NAPA COUNTY LAND USE PLAN

Size: px
Start display at page:

Download "NAPA COUNTY LAND USE PLAN"

Transcription

1 N Graphics

2 NAPA COUNTY LAND USE PLAN * 3646 SMR VINEYARDS WINERY SCALE IN MILES 2 LEGEND * URBANIZED OR NON-AGRICULTURAL Study Area Cities Urban Residential Rural Residential Industrial See Action Item AG/LU regarding agriculturally * * Public-Institutional Napa Pipe Mixed Use OPEN SPACE Agricultural Resource APN B UP TRANSPORTATION L F Mineral Resource Limited Access Highway Major Road American Canyon ULL City of Napa RUL Landfill - General Plan Secondary Road Airport Railroad Airport Clear Zone P14-327_SMR_Vineyards_up1.cdr

3 3646 SMR VINEYARDS WINERY Driveway Driveway STONY HILL VINEYARD BARNETT VINEYARDS SMITH MADRONE VINEYARDS Driveway APN Ac. Driveway AW Driveway SCHWEIGER VINEYARDS # 3646 SMR VINEYARD ROBERT KEENAN WINERY PALOMA VINEYARD Driveway GUILLIAMS LOKOYA DOMAINE CHARBAY WINERY PHILIP VINEYARD Langtry Rd Legend Wineries [ Status Producing Producing, with pending major mod $ Approved # Pending Unknown Zoning Parcels Feet 6 1,2 2,4 3,6 4,8 Napa County Conservation P14-327_SMR_Vineyards_up1.cdr B UP Development and Planning Department

4 3646 SMR VINEYARDS WINERY Existing Conditions Napa County Conservation B UP Development and Planning Department P14-327_SMR_Vineyards_up1.cdr

5 21 APPLIED CIVIL ENGINEERING INCORPORATED 3646 SMR VINEYARD WINERY USE PERMIT CONCEPTUAL SITE PLANS SCALE: 1" = 2,' REG I S F TE RE OR R C VIE U O W SE N ST N PE RU OT RM C FO IT TI O R N (STATE OF CALIFORNIA DEPARTMENT OF PARKS AND RECREATION) DESIGNED BY: M VINEYARD AREA CLEARED UNDER ECP #98233 BUT NOT YET PLANTED (1.± ACRES) (2,9 SF) 7 SEPTIC SYSTEM TEST PIT (TYP) TP #2 TP #8 (E) LEACH FIELD (APPROXIMATE) 7 + SS 1 2+ ' TP #3 1+ TP #4 SEE SHEET C6 SEE SHEET C4 FOR (E) ONSITE DRIVEWAY & (P) IMPROVEMENTS '± + 1 ' APPROXIMATE PROP PRO (E) HOUSE WELL PERT Y LIN E TEST PITS ONE THROUGH EIGHT (TP #1 - TP #8) WERE EXCAVATED BY R.D. SHERILL INC. ON NOVEMBER 7, 2 AND WERE WITNESSED BY MIKE MUELRATH OF APPLIED CIVIL ENGINEERING INCORPORATED AND A REPRESENTATIVE OF THE NAPA COUNTY PLANNING, BUILDING AND ENVIRONMENTAL SERVICES DEPARTMENT ENVIRONMENTAL HEALTH DIVISION (SEE E-72). 2. FADED BACKGROUND REPRESENTS EXISTING TOPOGRAPHIC FEATURES. THE TOPOGRAPHIC INFORMATION AND APRIL 9, 211 AERIAL PHOTOGRAPHS SHOWN ON THE OVERALL SITE PLAN WERE OBTAINED FROM THE NAPA COUNTY GEOGRAPHIC INFORMATION SYSTEM (GIS) DATABASE. THE TOPOGRAPHIC INFORMATION SHOWN ON THE REMAINING SHEETS WAS OBTAINED FROM THE "MAP OF TOPOGRAPHY OF A PORTION OF THE LANDS OF 3646 SPRING MOUNTAIN ROAD" PREPARED BY ALBION SURVEYS, INC., DATED JUNE 23, 214. APPLIED CIVIL ENGINEERING INCORPORATED ASSUMES NO LIABILITY REGARDING THE ACCURACY OR COMPLETENESS OF THE TOPOGRAPHIC INFORMATION NOTES: VINEYARD AREA SUITABLE FOR TREATED PROCESS WASTE IRRIGATION 2 7 (.± ACRES) APN (MICHAEL C. KEENAN) OVERALL SITE PLAN OVERALL SITE PLAN DRIVEWAY PLAN STA 1+ TO STA 23+ DRIVEWAY PLAN STA 23+ TO STA 34+ DRIVEWAY STA + TO STA + WINERY CONCEPTUAL SITE PLAN IMPERVIOUS AREA EXHIBIT 7 SEE SHEET C4 FOR (E) ONSITE DRIVEWAY & (P) IMPROVEMENTS (P) Domestic Water Tank Alternate Location ESTIMATED VOLUME = 3, TO, GALLONS 6+ MAT E OXI (P) FIRE PROTECTION WATER TANK(S) 2 + 1' WELL SETBACK C1 C2 C3 C4 C C6 (P) Domestic Water Tank 7 (,8 SF) SHEET INDEX: 8 TP # 2 TP #6 2 ' 1' WELL SETBACK 7 (E) SPRING 1 (P) SUBSURFACE DRIP DISPOSAL FIELD & 1% RESERVE AREA 1' SETBACK FROM POND TOP OF BANK (TYP) 19 NO (E) POND 1 APPR G:\Projects\-143 Andrew Rudd\Drawings\_In Progress\Use Permit\-143con_OSP.dwg, 2/2/21 :42:3 PM, DWG To PDF.pc3 676'± PROPOSED WINERY (E) "IRRIGATION" WELL 7 1 1' WELL SETBACK (E) BUILDING TO BE REMOVED ERTY LINE APPROXIMATE PROPERTY LINE 1 1 (E) RESIDENCE TO REMAIN 1 APPROXIMATE PROPERTY LINE (3646 SMR VINEYARD LLC) 1 7 (HERNE ROAD LLC) SS (1.8± ACRES) APN TP #7 VINEYARD AREA SUITABLE FOR TREATED PROCESS WASTE IRRIGATION APN (.8± ACRES) (MICHAEL C. KEENAN) 1 APN TP # APPROXIMATE PROPERTY LINE VINEYARD AREA SUITABLE FOR TREATED PROCESS WASTE IRRIGATION (P) 1% RESERVE AREA PROPERTY OWNER & APPLICANT: 3646 SMR VINEYARD LLC CARE OF: ANDREW RUDD 2 NORTH CALIFORNIA BOULEVARD #4 WALNUT CREEK, CA 9496 SITE ADDRESS: 3646 SPRING MOUNTAIN ROAD SAINT HELENA, CA 9474 ASSESSOR'S PARCEL NUMBER: PARCEL SIZE: 6.7± ACRES PROJECT SIZE: 1.7± ACRES ZONING: AGRICULTURAL WATERSHED (AW) DOMESTIC WATER SOURCE: PRIVATE WELL FIRE PROTECTION WATER SOURCE: STORAGE TANK WASTEWATER DISPOSAL: ONSITE TREATMENT AND DISPOSAL PROJECT INFORMATION: SCALE: 1" = 2,' LOCATION MAP '± EK CHECKED BY: 1 7 E CR ILL DRAWN BY: BT DRAFTING (E) DRIVEWAY TO SPRING MOUNTAIN ROAD. SEE SHEETS C2 THROUGH C4 FOR PROPOSED IMPROVEMENTS APPROXIMATE PROPERTY LINE 2 14 SITE 7 APN SEE LOCATION MAP ABOVE RIGHT AND SHEETS C2 THROUGH C3 FOR DRIVEWAY TO SPRING MOUNTAIN ROAD & PROPOSED IMPROVEMENTS CONTOUR INTERVAL: DATE: JANUARY 1, 21 JOB NUMBER: -143 FILE: -143CON_OSP.DWG SHEET C1: FIVE () FEET, HIGHLIGHTED EVERY TWENTY FIVE (2) FEET ORIGINAL SIZE: 24" X 36" REMAINING SHEETS: ONE (1) FOOT, HIGHLIGHTED EVERY FIVE () FEET SCALE: BENCHMARK: SHEET C1: VERTICAL DATUM BASED ON NAVD 88 REMAINING SHEETS: VERTICAL DATUM ASSUMED 4. THE PROPERTY LINES SHOWN ON THESE PLANS DO NOT REPRESENT A BOUNDARY SURVEY. THEY ARE APPROXIMATE AND ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. 8. ACCORDING TO FEMA FIRM COMMUNITY PANEL 6C24E THE SUBJECT PARCEL IS DETERMINED TO BE OUTSIDE OF THE YEAR FLOOD BOUNDARY. SEE FEMA FIRM COMMUNITY PANEL 6C24E FOR MORE INFORMATION. SCALE: 1" = 1' USE PERMIT CONCEPTUAL SITE PLANS OVERALL SITE PLAN M 3646 SMR VINEYARD WINERY 3646 SMR VINEYARD LLC 3646 SPRING MOUNTAIN ROAD SAINT HELENA, CA 9474 NAPA COUNTY APN K 2 ILL CR NO Exp. /31/2 NEER EE 7 1 F ESS I ON PRO AL GI EN ED AS NOTED SHEET NUMBER: C1 OF 6

6 21 APPLIED CIVIL ENGINEERING INCORPORATED 3646 SMR VINEYARD WINERY USE PERMIT CONCEPTUAL SITE PLANS SCALE: 1" = 2,' REG I S F TE RE OR R C VIE U O W SE N ST N PE RU OT RM C FO IT TI O R N (STATE OF CALIFORNIA DEPARTMENT OF PARKS AND RECREATION) DESIGNED BY: VINEYARD AREA CLEARED UNDER ECP #98233 BUT NOT YET PLANTED (1.± ACRES) (2,9 SF) SEPTIC SYSTEM TEST PIT (TYP) 7 + SS 1 TP # '± TP #4 PROPOSED WINERY SEE SHEET C6 (E) POND 1+ 1 ' PRO (E) HOUSE WELL PERT Y LIN E ESTIMATED VOLUME = 3, TO, GALLONS 6+ MAT E SEE SHEET C4 FOR (E) ONSITE DRIVEWAY & (P) IMPROVEMENTS FADED BACKGROUND REPRESENTS EXISTING TOPOGRAPHIC FEATURES. THE TOPOGRAPHIC INFORMATION AND APRIL 9, 211 AERIAL PHOTOGRAPHS SHOWN ON THE OVERALL SITE PLAN WERE OBTAINED FROM THE NAPA COUNTY GEOGRAPHIC INFORMATION SYSTEM (GIS) DATABASE. THE TOPOGRAPHIC INFORMATION SHOWN ON THE REMAINING SHEETS WAS OBTAINED FROM THE "MAP OF TOPOGRAPHY OF A PORTION OF THE LANDS OF 3646 SPRING MOUNTAIN ROAD" PREPARED BY ALBION SURVEYS, INC., DATED JUNE 23, 214. APPLIED CIVIL ENGINEERING INCORPORATED ASSUMES NO LIABILITY REGARDING THE ACCURACY OR COMPLETENESS OF THE TOPOGRAPHIC INFORMATION (MICHAEL C. KEENAN) APN TEST PITS ONE THROUGH EIGHT (TP #1 - TP #8) WERE EXCAVATED BY R.D. SHERILL INC. ON NOVEMBER 7, 2 AND WERE WITNESSED BY MIKE MUELRATH OF APPLIED CIVIL ENGINEERING INCORPORATED AND A REPRESENTATIVE OF THE NAPA COUNTY PLANNING, BUILDING AND ENVIRONMENTAL SERVICES DEPARTMENT ENVIRONMENTAL HEALTH DIVISION (SEE E-72). Potential oak tree replanting areas (typ) (.± ACRES) VINEYARD AREA SUITABLE FOR TREATED PROCESS WASTE IRRIGATION 2 NOTES: OVERALL SITE PLAN OVERALL SITE PLAN DRIVEWAY PLAN STA 1+ TO STA 23+ DRIVEWAY PLAN STA 23+ TO STA 34+ DRIVEWAY STA + TO STA + WINERY CONCEPTUAL SITE PLAN IMPERVIOUS AREA EXHIBIT 7 OXI (P) FIRE PROTECTION WATER TANK(S) 2 + APPR C1 C2 C3 C4 C C6 + 7 APPROXIMATE PROP SHEET INDEX: 8 1' WELL SETBACK ERTY LINE APPROXIMATE PROPERTY LINE 7 TP # (,8 SF) Potential oak tree replanting areas (typ) TP #6 2 ' 1 (P) SUBSURFACE DRIP DISPOSAL FIELD & 1% RESERVE AREA 1' WELL SETBACK 2 (E) SPRING 7 1' SETBACK FROM POND TOP OF BANK (TYP) 19 1 Potential oak tree replanting areas (typ) SEE SHEET C4 FOR (E) ONSITE DRIVEWAY & (P) IMPROVEMENTS NO (E) "IRRIGATION" WELL 7 1 1' WELL SETBACK (E) BUILDING TO BE REMOVED G:\Projects\-143 Andrew Rudd\Drawings\_In Progress\Use Permit\-143con_OSP.dwg, 2/2/21 :42:3 PM, DWG To PDF.pc ' (3646 SMR VINEYARD LLC) 1 (E) RESIDENCE TO REMAIN 423'± 1 (E) LEACH FIELD (APPROXIMATE) 1 SS (1.8± ACRES) (HERNE ROAD LLC) APPROXIMATE PROPERTY LINE 147 TP #7 VINEYARD AREA SUITABLE FOR TREATED PROCESS WASTE IRRIGATION APN TP #2 2 1 TP #1 TP #8 APN APPROXIMATE PROPERTY LINE (.8± ACRES) (MICHAEL C. KEENAN) 7 (P) 1% RESERVE AREA APN '± 14 PROPERTY OWNER & APPLICANT: 3646 SMR VINEYARD LLC CARE OF: ANDREW RUDD 2 NORTH CALIFORNIA BOULEVARD #4 WALNUT CREEK, CA 9496 SITE ADDRESS: 3646 SPRING MOUNTAIN ROAD SAINT HELENA, CA 9474 ASSESSOR'S PARCEL NUMBER: PARCEL SIZE: 6.7± ACRES PROJECT SIZE: 1.7± ACRES ZONING: AGRICULTURAL WATERSHED (AW) DOMESTIC WATER SOURCE: PRIVATE WELL FIRE PROTECTION WATER SOURCE: STORAGE TANK WASTEWATER DISPOSAL: ONSITE TREATMENT AND DISPOSAL 1 VINEYARD AREA SUITABLE FOR TREATED PROCESS WASTE IRRIGATION PROJECT INFORMATION: 2 1 SCALE: 1" = 2,' LOCATION MAP CHECKED BY: 1 M EEK CR L IL DRAWN BY: BT DRAFTING (E) DRIVEWAY TO SPRING MOUNTAIN ROAD. SEE SHEETS C2 THROUGH C4 FOR PROPOSED IMPROVEMENTS APPROXIMATE PROPERTY LINE 2 14 SITE 7 APN SEE LOCATION MAP ABOVE RIGHT AND SHEETS C2 THROUGH C3 FOR DRIVEWAY TO SPRING MOUNTAIN ROAD & PROPOSED IMPROVEMENTS CONTOUR INTERVAL: DATE: JANUARY 1, 21 JOB NUMBER: -143 FILE: -143CON_OSP.DWG SHEET C1: FIVE () FEET, HIGHLIGHTED EVERY TWENTY FIVE (2) FEET ORIGINAL SIZE: 24" X 36" REMAINING SHEETS: ONE (1) FOOT, HIGHLIGHTED EVERY FIVE () FEET SCALE: BENCHMARK: SHEET C1: VERTICAL DATUM BASED ON NAVD 88 REMAINING SHEETS: VERTICAL DATUM ASSUMED 4. THE PROPERTY LINES SHOWN ON THESE PLANS DO NOT REPRESENT A BOUNDARY SURVEY. THEY ARE APPROXIMATE AND ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. 8. ACCORDING TO FEMA FIRM COMMUNITY PANEL 6C24E THE SUBJECT PARCEL IS DETERMINED TO BE OUTSIDE OF THE YEAR FLOOD BOUNDARY. SEE FEMA FIRM COMMUNITY PANEL 6C24E FOR MORE INFORMATION. SCALE: 1" = 1' USE PERMIT CONCEPTUAL SITE PLANS OVERALL SITE PLAN M 3646 SMR VINEYARD WINERY 3646 SMR VINEYARD LLC 3646 SPRING MOUNTAIN ROAD SAINT HELENA, CA 9474 NAPA COUNTY APN K 2 ILL CR NO Exp. /31/2 NEER EE 7 1 F ESS I ON PRO AL GI EN ED AS NOTED SHEET NUMBER: C1 OF 6

7 21 APPLIED CIVIL ENGINEERING INCORPORATED MATCHLINE STA + REG I STERED PROFESS IONA L NO Exp. /31/2 FOR USE PERMIT ENG I NEER REVIEW NOT FOR CONSTRUCTION DESIGNED BY: DRAWN BY: BT DRAFTING CHECKED BY: DRIVEWAY WIDENING CONCEPT PLAN STA 1+ TO STA + SCALE: 1" = 2' LEGEND: COMPACTED CLASS 2 AB SHOULDER 3646 SMR VINEYARD WINERY USE PERMIT CONCEPTUAL SITE PLANS COBBLE LINED DRAINAGE SWALE G:\Projects\-143 Andrew Rudd\Drawings\_In Progress\Use Permit\-143con_DRWY-1.dwg, 2/2/21 :43: PM, DWG To PDF.pc3 MATCHLINE STA + DRIVEWAY WIDENING CONCEPT PLAN STA + TO STA 23+ SCALE: 1" = 2' MATCHLINE STA SMR VINEYARD LLC 3646 SPRING MOUNTAIN ROAD SAINT HELENA, CA 9474 NAPA COUNTY APN DATE: JANUARY 1, 21 JOB NUMBER: -143 FILE: -143CON_DRWY-1.DWG ORIGINAL SIZE: 24" X 36" SCALE: AS NOTED SHEET NUMBER: C2 OF 6

8 21 APPLIED CIVIL ENGINEERING INCORPORATED MATCHLINE STA 23+ REG I STERED PROFESS IONA L NO Exp. /31/2 FOR USE PERMIT ENG I NEER REVIEW NOT FOR CONSTRUCTION MATCHLINE STA 29+ DESIGNED BY: DRAWN BY: BT DRAFTING CHECKED BY: DRIVEWAY WIDENING CONCEPT PLAN STA 23+ TO STA 29+ SCALE: 1" = 2' LEGEND: COMPACTED CLASS 2 AB SHOULDER COBBLE LINED DRAINAGE SWALE APPROXIMATE 4' WIDE RIGHT OF WAY ALONG EXISTING OCCUPATIONAL CENTERLINE 3646 SMR VINEYARD WINERY USE PERMIT CONCEPTUAL SITE PLANS G:\Projects\-143 Andrew Rudd\Drawings\_In Progress\Use Permit\-143con_DRWY-2.dwg, 2/2/21 :43:28 PM, DWG To PDF.pc3 MATCHLINE STA 29+ DRIVEWAY WIDENING CONCEPT PLAN STA 29+ TO STA 34+ SCALE: 1" = 2' MATCHLINE STA SMR VINEYARD LLC 3646 SPRING MOUNTAIN ROAD SAINT HELENA, CA 9474 NAPA COUNTY APN DATE: JANUARY 1, 21 JOB NUMBER: -143 FILE: -143CON_DRWY-2.DWG ORIGINAL SIZE: 24" X 36" SCALE: AS NOTED SHEET NUMBER: C3 OF 6

9 21 APPLIED CIVIL ENGINEERING INCORPORATED MATCHLINE STA 6+ (E) GRAVEL DRIVEWAY (E) PAVED DRIVEWAY (E) TREES LIMIT FURTHER WIDENING (P) DRIVEWAY ' 1'± (E) DRIVEWAY (E) TREES LIMIT FURTHER WIDENING REG I STERED PROFESS IONA L NO Exp. /31/2 DESIGNED BY: ENG I NEER FOR USE PERMIT REVIEW NOT FOR CONSTRUCTION NOTE: (P) DRIVEWAY WIDTHS INCLUDE PAVED SURFACE AND SHOULDERS. A MAXIMUM OF 2' OF THE PROPOSED WIDTH SHALL BE USED FOR SHOULDERS. DRAWN BY: BT DRAFTING CHECKED BY: NOTE: IT IS INTENDED THAT ALL TREES OUTSIDE OF THE LIMITS OF GRADING WILL BE SAVED HOWEVER, EARTHWORK FOR DRIVEWAY CONSTRUCTION MAY IMPACT TREES AND LEAD TO REMOVAL OF ADDITIONAL TREES THAT ARE ADJACENT TO THE LIMITS OF WORK. (E) GRAVEL DRIVEWAY (E) PAVED DRIVEWAY DRIVEWAY WIDENING CONCEPT PLAN STA + TO STA 6+ SCALE: 1" = 2' MATCHLINE STA 34+ SECTION A-A SCALE: 1" = 1' 3646 SMR VINEYARD WINERY USE PERMIT CONCEPTUAL SITE PLANS G:\Projects\-143 Andrew Rudd\Drawings\_In Progress\Use Permit\-143con_DRWY-4.dwg, 2/2/21 :44:23 PM, DWG To PDF.pc3 NOTE: IT IS INTENDED THAT ALL TREES OUTSIDE OF THE LIMITS OF GRADING WILL BE SAVED HOWEVER, EARTHWORK FOR DRIVEWAY CONSTRUCTION MAY IMPACT TREES AND LEAD TO REMOVAL OF ADDITIONAL TREES THAT ARE ADJACENT TO THE LIMITS OF WORK. DRIVEWAY WIDENING CONCEPT PLAN STA 6+ TO STA + SCALE: 1" = 2' NOTE: (P) DRIVEWAY WIDTHS INCLUDE PAVED SURFACE AND SHOULDERS. A MAXIMUM OF 2' OF THE PROPOSED WIDTH SHALL BE USED FOR SHOULDERS. MATCHLINE STA SMR VINEYARD LLC 3646 SPRING MOUNTAIN ROAD SAINT HELENA, CA 9474 NAPA COUNTY APN DATE: JANUARY 1, 21 JOB NUMBER: -143 FILE: -143CON_DRWY-4.DWG ORIGINAL SIZE: 24" X 36" SCALE: AS NOTED SHEET NUMBER: C4 OF 6

10 21 APPLIED CIVIL ENGINEERING INCORPORATED REG I STERED PROFESS IONA L NO Exp. /31/2 ENG I NEER FOR USE PERMIT REVIEW NOT FOR CONSTRUCTION DESIGNED BY: DRAWN BY: BT DRAFTING CHECKED BY: 3646 SMR VINEYARD WINERY USE PERMIT CONCEPTUAL SITE PLANS WINERY CONCEPTUAL SITE PLAN G:\Projects\-143 Andrew Rudd\Drawings\_In Progress\Use Permit\-143con_SITE.dwg, 2/2/21 :4:27 PM, DWG To PDF.pc3 WINERY CONCEPTUAL SITE PLAN SCALE: 1" = 2' 3646 SMR VINEYARD LLC 3646 SPRING MOUNTAIN ROAD SAINT HELENA, CA 9474 NAPA COUNTY APN DATE: JANUARY 1, 21 JOB NUMBER: -143 FILE: -143CON_SITE.DWG ORIGINAL SIZE: 24" X 36" SCALE: AS NOTED SHEET NUMBER: C OF 6

11 21 APPLIED CIVIL ENGINEERING INCORPORATED REG I STERED PROFESS IONA L NO Exp. /31/2 ENG I NEER FOR USE PERMIT REVIEW NOT FOR CONSTRUCTION DESIGNED BY: DRAWN BY: BT DRAFTING CHECKED BY: 42,83± SF 4,76± SF WINERY COVERAGE AREA WINERY DEVELOPMENT AREA 3646 SMR VINEYARD WINERY USE PERMIT CONCEPTUAL SITE PLANS IMPERVIOUS SURFACE EXHIBIT G:\Projects\-143 Andrew Rudd\Drawings\_In Progress\Use Permit\-143con_IMPERV.dwg, 2/2/21 :4:2 PM, DWG To PDF.pc3 IMPERVIOUS SURFACE EXHIBIT SCALE: 1" = 4' 3646 SMR VINEYARD LLC 3646 SPRING MOUNTAIN ROAD SAINT HELENA, CA 9474 NAPA COUNTY APN DATE: JANUARY 1, 21 JOB NUMBER: -143 FILE: -143CON_IMPERV.DWG ORIGINAL SIZE: 24" X 36" SCALE: AS NOTED SHEET NUMBER: C6 OF 6

12 Irrigation Notes DIRT 1. Irrigation system shall be installed in conformance with all applicable state and local codes and ordinances, by licensed contractors and experienced workers. The contractor shall coordinate with related contractors to complete the entire irrigation system, including the electrical hook-up for automatic controller. The contractor shall obtain and pay for all required permits and fees relating to the work. 2. Spray irrigation shall be used unless noted otherwise. Pop-up heads shall be used adjacent to all drives, paths, and in all lawn areas. Coordinate all irrigation types with the landscape architect. New trees shall be irrigated with bubblers, 2 per tree, see legend for bubbler type. Bubblers shall be included on that area's valve (the tree will be watered during that area's water cycle). 3. The contractor shall install a "design build" underground automatic irrigation system. Areas noted are valving guides only and are to illustrate different water requirements of microclimates. The system shall have 1% coverage for planting areas on the site. An as-built drawing is to be provided to the landscape architect upon completion and acceptance of the irrigation system. Locate spray heads 24" from buildings and " from paving. Use MPR series nozzles by Hunter on spray bodies to match existing standards. 4. The contractor shall install complete and coordinated equipment. No partial substitutions or incomplete components shall be installed.. The contractor shall verify all existing conditions and water pressure. The contractor shall verify the location of existing underground utilities and structures prior to the excavation of trenches or holes. Contractor is to repair any damage caused by or during the performance of this work at no additional cost to the owner. existing rock stack to remain Point of Connection - coordinate with winery improvements existing tree to remain 6. The irrigation plan is diagrammatic. Parallel pipes may be installed in a common trench. Pipes shall have 3" horizontal separation, and are not to be installed directly above one another. Adjust heads to achieve best coverage. Locate piping in planting areas whenever possible. Valve boxes shall be in groundcover/shrub areas. They shall not be located in any lawn area. 7. All pipes shall be schedule 4 pvc or upgraded. existing residence to remain dg terrace steps steps C Irrigation Legend symbol description remarks main line 2" dia, sch 4 pvc, solvent weld joints by IPS glue and primer lateral line sch 4 pvc, size varies, solvent weld by IPS glue and primer landing W I N E R Y existing rock stack to remain access sleeve backflow preventer 4" dia sch 4 pvc, " cover, extend 24" beyond paving and mark with stakes above grade Febco 82Y or equal, installed on galv risers and fittings for stability remote control valve Hunter ICV filter sentry series with 3M wire splice kits shut off valve at valve manifold: 2" plastic butterfly valve submit sample, in Carson valve box on main: American Flow Control 2 series, RWGV1, in Carson valve box deck covered receiving C hose bibb controller Rainbird 33DNP, 3/4" quick coupler in Carson valve box provide - 33DK valve key with SH adapter and cover keys Hunter ACC decoder controller, with ICR remote control *** review valve and controller system carefully *** TBD spray head Hunter MPR series rotating nozzles shrub / meadow body Hunter INST CV, " pop up with check valve, with 24" cobra fitting existing tree to remain Partial Site Plan Scale: 1" = 2 ft 2 4 FT CLEAVER DESIGN 3646 SMR Vineyard Winery Napa County landscape architects 1 Vacation Drive Lafayette, CA 9449 P CA reg # 414 Irrigation Plan L-2 1 8SEP214 issued for review No. Date Issue Notes This drawing is the property of Cleaver Design Associates. Any unauthorized use in part or in whole without written permission is prohibited.

13 Instructions Rudd Winery Project, Lafayette, CA Maximum Applied Water Allowance Calculations for New and Rehabilitated Landscapes DIRT Cells with pale blue background are for entering data Enter value in Pale Blue Cells Results show in cells with tan background Messages and warnings are displayed in cells with yellow background 1) Select city by clicking on pale blue cell and Tan Cells Show Results Messages and Warnings choosing a city from the drop down menu Click on the blue cell on right to Pick City Name St Helena Name of City ETo appears in the tan cell below the name of the city ETo of City from Appendix A 44.1 ET 2) Enter total landscape area, including Special Landscape Area (SLA) Enter total landscape including SLA 11,78. LA (ft SLA means an area of the landscape dedicated solely to edible plants, areas irrigated with recycled water, water features using recycled water and areas dedicated to active play such as parks, sports fields, golf courses, and where turf provides a playing surface. 3) Enter square footage of SLA, if any Enter Special Landscape Area. SLA (ft Required for additional water for SLA (.3 ETAF accounts for the additional water) Results: 4) MAWA results appear in the tan cells MAWA = (ET 22,41.33 Gallons 3,1.9 Cubic Feet 31.1 HCF.69 Acre-feet.23 Millions of Gallons existing rock stack to remain existing tree to remain MAWA calculation incorporating Effective Precipitation (Optional) existing residence to remain dg terrace steps steps Hydrozone 1 - Seeded Area-2946 sq ft Hydrozone 1 - Seeded Area-264 sq ft ) If you are considering effective precipitation (Eppt), enter the value. Eppt is 2% of total annual ETo of City from Appendix A Landscape Area Special Landscape Area Rudd Winery Project, St Helena, CA 44.1 ET 11,78. LA (ft. SLA (ft precipitation Enter Effective Precipitation. Eppt (in/yr) 6) For comparison, MAWA without effective precipitation is displayed below MAWA without Eppt (Gallons) Results: 22,41.33 MAWA=(ET - Gallons - Cubic Feet - HCF - Acre-feet - Millions of Gallons -Olea 'Swan Hill' landing Hydrozone 2-66 sq ft 2-ARC EME 1-ARC HOW 1-LAV PRO W I N E R Y existing rock stack to remain Estimated Total Water Use Equation: ETWU = (ET Cleaver Design Associates RLA Enter values in Pale Blue Cells Tan Cells Show Results Messages and Warnings Enter Irrigation Efficiency (equal to or greater than.71).8 Hydrozone 1 - Seeded Area-74 sq ft Hydrozone 2-64 sq ft -ARC EME 8-ARC HOW 8-LAV PRO deck covered receiving Irrigation Efficiency Default Value.71 Plant Water Use Type Plant Factor Low -.3 Medium High.7-1. SLA 1. Hydrozone Plant Water Use Type (s) (low, medium, high) Plant Factor (PF) Hydrozone Area (HA) (ft PF x HA (ft 1 Medium.4 1, Low.2 1,1 2,38 3,192 SLA 1 Sum 11,78 Hydrozone 2-1 sq ft 2-ARC EME 1-ARC HOW 1-LAV PRO existing tree to remain Results MAWA = 22,41 ETWU= 2,434 Gallons ETWU complies with MAWA,367 Cubic Feet 4 HCF.38 Acre-feet. Millions of Gallons Hydrozone 1 - Seeded Area-227 sq ft Cleaver Design Associates RLA Hydrozone 1 - Seeded Area-23 sq ft 7-Olea 'Swan Hill' Hydrozone 1 - Seeded Area-3389 sq ft Partial Site Plan Scale: 1" = 2 ft 2 4 FT Planting Notes 1. All new planting areas shall receive 1% coverage from an automatic, underground irrigation system. The system shall be valved with similar planting and sun/shade conditions. All new trees shall be watered with bubblers. 2. The landscape contractor shall perform an agricultural suitability test for the existing soil. The landscape contractor shall amend the soil per the recommendations in the report. 3. All planting area finished grades with a slope of 3:1 or greater shall receive a layer of jute mesh placed under the mulch, secured with metal staples. 4. Planting areas shall receive a 2" layer of % compost and % mini mulch fir bark. This should be spread after container planting. The contractor shall provide a sample to the landscape architect prior to shipping to site.. These drawings are based on information supplied by the Taylor Lombardo Architects LLC and Applied Civil Engineering Inc. Plant List Trees OLE SH Olea 'Swan Hill' Fruitless Olive 24" box Y L Category ARC EME Arctostaphylos 'Emerald Carpet' Emerald Carpet Manzanita 39 1 gallon Y Y L Shrubs ARC HOW Arctostaphylos densiflora 'Howard McMinn' Howard McMinn Manzanita 19 1 gallon Y Y L Perennials LAV PRO Lavandula x intermedia 'Provence' Provence French Lavender 19 1 gallon Y L CLEAVER DESIGN landscape architects 1 Vacation Drive Lafayette, CA 9449 P CA reg # SMR Vineyard Winery Napa County Landscape Plan L-1 1 8SEP214 issued for review No. Date Issue Notes This drawing is the property of Cleaver Design Associates. Any unauthorized use in part or in whole without written permission is prohibited.

14 Design Concept Sketch (not to scale) Project Team CLIENT: PLANNING/PERMITS: CIVIL ENGINEER: 3646 SMR Vineyard LLC Andrew Rudd PLANS 4 WINE Donna Olford APPLIED CIVIL ENGINEERING 2 North California Blvd. Ste 4 Walnut Creek, CA Pinot Way St. Helena, CA 9474 T: dboldford@aol.com LANDSCAPE ARCHITECT: ARCHITECT: CLEAVER DESIGN ASSOCIATES Bob Cleaver TAYLOR LOMBARDO ARCHITECTS LLP 1 Vacation Drive Lafayette, CA 9449 T: F: bob@cleaverdesign.com Tom Taylor x2 Maggie Judge x29 Mike Muelrath N 274 West Lincoln Avenue Napa, CA 948 T: F: mmuelrath@appliedcivil.com 4 Hotaling Place San Francisco, CA T: F: tom@taylorlombardo.com maggie@taylorlombardo.com N Location Map (not to scale) Plot Plan scale: 1"=3' Square Footages Building Area Summary Production vs Ancillary Total Net Usable Areas by Type Net Production Net Ancillary Project Data Index of Drawings Site Address: 3646 Spring Mountain Road Saint Helena, CA 9474 A Cover Sheet C1 C2 C3 C4 C C6 Overall Site Plan Driveway Plan Driveway Plan Driveway Plan Winery Conceptual Site Plan Impervious Area Exhibit L1 L2 Landscape Plan Irrigation Plan A1 A2 A3 Cellar + First Floor Plan Second Floor + Roof Plan Elevations Exterior Spaces included. 7,44 Total Net Usable Areas 1,1 8,9 Ancillary Percentage of Total Net Production Area: approximate property line 2.9% Zoning District: AW Building Area Details BUILDING AREAS ROOM NAME/ TYPE PRODUCTION CELLAR Main Barrel Room Stair #2 Vestibule Covered Work Area Storage (e) pond Cellar Sub Total Net Usable Area Cellar Total Net Usable Area H w y 8 FIRST FLOOR Fermentation Mechanical/Storage Lab Toilet #1 Lounge/Office Hall Stair Kitchen Toilet #2 Tasting ANCILLARY Project Scope: New Winery Building 2, ,88 3,88 1, First Floor Sub Total Net Usable Area First Floor Total Net Usable Area sp 2,868 g m ro ou ad nt ain 997 elevation reference Second Floor Sub Total Net Usable Area Second Floor Total Net Usable Area - Main Building Sub Total Net Usable Area Main Building Total Net Usable Area 6, section reference 1,1 8,277 OUTDOOR AREA ROOM NAME/ TYPE project site Symbols Legend 3,86 SECOND FLOOR Stair Work Stations Office rin Use Group & Occupancy: Rural Homesite; F-1, A-2, M, B AREA (SF) proposed building Assessor's Parcel Number: datum or work point AREA (SF) Covered Receiving Area Outdoor Sub Total Net Usable Area Total Net Usable Area PRODUCTION ANCILLARY 678 TOTAL TYPE AREA (SF) BUILDING COVERED OUTDOOR AREA Sub Total Net Usable Area Total Net Usable Area 3646 SMR Vineyard 3646 Spring Mountain Road St. Helena, CA, 9474 APN Cover Sheet Taylor Lombardo Architects (1) PRODUCTION 6, ,44 ANCILLARY 1,1 1,1 8,9 revision: date: job no: Conditional1/2/14 Use Permit drawn: MJ checked: TT scale: as noted date: sheet no: A

15 retaining walls 86'-1" 86'-1" 22'-" 36'-" 23'-1" 22'-" 31'-11" 28'-4" 3'-1" Covered Work Area 474 S.F. blending tanks 3 6'-7" 32'-4" 28'-3" up up Vestibule 339 S.F. Cellar 2627 S.F. Storage 3 S.F. 46'-9" 14'-" 32'-4" 4 dn dn Kitchen 34 S.F. Tasting 447 S.F. up dn Toilet #2 Hall 6 S.F. 34 S.F. concrete tanks Lounge /Office 8 S.F. Lab 8 S.F. Toilet #1 49 S.F. up up Mech/Stor. catwalk (+6'-") Fermentation ('-") 31 S.F. (+6'-") 36 S.F. Covered Receiving 67. S.F. (+6'-") roof above 2 sliding doors entry catwalk (+6'-") outline of roof above stone terrace 1 1 Cellar Floor Plan scale: 1/8"=1'-" 2 Main Floor Plan scale: 1/8"=1'-" 3646 SMR Vineyard Cellar + First Floor Plan revision: date: Conditional Use Permit job no: drawn: MJ sheet no: 3646 Spring Mountain Road St. Helena, CA, 9474 APN scale: 1/8" = 1'-" checked: TT date: A1

16 22'-" 8'-2 1/2" 3 3 standing seam metal roofing, typ. dn 3 : 266 S.F. 4 32'-4" '-6 1/2" Office 9 S.F. ws ws roof below : 2 1'-9 1/2" 3 : 6 : 3 : 6 : 6 : open to Tasting Room below 6 : line of building below shown dashed line of roof above Office Level Floor Plan scale: 1/8"=1'-" 2 Roof Plan scale: 1/8"=1'-" 3646 SMR Vineyard Second Floor + Roof Plan revision: date: Conditional Use Permit job no: drawn: MJ sheet no: 3646 Spring Mountain Road St. Helena, CA, 9474 APN scale: 1/8" = 1'-" checked: TT date: A2

17 ridge wood support bracket metal roofing, typ. wood siding, typ. wood truss ridge roof midpoint roof midpoint at receiving 3 6 ± 27'-4 3/8" ±21'-6 7/8" sliding doors open to beyond ± 2'-6" ± 22'-1" ± '-1" receiving 3 stone terrace 6'-" fermentation sliding wood doors '-" Tasting Room entry cellar 1 South Elevation scale: 1/8"=1'-" 2 East Elevation scale: 1/8"=1'-" ridge metal louvers roof midpoint ridge 6 roof midpoint roof midpoint 3 3 ± 2'-6" ± 22'-1" open to beyond stone terrace beyond ± 23'-11 1/2" ± 27'-8 1/2" ± 22'-4 1/2" receiving 6'-" 3 fermentation stair to cellar beyond concrete retaining wall 3 North Elevation scale: 1/8"=1'-" 4 West Elevation scale: 1/8"=1'-" 3646 SMR Vineyard Elevations revision: date: Conditional Use Permit job no: drawn: MJ sheet no: 3646 Spring Mountain Road St. Helena, CA, 9474 APN scale: As Noted checked: TT date: A3

18 ± ± ± Water Storage Tank Scale: 1/8" = 1'-" 3646 Spring Mountain Road St. Helena, CA 9474 APN proj. no. 142 date: 2.3.

Graphics. Taylor Industrial Development Camino Dorado Project, P Planning Commission Hearing Date August 2, 2017

Graphics. Taylor Industrial Development Camino Dorado Project, P Planning Commission Hearing Date August 2, 2017 F Graphics Taylor Industrial Development Camino Dorado Project, P17-75 Planning Commission Hearing Date August 2, 217 !! NAPA COUNTY LAND USE PLAN 28-23 CAMINO DORADO FACILITY * SCALE IN MILES 2 LEGEND

More information

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

TOWN OF HILLSBOROUGH SAN MATEO COUNTY TOWN OF HILLSBOROUGH SAN MATEO COUNTY Planning Division 650/375-7422 Fax: 650/375-7415 1600 Floribunda Avenue Hillsborough California 94010 Administrative Review of Landscape Plans April 2017 WHAT TYPES

More information

New Rehabilitated Area (ft 2 ) Private Homeownerinstalled

New Rehabilitated Area (ft 2 ) Private Homeownerinstalled LANDSCAPE DOCUMENTATION PACKAGE SUBMITTAL FORM To be completed by applicant and submitted with the required materials listed in Section C. For projects that qualify and apply using the Prescriptive Compliance

More information

LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE

LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE CITY OF FONTANA Engineering Department 8353 Sierra Avenue, Fontana CA 92335 (909) 350-7610 CHECKLIST FOR LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE SECTION 1: GENERAL REQUIREMENTS

More information

LANDSCAPE AND IRRIGATION REGULATIONS FOR THE CITY OF SAN MARINO

LANDSCAPE AND IRRIGATION REGULATIONS FOR THE CITY OF SAN MARINO LANDSCAPE AND IRRIGATION REGULATIONS FOR THE CITY OF SAN MARINO DEFINITIONS: APPLIED WATER: The portion of water supplied by the irrigation system to the landscape. AUTOMATIC IRRIGATION CONTROLLER: An

More information

WATER EFFICIENT LANDSCAPE WORKSHEET ORDINANCE NO. 09 O 2574

WATER EFFICIENT LANDSCAPE WORKSHEET ORDINANCE NO. 09 O 2574 WATER EFFICIENT LANDSCAPE WORKSHEET ORDINANCE NO. 09 O 2574 NOTE: This worksheet is filled out by the project applicant and it is a required element of the Landscape Documentation Package. Please complete

More information

Request for an Exception to the Napa County Road and Street Standards

Request for an Exception to the Napa County Road and Street Standards F Request for an Exception to the Napa County Road and Street Standards Shed Creek Winery Use Permit P16-327 and Use Permit Exception to the Conservation Regulations P17-178 Planning Commission Hearing

More information

Sun City Lincoln Hills ARC Application Checklist

Sun City Lincoln Hills ARC Application Checklist Sun City Lincoln Hills ARC Application Checklist Landscape Plants & Trees Checklist 19 It is recommended that the Owner or Landscape Architect/Designer/Contractor attend the ARC meeting to answer any questions

More information

PERFORMANCE APPROACH (For landscape areas over 2500 square feet)

PERFORMANCE APPROACH (For landscape areas over 2500 square feet) Model Water Efficient Landscape Ordinance (MWELO) SUBMITTAL CHECKLIST Permit Number: Project Applicant: Applicant email: Applicant Phone: Project address: Owner Name: Owner Email: Owner Phone: The following

More information

Appendix A. Reference Evapotranspiration (ETo) Table.

Appendix A. Reference Evapotranspiration (ETo) Table. Appendix A. Reference Evapotranspiration (ETo) Table. Appendix A - Reference Evapotranspiration (ETo) Table* KINGS Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Caruthers 1.6 2.5 4.0 5.7 7.8 8.7

More information

CITY OF LOS BANOS LANDSCAPE PLAN REVIEW PROCEDURE. Public Works Department 411 Madison Avenue, Los Banos, CA FOR ALL PROJECTS:

CITY OF LOS BANOS LANDSCAPE PLAN REVIEW PROCEDURE. Public Works Department 411 Madison Avenue, Los Banos, CA FOR ALL PROJECTS: FOR ALL PROJECTS: CITY OF LOS BANOS LANDSCAPE PLAN REVIEW PROCEDURE 1. Obtain Improvement Plan/Landscape Plan Submittal Packet from the or from the City of Los Banos website, under Documents tab. (www.losbanos.org)

More information

Landscape Documentation Package Review

Landscape Documentation Package Review Water Efficient Landscape Ordinance Tool Kit Landscape Documentation Package Review A. Project Location Project Street Address Project City, State, Zip Parcel or lot number(s) if available B. Application

More information

Project No. Tract No. APN ETo Zone No. MAWA = ccf ETWU = ccf

Project No. Tract No. APN ETo Zone No. MAWA = ccf ETWU = ccf Project Name Project Location COACHELLA VALLEY WATER DISTRICT LANDSCAPE AND IRRIGATION PRE-SUBMITTAL CHECKLIST ORDINANCE NO. 1302.2 (This submittal checklist does not include all the requirements of the

More information

WILSON PLACE FINAL DESIGN

WILSON PLACE FINAL DESIGN WILSON PLACE FINAL DESIGN SANTA MONICA, CA P:\2007\07-812.1_Borderline_Neighborhood\04 Design\Sheetfiles\_Phases\DD Wilson Place\C4.0 Grading and Drainage Plan.dwg,C1.0 Coversheet,Mike Amodeo,4/9/2009

More information

LANDSCAPE DOCUMENTATION PACKAGE SUBMITTAL FORM To be completed by applicant and submitted with the required materials.

LANDSCAPE DOCUMENTATION PACKAGE SUBMITTAL FORM To be completed by applicant and submitted with the required materials. COMMUNITY DEVELOPMENT AND SUSTAINABILITY DEPARTMENT 23 Russell Boulevard, Suite 2 Davis, California 95616 530/757-5610 FAX: 530/757-5660 TDD: 530/757-5666 LANDSCAPE DOCUMENTATION PACKAGE SUBMITTAL FORM

More information

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES The Parks Planning and Development Division of the City of Modesto s Parks, Recreation and Neighborhoods Department is responsible for the task of reviewing

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

TENTATIVE MAP CHECKLIST

TENTATIVE MAP CHECKLIST Business License 707.648.4357 www.cityofvallejo.net Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Building 707.648.4374 Planning 707.648.4326 TENTATIVE MAP CHECKLIST Public Works/Engineering

More information

COUNCIL POLICY Policy Effective Number Subject: Number Date of Pages SINGLE FAMILY RESIDENTIAL LANDSCAPE

COUNCIL POLICY Policy Effective Number Subject: Number Date of Pages SINGLE FAMILY RESIDENTIAL LANDSCAPE 200-19 01/01/2007 Page 1 of 9 I. PURPOSE The purpose of this policy is to ensure efficient landscape water use by establishing standards for landscape design appropriate to Santa Rosa s climate, soils,

More information

City of Placerville Planning Commission AGENDA REPORT ITEM 7

City of Placerville Planning Commission AGENDA REPORT ITEM 7 Placerville, a Unique Historical Past Forging into a Golden Future City of Placerville Planning Commission REPORT ITEM 7 MEETING DATE: September 1, 2015 APPLICATION NO: 225 Placerville Drive Site Plan

More information

The Board of Supervisors of the County of Riverside ordains as follows: Ordinance No. 859 is hereby amended in its entirety to read as follows:

The Board of Supervisors of the County of Riverside ordains as follows: Ordinance No. 859 is hereby amended in its entirety to read as follows: ORDINANCE NO. 859 (AS AMENDED THROUGH 859.2) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO. 859 THE WATER EFFICIENT LANDSCAPE REQUIREMENTS The Board of Supervisors of the County of Riverside

More information

Water-Efficient Landscape & Irrigation Standards Plan Submittal Check List Revised August 10, 2016

Water-Efficient Landscape & Irrigation Standards Plan Submittal Check List Revised August 10, 2016 Water-Efficient Landscape & Irrigation Standards Plan Submittal Check List Revised August 10, 2016 Fill out and mail, fax or email to: Civil Engineering Division Land Development Section 1685 Main Street

More information

SMITH SUBDIVISION LANDSCAPE CONSTRUCTION PLANS

SMITH SUBDIVISION LANDSCAPE CONSTRUCTION PLANS SMITH SUBDIVISION SHEET INDEX LANDSCAPE CONSTRUCTION PLANS SHEET # 1 2-4 5-6 7 8 9-11 12 SHEET TITLE TITLE SHEET IRRIGATION PLANS AND NOTES IRRIGATION DETAILS IRRIGATION RUN TIME SCHEDULES WATER CONSERVATION

More information

Irrigation and Landscape Regulations

Irrigation and Landscape Regulations SHADE 2017 Irrigation and Landscape Regulations Issues Facing California Consultants from Drought Legislation Steve Hohl, FASIC SHADE 2017 GOAL To explain how legislation and codes have changed in California

More information

Option 1 Turf shall not exceed 40 percent of the landscapable area. Turf shall not be installed on slopes greater than 4:1.

Option 1 Turf shall not exceed 40 percent of the landscapable area. Turf shall not be installed on slopes greater than 4:1. WaterSense Water Budget Approach and Tool I. Introduction On May 22, 2008, EPA released a draft specification for water-efficient single-family new homes (www.epa.gov/watersense/specs/homes.htm). To meet

More information

Site Development Plan (SDP) Checklist

Site Development Plan (SDP) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 303-660-1393 or CRGov.com Site Development Plan (SDP) Checklist A complete Site Development Plan (SDP) submittal will contain

More information

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

TOWN OF HILLSBOROUGH SAN MATEO COUNTY TOWN OF HILLSBOROUGH SAN MATEO COUNTY Planning Office 650/375-7422 Fax 650/375-7415 1600 Floribunda Avenue Hillsborough California 94010 Architecture and Design Review Board LANDSCAPING APPLICATION PACKET

More information

Chapter LANDSCAPING

Chapter LANDSCAPING Chapter 20.36 Sections: 20.36.010 Purpose 20.36.020 Applicability 20.36.030 Water Efficient Landscaping Ordinance 20.36.040 Landscape and Sprinkler Plans 20.36.050 Required Landscape Areas 20.36.060 Landscape

More information

14.0 LANDSCAPING AND IRRIGATION

14.0 LANDSCAPING AND IRRIGATION 14.0 LANDSCAPING AND IRRIGATION The following landscape policies and procedures are based on the requirements provided within the City of Highland Municipal Code Chapter 16.40.390 and the 2015 State of

More information

iii. Soil Management Report; iv. Landscape Design Plan; v. Irrigation Design Plan; and vi. Grading Design Plan. 4. Soil Management Report (SMR)

iii. Soil Management Report; iv. Landscape Design Plan; v. Irrigation Design Plan; and vi. Grading Design Plan. 4. Soil Management Report (SMR) ii. Water Efficient Landscape Worksheet that includes the following: 1) Hydro-zone information table 2) Water budget calculations including: a. Maximum Applied Water Allowance (MAWA) including water features;

More information

LANDSCAPE STANDARDS PURPOSE AND INTENT OF LANDSCAPE ORDINANCE

LANDSCAPE STANDARDS PURPOSE AND INTENT OF LANDSCAPE ORDINANCE LANDSCAPE STANDARDS COMMUNITY DEVELOPMENT DEPARTMENT / PLANNING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: 619.667-1177 Fax: 619.667-1380 PURPOSE AND INTENT OF LANDSCAPE ORDINANCE The regulations

More information

CITY OF EL MONTE Water Efficient Landscape Ordinance Documentation Package Chapter Water Efficiency Ordinance El Monte Municipal Code (EMMC)

CITY OF EL MONTE Water Efficient Landscape Ordinance Documentation Package Chapter Water Efficiency Ordinance El Monte Municipal Code (EMMC) CITY OF EL MONTE Water Efficient Landscape Ordinance Documentation Package Chapter 17.11 Water Efficiency Ordinance El Monte Municipal Code (EMMC) Planning Division 11333 Valley Boulevard El Monte, CA

More information

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN) Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Business License Building Fire Prevention Planning Public Works 707.648.4310 707.648.4374 707.648.4565 707.648.4326 707.651.7151 PLANNED DEVELOPMENT

More information

GUIDELINES FOR IMPLEMENTATION OF THE CITY OF LA HABRA WATER EFFICIENT LANDSCAPE ORDINANCE

GUIDELINES FOR IMPLEMENTATION OF THE CITY OF LA HABRA WATER EFFICIENT LANDSCAPE ORDINANCE GUIDELINES FOR IMPLEMENTATION OF THE CITY OF LA HABRA WATER EFFICIENT LANDSCAPE ORDINANCE TABLE OF CONTENTS Section Page No. 1. Purpose and Applicability... 1 1.1 Purpose... 1 1.2 Applicability... 1 2.

More information

CONTENTS. Purpose. Applicability 1. Definitions 2. Tier 1 - New Construction and Rehabilitation Projects 3

CONTENTS. Purpose. Applicability 1. Definitions 2. Tier 1 - New Construction and Rehabilitation Projects 3 SECTION F - WATER EFFICIENT IRRIGATION (Adopted May 25, 2010, Effective January 1, 2011) From the SFPUC Rules and Regulations Governing Water Service to Customers CONTENTS Purpose RULE Applicability 1

More information

The Model Water Efficient Landscape Ordinance

The Model Water Efficient Landscape Ordinance Water Use and Efficiency Branch The Model Water Efficient Landscape Ordinance Landscape Graphic Courtesy of Sonoma County Water Agency, Ali Davidson Landscape Architect David Bunnett Illustrator What is

More information

CRESCENT RESOURCES INC.

CRESCENT RESOURCES INC. CRESCENT RESOURCES INC. Due Diligence Checklist Project Name: Client: Project No. Date: 1 Survey Review survey for compliance with Crescent Resources, Inc. s Instructions to Surveyors (see below): All

More information

C H A P T E R 43. Landscaping, Irrigation and Grading. Sections

C H A P T E R 43. Landscaping, Irrigation and Grading. Sections C H A P T E R 43 Landscaping, Irrigation and Grading Sections 25-43.1 Purpose. 25-43.2 General provisions. 25-43.3 Specific provisions. 25-43.4 Landscape Plans and Submittal for Landscape Designs Not Subject

More information

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001 STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP 2014-0030 FEBRUARY 26, 2015 CPA - 1 OWNER/APPLICANT: AGENT: REQUEST: HANS HEIM PO BOX 238 APTOS, CA 94001 JAMES HAY PO BOX 762 MENDOCINO, CA 95460

More information

GUIDELINES FOR IMPLEMENTATION OF THE CITY OF ANAHEIM LANDSCAPE WATER EFFICIENCY ORDINANCE

GUIDELINES FOR IMPLEMENTATION OF THE CITY OF ANAHEIM LANDSCAPE WATER EFFICIENCY ORDINANCE GUIDELINES FOR IMPLEMENTATION OF THE CITY OF ANAHEIM LANDSCAPE WATER EFFICIENCY ORDINANCE Effective Date: February 29, 2016 TABLE OF CONTENTS Section Page No. 1. Purpose and Applicability... 1 1.1 Purpose...

More information

Water Resources and Policy Initiatives CSU Campus Water Use Calculations Standard Operating Procedures February 26, 2016

Water Resources and Policy Initiatives CSU Campus Water Use Calculations Standard Operating Procedures February 26, 2016 Water Resources and Policy Initiatives CSU Campus Water Use Calculations Standard Operating Procedures February 26, 2016 Project Background California State University (CSU) campuses face a challenge in

More information

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS What is Stormwater? Stormwater is water that falls to the ground during a precipitation event. When land is undeveloped or covered with vegetative surface,

More information

RULE WATER EFFICIENT LANDSCAPE REQUIREMENTS

RULE WATER EFFICIENT LANDSCAPE REQUIREMENTS RULE 142.1 - WATER EFFICIENT LANDSCAPE REQUIREMENTS A. Purpose. The purpose of this Rule is to provide landscape standards that minimize water use, eliminate Water Waste, and reduce storm water Runoff

More information

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1" = 600'

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1 = 600' LOCATED IN THE SOHWEST QUARTER OF SECTION, TOWNSHIP SOH, Case # Z 6 - Legal Description Tract G, H and J of the Villages at Riverdale Filing No., a part of the Southwest quarter of Section, Township South,

More information

Model Water Efficient Landscape Ordinance

Model Water Efficient Landscape Ordinance Model Water Efficient Landscape Ordinance 1 California Code of Regulations Title 23. Waters Division 2. Department of Water Resources Chapter 2.7. Model Water Efficient Landscape Ordinance 490. Purpose.

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Problem: Stormwater collected from the neighborhood upstream is released at 9 Muirfield Lane and flows west toward

More information

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address,  and Phone # of Applicant APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN Name of Applicant Address, Email and Phone # of Applicant Name and Address of Owner (if other than applicant) Ownership Interest of Applicant

More information

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET TABLE OF CONTENTS: ABBREVIATIONS: SHEET NO. A SHEET DESCRIPTION REFERENCE SHEETS TITLE SHEET COS CSO GPM PVC SF CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

More information

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018 COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018 A. California Residential Code Requirement - Construction plans shall indicate how

More information

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PLEASE REFER TO THE CLEARING & GRADING PERMIT CHECKLIST BELOW FOR SUBMITTAL REQUIREMENTS. SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PROJECT ADDRESS (Street, Suite #): Parcel(s) #: Total Site Area

More information

UNAUTHORIZED CHANGES ACCURACY OF UTILITIES

UNAUTHORIZED CHANGES ACCURACY OF UTILITIES BENCHMARK/DATUM RECORD DRAWINGS UNAUTHORIZED CHANGES REVISIONS ACCURACY ACCURACY UTILITIES VICINITY MAP LOCATION MAP DESCRIPTION H:\9 SF Estuary Partnership\9 00 San Pablo Ave GSS\Engineering\ Drawings\TITLE

More information

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING IV 13 404 MASTER PLANNING Master Planning through the Site Analysis (Master Planning Site Analysis) or Planned Development (Master Planning Planned Development) is provided to encourage development which

More information

The planning and zoning board held workshops on January 11, 2016, January 18, 2016 and January 25, 2016 to discuss the issue.

The planning and zoning board held workshops on January 11, 2016, January 18, 2016 and January 25, 2016 to discuss the issue. MIAMI SHORES DEPARTMENT OF PLANNING & ZONING 10050 NE 2 nd Avenue Miami Shores FL 33037-2304 www.miamishoresvillage.com David A. Dacquisto AICP, Director Main Number: 305-795-2207 Fax Number: 305-756-8972

More information

ORDINANCE NO Adopted by the Sacramento City Council. November 24, 2015

ORDINANCE NO Adopted by the Sacramento City Council. November 24, 2015 ORDINANCE NO. 2015-0038 Adopted by the Sacramento City Council November 24, 2015 AN ORDINANCE REPEALING AND ADDING CHAPTER 15.92 OF THE SACRAMENTO CITY CODE, RELATING TO WATER EFFICIENT LANDSCAPE REQUIREMENTS

More information

HILLSIDE BUILDING COMMITTEE PLAN REVIEW DIRECTIONS

HILLSIDE BUILDING COMMITTEE PLAN REVIEW DIRECTIONS HILLSIDE BUILDING COMMITTEE PLAN REVIEW DIRECTIONS 1 1. Review Hillside Regulations to ensure your design is in conformance with current Town Code. 2. Complete page 3 and contact Paul Mood at 480-348-3573,

More information

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW This checklist is to be used as a guide for complying with the Town of Hollis Site Plan Regulations. It is to be used for each individual site plan review application submitted. Applicants are encouraged

More information

Attachment A ORDINANCE NO.

Attachment A ORDINANCE NO. ORDINANCE NO. ORDINANCE OF THE COUNCIL OF THE CITY OF SANTA ROSA AMENDING CHAPTER 14-30 WATER EFFICIENT LANDSCAPE ORDINANCE TO COMPLY WITH UPDATED WATER EFFIEICENT REQUIREMENTS FROM THE STATE OF CALIFORNIA

More information

FEG AIR COMMERCE PARK - PD FRAMEWORK MASTER PLAN ORLANDO, FLORIDA FLORIDA ENGINEERING GROUP. Orlando, FL Phone: Fax:

FEG AIR COMMERCE PARK - PD FRAMEWORK MASTER PLAN ORLANDO, FLORIDA FLORIDA ENGINEERING GROUP. Orlando, FL Phone: Fax: AIR COMMERCE PARK - PD FRAMEWORK MASTER PLAN ORLANDO, FLORIDA PARCEL I.D. NOs. 30-24-05-0000-00-002 30-24-05-0000-00-008 30-24-05-0000-00-003 30-24-05-7268-00-761 30-24-05-0000-00-004 OWNERS: GEOTECHNICAL

More information

Xeriscape Rebate Program Manual

Xeriscape Rebate Program Manual Xeriscape Rebate Program Manual Program Purpose & Goals Introducing the community to xeriscape Create attractive, lower-maintenance yards that will save water and withstand drought Incentivize the conversion

More information

NOTES: 1.) THE BOGGY CREEK RD. AND SIMPSON RD. IMPROVEMENTS DEPICTED ON THIS PLAN ARE BASED ON RECORD CONSTRUCTION PLANS AND HAVE NOT BEEN SURVEYED. 2.) EXISTING RESIDENTIAL BUILDING STRUCTURES AND ANCILLARY

More information

Small Project Guidance Document

Small Project Guidance Document Small Project Guidance Document Introduction If you are considering a relatively small construction project on your property that creates new impervious area and you need to manage the stormwater that

More information

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST Planning Department Date Stamp Design Review Formal Application Change of Use (No Site Improvements)* All information provided and submitted

More information

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST Planning Department Date Stamp Design Review Formal Application All information provided and submitted with this Application Checklist shall

More information

NOVEMBER 14, 2016 BURRELL ENGINEERING TROY BURRELL N FLORIDA AVE DUNNELLON, FL 34434

NOVEMBER 14, 2016 BURRELL ENGINEERING TROY BURRELL N FLORIDA AVE DUNNELLON, FL 34434 NOVEMBER, 0 BURRELL ENGINEERING TROY BURRELL 005 N FLORIDA AVE DUNNELLON, FL 33 PROJECT NAME: SECO @ SR 00 PROJECT #9990079 APPLICATION: MAJOR SITE PLAN #9388 Dear Troy: The above referenced project was

More information

MISSION SPRINGS WATER DISTRICT WATER EFFICIENT LANDSCAPING GUIDELINES

MISSION SPRINGS WATER DISTRICT WATER EFFICIENT LANDSCAPING GUIDELINES Sections: 0.00.010 Purpose and intent. 0.00.020 Definitions. -2009- MISSION SPRINGS WATER DISTRICT WATER EFFICIENT LANDSCAPING GUIDELINES 0.00.030 Provisions for New or Rehabilitated Landscapes (Application).

More information

The planning and zoning board held workshops on January 11, 2016, January 18, 2016 and January 25, 2016 to discuss the issue.

The planning and zoning board held workshops on January 11, 2016, January 18, 2016 and January 25, 2016 to discuss the issue. MIAMI SHORES DEPARTMENT OF PLANNING & ZONING 10050 NE 2 nd Avenue Miami Shores FL 33037-2304 www.miamishoresvillage.com David A. Dacquisto AICP, Director Main Number: 305-795-2207 Fax Number: 305-756-8972

More information

PLANTING SCHEDULE KEYNOTES Quant. Min. Planting Size* 212" cal. 7 gal. Hibiscus syriacus 'Helene' Hydrangea panculata 'Jane' or Rosa x Radsunny

PLANTING SCHEDULE KEYNOTES Quant. Min. Planting Size* 212 cal. 7 gal. Hibiscus syriacus 'Helene' Hydrangea panculata 'Jane' or Rosa x Radsunny PLANTING SCHEDULE KEYNOTES Quant. EXISTING ROCK DRAINAGE SWELL EXISTING ELECTRICAL TRANSFORMER LAVENDER TWIST REDBUD Cercis canadensis var. texensis 'Oklahoma' 2"" cal 4. PREPARE SITE FOR PLANTING BY GRUBBING

More information

How to Convert Spray Irrigation to Drip

How to Convert Spray Irrigation to Drip How to Convert Spray Irrigation to Drip BAWSCA & Stanford University 24-May-2018 Sherri D. Osaka Sustainable Landscape Designs Topics Tracking water use Why switch from spray to drip? Designing inline

More information

SMALL PROJECTS SIMPLIFIED APPROACH

SMALL PROJECTS SIMPLIFIED APPROACH SMALL PROJECT APPLICATION AND STORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL FOR SMALL PROJECTS IN FULTON TOWNSHIP LANCASTER COUNTY, PENNSYLVANIA SMALL PROJECTS SIMPLIFIED APPROACH Prepared By: Light-Heigel

More information

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St. Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St. Project Summary Project Type: Technologies: Major Benefits: Light industrial retrofit (parking lot) - demonstration project Landscape

More information

Vailsburg Park Green Infrastructure Information Sheet Location: 112 S Munn Avenue, Newark, NJ Site Use: Park

Vailsburg Park Green Infrastructure Information Sheet Location: 112 S Munn Avenue, Newark, NJ Site Use: Park Vailsburg Park Green Infrastructure Information Sheet Location: S Munn Avenue, Newark, NJ 0706 Site Use: Park Watershed Name: Elizabeth River Ward: West Green Infrastructure Description: Rain garden Targeted

More information

Intentionally Left Blank

Intentionally Left Blank Intentionally Left Blank CITY OF LOS ANGELES LOW IMPACT DVELOPMENT BEST MANAGEMENT PRACTICES HANDBOOK LOW IMPACT DEVELOPMENT (LID) CHECKLIST SMALL SCALE RESIDENTIAL (4 UNITS OR LESS) WPD Project Plan Checker:

More information

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC. GRAND ARBOR RESERVE BIRCHWOOD POINT, LOT-1 10203 MINERAL POINT ROAD MADISON, WISCONSIN GRAND ARBOR RESERVE, LLC 6417 ODANA RD MADISON, WISCONSIN 53719 CONTACT: DAN SCHMIDT PHONE: 608-285-8680 FAX: 608-255-3387

More information

L100 LANDSCAPE PLAN L101 SITE PHOTOMETRICS A1 BUILDING ELEVATIONS A2 BUILDING ELEVATIONS A3 BUILDING ISOMETRICS A-2 ARCHITECTURAL FLOOR PLAN

L100 LANDSCAPE PLAN L101 SITE PHOTOMETRICS A1 BUILDING ELEVATIONS A2 BUILDING ELEVATIONS A3 BUILDING ISOMETRICS A-2 ARCHITECTURAL FLOOR PLAN WARNING!: These plans are for the exclusive use of Culver Franchising Systems, Inc. and authorized franchise holders only. No part of these plans or the design they represent may be duplicated or reproduced

More information

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden: P OGA M T O O What is a rain garden and why should you plant one? C TO A rain garden is simply a garden that is designed specifically to capture, store and clean storm water runoff from your roof, driveway,

More information

Using the Free Landscape Design Templates 3/28/2019

Using the Free Landscape Design Templates 3/28/2019 Using the Free Landscape Design Templates 3/28/2019 Overview 1. Verify and Select 2. Adjust Layout & Planting Plan 3. Adjust Irrigation Plan 4. Complete 75/25 Rule Worksheet 5. Complete Application Packet

More information

Commercial Rules and Regulations

Commercial Rules and Regulations Commercial Rules and Regulations Public Works and Community Development Department City of Shenandoah 29955 I 45 North Shenandoah, Texas 77381 281 298 5522 www.shenandoahtx.us Construction Documents Submit

More information

NAPA COUNTY LAND USE PLAN

NAPA COUNTY LAND USE PLAN NAPA COUNTY LAND USE PLAN 2008-2030 * LEGEND URBANIZED OR NON-AGRICULTURAL Cities Urban Residential Rural Residential Industrial Public-Institutional Study Area OPEN SPACE * * Agriculture, Watershed &

More information

City of Lafayette Study Session Staff Report Design Review Commission

City of Lafayette Study Session Staff Report Design Review Commission ++ City of Lafayette Study Session Staff Report Design Review Commission Meeting Date: January 08, 2018 Staff: Subject: Chris Juram, Planning Technician SS12-17 Miramar Homebuilders, R-20 Zoning: Request

More information

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES The following 2019 information is based on the information available to staff at the time of creation. Dates & time may change

More information

Turf Removal Rebate Program Requirements

Turf Removal Rebate Program Requirements Revised July 2018 Turf Removal Rebate Program Requirements 1. You must have grass green, yellow, brown, and/or patches to be eligible for the program and receive project start approval before removing

More information

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria CleanSScapes Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria Howard County Office of Community Sustainability, 410-313-0678 CleanScapes Program, www.cleanwaterhoward.com

More information

Memorandum. DATE October 27, Lambert Giessinger, Historic Preservation Architect Office of Historic Resources

Memorandum. DATE October 27, Lambert Giessinger, Historic Preservation Architect Office of Historic Resources Memorandum DATE October 27, 2015 TO FROM CC RE Lambert Giessinger, Historic Preservation Architect Office of Historic Resources Robert Chattel, AIA, President Bradley Furuya, Associate Chattel, Inc. Chris

More information

STATUS OF REVIEW: ENGINEER WILL COMPLY

STATUS OF REVIEW: ENGINEER WILL COMPLY OCTOBER 8, 2013 PROJECT NAME: UHAUL SELF-STORAGE @ S HWY 441 - MAJOR SITE PLAN PROJECT NUMBER: 1999007762 APPLICATION: #11903 Met with staff 10/24/13, DRC on 11/4/13 1. DEPARTMENT: ENGDRN - STORMWATER

More information

TEN MILE PLANNING COMMISSION AGENDA March 14, :30 p.m. Buffalo Mountain Meeting Room, County Commons 0037 Peak One Dr., SCR 1005, Frisco, CO

TEN MILE PLANNING COMMISSION AGENDA March 14, :30 p.m. Buffalo Mountain Meeting Room, County Commons 0037 Peak One Dr., SCR 1005, Frisco, CO PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 TEN MILE PLANNING COMMISSION AGENDA March 14, 2019-5:30 p.m. Buffalo Mountain Meeting Room, County

More information

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) For: (Insert Project Name) (Site Address or Tract/Lot Number) Prepared for: (Insert Owner/Developer Name) (Insert Address) (Insert City, State, ZIP) (Insert

More information

City of Lafayette Staff Report

City of Lafayette Staff Report City of Lafayette Staff Report For: By: Design Review Commission Greg Wolff, Senior Planner Meeting Date: April 27, 2015 Subject: SS03-15 Gundi & Peter Younger (Owners), R-40 Zoning: Request for a Study

More information

Sustainable Sites. hblanarc.ca. RDN Workshop June 25, David Reid, FCSLA, Landscape Architect, Environmental Designer

Sustainable Sites. hblanarc.ca. RDN Workshop June 25, David Reid, FCSLA, Landscape Architect, Environmental Designer Sustainable Sites RDN Workshop June 25, 2011 David Reid, FCSLA, Landscape Architect, Environmental Designer hblanarc.ca Surrey ESA Networks & linear corridors ESA Network: Develop with Care SITE Hub >10

More information

Chapter LANDSCAPE FOR PLANNING APPLICATIONS

Chapter LANDSCAPE FOR PLANNING APPLICATIONS Chapter 27.71 LANDSCAPE FOR PLANNING APPLICATIONS 27.71.010 PURPOSE. The purpose of this chapter is to enhance the quality of life in San Mateo by the provision for appropriate design of landscaping and

More information

PG&E VACAVILLE CRITICAL OPERATIONS CENTER BUILDING B4 GRADING & UNDERGROUND UTILITY PACKAGE RESPONSE TO PUBLIC WORKS-2 COMMENTS

PG&E VACAVILLE CRITICAL OPERATIONS CENTER BUILDING B4 GRADING & UNDERGROUND UTILITY PACKAGE RESPONSE TO PUBLIC WORKS-2 COMMENTS PG&E VACAVILLE CRITICAL OPERATIONS CENTER BUILDING B4 GRADING & UNDERGROUND UTILITY PACKAGE RESPONSE TO PUBLIC WORKS-2 COMMENTS NOVEMBER 01, 2016 CONSULTANTS Civil Engineer BKF Engineers 1646 N. California

More information

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD IBOARD OF ADJUSTMENT Coast Highway APN

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD IBOARD OF ADJUSTMENT Coast Highway APN CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: October 13,2011 TO: DESIGN REVIEW BOARD IBOARD OF ADJUSTMENT CASE: Variance 7717 Design Review 11-163 Coastal Development

More information

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas. Chapter 19.06. Landscaping and Fencing. Sections: 19.06.01. Purpose. 19.06.02. Required Landscaping Improvements. 19.06.03. General Provisions. 19.06.04. Landscaping Plan. 19.06.05. Completion of Landscape

More information

Advance Engineering & Surveying PLLC

Advance Engineering & Surveying PLLC Advance Engineering & Surveying, PLLC Consulting in: Civil & Environmental Engineering Land Surveying Land Development 11 Herbert Drive Phone: (518) 698-3772 Latham, N.Y. 12110 Email:ncostape@gmail.com

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

CHAPTER LANDSCAPING

CHAPTER LANDSCAPING CHAPTER 19.70 LANDSCAPING Section: 19.70.010 INTENT AND PURPOSE 19.70.020 DEFINITIONS 19.70.030 WATER CONSERVATION REQUIREMENTS FOR NEW OR REHABILITATED LANDSCAPES 19.70.040 LANDSCAPE PLAN CHECK REQUIREMENTS

More information

PLANNING COMMISSION AGENDA REPORT SEPTEMBER 1, 2016

PLANNING COMMISSION AGENDA REPORT SEPTEMBER 1, 2016 PLANNING COMMISSION AGENDA REPORT SEPTEMBER 1, 2016 TO: Members of the Planning Commission FROM: Michael Klein, Planner FILE NO.: 150000780 PROPOSAL: APPLICANT: RECOMMENDATION: A request for a Site Plan

More information

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project of an Environmental Impact Report and Scoping Meeting for the As the Lead Agency, the County of San Mateo (County) will prepare an Environmental Impact Report (EIR) for the (project), and would like your

More information

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts) BUILDING CODE ANALYSIS REFERENCE CODES 0 CALIFORNIA BUILDING CODE 0 INTERNATIONAL BUILDING CODE OCCUPANCY USE AND CLASSIFICATION SECTION 0 & THE PROPOSED BUILDING CONSISTS OF STORIES OF OVER STORY OF VALET

More information

Irrigation Requirements

Irrigation Requirements Irrigation Requirements In order to bettter educate the public on irrigation requiremetns, we have prepared this packet of information to assist you in elminating any confusion and getting things done

More information

Major Subdivision Sketch Plan Checklist

Major Subdivision Sketch Plan Checklist This checklist provides specific requirements that are apart of the Sketch process. The entire process is described by the Huntersville Subdivision Review Process which details all the submittal and resubmittal

More information