded by Golden Gate Park and residential areas to the East, Fort Funston to the South and cliffs to the North (see Exhibit 1). Even with its current lack of amenities, Ocean Beach is annually visited by as many as two million people for activities such as walking, picnicking, jogging, dog walking, surfing and fishing. The Master Plan includes recommendations to enhance the visitor experience, including improved access between Golden Gate Park and Ocean Beach and improved bicycle connections from Ocean Beach to the north. Ocean Beach also provides habitat for plants and animals, including the Western snowy plover, a federally threatened species, and the bank swallow, a state-listed threatened species. There are large dune areas, which are primarily vegetated with European beach grass. The Master Plan includes recommendations for dune restoration in the middle reach. Ocean Beach is facing a severe coastal erosion issue in the south reach (between Sloat and Skyline Blvds.) which has caused temporary closures of that section of the Great Highway and prompted the City of San Francisco to undertake emergency repairs and seek Coastal Commission permits for additional work. The Corps deposits dredged materials to the south of the shipping channels entering San Francisco Bay, which have resulted in the growth of the northern end of Ocean Beach. However, due to where the sediments are placed and offshore dynamics, there is no (or limited) deposition on the southern end of Ocean Beach, which is eroding away and threatening the Great Highway. The San Francisco Public Utilities Commission manages major infrastructure within the bounds of the project area, namely the Oceanside Wastewater Treatment Plant, and the associated Lake Merced Wastewater Tunnel, Southwest Ocean Outfall, and the sewer transport boxes that run under the Great Highway. This infrastructure is susceptible to sea level rise and coastal erosion to varying degrees, and was a significant driver in the Master Plan process. Page 4 of 9

5 OCEAN BEACH MASTER PLAN The Great Highway and Sloat Boulevard are major traffic corridors in the area, but are both oversized. The Master Plan includes recommendations for improved traffic circulation, which would allow for the permanent closure of the Great Highway south of Sloat and a reduction in size of the Great Highway north of Sloat Blvd., which allows for more creative solutions to the coastal erosion issue, allows for a greater level of managed retreat from sea level rise, and allows for increased public amenities. Project History: In 2000, residents, businesses, government entities and community-based organizations came together to coordinate the activities of the many government agencies involved in the Ocean Beach area, as well as develop an active grassroots movement to support its revitalization and protection. This group identified the need for a single document that integrates the requirements of the natural environment and green spaces, the desires of area residents, recreational opportunities, as well as the plans and expertise of the number of public agencies maintaining the area. In early 2008, Mayor Gavin Newsom created the Ocean Beach Vision Council, whose main task was to create a Master Plan for revitalizing Ocean Beach. The Conservancy authorized a $300,000 grant to SPUR in May of 2010 to develop the Master Plan, building upon the work of the Ocean Beach Vision Council. Through the Master Plan effort, SPUR developed a set of far reaching and multi-objective recommendations. This authorization would allow for SPUR to take the next step in ensuring the recommendations are implemented by the public agencies responsible for management of Ocean Beach. PROJECT FINANCING: Coastal Conservancy $400,000 San Francisco Public Utilities Commission $300,000 National Park Service $125,000 Total Project Cost $825,000 Conservancy funds are anticipated to come from the Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Bond Act of 2006 (Proposition 84). Proposition 84 funds may be used for the purposes of promoting access to and enjoyment of the coastal resources of the State in accordance with the provisions of the Conservancy s enabling legislation, Division 21 of the Public Resources Code. Consistent with the purposes of Proposition 84, the proposed project will be undertaken pursuant to the San Francisco Bay Area Conservancy Program (Chapter 4.5 of Division 21 of the Public Resources Code), and will consist of planning and related activities necessary to assist, promote and enhance access to and visitor-serving amenities at Ocean Beach in the City and County of San Francisco. The SFPUC has indicated in their budget documents, which are subject to approvals by the Mayor and Board of Supervisors, an appropriation of $300,000 for this effort over the next two fiscal years. The SFPUC may be able to increase their contribution. The National Park Service has committed $125,000 towards the efforts to implement the Ocean Beach Master Plan, using funds intended for transportation enhancements within GGNRA. Funds are also being sought for the project through the San Francisco County Transportation Authority. In addition, the project will benefit from the in-kind services of members of the steering committee and advisory committee. Page 5 of 9

6 OCEAN BEACH MASTER PLAN CONSISTENCY WITH CONSERVANCY S ENABLING LEGISLATION: The proposed project is consistent with Chapter 4.5 of Division 21 of the Public Resources Code, sections regarding San Francisco Bay projects. Pursuant to Section 31162, the Conservancy may award grants in the nine-county San Francisco Bay Area that help to achieve various specific goals, including the goals of increasing public access to the coast, protecting natural habitats and open space resources of regional importance, and promoting projects that provide open space and natural areas accessible to urban populations for recreational purposes. The proposed project is located entirely within the County of San Francisco. Consistent with Section 31162(a), the proposed project will plan for improved public access to the coast and improved connection of population centers to the coast through efforts to implement the Master Plan recommendations. The proposed project will not have a significant adverse effect on agricultural operations, environmentally sensitive areas or wildlife; in fact, the Master Plan recommends dune restoration to better protect environmentally sensitive habitat areas and wildlife and changes in traffic circulation to allow for improved public amenities, enhanced habitat, and managed retreat from sea level rise. Consistent with Section 31162(b), the proposed project, which will pursue implementation of the Master Plan recommendations, will increase protection of natural habitats, scenic areas and open-space resources of regional importance in the Ocean Beach area. Consistent with Section 31162(c), the activities proposed for funding will serve to assist in carrying out the policies of the City and County of San Francisco s certified Local Coastal Program, as discussed in detail in the CONSISTENCY WITH LOCAL COASTAL PROGRAM POLICIES section, below, as well as the policies governing the GGNRA. Consistent with Section 31162(d), the activities proposed for funding will assist and promote a project whose major purpose is to provide increased accessibility of the Ocean Beach area to urban populations for recreational and educational purposes. In addition, the proposed project satisfies criteria for determining project priority under Section 31163(c), as follows: (1) the proposed project is multijurisdictional (Ocean Beach is jointly owned and managed by the National Park Service as part of the GGNRA and the City and County of San Francisco) and will serve a regional consistency (Ocean Beach receives over two million visitors annually, including residents and tourists); (2) the proposed project will be implemented in a timely way (anticipated to start immediately); (3), the proposed project will include matching funds from other sources (SFPUC and GGNRA); and (4) the project is fully consistent with and supported by adopted local plans, as described in the Consistency with Local Coastal Program Policies section, below. CONSISTENCY WITH CONSERVANCY S 2007 STRATEGIC PLAN GOAL(S) & OBJECTIVE(S): Consistent with Goal 1, Objective C of the Conservancy s 2007 Strategic Plan, the proposed project will plan for the creation or improvement of approximately 3.5 miles of the Coastal Trail. Page 6 of 9

7 OCEAN BEACH MASTER PLAN Consistent with Goal 6, Objective G, the proposed project will facilitate development and implementation of efforts to manage shoreline erosion. Consistent with Goal 11, Objective A, the proposed project will facilitate implementation of a plan that provides for recreational opportunities. Consistent with Goal 11, Objective H, the proposed project will develop a plan for community connectors that link an urban area to the Coastal Trail. CONSISTENCY WITH CONSERVANCY S PROJECT SELECTION CRITERIA & GUIDELINES: The proposed project is consistent with the Conservancy s Project Selection Criteria and Guidelines, last updated on November 10, 2011, in the following respects: Required Criteria 1. Promotion of the Conservancy s statutory programs and purposes: See the Consistency with Conservancy s Enabling Legislation section above. 2. Consistency with purposes of the funding source: See the Project Financing section above. 3. Support of the public: The proposed project is supported by Senator Dianne Feinstein, State Senator Leland Yee (District 8), State Assemblymember Fiona Ma (District 12), Supervisors Eric Mar (District 1) and Carmen Chu (District 4), Surfrider, Save The Waves, and many individuals who reside near or use Ocean Beach. Please see letters in Exhibit Location: The proposed project is located on the Pacific Coast waterfront of the City and County of San Francisco, which is within the nine-county Bay Area. 5. Need: Conservancy funds are needed to leverage SFPUC and GGNRA funds and allow SPUR to begin work immediately, which will sustain the engagement of agencies and stakeholders. 6. Greater-than-local interest: Located within the City and County of San Francisco and the GGNRA, Ocean Beach receives over two million visitors annually, from local to international origin. 7. Sea level rise vulnerability: The Master Plan addresses sea level rise, laying out an ambitious and new approach to management of Ocean Beach in the face of coastal erosion and sea level rise. This proposed next phase of work will develop a new traffic circulation plan that will allow for managed retreat, as well as phasing plans with triggers for adapting to sea level rise and associated coastal erosion. Additional Criteria 8. Urgency: Winter storms in December 2009 and January 2010 have eroded between 30 and 70 feet of bluff along Ocean Beach, affecting the Great Highway, the Lake Merced Wastewater Tunnel and the Southwest Ocean Outfall Pipe. The recommendations in the Master Plan squarely address this issue and need to be moved towards implementation. Page 7 of 9

8 OCEAN BEACH MASTER PLAN 9. Resolution of more than one issue: The proposed project addresses the following elements by pursuing the implementation of the Master Plan s multi-objective recommendations: climate change and sea level rise; coastal erosion; natural resources protection; public access and recreation; vehicular, bicycle, and pedestrian access and circulation; and implementation, management and maintenance. 10. Leverage: See the Project Financing section above. 11. Conflict resolution: A comprehensive public engagement process took place as part of the Master Plan development, and included three public workshops, numerous community presentations, an Advisory Committee and Steering Committee that each met several times, and a robust online and social media presence, and an exhibit at SPUR s Urban Center. These efforts have deepened public understanding of the challenges and constraints at Ocean Beach and have resulted in a set of broad, multi-objective recommendations that resolve multiple conflicts. 12. Readiness: The proposed project will commence as soon as funds are authorized, and will be completed within three years. 13. Cooperation: The proposed project will build upon the stakeholder engagement to date and the cooperation of the public agencies involved in management of Ocean Beach. CONSISTENCY WITH LOCAL COASTAL PROGRAM POLICIES: The proposed project is consistent with the applicable policies contained in the land use plan portion of the City and County of San Francisco s certified Local Coastal Program (certified March 14, 1986), namely the Western Shoreline Plan: A Part of the Master Plan of the City and County of San Francisco (adopted by the San Francisco City Planning Commission by Resolution No on April 18, 1985). The Western Shoreline Plan covers a six-mile area from the Point Lobos recreational area in the north to the Fort Funston cliff area in the south, and includes Lake Merced, the San Francisco Zoo, Ocean Beach, the Great Highway, Golden Gate Park, and the Sutro Heights Park and Sutro Baths. Much of this planning area will be within the scope of the Ocean Beach Master Plan, which is consistent with the following Western Shoreline Plan policies: Consistent with Transportation Policies 1 and 2, the proposed project will seek to improve east-west public transit connections to Ocean Beach, and improve connections amongst the coastal recreation destinations (e.g., the zoo, etc). Consistent with The Great Highway Policy 4, the proposed project will seek to provide for a continuous Class 1 bicycle trail; consistent with Policy 6, the proposed project will seek to improve public access to Ocean Beach from Golden Gate Park; consistent with Policies 7-8, the proposed project will seek to address safe and flexible parking areas; consistent with Policies 9-11, the proposed project will seek to improve pedestrian safety at crossings and parking areas. Consistent with the Golden Gate Park Objective (No. 3), the proposed project will seek to enhance the recreational connection between Golden Gate Park and the beach frontage by strengthening visual and physical connections. Consistent with The Zoo Objective (No. 4), the proposed project will seek to improve the quality of the zoo s relationship to the coastal zone recreational system. Page 8 of 9

9 OCEAN BEACH MASTER PLAN Consistent with the Ocean Beach Objective (No. 6), the proposed project will seek to maintain and enhance the recreational use of the Ocean Beach shoreline. Consistent with Policies 1 and 2, the proposed project will seek to continue and maintain the beach s natural areas; consistent with Policies No. 3-4, the proposed project will seek to maintain and improve the beach s natural appearance and physical condition; consistent with Policy No. 5, the proposed project will seek to enhance the enjoyment of visitors by providing for convenient visitor-oriented services. COMPLIANCE WITH CEQA: The proposed planning project is statutorily and categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under two sections of the CEQA Guidelines, 14 Cal. Code of Regulations 15000, et seq. The proposed planning activities are statutorily exempt pursuant to Section in that they will involve feasibility and planning analysis for possible future action that has not yet been adopted, approved or funded and they will include consideration of environmental factors. The planning activities are likewise categorically exempt under to the extent that they involve basic data collection and resource evaluation activities. Staff will file a Notice of Exemption upon approval of the project. Page 9 of 9

10 Project Location Exhibit 1 Project Location Map

11 San Rafael Larkspur Richmond Corte Madera El Cerrito Mill Valley Tiburon Albany Berkeley Sausalito Oakland Bay Area Ridge Trail Alameda Ocean Beach Master Plan Area San Francisco miles Daly City Colma Brisbane OCEAN BEACH Regional Map

12 Fort Point Mason St Crissy Field Palace of Fine Arts Fort Mason Presidio of San Francisco Lombard St China Beach Jackson St Divisadero St Van Ness Ave Lincoln Blvd Arguello Blvd Presidio Ave Broadway St Pine St Fillmore St Bush St Lincoln Park California St Sutro Heights Park 36th Ave 25 th Ave Geary Blvd 14th Ave Funston Ave Fulton St University of San Francisco Turk St Fell St Alamo Square Gough St Frankli n St Oak St Golden Gate Park Buena Vista Park Duboce Park Market St Lincoln Way 19th Ave 16th St 17th St Ocean Beach Master Plan Area Judah St Lawton St Mission Dolores Park Dolores St Guerrero St Ocean Beach Great Hwy 46th Ave Sunset Blvd Noriega St 28th Ave i d g e T r a i l R Castro St 24th St Clipper St B a y A r e a Taraval St Vicente St Porto la Dr San Francisco Zoo Sloat Blvd San Francisco State University Junipero Serra Blvd Holloway Ave Ocean Ave Monterey Blvd San Jose Ave Mission St Silver Ave Naples St Ca miles Fort Funston Lake Merced Blvd Plymouth Ave Alemany Blvd OCEAN BEACH Geneva Ave Persia Ave Site-Scale Map

13 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations public workshop 3 click to edit master title style october 29, october 29, 2011

14 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations draft recommendations october 29, 2011

15 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations ü analysis to 2100 horizon ü recommendations to 2050 ü non-regulatory guidance document ü ongoing monitoring + adaptive management ü re-evaluation in 2030 october 29,

16 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations south reach 2 4 middle reach north reach 6 1 six (6) key moves SOUTH REACH KEY MOVE 1 : Reroute Great Highway behind the Zoo via Sloat and Skyline KEY MOVE 2 : Introduce a multi-purpose coastal protection/restoration/access system MIDDLE REACH KEY MOVE 3 : Reduce width of Great Highway to provide Amenities / Managed Retreat KEY MOVE 4 : Middle Reach Native Dune Restoration NORTH REACH KEY MOVE 5 : Better Connection between Golden Gate Park and Beach KEY MOVE 6 : Bicycle + pedestrian improvements north of Balboa october 29,

17 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations SOUTH REACH october 29,

18 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 1 reroute great highway behind the zoo via sloat and skyline october 29,

19 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 1 : reroute great highway behind the zoo via sloat and skyline 1.1 reconfigure sloat/great highway and sloat/skyline intersections 1.2 maintain 1-lane out southbound from oceanside treatment plant (OTP) for trucks 1.3 reconfigure sloat blvd, with parking along zoo boundary, permeable pavement, bikeway, and coastal access amenities 1.4 pull L-taraval south across sloat, terminus at zoo gate 1.5 introduce coastal trail to ft funston 1.6 connect N-S to california coastal trail, linking lake merced all the way to marin 1.7 replace beach/zoo parking along armory road and using OTP roof 1.8 reopen armory road: skyline to zoo lot october 29,

20 ocean beach master Exhibit plan 2: Ocean Beach Master Plan Presentation: Draft Recommendations draft recommendations KEY MOVE 1 : reroute great highway behind the zoo via sloat and skyline 1.3 reconfigure sloat blvd, with parking along zoo boundary, permeable pavement, bikeway, and coastal access amenities october 29,

21 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 1 : reroute great highway behind the zoo via sloat and skyline BEFORE october 29,

22 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 1 : reroute great highway behind the zoo via sloat and skyline 1.3 reconfigure sloat blvd, with parking along zoo boundary, permeable pavement, bikeway, and coastal access amenities bike lane swale permeable paving AFTER october 29,

23 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 1 : reroute great highway behind the zoo via sloat and skyline benefits ü spectacular new coastal trail, continuous pedestrian connection ü enables significant retreat from coastal erosion ü more flexible infrastructure protection ü major improvements to sloat blvd design, with green infrastructure elements constraints ü some traffic impacts, likely minor ü requires reconfiguring zoo access ü cost of roadway and intersection improvements outstanding questions ü nature of traffic impacts? ü configuration of sloat blvd? ü funding sources? october 29,

24 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 2 introduce a multi-purpose coastal protection / restoration / access system october 29,

25 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 2 : introduce a multi-purpose coastal protection / restoration / access system 2.1 withdraw from bluff edge, incrementally demolish roadway, parking, restroom at sloat cobble berm + sand 2.2 reinforce the lake merced tunnel in place with a low profile structure or internal ballast, remove revetments and fill 2.3 sand nourishment via army corps,develop and pursue best practices for beach nourishment 2.4 cobble berm over lm tunnel covered by sand (via army corps sand nourishment) serves as wave dissipation zone; overwash occurs during severe storm events 2.5 second cobble berm protects force mains, high ground at pump station, fleishhacker bldg october 29,

26 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 2 (cont) : introduce a multi-purpose coastal protection / restoration / access system vegetated seawall 2.6 terraced, vegetated seawall with cobble toe along oceanside treatment plant, incorporating tunnel structure, coastal trail, erodible bluff (banks swallow habitat), and plant driveway 2.7 create detention swale (through zoo) and constructed wetland to passively clean and infiltrate stormwater from sloat blvd and adjacent parking 2.8 fleishhacker bldg renovated as warming hut and interpretive center 2.9 pump station, force mains remain; interpretive elements explain the system to visitors. beautify pump station and reconfigure to maximize adjacent coastal access constructed wetland 2.10 conduct near-term pilot studies of dynamic coastal protection october 29,

27 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations KEY MOVE 2 : introduce a multi-purpose coastal protection / restoration / access system 2.4 cobble berm over lm tunnel covered by sand (via army corps sand nourishment) serves as wave dissipation zone; overwash occurs during severe storm events 2.5 second cobble berm protects force mains, high ground at pump station, fleishhacker bldg october 29,

28 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations KEY MOVE 2 : introduce a multi-purpose coastal protection / restoration / access system zoo parking lot bluff fleishhacker pool bldg back beach second cobble berm cobble berm + sand detention pond force mains lake merced tunnel october 29,

29 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations october 29,

30 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations revetments exposed fill ocean level 2011 BEFORE october 29,

31 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations cobble berm ocean level 2050 cobble berm + sand AFTER october 29,

32 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 2 : introduce a multi-purpose coastal protection / restoration / access system benefits ü incorporates significant coastal retreat ü protects costly infrastructure in place for decades ü a softer approach to coastal protection, that can work with coastal processes ü restores ecological and recreational function constraints ü significant up-front investment from multiple agencies ü challenging to maintain sand cover and surface restoration ü depends on careful integration with army corps beach nourishment ü new approach requiring careful study and monitoring outstanding questions ü can the tunnel be protected at a low enough profile for a reasonable cost? ü how will wave action interact with cobble and sand to shape the beach and berm? ü how will protection measures be phased to prevent spills, protect habitat, and manage cost? october 29,

33 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations MIDDLE REACH october 29,

34 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 3 reduce the width of great highway to provide amenities / managed retreat october 29,

35 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 3 : reduce the width of great highway to provide amenities / managed retreat 3.1 reduce great highway from 4 lanes to 2 at balboa-sloat, including wide shoulder for cycling/emergency access; use current south-bound lanes and median for dune restoration, amenities 3.2 reconfigure great highway/sloat intersection slightly inland, following transport box to avoid erosion 3.3 introduce small pockets of parking distributed at key access nodes 3.4 powered by wind and solarrestore existing restrooms; introduce 3 new off-the-grid restrooms 3.5 improve access at judah, taraval, rivera and noriega with trailheads/info, bike parking, vertical elements, etc 3.6 traffic calming and mitigation measures to lessen neighborhood traffic impacts 3.7 LID (Low-Impact Design) throughout adjacent neighborhoods to address stormwater management DETAIL october 29,

36 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 3 : reduce the width of great highway to provide amenities / managed retreat 3.1 reduce great highway from 4 lanes to 2 at balboa-sloat, including wide shoulder for cycling/emergency access; use current south-bound lanes and median for dune restoration, amenities 3.2 reconfigure great highway/sloat intersection slightly inland, following transport box to avoid erosion 3.3 introduce small pockets of parking distributed at key access nodes 3.4 restore existing restrooms; introduce 2-3 new off-the-grid (wind/solar) restrooms 3.5 improve access at judah, taraval, rivera and noriega with trailheads/info, bike parking, vertical elements, etc 3.6 traffic calming and mitigation measures to lessen neighborhood traffic impacts 3.7 LID (Low-Impact Design) throughout adjacent neighborhoods to address stormwater management DETAIL october 29,

37 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations october 29,

38 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations public restroom seating / play permeable parking bike share station signage KEY MOVE 3 : reduce the width of great highway to provide amenities / managed retreat october 29,

39 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 3 : reduce the width of great highway to provide amenities / managed retreat benefits ü a restored dune system is given space to migrate landward, allowing a wider beach as sea-level rise sets in. ü allows space for additional amenities, improved beach access ü favors pedestrians, bicycles, beach access, and wildlife over traffic flow constraints ü traffic impacts, which may be significant, in adjacent neighborhoods ü limited space gained at substantial cost ü potential to bring more users to plover habitat areas ü some redundancy between recreational trails outstanding questions ü what will traffic impacts be and to what degree can they be mitigated? ü how much additional beach width will result in the long run? october 29,

40 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 4 middle reach native dune restoration october 29,

41 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 4 : middle reach native dune restoration 4.1 sand nourishment via army corps of engineers along southern end of middle reach 4.2 dune restoration in key locations: especially at lincoln, vicente 4.3 sand ladders and modular boardwalks provide access while limiting impact dune restoration sand ladder october 29,

42 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations CA native dune profile non-native dune profile EXISTING non-native dune at OB PROPOSED native dune restoration october 29,

43 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 4 : middle reach native dune restoration benefits ü ecological restoration and improved aesthetics ü removal of non-native species ü lower profile will allow more visual access to the ocean ü potential for improved sand management with lower profile constraints ü significant cost ü challenge of fully removing non-native grasses ü access to dunes limited to protect restoration outstanding questions ü would a native dune form offer comparable coastal protection? ü to what degree would management of windblown sand be improved ü how can sand placed through beach nourishment best feed the dune system? october 29,

44 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations NORTH REACH october 29,

45 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 5 better connection between golden gate park and beach october 29,

46 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 5 : better connection between golden gate park and beach 5.1 tighten parking lot potentially replacing asphalt for permeable paving, preserve event/flex-space capacity 5.2 maintain row of watching the water parking 5.3 modify parking entrances, and improve pedestrian crossings at JFK/beach chalet 5.4 provide vertical arrival element / overlook at ends of golden gate park 5.5 add east side bike lanes (in both directions) north of fulton to balboa, connect bike trail with existing GGP trail right-ofway 5.6 add abundant bike parking 5.7 joint city/federal parking management plan, consider some fee parking on peak days 5.8 introduce landscape site elements and seating appropriate to rugged conditions and introduce and restore climate appropriate/native landscape golden gate park october 29,

47 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations KEY MOVE 5 : better connection between golden gate park and beach permeable parking + ocean overlook seating / overlook public restroom permeable parking 5.1 tighten parking lot potentially replacing asphalt for permeable paving, preserve event/flex-space capacity october 29,

48 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 5 : better connection between golden gate park and beach benefits ü a sense of arrival in a context-appropriate landscape ü improved basic amenities at the busiest access point ü maintains parking and event capacity while improving pedestrian and bicycle safety ü improved environmental performance with permeable paving, alternative energy constraints ü cost ü interagency management challenges october 29,

49 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 6 bicycle + pedestrian improvements north of balboa october 29,

50 ocean beach master Exhibit plan 2: Ocean Beach Master Plan Presentation: Draft Recommendations draft recommendations KEY MOVE 6 : bicycle + pedestrian improvements north of balboa 6.1 narrow great highway north of balboa (from 4 to 2 lanes) 6.2 keep diagonal cliff house parking 6.3 narrow point lobos avenue from 4 lanes to 2, add 2-way separated bikeway on inland side; separated bikeway along cliff to prevent bicycle/vehicular conflict on steep slope 6.4 connect bike lane to bike trail to lands end and add bicycle box at pt lobos and 49 th october 29,

51 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 6 : bicycle + pedestrian improvements north of balboa BEFORE october 29,

52 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 6 : bicycle + pedestrian improvements north of balboa 6.3 narrow point lobos avenue from 4 lanes to 2, add 2-way separated bikeway on inland side; separated bikeway along cliff to prevent bicycle/vehicular conflict on steep slope 6.4 connect bike lane to bike trail to lands end and add bicycle box at pt lobos and 49 th AFTER october 29,

53 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations ocean beach master plan draft recommendations KEY MOVE 6 : bicycle + pedestrian improvements north of balboa benefits ü improved pedestrian, bicycle safety, shortened crossings ü improved aesthetics and street design ü maintains cliff house parking while reducing car-bike conflicts ü enhances key recreational connection to land s end, coastal trail constraints ü modest traffic impacts outstanding questions ü what is the optimal arrangement of bicycle lanes along point lobos avenue? ü what will the traffic impacts be? october 29,

54 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations key moves after 2050 ü with the same assumptions: ü additional armoring will likely be required ü availability of sand may change ü beach may become difficult to maintain ü revisit assumptions and adapt in 2030 ü infrastructure configuration ü private property acquisition october 29,

55 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations key moves key move 7 ocean beach master plan adaptive revision : 2030 ü better data on climate change ü advances in techniques and policies ü more public awareness ü 2 decades of proactive management ü 2 decades left in phase I october 29,

56 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations implementation updates ü Army Corps beach nourishment process update ü Environmental Review Documents Pending ü Beneficial Reuse Plan in Draft Form ü Dredge retrofit awaiting funding october 29,

57 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations implementation updates ü OBMP implementation roadmap in progress ü projects ü lead and partner agencies ü regulatory process ü funding opportunities october 29,

58 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations implementation updates ü Several efforts already pending ü Recreation and Open Space Element (SF General Plan) ü GGNRA General Management Plan Update (in Draft) ü Urban Watersheds Framework (SFPUC) ü "Tier 5" Westside Transportation Study (meeting 11/2, SFSU) october 29,

59 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations 09/11 10/11 11/11 12/11 01/12 02/12 PAC 5 public workshop 3 PAC 6 PAC briefing session PAC 7 public presentation recommendations draft master plan (MP) MP document draft final master plan october 29,

60 Exhibit 2: Ocean Beach Master Plan Presentation: Draft Recommendations master plan document draft : december 2011 next public meeting : february 2012 questions / comments / suggestions? oceanbeach@spur.org october 29,

61 Exhibit 3: Project Letters

62 Exhibit 3: Project Letters

COASTAL CONSERVANCY. Staff Recommendation December 13, 2007 COASTAL TRAIL AT LAND S END. File No Project Manager: Joan Cardellino

COASTAL CONSERVANCY. Staff Recommendation December 13, 2007 COASTAL TRAIL AT LAND S END. File No Project Manager: Joan Cardellino COASTAL CONSERVANCY Staff Recommendation December 13, 2007 COASTAL TRAIL AT LAND S END File No. 07-086-01 Project Manager: Joan Cardellino RECOMMENDED ACTION: Authorization to disburse up to eight hundred

More information

COASTAL CONSERVANCY. Staff Recommendation May 27, 2010 OCEAN BEACH MASTER PLAN. File No Project Manager: Moira McEnespy

COASTAL CONSERVANCY. Staff Recommendation May 27, 2010 OCEAN BEACH MASTER PLAN. File No Project Manager: Moira McEnespy COASTAL CONSERVANCY Staff Recommendation May 27, 2010 OCEAN BEACH MASTER PLAN File No. 08-163-01 Project Manager: Moira McEnespy RECOMMENDED ACTION: Authorization to disburse up to $300,000 to the San

More information

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 LOS ANGELES GREEN VISION PLAN. File No.: Project Manager: Marc Beyeler

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 LOS ANGELES GREEN VISION PLAN. File No.: Project Manager: Marc Beyeler COASTAL CONSERVANCY Staff Recommendation March 25, 2004 File No.: 04-014 Project Manager: Marc Beyeler RECOMMENDED ACTION: Authorization to disburse up to $50,000 to the University of Southern California

More information

COASTAL CONSERVANCY. Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT. File No Project Manager: Megan Johnson

COASTAL CONSERVANCY. Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT. File No Project Manager: Megan Johnson COASTAL CONSERVANCY Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT File No. 08-059 Project Manager: Megan Johnson RECOMMENDED ACTION: Authorization to disburse an amount not

More information

COASTAL CONSERVANCY. Staff Recommendation April 27, 2006 TALL SHIPS EXPOSITION File No Project Manager: Neal Fishman/Carol Arnold

COASTAL CONSERVANCY. Staff Recommendation April 27, 2006 TALL SHIPS EXPOSITION File No Project Manager: Neal Fishman/Carol Arnold COASTAL CONSERVANCY Staff Recommendation April 27, 2006 TALL SHIPS EXPOSITION 2008 File No. 05-020 Project Manager: Neal Fishman/Carol Arnold RECOMMENDED ACTION: Authorization to disburse up to $100,000

More information

TOWN COUNCIL / PLANNING COMMISSION

TOWN COUNCIL / PLANNING COMMISSION Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.

More information

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies Vision Statement Queen Creek s interconnected network of parks, trails, open spaces and recreation opportunities provide safe and diverse activities and programs that sustain its unique, small town, equestrian

More information

MEMORANDUM OF UNDERSTANDING REGARDING MANAGEMENT OF THE LAKE MERCED TRACT

MEMORANDUM OF UNDERSTANDING REGARDING MANAGEMENT OF THE LAKE MERCED TRACT June 24, 2011 Draft MEMORANDUM OF UNDERSTANDING REGARDING MANAGEMENT OF THE LAKE MERCED TRACT THIS MEMORANDUM OF UNDERSTANDING ("MOU"), dated for reference purposes only as of, 2011, is entered into by

More information

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW Steering Committee Presentation February 14, 2018 Purpose of General Plan Guide land use and development decisions Coordinate transportation, infrastructure,

More information

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development Office of the City Manager ACTION CALENDAR January 29, 2013 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Eric Angstadt, Director, Planning and

More information

Ashbridges Bay Erosion and Sediment Control Project

Ashbridges Bay Erosion and Sediment Control Project Ashbridges Bay Erosion and Sediment Control Project Project Brief Overview Toronto and Region Conservation Authority, in partnership with the City of Toronto, intends to carry out remedial erosion control

More information

STATE COASTAL CONSERVANCY. Staff Recommendation August 5, 2010 TALL SHIPS FESTIVALS OF File No Project Manager: Deborah Ruddock

STATE COASTAL CONSERVANCY. Staff Recommendation August 5, 2010 TALL SHIPS FESTIVALS OF File No Project Manager: Deborah Ruddock STATE COASTAL CONSERVANCY Staff Recommendation August 5, 2010 TALL SHIPS FESTIVALS OF 2010 File No. 10-008 Project Manager: Deborah Ruddock RECOMMENDED ACTION: Authorization to disburse up to $60,000 to

More information

Stafford County Strategic Plans

Stafford County Strategic Plans Stafford County Strategic s Strategic Department Description Date Adopted Board of Supervisors Priorities Fiscal Responsibility Education Public Safety Infrastructure Economic Development Service Excellence

More information

Venice Pumping Plant Dual Force Main Project Draft EIR

Venice Pumping Plant Dual Force Main Project Draft EIR City of Los Angeles 5.9 LAND USE PLANS 5.9.1 Environmental Setting Venice Pumping Plant Dual Force Main Project Draft EIR The Project lies within the bounds of Los Angeles County and the City of Los Angeles.

More information

Planning Commission Report

Planning Commission Report Planning Commission Report To: From: Subject: Planning Commission Meeting: January 6, 2016 Agenda Item: 8-B Planning Commission David Martin, Planning & Community Development Director Introduction to the

More information

CHAPTER 1 Introduction

CHAPTER 1 Introduction CHAPTER 1 Introduction From sea to summit, Lane County covers almost 4,800 square miles of diverse Oregon landscape. Stretching from the Pacific Ocean through the Coastal Range, the Willamette Valley to

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

Mendota Heights 2040 Comprehensive Plan Draft Vers

Mendota Heights 2040 Comprehensive Plan Draft Vers 4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs

More information

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -

More information

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan. Regional Smart Growth Program Economic Development Commission What is Smart Growth? Adopted as part of the Regional Comprehensive Plan (RCP) RCP provides vision for region based on Smart Growth and sustainability

More information

Issues Requiring Future Study

Issues Requiring Future Study Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

North Fair Oaks Community Plan Summary and Information

North Fair Oaks Community Plan Summary and Information North Fair Oaks Community Plan Summary and Information WHAT IS THE NORTH FAIR OAKS COMMUNITY PLAN? The North Fair Oaks Community Plan is part of the San Mateo County General Plan, and establishes policies

More information

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN TO: FROM: SUBJECT: Honorable Mayor and City Council Planning Department ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN RECOMMENDATION: It is recommended that the City Council:

More information

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program 1Pursue Minnehaha-Hiawatha Community Works Project Minnehaha-Hiawatha Community Works is a project within the Hennepin Community Works (HCW) program. The mission of the HCW program is to enhance how the

More information

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY MAIN STREET ECONOMIC DEVELOPMENT STRATEGY A PATHWAY TO A BETTER POUGHKEEPSIE DRAFT Working Paper #2: Planning Strategies Submitted December 1 st, 2015 to the City of Poughkeepsie LAND USE LAW CENTER PACE

More information

Master Plan Objectives and Policies

Master Plan Objectives and Policies Master Plan Objectives and Policies Introduction This chapter identifies the Park issues and recommended policies established by this Master Plan. The issues were identified through meetings with staff,

More information

BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT

BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT For meeting of: BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT TO: FROM: Honorable Chair and Planning Commissioners Jill Ekas, Community Development Director Brittney Cozzolino,

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

COASTAL CONSERVANCY. Staff Recommendation November 9, 2006 WESTERN SALT WORKS SITE ASSESSMENT AND SOUTH SAN DIEGO BAY TRAIL LINKAGES

COASTAL CONSERVANCY. Staff Recommendation November 9, 2006 WESTERN SALT WORKS SITE ASSESSMENT AND SOUTH SAN DIEGO BAY TRAIL LINKAGES COASTAL CONSERVANCY Staff Recommendation November 9, 2006 WESTERN SALT WORKS SITE ASSESSMENT AND SOUTH SAN DIEGO BAY TRAIL LINKAGES File No. 06-081 Project Manager: Prentiss Williams RECOMMENDED ACTION:

More information

2011 ASLA Design Awards. Westside Creeks Restoration Plan Merit Award AECOM, Fort Collins. Planning & Urban Design

2011 ASLA Design Awards. Westside Creeks Restoration Plan Merit Award AECOM, Fort Collins. Planning & Urban Design 2011 ASLA Design Awards Westside Creeks Restoration Plan Merit Award AECOM, Fort Collins Planning & Urban Design Project Fact Sheet Category of Entry: Rotating Specialty Award: 2011 2011 ASLA Colorado

More information

PLAN ELEMENTS WORKSHOP. April 5, 2016

PLAN ELEMENTS WORKSHOP. April 5, 2016 PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly

More information

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01]

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01] This document is scheduled to be published in the Federal Register on 12/18/2017 and available online at https://federalregister.gov/d/2017-27194, and on FDsys.gov Billing Code: 4210-67 DEPARTMENT OF HOUSING

More information

implementation r expression in landscape

implementation r expression in landscape 6 ubc okanagan implementation campus plan r expression in landscape 68 6 implementation campus plan sections The Campus Plan supports the academic mission, values and commitments of the University by providing

More information

CHAPTER 12 IMPLEMENTATION

CHAPTER 12 IMPLEMENTATION CHAPTER 12 IMPLEMENTATION The 2010 Town of Denton Comprehensive Plan is intended to capture a vision of the future of Denton. As such, it provides a basis for a wide variety of public and private actions

More information

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management Empowering Local Action for Coastal Resilience in Massachusetts Bruce K. Carlisle MA Office of Coastal Zone Management Context Coastal communities continue to face both chronic and acute storm surge, erosion,

More information

38 Queen s University Campus Master Plan Part 1

38 Queen s University Campus Master Plan Part 1 38 Queen s University Campus Master Plan Part 1 46 The Campus at the City Scale Chapter 4 The Campus at the City Scale 39 Queen s is an urban University centrally located in Kingston. Decisions made by

More information

Public may provide comments on the GDP within the next two weeks (December 24)

Public may provide comments on the GDP within the next two weeks (December 24) 25/70 General Development Plan (GDP) Public Meeting Wednesday, December 10, 2014 6:00 8:00 P.M. District 1 Police Station Community Room 1311 W 46th Ave, Denver, CO 80211 Council Woman Montero: This particular

More information

COASTAL CONSERVANCY. Staff Recommendation October 21, 2010 BATTERY POINT LIGHTHOUSE ENHANCEMENTS. File No Project Manager: Deborah Hirst

COASTAL CONSERVANCY. Staff Recommendation October 21, 2010 BATTERY POINT LIGHTHOUSE ENHANCEMENTS. File No Project Manager: Deborah Hirst COASTAL CONSERVANCY Staff Recommendation October 21, 2010 BATTERY POINT LIGHTHOUSE ENHANCEMENTS File No. 10-025 Project Manager: Deborah Hirst RECOMMENDED ACTION: Authorization to disburse up to $100,000

More information

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 7 To provide park facilities, recreation programs, and open space resources that are safe, adequate, and accessible to all City residents,

More information

City of Toronto. Emery Village Transportation Master Plan

City of Toronto. Emery Village Transportation Master Plan City of Toronto Emery Village Transportation Master Plan May 2009 Emery Village Transportation Master Plan Toronto, ON May 2009 Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel:

More information

Visual and Aesthetics

Visual and Aesthetics Such a connection could accommodate timed transfers and improve connections between local transit service and Presidio Shuttle service. Level of Service The results of the analysis are provided on a route-by-route

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010 University of the District of Columbia Van Ness Campus Master Plan Open House 3 December 8, 2010 Introductions Sequence of Work: Campus Master Plan BEGIN: INTRODUCE AND START WORK Project Initiation Team

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

M E M O R A N D U M. DATE: July 19, Patrick D. O Keeffe, City Manager. Economic Development & Housing

M E M O R A N D U M. DATE: July 19, Patrick D. O Keeffe, City Manager. Economic Development & Housing M E M O R A N D U M DATE: July 19, 2011 TO: FROM: Patrick D. O Keeffe, City Manager Economic Development & Housing SUBJECT: Resolution of the City Council of the City of Emeryville Approving the Application

More information

Toronto Complete Streets Guidelines

Toronto Complete Streets Guidelines Toronto Complete Streets Guidelines 108 110 7.1 Green Infrastructure Design Principles 112 7.2 Context-Sensitive Green Streets 114 7.3 Key Green Street Elements Green infrastructure refers to natural and

More information

Pedestrian and Bike Bridge LOGO

Pedestrian and Bike Bridge LOGO 6.2.2 Pedestrian and Bike Bridge The proposed pedestrian and bike crossing re-envisions the existing bridge at Pismo Creek on Cypress Street. The bridge is currently underutilized by vehicular through

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 5H From: Date: Subject: Staff October 17, 2008 Council Meeting Local Government Comprehensive Plan Review Draft

More information

Route 1 Corridor Study

Route 1 Corridor Study Route 1 Corridor Study Westbrook, Connecticut A Vision for the Connecticut Shoreline Public Informational Meeting July 28, 2015 Lower Connecticut River Valley Council of Governments Fitzgerald & Halliday,

More information

1.0 Circulation Element

1.0 Circulation Element 5/9/18 1.0 Circulation Element 1.1 Introduction As growth and development occur in Apache County, enhancements to its circulation system will be necessary. With time, more roads will be paved and air and

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts August 27, 2015 US Army Corps of Engineers New England District 696 Virginia Road Concord, MA 01742-2751 Attn: Phillip W. Nimeskern Dear Mr. Nimeskern, Sierra Club Comments on ACOE Public Notice NAE-2014-259

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

California Environmental Quality Act (CEQA) Environmental Review Process

California Environmental Quality Act (CEQA) Environmental Review Process California Environmental Quality Act (CEQA) Environmental Review Process Los Angeles Union Station Forecourt and Esplanade Improvements constitute a Project Los Angeles County Metropolitan Transportation

More information

LOS ANGELES AIRPORT/EL SEGUNDO DUNES Specific Plan

LOS ANGELES AIRPORT/EL SEGUNDO DUNES Specific Plan LOS ANGELES AIRPORT/EL SEGUNDO DUNES Specific Plan Ordinance No. 167,940 Effective June 28, 1992 TABLE OF CONTENTS MAP Section 1. Section 2. Section 3. Section 4. Section 5. Section 6. Specific Plan Area

More information

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element: G. RECREATION AND OPEN SPACE ELEMENT The purpose of the Element is to provide the framework and direction for a comprehensive system of public and private sites for recreation, including, but not limited

More information

CHAPTER Committee Substitute for Senate Bill No. 1472

CHAPTER Committee Substitute for Senate Bill No. 1472 CHAPTER 2007-99 Committee Substitute for Senate Bill No. 1472 An act relating to beaches and shores; amending s. 161.021, F.S.; amending a definition; amending s. 161.085, F.S.; restricting the use of

More information

Parks, Trails, and Open space Element

Parks, Trails, and Open space Element Parks, Trails, and Open space Element Parks, Trails, and Open Space element Parks, Recreation, and Open Space are important components of the quality of life desired by the residents of Elk Grove. This

More information

Portage Parkway Environmental Assessment Public Information Centre No. 1

Portage Parkway Environmental Assessment Public Information Centre No. 1 City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces

More information

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018

More information

Canyon Lake Master Plan Revision Public Information Meeting March 18, 2016

Canyon Lake Master Plan Revision Public Information Meeting March 18, 2016 Canyon Lake Master Plan Revision Public Information Meeting March 18, 2016 Marcus Schimank Canyon Lake Manager Capital Regional Office U.S. Army Corps of Engineers Fort Worth District US Army Corps of

More information

DATE: May 25, Watershed Conservation Authority Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

DATE: May 25, Watershed Conservation Authority Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer DATE: May 25, 2017 TO: FROM: THROUGH: SUBJECT: Watershed Conservation Authority Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer : Consideration of a resolution to approve

More information

Shoreline Master Program Town of La Conner, Washington

Shoreline Master Program Town of La Conner, Washington Shoreline Master Program Town of La Conner, Washington Department of Ecology approval effective Adopted September 24, 2013 by Town of La Conner Ordinance No.1106 Amended May 13, 2014 by Town of La Conner

More information

draft ocean beach master plan AECOM ESA PWA Nelson\Nygaard Sherwood Design Engineers Phil G. King Ph.D. with

draft ocean beach master plan AECOM ESA PWA Nelson\Nygaard Sherwood Design Engineers Phil G. King Ph.D. with draft with AECOM ESA PWA Nelson\Nygaard Sherwood Design Engineers Phil G. King Ph.D. 1 it is nice to have such a remote wild-feeling place near the city workshop 1 participant 2 contents I executive summary

More information

Section 4: Goals, Objectives, and Strategies

Section 4: Goals, Objectives, and Strategies 99 Section 4: Goals, Objectives, and Strategies Goal 1 Resource Protection, Maintenance, Preservation, and Enhancement Protect, preserve, maintain, and enhance the natural, recreational, archaeological,

More information

Town Center (part of the Comprehensive Plan)

Town Center (part of the Comprehensive Plan) Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

Pinellas County Greenways

Pinellas County Greenways Pinellas County Greenways USING GREENWAYS TO LINK OPEN SPACES The Florida Greenways Commission has defined a greenway as...a corridor of protected open space that is managed for conservation and/or recreation.

More information

Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting

Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting BACKGROUND The San Francisco Public Utilities Commission

More information

Introduction and Overview

Introduction and Overview Introduction and Overview Articulate local values and priorities Guide land use and development decisions Coordinate transportation, infrastructure, and City services with expected growth and available

More information

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay Green Streets Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay As the Bay Area continues to grow through development of roads, revitalization of neighborhoods, and construction

More information

COASTAL CONSERVANCY. Staff Recommendation May 24, 2012 PIGEON POINT LIGHT STATION RESTORATION PLANNING

COASTAL CONSERVANCY. Staff Recommendation May 24, 2012 PIGEON POINT LIGHT STATION RESTORATION PLANNING COASTAL CONSERVANCY Staff Recommendation May 24, 2012 PIGEON POINT LIGHT STATION RESTORATION PLANNING Project No. 12-010-01 Project Manager: Janet Diehl RECOMMENDED ACTION: Disbursement of up to $200,000

More information

Creating Complete Roadway Corridors:

Creating Complete Roadway Corridors: Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee

More information

A. WHAT IS A GENERAL PLAN?

A. WHAT IS A GENERAL PLAN? I. Introduction A. WHAT IS A GENERAL PLAN? A general plan is the planning guideline for the future of a city. It contains goals and policies which regulate urban development, the protection of the natural

More information

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose: Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:

More information

San Diego River Coalition 2012 Work Plan

San Diego River Coalition 2012 Work Plan San Diego River Coalition 2012 Work Plan Adopted November 18, 2011 The mission of the San Diego River Coalition is preserve and enhance the San Diego River, its watershed, and its natural, cultural and

More information

Office of Greenways & Trails Providing Statewide Leadership and Coordination. Southeast Greenways and Trails Summit October 1-3, 2017

Office of Greenways & Trails Providing Statewide Leadership and Coordination. Southeast Greenways and Trails Summit October 1-3, 2017 Office of Greenways & Trails Providing Statewide Leadership and Coordination Southeast Greenways and Trails Summit October 1-3, 2017 1 Office of Greenways and Trails The Office of Greenways and Trails

More information

Intergovermental Coordination

Intergovermental Coordination Intergovermental Coordination CITY OF WINTER PARK CHAPTER 8: INTERGOVERNMENTAL COORDINATION ELEMENT INTERGOVERNMENTAL COORDINATION ELEMENT GOAL 8-1: PROVIDE FOR IMPROVED INTERGOVERNMENTAL COORDINATION

More information

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference Scarborough Subway Extension Final Terms of Reference 1 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from

More information

New Partners for Smart Growth Conference February 5, 2010

New Partners for Smart Growth Conference February 5, 2010 Dan Stroh, Planning Director City of Bellevue Planning and Community Development Bellevue, WA New Partners for Smart Growth Conference February 5, 2010 Summary of Project Long-range plan update for Bel-Red

More information

DRAFT MAP AMENDMENT FLU 04-4

DRAFT MAP AMENDMENT FLU 04-4 DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,

More information

Report to: Development Services Committee Report Date: April 24, 2017

Report to: Development Services Committee Report Date: April 24, 2017 SUBJECT: Cornell Rouge National Urban Park Gateway - Report on Design Charrette and Next Steps PREPARED BY: Lilli Duoba, MES, MCIP, RPP, Manager, Natural Heritage (ext. 7925) REVIEWED BY: Marg Wouters,

More information

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Streets for People, Place-Making and Prosperity.  #TOcompletestreets COMPLETE STREETS FOR TORONTO Streets for People, Place-Making and Prosperity COMPLETE STREETS: A NEW APPROACH A Complete Streets design approach considers the needs of all users people who walk, bicycle,

More information

City of Hermosa Beach Administrative Policy #

City of Hermosa Beach Administrative Policy # City of Hermosa Beach Administrative Policy # SUBJECT: Living Streets Policy Date: Approved by: City Council Authority: Public Works Department & Community Development Department Mayor, PURPOSE The City

More information

Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017

Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017 Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017 Presented By Rob Jordan Lake Manager U.S. Army Corps of Engineers Fort Worth District US Army Corps of Engineers Purpose

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving the removal of Municipal Railway bus zones at various

More information

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL R-1: DEVELOP A RECREATION, OPEN SPACE AND GREENWAYS SYSTEM AS AN INTEGRAL COMPONENT OF AN OVERALL, COUNTY-WIDE ECONOMIC

More information

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Rezoning Transportation Analysis Petition Number: General Location Identifier: From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Kory Hedrick, PE, PMP Khedrick@charlottenc.gov 704-432-6511 CDOT s review of this rezoning petition is intended to

More information

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE TABLE OF CONTENTS SECTION TITLE PAGE 1 INTRODUCTION AND OVERVIEW 1-1 1.1 Purpose and Need 1-1 1.2 Goals and Objectives 1-3 1.3 Overview of the Planning Process 1-5 1.4 Federal and State Requirements and

More information

Parks, Trails, and Open Space Element

Parks, Trails, and Open Space Element P arks, Recreation, and Open Space are important components of the quality of life desired by the residents of Elk Grove. This Element of the General Plan addresses the City s goals, policies, and actions

More information

Indian River Town Meeting Held June 6, 2017 The following are responses to issues, grouped under headings, raised at the Indian River Town Meeting.

Indian River Town Meeting Held June 6, 2017 The following are responses to issues, grouped under headings, raised at the Indian River Town Meeting. Indian River Town Meeting Held June 6, 2017 The following are responses to issues, grouped under headings, raised at the Indian River Town Meeting. Atlantic Coastal Pipeline/Southside Connector Distribution

More information

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES Introduction This River Conservation Plan was developed during a time of tremendous activity and effort in planning the transformation of the Delaware

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2 DATE: January 27, 2017 SUBJECT: The Virginia Department of Transportation s Transform I-66 Inside the

More information

SECTION 4(f) DE MINIMIS DOCUMENTATION

SECTION 4(f) DE MINIMIS DOCUMENTATION SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)

More information

Flooding Hearing: Long and Short Term Strategies

Flooding Hearing: Long and Short Term Strategies Services of the San Francisco Public Utilities Commission Flooding Hearing: Long and Short Term Strategies Presentation to San Francisco Board of Supervisors Public Safety and Neighborhood Services Subcommittee

More information

Enhance the High Line Canal Projects

Enhance the High Line Canal Projects Enhance the High Line Canal Projects Joint Project Proposal for Arapahoe County Open Spaces Funding Partner Sponsors: South Suburban Park and Recreation District City of Centennial City of Littleton October

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information