RESERVE DATA ANALYSIS est.1983

Size: px
Start display at page:

Download "RESERVE DATA ANALYSIS est.1983"

Transcription

1 RESERVE DATA ANALYSIS est.1983 Office (866) Bellevue Way NE, #483, Bellevue, WA SAMPLE MUSEUM Level 1 Full Reserve Study (With Site-Visit) Prepared For Fiscal Year 1/86

2 Contents 1 Title Page 2 Table of Contents 3 Preface 4 Reserve Disclosures (Part 1) 5 Reserve Disclosures (Part 2) 6 Cash Flow Analysis 7 Yearly Review Chart 8 Disbursement By Year 9 Reserve Balance Distribution 10 Allocation Breakdown 11 Category Breakdown Chart 12 Fully Funded Balance Breakdown 13 Category Summary 14 Component Details 15 Field Report (L1/L2) Appendices 14 All Rights Reserved. 2/86

3 Preface The individual responsible for report preparation and/or oversight is Joel Tax. Information contained in the report is considered reliable, but is not guaranteed. The report does not warrant against the contingency of unforseen conditions or circumstances, unreliable information, or an unpredictable inflationary or deflationary spiral. The report is not intended to predict precise expectations, but rather to chart the expectations that a reasonable person might anticipate in planning for the fiscal future. The scope of this report is expressly limited to the components described herein. It is strongly recommended by the Reserve Study Industry to have this reserve study report updated on an annual basis to ensure the security of a long-term funding plan. These necessary updates provide statutory compliance (as applicable) and allow for adjustments due to actual year-end inflation rate, actual year-end reserve balance and the unpredictable nature of the lives of many of the reserve components under consideration. 3/86

4 Reserve Disclosures Profile Name Location Units/General Type Base Year / Age Fiscal Year Ends Sample Museum Seattle, WA / Commercial 13 / 2 December-31 Parameters Level of Service Prepared for Fiscal Year (FY) Most Recent On-Site Inspection Date Allocation Increase Rate Contingency Rate Inflation Rate Interest Rate / Tax Rate Interest Rate (net effective) Current Reserve Allocation Current Reserve Balance Funding Plan - Method / Goal Level 1 Full Reserve Study (With Site-Visit) February 10, 15 ref Cash Flow Analysis ref Component Details 3.0% 1.0% / 0.0% 1.0% $48,000 per year $310,000 as of January 01, Cash Flow / Threshold - achieve 100% Percent Funded in 30 years Summary FY Start Balance Fully Funded Balance Percent Funded $99,0 $376,915 26% (projected to current FY end/next FY start) Proposed Budget per year per month per unit per month Reserve Allocation $127,198 $10,600 $ Association management/members need to understand that Percent Funded is a general indication of reserve strength and that the parameter fluctuates from year to year due to the Disbursement Schedule. The Reserve Allocation was determined using the Funding Plan indicated above under the Parameters section. This allocation should be increased annually using the Allocation Increase Rate found in the Cash Flow Analysis. Association management should budget the Reserve Allocation amount toward reserves for next fiscal year, to ensure the availability of reserves to fund future reserve component expenditures. This amount reflects an increase of 5.00 % from the Current Reserve Allocation. The Reserve Allocation must be reviewed and adjusted for inflation (and other vital factors) in succeeding years to ensure the- Security of a Successful Plan! 4/86

5 Reserve Disclosures Reserve Component Current Cost Useful Life Remaining Life 01 Auditorium Accessibility Lift Cinema Projection System Cinema Sound System - Retrofit Curtains Curtains Power Control and Track System Gypsum Board Suspended Ceiling - Refinish 17 Kaleidescape Server 8 5 Projection Screen with Power Lift Seating - Theatre Style Bathroom Fixtures Bathroom Countertops $5, Bathroom Partitions $6, Bathroom Sinks $5, Bathroom Urinal Partition $ Bathroom Urinals $4, Bathroom Water Closets $6, Bistro Appliances - Bar Refrigerator (Under-counter) Appliances - Beverage Cooler Boxes 17 Appliances - Commercial Coffee Grinder Appliances - Commercial Duel Coffee Maker Appliances - Commercial Hot Water Dispenser Appliances - Countertop Induction Range/Cooker 10 7 Appliances - Freezer (Under-counter) Appliances - Holding Cabinets 17 Appliances - Ice Machine (Under-counter) 10 7 Appliances - Meat Slicer 17 Appliances - Metal Grid Shelf Carts Appliances - Prep Refrigerator (Moveable) Appliances - Rack Style Dishwasher 10 7 Appliances - Refrigerator (True, Two Section) Appliances - Stainless Cleaning Station Single Sink Appliances - Stainless Cleaning Station Single Sink with Dishwasher Appliances - Stainless Prep Sink, Triple Sink Appliances - Stainless Prep Table /86

6 Reserve Disclosures Reserve Component Current Cost Useful Life Remaining Life 03 Bistro Appliances - Stainless Table Appliances - Turbo Chef High Speed Convection Micro Oven 17 Bistro Counters and Cabinets - Refurbish 17 Bistro/Kitchen Plumbing - Repair Contingency Computer Equipment 8 5 Indoor Furnishings - Bench Seat 17 Indoor Furnishings - Large Tables 17 Indoor Furnishings - Small Tables 17 Indoor Furnishings - Stackable Leland Chairs 17 Kitchen Backflow Devices - Rebuild/Replace 12 9 Outdoor Furnishings - Large Patio Tables 10 7 Outdoor Furnishings - Patio Chairs 10 7 Outdoor Furnishings - Propane Heaters 10 7 Outdoor Furnishings - Small Patio Tables 10 7 Outdoor Furnishings - Umbrellas 10 7 TV Monitor Building Exterior Metal Siding - Replace $12, Stone Veneer - 50% Repair Contingency $6, Tigerwood Rainscreen Siding - Replace $53, Ceiling & Wall Finishes Acoustic Tile Suspended Ceiling - 5% Repair Contingency $1, Acoustic Tile Suspended Ceiling - Refinish $15, Acoustic Tile Suspended Ceiling - Replace $49, Gypsum Board Suspended Ceiling - 5% Repair Contingency $1, Gypsum Board Suspended Ceiling - Refinish $14, Gypsum Board Suspended Ceiling - Replace $42, Gypsum Board Walls (In Galleries Only) - 25% Repair/Replace Contingnecy $14, Classroom Chairs - Stackable Classroom Classroom Projector Classroom Projector Screen /86

7 Reserve Disclosures Reserve Component Current Cost Useful Life Remaining Life 06 Classroom Storage Cabinets Doors Exterior Metal Doors $4, Glass Storefront Entry Door Auto Openers $5, Glass Storefront Entry Doors $17, Interior Doors $24, Pocket Doors $3, Elevator Elevator Cab Refurbish & Door Package $, Elevator System - Maintenance/Repairs 1 1 Elevator System - Modernize/Upgrade $75, Event Equipment Chairs - Stackable Fabric Covered Tables - Folding Fire Systems Backflow for Fire System $2, Fire System - Testing & Minor Repairs 1 1 Fire System Panel - Upgrade/Modernize $6, Fire System Sprinkler Heads - Replace $17, Floor Finishes Carpet Flooring - Auditorium $5, Carpet Flooring - Lower Level $9, Carpet Flooring - Sherry Grover Gallery $3, Carpet Flooring - Upper Level $9, Concrete Flooring Refinish - Auditorium $2, Concrete Flooring Refinish - Lower Level $22, Concrete Flooring Refinish - Main Level $10, Hardwood Flooring Refinish - Grand Staircase $1, Hardwood Flooring Refinish - Main & Upper Level $42, Hardwood Flooring Refinish - Stage $1, Hardwood Flooring Replace - Grand Staircase $22, Hardwood Flooring Replace - Main & Upper Level $129, Hardwood Flooring Replace - Stage $5, Tile Flooring - Main Level Bathrooms $6, Tile Flooring - Upper Level Bathrooms $6, /86

8 Reserve Disclosures Reserve Component Current Cost Useful Life Remaining Life 11 Floor Finishes 11. Vinyl Flooring - Upper Level Bathroom $ Vinyl/Lino Flooring - Classroom Upper Level $12, Gallery - Furnishings Day Lounger Exhibit Display Cabinet Exhibit Display Pedestal Partition Walls 17 Sherry Grover - Display Cabinets Sherry Grover - Display Table Case Sherry Grover - Stackable Leland Chairs 17 Sherry Grover - TV 10 7 Small Tables Stanchions 17 Wood Benches Wood Table Sets Glazing Systems Louver Sun Shade System - Replace $93, Storefront Type (Exterior) - Repair $27, Storefront Type (Exterior) - Replace $46, Storefront Type (Interior) - Repair/Replace 1 1 Structural Glazing Systems - Repair $1,1 17 Structural Glazing Systems - Replace $330, Window Interior Sun Shades - Replace $32, Kitchenette Appliances - Dishwashers Appliances - Microwaves 10 7 Appliances - Refrigerators Appliances - Sinks Cabinets & Countertops - Refurbish Landscaping & Irrigation Greenscreen Metal Vine Wall $7, Rooftop Garden - Membrane $7, Rooftop Garden - Renovate $19, Lighting - Exterior.01 Recessed Fixtures $4, /86

9 Reserve Disclosures Reserve Component Current Cost Useful Life Remaining Life 17 Lighting - Interior Lighting - Cove Light Fixtures $2, Lighting - Exhibit Track Fixtures $25, Lighting - Pendant Linear Fluorescent Fixtures $, Lighting - Recessed 2' x 2' Fixtures (Lower Level) $2, Lighting - Recessed Multilamp Fixtures $, Lighting - Recessed/Pendant Single Fixtures $13, Mechanical A/C Units, Ceiling Mounted (Mitsubishi) - Replace $13, A/C Units, Floor Mounted (Mitsubishi) - Replace $3, Air Handling Unit (11,230 CFM) - AHU #3 $50, Air Handling Unit (5,175 CFM) - AHU #2 $30, Air Handling Unit (800 CFM) - AHU #1 $13, Backflow Device for Mechanical $2, Boiler, Electric (563 MBH) - EB #1 $23, Chemical Feeder $2, Compressors 2hp, 29 Gallon $1, Dampers, Fire /Smoke $4, Dampers, Motorized Control $7, Expansion Tanks $9, Fans, Exhaust (300 CFM) - EF #1-2 $ Fans, Exhaust (340 CFM) - EF #2-1 $ Fans, Exhaust (380 CFM) - EF #L-1 $ Fans, Exhaust (850 CFM) - EF #1-1 $1,0 17 Fans, Scavenger (2,000 CFM) - #SF-L-1 $4, Fluid Cooler, Closed Loop $30, Generator - 14 KW $15, Heat Pumps Ton Geothermal Water to Air $36, Heat Pumps - Main and Upper Level HVAC $40, Humidifier - HUM #1 $3, Humidifier - HUM #2 $7, Pump, Circulation - Geothermal $10, Pump, Circulation Controls - Geothermal $2, Pump, In-Line Water Pump $4, Pump, In-Line Water Pump $4, Variable Air Volume Terminal (1,240 CFM) - VAV # Variable Air Volume Terminal (1,425 CFM) - VAV #2-3 9/86 $3, $3,

10 Reserve Disclosures Reserve Component Current Cost Useful Life Remaining Life 18 Mechanical # Variable Air Volume Terminal (1,475 CFM) - VAV #1-1 Variable Air Volume Terminal (1,610 CFM) - VAV #1-6 Variable Air Volume Terminal (195 CFM) - VAV #L -1 Variable Air Volume Terminal (2,100 CFM) - VAV #1-2 Variable Air Volume Terminal (2,180 CFM) - VAV #1-5 Variable Air Volume Terminal (425 CFM) - VAV #L -2 Variable Air Volume Terminal (485 CFM) - VAV #2-2 Variable Air Volume Terminal (550 CFM) - VAV #1-4 Variable Air Volume Terminal (660 CFM) - VAV #1-7 $3, $3, $1, $4, $4, $2, $2, $2, $2, Variable Frequency Drive (10 HP) - VFD #2 $3, Variable Frequency Drive (2 HP) - VFD #1 $5, Variable Frequency Drive ( HP) - VFD #3 $5, Water Storage Tank $9, Office Furnishings - Business Office Furnishings - Marketing Office 17 Office - Computer Equipment 8 5 Painting & Staining.01 Exterior Surfaces - Pressure Wash $5, Interior Surfaces 1 1 Louver Sun Shades - Paint (both sides) $13, Metal Siding - Refinish $3, Wood Siding & Overhang - Refinish $10, Plumbing Drinking Fountain $4, Duel Sump Pump $3, Duel Sump Pump Controls $2, Piping - Geothermal 1 1 Sewer Mains /86

11 Reserve Disclosures Reserve Component Current Cost Useful Life Remaining Life 21 Plumbing Water Heater $6, Water Heater Circulation Pump 1/6 hp $2, Water Mains Reception Computer Equipment Desk Retail Store Cabinets Computer Equipment 8 5 Display Pedestal Cabinets Display Tables Roofing Downspouts $1, Roof Deck - Guard Rail $5, Roof Deck - Paver System $2, Roof Hatch $1, Single Ply Membrane (PVC) - Replace $75, Skylights $17, Security Keri Systems - Key Fob System Upgrades $6, Security - Cameras Replace $23, Security - DVR Unit Modernization/Upgrade $4, Solar System Solar Panel Mounting Brackets $, Solar Panels - Replace $57, Solar Panels Controller - Replace $3, Grand Total: 4 $2,117,426 11/86

12 Cash Flow Analysis $840 $99,0 $272,419 $99,0 $992 $127, % $5,768 $221,582 $376, $221,582 $2,2 $131, % $12,250 $342,562 $482, $342,562 $3,426 $134, % $480,932 $587, $480,932 $4,809 $138, % $6,303 $618,431 $711,0 $618,431 $6,184 $143,2 3.0% $12,030 $755,747 $835, $755,747 $7,557 $147, % $,745 $890,0 $960, $890,0 $8,900 $151, % $109,825 $940,972 $1,084, $940,972 $9,410 $156, % $13,146 $1,093,673 $1,123,4 24 $1,093,673 $10,937 $1, % $72,089 $1,193,652 $1,266, $1,193,652 $11,937 $5, % $7,526 $1,364,028 $1,356, $1,364,028 $13,640 $170, % $14,364 $1,534,247 $1,5, $1,534,247 $15,342 $176, % $176,970 $1,548,691 $1,685, $1,548,691 $15,487 $181, % $17,035 $1,728,497 $1,692, $1,728,497 $17,285 $186, % $17,965 $1,914,612 $1,868, $1,914,612 $19,146 $192, % $76,923 $2,049,233 $2,053, $2,049,233 $,492 $198, % $41,080 $2,226,815 $2,187, $2,226,815 $22,268 $4, % $1,022,153 $1,431,045 $2,366, $1,431,045 $14,310 $210, % $1,655,594 $1,545, $1,655,594 $,556 $2, % $69,440 $1,819,256 $1,756, $1,819,256 $18,193 $223, % $18,742 $2,041,749 $1,908, $2,041,749 $,417 $229, % $110,223 $2,181,677 $2,122, $2,181,677 $21,817 $236, % $304,300 $2,135,8 $2,252, $2,135,8 $21,358 $243, % $50,084 $2,350,819 $2,193, $2,350,819 $23,508 $251, % $35,3 $2,590,047 $2,399, $2,590,047 $25,900 $258, % $13,484 $2,861,030 $2,632, $2,861,030 $28,610 $266, % $22,379 $3,133,585 $2,901, $3,133,585 $31,336 $274, % $922,171 $2,517,064 $3,174, $2,517,064 $25,171 $282, % $76,072 $2,748,707 $2,535, $2,748,707 $27,487 $291, % $24,454 $3,042,760 $2,756, $3,042,760 $30,428 $299, % $3,372,938 $3,042, % 46% 58% 68% 74% 79% 82% 84% 86% 88% 90% 91% 91% 92% 93% 94% 94% 93% 94% 95% 96% 97% 97% 98% 98% 99% 99% 99% 100% 100% 1.0% - Interest Rate Min FY End Balance: $221,582 Min % Funded: 26% 3.0% - Inflation Avg FY End Balance: $1,759,526 Avg % Funded: 87% 12/86

13 Cash Flow Analysis $840 $99,0 $272,419 $99,0 $992 $72, % $5,768 $6,448 $376, $6,448 $1,664 $74, % $12,250 $230,088 $482, $230,088 $2,301 $76, % $308,842 $587, $308,842 $3,088 $78, % $6,303 $384,374 $711,0 $384,374 $3,844 $81, % $12,030 $457,297 $835, $457,297 $4,573 $83, % $,745 $524,667 $960, $524,667 $5,247 $86, % $109,825 $506,138 $1,084, $506,138 $5,061 $88, % $13,146 $586,683 $1,123,4 24 $586,683 $5,867 $91, % $72,089 $611,750 $1,266, $611,750 $6,118 $94, % $7,526 $704,370 $1,356, $704,370 $7,044 $96, % $14,364 $793,899 $1,5, $793,899 $7,939 $99, % $176,970 $724,622 $1,685, $724,622 $7,246 $102, % $17,035 $817,580 $1,692, $817,580 $8,176 $105, % $17,965 $913,6 $1,868, $913,6 $9,136 $109, % $76,923 $954,837 $2,053, $954,837 $9,548 $112, % $41,080 $1,035,579 $2,187, $1,035,579 $10,356 $115, % $1,022,153 $139,424 $2,366, $139,424 $1,394 $119, % $259,930 $1,545, $259,930 $2,599 $122, % $69,440 $315,774 $1,756, $315,774 $3,158 $126, % $18,742 $426,556 $1,908, $426,556 $4,266 $130, % $110,223 $450,755 $2,122, $450,755 $4,508 $134, % $304,300 $285,024 $2,252, $285,024 $2,850 $138, % $50,084 $375,873 $2,193, $375,873 $3,759 $142, % $35,3 $486,541 $2,399, $486,541 $4,865 $146, % $13,484 $624,414 $2,632, $624,414 $6,244 $150, % $22,379 $759,6 $2,901, $759,6 $7,592 $155, % $922,171 $1 $3,174, $1 $0, % $76,072 $84,005 $2,535, $84,005 $840 $4, % $24,454 $225,269 $2,756, $225,269 $2,253 $9, % $397,347 $3,042, % 35% 39% 43% 46% 48% 48% 45% 46% 45% 46% 47% 43% 44% 44% 44% 44% 9% 15% 17% % % 13% % 18% 22% 24% 0% 3% 7% 1.0% - Interest Rate Min FY End Balance: $1 Min % Funded: 0% 3.0% - Inflation Avg FY End Balance: $485,029 Avg % Funded: 31% 12/86

14 $4,000,000 Yearly Review Chart Disbursement with Percent Funded Comparison 1% $3,500,000 $3,000, % Reserve Balance & Disbursement $2,500,000 $2,000,000 $1,500,000 $1,000,000 $500,000 80% 60% 40% % Percent Funded Disbursement FY End Balance Recommended Current % Baseline % 0% The Recommended reserve allocation rate gradually leads the association s reserve balance to a 100%, Fully Funded level within a 30 year period. There are some fluctuations in any given year due to projected component expenditures. The Current reserve allocation rate is not sufficient to keep the funding level above 0% funded for a large portion of the 30 year period covered in this study. Continuing with the current allocation rate carries significant risk as the reserve account balance is predicted to reach a balance within the 30 years covered in this study. The goal of the Baseline reserve allocation rate is to keep the reserve account cash balance above throughout the 30 year period of this study. Following a baseline allocation rate is not recommended by your reserve analyst as this type of funding plan can lead to unexpected special assessments and deferred maintenance due to fluctuations in actual life expectancies and fluctuations in actual costs in years where the reserve balance is near. ID2883-Sample Museum 13/86

15 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $840 $5,768 $12,250 $ Vinyl Flooring - Upper Level Bathroom Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $5, Exterior Surfaces - Pressure Wash.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs $1, Hardwood Flooring Refinish - Grand Staircase Storefront Type (Interior) - Repair/Replace.02 Interior Surfaces $11, Wood Siding & Overhang - Refinish Piping - Geothermal Sewer Mains Water Mains Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains 14/86

16 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $6,303 $12,030 $, Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $6, Exterior Surfaces - Pressure Wash.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains Kaleidescape Server Computer Equipment Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace Office - Computer Equipment.02 Interior Surfaces $12, Wood Siding & Overhang - Refinish Piping - Geothermal Sewer Mains Water Mains Computer Equipment Computer Equipment $2, Acoustic Tile Suspended Ceiling - 5% Repair Contingency $18, Acoustic Tile Suspended Ceiling - Refinish Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains 15/86

17 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown 22 $109, Appliances - Countertop Induction Range/Cooker Appliances - Ice Machine (Under-counter) Appliances - Rack Style Dishwasher Outdoor Furnishings - Large Patio Tables Outdoor Furnishings - Patio Chairs Outdoor Furnishings - Propane Heaters Outdoor Furnishings - Small Patio Tables Outdoor Furnishings - Umbrellas TV Monitor $3, Pocket Doors Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs $6, Carpet Flooring - Auditorium $11, Carpet Flooring - Lower Level $4, Carpet Flooring - Sherry Grover Gallery $11, Carpet Flooring - Upper Level $1, Hardwood Flooring Refinish - Grand Staircase $51, Hardwood Flooring Refinish - Main & Upper Level $2, Hardwood Flooring Refinish - Stage Day Lounger Sherry Grover - TV Storefront Type (Interior) - Repair/Replace Appliances - Microwaves $6, Exterior Surfaces - Pressure Wash.02 Interior Surfaces $4, Metal Siding - Refinish $5, Drinking Fountain Piping - Geothermal Sewer Mains Water Mains /86

18 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $13,146 $72, Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace.02 Interior Surfaces $13, Wood Siding & Overhang - Refinish Piping - Geothermal Sewer Mains Water Mains Kitchen Backflow Devices - Rebuild/Replace Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $13, Pump, Circulation - Geothermal $5, Pump, In-Line Water Pump $5, Pump, In-Line Water Pump.02 Interior Surfaces $3, Duel Sump Pump Piping - Geothermal Sewer Mains Water Mains $7, Keri Systems - Key Fob System Upgrades $30, Security - Cameras Replace $5, Security - DVR Unit Modernization/Upgrade 25 $7, Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $7, Exterior Surfaces - Pressure Wash.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains 17/86

19 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $14,364 $176, Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace.02 Interior Surfaces $14, Wood Siding & Overhang - Refinish Piping - Geothermal Sewer Mains Water Mains Cinema Projection System Cinema Sound System - Retrofit Appliances - Bar Refrigerator (Undercounter) Appliances - Commercial Coffee Grinder Appliances - Commercial Duel Coffee Maker Appliances - Commercial Hot Water Dispenser Appliances - Freezer (Under-counter) Appliances - Prep Refrigerator (Moveable) Appliances - Refrigerator (True, Two Section) 03. Appliances - Stainless Cleaning Station Single Sink with Dishwasher Bistro/Kitchen Plumbing - Repair Contingency Classroom Projector Elevator System - Maintenance/Repairs $3, Backflow for Fire System Fire System - Testing & Minor Repairs $1, Hardwood Flooring Refinish - Grand Staircase Storefront Type (Interior) - Repair/Replace $27, Rooftop Garden - Renovate $3, Backflow Device for Mechanical $33, Boiler, Electric (563 MBH) - EB #1 $3, Chemical Feeder $1, Fans, Exhaust (300 CFM) - EF #1-2 18/86

20 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $176,970 $17,035 $17,965 $1, Fans, Exhaust (340 CFM) - EF #2-1 $1, Fans, Exhaust (380 CFM) - EF #L-1 $4, Humidifier - HUM #1 $9, Humidifier - HUM #2.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains $81, Solar Panels - Replace $4, Solar Panels Controller - Replace Kaleidescape Server Computer Equipment Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace Office - Computer Equipment $8, Exterior Surfaces - Pressure Wash.02 Interior Surfaces Piping - Geothermal Sewer Mains $8, Water Heater Water Mains Computer Equipment Computer Equipment Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $2, Compressors 2hp, 29 Gallon.02 Interior Surfaces $15, Wood Siding & Overhang - Refinish Piping - Geothermal Sewer Mains Water Mains 19/86

21 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $76,923 $41,080 $1,022,153 $2, Acoustic Tile Suspended Ceiling - 5% Repair Contingency $24, Acoustic Tile Suspended Ceiling - Refinish Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $49, Window Interior Sun Shades - Replace Appliances - Dishwashers Appliances - Refrigerators.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains $32, Elevator Cab Refurbish & Door Package Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $8, Exterior Surfaces - Pressure Wash.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains Gypsum Board Suspended Ceiling - Refinish $9, Bathroom Partitions $1, Bathroom Urinal Partition Appliances - Beverage Cooler Boxes Appliances - Countertop Induction Range/Cooker Appliances - Holding Cabinets Appliances - Ice Machine (Under-counter) Appliances - Meat Slicer Appliances - Rack Style Dishwasher 03. Appliances - Turbo Chef High Speed Convection Micro Oven /86

22 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown 32 $1,022, Bistro Counters and Cabinets - Refurbish Indoor Furnishings - Bench Seat Indoor Furnishings - Large Tables Indoor Furnishings - Small Tables Indoor Furnishings - Stackable Leland Chairs Outdoor Furnishings - Large Patio Tables Outdoor Furnishings - Patio Chairs Outdoor Furnishings - Propane Heaters Outdoor Furnishings - Small Patio Tables Outdoor Furnishings - Umbrellas TV Monitor $10, Stone Veneer - 50% Repair Contingency $82, Acoustic Tile Suspended Ceiling - Replace $3, Gypsum Board Suspended Ceiling - 5% Repair Contingency $23, Gypsum Board Suspended Ceiling - Refinish $23, Gypsum Board Walls (In Galleries Only) - 25% Repair/Replace Contingnecy Chairs - Stackable Classroom $8, Glass Storefront Entry Door Auto Openers $28, Glass Storefront Entry Doors $4, Pocket Doors Elevator System - Maintenance/Repairs Chairs - Stackable Fabric Covered Tables - Folding Fire System - Testing & Minor Repairs $8, Carpet Flooring - Auditorium $15, Carpet Flooring - Lower Level $6, Carpet Flooring - Sherry Grover Gallery $, Carpet Flooring - Upper Level $1, Hardwood Flooring Refinish - Grand Staircase $69, Hardwood Flooring Refinish - Main & Upper Level $2, Hardwood Flooring Refinish - Stage Day Lounger 21/86

23 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown 32 $1,022, Partition Walls Sherry Grover - Stackable Leland Chairs Sherry Grover - TV Stanchions $45, Storefront Type (Exterior) - Repair Storefront Type (Interior) - Repair/Replace $198, Structural Glazing Systems - Repair Appliances - Microwaves $7, Recessed Fixtures $22, A/C Units, Ceiling Mounted (Mitsubishi) - Replace $4, A/C Units, Floor Mounted (Mitsubishi) - Replace $82, Air Handling Unit (11,230 CFM) - AHU #3 $49, Air Handling Unit (5,175 CFM) - AHU #2 $22, Air Handling Unit (800 CFM) - AHU #1 $14, Expansion Tanks $1, Fans, Exhaust (850 CFM) - EF #1-1 $7, Fans, Scavenger (2,000 CFM) - #SF-L-1 $49, Fluid Cooler, Closed Loop $59, Heat Pumps Ton Geothermal Water to Air $66, Heat Pumps - Main and Upper Level HVAC $8, Variable Frequency Drive (2 HP) - VFD #1 $9, Variable Frequency Drive ( HP) - VFD # Furnishings - Business Office Furnishings - Marketing Office.02 Interior Surfaces $21, Louver Sun Shades - Paint (both sides) $5, Metal Siding - Refinish $17, Wood Siding & Overhang - Refinish $6, Drinking Fountain Piping - Geothermal Sewer Mains $3, Water Heater Circulation Pump 1/6 hp 22/86

24 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $1,022, Water Mains Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains 23/86

25 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown 34 $69, Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $5, Variable Air Volume Terminal (1,240 CFM) - VAV #2-1 $5, Variable Air Volume Terminal (1,425 CFM) - VAV #2-3 $5, Variable Air Volume Terminal (1,475 CFM) - VAV #1-1 $6, Variable Air Volume Terminal (1,610 CFM) - VAV #1-6 $2, Variable Air Volume Terminal (195 CFM) - VAV #L-1 $7, Variable Air Volume Terminal (2,100 CFM) - VAV #1-2 $7, Variable Air Volume Terminal (2,180 CFM) - VAV #1-5 $3, Variable Air Volume Terminal (425 CFM) - VAV #L-2 $3, Variable Air Volume Terminal (485 CFM) - VAV #2-2 $3, Variable Air Volume Terminal (550 CFM) - VAV #1-4 $3, Variable Air Volume Terminal (660 CFM) - VAV #1-7 $6, Variable Frequency Drive (10 HP) - VFD #2 $9,8.01 Exterior Surfaces - Pressure Wash.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains 24/86

26 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $18,742 $110, Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace.02 Interior Surfaces $18, Wood Siding & Overhang - Refinish Piping - Geothermal Sewer Mains Water Mains Kaleidescape Server Computer Equipment Kitchen Backflow Devices - Rebuild/Replace Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $19, Pump, Circulation - Geothermal $3, Pump, Circulation Controls - Geothermal $7, Pump, In-Line Water Pump $7, Pump, In-Line Water Pump Office - Computer Equipment.02 Interior Surfaces $5, Duel Sump Pump $3, Duel Sump Pump Controls Piping - Geothermal Sewer Mains Water Mains Computer Equipment Computer Equipment $11, Keri Systems - Key Fob System Upgrades $44, Security - Cameras Replace $7, Security - DVR Unit Modernization/Upgrade 25/86

27 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown 37 $304, Accessibility Lift Curtains Curtains Power Control and Track System Projection Screen with Power Lift Seating - Theatre Style Classroom Projector Screen Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs $11, Fire System Panel - Upgrade/Modernize $33, Fire System Sprinkler Heads - Replace $4, Concrete Flooring Refinish - Auditorium $42, Concrete Flooring Refinish - Lower Level $21, Concrete Flooring Refinish - Main Level $2, Hardwood Flooring Refinish - Grand Staircase $24, Vinyl/Lino Flooring - Classroom Upper Level Storefront Type (Interior) - Repair/Replace $4, Lighting - Cove Light Fixtures $49, Lighting - Exhibit Track Fixtures $39, Lighting - Pendant Linear Fluorescent Fixtures $3, Lighting - Recessed 2' x 2' Fixtures (Lower Level) $31, Lighting - Recessed Multilamp Fixtures $25, Lighting - Recessed/Pendant Single Fixtures $10, Exterior Surfaces - Pressure Wash.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains 26/86

28 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $50,084 $35,3 $13, Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $29, Generator - 14 KW.02 Interior Surfaces $, Wood Siding & Overhang - Refinish Piping - Geothermal Sewer Mains Water Mains $3, Acoustic Tile Suspended Ceiling - 5% Repair Contingency $31, Acoustic Tile Suspended Ceiling - Refinish Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs $1, Vinyl Flooring - Upper Level Bathroom Storefront Type (Interior) - Repair/Replace $11, Exterior Surfaces - Pressure Wash.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains 27/86

29 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $22,379 $922, Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace.02 Interior Surfaces $22, Wood Siding & Overhang - Refinish Piping - Geothermal Sewer Mains Water Mains Cinema Projection System Cinema Sound System - Retrofit Appliances - Bar Refrigerator (Undercounter) Appliances - Commercial Coffee Grinder Appliances - Commercial Duel Coffee Maker Appliances - Commercial Hot Water Dispenser Appliances - Countertop Induction Range/Cooker Appliances - Freezer (Under-counter) Appliances - Ice Machine (Under-counter) Appliances - Metal Grid Shelf Carts Appliances - Prep Refrigerator (Moveable) Appliances - Rack Style Dishwasher Appliances - Refrigerator (True, Two Section) Appliances - Stainless Cleaning Station Single Sink 03. Appliances - Stainless Cleaning Station Single Sink with Dishwasher Appliances - Stainless Prep Sink, Triple Sink Appliances - Stainless Prep Table Appliances - Stainless Table Bistro/Kitchen Plumbing - Repair Contingency Outdoor Furnishings - Large Patio Tables Outdoor Furnishings - Patio Chairs 28/86

30 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown 42 $922, Outdoor Furnishings - Propane Heaters Outdoor Furnishings - Small Patio Tables Outdoor Furnishings - Umbrellas TV Monitor Classroom Projector Storage Cabinets $10, Exterior Metal Doors $6, Pocket Doors Elevator System - Maintenance/Repairs $6, Elevator System - Modernize/Upgrade $5, Backflow for Fire System Fire System - Testing & Minor Repairs $11, Carpet Flooring - Auditorium $, Carpet Flooring - Lower Level $8, Carpet Flooring - Sherry Grover Gallery $21, Carpet Flooring - Upper Level $2, Hardwood Flooring Refinish - Grand Staircase $93, Hardwood Flooring Refinish - Main & Upper Level $3, Hardwood Flooring Refinish - Stage Day Lounger Exhibit Display Cabinet Exhibit Display Pedestal Sherry Grover - Display Cabinets Sherry Grover - Display Table Case Sherry Grover - TV Small Tables Wood Benches Wood Table Sets Storefront Type (Interior) - Repair/Replace Appliances - Microwaves $17, Rooftop Garden - Membrane $43, Rooftop Garden - Renovate $5, Backflow Device for Mechanical $52, Boiler, Electric (563 MBH) - EB #1 $4, Chemical Feeder $1, Fans, Exhaust (300 CFM) - EF #1-2 29/86

31 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $922,171 $76,072 $1, Fans, Exhaust (340 CFM) - EF #2-1 $1, Fans, Exhaust (380 CFM) - EF #L-1 $7, Humidifier - HUM #1 $15, Humidifier - HUM #2.02 Interior Surfaces $7, Metal Siding - Refinish $9, Drinking Fountain Piping - Geothermal Sewer Mains Water Mains Desk Cabinets Display Pedestal Cabinets Display Tables $3, Downspouts $11, Roof Deck - Guard Rail $5, Roof Deck - Paver System $3, Roof Hatch $7, Single Ply Membrane (PVC) - Replace $38, Skylights $36, Solar Panel Mounting Brackets $126, Solar Panels - Replace $6, Solar Panels Controller - Replace Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace $10, Dampers, Fire /Smoke $17, Dampers, Motorized Control $21, Water Storage Tank $12, Exterior Surfaces - Pressure Wash.02 Interior Surfaces Piping - Geothermal Sewer Mains $13, Water Heater Water Mains 30/86

32 Disbursement By Year Fiscal Year Disbursement Disbursement Breakdown $24, Kaleidescape Server Computer Equipment Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace Office - Computer Equipment.02 Interior Surfaces $24, Wood Siding & Overhang - Refinish Piping - Geothermal Sewer Mains Water Mains Computer Equipment Computer Equipment Elevator System - Maintenance/Repairs Fire System - Testing & Minor Repairs Storefront Type (Interior) - Repair/Replace.02 Interior Surfaces Piping - Geothermal Sewer Mains Water Mains Grand Total: $3,273,677 31/86

33 Reserve Balance Distribution Note- This distribution is based on the disbursement by year in ascending order. Reserve Component 01 Auditorium Accessibility Lift Cinema Projection System Cinema Sound System - Retrofit Curtains Curtains Power Control and Track System Gypsum Board Suspended Ceiling - Refinish Kaleidescape Server Projection Screen with Power Lift Seating - Theatre Style 02 Bathroom Fixtures Bathroom Countertops Bathroom Partitions Bathroom Sinks Bathroom Urinal Partition Bathroom Urinals Bathroom Water Closets $99,0 $99,0 Distribution : FY Start Balance : Distributed Funds : Remaining Funds Percentage 03 Bistro Appliances - Bar Refrigerator (Under-counter) Appliances - Beverage Cooler Boxes Appliances - Commercial Coffee Grinder Appliances - Commercial Duel Coffee Maker Appliances - Commercial Hot Water Dispenser Appliances - Countertop Induction Range/Cooker Appliances - Freezer (Under-counter) Appliances - Holding Cabinets Appliances - Ice Machine (Under-counter) Appliances - Meat Slicer Appliances - Metal Grid Shelf Carts Appliances - Prep Refrigerator (Moveable) Appliances - Rack Style Dishwasher Appliances - Refrigerator (True, Two Section) Appliances - Stainless Cleaning Station Single Sink 03. Appliances - Stainless Cleaning Station Single Sink with Dishwasher 32/86

34 Reserve Balance Distribution Note- This distribution is based on the disbursement by year in ascending order. Reserve Component 03 Bistro Sink with Dishwasher Appliances - Stainless Prep Sink, Triple Sink Appliances - Stainless Prep Table Appliances - Stainless Table 03. Appliances - Turbo Chef High Speed Convection Micro Oven Bistro Counters and Cabinets - Refurbish Bistro/Kitchen Plumbing - Repair Contingency Computer Equipment Indoor Furnishings - Bench Seat Indoor Furnishings - Large Tables Indoor Furnishings - Small Tables Indoor Furnishings - Stackable Leland Chairs Kitchen Backflow Devices - Rebuild/Replace Outdoor Furnishings - Large Patio Tables Outdoor Furnishings - Patio Chairs Outdoor Furnishings - Propane Heaters Outdoor Furnishings - Small Patio Tables Outdoor Furnishings - Umbrellas TV Monitor 04 Building Exterior Metal Siding - Replace Stone Veneer - 50% Repair Contingency Tigerwood Rainscreen Siding - Replace $99,0 $99,0 Distribution : FY Start Balance : Distributed Funds : Remaining Funds Percentage 05 Ceiling & Wall Finishes Acoustic Tile Suspended Ceiling - 5% Repair $1, % Contingency Acoustic Tile Suspended Ceiling - Refinish $15, % Acoustic Tile Suspended Ceiling - Replace Gypsum Board Suspended Ceiling - 5% Repair Contingency Gypsum Board Suspended Ceiling - Refinish Gypsum Board Suspended Ceiling - Replace Gypsum Board Walls (In Galleries Only) - 25% Repair/Replace Contingnecy 06 Classroom 33/86

35 Reserve Balance Distribution Note- This distribution is based on the disbursement by year in ascending order. Reserve Component 06 Classroom Chairs - Stackable Classroom Classroom Projector Classroom Projector Screen Storage Cabinets $99,0 $99,0 Distribution : FY Start Balance : Distributed Funds : Remaining Funds Percentage 07 Doors Exterior Metal Doors Glass Storefront Entry Door Auto Openers Glass Storefront Entry Doors Interior Doors Pocket Doors $3, % 08 Elevator Elevator Cab Refurbish & Door Package Elevator System - Maintenance/Repairs Elevator System - Modernize/Upgrade 09 Event Equipment Chairs - Stackable Fabric Covered Tables - Folding 10 Fire Systems Backflow for Fire System Fire System - Testing & Minor Repairs Fire System Panel - Upgrade/Modernize Fire System Sprinkler Heads - Replace 11 Floor Finishes Carpet Flooring - Auditorium $5, % Carpet Flooring - Lower Level $9, % Carpet Flooring - Sherry Grover Gallery $3, % Carpet Flooring - Upper Level $9, % Concrete Flooring Refinish - Auditorium Concrete Flooring Refinish - Lower Level Concrete Flooring Refinish - Main Level Hardwood Flooring Refinish - Grand Staircase $2, % Hardwood Flooring Refinish - Main & Upper $,678.8% Level Hardwood Flooring Refinish - Stage Hardwood Flooring Replace - Grand Staircase 34/86

36 Reserve Balance Distribution Note- This distribution is based on the disbursement by year in ascending order. $99,0 $99,0 : FY Start Balance : Distributed Funds : Remaining Funds Reserve Component 11 Floor Finishes Hardwood Flooring Replace - Main & Upper Level Hardwood Flooring Replace - Stage Tile Flooring - Main Level Bathrooms Tile Flooring - Upper Level Bathrooms 11. Vinyl Flooring - Upper Level Bathroom Vinyl/Lino Flooring - Classroom Upper Level 12 Gallery - Furnishings Day Lounger Exhibit Display Cabinet Exhibit Display Pedestal Partition Walls Sherry Grover - Display Cabinets Sherry Grover - Display Table Case Sherry Grover - Stackable Leland Chairs Sherry Grover - TV Small Tables Stanchions Wood Benches Wood Table Sets 13 Glazing Systems Louver Sun Shade System - Replace Storefront Type (Exterior) - Repair Storefront Type (Exterior) - Replace Storefront Type (Interior) - Repair/Replace Structural Glazing Systems - Repair Structural Glazing Systems - Replace Window Interior Sun Shades - Replace 14 Kitchenette Appliances - Dishwashers Appliances - Microwaves Appliances - Refrigerators Appliances - Sinks Cabinets & Countertops - Refurbish 15 Landscaping & Irrigation Distribution Percentage 35/86

37 Reserve Balance Distribution Note- This distribution is based on the disbursement by year in ascending order. $99,0 $99,0 : FY Start Balance : Distributed Funds : Remaining Funds Reserve Component 15 Landscaping & Irrigation Greenscreen Metal Vine Wall Rooftop Garden - Membrane Rooftop Garden - Renovate Lighting - Exterior.01 Recessed Fixtures 17 Lighting - Interior Lighting - Cove Light Fixtures Lighting - Exhibit Track Fixtures Lighting - Pendant Linear Fluorescent Fixtures Lighting - Recessed 2' x 2' Fixtures (Lower Level) Lighting - Recessed Multilamp Fixtures Lighting - Recessed/Pendant Single Fixtures 18 Mechanical A/C Units, Ceiling Mounted (Mitsubishi) - Replace A/C Units, Floor Mounted (Mitsubishi) - Replace Air Handling Unit (11,230 CFM) - AHU # Air Handling Unit (5,175 CFM) - AHU # Air Handling Unit (800 CFM) - AHU # Backflow Device for Mechanical Boiler, Electric (563 MBH) - EB # Chemical Feeder Compressors 2hp, 29 Gallon Dampers, Fire /Smoke Dampers, Motorized Control Expansion Tanks Fans, Exhaust (300 CFM) - EF # Fans, Exhaust (340 CFM) - EF # Fans, Exhaust (380 CFM) - EF #L Fans, Exhaust (850 CFM) - EF # Fans, Scavenger (2,000 CFM) - #SF-L Fluid Cooler, Closed Loop Generator - 14 KW 18. Heat Pumps Ton Geothermal Water to Air Heat Pumps - Main and Upper Level HVAC Humidifier - HUM #1 Distribution Percentage 36/86

38 Reserve Balance Distribution Note- This distribution is based on the disbursement by year in ascending order. Reserve Component 18 Mechanical Humidifier - HUM # Pump, Circulation - Geothermal Pump, Circulation Controls - Geothermal Pump, In-Line Water Pump Pump, In-Line Water Pump Variable Air Volume Terminal (1,240 CFM) - VAV # Variable Air Volume Terminal (1,425 CFM) - VAV # Variable Air Volume Terminal (1,475 CFM) - VAV # Variable Air Volume Terminal (1,610 CFM) - VAV # Variable Air Volume Terminal (195 CFM) - VAV #L Variable Air Volume Terminal (2,100 CFM) - VAV # Variable Air Volume Terminal (2,180 CFM) - VAV # Variable Air Volume Terminal (425 CFM) - VAV #L Variable Air Volume Terminal (485 CFM) - VAV # Variable Air Volume Terminal (550 CFM) - VAV # Variable Air Volume Terminal (660 CFM) - VAV # Variable Frequency Drive (10 HP) - VFD # Variable Frequency Drive (2 HP) - VFD # Variable Frequency Drive ( HP) - VFD # Water Storage Tank 19 Office Furnishings - Business Office Furnishings - Marketing Office Office - Computer Equipment $99,0 $99,0 Distribution : FY Start Balance : Distributed Funds : Remaining Funds Percentage Painting & Staining.01 Exterior Surfaces - Pressure Wash $11,0 11.3% 37/86

39 Reserve Balance Distribution Note- This distribution is based on the disbursement by year in ascending order. Reserve Component $99,0 $99,0 Distribution : FY Start Balance : Distributed Funds : Remaining Funds Percentage Painting & Staining.02 Interior Surfaces.03 Louver Sun Shades - Paint (both sides).04 Metal Siding - Refinish.05 Wood Siding & Overhang - Refinish $,754.9% 21 Plumbing Drinking Fountain Duel Sump Pump Duel Sump Pump Controls Piping - Geothermal Sewer Mains Water Heater Water Heater Circulation Pump 1/6 hp Water Mains 22 Reception Computer Equipment Desk 23 Retail Store Cabinets Computer Equipment Display Pedestal Cabinets Display Tables 24 Roofing Downspouts Roof Deck - Guard Rail Roof Deck - Paver System Roof Hatch Single Ply Membrane (PVC) - Replace Skylights 25 Security Keri Systems - Key Fob System Upgrades Security - Cameras Replace Security - DVR Unit Modernization/Upgrade 26 Solar System Solar Panel Mounting Brackets 38/86

40 Reserve Balance Distribution Note- This distribution is based on the disbursement by year in ascending order. $99,0 $99,0 : FY Start Balance : Distributed Funds : Remaining Funds Reserve Component 26 Solar System Solar Panels - Replace Solar Panels Controller - Replace Distribution Percentage 39/86

41 Allocation Breakdown Reserve Component Reserve Allocation Reserve Allocation Reserve Allocation Allocation (per year) (per month) (per unit per month) % 01 Auditorium % Accessibility Lift % Cinema Projection System % Cinema Sound System - Retrofit % Curtains % Curtains Power Control and Track System Gypsum Board Suspended Ceiling - Refinish % % Kaleidescape Server % Projection Screen with Power Lift % Seating - Theatre Style % 02 Bathroom Fixtures $1, $ $ % Bathroom Countertops $ $.37 $ % Bathroom Partitions $ $33.70 $ % Bathroom Sinks $2.21 $.85 $.85 0.% Bathroom Urinal Partition $53.92 $4.49 $ % Bathroom Urinals $1.77 $13.48 $ % Bathroom Water Closets $ $21.34 $ % 03 Bistro % Appliances - Bar Refrigerator (Under-counter) Appliances - Beverage Cooler Boxes Appliances - Commercial Coffee Grinder Appliances - Commercial Duel Coffee Maker Appliances - Commercial Hot Water Dispenser Appliances - Countertop Induction Range/Cooker Appliances - Freezer (Undercounter) % % % % % % % 40/86

42 Allocation Breakdown Reserve Component Reserve Allocation Reserve Allocation Reserve Allocation Allocation (per year) (per month) (per unit per month) % 03 Bistro % Appliances - Holding Cabinets % Appliances - Ice Machine (Undercounter) % Appliances - Meat Slicer % Appliances - Metal Grid Shelf Carts % Appliances - Prep Refrigerator (Moveable) Appliances - Rack Style Dishwasher Appliances - Refrigerator (True, Two Section) Appliances - Stainless Cleaning Station Single Sink Appliances - Stainless Cleaning Station Single Sink with Dishwasher Appliances - Stainless Prep Sink, Triple Sink % % % % % % Appliances - Stainless Prep Table % Appliances - Stainless Table % Appliances - Turbo Chef High Speed Convection Micro Oven Bistro Counters and Cabinets - Refurbish Bistro/Kitchen Plumbing - Repair Contingency % % % Computer Equipment % Indoor Furnishings - Bench Seat % Indoor Furnishings - Large Tables % Indoor Furnishings - Small Tables % Indoor Furnishings - Stackable Leland Chairs Kitchen Backflow Devices - Rebuild/Replace Outdoor Furnishings - Large Patio Tables % % % 41/86

43 Allocation Breakdown Reserve Component Reserve Allocation Reserve Allocation Reserve Allocation Allocation (per year) (per month) (per unit per month) % 03 Bistro % Outdoor Furnishings - Patio Chairs % Outdoor Furnishings - Propane Heaters Outdoor Furnishings - Small Patio Tables % % Outdoor Furnishings - Umbrellas % TV Monitor % 04 Building Exterior $2, $ $ % Metal Siding - Replace $ $34.51 $ % Stone Veneer - 50% Repair Contingency Tigerwood Rainscreen Siding - Replace $ $35.39 $ % $1, $ $ % 05 Ceiling & Wall Finishes $9, $ $ % Acoustic Tile Suspended Ceiling - 5% Repair Contingency Acoustic Tile Suspended Ceiling - Refinish Acoustic Tile Suspended Ceiling - Replace Gypsum Board Suspended Ceiling - 5% Repair Contingency Gypsum Board Suspended Ceiling - Refinish Gypsum Board Suspended Ceiling - Replace Gypsum Board Walls (In Galleries Only) - 25% Repair/Replace Contingnecy $ $23.23 $ % $2, $ $ % $3, $ $ % $ $10.82 $ % $ $78.69 $ % $1,4.46 $ $ % $ $80.32 $ % 06 Classroom % Chairs - Stackable Classroom % Classroom Projector % Classroom Projector Screen % Storage Cabinets % 42/86

44 Reserve Component Reserve Allocation Reserve Allocation Reserve Allocation Allocation (per year) (per month) (per unit per month) % Concrete Flooring Refinish - Lower Level Allocation Breakdown 07 Doors $2, $ $ % Exterior Metal Doors $ $17.97 $ % Glass Storefront Entry Door Auto Openers $ $28.08 $ % Glass Storefront Entry Doors $1, $98.29 $ % Interior Doors $ $69.65 $ % Pocket Doors $ $33.70 $ % 08 Elevator $4, $ $ % Elevator Cab Refurbish & Door Package Elevator System - Maintenance/Repairs Elevator System - Modernize/Upgrade $1, $ $ % % $3, $ $ % 09 Event Equipment % Chairs - Stackable Fabric Covered % Tables - Folding % 10 Fire Systems $1, $ $ % Backflow for Fire System $ $18.72 $ % Fire System - Testing & Minor Repairs Fire System Panel - Upgrade/Modernize Fire System Sprinkler Heads - Replace % $ $26.96 $ % $ $77.74 $ % 11 Floor Finishes $18, $1, $ % Carpet Flooring - Auditorium $ $56.22 $ % Carpet Flooring - Lower Level $1, $ $ % Carpet Flooring - Sherry Grover Gallery $ $44.49 $ % Carpet Flooring - Upper Level $1, $ $ % Concrete Flooring Refinish - Auditorium $ $11.17 $ % $1,3.37 $ $ % 43/86

45 Allocation Breakdown Reserve Component Reserve Allocation Reserve Allocation Reserve Allocation Allocation (per year) (per month) (per unit per month) % 11 Floor Finishes $18, $1, $ % Level Concrete Flooring Refinish - Main Level Hardwood Flooring Refinish - Grand Staircase Hardwood Flooring Refinish - Main & Upper Level $ $49.38 $ % $ $26.29 $ % $5, $ $ % Hardwood Flooring Refinish - Stage $ $19. $ % Hardwood Flooring Replace - Grand Staircase Hardwood Flooring Replace - Main & Upper Level $ $63.19 $ % $4, $ $ % Hardwood Flooring Replace - Stage $ $14.77 $ % Tile Flooring - Main Level Bathrooms Tile Flooring - Upper Level Bathrooms Vinyl Flooring - Upper Level Bathroom Vinyl/Lino Flooring - Classroom Upper Level $ $18.25 $ % $ $18.25 $ % $45.29 $3.77 $ % $ $56.62 $ % 12 Gallery - Furnishings % Day Lounger % Exhibit Display Cabinet % Exhibit Display Pedestal % Partition Walls % Sherry Grover - Display Cabinets % Sherry Grover - Display Table Case % Sherry Grover - Stackable Leland Chairs % Sherry Grover - TV % Small Tables % Stanchions % Wood Benches % 44/86

46 Allocation Breakdown Reserve Component Reserve Allocation Reserve Allocation Reserve Allocation Allocation (per year) (per month) (per unit per month) % 12 Gallery - Furnishings % Wood Table Sets % 13 Glazing Systems $28,9. $2, $ % Louver Sun Shade System - Replace $3, $ $ % Storefront Type (Exterior) - Repair $1, $ $ % Storefront Type (Exterior) - Replace $1, $ $ % Storefront Type (Interior) - Repair/Replace % Structural Glazing Systems - Repair $8, $ $ % Structural Glazing Systems - Replace Window Interior Sun Shades - Replace $11, $ $ % $2, $ $ % 14 Kitchenette % Appliances - Dishwashers % Appliances - Microwaves % Appliances - Refrigerators % Appliances - Sinks % Cabinets & Countertops - Refurbish % 15 Landscaping & Irrigation $2, $197. $ % Greenscreen Metal Vine Wall $ $21.91 $ % Rooftop Garden - Membrane $ $29.21 $ % Rooftop Garden - Renovate $1, $ $ % Lighting - Exterior $ $24.71 $ %.01 Recessed Fixtures $ $24.71 $ % 17 Lighting - Interior $4, $ $ % Lighting - Cove Light Fixtures $ $11.23 $ % Lighting - Exhibit Track Fixtures $1, $ $ % Lighting - Pendant Linear Fluorescent Fixtures Lighting - Recessed 2' x 2' Fixtures (Lower Level) $1, $92.12 $ % $ $8.99 $ % 45/86

47 Allocation Breakdown Reserve Component Reserve Allocation Reserve Allocation Reserve Allocation Allocation (per year) (per month) (per unit per month) % 17 Lighting - Interior $4, $ $ % Lighting - Recessed Multilamp $ $72.79 $ % Fixtures Lighting - Recessed/Pendant Single Fixtures $ $60.66 $ % 18 Mechanical $26, $2,176. $ % A/C Units, Ceiling Mounted (Mitsubishi) - Replace A/C Units, Floor Mounted (Mitsubishi) - Replace Air Handling Unit (11,230 CFM) - AHU #3 Air Handling Unit (5,175 CFM) - AHU #2 Air Handling Unit (800 CFM) - AHU #1 $ $75.83 $ % $2.21 $.85 $.85 0.% $3, $ $ % $2, $8.51 $ % $ $75.83 $ % Backflow Device for Mechanical $ $18.72 $ % Boiler, Electric (563 MBH) - EB #1 $2, $ $ % Chemical Feeder $ $.48 $.48 0.% Compressors 2hp, 29 Gallon $ $8.43 $ % Dampers, Fire /Smoke $2.21 $.85 $.85 0.% Dampers, Motorized Control $ $28.65 $ % Expansion Tanks $ $50.55 $ % Fans, Exhaust (300 CFM) - EF #1-2 $67.40 $5.62 $ % Fans, Exhaust (340 CFM) - EF #2-1 $67.40 $5.62 $ % Fans, Exhaust (380 CFM) - EF #L-1 $67.40 $5.62 $ % Fans, Exhaust (850 CFM) - EF #1-1 $80.88 $6.74 $ % Fans, Scavenger (2,000 CFM) - #SF -L-1 $ $26.96 $ % Fluid Cooler, Closed Loop $2, $8.51 $ % Generator - 14 KW $ $67.40 $ % Heat Pumps Ton Geothermal Water to Air Heat Pumps - Main and Upper Level HVAC $2, $2.21 $ % $2, $ $ % 46/86

48 Allocation Breakdown Reserve Component Reserve Allocation Reserve Allocation Reserve Allocation Allocation (per year) (per month) (per unit per month) % 18 Mechanical $26, $2,176. $ % Humidifier - HUM #1 $ $26.21 $ % Humidifier - HUM #2 $ $52.42 $ % Pump, Circulation - Geothermal $1, $98.29 $ % Pump, Circulation Controls - Geothermal $ $9.36 $ % Pump, In-Line Water Pump $ $37.45 $ % Pump, In-Line Water Pump $ $37.45 $ % Variable Air Volume Terminal (1,240 CFM) - VAV #2-1 Variable Air Volume Terminal (1,425 CFM) - VAV #2-3 Variable Air Volume Terminal (1,475 CFM) - VAV #1-1 Variable Air Volume Terminal (1,610 CFM) - VAV #1-6 Variable Air Volume Terminal (195 CFM) - VAV #L-1 Variable Air Volume Terminal (2,100 CFM) - VAV #1-2 Variable Air Volume Terminal (2,180 CFM) - VAV #1-5 Variable Air Volume Terminal (425 CFM) - VAV #L-2 Variable Air Volume Terminal (485 CFM) - VAV #2-2 Variable Air Volume Terminal (550 CFM) - VAV #1-4 Variable Air Volume Terminal (660 CFM) - VAV #1-7 Variable Frequency Drive (10 HP) - VFD #2 Variable Frequency Drive (2 HP) - VFD #1 Variable Frequency Drive ( HP) - VFD #3 $ $15.32 $ % $ $15.32 $ % $ $15.32 $ % $ $17.87 $ % $91.91 $7.66 $ % $ $.42 $ % $ $22.98 $ % $ $10.21 $ % $ $10.21 $ % $ $10.21 $ % $ $10.21 $ % $ $17.87 $ % $ $28.08 $ % $ $30.89 $ % Water Storage Tank $ $35.57 $ % 47/86

49 Allocation Breakdown Reserve Component Reserve Allocation Reserve Allocation Reserve Allocation Allocation (per year) (per month) (per unit per month) % 19 Office % Furnishings - Business Office % Furnishings - Marketing Office % Office - Computer Equipment % Painting & Staining $8, $ $ % Exterior Surfaces - Pressure Wash $2,5.35 $9.70 $ % Interior Surfaces % Louver Sun Shades - Paint (both sides) $ $73.52 $ % Metal Siding - Refinish $ $40.26 $ % Wood Siding & Overhang - Refinish $4, $ $ % 21 Plumbing $1, $ $ % Drinking Fountain $ $47.18 $ % Duel Sump Pump $ $28.08 $ % Duel Sump Pump Controls $ $9.36 $ % Piping - Geothermal % Sewer Mains % Water Heater $ $44.93 $ % Water Heater Circulation Pump 1/6 hp $ $11.23 $ % Water Mains % 22 Reception % Computer Equipment % Desk % 23 Retail Store % Cabinets % Computer Equipment % Display Pedestal Cabinets % Display Tables % 24 Roofing $4, $ $ % Downspouts $80.88 $6.74 $ % 48/86

50 Allocation Breakdown Reserve Component Reserve Allocation Reserve Allocation Reserve Allocation Allocation (per year) (per month) (per unit per month) % 24 Roofing $4, $ $ % Roof Deck - Guard Rail $ $.13 $ % Roof Deck - Paver System $ $9.55 $ % Roof Hatch $80.88 $6.74 $ % Single Ply Membrane (PVC) - Replace $3, $ $ % Skylights $ $64.71 $ % 25 Security $3, $ $ % Keri Systems - Key Fob System Upgrades $ $56.17 $ % Security - Cameras Replace $2, $ $ % Security - DVR Unit Modernization/Upgrade $ $37.45 $ % 26 Solar System $6, $ $ % Solar Panel Mounting Brackets $ $61.79 $ % Solar Panels - Replace $5, $ $ % Solar Panels Controller - Replace $ $22.47 $ % Grand Total: $127,198 $10, $ % 49/86

51 Category Breakdown Chart 50/86

Additional Information 1626 Arapahoe Trail

Additional Information 1626 Arapahoe Trail Additional Information 1626 Arapahoe Trail The purpose of this document is to provide helpful information about this property and its amenities. It is not intended to be an all-inclusive list of every

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Oscar DePriest Elementary School

Oscar DePriest Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Sudbury Kitchens DESIGN SURVEY

Sudbury Kitchens DESIGN SURVEY Sudbury Kitchens DESIGN SURVEY Name(s): Home Tel.: Mobile: Address: City/State/Zip: E-mail: How did you hear about Sudbury Kitchens? Desired completion date of project: Do you have a budget in mind? How

More information

Genevieve Melody Elementary School

Genevieve Melody Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

25000 COLLEGE BLVD OLATHE, KS 66061

25000 COLLEGE BLVD OLATHE, KS 66061 25000 COLLEGE BLVD OLATHE, KS 66061 PRICE REDUCTION! HIGHLIGHTS 10,664 SF Flex Building FOR SALE FOR LEASE 3,682 SF Warehouse with 22-24 Ceiling Height & Drive-In Door Office - $19.00/SF IG Warehouse -

More information

Restaurant for Sale. Sur th Ave. E. Seattle, WA PROPERTY FEATURES: Capitol Hill

Restaurant for Sale. Sur th Ave. E. Seattle, WA PROPERTY FEATURES: Capitol Hill Restaurant for Sale Capitol Hill 340 15th Ave. E. Seattle, WA 9122 PROPERTY FEATURES: Excellent 15th Ave. location in the heart of one of Capitol Hill s favorite retail/ restaurant districts Fully built-out

More information

sjvhomes.com Kitchen Features

sjvhomes.com Kitchen Features Home Comfort & Energy Saving Features Solar ready conduit for electrical, plumbed gas line at water heater, and roof zone for paneling Insulated, fiberglass entry door with view hole Dual glazed, Low-E,

More information

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: JUDICIAL CHAMBER SPACE TYPE: JUDICIAL CHAMBER Construction Criteria The unit costs for Judicial Chamber space types are based on the construction quality and design features in the following table. This information has

More information

Focus on Energy Business Programs Summary of Services and Incentives July 2009

Focus on Energy Business Programs Summary of Services and Incentives July 2009 Focus on Energy Business Programs Summary of Services and Incentives July 2009 OVERVIEW Focus on Energy Business Programs goals are to educate Wisconsin s farmers, businesses, industry, schools and local

More information

sjvhomes.com Quality Pfister chrome plumbing fixture Refrigerator space plumbed for ice-maker Quality Pfister chrome plumbing fixture

sjvhomes.com Quality Pfister chrome plumbing fixture Refrigerator space plumbed for ice-maker Quality Pfister chrome plumbing fixture Home Comfort & Energy Saving Features urable concrete tile roof with radiant barrier roof sheeting to help your home stay cooler during the hot summer months and helps keep your energy costs down Solar

More information

Carter Oaks 9700 Cragmont Drive, Richmond, VA Represented by Richard Bower (804) Joyner Fine Properties

Carter Oaks 9700 Cragmont Drive, Richmond, VA Represented by Richard Bower (804) Joyner Fine Properties Carter Oaks 9700 Cragmont Drive, Richmond, VA 23229 Represented by Richard Bower (804) 476-0010 www.richardbower.com Joyner Fine Properties Owner: Kristin & Andrew N. Wessel Price: $1,099,950 Legal Description:

More information

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com Residential Construction and Remodeling Estimates compliments of STRUCTURE/EXTERIOR Structure > addition (foundation to roof) $95 $130/sq.ft. > basement entrance $5250 $10500 > basement main beam $2100

More information

EXHIBIT A-1 CITY OF BELLFLOWER JANITORIAL MAINTENANCE SPECIFICATIONS

EXHIBIT A-1 CITY OF BELLFLOWER JANITORIAL MAINTENANCE SPECIFICATIONS EXHIBIT A-1 CITY OF BELLFLOWER JANITORIAL MAINTENANCE SPECIFICATIONS Janitorial Service Specifications Services shall include furnishing all labor, equipment, tools, fuel, materials, insurance, supervision,

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

7 Overlook Terrace Short Hills, New Jersey. Each Keller Williams office is independently owned and operated.

7 Overlook Terrace Short Hills, New Jersey. Each Keller Williams office is independently owned and operated. 7 Overlook Terrace Short Hills, New Jersey Each Keller Williams office is independently owned and operated. A short drive through the tree lined streets of the Glenwood section of Short Hills will bring

More information

Albany Senior Center Remodel

Albany Senior Center Remodel Albany Senior Center Remodel Todd Jersey Architecture June 13, 2011 Todd Jersey Architecture Albany Senior Center Project Overview The main focus of the Albany Senior Center renovation is in the Lobby,

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

PMS 1595 U PMS 547 U PMS 12 U

PMS 1595 U PMS 547 U PMS 12 U PMS 1595 U PMS 547 U PMS 12 U 3 BEDROOM 3 BATH WORKSPACE ENTRY POWDER PANTRY LIVING DINING KITCHEN GARAGE PATIO W DN D LAUNDRY STORAGE LINEN WALK-IN HALLWAY DECK BEDROOM 2 BATH 2 BEDROOM 1 MASTER BATH

More information

George B Swift Elementary Specialty School

George B Swift Elementary Specialty School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

WPUMC Capital Report Existing Facilities February 19, Maintenance Coordinator George Smit

WPUMC Capital Report Existing Facilities February 19, Maintenance Coordinator George Smit WPUMC Capital Report Existing Facilities February 19, 2017 Maintenance Coordinator George Smit Facility Overview Buildings Sanctuary Building (SB) Sanctuary, Narthex, Lobby Choir Room. Dr. Lee s Office,

More information

Sidney Sawyer Elementary School

Sidney Sawyer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

FOOD SERVICE May 6, 2016

FOOD SERVICE May 6, 2016 FOOD SERVICE May 6, 2016 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype requirements

More information

R e s i d e n t i a l P l a n n i n g P r o g r a m

R e s i d e n t i a l P l a n n i n g P r o g r a m R e s i d e n t i a l P l a n n i n g P r o g r a m Building a new home, or a completing a remodeling project can be a rewarding and exciting experience. Essential to a good design solution for your particular

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

3.2.4 OFFICE FACILITIES

3.2.4 OFFICE FACILITIES 3.2.4 OFFICE FACILITIES 3.2.4.1 General The guidelines in this section address offices and office support spaces. Office and office support space standards are used to provide the Project Team with design

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

210 Ironstone Court. Above information is believed to be accurate but is not warranted. Multiple Listing Service Property, Ottawa Real Estate Board

210 Ironstone Court. Above information is believed to be accurate but is not warranted. Multiple Listing Service Property, Ottawa Real Estate Board 210 Ironstone Court Gorgeous Custom Built Estate Bungalow on 2.016 Acres! Loaded with Upgrades & Finished Lower Level! Located on Quiet Court Across From Private Park in Stittsville! 210 Ironstone Court

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

The ocean Estates collection

The ocean Estates collection The ocean Estates collection Beach View House I 1 st FLOOR 2 nd Floor Beach View House I 5 Bedroom, 5 1/2 Bath 1st Floor Living Area 2nd Floor Living Area Total Living Area Verandahs Total Area 1,644 sf

More information

Estimated Repair, Replacement, and Upgrade Costs

Estimated Repair, Replacement, and Upgrade Costs Description Electrical Attic ventilator-mechanical $250 Baseboard heater (4') $150-$400 Ceiling fan $200 Doorbell system $80-$100 Dryer duct $100-$150 Hardwired smoke detector $60-$120 Exhaust Fan-Bathroom

More information

School District of Milton 5- Year Capital Maintenance and Improvement Plan

School District of Milton 5- Year Capital Maintenance and Improvement Plan Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom

More information

* Peak kw is determined by the average kw load reduction occurring between 1PM and 4PM on weekdays during June, July and August.

* Peak kw is determined by the average kw load reduction occurring between 1PM and 4PM on weekdays during June, July and August. overview Summary of Services & Incentives Effective through March 31, 2014 Last updated April 1, 2013 business programs The goal of the Focus on Energy Business Programs is to help Wisconsin s non-residential

More information

Former A.J. CHRISTOPHER S PIZZA * BAR * GRILL

Former A.J. CHRISTOPHER S PIZZA * BAR * GRILL Former A.J. CHRISTOPHER S PIZZA * BAR * GRILL 5626 West Lincoln Highway (Route 30), Parkesburg, West Sadsbury Township, PA 19365 (Gateway to Lancaster) Sale Price $3,250,000 Includes: Restaurant, Real

More information

14 Jim Mandryk Crescent

14 Jim Mandryk Crescent 14 Jim Mandryk Crescent Exceptional Stonewall family home with soaring 2 storey ceilings, Brazilian hardwood floors, gourmet maple kitchen and more! Style: 1 ½ Storey Living Area: 2,300 sq. ft. (approx.)

More information

Unit # E ± 1,200 SF Width ± 20' Depth ± 60'

Unit # E ± 1,200 SF Width ± 20' Depth ± 60' Lease Outline Drawing ±60' Lease Line Sunnymead Plaza 24907 Sunnymead Blvd., Unit # E, Moreno Valley, CA 92553 Unit # E ± 1,200 SF Width ± 20' Depth ± 60' Plans produced by: ID Plans 6/13/2017 (813) 657-2545

More information

REPAIR ESTIMATE GUIDE

REPAIR ESTIMATE GUIDE REPAIR ESTIMATE GUIDE STRUCTURE Foundation Addition (foundation to roof)... $125 - $170/sq.ft. Basement entrance... $6485 - $13690 Basement main beam... $2740 Basement support post/foundation... $650 -

More information

Luxury Country Home for Sale

Luxury Country Home for Sale The kitchen is inspired by a Downsview kitchen featured in Architectural Digest, the ceiling is vaulted and beamed. Granite countertops; large island, pantry, and tons of custom built cabinets stained

More information

AFFORDABLE CANADIAN HOME INSPECTIONS

AFFORDABLE CANADIAN HOME INSPECTIONS AFFORDABLE CANADIAN HOME INSPECTIONS Al Wright Hamilton, Ontario Cell: 905-730-9300 Expectancy of Household Components Appliances Compactors 7-12 Dishwashers 9-16 Disposal, Food Waste 11-16 Dryers 11-16

More information

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE SCHEDULE OF S Penalty Fees. The fee for construction work performed before securing permit(s), where required, may be charged a fee of TWO TIMES THE COST OF THE PERMIT (S). Building Fee Schedule Residential

More information

FOR MORE INFORMATION CALL OR EMAIL: Nancy Bass (757) 681-3573 nbass@williamewood.com Marketed by: Built by: www.mcqbuilders.com Builder Reserves the right to substitute plans, prices, components and specifications

More information

Welcome! 355 Richards Rd. We know Columbus Real Estate!

Welcome! 355 Richards Rd. We know Columbus Real Estate! Welcome! 100 E. Wilson Bridge Rd. Worthington, OH 43085 614-888-6100 www.thecolumbusteam.com www.facebook.com/thecolumbusteam www.twitter.com/thecolumbusteam homes@thecolumbusteam.com DETAILS Two Story

More information

FOOD SERVICE May 6, 2016

FOOD SERVICE May 6, 2016 FOOD SERVICE May 6, 2016 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and any requirements that may differ from the prototype requirements

More information

631 Logan Avenue - Features & Finishes

631 Logan Avenue - Features & Finishes 631 Logan Avenue - Features & Finishes Main Floor Foyer Separated from Living Room Full light front door Living Room Casement window with 2 operating windows, west facing Dining Room 2 fixed windows &

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

The Villas of Wyldewood

The Villas of Wyldewood The Chalet 1442 Sq. Ft. 2 Bedrooms 2 Full Baths 2 Car Garage 1st Floor Laundry Stain Resistant Carpet Gas Fireplace Central Air Easy Access - No Steps Private Deck Lake & Walking Trail All Dimensions,

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2327 N. MIDDLETOWN ROAD

2327 N. MIDDLETOWN ROAD 2327 N. MIDDLETOWN ROAD Paris, Bourbon County, Kentucky 32 +/- Acres Offered Exclusively By www.kyhorsefarms.com 518 East Main Street Lexington, Kentucky 40508 (859) 255-3657 MAIN RESIDENCE Entry Hall:

More information

Freshwater House Guillard Lane, St Andrew Price: 1,495,000 Sole Agent Open Market Sales

Freshwater House Guillard Lane, St Andrew Price: 1,495,000 Sole Agent Open Market Sales Freshwater House Guillard Lane, St Andrew Price: 1,495,000 Sole Agent Open Market Sales Master Bedroom with En Suite Shower Room and Dressing Room, 3 further Double Bedrooms (1 En Suite), Bathroom, Kitchen/Dining/

More information

Replacement Cost Questionnaire

Replacement Cost Questionnaire Replacement Cost Questionnaire 1. Please provide some general information about yourself: A) Name and address of insured location (as it appears on your Homeowners policy): Name: Street Address: City:

More information

3404 Greenbank Road - Jockvale on the River

3404 Greenbank Road - Jockvale on the River 3404 Greenbank Road - Jockvale on the River Welcome to 3404 Greenbank Road LIVING ROOM Inviting FAMILY ROOM DINING ROOM Enjoy KITCHEN Entertain MASTER BEDROOM ENSUITE Relax BEDROOMS BATHROOMS RECREATION

More information

More information about this property at snellrealestate.com

More information about this property at snellrealestate.com E&V Cas a D elfines Bedrooms Dormitorios Schlafzimmer 3 Baths Baños Badezimmer 3 A/C sq. ft. Superficie Construída Wohnzimmer 2,636 View Vista Ocean Furnished Construcción Fully Year built Año de construcción

More information

450 Greywalls Lane Iron Station, North Carolina

450 Greywalls Lane Iron Station, North Carolina 450 Greywalls Lane Iron Station, North Carolina Main Floor Main Entry Foyer Grand Foyer with winding staircase leading to wrap-around upper foyer Karastan Wool carpet on center of stairs Picture frame

More information

Unit HH Gregg. ± 30,000 SF Width ±26' Lakeland Retail Center. Lease Outline Drawing. Unit HH Gregg. Depth ± 145' HVAC Units & Information

Unit HH Gregg. ± 30,000 SF Width ±26' Lakeland Retail Center. Lease Outline Drawing. Unit HH Gregg. Depth ± 145' HVAC Units & Information Lease Outline Drawing Lakeland Retail Center 4000 US Hwy. 98, Unit HH Gregg, Lakeland, FL 33809 ±26' ±200' Lease Line Unit HH Gregg ±46' Lease Line ±21' Unit HH Gregg ±145' Lease Line ± 30,000 SF Width

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

FEATURES PLEASANT PROSPECT RD. BOWIE, MD 20721

FEATURES PLEASANT PROSPECT RD. BOWIE, MD 20721 Originally built in 1986. Structure was demolished and new house was rebuilt in 1996 Choice premium lot on 8 th Hole Double driveways to include circular with custom landscaping Custom Grand front entry

More information

Food Service Plan Review Information

Food Service Plan Review Information Food Service Plan Review Information New or remodeled food preparation facilities, and those changing ownership, must undergo a plan review process prior to a health permit being issued. The purpose of

More information

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line ± 4' ± 13' ± 72' Lease Line ± 6' ± 7' Plot # R019A ± 18' Lease Line Site N o : Site N ame: Lo catio n: Submitted B y: D rawn by D ate: 991 Santee Trolley Square Santee, CA ID Plans 11/10/2016 This drawing

More information

Landscape Includes sprinkler system Irrigation, system maintenance, and landscape upkeep are all included in H.O.A. dues

Landscape Includes sprinkler system Irrigation, system maintenance, and landscape upkeep are all included in H.O.A. dues Current as of 7/24/17 Construction & Design Specifications for: 3803 Echo Farms Blvd Priced as described below: $236,500 Exterior Raised slab foundation o pretreated for termites -- termite bond maintained

More information

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60'

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60' ±60' Lease Line Lease Outline Drawing Needles Towne Center 1004 E. Broadway St.,, Needles, CA 92363 ± 900 SF Width ± 15' Depth ± 60' Plans produced by: ID Plans 6/16/2017 (813) 657-2545 C 2017 Site map

More information

Library stacks and records storage 150 LB/SF live load

Library stacks and records storage 150 LB/SF live load SPACE TYPE: LIBRARY Construction Criteria The unit costs for Library space types are based on the construction quality and design features in the following table. This information has been generally organized

More information

DeWitt Clinton Elementary School

DeWitt Clinton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

28 HAWTHORN AVENUE. Approx. 3,004 sq. ft. (+ 937 sq. ft. on the lower level) Closing Date: 3 car parking

28 HAWTHORN AVENUE. Approx. 3,004 sq. ft. (+ 937 sq. ft. on the lower level) Closing Date: 3 car parking PROPERTY INFORMATION 28 HAWTHORN AVENUE Property Details Taxes: $15,884.49 (2017) Lot Size: 33.5 x 150 ft. Square Footage: Approx. 3,004 sq. ft. (+ 937 sq. ft. on the lower level) Closing Date: To be determined

More information

Brookstone Collection. Included Features

Brookstone Collection. Included Features ATTRACTIVE INTERIORS: Brookstone Collection Satin Nickel Door Hardware Shed Resistant, Continuous Filament Carpet with Stainguard 1/2 -Inch, 6-Pound Nominal Carpet Pad Crown Molding in 1st Story Entry,

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

Proudly Presenting Pritchard Drive

Proudly Presenting Pritchard Drive Proudly Presenting 1645 Pritchard Drive Level Lakeshore - Dock -Sandy Beach Features at a Glance Lot size: 0.26 acres with 75 ft. of water frontage, 75 ft. x 128 ft. Age: Built in 2011 Finished Area: 5076

More information

Facilities Management State-Funded and Billable Services

Facilities Management State-Funded and Billable Services Facilities Management State-Funded and Billable Services Facilities Management receives funding to provide maintenance in eligible state-supported areas only, per UCOP guidelines. State-supported areas,

More information

COVIDIEN SENECA, SOUTH CAROLINA

COVIDIEN SENECA, SOUTH CAROLINA SENECA, SOUTH CAROLINA 220,250 Square Feet on 73.30 Acres 1448 BLUE RIDGE BOULEVARD SENECA, SOUTH CAROLINA 29672 (OCONEE COUNTY) SIZE: NUMBER OF BUILDINGS: GROUND: Approximately 220,250 square feet One,

More information

25150 N. 93 rd Street Residence

25150 N. 93 rd Street Residence Residence o Built 2009 on 1.7 acres, gated community o View of Pinnacle Peak from courtyard and rooms facing east o 180-degree view of the city from the balcony o Square footage from architectural plans

More information

27 Sanctuary Trail Missouri City, TX FEATURES

27 Sanctuary Trail Missouri City, TX FEATURES 27 Sanctuary Trail Missouri City, TX 77459 FEATURES EXTERIOR FRONT Stamped/pattern Concrete Circular Driveway Sprinkler System Porte-cochere with Recessed Can Lights Gas Lantern Coach Lights 12 Wood Double

More information

Examples of Acclaim s Energy-Efficiency Green Technology

Examples of Acclaim s Energy-Efficiency Green Technology Examples of Acclaim s Energy-Efficiency Green Technology This packet shows examples of some of the energy-efficiency materials that we provide as standard in our homes at Creekmoor. At the end of the packet,

More information

3813 Fairway Drive Woodbury, Mn Offered At $639,000

3813 Fairway Drive Woodbury, Mn Offered At $639,000 3813 Fairway Drive Woodbury, Mn. 55125 Offered At $639,000 S p e c i f i c a t i o n s Style Two Story Year Built 1999 Built By Kootenia Exterior Brick/Stucco & Hardie Plank Lot Size 147x77x175x160 Legal

More information

FAIRA TRANSPARENCY REPORTS th Ave NE B-3, Kenmore, WA March 28 th, 2017

FAIRA TRANSPARENCY REPORTS th Ave NE B-3, Kenmore, WA March 28 th, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 17817 80th Ave NE B-3, Kenmore,

More information

965 Fell Street. of Long & Foster Real Estate Associate Broker, GRI, ABR. Christie s International Real Estate

965 Fell Street. of Long & Foster Real Estate Associate Broker, GRI, ABR.   Christie s International Real Estate of Long & Foster Real Estate 965 Fell Street Fells Point Nancy C. Hubble Associate Broker, GRI, CRS, ABR Nancy@HubbleBisbee.com 443-465-1424 Karen Hubble Bisbee Associate Broker, GRI, ABR Karen@HubbleBisbee.com

More information

Jeff Brown Inspections

Jeff Brown Inspections Cover Page Jeff Brown Inspections Property Inspection Report Vegas NV, 89145 Inspection prepared for: Jim Shen Agent: Lauren Paris - Resolution Realty Inspection Date: 6/13/2013 Time: 10:00 Age: 26 years

More information

Kitchen Planning Worksheet

Kitchen Planning Worksheet Kitchen Planning Worksheet Thorough planning is an essential element in any successful remodeling project. Your kitchen remodel may be simple or elaborate. Complete this worksheet to help clarify your

More information

Bath Planning Worksheet

Bath Planning Worksheet Bath Planning Worksheet Thorough planning is an essential element in any successful remodeling project. Your bathroom may be a simple powder room or a spa like space. Complete a worksheet for each bath

More information

Bethlehem University 2008 Projects Summary

Bethlehem University 2008 Projects Summary 2008 Projects Summary 2008 Projects Summary In Addition to following up daily engineering related issues and supervising the Maintenance and Security Departments the University Engineer is involved in

More information

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS TERRACE VIEW APARTMENTS HUNT CLUB ROAD BLACKSBURG, VIRGINIA APARTMENT FINISHES AND UPGRADES UNIT TYPE 3A x 1.5 Phase 5-8 Unit Number 4 Units Total 1) 6600F 2) 6800K 3) 7600G 4) 7900H SCOPE OF WORK A-108-E

More information

Welcome to 6654 Old Forest Drive Maple Forest Estates, North Gower $770,000

Welcome to 6654 Old Forest Drive Maple Forest Estates, North Gower $770,000 Welcome to 6654 Old Forest Drive Maple Forest Estates, North Gower $770,000 This beautiful executive 2 storey home offers 4 bedrooms, 6 bathrooms, triple car garage & indoor swimming pool. Stunning finishing

More information

The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on

The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on HOME PROPERTY SCAN INSPECTIONS The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on January 11, 2010 and

More information

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS TERRACE VIEW APARTMENTS HUNT CLUB ROAD BLACKSBURG, VIRGINIA APARTMENT FINISHES AND UPGRADES UNIT TYPE 4 x 2.5 Phase 5-8 Unit Number 1 Unit Total 1) 7400B SCOPE OF WORK A-112-C 4 Bedroom 2 Bath 2 Half

More information

22576 INSPIRATION POINT INTERIOR FEATURES BY ROOM

22576 INSPIRATION POINT INTERIOR FEATURES BY ROOM 22576 INSPIRATION POINT INTERIOR FEATURES BY ROOM FIRST (TOP) FLOOR NOTE THROUGHOUT - STAINED 8 DOORS, JAMBS, CASING AND CROWN MOLDING; BRUSHED NICKEL HARDWARE AND HINGES ENTRY Ceiling height, 17 Energy-efficient

More information

1130 KIDDS MILL ROAD

1130 KIDDS MILL ROAD 1130 KIDDS MILL ROAD Woodford County, Kentucky 35 +/- Acres Offered Exclusively By www.kyhorsefarms.com 518 East Main Street Lexington, Kentucky 40508 (859) 255-3657 MAIN RESIDENCE Entry Hall: Mahogany

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

REQUIRED CONTRACT DETAIL. $2, , Direct DC Fuel Cell Power System, Stationary PACE Power output < 40 kw

REQUIRED CONTRACT DETAIL. $2, , Direct DC Fuel Cell Power System, Stationary PACE Power output < 40 kw Residential Eligible Improvements and Guidelines FLORIDA To qualify for Ygrene funding, all project improvements must meet or exceed applicable local, state and federal codes and standards, and be installed

More information

JANITORIAL SPECIFICATIONS

JANITORIAL SPECIFICATIONS JANITORIAL SPECIFICATIONS A. Office Areas 1. Empty and wipe outside wastebaskets, replacing liners, if necessary. Remove to appropriate receptacle for disposal. All bins will be returned to their original

More information

Thesis Proposal. Brian Regan The Virginia Historical Society Building West Wing Addition RICHMOND, VIRGINIA

Thesis Proposal. Brian Regan The Virginia Historical Society Building West Wing Addition RICHMOND, VIRGINIA Thesis Proposal Brian Regan The Virginia Historical Society Building West Wing Addition RICHMOND, VIRGINIA New Addition s Functions Auditorium Entrances located on ground and basement floors Museum Art

More information

WELCOME TO 18 BURNHAM ROAD

WELCOME TO 18 BURNHAM ROAD WELCOME TO National Chairman s Club Award Top 1% In Canada top 10 agents in canada 416.424.4900 Cailey@HeapsEstrin.com www.heapsestrin.com Helping you is what we do. Main Floor Four Piece Ensuite Heated

More information

Sagecrest. LIVE All about you and how you live every day... Comfortable & Peace of Mind

Sagecrest. LIVE All about you and how you live every day... Comfortable & Peace of Mind Sagecrest II Included Features DESIGN Thoughtful choices to assist you in personalizing your new home reflecting your individual taste and personal style... Easy & Affordable DISTINCTIVE EXTERIOR DETAILING:

More information