Technical Committee on Fundamentals (HEA-FUN)

Size: px
Start display at page:

Download "Technical Committee on Fundamentals (HEA-FUN)"

Transcription

1 Technical Committee on Fundamentals () M E M O R A N D U M DATE: July 20, 2015 TO: Principal and Alternate Members of the Technical Committee on Fundamentals () FROM: Jon Hart, Staff Liaison SUBJECT: AGENDA PACKAGE NFPA 99 First Draft Meeting (A2017) Enclosed is the agenda for the NFPA 99 First Draft meeting of the Technical Committee on Fundamentals, which will be held on Thursday, August 13, 2015 at the Sheraton Inner Harbor Hotel, in Baltimore, MD. Please review the attached Public Inputs in advance, and if you have alternate suggestions, please come prepared with proposed language and respective substantiation. If you have any questions prior to the meeting, please do not hesitate to contact me at: Office: (617) jhart@nfpa.org For administrative questions, please contact Elena Carroll at (617) I look forward to working with everyone. 1

2 Table of Contents Part 1 Meeting Agenda Part 2 Committee Roster Part 3 Committee Distribution Part 4 Previous Meeting Minutes Part 5 Sample Meeting Motions Part 6 Public Inputs 2

3 Technical Committee on Fundamentals () NFPA 99 First Draft Meeting (Annual 2017) Thursday, August 13, 2015 Sheraton Inner Harbor Hotel 300 S. Charles Street, Baltimore, MD AGENDA 1. Call to Order 8:00 am 2. Introductions and Attendance 3. Chairman Comments 4. Approval of Previous Meeting Minutes 5. Staff Liaison Presentation on NFPA Revision Process and A2017 Cycle 6. Preparation of the First Draft for NFPA 99 Review Public Inputs Create First Revisions 7. New Business 8. Discuss dates for the TC Second Draft Meeting (Between 5/16 and 7/25, 2016) 9. Adjournment Please submit requests for additional agenda items to the chair and staff liaison at least seven days prior to the meeting. Please notify the chair and staff liaison as soon as possible if you plan to introduce any new material not submitted through Public Input at the meeting. 3

4 Technical Committee on Fundamentals () NFPA 99 First Draft Meeting (Annual 2017) Thursday, August 13, 2015 Sheraton Inner Harbor Hotel 300 S. Charles Street, Baltimore, MD Key Dates for the Annual 2017 Revision Cycle Public Input Closing Date July 6, 2015 Final Date for First Draft Meeting September 14, 2015 Ballots Mailed to TC before October 26, 2015 Ballots Returned By November 16, 2015 Correlating Committee First Draft Meeting December 15, 2015 Final First Draft Posted March 7, 2016 Public Comment Closing Date May 16, 2016 Final Date for Second Draft Meeting July 25, 2016 Correlating Committee Second Draft Meeting by November 21, 2016 Final Second Draft Posted January 16, 2017 Closing Date for Notice of Intent to Make a Motion (NITMAM) February 20, 2017 Issuance of Consent Document (No NITMAMs) May 12, 2017 NFPA Annual Meeting (Boston) June 2017 Issuance of Document with NITMAM August 10, 2017 Technical Committee deadlines are in bold. 4

5 Technical Committee Roster 5

6 Address List No Phone Fundamentals Health Care Facilities David P. Klein Chair US Department of Veterans Affairs 810 Vermont Avenue, NW, Suite 800 Mail Code: (10NA8) Washington, DC US Department of Veterans Affairs Alternate: Peter Leszczak U 7/26/2007 Bruce L. Abell Principal US Army Corps of Engineers (CEHNC-ED-MX) 7701 Telegraph Road (3rd Floor) Alexandria, VA /14/2015 Jonathan Hart U 08/09/2012 Chad E. Beebe Principal ASHE - AHA PO Box 5756 Lacey, WA American Society for Healthcare Engineering U 10/20/2010 Jeff N. Besel Principal Michaud Cooley Erickson 333 South Seventh Street, #1200 Minneapolis, MN Automatic Fire Alarm Association, Inc. Alternate: Daniel P. Finnegan M 3/1/2011 Gordon D. Burrill Principal Teegor Consulting Inc. 316 Jewett Street Fredericton, NB E3A 5T2 Canada Canadian Healthcare Engineering Society U 1/25/2007 Michael A. Crowley Principal JENSEN HUGHES 8827 West Sam Houston Parkway Suite 150 Houston, TX Alternate: Eric R. Rosenbaum SE 10/1/1996 Carl J. Ferlitch, Jr. Principal Chubb Group of Insurance Companies 3 Otis Court New Freedom, PA I 3/1/2011 Michael S. Jensen Principal US Department of Health & Human Services Phoenix Area Indian Health Service Two Renaissance Square 40 North Central Avenue, Suite 720 Phoenix, AZ Alternate: Roger N. Dahozy E 1/25/2007 Frank L. Keisler, Jr. Principal CNA Insurance Company 425 Arborshade Trace Duluth, GA Alternate: Michael Mansfield I 8/9/2011 Henry Kowalenko Principal Illinois Department of Public Health Office of Health Care Regulation 525 West Jefferson Street, 4th Floor Springfield, IL E 8/9/2011 James K. Lathrop Principal Koffel Associates, Inc. 81 Pennsylvania Avenue Niantic, CT Alternate: Allison C. Ellis SE 10/27/2009 Stephen M. Lipster Principal The Electrical Trades Center 947 Goodale Boulevard Columbus, OH International Brotherhood of Electrical Workers Alternate: Gary A. Beckstrand L 1/10/

7 Address List No Phone Fundamentals Health Care Facilities Dale L. Lyman Principal Greeley Fire Department th Street, Suite 100 Greeley, CO E 03/03/2014 Bret M. Martin Principal Carolinas Healthcare Systems 4716 Nesbit Road Monroe, NC /14/2015 Jonathan Hart U 07/29/2013 Jack McNamara M 10/27/2009 Principal Bosch Security Systems 130 Perinton Parkway Fairport, NY National Electrical Manufacturers Association Thomas G. McNamara Principal North Shore LIJ Health System-Southside Hospital 301 East Main Street Bay Shore, NY U 10/28/2008 James S. Peterkin Principal Heery International 1717 Arch Street, Suite 3730 Philadelphia, PA SE 10/28/2008 Milosh T. Puchovsky Principal Worcester Polytechnic Institute Department of Fire Protection Engineering 100 Institute Road Worcester, MA SE 03/03/2014 Grayson Sack Principal Cashins and Associates, Inc. 21 Fisher Street Natick, MA SE 07/29/2013 Frank L. Van Overmeiren Principal FP&C Consultants, Inc Main Street Indianapolis, IN Alternate: Beth A. Alexander SE 7/26/2007 John L. Williams Principal Washington State Department of Health 310 Isreal Road, SE Olympia, WA Alternate: Kevin A. Scarlett E 03/07/2013 Jennifer Zaworski Principal Aon Fire Protection Engineering 6305 Ivy Lane, Suite 220 Greenbelt, MD I 10/29/2012 Beth A. Alexander Alternate FP&C Consultants, Inc Main Street Indianapolis, IN Principal: Frank L. Van Overmeiren SE 3/4/2009 Gary A. Beckstrand Alternate Utah Electrical JATC 1737 East 2100 South Salt Lake City, UT International Brotherhood of Electrical Workers Principal: Stephen M. Lipster L 3/1/2011 Roger N. Dahozy Alternate US Department of Health & Human Services Phoenix Area Indian Health Service Two Renaissance Square 40 North Central Avenue, Suite 720 Phoenix, AZ Principal: Michael S. Jensen E 04/08/2015 Allison C. Ellis Alternate Koffel Associates, Inc Centre Park Drive, Suite 200 Columbia, MD Principal: James K. Lathrop SE 08/11/

8 Address List No Phone Fundamentals Health Care Facilities 07/14/2015 Jonathan Hart Daniel P. Finnegan Alternate Siemens Industry, Inc. Building Technologies Division Fire & Security 2953 Exeter Court West Dundee, IL Automatic Fire Alarm Association, Inc. Principal: Jeff N. Besel M 3/1/2011 Peter Leszczak Alternate US Department of Veterans Affairs 950 Campbell Avenue West Haven, CT Principal: David P. Klein U 7/26/2007 Michael Mansfield Alternate CNA Insurance Company 2800 North Orchard, Unit 707 Chicago, IL Principal: Frank L. Keisler, Jr. I 10/29/2012 Eric R. Rosenbaum Alternate JENSEN HUGHES 3610 Commerce Drive, Suite 817 Baltimore, MD Principal: Michael A. Crowley SE 08/11/2014 Kevin A. Scarlett Alternate Washington State Department of Health 1701 North Mildred Street Tacoma, WA Principal: John L. Williams E 07/29/2013 Jonathan Hart Staff Liaison National Fire Protection Association 1 Batterymarch Park Quincy, MA /1/

9 Technical Committee Distribution 9

10 Distribution by % Fundamentals Tuesday 7 14, Tuesday Name Company Representation Class Office Michael S. Jensen US Department of Health & Human Services HHS-IHS E Principal Henry Kowalenko Illinois Department of Public Health E Principal Dale L. Lyman Greeley Fire Department E Principal John L. Williams Washington State Department of Health E Principal Voting Number 4 Percent 18% Carl J. Ferlitch, Jr. Chubb Group of Insurance Companies I Principal Frank L. Keisler, Jr. CNA Insurance Company I Principal Jennifer Zaworski Aon Fire Protection Engineering AON I Principal Voting Number 3 Percent 14% Stephen M. Lipster The Electrical Trades Center IBEW L Principal Voting Number 1 Percent 5% Jeff N. Besel Michaud Cooley Erickson AFAA M Principal Jack McNamara Bosch Security Systems NEMA M Principal Voting Number 2 Percent 9% Michael A. Crowley JENSEN HUGHES SE Principal James K. Lathrop Koffel Associates, Inc. SE Principal James S. Peterkin Heery International SE Principal Milosh T. Puchovsky Worcester Polytechnic Institute SE Principal Grayson Sack Cashins and Associates, Inc. SE Principal Frank L. Van Overmeiren FP&C Consultants, Inc. SE Principal Voting Number 6 Percent 27% David P. Klein US Department of Veterans Affairs USVA U Chair Bruce L. Abell US Army Corps of Engineers U Principal Chad E. Beebe ASHE - AHA ASHE U Principal Gordon D. Burrill Teegor Consulting Inc. CHES U Principal 10

11 Distribution by % Fundamentals Tuesday 7 14, Tuesday Name Company Representation Class Office Bret M. Martin Carolinas Healthcare Systems U Principal Thomas G. McNamara North Shore LIJ Health System- Southside Hospital U Principal Voting Number 6 Percent 27% Total Voting Number 22 11

12 Previous Meeting Minutes 12

13 MINUTES NFPA Technical Committee on Fundamentals () June 3, 2013 Second Draft Meeting Embassy Suites Ft. Lauderdale Ft. Lauderdale, FL 1. Call to Order. Committee Chair, David Klein, called the meeting to order at 8:00 am on Monday June 3, Attendance and Introductions: Attendance was taken and those present at the meeting introduced themselves and stated who they represent on the committee. Those who were present at the meeting are listed below: Name Klein, David Chair Abell, Bruce Principal (Web) Beebe, Chad Principal Burrill, Gordon Principal Crowley, Michael Principal (web) Donohue, Sean Principal Fertlitch, Carl Principal Jensen, Michael Principal Keisler, Frank Principal Kowalenko, Henry Principal Lathrop, James Principal Lipster, Stephen Principal McNamara, Jack Principal McNamara, Thomas Principal Peterkin, James Principal Van Overmeiren, Frank Principal Williams, John Principal Representing US Department of Veterans Affairs U.S. Army Corps of Engineers American Society for Healthcare Engineers Canadian Healthcare Engineering Society The RJA Group, Inc. Hughes Associates Chubb Group of Insurance Companies US Department of Health and Human Services/IHS CAN Insurance Company Illinois Department of Public Health Koffel Associates, Inc. International Brotherhood of Electrical Workers National Electrical Manufacturers Association North Shore LIJ Health System Southside Heery International FP&C Consultants, Inc. Washington State Department of Health 13

14 Zaworski, Jennifer Principal Finnegan, Daniel Voting Alternate Alexander, Beth Alternate (web) Mansfield, Michael Alternate Hart, Jonathan Staff Liaison Besel, Jeff Guest (re applying) Aon Corporation Automatic Fire Alarm Association, Inc. FP&C Consultants, Inc. CNA Insurance Company NFPA Automatic Fire Alarm Association, Inc. 3. Chairman Comments: David Klein spoke to the agenda for the meeting and provided opening comments. 4. Minutes Approval: The minutes of the August 27, 2012 First Draft Meeting were approved as distributed in the Agenda Package. James Peterkin later requested that they be amended to show him a present. 5. Staff Liaison Presentation: Jon Hart gave the staff presentation for the meeting, which included general meeting procedures and a review of the Annual 2014 revision cycle. 6. Development of Second Draft: The committee reviewed all public comments (PC) and resolved them by either taking action by providing a committee statement or by creating a second revision (SR) based on the PC. Other Second Revisions were also created. See the Second Draft and Second Draft Report for the official committee actions. 7. Old Business: Jim Lathrop reported back that the task group formed to review the MED use of risk assessment did not meet. The MED TC did not end up using the risk approach so therefore the charge of the task group was not needed. The task group was disbanded. 14

15 8. New Business: There was no new business. 9. Meeting Adjourned: The meeting was adjourned at 10:38 am on June 3,

16 Sample Motions for First Draft Meeting 16

17 NEW PROCESS ACTIONS AND MOTIONS Possible Action #1: Resolve PI (no change to section) Action Required Sample motion Make a statement to resolve a PI I move to resolve PI # with the following statement... Possible action #2: Create First Revision (make a change to a section) Action Required Sample motion Step 1 Create a First revision based one or more PIs I move to create a First Revision based on PI # Step 2 If the revision is related to multiple PIs, generate a statement to respond to all of them together Step 1 Create a First Revision I move to create a First Revision as follows... Step 2 Generate a statement (substantiation) Possible Action 3: Create Committee input Step 1 Create proposed revision for solicitation of public comments I move to create CI with a proposed revision to X as follows... Step 2 Generate a statement to explain the intent and why the Committee is seeking public comment 17

18 Public Input 18

19 Public Input No. 5-NFPA [ Global Input ] Throughout standard remove references to the following and replace with the following: 1. ANSI/AWS A5.8 and replace with AWS A ANSI/UL and replace with UL. 3. Instrumentation, Systems, and Automation Society and replace with International Society of Automation. 4. ANSI/ISA and replace with ISA. 5. ANSI/ASME B16.50 and replace with ASME B ANSI/ASME PVHO-1 and replace with ASME PVHO ASHRAE Handbook of Fundamentals and replace with ASHRAE Handbook - Fundamentals. 8. American Society of Mechanical Engineers and replace with ASME International. 9. SP 58 and replace with MSS SP ANSI/IEC/ISO and replace with IEC ANSI/IEC/ISO and replace with IEC TR ANSI/IEEE and replace with IEEE. 13. CGA C-7 Guide to the Preparation and Precautionary Labelling and Marking Gas Containers, 2011, and replace with CGA C-7 Guide to Classification and Labelling of Compressed Gases, 10th edition, CGA M-1 Guide for Medical Gas Installations at Consumer Sites, 2007 and replace with Standard for Medical Gas Installations at Health Care Facilities, 3rd edition, TIA/EIA 568-B Commerical Building Telecommunications Cabling Standard and TIA/EIA 606-A Administration Standard for Telecommunications Building Infrastructure and replace with TIA Wiring Standards, Recommended revisions to correlate with PI-6 and PI-7. Related Public Inputs for This Document Related Input Public Input No. 6-NFPA [Section No. 2.3] Public Input No. 7-NFPA [Section No. D.1.2] Public Input No. 15-NFPA [Section No. D.2] Relationship Referenced current SDO names, addresses, standard names, numbers, and editions. Referenced current SDO names, addresses, standard names, numbers, and editions. Submitter Full Name: Aaron Adamczyk Organization: [ Not Specified ] Submittal Date: Sun Feb 08 23:57:13 EST of 1 7/8/ :16 AM 19

20 National Fire Protection Association Report of /8/2015 3:05 PM Public Input No. 237-NFPA [ Section No ] * Hyperbaric Facilities. Chapter 14 covers the recognition of, and protection against, hazards of an electrical, explosive, or implosive nature, as well as fire establishes criteria for design of hyperbaric chambers and design and operation of hyperbaric facilities. Chapter 14 covers electrical, fire, pressure, and gas hazards associated with hyperbaric chambers and associated facilities that are used, or intended to be used, for medical applications and experimental procedures at gauge pressures from 0 kpa to 690 kpa (0 psi to 100 psi). One of the proposed edits specifies that the hyperbaric facilities chapter is used for facility design, chamber design, and facility operation. The other edits make the existing paragraph more concise. Related Public Inputs for This Document Related Input Public Input No. 238-NFPA [Section No. A ] Relationship Submitter Full Name: ROBERT SHEFFIELD Organization: INTERNATIONAL ATMO INC Submittal Date: Tue Jun 23 21:32:51 EDT

21 National Fire Protection Association Report of /8/2015 3:05 PM Public Input No. 27-NFPA [ New Section after ] Special inspections Special inspections of engineered design medical gas systems shall be conducted in accordance with Sections and Periodic inspection. The registered design professional, AHJ or designee shall periodically inspect and observe the engineered design to determine that the installation is in accordance with the approved construction documents. All discrepancies shall be brought to the immediate attention of the plumbing contractor for correction. Records shall be kept of all inspections Written report. The registered design professional shall submit a final report in writing to the code official upon completion of the installation, certifying that the engineered design conforms to the approved construction documents. A notice of approval for the plumbing system shall not be issued until a written certification has been submitted. By adding the Special Inspections definitions would be consistent with NFPA 1, 101 and 5000 sections Special Inspections. Adding this to NFPA 99 will address a definition that is being used by City and County officials. The Special Inspector tends to be one of three individuals, AHJ, Engineer, or a Third Party hired by the Owner or GC. We wish to provide some sort of a description to best capture these individuals. Submitter Full Name: John Gregory Organization: HDR Architecture Inc. Affilliation: P.I.P.E. Medical Gas Committee Phoenix AZ Submittal Date: Wed Apr 08 12:07:09 EDT

22 National Fire Protection Association Report of /8/2015 3:05 PM Public Input No. 30-NFPA [ Section No ] Enforcement. This code shall be administered and enforced by the authority having jurisdiction, if a designee is appointed, they shall be appointed by the AHJ, or RDPRC. (See Annex C for a sample wording for enabling legislation.) gives the RDPRC (engineer of record) more control over their design. Submitter Full Name: John Gregory Organization: HDR Architecture Inc. Affilliation: P.I.P.E. Medical Gas Committee Phoenix AZ Submittal Date: Wed Apr 08 12:38:18 EDT

23 National Fire Protection Association Report 0 of 29 7/8/2015 3:05 PM Public Input No. 6-NFPA [ Section No. 2.3 ] 2.3 Other Publications ANSI Publications. American National Standards Institute, Inc., 22 West 43rd Street, 4th Floor, New York, NY ANSI B57.1, Compressed Gas Cylinder Valve Outlet and Inlet Connections ANSI Z , Safe Use of Optical Fiber Communication Systems Utilizing Laser Diode and LED Sources, ANSI/UL 723, Standard for Test for Surface Burning Characteristics of Building Materials, 2010.ANSI/ AAMI ES , Medical Electrical Equipment, ANSI/UL 1069, Safety Standard for Hospital Signaling and Nurse Call Equipment, (Same IEC ) ASHRAE Publications. ASHRAE, 1791 Tullie Circle, NE, Atlanta, GA ASHRAE STD 90.1 IP, Energy Standard for Buildings Except Low-Rise Residential Buildings, 2010.ASHRAE , Errata, (Supersedes ASHRAE STD 90.1) ASHRAE STD 170, Ventilation of Health Care Facilities, ASME Publications. American Society of Mechanical Engineers ASME International, Two Park Avenue, New York, NY ASME A.17.1, Safety Code for Elevators and Escalators, ASME A.17.3, Safety Code for Existing Elevators and Escalators, ASME B1.20.1, Pipe Threads, General Purpose, Inch, ASME B16.22, Wrought Copper and Copper Alloy Solder-Joint Pressure Fittings, ASME B16.26, Cast Copper Alloy Fittings for Flared Copper Tubes, ANSI/ ASME B16.50, Wrought Copper and Copper Alloy Braze-Joint Pressure Fittings, ASME B31.3, Pressure Process Piping, ASME B40.100, Pressure Gauges and Gauge Attachments, ASME Boiler and Pressure Vessel Code, Section VIII, Division 1, Rules for Construction of Power Boilers, ASME Boiler and Pressure Vessel Code, Sections VIII and Section IX, 2010 Welding, Brazing, and Fusing, Qualifications, ANSI/ ASME PVHO-1, Safety Standard for Pressure Vessels for Human Occupancy, ASSE Publications. American Society of Sanitary Engineering, 901 Canterbury Road, Suite A, Westlake, OH ASSE 6010, Professional Qualification Standard for Medical Gas Systems Installers, ASSE 6015, Professional Qualification Standard for Bulk Medical Gas Systems Installer, ASSE 6030, Professional Qualification Standard for Medical Gas Systems Verifiers, ASSE 6040, Professional Qualification Standard for Medical Gas Maintenance Personnel,

24 National Fire Protection Association Report 1 of 29 7/8/2015 3:05 PM ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA ASTM A 269 A269 /A269M, Standard Specification for Seamless and Welded Austenitic Stainless Steel Tubing for General Service, e1. ASTM A 312 A312 /A312M, Standard Specification for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes, 2013a 201 4b. ASTM B 32 B32, Standard Specification for Solder Metal, 2008, Reapproved ASTM B 88 B88, Standard Specification for Seamless Copper Water Tube, ASTM B 280 B280, Standard Specification for Seamless Copper Tubing for Air Conditioning and Refrigeration Field Service, ASTM B 819 B819, Standard Specification for Seamless Copper Tube for Medical Gas Systems, 2000 (, Reapproved 2011 ). ASTM B 828 B828, Standard Practice for Making Capillary Joints by Soldering of Copper and Copper Alloy Tube and Fittings, 2002 (, Reapproved 2010 ). ASTM D 5 D5 /D5M, Standard Test Method for Penetration of Bituminous Materials, 2006 e ASTM D 1785 D1785, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120, ASTM D 2466 D2466, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40, ASTM D 2467 D2467, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80, a. ASTM D 2672 D2672, Standard Specification for Joints for IPS PVC Pipe Using Solvent Cement, 1996a (2009) ASTM D 2846 D2846 /D2846M, Standard Specification for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Hot- and Cold-Water Distribution Systems, 2009b e ASTM D 2863 D2863, Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index), ASTM D 4359 D4359, Standard Test Method for Determining Whether a Material Is a Liquid or a Solid, ASTM E 84 E84, Standard Test Method for Surface Burning Characteristics of Building Materials, 2012c ASTM E 136 E136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 C, ASTM E 1352 E1352, Standard Test Method for Cigarette Ignition Resistance of Mock-Up Upholstered Furniture Assemblies, 2008a. ASTM E 1353 E1353, Standard Test Methods for Cigarette Ignition Resistance of Components of Upholstered Furniture, 2008a e1. ASTM E 1537 E1537, Standard Test Method for Fire Testing of Upholstered Furniture, ASTM E 1590 E1590, Standard Test Method for the Fire Testing of Mattresses, ASTM E 2652 E2652, Standard Test Method for Behavior of Materials in a Tube Furnace with a Cone-shaped Airflow Stabilizer, at 750 C, a. ASTM F 438 F438, Standard Specification for Socket-Type Chlorinated Poly (Vinyl Chlorinated) (CPVC) Plastic Pipe Fittings, Schedule 40, ASTM F 439 F439, Standard Specification for Chlorinated Poly (Vinyl Chlorinated) (CPVC) Plastic Pipe Fittings, Schedule 80, ASTM F 441 F441 /F441M, Standard Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe, Schedules 40 and 80, e1. ASTM F 493 F493, Solvent Cements for CPVC Pipe and Fittings, AWS Publications. American Welding Society, NW LeJeune Road 36 Street, #130, Miami, FL ANSI/ AWS A5. 8M/ A5. 8, Specification for Filler Metals for Brazing and Braze Welding, 2011, Addendum 1, AWS B2.2/B2.2M, Standard for Brazing Procedure and Performance Qualification, BICSI Publications. BICSI, 8610 Hidden River Parkway, Tampa, FL The BICSI BICSI ICT Terminology Handbook, V 1.0 (Download Only). (Supersedes BICSI's Information Transport Systems (ITS) Dictionary, 3rd edition. ) CDA Publications. Copper Development Association Inc., 260 Madison Avenue, New York, NY Copper Tube Handbook,

25 National Fire Protection Association Report 2 of 29 7/8/2015 3:05 PM CGA Publications. Compressed Gas Association, George Carter Way, Suite 103, Chantilly, VA CGA C-4, Standard Method of Marking Portable Compressed Gas Containers to Identify the Material Contained (Superseded by CGA C-7) CGA C-7, Guide to the Preparation of Precautionary Labeling and Marking Classification and Labelling of Compressed Gas Containers, 2011 Gases, 10th edition, CGA G-4, Oxygen, CGA G-4.1, Cleaning Equipment for Oxygen Service, CGA G-6.1, Standard for Insulated Carbon Dioxide Systems at Consumer Sites, th edition, CGA G-6.5, Standard for Small, Stationary, Insulated Carbon Dioxide Supply Systems, th edition, CGA G-8.1, Standard for Nitrous Oxide Systems at Consumer Sites, th edition, CGA M-1,Guide Standard for Medical Gas Installations at Consumer Sites, 2007 Health Care Facilites, 3rd edition, CGA O2-DIR, Directory of Cleaning Agents for Oxygen Service, Edition 4. CGA P-2.5, Transfilling of High Pressure Gaseous Oxygen to Be Used for Respiration, CGA P-2.6, Transfilling of Liquid Oxygen to Be Used for Respiration, CGA P-18, Standard for Bulk Inert Gas Systems at Consumer Sites, th edition, CGA V-1, Compressed Gas Association Standard for Compressed Gas Cylinder Valve Outlet and Inlet Connections (ANSI B57.1), 2005, 13th edition, CGA V-5, Diameter-Index Safety System (Noninterchangeable Low Pressure Connections for Medical Gas Applications), CSA Publications. Canadian Standards Association, 5060 Spectrum Way, Mississauga 178 Rexdale Blvd, Toronto, ON, L4W 5N6 M9W 1R3, Canada. CSA C22.2 No. 0.3, Test Methods for Electrical Wires and Cables, 2009, Reaffirmed FGI Publications. Facility Guidelines Institute, 1919 McKinney Avenue, Dallas, TX Guidelines for Design and Construction of Hospitals and Outpatient Facilities, IEC Publications. International Electrotechnical Commission, 3, rue de Varembé, P.O. Box 131, CH-1211 Geneva 20, Switzerland. IEC , Medical Electrical Equipment Part 1: General Requirements for Basic Safety and Essential Performance, ISA Publications. Instrumentation, Systems, and Automation Society (ISA), 67 Alexander Drive, Research International Society of Automation, 67 T.W. Alexander Drive, P.O. Box 12207, Research Triangle Park, NC ANSI/ ISA S , Quality Standard for Instrument Air, MSS Publications. Manufacturer s Standardization Society of the Valve and Fittings Industry, Inc., 127 Park Street NE, Vienna, VA MSS SP-58, Pipe Hangers and Supports Materials, Design, Manufacture, Selection, Application and Installation, TC Publications. Transport Canada, 330 Sparks Street, Ottawa, ON, K1A / ON5, Canada. Transportation of Dangerous Goods Regulations TIA Publications. Telecommunications Industry Association, 2500 Wilson Boulevard, Suite 300, Arlington, VA TIA /EIA B C.1, Commercial Building Telecommunications Cabling Standard, (Supersedes TIA/EIA 568-B) TIA/EIA 606-A, Administration Standard for Commercial Telecommunications Infrastructure, TIA Wiring Standards, (Supersedes and includes the 2 above referenced standards. ) UL Publications. Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL UL 723, Standard for Test for Surface Burning Characteristics of Building Materials, 2008, Revised UL 1069, Safety Standard for Hospital Signaling and Nurse Call Equipment, 2007, Revised UL 1685, Standard for Vertical-Tray Fire-Propagation and Smoke-Release Test for Electrical and Optical-Fiber Cables, 2007, Revised U.S. Government Publications. Document Automation and Production Service (DAPS), Building 4D, 700 Robbins Avenue, Philadelphia, PA , 21 USC 9, United States Food, Drug, and Cosmetic Act. U.S. Government Commercial Standard , Casters, Wheels, and Glides for Hospital Equipment. 16 CFR 1632, Standard for the Flammability of Mattresses and Mattress Pads (FF 4-72), CFR Part 1633, Standard for the Flammability (Open Flame) of Mattress Sets,

26 National Fire Protection Association Report 3 of 29 7/8/2015 3:05 PM Other Publications. Merriam-Webster s Collegiate Dictionary, 11th edition, Merriam-Webster, Inc., Springfield, MA, California Technical Bulletin 117, Requirements, Test Procedure and Apparatus for Testing the Flame Retardance of Resilient Filling Materials Used in Upholstered Furniture, California Technical Bulletin 129, Flammability Test Procedure for Mattresses for Use in Public Buildings, California Technical Bulletin 133, Flammability Test Procedure for Seating Furniture for Use in Public Occupancies, State of California, Department of Consumer Affairs, 3485 Orange Grove Avenue, North Highlands, CA Referenced current SDO names, addresses, standard names, numbers, and editions. Related Public Inputs for This Document Related Input Public Input No. 5-NFPA [Global Input] Public Input No. 7-NFPA [Section No. D.1.2] Public Input No. 15-NFPA [Section No. D.2] Relationship Submitter Full Name: Aaron Adamczyk Organization: [ Not Specified ] Submittal Date: Mon Feb 09 00:32:37 EST

27 National Fire Protection Association Report 4 of 29 7/8/2015 3:05 PM Public Input No. 297-NFPA [ Section No ] ANSI Publications. American National Standards Institute, Inc., 22 West 43rd Street, 4th Floor, New York, NY ANSI B57.1, Compressed Gas Cylinder Valve Outlet and Inlet Connections ANSI Z136.3, Safe Use of Optical Fiber Communication Systems Utilizing Laser Diode and LED Sources, ANSI/UL 723, Standard for Test for Surface Burning Characteristics of Building Materials, 2010.ANSI/ AAMI ES , Medical Electrical Equipment, ANSI/UL 1069, Safety Standard for Hospital Signaling and Nurse Call Equipment, ANSI/UL 723 and ANSI/UL 1069 are UL Publications, and should be located in Section , not in the ANSI section. Submitter Full Name: RONALD FARR Organization: UL LLC Submittal Date: Wed Jul 01 08:35:45 EDT

28 National Fire Protection Association Report 5 of 29 7/8/2015 3:05 PM Public Input No. 41-NFPA [ Section No ] ASSE Publications. American Society of Sanitary Engineering, 901 Canterbury Road, Suite A, Westlake, OH ASSE 6010, Professional Qualification Standard for Medical Gas Systems Installers, ASSE 6015, Professional Qualification Standard for Bulk Medical Gas Systems Installer, ASSE 6020, Professional Qualifications Standard for Medical Gas Systems Inspectors, ASSE 6030, Professional Qualification Standard for Medical Gas Systems Verifiers, ASSE 6040, Professional Qualification Standard for Medical Gas Maintenance Personnel, We exclude the medical gas inspector 6020 for what reason? The ASSE 6010 is required to inform a 6020 for each test they are to perform as stated in the Annex A they follow. They also have verbiage in the 6010 section which speaks to a Job Inspector and the AHJ, this job inspector has no certification requirement? ASSE 6030 also references the 6020 under section Documenting and Recording of Inspections and Tests Submitter Full Name: John Gregory Organization: HDR Architecture Inc. Affilliation: P.I.P.E. Medical Gas Committee Phoenix AZ Submittal Date: Thu Apr 09 12:46:55 EDT

29 National Fire Protection Association Report 6 of 29 7/8/2015 3:05 PM Public Input No. 276-NFPA [ Section No ] ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA ASTM A 269, Standard Specification for Seamless and Welded Austenitic Stainless Steel Tubing for General Service, ASTM A 312, Standard Specification for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes, 2013a. ASTM B 32, Standard Specification for Solder Metal, ASTM B 88, Standard Specification for Seamless Copper Water Tube, ASTM B 280, Standard Specification for Seamless Copper Tubing for Air Conditioning and Refrigeration Field Service, ASTM B 819, Standard Specification for Seamless Copper Tube for Medical Gas Systems, 2000 (2011). ASTM B 828, Standard Practice for Making Capillary Joints by Soldering of Copper and Copper Alloy Tube and Fittings, 2002 (2010). ASTM D 5, Standard Test Method for Penetration of Bituminous Materials, 2006 e1. ASTM D 1785, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120, ASTM D 2466, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40, ASTM D 2467, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80, ASTM D 2672, Standard Specification for Joints for IPS PVC Pipe Using Solvent Cement, 1996a (2009). ASTM D 2846, Standard Specification for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Hot- and Cold-Water Distribution Systems, 2009b e1. ASTM D 2863, Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index), ASTM D 4359, Standard Test Method for Determining Whether a Material Is a Liquid or a Solid, ASTM E 84, Standard Test Method for Surface Burning Characteristics of Building Materials, 2012c 2015a. ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 C, ASTM E 1352, Standard Test Method for Cigarette Ignition Resistance of Mock-Up Upholstered Furniture Assemblies, ASTM E 1353, Standard Test Methods for Cigarette Ignition Resistance of Components of Upholstered Furniture, ASTM E 1537, Standard Test Method for Fire Testing of Upholstered Furniture, ASTM E 1590, Standard Test Method for the Fire Testing of Mattresses, ASTM E 2652, Standard Test Method for Behavior of Materials in a Tube Furnace with a Cone-shaped Airflow Stabilizer, at 750 C, ASTM F 438, Standard Specification for Socket-Type Chlorinated Poly (Vinyl Chlorinated) (CPVC) Plastic Pipe Fittings, Schedule 40, ASTM F 439, Standard Specification for Chlorinated Poly (Vinyl Chlorinated) (CPVC) Plastic Pipe Fittings, Schedule 80, ASTM F 441, Standard Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe, Schedules 40 and 80, ASTM F 493, Solvent Cements for CPVC Pipe and Fittings, date updates Submitter Full Name: MARCELO HIRSCHLER Organization: GBH INTERNATIONAL Submittal Date: Mon Jun 29 21:19:14 EDT

30 National Fire Protection Association Report 7 of 29 7/8/2015 3:05 PM Public Input No. 283-NFPA [ Section No ] ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA ASTM A 269, Standard Specification for Seamless and Welded Austenitic Stainless Steel Tubing for General Service, ASTM A 312, Standard Specification for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes, 2013a. ASTM B 32, Standard Specification for Solder Metal, ASTM B 88, Standard Specification for Seamless Copper Water Tube, ASTM B 280, Standard Specification for Seamless Copper Tubing for Air Conditioning and Refrigeration Field Service, ASTM B 819, Standard Specification for Seamless Copper Tube for Medical Gas Systems, 2000 (2011). ASTM B 828, Standard Practice for Making Capillary Joints by Soldering of Copper and Copper Alloy Tube and Fittings, 2002 (2010). ASTM D 5, Standard Test Method for Penetration of Bituminous Materials, 2006 e1. ASTM D 1785, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120, ASTM D 2466, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40, ASTM D 2467, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80, ASTM D 2672, Standard Specification for Joints for IPS PVC Pipe Using Solvent Cement, 1996a (2009). ASTM D 2846, Standard Specification for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Hot- and Cold-Water Distribution Systems, 2009b e1. ASTM D 2863, Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index), 2012.ASTM D 4359, Standard Test Method for Determining Whether a Material Is a Liquid or a Solid, ASTM E 84, Standard Test Method for Surface Burning Characteristics of Building Materials, 2012c. ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 C, ASTM E 1352, Standard Test Method for Cigarette Ignition Resistance of Mock-Up Upholstered Furniture Assemblies, ASTM E 1353, Standard Test Methods for Cigarette Ignition Resistance of Components of Upholstered Furniture, ASTM E 1537, Standard Test Method for Fire Testing of Upholstered Furniture, ASTM E 1590, Standard Test Method for the Fire Testing of Mattresses, ASTM E 2652, Standard Test Method for Behavior of Materials in a Tube Furnace with a Cone-shaped Airflow Stabilizer, at 750 C, ASTM F 438, Standard Specification for Socket-Type Chlorinated Poly (Vinyl Chlorinated) (CPVC) Plastic Pipe Fittings, Schedule 40, ASTM F 439, Standard Specification for Chlorinated Poly (Vinyl Chlorinated) (CPVC) Plastic Pipe Fittings, Schedule 80, ASTM F 441, Standard Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe, Schedules 40 and 80, ASTM F 493, Solvent Cements for CPVC Pipe and Fittings, ASTM D2863 is not actually being referenced in NFPA 99. Submitter Full Name: MARCELO HIRSCHLER Organization: GBH INTERNATIONAL Submittal Date: Tue Jun 30 08:36:49 EDT

31 National Fire Protection Association Report 8 of 29 7/8/2015 3:05 PM Public Input No. 298-NFPA [ Section No ] UL Publications. Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL ANSI/ UL 723, Standard for Test for Surface Burning Characteristics of Building Materials, 2008, Revised UL 1685, Standard for Vertical-Tray Fire-Propagation and Smoke-Release Test for Electrical and Optical-Fiber Cables, 2007, Revised ANSI/UL 1069, Safety Standard for Hospital Signaling and Nurse Call Equipment, 2007, Revised ANSI/UL 1069 is a UL Publications, and should be located in Section , not in the ANSI section. Also updated editions of referenced UL Standards Submitter Full Name: RONALD FARR Organization: UL LLC Submittal Date: Wed Jul 01 08:40:46 EDT

32 National Fire Protection Association Report 3 of 54 7/8/2015 2:55 PM Public Input No. 357-NFPA [ Section No ] Critical Care Area. A room or space in which failure of equipment or a system is likely to cause major injury or death to patients or caregivers (Category 1). (See ) Definition for Critical Care Area or Space is no longer necessary and should be eliminated to avoid confusion of technical terms used in NFPA 99. The term has changed to reflect Category language. This term is now designated as shown in NFPA 99: Patient Care Space designated as Category 1 Space. This definition and any references to the term "Critical Care Area" or "Critical Care Space" used through out NFPA 99 should be removed and/or changed to Category 1 Space. Related Public Inputs for This Document Related Input Public Input No. 359-NFPA [Section No ] Public Input No. 363-NFPA [Section No ] Public Input No. 364-NFPA [Section No ] Public Input No. 367-NFPA [Section No ] Public Input No. 369-NFPA [Section No [Excluding any Sub-Sections]] Public Input No. 370-NFPA [Section No ] Public Input No. 373-NFPA [Section No ] Public Input No. 374-NFPA [Section No ] Public Input No. 381-NFPA [Section No ] Public Input No. 382-NFPA [Section No ] Public Input No. 383-NFPA [Section No. A ] Public Input No. 385-NFPA [Section No. A ] Public Input No. 386-NFPA [Section No. A.5.1.7] Public Input No. 387-NFPA [Section No. A (2)] Public Input No. 388-NFPA [Section No. A (1)] Relationship Submitter Full Name: GARY BECKSTRAND Organization: UTAH ELECTRICAL JATC Submittal Date: Sun Jul 05 11:44:24 EDT

33 National Fire Protection Association Report 7 of 54 7/8/2015 2:55 PM Public Input No. 35-NFPA [ New Section after ] Designee. Designee is an individual or third party organization appointed by the AHJ or their governing body. This individual or third party organization shall be considered the AHJ for the appointed system (s). When a Designee is appointed for the medical gas systems, the Designee shall be credentialed to ASSE 6020 Professional Qualifications Standard for Medical Gas Systems Inspector or ASSE 6030 Professional Qualifications Standard for Medical Gas Systems Verifier. The City in some cases will push the medical gas inspections off on to a third party or a special inspections person. This will now provide some guidance as to what these designee s are to be certified too. Submitter Full Name: John Gregory Organization: HDR Architecture Inc. Affilliation: P.I.P.E. Medical Gas Committee Phoenix AZ Submittal Date: Wed Apr 08 18:47:29 EDT

34 National Fire Protection Association Report 9 of 54 7/8/2015 2:55 PM Public Input No. 18-NFPA [ Section No ] * Medical / Office ( Dental Office). A building or part thereof in which the following occur: (1) examinations and minor treatments/procedures are performed under the continuous supervision of a medical / or dental professional; (2) only no more than sedation or local anesthesia is involved, and treatment or procedures do not render the patient incapable of self-preservation under emergency conditions; and (3) overnight stays for patients or 24-hour operation operations are not provided. (FUN) To improve readability of the Code, and for compatibility with the Style Manuals of other NFPA Codes that extract content from NFPA 99. Ambiguous as to whether BOTH medical AND dental (treatments, professionals) or medical OR dental. Also (2) ambiguously appears to REQUIRE that sedation or local anesthesia MUST be performed at a MINIMUM (rather than OPTIONALLY at a MAXIMUM).. Also (3) to correctly match the pluralization of nouns and verbs grammatically. Submitter Full Name: BRIAN ROCK Organization: HUBBELL INCORPORATED Submittal Date: Sun Mar 22 14:33:38 EDT

35 National Fire Protection Association Report 1 of 54 7/8/2015 2:55 PM Public Input No. 147-NFPA [ New Section after ] Oxygen Concentrator Unit. An engineered assembly of components which operate to separate air into constituent gases, typically providing oxygen 93 as their product. New definition needed to support the concentrators proposal. Related Public Inputs for This Document Related Input Public Input No. 135-NFPA [New Section after ] Relationship Parent Submitter Full Name: MARK ALLEN Organization: BEACON MEDAES Submittal Date: Mon May 25 12:29:57 EDT

36 National Fire Protection Association Report 2 of 54 7/8/2015 2:55 PM Public Input No. 130-NFPA [ Section No ] Oxygen USP. Oxygen complying with Medical USP Oxygen, USP or Oxygen 93, USP. This new definition recognizes that two medical oxygen monographs exist, are in clinical use and should be recognized in the 99. Submitter Full Name: MARK ALLEN Organization: BEACON MEDAES Submittal Date: Mon May 25 10:52:06 EDT

37 Public Input Number 130 ( ) Oxygen USP. Oxygen complying with Medical Oxygen, USP or Oxygen 93, USP. Submitter Substantiation: This new definition recognizes that two medical oxygen monographs exist, are in clinical use and should be recognized in the

38 National Fire Protection Association Report 6 of 54 7/8/2015 2:55 PM Public Input No. 31-NFPA [ New Section after ] Special Inspector Special Inspector. The Special Inspector, since jurisdictions and approval agencies vary, as do their responsibilities, a Special Inspector shall be retained by either the AHJ, RDPRC or the owner. A Special Inspector may be one of the following and shall be considered the designee : (1) Registered Design Professional in Responsible Charge (RDPRC) regularly involved in design of medical gas systems. (2) Third party inspector approved by both the AHJ and the RDPRC, and credentialed to ASSE 6020 standards. (3) The Special Inspector shall follow the process and procedures outlined in ASSE 6000 Appendix B. Special Inspector needs a definition to better define who this can be Submitter Full Name: John Gregory Organization: HDR Architecture Inc. Affilliation: PIPE Medical Gas Committee Phoenix, AZ Submittal Date: Wed Apr 08 12:42:56 EDT

39 National Fire Protection Association Report 7 of 54 7/8/2015 2:55 PM Public Input No. 29-NFPA [ New Section after ] (carried over from NFPA 1, 101 and 5000 section Special Inspections) Special Inspections. Services provided by a designated agent known as a qualified person Special Inspector, and retained by the AHJ, Registered Design Professional in Responsible Charge (RDPRC), or the owner. The Special Inspector shall be considered the Designee for inspecting the medical gas system, materials, installation, documentation, process and procedures, site observations and witness to all required contractors tests prior to the verification process. same comment as previous Special Inspector comment Submitter Full Name: John Gregory Organization: HDR Architecture Inc. Affilliation: PIPE Medical Gas Committee Phoenix, AZ Submittal Date: Wed Apr 08 12:23:57 EDT

40 National Fire Protection Association Report 1 of 25 7/8/2015 3:10 PM Public Input No. 482-NFPA [ New Section after ] Type your content here... The governing body is responsible for conducting risk assessments and shall have the authority to determine the risk. this will help to clearly identify that the governing body can determine risk. and the AHJ does not have to Submitter Full Name: DAVID DAGENAIS Organization: WENTWORTH-DOUGLASS HOSPITAL Submittal Date: Mon Jul 06 16:25:52 EDT

41 National Fire Protection Association Report 2 of 25 7/8/2015 3:10 PM Public Input No. 457-NFPA [ Section No ] Categories shall be determined by following the governing body by following and documenting a defined risk assessment procedure. this should help the AHJ understand who is responsible for the risk assessment. Submitter Full Name: DAVID DAGENAIS Organization: WENTWORTH-DOUGLASS HOSPITAL Submittal Date: Mon Jul 06 15:12:35 EDT

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Correlating Committee on Health Care Facilities (HEA-AAC)

Correlating Committee on Health Care Facilities (HEA-AAC) M E M O R A N D U M DATE: November 2, 2016 TO: and Alternate Members of the Correlating Committee on Health Care Facilities FROM: Jon Hart, Senior Fire Protection Engineer/NFPA Staff Liaison SUBJECT: AGENDA

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 35 12/3/2015 7:13 AM Public Input No. 1-NFPA 90A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI/ASHRAE

More information

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 4-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1 * This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less

More information

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda])

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda]) FINAL MINUTES Healthcare Interpretations Task Force Tuesday, June 15, 2016 Mandalay Bay Convention Center South Convention Center, Level 2 Room Surf F Las Vegas, NV 1. Call to Order. The meeting was called

More information

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Second Revision No. 3-NFPA [ Section No. 2.3 ] Second Revision No. 3-NFPA 804-2014 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990. ASME Boiler

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

Change all instances of flame resistant (hypobaric) to Limited-Combustible (material) in all instances in the document. 1 of 9 10/21/2015 1:22 PM First Revision No. 3-NFPA 99B-2015 [ Global Input ] Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

More information

Technical Committee on Fundamentals

Technical Committee on Fundamentals Technical Committee on Fundamentals () M E M O R A N D U M DATE: May 20, 2016 TO: and Alternate Members of the Technical Committee on Fundamentals () FROM: Jon Hart, Staff Liaison SUBJECT: AGENDA PACKAGE

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

Technical Committee on Fundamentals (HEA-FUN)

Technical Committee on Fundamentals (HEA-FUN) Technical Committee on Fundamentals () M E M O R A N D U M DATE: July 31, 2012 TO: and Alternate Members of the Technical Committee on Fundamentals () FROM: Jon Hart, Associate Fire Protection Engineer/NFPA

More information

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Industrial and Medical Gases

More information

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference Matthews, Diane Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference http://nfpa.adobeconnect.com/rpbmeet/

More information

Technical Committee on Mechanical Systems (HEA-MEC)

Technical Committee on Mechanical Systems (HEA-MEC) Technical Committee on Mechanical Systems () M E M O R A N D U M DATE: July 20, 2015 TO: and Alternate Members of the Technical Committee on Mechanical Systems () FROM: Jon Hart, Staff Liaison SUBJECT:

More information

4/18/2017. *2012 edition of NFPA 99 has gone through a major overhaul. *This document is now a Code.

4/18/2017. *2012 edition of NFPA 99 has gone through a major overhaul. *This document is now a Code. Carsten Lunde, ASSE 6050 Instructor April 20, 2017 Carsten s Yearly Analysis, Inc. Any opinions expressed verbally by the speaker before you and all text in this presentation should be considered the speakers

More information

CHAPTER 6 [CE] REFERENCED STANDARDS

CHAPTER 6 [CE] REFERENCED STANDARDS CHAPTER 6 [CE] REFERENCED STANDARDS User note: About this chapter: Chapter 6 lists the full title, edition year and address of the promulgator for all standards that are referenced in the code. The section

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

CHAPTER 6 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL

CHAPTER 6 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL CHAPTER 6 REFERENCED STANDARDS This chapter lists the standards that are d in various sections of this document. The standards are listed herein by the promulgating agency of the standard, the standard

More information

M E M O R A N D U M. Technical Committee on Fundamentals TO: Elena Carroll, Project Administrator FROM: DATE: September 15, 2016

M E M O R A N D U M. Technical Committee on Fundamentals TO: Elena Carroll, Project Administrator FROM: DATE: September 15, 2016 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fundamentals Elena

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Merchant Vessels

More information

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m.

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m. 1. Call to Order: NFPA Technical Committee on Building Systems NFPA 900 First Draft Teleconference/Web Meeting AGENDA Thursday, February 13, 2014 11:00 a.m. Noon EDT Online meeting link: http://nfpa.adobeconnect.com/r366m2eaxx6/

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

Public Comment No. 1-NFPA [ Section No ]

Public Comment No. 1-NFPA [ Section No ] Page 1 of 7 Public Comment No. 1-NFPA 556-2014 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA, 19428-2959. ASTM D2859, Standard

More information

Healthcare Interpretations Task Force AGENDA Mandalay Bay Convention Center Meeting Room Oceanside G Las Vegas, NV

Healthcare Interpretations Task Force AGENDA Mandalay Bay Convention Center Meeting Room Oceanside G Las Vegas, NV Healthcare Interpretations Task Force AGENDA Mandalay Bay Convention Center Meeting Room Oceanside G Las Vegas, NV June 12, 2018 1:00 P.M. to 6:00 P.M. Call to Order 1:00 P.M. Introduction of Members and

More information

Technical Committee on Record Protection (REA-AAA)

Technical Committee on Record Protection (REA-AAA) Technical Committee on Record Protection (REA-AAA) DATE: September 8, 2015 TO: FROM: M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Record Protection (REA-AAA) Audrey

More information

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Emergency Power Supplies Kelly

More information

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement 1 of 7 3/4/2016 12:02 PM Second Revision No. 5-NFPA 56-2016 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

Remove the "Exception" text to be consistent with direction provided in the MOS.

Remove the Exception text to be consistent with direction provided in the MOS. of 37 1/11/2017 7:38 AM Public Input No. 9-NFPA 88A-2015 [ Global Input ] Remove the "Exception" text to be consistent with direction provided in the MOS. The current language in 88A has numerous section

More information

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX 1. Call to Order. The meeting of the Technical Committee on Fire Tests

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 1-NFPA 36-2013 [ Global Input ] Revise the document to eliminate the use of "Exception" text. The use of "Exception" text is inconsistent with the Manual of Style. Exception text should

More information

CHAPTER 5 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL

CHAPTER 5 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL CHAPTER 5 REFERENCED STANDARDS This chapter lists the standards that are d in various sections of this document. The standards are listed herein by the promulgating agency of the standard, the standard

More information

MEMORANDUM. NFPA 99 Second Draft Correlating Committee FINAL Ballot Results (A2017)

MEMORANDUM. NFPA 99 Second Draft Correlating Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Correlating Committee on Health Care Facilities Elena

More information

M E M O R A N D U M. NFPA Technical Committee on Telecommunications. Elena Carroll, Administrator, Technical Projects. Date: July 8, 2014

M E M O R A N D U M. NFPA Technical Committee on Telecommunications. Elena Carroll, Administrator, Technical Projects. Date: July 8, 2014 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Telecommunications

More information

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES 1.

More information

(a) Flame shall not spread to the outer extremities of the sample on the 8 ft 12 ft (2440 mm 3660 mm) wall. Flashover shall not occur.

(a) Flame shall not spread to the outer extremities of the sample on the 8 ft 12 ft (2440 mm 3660 mm) wall. Flashover shall not occur. First Revision No. 1-NFPA 501-2015 [ Section No. 5.3.1.3 ] 5.3.1.3 The following conditions shall be met when an interior finish material is tested using the test protocol of NFPA 286, Standard Methods

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] First Revision No. 1-NFPA 499-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this recommended practice

More information

Standard Compared 2012 Changes of the International Building Code and National Fire Protection Association- 101

Standard Compared 2012 Changes of the International Building Code and National Fire Protection Association- 101 Standard Compared 2012 Changes of the International Building Code and National Fire Protection Association- 101 For the Florida Building Commission And the Fire Code Advisory Council Introduction The scope

More information

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 90A-2016 [ Section No. 2.3.2 ] 2.3.2 ASTM International Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM C411, Standard

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical on Laser Fire Protection Kimberly

More information

M E M O R A N D U M. NFPA 76 Second Draft TC FINAL Ballot Results (F2015 Cycle)

M E M O R A N D U M. NFPA 76 Second Draft TC FINAL Ballot Results (F2015 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Telecommunications

More information

Second Revision No. 1 NFPA [ Chapter 2 ]

Second Revision No. 1 NFPA [ Chapter 2 ] Second Revision No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be

More information

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] 1.3 Application. 1.3.1 This standard shall apply to all systems for the movement of environmental air in structures that serve the following, except

More information

Page 1 of 11. Public Input No. 1-NFPA 12A-2015 [ Chapter 2 ] Referenced Publications. 2.1 General.

Page 1 of 11. Public Input No. 1-NFPA 12A-2015 [ Chapter 2 ] Referenced Publications. 2.1 General. Public Input No. 1-NFPA 12A-2015 [ Chapter 2 ] Chapter 2 2.1 General. Referenced Publications The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document National Fire Protection Association Report of 113 http://submittals.nfpa.org/terraviewweb/contentfetcher?commentpara... 2/9/2016 10:50 AM Public Input No. 1-NFPA 87-2015 [ Global Input ] Throughout standard

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

Page 1 of 13 Second Revision No. 1-NFPA 326-2014 [ Section No. 2.3.1 ] 2.3.1 ACGIH Publications. American Conference of Governmental Industrial Hygienists, 1330 Kemper Meadow Drive, Cincinnati, OH 45240-1634.

More information

1 of /3/ :03 PM. Public Input No. 1-NFPA 13D-2015 [ Chapter 2 ]

1 of /3/ :03 PM. Public Input No. 1-NFPA 13D-2015 [ Chapter 2 ] 1 of 129 11/3/2016 12:03 PM Public Input No. 1-NFPA 13D-2015 [ Chapter 2 ] 2 of 129 11/3/2016 12:03 PM American Society of Mechanical Engineers Chapter 2 Referenced Publications 2.1 General. The documents

More information

TECHNICAL COMMITTEE MEMBERS WHO PARTICIPATED

TECHNICAL COMMITTEE MEMBERS WHO PARTICIPATED MEETING MINUTES NFPA Correlating Committee on Safety to Life (SAF-AAC) November 7, 2013 Second Draft Meeting Embassy Suites Atlanta Hartsfield Airport Hotel Atlanta, GA 1. Call to Order. The meeting was

More information

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ] 8 of 93 11/6/2015 7:41 AM Public Input No. 52-NFPA 30-2015 [ Section No. 21.2 [Excluding any Sub-Sections] ] For the purpose of this chapter, the term in this section shall have the definitions given.

More information

A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US

A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US Rivkin, C. 1, Blake, C. 1, Burgess, R. 1, Buttner, W. 1, and Post, M. 1 1 Hydrogen Technologies and Systems Center, National Renewable Energy Laboratory,

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

CHAPTER 15 REFERENCED STANDARDS SECTION MC 1502 STANDARDS. Number Title section number Manual D 95 Residential Duct Systems

CHAPTER 15 REFERENCED STANDARDS SECTION MC 1502 STANDARDS. Number Title section number Manual D 95 Residential Duct Systems CHAPTER 15 REFERENCED STANDARDS SECTION MC 1501 GENERAL 1501.1 General. This chapter lists the standards that are referenced in various sections of this document. The standards are listed herein by the

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document of 79 1/27/2016 2:09 PM Public Input No. 1-NFPA 59-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/API and replace with API. (2) ANSI/UL

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

First Revision No. 20-NFPA [ Section No ]

First Revision No. 20-NFPA [ Section No ] of 25 7/15/2015 8:30 AM First Revision No. 20-NFPA 56-2015 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by NFPA

More information

M E M O R A N D U M. NFPA 270 First Draft Technical Committee FINAL Ballot Results (F2017)

M E M O R A N D U M. NFPA 270 First Draft Technical Committee FINAL Ballot Results (F2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fire Tests Kelly

More information

MEETING MINUTES NFPA Technical Correlating Committee on Safety to Life January 6, 2011 ROC Meeting The Wyndham Phoenix, Phoenix, AZ

MEETING MINUTES NFPA Technical Correlating Committee on Safety to Life January 6, 2011 ROC Meeting The Wyndham Phoenix, Phoenix, AZ MEETING MINUTES NFPA Technical Correlating Committee on Safety to Life January 6, 2011 ROC Meeting The Wyndham Phoenix, Phoenix, AZ 1. Call to Order. The meeting was called to order by Chair William Koffel

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Residential Sprinkler

More information

CHAPTER 15 REFERENCED STANDARDS. Air-Conditioning, Heating and Refrigeration Institute 4100 North Fairfax Drive, Suite 200 Arlington, VA 22203

CHAPTER 15 REFERENCED STANDARDS. Air-Conditioning, Heating and Refrigeration Institute 4100 North Fairfax Drive, Suite 200 Arlington, VA 22203 CHAPTER 15 REFERENCED STANDARDS This chapter lists the standards that are d in various sections of this document. The standards are listed herein by the promulgating agency of the standard, the standard

More information

COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE

COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE 100126 The course is organized into three bands. Band A covers HVACrelated building components and other types

More information

Public Comment No. 16-NFPA 13D-2014 [ Section No ]

Public Comment No. 16-NFPA 13D-2014 [ Section No ] of 52 9/22/2014 9:20 AM Public Comment No. 16-NFPA 13D-2014 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM

More information

NEC Code-Making Panel 15. Second Draft Meeting Agenda. November 5-7, San Diego, CA Introduction of Members and Guests

NEC Code-Making Panel 15. Second Draft Meeting Agenda. November 5-7, San Diego, CA Introduction of Members and Guests National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NEC Code-Making Panel 15 Second Draft Meeting Agenda November 5-7, 2015

More information

First Revision No. 6-NFPA [ Section No. 2.2 ]

First Revision No. 6-NFPA [ Section No. 2.2 ] Page 1 of 18 First Revision No. 6-NFPA 555-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 12, Standard on Carbon

More information

Reference to the Smoke Damage Index (SDI) is needed as it is part of the test method.

Reference to the Smoke Damage Index (SDI) is needed as it is part of the test method. Public Input No. 4-NFPA 287-2014 [ Section No. 1.2.3.2 ] 1.2.3.2 Indices resulting from the test methods include critical heat flux (CHF), thermal response parameter (TRP), fire propagation index (FPI),

More information

Technical Committee on Incinerators and Waste Handling Systems

Technical Committee on Incinerators and Waste Handling Systems Technical Committee on Incinerators and Waste Handling Systems Date: April 27, 2017 To: From: Technical Committee on Incinerators and Waste Handling Systems Eric Nette, Staff Liaison/Engineer Re: Agenda

More information

MEETING AGENDA High Rise Building Safety Advisory Committee

MEETING AGENDA High Rise Building Safety Advisory Committee MEETING AGENDA High Rise Building Safety Advisory Committee March 4, 2015 Teleconference/Web Meeting 1. Call to Order. Call the meeting to order by Chair, Jim Quiter, at 1:00 pm EST on Wednesday, March

More information

Technical Committee on Portable Fire Extinguishers

Technical Committee on Portable Fire Extinguishers Technical Committee on Portable Fire Extinguishers DATE: February 29, 2016 TO: FROM: M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Portable Fire Extinguishers Barry

More information

ROP MEETING MINUTES. 2. Introduction of Attendees. The following committee members and guests were in attendance. TECHNICAL COMMITTEE MEMBERS PRESENT

ROP MEETING MINUTES. 2. Introduction of Attendees. The following committee members and guests were in attendance. TECHNICAL COMMITTEE MEMBERS PRESENT BLD/SAF-FIR 24-25 September 2009 ROP Meeting Minutes ROP MEETING MINUTES Building Code Life Safety Technical Committee on Fire Protection Features Thursday-Friday, September 24-25, 2009 Meeting Embassy

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems San Antonio, TX October 12-14, 2016 The following are the meeting minutes from the third meeting of the Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems held in San Antonio,

More information

There are many changes to NFPA 99 from 1993 to 2015, but we want to concentrate on the changes made from 2012 to 2015, and we need to know a little

There are many changes to NFPA 99 from 1993 to 2015, but we want to concentrate on the changes made from 2012 to 2015, and we need to know a little There are many changes to NFPA 99 from 1993 to 2015, but we want to concentrate on the changes made from 2012 to 2015, and we need to know a little about how all of this developed into the 2015 edition.

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of

More information

NFPA 77 Public Inputs with Responses Page 1 of 15

NFPA 77 Public Inputs with Responses Page 1 of 15 Public Input No. 46-NFPA 77-2016 [ Global Input ] Type your content here... Make universal change from "bonding and grounding" to "bonding or grounding". While "grounding and bonding" is ok in some context

More information

27th Annual AHCA Seminar

27th Annual AHCA Seminar 27th Annual AHCA Seminar NFPA 99 2012 Edition Overview and Discussion Presented by James Peterkin, PE Sr. Fire Protection Engineer Heery International Monday September 26, 2011 Disclaimer Not Speaking

More information

Report on First Revision November 2013 NFPA 750

Report on First Revision November 2013 NFPA 750 750 FR1 (Chapter 2) Recommendation: Update the following references: Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard

More information

NFPA 37 Public Comment Responses Page 1 of 32

NFPA 37 Public Comment Responses Page 1 of 32 of 30 11/4/2016 3:05 PM Public Comment No. 6-NFPA 37-2016 [ New Section after 1.6 ] TITLE OF NEW CONTENT Type your content here... 1.7 Pressure Measurement. All pressures expressed in this document are

More information

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 2-NFPA 259-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM D 5865, Standard Test Method

More information

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12.

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12. 2/18/2016 National Fire Protection Association Report Committee Input No. 70 NFPA 54 2015 [ Section No. 12.5 ] This was a First Revision that failed ballot. 12.5 Type of Venting System to Be Used. 12.5.1

More information

MEETING AGENDA High Rise Building Safety Advisory Committee

MEETING AGENDA High Rise Building Safety Advisory Committee MEETING AGENDA High Rise Building Safety Advisory Committee Renaissance Blackstone Chicago 636 South Michigan Avenue, Chicago, IL 60605 May 13-14, 2014 Chicago, IL 1. Call to Order. Call the meeting to

More information

CHAPTER 45 REFERENCED STANDARDS

CHAPTER 45 REFERENCED STANDARDS CHAPTER 45 REFERENCED STANDARDS This chapter lists the standards that are d in various sections of this document. The standards are listed herein by the promulgating agency of the standard, the standard

More information

MEMORANDUM. NFPA Technical Committee on Hazard and Risk of Contents and Furnishings. NFPA 556 First Draft TC FINAL Ballot Results (A2015)

MEMORANDUM. NFPA Technical Committee on Hazard and Risk of Contents and Furnishings. NFPA 556 First Draft TC FINAL Ballot Results (A2015) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Hazard and Risk of Contents

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Hot Work Operations

More information

M E M O R A N D U M. NFPA Technical Committee on Water Spray Fixed Systems

M E M O R A N D U M. NFPA Technical Committee on Water Spray Fixed Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Water Spray

More information

First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] 4.3.11.5.5 Materials within a raised floor plenum exposed to the airflow shall be (a) noncombustible or (b) exhibit a maximum flame spread index of 25

More information

2016 Annual Revision Cycle Consent Document NFPA 75

2016 Annual Revision Cycle Consent Document NFPA 75 2016 Annual Revision Cycle Consent Document NFPA 75 The Committee on Electronic Computer Systems produced a Technical Committee Report that received at least one Notice of Intent to Make a Motion (NITMAM)

More information

The distances in shall be reduced to 130 ft (39.7 m) when manual dry standpipes are installed in open parking garages.

The distances in shall be reduced to 130 ft (39.7 m) when manual dry standpipes are installed in open parking garages. of 123 6/10/2014 9:07 AM First Revision No. 117-NFPA 14-2014 [ Global Input ] 7.3.2.7.5 The distances in 7.3.2.2 shall be reduced to 130 ft (39.7 m) when manual dry standpipes are installed in open parking

More information

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached) TECHNICAL COMMITTEE ON WATER-COOLING TOWERS NFPA 214 (F2015) Second Draft Meeting Agenda February 17, 2014 10:00 AM - 1:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions

More information

2009 NFPA Text 2009 International Building Code Text Recommendation. NFPA IBC 2009 IBC is most recent

2009 NFPA Text 2009 International Building Code Text Recommendation. NFPA IBC 2009 IBC is most recent 2009 Changes of the Referenced Standards of the National Fire Protection Association- 101 Compared to the International Building Code- 2009 Referenced Standards For the Florida Building Commission And

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 105 1/21/2016 7:49 AM Public Input No. 2-NFPA 30A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document of 78 9/22/2015 11:20 AM Public Input No. 1-NFPA 59-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/API and replace with API. (2) ANSI/UL

More information

CHAPTER 15 REFERENCED STANDARDS. Air-Conditioning, Heating and Refrigeration Institute 4100 North Fairfax Drive, Suite 200 Arlington, VA 22203

CHAPTER 15 REFERENCED STANDARDS. Air-Conditioning, Heating and Refrigeration Institute 4100 North Fairfax Drive, Suite 200 Arlington, VA 22203 CHAPTER 15 REFERENCED STANDARDS This chapter lists the standards that are d in various sections of this document. The standards are listed herein by the promulgating agency of the standard, the standard

More information

NFPA 550 ROP Meeting Minutes

NFPA 550 ROP Meeting Minutes NFPA 550 ROP Meeting Minutes NFPA Technical Committee on Fire Risk Assessment Methods (FIR-AAA) June 24, 2010 Microsoft Live Meeting 1. Call to order. The meeting was called to order at 1:00 PM on Monday,

More information

CHAPTER 45 REFERENCED STANDARDS

CHAPTER 45 REFERENCED STANDARDS CHAPTER 45 REFERENCED STANDARDS Point of Information City of Seattle Ordinance 121524 adopts the 2003 Seattle Fire Code and adds the following three National Fire Protection s, as amended by that same

More information

FIF AAA (F2014) Second Draft Meeting Web/Teleconference Meeting Agenda March 18, :00 5:00 p.m. ET

FIF AAA (F2014) Second Draft Meeting Web/Teleconference Meeting Agenda March 18, :00 5:00 p.m. ET NFPA 804, Standard for Fire Protection for Advanced Light Water Reactor Electric Generating Plants, NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating

More information