1 3 Regency Centers ( the applicant ) has proposed to build East Washington Place, a retail and office project on approximately 33 acres adjacent to the southwest corner of Highway 101 and East Washington Street, as well as the Sonoma-Marin County Fairgrounds in the City of Petaluma. This project would be located on the former Kenilworth Junior High School property. For ease of understanding, the applicant described the East Washington Street direction of the site as the north, the Highway 101 side east, the Fairgrounds west and the portion nearing Lindberg Lane the south in their development application. DC&E has followed that protocol in the narrative of this Environmental Impact Report (EIR) for the sake of consistency, although all maps accurately reflect the true directions. The project site is designated mixed-use, including office and retail uses. The project includes approximately 380,000 square feet of new mixed uses (retail/office). The retail and office components of the Project would include approximately 364,000 square feet and 16,000 square feet, respectively. Offices will be located on the second floor of two of the retail buildings. A. Project Site Location and Characteristics Figure 3-1 shows the regional location of the proposed East Washington Place site, which is located in the City of Petaluma in Sonoma County. As shown in Figure 3-2, the project site is located in the west of Petaluma, in the Petaluma Community Development Project Area, adjacent to Highway 101 and East Washington Street. The proposed East Washington Place project site consists of approximately 33 acres of land. The precise boundaries of the site are shown on Figure 3-2. As shown on Figure 3-3, the anchor retail tenants will be positioned on the northeast side of the site closest to the interchange of East Washington Street and Highway 101, facing the improved Kenilworth Drive. East Washington Street, a major arterial with ramps to Highway 101, provides major access to the site. Other points of access to the site would include Kenilworth Drive via Lindberg Lane and Johnson Drive. The project applicant has proposed that a Target store be the major anchor, containing approximately 139,000 square feet. In this space, the proposed Target will have an outdoor garden center, but will not include a full-service grocery. Spaces planned for other retail anchors generally range from 15,000 to 42,000 square feet. Retail shop buildings will be located throughout the site in a dispersed pattern, 3-1

2 5 505 Yolo Davis Sonoma tu 101 Santa Rosa Napa 80 Sacramento Petaluma Napa Solano Fairfield Sacramento Marin Novato San Rafael 80 San Joaquin 580 Contra Costa tu 101 Oakland 680 Pacific Ocean San Francisco San Francisco Bay tu Alameda Tracy [ Sacramento San Francisco Nevada California San Mateo Palo Alto Santa Clara PETALUMA San Jose Los Angeles Santa Cruz tu Miles FIGURE 3-1 REGIONAL MAP

3 Arlington Dr tu 101 Madison St Margo Ln Burlington Dr Stuart Dr McKenzie Ave McDowell Blvd Ellis St PROJECT SITE McGregor Ave Doris Way Alma Ct Kenilworth Dr Redwood Highway East Washington St Lindberg Ln St Francis Dr East D St Payran St Sonoma - Marin Fairgrounds Vallejo St Edith St Jefferson St Judith Ct Lindberg Ln tu 101 Wilson St Napa County Sonoma County Sonoma County Marin County Caulfield Ln Site[ Petaluma East Ct Lakeville St Miles Source: City of Petaluma, DC&E, FIGURE 3-2 PROJECT LOCATION

4 as shown on Figure 3-3, to facilitate customer access and connectivity for automobiles, pedestrians and bicycles. An existing pedestrian over-crossing connects the project site with the residential neighborhoods to the east of Highway 101. Separated from traffic, this over-crossing would be incorporated into the project as a pedestrian gathering node with outdoor seating and public art. B. On-Site Uses The current zoning designation for the project site is Mixed-Use 1B. This designation is intended for pedestrian-oriented mixed-use development. The majority of the site is currently vacant. Existing uses on the property include Carter Little League ball field facilities, which will be relocated by the school district. The topography of the site is relatively flat, with a one to five percent slope across the site. The project site contains some larger trees of varying health and two ephemeral ditches. There are also seasonal wetlands in the low areas adjacent to the athletic fields. These low areas receive excessive irrigation runoff from the athletic fields in the dry season and are seasonally wet in the winter months. C. Surrounding Uses The Sonoma-Marin Fairgrounds, including the Petaluma Speedway, are located adjacent to the site to the west. Live Oak Charter School leases several buildings at the fairgrounds. 1 The City-owned swim center and skate park are located northwest of the site, while the Petaluma School District bus facility and transportation offices are located southwest of the site. Residential neighborhoods extend from the eastern side of the Highway 101 and the western side of the Fairgrounds. To the north, along East Washington Street, there are commercial uses, while to the south, along Lindberg Lane, there is a mixture of industrial uses. D. Project Background The opportunity for the East Washington Place project arose as a result of the replacement of the former Kenilworth Junior High School to another Petaluma location at 800 Riesling Road. The applicant 1 Live Oak Charter School serves 225 K-7 th grade students and has plans to expand its services to 8 th graders for the school year. 3-4

5 Feet Source: SGPA Architecture + Planning, Gates & Associates, AMS Associates. N O RT H E A S T s ite pla n FIGU R E 3-3 C I T Y O F P E TA L U M A W A S H I N G T O N P L A C E E I R

6

7 purchased the parcel in May Petaluma City Schools has constructed a replacement junior high school using the financial proceeds of the sale. The environmental impacts of the school relocation were studied by the School District in compliance with the California Environmental Quality Act (CEQA) and a Negative Declaration was certified in July The replacement Kenilworth Junior High School opened for classes in September In 2006, the applicant completed the asbestos abatement and demolition of the existing school facilities on the project site. The applicant did not purchase the Petaluma School District transit facility at the southern portion of the former Kenilworth Junior High site. These transit facilities, which also include various school buildings, remain adjacent to the project site. In compliance with CEQA, a Negative Declaration was certified in October 2005 for the relocation of the facilities to 1240 North McDowell Boulevard in Petaluma. The potential demolition of the Little League's Carter Field is analyzed in the air quality, biology, and hazardous materials sections of this analysis. Demolition of this facility is not analyzed in the other sections of the EIR because its demolition would not result in impacts to the other issues analyzed. A Mitigated Negative Declaration was prepared by the Petaluma City Schools District for relocation of a portion of the existing baseball fields to Petaluma Junior High School, at 700 Bantam Way. The School District certified a Mitigated Negative Declaration under CEQA in August The removal of Carter Field and other fields on the project site is further discussed in the Parks and Recreation subsection of the Section 4.12, Public Services, of this EIR. E. Project Overview and Specific Components The basic concept for the proposed East Washington Place project is to construct a mixed-use development project on an infill site that is convenient to freeway, roadway, bicycle and pedestrian access and in the proximity of public transit. The mixed-use project would have retail and office components; each of these components is described below. The site plan for the proposed project is shown in Figure 3-3. Table 3-1 summarizes the project building program. 1. Retail Development Table 3-1 provides a summary of the project concept including approximate square footage and parking provisions for the proposed uses. The proposed site plan depicts the expected square footage for the retail area based on the maximum expected Caltrans right-of-way takings for the Highway 101 southbound on-ramp improvements; however, there is a possibility that Caltrans would not require as large of a right-of-way. In this event, the overall square footage of the major retail stores along 3-7

8 TABLE 3-1 BUILDING SUMMARY Retail Buildings Building Reference (Site Plan) Use Approximate Building Size (SF) Parking Provided (Spaces) Parking Ratio (Spaces/ 1,000 SF) A1 Anchor 130, GC Garden Center 8, M1 Major 15, M2 Major 24, M3 Major 20, M4 Major 20, M5 Major 18, M6 Major 42, S1 Shops 6, S2 Shops 10, S3 Shops 8, S4 Shops 8, S5 Shops 6, S6 Shops 9, S7 Shops 5, S8 Shops S9 Shops 5, S10 Shops 5, S11 Shops 10, O1 Office 6, O2 Office 10, TOTAL 377,951 1,

9 Highway 101 may be increased by up to 12,940 square feet. This square footage would likely be split between two users. This EIR has, in general, taken into consideration this potential variance in the project. a. Retail The primary feature in the retail portion of the site would be a major anchor tenant and would be located at the northeastern edge of the site, oriented towards the future Kenilworth Drive. One freestanding retail pad building would be built where the mixed-use buildings meet Kenilworth Drive. Two additional freestanding retail/restaurant pad buildings would be built at the corner of East Washington and Kenilworth Drive. At this time, the sole committed tenant is Target, slated to be the major anchor in the 139,000 squarefoot space and adjoining garden center. There is no reported committed tenant for two large anchor spaces of approximately 20,000 square feet. b. Mixed-Use Retail and Office Two vertically mixed buildings are proposed for the northwestern corner of the site adjacent to the swim center. For each building, there would be two commercial spaces. These retail sites would be oriented to the retail parking area. Offices would be located on the second floor of two of the buildings adjacent to East Washington Street and would constitute 16,000 square feet. 2. Circulation The project includes a number of circulation improvements to the site, as well as accommodating the proposed Highway 101/East Washington Place interchange improvements, as described below. To support project generated traffic, there will also be the need for off-site circulation improvements. a. Caltrans Road Improvements Although not part of the project proposal, Caltrans has had a long term plan to improve the southbound on-ramp onto Highway 101 off of East Washington Street. This road improvement plan is independent of the applicant s proposed project. The Caltrans plans anticipate a taking of the applicant s land to provide for future improvements to the southbound on-ramp onto Highway 101 in the northeast corner of the site. This proposed ramp change would smooth the transition onto the freeway to meet modern public safety standards. Ramp improvements and the estimated land to be taken by Caltrans have been incorporated into the site plan with future detailed plans pending further analysis by Caltrans. b. Automobile Access Primary access to the project from East Washington Street would circulate around the existing pool and skate park parcel via a new Johnson Drive. The proposed Johnson Drive would go around these 3-9

10 TABLE 3-2 PARKING SUMMARY Total Parking Provided: Standard Spaces Compact Spaces Handicapped Spaces Area Compact Spaces to Total Parking Space Ratio 20% Parking Provided 1,510 (4.0/1000) 1, Total Bicycle Parking Space Provided 126 FAR 0.26 Source: SGPA Architecture and Planning, Conceptual Site Plan, April facilities. Kenilworth Drive also provides automobile access to and from the site. The property on which the pool and the swim center are located is owned by the City; the fairgrounds control its overlaying lease. The area that would be used for project access would need to be removed from the fairground s lease and dedicated for public use as a street. 2 Additional access would be provided via Lindberg Lane on the southern end of the site. Several improvements would be made to streets that would provide access to and from the site. These improvements include: East Washington Street. The project would provide the following improvements along East Washington Street fronting the City swim center and Sonoma-Marin Fairgrounds access entrance (the new Johnson Drive), at the Highway 101 southbound on-ramp and on Kenilworth Drive: 1. Provide an eastbound bicycle lane along the project s East Washington Street frontage, consistent with the City s Bicycle Plan. 2. Provide a second left turn lane on the East Washington Street approach to the westbound Johnson Drive/Ellis Street intersection. 3. Provide the right-of-way for an improved Highway 101 southbound on-ramp at East Washington Street, in order that Caltrans may implement its long-term plans for this on-ramp. According to Caltrans, the change to the on-ramp would better conform to current safety standards. 2 Craig Spaulding, City of Petaluma Public Works Department. communication with Betsi Lewitter (contract Planner), October, 24,

11 4. Create an intersection in the middle of a 90-degree curve which would serve the swim center/skate park (on the inside of the curve) and the Fairgrounds (on the outside of the curve). 5. Provide sidewalks along the south and north side of East Washington Street. Kenilworth Drive. Kenilworth Drive would be realigned to provide right in/right out access to East Washington Street, between the project site and the existing public swim center. Kenilworth Drive would run along the boundary with the Fairgrounds and connect East Washington Street to Lindberg Lane. This road would accommodate traffic passing through the site or making internal trips. Traffic circulation for the retail and mixed use area would be provided by four driveways on Kenilworth Drive, with dedicated left turn pockets accessing the anchor retail project. These access points would connect to the main aisles leading to retail parking and circulation for the retail project. Kenilworth Drive is designed to accommodate potential future development should the Fairgrounds area be redeveloped in the future. 1. Provide an improved Kenilworth Drive with curbs, gutters and bike lanes along the western project frontage. 2. Provide an improved Kenilworth Drive with continuous frontage along the western project frontage. Johnson Drive. Johnson Drive would be constructed at the existing intersection of Ellis Street/Kenilworth Drive and East Washington Street. Johnson Drive would curve along the perimeter of the existing swim center/skate-park property to connect with the realigned Kenilworth Drive. It would connect to East Washington Street at the other end. Lindberg Lane. Lindberg Lane would provide access to the retail area from points south, including Payran Street, Caulfield Lane and Lakeville Highway. Skate Park and Swim Center. 1. Improve the separation between pedestrians and vehicles in the vicinity of the skate park by providing continuous sidewalks on all sides of the City swim center and skate park. 2. Clarify the poorly defined, confusing vehicle circulation and parking layout around the swim center and former Kenilworth School site. c. Truck Access Trucks servicing the retail portion of the project would be routed to the rear of the retail center, along the frontage with Highway 101. The truck circulation system is designed to keep trucks separate from automobile, bicycle and pedestrian areas by providing entry and exit points at the most northerly access point of the retail project. Trees would be planted and vines would grow on a proposed fence and 3-11

12 would act as a buffer to further separate the truck access from pedestrian and bicycle access routes. d. Transit Access There is no transit access proposed on the project site. However, Sonoma County Transit Bus Route 44 passes the site along East Washington Street and stops at Ellis Street. Pedestrian and bicycle access from the bus stop will be facilitated by new sidewalk and bicycle path construction proposed as part of the project. e. Pedestrian Access Pedestrian walkways within the project site would include crosswalks and ADA accessible ramps. Pedestrian connections to adjacent streets would be provided by 5-foot-wide sidewalks, with landscaping along Kenilworth and Johnson Drives. The sidewalk on Johnson Drive would be limited to the north side of the roadway. Along Kenilworth Drive there would be sidewalks on both sides for the portions of the roadway between East Washington Street and Johnson Drive. The portion of East Washington Street between Johnson Drive and Kenilworth Drive would only have sidewalks on the south side of the roadway. The existing pedestrian Highway 101 overpass would remain and would be integrated into the project for maximum pedestrian usage and safety, as shown on Figure 3-3. f. Bicycle Access Bicycle lanes would be added along the widened East Washington Street and along the entire portions of Kenilworth Drive within the project site and on Johnson Drive between Kenilworth Drive and East Washington Street. Bicyclists could access the project site via bike lanes on East Washington Street. The bike lanes along Kenilworth and Johnson Drives would be 5 feet wide. Facilities for bicycle parking would be located throughout the project site. There will be a total of 126 bike parking spaces. Total bike parking provided is based on a minimum of 10 percent of total parking required Parking Retail parking spaces would be 9 feet wide for standard stalls. The landscaping along end stalls would be designed to provide adequate parking and landscape areas. Compact stalls would be 8 feet wide. The overall parking ratio would be approximately four parking spaces per 1,000 square feet of retail space. In total, the project would provide 1,510 parking spaces on-site. The swim center and skate park parking and drive aisles will be reconfigured so as to integrate them with improvements to adjacent public streets. The reconfigured parking and drive isles will increase the Swim Center s parking count from 63 spaces to 84 spaces. As part of this reconfiguration, existing decrepit solar panels will be removed and replaced with new, more efficient solar thermal water panels. Greater detail regarding access reconfiguration can be found in subsection b. of this discussion. 3 SGPA Architecture and Planning, East Washington Place Conceptual Site Plan, April 11,

13 4. Open Space Open spaces, including nine plaza areas, will be designed as pedestrian gathering places with outdoor seating, public art features and will be enhanced with landscaping. These nine plaza areas represent approximately 44,000 square feet of open space. 5. Landscaping Landscaping would be used to break up the parking areas, provide shade and identify primary circulation pathways. All open space and play areas would be landscaped. Trees located along Kenilworth Drive would act as a traffic-calming feature. 6. Grading and Utilities The project site is generally flat, between 0 to 5 degrees of slope, and has been graded in the past for existing development and use. While the site would be re-graded to support drainage for the proposed project, there would not be major changes in topography. There are existing connections to utilities, which would be utilized to support the proposed project; however, no off-site improvements to water, wastewater or flood control facilities are proposed. a. Water Supply Water would be provided from an existing connection to the water main along East Washington Street, as well as a new connection to the water main within Lindberg Lane. The Applicant will extend and stub the connection to Lindberg Lane as part of the development improvement package. The on-site water distribution system would be designed to provide minimum fire flows, as follows: Commercial fire flow of 2,500 gallons per minute (gpm) at 20 pounds per square inch (psi) in the retail portion of the project. Pipe velocity below 10 feet per second (fps) in new pipes. Under the City s water capacity fee program, the project would provide a fair share fee toward the replacement of a 10-inch water main that supplies water to the project site. The main would be replaced by an 18-inch main. The existing main has been identified for replacement in the City s Water Capital Improvement Program due to its age and condition. 4 To help improve the City s overall the water supply, the Applicant has agreed to pay for construction of a well on or near the project site. Because there is no time commitment for construction of the well 4 City of Petaluma, Fiscal Year 2009 Budget: Water Utility Projects, page CIP-101, available at accessed April 1,

14 and no chosen location, the well is not analyzed further in this document. The impact of the well on groundwater supplies has been addressed in the City s overall water supply calculations. 5 The project would also include the provision of an irrigation system that would be connected to the City s recycled water system. To supply recycled water to the site, the City s piping system would be extended to Lindberg Lane, in accordance with the City s 2008 Recycled Water Master Plan. The connection will not be made until such time that recycled water Model Area E is improved. 6 When the recycled water improvements have been extended to Lindberg Lane, the irrigation system can be relatively easily converted to a recycled water system. b. Sanitary Sewer The project would be connected to sewer using the existing on-site sewer line connection to the sewer main in Lindberg Lane. There would be a connection to the existing Ellis Street sewer line that is located at the swim center and skate park property. c. Storm Water Drainage On-site drainage would utilize existing historic drainage patterns; however, the two drainage areas that comprise the southern portion of the existing site and the school bus facility adjacent to the site would be combined into one drainage area. On-site storage of stormwater would be provided by underground, oversized infrastructure. Details on the utilities system are provided in Section 4.14, Utilities, and Section 4.8, Hydrology and Water Quality. 7. Implementing Zoning Ordinance and Signage Requirements The project is in compliance with the property s General Plan and Zoning designation, MU1B. Per Section of the Petaluma Implementing Zoning Ordinance, all uses (including but not limited to general retail, professional/administrative office, plant nursery and building and landscape materials sales) proposed by the project are allowable under the MU1B zoning designation. The Implementing Zoning Ordinance requires that retailers occupying over 130,000 square feet (the anticipated retail use for the major tenant) have at least 8 loading berths. 7 Although the current project does not meet the current City requirements for the number of loading docks, it has been acknowledged by the City that the requirements may be excessive. 8 On past occasions, other applicants 5 City of Petaluma, May 2007, 2005 Urban Water Management Plan. 6 Model Area E refers to the Model Areas identified in Dodson Engineers, Water Demand and Supply Analysis Report. Prepared for City of Petaluma. Technical Appendix C to the General Plan 2025, Vol page 88. Downloaded June 9, The requirement is for 5 loading berths for 50,000-75,000 square feet and an additional berth for every additional 25,000 square feet. 8 from Betsi Lewitter to Alexis Lynch, DC&E, June 4,

15 have been required to provide a plan for the Site Plan and Architectural Review Committee (SPARC) to show how they could meet the requirements of the zoning ordinance if the number of proposed loading berths is shown to be insufficient. 9 F. Project Objectives The following is a list of objectives for the project: To develop a project with 380,000 square feet of retail and office buildings. To realize sufficient economic return on the property to construct the project. To provide local retail opportunities and, thereby, to reduce excess traffic on Highway 101 that currently is required for Petaluma residents to travel to other area communities such as Novato, Rohnert Park, and Santa Rosa to satisfy local retail demands. To address the City-identified goal to alleviate retail leakage from the community at this preferred location as identified in the City s Leakage & Sustainable Retail Strategy Study June, 2004 prepared by Thomas Consultants Inc., and the General Plan s Key Issue for Economic Health as cited on page i-6 of the General Plan. To increase the number of locally available jobs by increasing the number of professional and retail sales venues for businesses. To locate the project on an urban infill site with convenient freeway, roadway, bicycle and pedestrian access and in the proximity of public transit. To incorporate Caltrans ramp improvements without significant adverse impacts on the project size or economics. To construct a high-quality, aesthetically-pleasing and economically-viable mixed-use development with a combination of retail and office uses. To meet major retail tenant signage requirements and parking requirements of a minimum of 4 spaces per 1,000 square feet of retail. To facilitate the stated goal of the City and the Petaluma City School District to replace the outdated Kenilworth Junior High School at its new location by Fall, After relocating the existing school, to create the redevelopment opportunity to provide for the financial benefits of sales tax and property tax increment to the City that will be provided by the proposed redevelopment of these previously public lands. 9 from Betsi Lewitter to Nicola Swinburne, DC&E, June 11, This was an original Project Objective and has been achieved. 3-15

16 G. Project Phasing Kenilworth Junior High School, previously located on the project site, has been vacated and fully demolished. On-site and off-site improvements would be constructed concurrently. The retail and office uses would be under construction at the same time. The retail component would be completed within 12 months of construction commencement. Full absorption of the retail will take about 6 to 9 months following the opening of the major tenants. Construction of the project is estimated to begin in March 2010 with the opening of the project scheduled for July H. Required Project Approvals Permits and approvals required from the City of Petaluma include: Vesting Tentative Map Approval Certification of EIR Site Plan and Architectural Review Committee Development of the Project also may require permits or approvals from the following agencies: California Department of Transportation (Caltrans) California Department of Food & Agriculture San Francisco Bay Regional Water Quality Control Board United States Army Corps of Engineers Sonoma County Water Quality Board Sonoma County Water Agency 3-16

4.1 AESTHETICS. A. Regulatory Framework

4.1 AESTHETICS. A. Regulatory Framework 4.1 This section includes a description of the existing visual setting of the project site and an analysis of the effects the proposed project would have on aesthetics in the project vicinity. Aesthetics

More information

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014 Introduction / Written Statement McDonald s Restaurant - Purcellville McDonald s Corporation is proposing to redevelop the existing McDonald s eating establishment with a drive-through located at 121 N

More information

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -

More information

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT TO: State Clearinghouse, Responsible and Trustee Agencies, and Other Interested Parties DATE: May 18, 2017 SUBJECT: Notice of Preparation of Environmental

More information

1650 LOS GAMOS DRIVE ENTITLEMENTS. Project Description

1650 LOS GAMOS DRIVE ENTITLEMENTS. Project Description 1650 LOS GAMOS DRIVE ENTITLEMENTS Project Description KAISER FOUNDATIONS INC. 1650 Los Gamos Drive San Rafael, CA PA Number: 839-951-01 2/17/2017 Project Description for Kaiser Permanente s 1650 Los Gamos

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION To: All Interested Parties Subject: Notice of Preparation of an Environmental Impact Report From: City of Petaluma Address: 11 English Street, Petaluma, CA 94952-2610 Contact: Heather

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213

More information

Prepared by: Casey Kempenaar, Senior Planner

Prepared by: Casey Kempenaar, Senior Planner CITY OF CITRUS HEIGHTS PLANNING DIVISION STAFF REPORT PLANNING COMMISSION MEETING September 13, 2017 Prepared by: Casey Kempenaar, Senior Planner REQUEST The applicant requests a Design Review Permit Modification

More information

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment Urban Design Brief Proposed Official Plan & Zoning By-Law Amendment 3244, 3263 and 3274 Wonderland Road South Southside Group December 23, 2015 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT PUBLIC COMMENT PERIOD November 12, 2015 to December 14, 2015 INTRODUCTION The City

More information

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative Introduction Mitchell Ranch South is a proposed single family (detached) residential development on

More information

Olde Towne Vision Plan

Olde Towne Vision Plan Olde Towne Vision Plan Introduction In 2016, the City of Bellevue will complete its move of City offices from Olde Towne Bellevue to its new municipal complex on Wall Street. The City intends to sell its

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION To: Agencies, Organizations, and Interested Parties From: City of Alameda, Community Development Services Department Subject: Notice of Preparation of a Draft Environmental Impact

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

The subject site plan amendment proposes the following revisions to the approved site plan:

The subject site plan amendment proposes the following revisions to the approved site plan: PROPOSED AMENDMENT The subject site plan amendment proposes the following revisions to the approved site plan: 1. The building footprint was modified to accommodate the revised architectural design. 2.

More information

Rezoning Petition Zoning Committee Recommendation August 1, 2017

Rezoning Petition Zoning Committee Recommendation August 1, 2017 Rezoning Petition 2017-090 Zoning Committee Recommendation August 1, 2017 REQUEST LOCATION SUMMARY OF PETITION PROPERTY OWNER PETITIONER AGENT/REPRESENTATIVE COMMUNITY MEETING STATEMENT OF CONSISTENCY

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. December 21, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT DATE: April 29, 2013 STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT 1100 Patricia Boulevard, Prince George, B.C., V2L 3V9 TO: FROM: SUBJECT: MAYOR AND COUNCIL JESSE DILL, PLANNER Development Variance

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. June 18, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

PLANNING COMMISSION. Submitted

PLANNING COMMISSION. Submitted PLANNING COMMISSION City Hall 1275 Main Street El Centro, CA 92243 Submitted PLANNING COMMISSION ACTION ITEM (1844) Meeting: 05/10/16 12:00 AM Department: Community Development Category: Public Hearing

More information

M E M O R A N D U M July 27, 2018

M E M O R A N D U M July 27, 2018 M E M O R A N D U M July 27, 2018 To: Southlake 2035 Corridor Planning Committee From: Kenneth Baker, Sr. Director of Planning and Development Services Subject: Item #6 First National Bank Purpose Review,

More information

SHEFFIELD PARK Paulding County, GA DRI #588

SHEFFIELD PARK Paulding County, GA DRI #588 SHEFFIELD PARK Paulding County, GA DRI #588 Supplemental Information for RDC s DRI (Form 2) Review August 16, 2004 Prepared for: Mr. David Howerin Coosa Valley RDC 1 Jackson Hill Drive Rome, GA 30161 P.O.

More information

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013 Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN

More information

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP PROJECT DESCRIPTION ENVIRONMENTAL SETTING Project Site Location The proposed project site is located within the City of Camarillo in Ventura County. As shown in Figure 1, the City of Camarillo is located

More information

City of Fontana Notice of Preparation and Notice of Public Scoping Meeting Fontana North Walmart Project

City of Fontana Notice of Preparation and Notice of Public Scoping Meeting Fontana North Walmart Project Notice of Preparation and Notice of Public Scoping Meeting Fontana North Walmart Project Date: Monday, February 22, 2016 To: From: Subject: Public Agencies and Interested Parties Orlando Hernandez, Senior

More information

Appendix I-A3 DENAIR COMMUNITY PLAN

Appendix I-A3 DENAIR COMMUNITY PLAN Appendix I-A3 DENAIR COMMUNITY PLAN Adopted by the Stanislaus County Board of Supervisors DECEMBER 15, 1998* *A technical update removing reference to the former Stanislaus County Redevelopment Agency

More information

Planning Districts INTRODUCTION

Planning Districts INTRODUCTION INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is

More information

Ten Mile Creek Planning Area

Ten Mile Creek Planning Area PLANNING AREA POLICIES TEN MILE CREEK Ten Mile Creek Planning Area Location and Context The Ten Mile Creek Planning Area ( Ten Mile Creek area ) is located south of the current Boise AOCI, generally south

More information

CITY OF SANTA ROSA PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT STAFF REPORT FOR PLANNING COMMISSION JUNE 23, 2016 APPLICANT. Joseph Rubin MJP15-005

CITY OF SANTA ROSA PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT STAFF REPORT FOR PLANNING COMMISSION JUNE 23, 2016 APPLICANT. Joseph Rubin MJP15-005 Item No. 9 CITY OF SANTA ROSA PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT STAFF REPORT FOR PLANNING COMMISSION JUNE 23, 2016 PROJECT TITLE ADDRESS/LOCATION 3785 Cleveland Avenue ASSESSOR S PARCEL NUMBER

More information

OP Council Resolution June 16, Planning and Development Services

OP Council Resolution June 16, Planning and Development Services OP-08-01 Council Resolution June 16, 2008 Planning and Development Services Kingsgate Landing Outline Plan Table of Contents 1.0 Introduction 1 1.1 Purpose of Plan 1 1.2 Plan Area Location 1 1.3 Ownership

More information

Advance Engineering & Surveying PLLC

Advance Engineering & Surveying PLLC Advance Engineering & Surveying, PLLC Consulting in: Civil & Environmental Engineering Land Surveying Land Development 11 Herbert Drive Phone: (518) 698-3772 Latham, N.Y. 12110 Email:ncostape@gmail.com

More information

MEMO 1. INTRODUCTION PURPOSE & PROCESS REQUEST

MEMO 1. INTRODUCTION PURPOSE & PROCESS REQUEST MEMO Date: August 22, 2017 To: Board of Commissioners From: Jason Burdette, Planning Director Re: Davidson Commons East Hotel Stakeholder Feedback 1. INTRODUCTION PURPOSE & PROCESS This memorandum summarizes

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

Jordan Harrison, Planner III, San Francisco Recreation and Park Department

Jordan Harrison, Planner III, San Francisco Recreation and Park Department Date December 8, 2015 To: Through: From: Subject: Recreation and Park Commission Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division Jordan Harrison, Planner III,

More information

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN) Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Business License Building Fire Prevention Planning Public Works 707.648.4310 707.648.4374 707.648.4565 707.648.4326 707.651.7151 PLANNED DEVELOPMENT

More information

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013 APPENDIX 5 - Guiding Design Vision and Principles Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013 Vision Statement The redevelopment of the former

More information

9 th Street Sub Area Plan

9 th Street Sub Area Plan 9 th Street Sub Area Plan In the 1990 s, when the Township prepared the last Master Plan, the 9 th Street corridor was studied as part of a larger 9 th Street Focus Area that included the West Main Street

More information

TO: Glynn County Islands Planning Commission. Karl Bursa, AICP, Planner II. SP3124 Aviator Plaza. DATE: November 17, 2015

TO: Glynn County Islands Planning Commission. Karl Bursa, AICP, Planner II. SP3124 Aviator Plaza. DATE: November 17, 2015 COMMUNITY DEVELOPMENT DEPARTMENT Planning and Zoning Division 1725 Reynolds Street, Suite 200, Brunswick, GA 31520 Phone: 912-554-7428/Fax: 1-888-252-3726 TO: Glynn County Islands Planning Commission MEMO

More information

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC 14 October 10, 2012 Public Hearing APPLICANT: MPB, INC PROPERTY OWNER: MUNDEN & ASSOCIATES, LP STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-1 & AG-2 to Conditional O-2) ADDRESS

More information

NORTH, NORTH REDWOOD BOULEVARD CORRIDOR STUDY

NORTH, NORTH REDWOOD BOULEVARD CORRIDOR STUDY BOULEVARD CORRIDOR STUDY Southern Central Northern STUDY AREA OPPORTUNITIES AND CONSTRAINTS BOULEVARD CORRIDOR WORKSHOP Constraints Wetlands For illustrative purposes only BINFORD RD RUSH LANDING RD BOULEVARD

More information

UNIVERSITY OF CALIFORNIA, SAN DIEGO

UNIVERSITY OF CALIFORNIA, SAN DIEGO UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ CAMPUS PLANNING 9500 GILMAN DRIVE # 0074 TEL: (858) 534 6515 LA JOLLA,

More information

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project Planning and Development Department Land Use Planning Division NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project Notice

More information

DRAFT Civic Center Station Area Plan. Executive Summary

DRAFT Civic Center Station Area Plan. Executive Summary DRAFT Civic Center Station Area Plan Executive Summary This project is funded in part through the Metropolitan Transportation Commission s Station Area Planning Program. The preparation of this report

More information

FY Capital Improvement Program Arroyo Projects

FY Capital Improvement Program Arroyo Projects FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 Hahamongna - Implement Master Plan - Oak Grove Area Improvements (7756) Hahamongna - Implement Master

More information

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW Steering Committee Presentation February 14, 2018 Purpose of General Plan Guide land use and development decisions Coordinate transportation, infrastructure,

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

I. Introduction. Prior Approvals

I. Introduction. Prior Approvals Statement of Justification First National Bank 19790 Crystal Rock Drive, Germantown, Maryland Application for Site Plan and Limited Preliminary Plan Amendment I. Introduction DPH Architecture, for First

More information

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan Department of Community Planning & Economic Development 50 South 4th Street, Room 300 Minneapolis, MN 5545-385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,

More information

Carlsbad Village Redevelopment Concept Summary of Features

Carlsbad Village Redevelopment Concept Summary of Features Carlsbad Village Redevelopment Concept Summary of Features Calthorpe Associates November 5, 2003 The Redevelopment Concept illustrates a vision for the future of Carlsbad Village. The overall vision of

More information

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development CITY OF MANHATTAN BEACH STAFF REPORT TO: Planning Commission THROUGH: Marisa Lundstedt, Director of Community Development FROM: Tony Olmos, Director of Public Works DATE: April 29, 2015 SUBJECT: Determination

More information

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165 Planning Commission Charter Township of Lyon 58000 Grand River Ave. New Hudson, MI 48165 Subject: AP-18-68; 11 Mile and Milford Road Park, Site Plan Review #1 Based on site plan dated 11/12/18 Location:

More information

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT PETITION INFORMATION Docket # C-226 Staff Megan Ledbetter Petitioner(s) JBJH Properties, LLC Owner(s) JBJH Properties, LLC Subject Property 5892-49-1766

More information

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX City of Reedley SPECIAL PERMIT Submittal Requirements Conditional Use Permit (CUP), Site Plan Review (SPR) & Variance (VAR) Please use this information sheet as a checklist to assemble materials required

More information

Rezoning Petition Pre-Hearing Staff Analysis October 15, 2018

Rezoning Petition Pre-Hearing Staff Analysis October 15, 2018 Rezoning Petition 2017-137 Pre-Hearing Staff Analysis October 15, 2018 REQUEST Current Zoning: R-3 (single family residential) Proposed Zoning: B-2(CD) (general business, conditional) LOCATION Approximately

More information

CITY OF ZEELAND PLANNING COMMISSION

CITY OF ZEELAND PLANNING COMMISSION APPLICATION FOR SITE PLAN REVIEW AND SPECIAL LAND USE Date City Official App. Filing Fee Rec'd ($350) NOTE TO APPLICANT: Please submit this application for Site Plan Review along with twenty (20) copies

More information

DEPARTURE FROM DESIGN STANDARDS DDS-586

DEPARTURE FROM DESIGN STANDARDS DDS-586 The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001 City Center Specific Plan Amendments And Background Report City of Richmond PLANNING COMMISION FINAL DRAFT January, 2001 TABLE OF CONTENTS Page LIST OF TABLES... LIST OF FIGURES... INDEX... OVERVIEW...

More information

Tyvola & Archdale Transit Station Area Plan. May 15, 2008

Tyvola & Archdale Transit Station Area Plan. May 15, 2008 Tyvola & Archdale Transit Station Area Plan First Public Meeting May 15, 2008 Presentation Outline 1. Purpose and Process 2. Station Area Overview 3. Plan Recommendations Vision Land Use Transportation

More information

Asbury Chapel Subdivision Sketch Plan

Asbury Chapel Subdivision Sketch Plan Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential

More information

A. WHAT IS A GENERAL PLAN?

A. WHAT IS A GENERAL PLAN? I. Introduction A. WHAT IS A GENERAL PLAN? A general plan is the planning guideline for the future of a city. It contains goals and policies which regulate urban development, the protection of the natural

More information

CHAPTER 7: Transportation, Mobility and Circulation

CHAPTER 7: Transportation, Mobility and Circulation AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to

More information

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Notice is hereby given that the City of Alameda, Lead Agency, will prepare an Environmental Impact Report

More information

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North. MEMORANDUM Date: August 28, 2015 Our File: 1010-20-15-062 To: Design Review Committee From: Lisa Berg, Senior Community Planner Re: Amendment to Development Permit for Park Royal North This memo deals

More information

3.0 Cumulative Scenario and Methodology. 3.0 Cumulative Scenario and Methodology

3.0 Cumulative Scenario and Methodology. 3.0 Cumulative Scenario and Methodology 3.0 Cumulative Scenario and Methodology Under the CEQA Guidelines, a cumulative impact consists of an impact which is created as a result of the combination of the project evaluated in the environmental

More information

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018 Rezoning Petition 2018-015 Pre-Hearing Staff Analysis April 16, 2018 REQUEST LOCATION Current Zoning: R-4 (single family residential) and UR-2(CD) (urban residential, conditional) Proposed Zoning: UR-2(CD)

More information

Transportation. Strategies for Action

Transportation. Strategies for Action Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;

More information

4 LAND USE DESIGNATIONS

4 LAND USE DESIGNATIONS 4 LAND USE DESIGNATIONS Chapter 4 describes the land use designations and densities that will implement the development vision for North Burlingame outlined in Chapter 3. Land use densities are described

More information

WEST OAKLAND SPECIFIC PLAN PROJECT DESCRIPTION

WEST OAKLAND SPECIFIC PLAN PROJECT DESCRIPTION WEST OAKLAND SPECIFIC PLAN PROJECT DESCRIPTION INTRODUCTION The West Oakland Specific Plan will guide future development in West Oakland. The purpose of the proposed West Oakland Specific Plan is to provide

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicant is the J.H. Snyder Company located at 5757 Wilshire Boulevard, Penthouse 20, in Los Angeles, CA 90036. B. PROJECT LOCATION The project

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

ZONING COMPLIANCE PERMIT APPLICATION

ZONING COMPLIANCE PERMIT APPLICATION ZONING COMPLIANCE PERMIT APPLICATION 405 Martin Luther King Jr. Blvd phone (919) 968-2728 fax (919) 969-2014 www.townofchapelhill.org Parcel Identifier Number (PIN): Date: Section A: Project Information

More information

Ohlone College Measure G Project Scope Revisions

Ohlone College Measure G Project Scope Revisions Scope Revisions Current Title Revised Title Current Scope Revised Scope 6101 Relocated Baseball Field Athletic Fields Create new sustainable baseball field with synthetic turf, bleacher seating and batting

More information

Rezoning Petition Final Staff Analysis October 2, 2018

Rezoning Petition Final Staff Analysis October 2, 2018 Rezoning Petition 2017-205 Final Staff Analysis October 2, 2018 REQUEST Current Zoning: MUDD-O (mixed use development district, optional) Proposed Zoning: MUDD-O SPA (mixed use development district, optional,

More information

4 February 11, 2015 Public Hearing

4 February 11, 2015 Public Hearing 4 February 11, 2015 Public Hearing APPLICANT: TAKE 5 OIL CHANGE, LLC PROPERTY OWNER: 1928 LASKIN RD, LLC (C/O TERRY VEITH) STAFF PLANNER: Graham Owen REQUEST: Conditional Use Permit (Automobile Repair

More information

DRAFT. 10% Common Open Space

DRAFT. 10% Common Open Space % OF CHARLOTTE IS CATEGORIZED AS A. LAND USES : Placeholder map displaying location of Place Type GOALS: Accommodate XX% of future growth. Provide a concentration of primarily commercial and civic activity

More information

PLANNING COMMISSION. Agenda Item # 3.

PLANNING COMMISSION. Agenda Item # 3. PLANNING COMMISSION Agenda Item # 3. CASE SUMMARY Conditional District Rezoning Planning Commission February 4, 2015 CD-9-215 Jeff Walton, 341-3260, jeff.walton@wilmingtonnc.gov Staff recommendation CONDITIONAL

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

M E M O R A N D U M November 9, 2018

M E M O R A N D U M November 9, 2018 M E M O R A N D U M November 9, 2018 To: Southlake 2035 Corridor Planning Committee From: Kenneth Baker, Sr. Director of Planning and Development Services Subject: Item #8 Up to thirteen (13) residential

More information

REPORT TO PLANNING COMMISSION

REPORT TO PLANNING COMMISSION CITY OF Meeting Date: October 25, 2011 Agenda Item: Community Development Department Planning Division P. O. Box 151560, San Rafael, CA 94915-1560 PHONE: (415) 485-3085/FAX: (415) 485-3184 Case Numbers:

More information

2 Project Description

2 Project Description Project Description 2 Project Description The proposed project would involve the demolition of the existing church and the construction of 40 twostory single family residences. The residential lots would

More information

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period. Definitions Access Management: A combination of physical techniques and transportation policies used to control the flow of traffic between roads and the surrounding lands. Alternative City Form Scenarios:

More information

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance

More information

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director MEMORANDUM DATE: March 15, 2019 TO: FROM: Chairman and Members Community Redevelopment Agency Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director SUBJECT: Camino Square, IDA No. CRP-16-02, located at 171

More information

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way PROJECT FACT SHEET Section A: Project Information Application type: Date: Project Name: Use Type: (check/list all that apply) Office/Institutional Residential Mixed-Use Other: Overlay District: (check

More information

include playgrounds, sports fields, community gardens and picnic areas.

include playgrounds, sports fields, community gardens and picnic areas. DEVELOPMENT PLAN OPEN SPACE SYSTEM OPEN SPACE SYSTEM The neighborhood provides for a range of open space types. The Village Square is an important open space in the neighborhood. It serves as a gathering

More information

CITY OF SIMI VALLEY MEMORANDUM

CITY OF SIMI VALLEY MEMORANDUM CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. 9.1 May 18, 2016 TO: FROM: Planning Commission Department of Environmental Services SUBJECT: REVIEW OF POTENTIAL FISCAL YEAR (FY) 2016-17 CAPITAL IMPROVEMENT

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW OF PUTNAM COUNTY, WEST VIRGINIA Page 95 1150.01 PURPOSE 1150.02 APPLICABILITY 1150.03 APPLICATION PROCESS 1150.04 REVIEW PROCESS 1150.05 REVIEW CRITERIA 1150.06 SITE PLAN GUIDELINES 1150.01 PURPOSE ARTICLE

More information

Errata 1 Landmark Apartments Project Final Environmental Impact Report

Errata 1 Landmark Apartments Project Final Environmental Impact Report Errata 1 Project Final Environmental Impact Report This document addresses proposed refinements to the Project evaluated in the (EIR or Final EIR) prepared in September 2016. Specifically, in response

More information

FUTURE LAND USE ELEMENT

FUTURE LAND USE ELEMENT FUTURE LAND USE ELEMENT GOAL I: To create and sustain a great place to live, play, and prosper Objective 1: The City of Ocala shall incorporate the principles and strategies of the Ocala 2035 Vision into

More information

SPRINGHILL LAKE TRANSIT VILLAGE

SPRINGHILL LAKE TRANSIT VILLAGE Greenbelt Metro Area Sector Plan - Subarea Design Policies and Guidelines - Springhill Lake Transit Village 113 SPRINGHILL LAKE TRANSIT VILLAGE Residential Neighborhood and Village Center CONCEPT Springhill

More information

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS CITY OF CYPRESS 5275 Orange Avenue Cypress, California 90630 (714) 229-6720 DESIGN REVIEW COMMITTEE PERMIT PROCESS 1. Discuss project with Planning staff to determine zoning regulations, any unusual characteristics

More information

Executive Summary. NY 7 / NY 2 Corridor

Executive Summary. NY 7 / NY 2 Corridor Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions

More information

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

IV.B. VISUAL RESOURCES

IV.B. VISUAL RESOURCES IV.B. VISUAL RESOURCES ENVIRONMENTAL SETTING Existing Visual Character Project Site The project site is located at 17331-17333 Tramonto Drive in the Pacific Palisades community of the City of Los Angeles

More information

Town of Chapel Hill. Prepared By: A Division of Pennoni. Chapel Hill, NC (919) Firm License: F-1267.

Town of Chapel Hill. Prepared By: A Division of Pennoni. Chapel Hill, NC (919) Firm License: F-1267. 401 Providence Road Suite 200 Chapel Hill, NC 27514 T: 919-929-1173 F: 919-493-6548 Firm License #: F-1267 www.pennoni.com Town of Chapel Hill Orange County, North Carolina STATEMENT OF COMPLIANCE Prepared

More information

Community Feedback and Recommendations. FAQ Section. 2. Will there be enough open space for the amount of new people proposed to live in the area?

Community Feedback and Recommendations. FAQ Section. 2. Will there be enough open space for the amount of new people proposed to live in the area? Community Feedback and Recommendations How long do we have to respond to the documents? Response: Comments must be received by October 1st Open Space FAQ Section 1. Where will the open space and/or parks

More information

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK Page 34 CITY PLANNING COMMISSION AGENDA ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK FILE NOS: CPC ZC 12-00035 QUASI-JUDICIAL CPC NV 12-00036 QUASI-JUDICIAL AR DP 12-00039 QUASI-JUDICIAL PROJECT: APPLICANT: OWNER: