1 k Center of Competence Refrigeration and Air conditioning Information sheet air handling unit Basic requirements The unit which should be tested has to be delivered completely with all necessary equipment. An operation manual, an electrical wiring diagram, and sufficient sealing and connection material has to be provided also with the unit. The unit should be mounted on an one-piece basic frame and should have a facility to move the unit with a crane. If this is not possible, the one-piece basic frame should be delivered separate to the unit and the parts of the air handling unit should be provided with a facility to move them with a crane. The maximal height of the air handling unit should not exceed 2,2 m (inclusive the basic-frame and the facility to move the unit with a crane). The unit has to be delivered with a complete electrical connection (repair switch, plug and if necessary with a frequency transformer). WRG Example for a unit with cooler, heater and heat recovery system page 1 of 9 Issue: 07/ 2010
2 Test of the mechanical performance The following mechanical performance has to be tested on the real unit: leakage of the casing - bypass- leakage casing strength Therefore two covers for each air side (e.g. sheet metal) and sealing material has to be provided. These covers should be equipped with a pipe ( o 6 mm, length min. 25mm) for the measuring of the internal pressure of the casing and a pipe ( i 105 mm, length min. 150 mm) in order to connect the unit to our leakage test facility. For units with a heat recovering system please take into account that we need the above mentioned covers for the exhaust side to. pipe ( 6 mm) HRS + - pipe i 105 mm Example for covers Seite 2 von 9 Stand: 07/ 2010
3 Air volume flow rate test The air volume flow rate of the unit will be tested with an orifice plate test stand. From the air volume flow rate test stand Transition piece Example of the test set-up for the air volume flow test For the adjustment of the unit to our air volume flow test stand it is necessary that the manufacturer delivers the following transition pieces with the unit. Supply air inlet: 625 mm 1 Transition piece according to the sketch, fitting to the below described duct 1 Duct with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping Supply air outlet: 1 Duct with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping and a downstream connected damper (with the possibility to adjust and lock from the outside). Seite 3 von 9 Stand: 07/ 2010
4 Capacity test (cooler / heater) To carry out the capacity test on a cooler/heater it is necessary that the manufacturer delivers the following transition pieces and additional equipment with the unit: 1 x siphon for a controlled drain of the condensate (only for cooling capacity tests). 2 x Fitting transition pieces for the water connection to the cooler/heater (inlet/outlet) in order to connect the cooler/heater to our test facility. Connection of the coil/ heater) Transition piece with o = 2 and a threat (outside) pipe: length min. 10 x ø Transition pieces for the air side of the unit in order to connect the unit to our test facility(see sketch). Supply air inlet: 620 mm 1Transition piece according to the sketch, fitting to the below described duct 1 Duct with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping Seite 4 von 9 Stand: 07/ 2010
5 Supply air outlet: 1 Duct with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping and a downstream connected damper (with the possibility to adjust and lock from the outside) 620 mm 1 Transition piece according to the sketch, fitting to the below described duct (damper) Test of the heat recovery system To carry out the capacity test on the heat recovery system of the unit it is necessary that the manufacturer delivers the following transition pieces and additional equipment with the unit: Transition pieces for the air side of the unit in order to connect the unit to our test facility (see sketch). Seite 5 von 9 Stand: 07/ 2010
6 Supply/ Exhaust air inlet: 620 mm 2 Transition pieces according to the sketch, fitting to the below described duct 2 Ducts with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping Supply/ Exhaust air outlet: 2 Ducts with the dimensions of the entrance of the unit (length 1 m) with wall pressure tapping and a downstream connected damper (with the possibility to adjust and lock from the outside) 620 mm 2 Transition pieces according to the sketch, fitting to the below described duct (damper) Seite 6 von 9 Stand: 07/ 2010
7 Induct sound power For the determination of the induct sound power the unit will be built into a chamber. The air outlet of the unit is in the level of the door of the chamber. Chinks between the unit and the door of the chamber are sealed with sound reducing material. The air volume flow of the unit will by adjusted be closing the air inlet damper of the unit. The sound power level is determined at an appropriate measuring surface. Only the induct sound power of the supply side is measured. Measuring surface for the determination of the in duct sound power Example for the test set-up of the induct sound power Seite 7 von 9 Stand: 07/ 2010
8 Airborne sound power The unit will be placed in a free field. On the inlet and outlet of the supply side of the unit sound attenuators will be mounted. The attenuators have to be provided by the manufacturer. The connection between the sound attenuators and the air handling unit has to be suitable and easy to install. Necessary additional equipment for the fixing of the attenuators have to be provided by the manufacturer. During the airborne sound power measurement only the supply side is working. Measuring surface for the determination of the airborne sound power Support (delivered by manufacturer Example for the test set-up of the airborne sound power Seite 8 von 9 Stand: 07/ 2010
9 Important: All above mentioned equipment has to be delivered with the air handling unit at the same time to the test house. The missing equipment will be procured by TÜV Süd Industrie Service. The procuring of these equipment (material and working time) and through it caused waiting periods will be separately be charged by TÜV Süd Industrie Service. The hourly laboratory wage come to 129 Euro/h. The units have to be delivered and picked up at the laboratory without costs for TÜV Süd Industrie Service. Eventually necessary costs for customs clearance will be charged separately by TÜV Süd Industrie Service. Delivery address: TÜV SÜD Industrie Service Center of Competence für Kälte- und Klimatechnik Ridlerstraße München Contact person: Dipl.-Ing. (FH) Thomas Bichler phone.: fax.: internet: (search for: air conditioning) Seite 9 von 9 Stand: 07/ 2010
R E P O R T W R G D I N E N
R E P O R T W R G 4 4 3 D I N E N 1 3 1 4 1-7 Test laboratory Test object Customer Scope of assignment Date of receipt of test object TÜV SÜD Industrie Service GmbH Center of Competence for Refrigeration
More informationR E P O R T D I N E N
R E P O R T W R G 3 9 6 D I N E N 1 3 1 4 1-7 Test laboratory Test object Customer Scope of assignment TÜV SÜD Industrie Service GmbH Center of Competence for Refrigeration and Air Conditioning Air Conditioning
More informationModular air-handling units
Modular air-handling units AHU N 12.10.002 Range AeroMaster XP Cirrus Modular air-handling units Why AeroMaster XP? The latest knowledge from field of projection, production and operation of air-handling
More informationTSEK VHR EC HEAT RECOVERY UNITS
TSEK EC HEAT RECOVERY UNITS TS EN ISO 9001:2008 SN: 01 100 901925 General Information TSEK VENCO Heat Recovery Ventilation Units () are designed for saving energy and also improving indoor air quality.
More informationHeat Recovery Units. Heat Recovery 1
Heat Recovery Units Heat Recovery 1 Heat Recovery Unit Why? A heat recovery unit (HRU) can help make mechanical ventilation more cost effective by reclaiming energy from exhaust airflows. HRUs use air-to-air
More informationHeat Recovery ventilation Dee Fly Cube 550 Field of application Description Advantages Range Technical details Installation Remote controls Servicing
Field of application Description Advantages Range Technical details Installation Remote controls Servicing Remote control ErP * ** Conpliance compliance. ErP ready. Advantages Reversible connections. Ventilation
More informationAcoustic Verification Report
Acoustic Verification Report Invacare XPO 2 Portable Oxygen Concentrator Type XPO100B-EU for Date: 2013-12-10 Our reference: IS-ATC2-MUC/js Document: Report Invacare VR.600010074.002.12 - Revision 2.docx
More informationKN-KWL 110 SE-EC Kontrollierte Wohnraumlüftung KN
KN-KWL 110 SE-EC Kontrollierte Wohnraumlüftung KN 2014-07 Druck-, Satzfehler und techn. Änderungen vorbehalten - Subject to change Seite 1 2014-07 Druck-, Satzfehler und techn. Änderungen vorbehalten -
More informationClimate Control System
Page 1 of 13 SECTION 412-00: Climate Control System General Information DESCRIPTION AND OPERATION 1998 Mark VIII Workshop Manual Climate Control System Cautions and Warnings WARNING: To avoid accidental
More informationCOMMERCIAL ENERGY SAVINGS GUIDE
COMMERCIAL ENERGY SAVINGS GUIDE www.touchstoneenergy.com/bea www.touchstoneenergy.com/bea USING ENERGY MORE EFFICIENTLY IMPROVES YOUR BOTTOM LINE. Cooperatives and their commercial members share a common
More informationInstructions for the BASIC Air Handling System, Sizes General 1.1 Description of the System
Instructions for the BASIC Air Handling System, Sizes 004 055 1. General 1.1 Description of the System The BASIC System is a complete modular air handling unit. The unit consists of blocks, i.e. a number
More informationA MEMBER OF MUHIBBAH ENGINEERING
CiBAS The CiBAS is an innovative and unique WHRU designed by CiTECH, specifically aimed at saving weight and space. With over 70 units in operation, it is an ideal environmentally friendly solution for
More informationSeparating Ventilation and Temperature Regulation
P r e s s R e l e a s e Separating Ventilation and Temperature Regulation Kampmann GmbH has a new concept for compliance with the 2009 Energy-Saving Directive (EnEV), 15: Users and the environment will
More informationA MEMBER OF MUHIBBAH ENGINEERING
CiBAS The CiBAS is an innovative and unique WHRU designed by CiTECH, specifically aimed at saving weight and space. With over 70 units in operation, it is an ideal environmentally friendly solution for
More informationCONTENTS. Page 1. THE DRYPAC SYSTEM - CUSTOM MADE 1 2. PRINCIPLE OF OPERATION 2 3. CONTROLS 4 4. FLEXIBILITY 6 5. DRYPAC OPTIONS 7
CONTENTS Page 1. THE DRYPAC SYSTEM - CUSTOM MADE 1 2. PRINCIPLE OF OPERATION 2 3. CONTROLS 4 4. FLEXIBILITY 6 5. DRYPAC OPTIONS 7 6. CONSTRUCTION / MATERIALS 8 7. DIMENSIONS 8 8. LAYOUT 12 9. PRINCIPLE
More informationGemini EC. Engineered with Excellence, Specified with Confidence All-in-One Renewable Energy Climate Control
Gemini EC 1000-12000 All-in-One Renewable Energy Climate Control - Integral Aerothermal fresh air source heat pump boiler - Integral dual function dehumidifying and expelled room air heat pump - Direct-Contact
More informationCOMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume
COMMERCIAL HVAC PACKAGED EQUIPMENT Rooftop Units Level 1: Constant Volume Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application
More informationVIESMANN VITOVENT 300-F Mechanical ventilation system with heat recovery
VIESMANN VITOVENT 300-F Mechanical ventilation system with heat recovery Datasheet For part no. and prices: see pricelist VITOVENT 300-F Mechanical ventilation system with heat recovery for demanddependent
More informationAir Handling Units. T F E.
Air Handling Units Extract from BS EN ISO 15138:2007 Petroleum & natural gas industries- Offshore production installations-heating, ventilation & air-conditioning. A.12.1 Function Installations provided
More informationTrane Performance Climate Changer Air Handlers. An air handler for every need.
Trane Performance Climate Changer Air Handlers An air handler for every need. Trane Performance Climate Changer air handlers: designed to optimize your HVAC system. Trane Performance Climate Changer air
More informationAIR COMPACT. Air handling units. Ultra high performance USE RANGE DESCRIPTION
Ultra high performance Environmentally friendly with heat recovery solutions Optimised performance thanks to the control system Air flowrate: 1500 to 6000 m 3 /hr and a compact 400 mm profile Available
More informationHEAT RECOVERY UNITS TSEK. Mech-Elec, 41, Hawthorn Road, Western Ind. Est., Dublin 12 Tel:
HEAT RECOVERY UNITS TSEK Mech-Elec,, Hawthorn Road, Western Ind. Est., Dublin Tel: +-- 88 E-Mail: info@mech-elec.ie Mech-Elec UK, Unit, Bretts Farm, Romford Road, Aveley, Essex, RM XD. Tel: +--879 E-Mail:
More information9. Check condensate piping for sagging and/or leakage. Repair any sags or leaks before restoring power to the appliance.
77 Do not install the condensate assembly if a component is lost or missing. Replace the entire assembly. Failure to follow this warning could result in property damage, serious personal injury, or death.
More informationSingle Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return
Single Zone System One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return Multi Zone System Used in small to medium sized buildings
More informationBOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:
4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This
More informationAIR HANDLING UNITS. AmberAir Compact Smarty RIS EKO 3.0 RIRS EKO 3.0
Residential/commercial units selection program: http://salda.lt/en/selection/ahu AmberAir Compact units selection program VentMaster: http://salda.lt/en/pros/category/download_page/ WWW.SALDA.LT Rotor
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section
More informationHAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001
This HAP e-help provides a high-level overview of induction beams, how they work and how to model them in HAP 4.8 (and later versions). The first half of the article explains how induction beams work.
More information39G Air Handling Unit
39G Air Handling Unit Air flow: 2000 ~ 60000 m³/h The Manufacturer reserves the right to change any produt specifications without prior notices Version: Supersede: Effective Date: CAT_39G_E-1307_02 CAT_39G_E-1205_01
More informationCompact. Efficient. TROX.
Compact. Efficient. TROX. The art of handling air TROX is the leader in the development, manufacture and sale of components and systems for the ventilation and air conditioning of rooms. With 24 subsidiary
More informationLiquid desiccant dehumidification systems. Product guide
Liquid desiccant dehumidification systems Product guide Advanced dehumidification systems Economic value comparison Performance guarantee Leading liquid desiccant technology Alfa Laval Kathabar dehumidification
More informationB. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
More informationOthers ( 50Hz areas ) ADVANCED SUBJECT DATE: May-08 PRODUCT NEWS. Advanced Product News: Launching of New KPI-(502~2002)E1E & KPI-3002H1E units
PAGE 1/32 Summary This document (_r2) updates the previous one (_r1) issued on Mar 08. Revised items are identified by using: 2 (1 Location). This Advanced Products News introduces the new line-up of KPI-(502~2002)E1E
More informationPress Release. How can the efficiency of the dryer section be increased? Dryer Section All Paper Grades. Heimbach wherever paper is made.
Dryer Section All Paper Grades Press Release How can the efficiency of the T. Bock (Dipl.-Ing.), Manager Application & Technical Service, Heimbach GmbH & Co. KG, thomas.bock@heimbach.com I. Durniok (Dipl.-Ing.),
More informationCertified Passive House Component For cool, temperate climates, valid until 31 December 2017
Certificate Certified Passive House Component For cool, temperate climates, valid until 31 December 2017 Category: Manufacturer: Product name: Heat recovery unit DencoHappel GmbH 44625 Herne, GERMANY Series
More informationClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV
ClearFire Economizer Model ECF Integral or External Addendum to manuals 750-295 CFH and 750-269 CFV CB-8466 08/2011 1-GENERAL The Model ECF economizer is a stainless steel coil tube arrangement using
More informationPharmaceutical Facility Design
PhEn-602 Pharmaceutical Facility Design J. Manfredi Notes 9A PhEn-602 J. Manfredi 1 Primary & Secondary HVAC units Primary Primary air handling unit arrangement: One unit is responsible for all of the
More informationVallox Oy. manufactures. over LOW POWER EFFICIENCY Specific electrical
Vallox 150 Effect SE MLV Vallox 150 Effect SE MLV Vallox Oy manufactures Certificate No VTT-C-3514-08 Translation 1 (2) ventilation units Vallox 150 Effect SE MLV (preheating with ground heat) Vallox 150
More informationCompact. Efficient. TROX.
Compact. Efficient. TROX. The art of handling air TROX understands the art of handling air like no other company. Since its foundation in 1951, TROX has been developing and manufacturing sophisticated
More informationTopic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline
ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces
More informationSmall Room Heat Recovery Ventilation
Small Room Heat Recovery Ventilation Ideal for smaller spaces that would benefit from heat recovery, such as staff rooms or offices Version 3.1 2 Breathing Buildings Small Room Heat Recovery 3 Small Room
More informationSub-Critical Operation of the CO2 Expander/ Compressor
Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 2006 Sub-Critical Operation of the CO2 Expander/ Compressor Josef Riha Technical University
More informationAPPLICATION, INSTALLATION, AND MAINTENANCE MANUAL CA2XRT, CA3XRT, CA4XRT
4510 Helgesen Drive, Madison, WI 53718 (608) 221-4499, (800) 627-4499, Fax: (608) 221-2824 support@renewaire.com www.renewaire.com APPLICATION, INSTALLATION, AND MAINTENANCE MANUAL CA2XRT, CA3XRT, CA4XRT
More informationDADANCO E U R O P E. Induction unit. Installation, operation & maintenance manual. Induction Units
DADANCO Induction unit Installation, operation & maintenance manual Induction Units DADANCO INDUCTION UNIT FLOOR-MOUNTED MODELS INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS DESCRIPTION FMLBY floor
More informationComfort Series. Energy Recovery Ventilator. Why Fresh Air Ventilation is Vital for Today s Energy-Efficient Homes
Comfort Series Energy Recovery Ventilator Why Fresh Air Ventilation is Vital for Today s Energy-Efficient Homes LEED Certification Points Carrier, the world s leader in high technology heating, air conditioning
More informationGFD. GVD V-shape coil condenser. Güntner Info. 8 additional basic models for container transport!w. V-shape coil drycooler
Güntner Info GFD V-shape coil drycooler GVD V-shape coil condenser also available with HydroSpray system 75 kw 2 MW 8 additional basic models for container transport!w Customized solutions for every application
More informationHRU SINGLE DWELLING HOUSES - ENERGY RECOVERY VENTILATION SYSTEMS WITH HEAT EXCHANGER AKOR BP HR Series
AKOR BP HR Series AKOR BP HR Energy recovery ventilation systems for single dwelling houses or multi-dwelling blocks, with crossflow heat exchanger. It guarantees continuous air replacement in single dwelling
More informationGreenMaster HP Exhaust air heat pump for residential properties
GreenMaster HP Exhaust air heat pump for residential properties Air-Site We are a Swedish company that likes air and energy recovery. That's why we develop products that use air to heat, cool and provide
More informationTechnical Assignment 1
0 Technical Assignment 1 ASHRAE Standard 62.1 Ventilation and Standard 90.1 Energy Design Evaluations Compliance Analysis David H. Koch Institute for Integrative Cancer Research Massachusetts Institute
More informationHeat recovery unit RDKS
Heat recovery unit RDKS Heat recovery unit RDAS is based on our RDAR unit and develops this further. The unit has a rotary heat exchanger with stepless speed control. This allows for very precise temperature
More informationTrane Performance Climate Changer Air Handlers. An air handler for every need.
Trane Performance Climate Changer Air Handlers An air handler for every need. Trane Performance Climate Changer air handlers: The most comprehensive air-handler portfolio in the industry. The portfolio
More informationTechnical documentation Comfort domestic ventilation system
Technical documentation Comfort domestic ventilation system CWL Excellent CWL-T Excellent CWL-F Excellent 2 CWL unit options Type CWL-F-150 Excellent CWL-F-300 Excellent CWL-180 Excellent CWL-300 Excellent
More informationDrying Tumblers Pound Capacity
Drying Tumblers 25-170 Pound Capacity Preventative Maintenance Please refer to your operating manual for detailed maintenance procedures. www.comlaundry.com Part No. 70323301R6 December 2009 Table of
More informationGENERAL CAPABILITIES
GENERAL CAPABILITIES Reliable Process Heating Solutions HEAT EXCHANGE AND TRANSFER, INC. 500 Superior Street Carnegie, PA 15106 Phone 412-276-3388 Fax 412-276-3397 www.heat-inc.com FROM CONCEPT TO COMPLETION,
More informationResidential Duct Mount Builder s Box Media Air Cleaner
INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS Residential Duct Mount Builder s Box Media Air Cleaner Part Numbers: P102-BB14A, P102-BB20 IMPORTANT: Read entire instructions before installing the
More informationIf a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option.
Air handling units Aesthetic Not to add significantly to the existing ambient noise levels. Functional requirements If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally
More informationHeat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools
Heat Recovery Dehumidification (HRD) system Designed for municipal swimming pools A dehumidification and ventilation system with dynamic heat pump heat recovery to swimming pool water and air ENVIRONMENTAL
More informationSECTION AIR COILS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:
More informationAT4 Hygienic Application According to Guideline VDI 6022
Air-handling-units AT4 Hygienic Application According to Guideline VDI 6022 AT4 AHU for hygienic application The VDI guideline 6022, part 1 and 3 defines the hygienic requirements for AHU with regard to:
More informationThe Book of AERMEC NRL Sequence of Operation
The Book of AERMEC NRL Sequence of Operation Heating and cooling operation. 2 Sequence of operation Aermec air to water chiller/heat pump use Hydronic s in conjunction with refrigerant to provide heating
More informationAssessment Schedule - TS8
The Assessor shall determine the business s commitment and support to good and safe working practices; also that it has a positive culture in all aspects of its work. In particular, the assessor shall
More informationHOT AIR GENERATOR WITH GAS BURNER NA11.45 A GGS. Installation Operation Commissioning Maintenance
Installation Operation Commissioning Maintenance HOT AIR GENERATOR WITH GAS BURNER GGS NA11.45 A 06-2011 04-2011 CONTENTS 1. DESCRIPTION OF THE UNIT 2. INSTALLATION & CONNECTION 3. COMMISSIONING 4. CARE
More informationEnergy Recovery Ventilator
Energy Recovery Ventilator LG Electronics www.lg.com http://partner.lge.com Distributed by Copyright 2015 LG Electronics. All rights reserved. 2015 Eco_V Energy Recovery Ventilator Heat Exchanger Bypass
More informationVEX100 series Air handling units with cross-flow heat exchanger
Product information - Version 6 VEX100 series Air handling units with cross-flow heat exchanger VEX140: 400-2200 m 3 /h VEX150: 700-3600 m 3 /h VEX160: 1100-5000 m 3 /h VEX170: 1400-8400 m 3 /h Contents
More information11.4 Component Assembly Diagrams and Parts Lists Case Assembly
.4 Component Assembly Diagrams and Parts Lists.4.1 Case Assembly 1 5 4 6 7 8 70 Appendixes # Description Part # Remark 1 Intake Air Duct Assembly 000866B Exhaust Pipe Assembly 000867A Case 00775A 4 Intake
More informationMLM. Multi-Layer Media for Regenerative Thermal Oxidizers. from Lantec Products Installation Manual
MLM Multi-Layer Media for Regenerative Thermal Oxidizers from Lantec Products Installation Manual 1. Introduction Contents 1. Introduction 2. Safety First 3. Media Inspection on Arrival 4. Proper Handling
More informationCustom Air Handler Solutions Custom Units to Meet Your Unique Design Needs
Custom Units to Meet Your Unique Design Needs Engineered for flexibility and performance Contents Horizontal Configuration....1 Horizontal with Standard Economizer Configuration...2 Stacked Configuration...3
More informationFans Air Handling Units Air Distribution Products Fire Safety Air Curtains and Heating Products Tunnel Fans. Topvex SoftCooler TR. Specification data
Fans Air Handling Units Air Distribution Products Fire Safety Air Curtains and Heating Products Tunnel Fans Topvex SoftCooler TR Specification data 2 Topvex SoftCooler TR Comfort cooling, ready from factory
More informationErP - COMPLIANT TO EUROPEAN DIRECTIVE VENTILATION UNITS (AHU) TECHNICAL DATA RIGHT VIEW TOP VIEW
BSK 1/5 RIGHT VIEW TOP VIEW GENERAL SPECIFICATIONS Supply Air Flow Return Air Flow Frame Dimensions (mm) 6,000 m³/h 6,000 m³/h 25 steel profile A2608 x H2723 x L4789 Supply Air Velocity Return Air Velocity
More informationCOMcheck Software Version Mechanical Compliance Certificate
COMcheck Software Version 3.8.2 Mechanical Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Rudy's Star Motors Construction Site:
More informationSECTION AIR HANDLING UNITS WITH COILS. 1. Central Station Air Handling Units. 1. Section Basic Mechanical Requirements.
SECTION 15855 AIR HANDLING UNITS WITH COILS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Central Station Air Handling Units. B. Related Sections: 1.02 REFERENCES 1. Section 15010 - Basic Mechanical
More informationBOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:
4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XIN INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This
More informationStandard Features. Performance/Capacities
TSC-66 Traditional Power/Connections Approximate Total Load AMPS 208V / 60HZ / 3PH 51.8 208V / 60HZ / 1PH 88.3 230V / 60HZ / 3PH 47.8 230V / 60HZ / 1PH 81.5 460V / 60HZ / 3PH 23.9 Booster Heater Options
More informationAir Distribution Fan and Outside Air Damper Recycling Control
building science.com 2008 Building Science Press All rights of reproduction in any form reserved. Air Distribution Fan and Outside Air Damper Recycling Control Research Report - 0991 5-July-1999 Armin
More information1998 Expedition/Navigator Workshop Manual
Page 1 of 8 SECTION 412-00: Climate Control System - General Information 1998 Expedition/Navigator Workshop Manual DESCRIPTION AND OPERATION Procedure revision date: 02/11/2000 Climate Control System WARNING:
More informationCERTIFICATE of QUALITY TEST
Testing laboratory for climatic, mechanical and corrosive environmental stress CERTIFICATE of QUALITY TEST Test report - No. 10142 / 13 Client ADDI-DATA GmbH Airpark Business Center Airport Boulevard B210
More informationKOMFORT EC DB Suspended heat recovery air handling units
2018 AIR HANDLING UNITS KOMFORT EC DB Suspended heat recovery air handling units Features Air handling units for efficient supply and exhaust ventilation in flats, houses, cottages and other buildings.
More information100% Outdoor Air Dehumidification Methods
Technical Bulletin 16 100% Outdoor Air ehumidification Methods I NTROUCTION As consulting engineers and end users implement the ASHRAE 6 ventilation code, they are faced with selecting an appropriate method
More informationControlled mechanical ventilation GB 03
RECUPER SLIM 2018 Controlled mechanical ventilation GB 03 ir conditioning Systems to install Recover... your wellbeing The home is a precious asset where we all spend a major time of your life. So it s
More informationRoofPak Applied Rooftop Systems
RoofPak Applied Rooftop Systems RoofPak Applied Rooftop Systems Design flexibility, energy efficiency, system performance and reliability make Daikin RoofPak applied rooftop systems the ideal solution
More informationAdconair 76. Comfort air conditioning unit with counterflow plate heat exchanger. AIR VOLUME FLOW: 2,600 23,600 m³/h
Comfort air conditioning 76 Comfort air conditioning unit with counterflow plate heat exchanger Automatically selects the most economical operating mode! 76 13 76 01 13 with 01 - Adiabatic simplified Pro
More informationINSTALLATION DO S AND DON TS
4.0 NOISE CONTROL Figure 4.1. - Transitions Abrupt transitions immediately adjacent to an attenuator will cause the attenuator pressure drop to increase. Ensure transitions close to attenuators are gradual
More informationEvaporative Cooling products
user manual Evaporative Cooling products OPERATION - MAINTENANCE Z0582995_A ISSUED 06/2017 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT general information Note Recold
More informationSchedule of Fees Schedule B
Schedule of Fees Schedule B BUILDING DEPARTMENT 2. Building Permit* $65.00 for value or valuation up to $1,000. After $1,000 of value $8.00 per $1,000. After $1,000,000 of value $6 per $1,000 3. Demolition
More informationHVAC Mandatory Provisions Part II, Page 1
HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency
More informationVallox Oy. manufactures ventilation units Vallox TSK Multi 80 MC. over Vallox TSK Multi 80 MC
Vallox TSK Multi 80 MC Vallox TSK Multi 80 MC Vallox Oy manufactures ventilation units Vallox TSK Multi 80 MC Certificate No VTT-C-11032-14 Translation 1 (2) Vallox TSK Multi 80 MC is intended to be used
More informationImplementation of the Laboratory Air Handling Unit Systems (LAHU)
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Architectural Engineering -- Faculty Publications Architectural Engineering 2003 Implementation of the Laboratory Air Handling
More informationTURBO HOODS. Product Brochure
TURBO HOODS Product Brochure TABLE OF CONTENTS FUNCTIONING PRINCIPLE... 04 PRODUCT CODE... 0 PRODUCT STRUCTURE... 06 TURBOSWING GREASE FILTER... 07 EXHAUST AIR... 08 SUPPLY AIR... 09 LIGHTS... 0 DIENSIONS...
More informationNatatorium Economizer Vs. Conventional Dehumidifier
Technical Bulletin 18 Natatorium s. Conventional Dehumidifier I NTODCTION This technical bulletin will review how an economizer-type indoor pool dehumidifier functions, and provide details on its control
More informationMuseum of Bavarian History Regensburg, Germany
Museum of Bavarian History Regensburg, Germany Dipl.-Ing. Raphaël Vibert, Herz & Lang GmbH Key Facts Client: Public building authorities of Regensburg Architect: Wörner Traxler Richter Planungsgesellschaft
More informationSmoke Control Ducts and Dampers For Single Compartment Applications. Fulfilling new requirements for EN product standards for CE Marking
Smoke Control Ducts and Dampers For Single Compartment Applications Fulfilling new requirements for EN product standards for CE Marking New Smoke Control Product Range Fläkt Woods Smoke Control Ducts and
More informationInsty-Pac Steam Humidifiers
IP-1 Insty-Pac Steam umidifiers The PURE umidifier Co. Insty-Pac (patent no. 6,065,740) steam injection humidifier is jobengineered to assure highly efficient steam release into the air stream. Each humidifier
More informationMold/Moisture Control Case Study
Mold/Moisture Control Case Study Presented by Boggarm S. Setty, P.E., FASHRAE Setty & Associates, Ltd. www.clima2005.ch Clima 2005 Lausanne Solothurnstrasse 13 CH-3322 Schönbühl Switzerland th 8 REHVA
More informationKOMFORT EC S5B KOMFORT EC D5B KOMFORT EC S. Heat and Energy Recovery Ventilators
KOMFORT EC S5B KOMFORT EC D5B KOMFORT EC S Heat and Energy Recovery Ventilators 2018 AIR HANDLING UNITS 2 CONTENT KOMFORT EC S5B270(-E) 4 KOMFORT EC D5B1(-E) 8 KOMFORT EC S(B)(-E) 12 AIR HANDLING UNITS
More informationCONTENTS DE-HUMIDIFICATION IN INDOOR SWIMMING POOLS 2 DESIGN PROPERTIES OF THE INDOOR POOL DE-HUMIDIFYING UNIT 4 FRAME STRUCTURE 6 PANEL STRUCTURE 6
INDOOR POOL INDOOR POOL CONTENTS DE-HUMIDIFICATION IN INDOOR SWIMMING POOLS 2 DESIGN PROPERTIES OF THE INDOOR POOL DE-HUMIDIFYING UNIT 4 FRAME STRUCTURE 6 PANEL STRUCTURE 6 DRAINAGE SYSTEM 7 OUR DISTINCTIONS
More informationducted / recirculating separately 2.1 WS / 11.8 HS 3-stage Rear Yes (600 CFM options sold separately) 29 3/8" x 31" x 2 3/4" 6" or 8"
HDD80050UC Stainless Steel Sleek, built-in, and retracts out of sight. Bosch 30" Downdraft's flexible design seamlessly integrates into your kitchen Features & Benefits Beautifully designed to preserve
More informationCLIMACIAT. air HanDLIng UnIT: CLIMaCIaT. Air handling unit
AHU for all applications Designed to meet the EN 13053 and EN 1886 standards The effective solution for service sector, industry and healthcare applications air HanDLIng UnIT: CLIMaCIaT represents the
More informationThe world s first batch annealing plant with fully automatic crane operation ensures optimal use of energy
Internet-PDF aus MPT (2015), Heft 3, Seite 136 141. Verlag Stahleisen GmbH, Düsseldorf. The new batch annealing plant at Bilstein comprises twelve bases; any hood fits on any free base The world s first
More informationAIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University
AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort
More informationCompact VERTICAL FLAT. Compact. Condensers GCHC/GCVC for HFCs, NH 3
INFO FLAT Compact VERTICAL Compact Condensers GCHC/GCVC for HFCs, NH 3, Propane Gas coolers GGHC/GGVC for Fluid coolers GFHC/GFVC for water/glycol and other media 4 400 kw Compact design ideal for commercial
More information