1 Planning Application for the Aylesbury Estate Regeneration Plot 18 Reserved Matters Application Ventilation Statement Aecom v1

2 Aylesbury Regeneration: Plot 18 Reserved Matters Application Ventilation Statement April 2016 Document Number / Ventilation Statement

3 Prepared by:... Checked by:... Jonathan Umpleby Carmen Lau Principal Engineer Principal Engineer Approved by:... Colin Page Regional Director Rev No Comments Checked by Approved by Date A Issued for Comment CL CP 15/04/2016 B Issued for Planning CL CP 29/04/ Storey's Way, Cambridge, CB3 0DT Telephone: Website: Job No Date Created April 2016 This document has been prepared by AECOM Limited for the sole use of our client (the Client ) and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM Limited and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM Limited, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM Limited. f:\projects\services - nhh aylesbury plot 18\7-0 reports and specifications\7-3 stage 3 (planning)\2016_04_14 ventilation planning statement.docx

4 Table of Contents 1 Introduction North Block Ventilation South Block Ventilation Other Plant Flues and s Appendices

5 1 Introduction 1.1 Background This Ventilation Statement has been prepared by AECOM to support the application for the approval of Reserved Matters in relation to Development Parcel 18 (Plot 18). Plot 18 is part of the wider Aylesbury Estate Regeneration Scheme which covers an area of 22.1 ha, and for which there is Outline Planning Permission (LPA ref: 13/AP/3844) granted on 5 th August Plot 18 Proposed Development The Plot 18 site itself is 1.02 ha and consists of Subplot 18a (North Block) and Subplot 18b (South Block). The North Block comprises the following uses: Residential Use (122 units) Community Facility (Library, Afterhours Facility, Stay and Play, Meeting Rooms, Creation Trust Office) Commercial Use The South Block comprises the following uses: Health Centre Early Years Facility Basement BOH and car park Figure 1: Plot 18 site in context 1

6 2 North Block Ventilation 2.1 Residential Dwellings [C3] All dwellings will be ventilated in accordance with Part F of Building Regulations. Each apartment will be provided with whole house heat recovery ventilation (MVHR) to extract air from the kitchen, bathroom(s) and utility room and to provide fresh air to the living areas and bedrooms. Ventilation extract boost will be operated by a switch located in the kitchen. The MVHR will also incorporate summer bypass. Extract grilles shall come with integrated removable filters to comply with the latest NHBC standards. All ductwork will be rigid plastic ductwork. There will be no use of flexible ductwork. Intake and exhaust ductwork will be insulated to prevent condensation. A double air brick on the façade shall be required for connecting the MVHR ventilation ductwork intake and discharge points to outside. Purge ventilation to each room will be provided through the use of an openable window. Cookers will be provided with recirculation hoods, as specified by the Architect. 2.2 Community Facility [D1] The Community Facility shall be provided with mechanical supply and extract ventilation based on 10l/s/person and in compliance with Building Regulations Part F. Ventilation shall be supplied from two central air handling units (AHU) as follows: Library AHU This AHU is located at high level in Block 2 cycle store (making use of the high floor to under soffit dimensions). The AHU will comprise of filters, heating and cooling coils and a thermal wheel. Air intake and exhaust shall be via high level louvres on the façade at ground floor level (see Figure 2). Stay & Play and Community Trust AHU This AHU is located at high level within the Buggy Store ceiling void. The AHU will comprise of filters, heating and cooling coils and a plate heat exchanger. Air intake and exhaust shall be via high level louvres on the façade at ground floor level (see Figure 2). Refer to Appendix A for detailed ventilation drawing of the North block ground floor. Figure 2: Community Facility ventilation strategy Intake AHU AHU Stay & Play Community Facility Creation Trust 2

7 2.3 Commercial unit [A1] The commercial unit is being designed as a shell and core for fit out by tenant. As part of the shell and core provision, high level louvres will be provided at ground floor level on each façade for the ventilation units to discharge exhaust air and bring in fresh air (see Figure 3). Final ventilation shall be designed and provided by the Fit-out contractor to suit the use of the space. Refer to Appendix A for detailed ventilation drawing of the North block ground floor. 2.4 Cafe [A1 / A3 ] The cafe is being designed as a shell and core for fit out by tennant. As part of the shell and core provision, high level louvres will be provided at ground floor at the front façade for the ventilation units to discharge exhaust air and bring in fresh air (see Figure 3). Final ventilation shall be designed and provided by the Fit-out contractor to suit the use of the space. Refer to Appendix A for detailed ventilation drawing of the North block ground floor. Figure 3: Commercial unit and Café shell and core ventilation strategy Intake / louvre Commercial unit (Pharmacy) Intake / louvre Cafe Intake / louvre 3

8 3 South Block Ventilation 3.1 Health Centre [D1] The Health Centre shall be provided with mechanical supply and extract ventilation in accordance with Health Technical Memorandum (HTM) Ventilation shall be supplied from a central air handling units (AHU) at roof level. The AHU will comprise of filters, heating and cooling coils and a thermal wheel. Air intake and exhaust shall be at roof level and separated by a distance of circa 10m and on different facades of the roof plant enclosure. Two smoke extract fans will also provide smoke clearance to the stair lobbies at each floor (see Figure 4). Refer also to Appendix B for a detailed roof level drawing of the South Block. 3.2 Early Years [D1] The Earl Years nursery shall be provided with mechanical ventilation in accordance with Part F of Building Regu lations. Ventilation shall be supplied from two central air handling units Early Years Facility and General AHU This AHU is located at roof level and will comprise of filters, heating and cooling coils and a plate heat exchanger. Air intake and exhaust shall also be at roof level and separated by a distance of circa 10m and on different facades of the roof plant enclosure (see Figure 4). Early Years Facility Kitchen AHU and extract fan The kitchen extract system shall meet the standard required by DEFRA Guidance on 'The control of odour and noise from commercial kitchen exhaust systems' (2011). A kitchen extract fan shall be provided at roof level with the exhaust also at roof level. Make-up supply air will be provided by a dedicated supply only AHU at roof levelthe AHU will comprise of filters and heating coils. The air intake will be at roof level and separated from the exhaust by a distance of circa 10m and on different facades of the roof plant enclosure (see Figure 4). Refer also to Appendix B for a detailed roof level drawing of the South Block. Figure 4: South Block roof layout with ventilation units Generator (see section 4.3) Line of roof plant enclosure Stair lobby smoke extract fan Health Centre AHU Intake Stair lobby smoke extract fan Kitchen AHU and separate extract fan Basement BOH supply AHU Intake Intake Early Years AHU (Health Centre and Kitchen) 4

9 3.3 South Block Basement BOH [D1] The Basement Back of House (BOH) areas shall be provided with mechanical ventilation in accordance with Part F of Building Regulations. Supply air ventilation shall be supplied from a roof mounted AHU and will comprise of filters, heating coils and a run-around heat recover coil linked to the extract unit located in the basement. Air intake is at roof level and is ducted through the building to the basement level to supply fresh air (see figure 4 above). The BOH areas of the basement shall have air extracted via an extract fan at basement level. The extracted air will be exhausted to outside at ground floor via louvres integrated into landscape feature (see Figure 5). This system will also run to provide smoke extract (albeit with dedicated smoke extract fans) in line with the Fire strategy. 3.4 South Block Basement Car Park [D1] The basement car park will be mechanically ventilated in accordance with Building Regulations Approved Document Part F and Part B and will achieve the standards set out in BS : Dedicated duty / standby car park extract fans will extract air from one end of the car park and exhausting the air to outside at ground floor. In normal mode it will extract 6 ac/hr. In fire mode it will extract 10ac/hr. Make-up air will be drawn in naturally via the car park ramp entrance. In order to achieve good distribution of air flow, the mechanical ventilation will be supported with an impulse fan (see Figure 5). Refer also to Appendix C for a detailed basement drawing of the South Block ventilation. Figure 5: South Block basement veniltation strategy Car park extract fans BOH extract fans Health Centre BOH Health Centre Car Park Impulse fan Air Intake 5

10 4 Other Plant Flues and s 4.1 Temporary gas fire boilers A purpose-built flue riser will accommodate the temporary boiler flues in the North Block heating plantroom. An individual flue will be provided for each boiler, running horizontally to the flue riser in Block 1 and will then rise vertically to discharge to atmosphere at the highest point of level 15 roof level to comply with the requirements of the Clean Air Act (see Figure 6) The condensing boilers shall be low NOx type achieving 35mg/kWh NOx emissions. Refer also to Appendix D for a detailed drawing of the North block roof with MEP services. 4.2 North Block Life safety generator A life safety generator will be provided for back up electricity on failure of mains electricity to life safety systems in the North Block. The generator will be located at roof level with the flue discharging above the generator to meet the Clean Air Acts requirement (see Figure 6). As the generator is proposed for emergency only, it will only be running during scheduled tests or in the event of a power cut. Refer also to Appendix D for a detailed drawing of the North block roof with MEP services. 4.3 South Block Life safety generator A life safety generator will be provided for back up electricity on failure of mains electricity to life safety systems in the South Block. The generator will be located at roof level with the flue discharging above the generator to meet the Clean Air Acts requirement (see Figure 4 on page 4). As the generator is proposed for emergency only, it will only be running during scheduled tests or in the event of a power cut. Refer also to Appendix B for a detailed roof level drawing of the South Block. Figure 6: North Block Flue discharge poin Life safety packaged generator with flue above unit Three tempoerary boiler fluea discharge 1m above highest point of building at Level 15 Core 1 residential corridor smoke extract and day to day environmental extrac fan air 6

11 5 Appendices Appendix A: Appendix B: Appendix C: Appendix D: North block ground floor ventilation drawing no. NHH-P18-NB-M-0100 South block roof level MEP drawing no. NHH-P18-SB-MEP-0001 South block basement ventilation drawing no. NHH-P18-SB- MEP-0002 North block roof level MEP drawing no. NHH-P18-NB-MEP

12 CF Refuse DW C Cloaks Clg Project M anagem ent Initials: Designer: Checked: Approved: ISO A1 594m m x 841m m Cupboard Block 03 Entrance $Last_Saved_Last_Plo ted_ne$ $Filenam e_ne$ LOUVRED DOORS TO UKPN SPECIFICATION EXHAUST SUBSTATION TO LOUVRE FOR AHU UKPN SPECIFICATION. 1585x350 6 AT HIGH LEVEL DURASTEEL DUCTWORK AT H.L. WITH LOUVRE AT FRONTAGE. Block 3 45 Cycles Block 3 Refuse FFL 2.75 Commercial: 115.9m² Sub St. DOORS VIA LOUVRED DOORS DUCT DROPS TO L.L. AT BACK OF SUBSTATION TO PROMOTE CROSS 600x500 EXHAUST DUCT Domestic Cold VIA LOUVRED DOORS VIA LOUVRED HIGH LEVEL LOUVRE STRIP ALONG FACADE FOR FIT OUT CONTRACTOR TO USE FOR VENTIALTION DUCT MOUNTED ATTENUATORS TO BE PROVIDED ON THE THE ROOM SIDE AND EXTERNAL SIDE OF ALL AIR HANDLING UNITS (E.G. INTAKE, SUPPLY, EXTRACT AND EXHAUST) Water Heating Cooling Comms VIA LOUVRED DOORS Electric Life Safety Cupboard COMMUNITY FACILITY AIR HANDLING UNIT AHU 6 AT HIGH LEVEL WITH ACCESS FROM BELOW THE UNIT. AHU TO INCLUDE HEATING COILS, COOLING COILS AND PLATE HEAT EXCHANGER HEAT RECOVERY BY FIT-OUT CONTRACTOR. HIGH LEVEL LOUVRE STRIP ALONG FACADE FOR FIT OUT CONTRACTOR TO USE FOR VENTIALTION CIRCULAR EXTRACT GRILLE. SELECTION OF GRILLE TO MATCH (OR CLOSELY MATCH) THE CIRCULAR CHILLED BEAM Staff Room 44m² Kitchen S+P Storage Child WC Buggy Store Escape Cleaners store DWC WC 8m² 10m² S+P Storage AHU 6 600x500 INTAKE DUCT ATT. ATT. ATT. ATT. Lockers 7m² 9m² NORTH BLOCK GROUND FLOOR PLANTROOMS AND RISERS IN PREFERRED LOCATIONS INTAKE LOUVRE AT HIGH LIBRARY AND WORK ROOM AIR HANDLING UNIT LEVEL FOR AHU 5 AND AHU 6 AHU 5 AT HIGH LEVEL ABOVE CYCLE STORE. AHU TO INCLUDE HEATING AND COOLING COILS AND THERMAL WHEEL HEAT RECOVERY. ACCESS ZONE TO BE KEPT CLEAR OF SERVICES TO THE SIDE OF THE UNIT FOR MAINTENANCE. 1000x250 EXTRACT DUCT Multi Use space : 110m² Brief: 65m² Meeting Rm x250 SUPPLY DUCT 1000x250 INTAKE DUCT AHU 5 17m² FFL 3.00 M 48m² Meeting Rm 2 F Community Trust: Brief: 59m² 17m² Block 2 Block 2 Refuse 40 Cycles Children's Block02 Entrance Library m² x250 SUPPLY DUCT Display Zone Display Display Display Display Display Display 1000x250 EXHAUST DUCT Life Safety Com ms REFUSE STORE WITH VIA LOUVRED DOORS Htg Electric Self Service Self EXHAUST LOUVRE FOR AHU 5 AT HIGH LEVEL Service Server Room 1000x250 EXTRACT DUCT 10m² Periodicals FFL 3.00 ACOUSTIC CEILING REQUIRED IN CEILING MOUNTED CIRCULAR BUGGY STORE TO MINIMISE 4 PIPE ACTIVE CHILLED BEAM NOISE BREAK OUT FROM AHU FOR HEATING AND COOLING (TYPICAL) Work Room 29m² Print Photocopier Payment Self Service Printing Information Technology Quiet Study Teenagers Study Group Fire Escape SUPPLY DIFFUSER FOR SUPPLY REMAINING FRESH AIR Kitchen REQUIREMENTS NOT PROVIDED BY CHILLED BEAMS (TYPICAL) Cafe: Block 1 Refuse 12 BINS VIA LOUVRED DOORS BY FIT-OUT CONTRACTOR. 82.7m² Electrical Block01 FFL 3.35 Resi LV intake Entrance FFL 3.10 LEGEND HIGH LEVEL LOUVRE STRIP ALONG TO USE FOR VENTIALTION 4-PIPE CIRCULAR ACTIVE CHILLED BEAM CIRCULAR CEILING SUPPLY DIFFUSER (TO MATCH APPEARANCE OF CIRCULAR CHILLED BEAM) CIRCULAR CEILING EXTRACT GRILLE (TO MATCH APPEARANCE OF CIRCULAR CHILLED BEAM) SQUARE LOUVREED FACE CEILING SUPPLY DIFFUSER SQUARE LOUVREED FACE CEILING EXTRACT GRILLE LINEAR EXTRACT GRILLE LINEAR SUPPLY DIFFUSER TRANSFER GRILLE DUCT MOUNTED LTHW RE-HEAT BATTERY VIA LOUVRED DOORS Mains Com ms water Riser intake Block 1 96 Cycles FACADE FOR FIT OUT CONTRACTOR FUTURE W ALL LINE VIA LOUVRED DOORS A1 PLAN Post Scale 1: This drawing has been prepared for the use of AECOM s client. It may not be used, modified, reproduced or relied upon by third parties, except as agreed by AECOM or as required by law. AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies on this drawing without AECOM s express writen consent. Do not scale this document. A l measurements must be obtained from the stated dimensions Block 01 Entrance PROJECT NHH AYLESBURY PLOT 18 NORTH BUILDING CLIENT NOTTING HILL HOUSING ASSOCIATION CONSULTANT AECOM 36 Storey's Way Cambridge, Cambridgeshire CB3 0DT United Kingdom Tel +44 (0) www. aecom.com NOTES 1. WORK TO FIGURED DIMENSIONS ONLY 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT, MEP AND STRUCTURAL ENGINEERING DRAWINGS, REPORTS, SPECIFICATIONS AND SCHEDULES 3. GROUND FLOOR DUCTWORK FROM SHALL BE CONSTRUCTED FROM GALVANISED SHEET STEEL IN ACCORDANCE WITH DW144 TO THE STANDARD DETAILED IN THE SPECIFICATION UNLESS STATED OTHERWISE 4. FIRE DAMPERS SHALL BE PROVIDED IN ALL DUCTWORK TO AT LEAST THE SAME RATING AS THE WALL THROUGH WHICH IT PENETRATES. IN 1 HOUR OR 2 HOUR COMPARTMENT WALLS, SMOKE DAMPERS WILL BE PROVIDED WHICH WILL BE ACTUATED BY AN ADDRESSIBLE SMOKE DAMPER PANEL. 5. DUCT ACCESS DOORS ARE TO BE INSTALLED FOR CLEANING PURPOSES AND FOR ACCESS TO DUCT MOUNTED EQUIPMENT IN ACORDANCE WITH DW/142. ACCESS DOORS MUST BE INDICATED ON CONTRACTOR WORKING DRAWINGS. 6. VOLUME CONTROL DAMPERS ARE TO BE INSTALLED AS REQUIRED FOR COMMISSIONING PURPOSES INLCUDING A VCD ON EACH MAJOR BRANCH AND EACH FINAL BRANCH TO GRILLE / CHILLED BEAM (NOTE - NOT SHOWN ON STAGE D DRAWINGS) 7. A MINIMUM OF 10mm DEPTH OF AREA IS TO BE PROVIDED VIA THE DOOR UNDERCUT (WITH ALLOWANCE MADE FOR FLOOR FINISH) TO ALL WCs, SHOWERS, DIRTY UTILITIES AND ANY OTHER ROOM WITHOUT A BALANCED AIR SUPPLY. ISSUE/REVISION B 23/04/2016 STAGE D ISSUE A 18/04/2016 PRELIMINARY ISSUE I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER SHEET TITLE NORTH BUILDING GROUND FLOOR SERVICES LAYOUT SHEET NUMBER NHH-P18-ACM-NB-M-0100 Printed on % Post-Consumer Recycled Content Paper

13 Comms: 650x600mm Power: 1750x600mm ISO A1 594m m x 841m m A B C D E F G H PROJECT NHH AYLESBURY JU Checked: AN Approved: CP $Last_Saved_Last_Plo ted_ne$ Project M anagem ent Initials: Designer: $Filenam e_ne$ EARLY YEARS SERVER DX OUTDOOR UNIT REF DX7 EARLY YEARS SERVER DX OUTDOOR UNIT REF DX8 SMOKE EXTRACT DUCT CONNECTS TO SMOKE EXTRACT SHAFT THROUGH BUILDING AOV AT TOP OF STAIR WELL FOR SMOKE EXTRACT MAKE-UP AIR 6no. WALL MOUNTED DX OUTDOOR UNITS (DOUBLE STACKED) REF DX1 TO DX6 SERVING BASEMENT HEALTH CENTRE SERVER ROOMS 1200x550 H/C EXTRACT DUCT AT L.L DROPS T.B. WITHIN RISER 1200x550 H/C SUPPLY DUCT AT H.L DROPS T.B. WITHIN RISER 1200x550 H/C EXTRACT DUCT AT L.L DROPS T.B. WITHIN RISER 1200x550 H/C SUPPLY DUCT AT H.L DROPS T.B. WITHIN RISER 850x500 BASEMENT SUPPLY DUCT AT L.L DROPS T.B. WITHIN RISER EXHAUST LOUVRE FOR AHU3 AT H.L. BASEMENT AIR HANDLING UNIT SUPPLY DECK WITH HEATING COIL AND RUN-AROUND HEAT RECOVERY COILS LINKED TO EXTRACT UNIT AT BASEMENT LEVEL INTAKE LOUVRE SERVING AHU2 AT L.L. AHU3 EXHAUST DUCT FROM L.L. TO H.L. TO RUN ABOVE AHU2 TO EXHAUST LOUVRE Plan Scale: A LIFE SAFETY GENERATOR Liftshaft overrun EY m m AHU2 RUN AROUND HEAT RECOVERY PIPEWORK FROM BASEMENT RISES TO H.L. AHU1 SUPPLY DUCT RISES TO H.L. TO MAINTAIN MAINTENANCE ACCESS 1200x550 H/C SUPPLY DUCT AT H.L DROPS T.B. WITHIN RISER 1200x550 H/C EXTRACT DUCT AT L.L DROPS T.B. WITHIN RISER VENITLATION RISER AT THIRD FLOOR A AOV: 1000x1000x150mm Doubles As Access Hatch Plant LVL m m 1400x850 SUPPLY DUCT AT H.L. AND 1400x850 EXTRACT DUCT AT L.L. AHU2 SMOKE EXTRACT FANS SEF5 A&B, RUN AND STANDBY Plant LVL m m Plant LVL m AOV AT TOP OF STAIR WELL FOR SMOKE EXTRACT MAKE-UP AIR AHU3 1400x850 SUPPLY DUCT AT H.L. 1400x850 EXTRACT DUCT AT L.L. GRP ENCLOSURE 1400x1400 EXTRACT DUCT AT H.L. 1400x1200 SUPPLY DUCT AT H.L. MCC EXPANSION VESSEL SECONDARY SUPPLY ATS FOR SMOKE EXTRACT FANS WITHIN SECTON A COIL W ITHDRAW AL ZONE PRESSURISATION UNIT m 1560 AHU1 CHILLER COIL W ITHDRAW AL ZONE 140 AHU4 COOLING PLANT ENCLOSED PLANTROOM TO BE PROVIDED BY THE ARCHITECT A HEAT RECOVERY PACKAGED LIFE SAFETY GENERATOR WITH INTEGRAL DIESIL OIL DAY TANK. IF UKPN CONFIRM THEY WILL PROVIDE A SECONDARY LIFE-SAFETY SUPPLY FOR THE BUILDING THIS GENERATOR WILL NOT BE REQUIRED. WSP TO CONFIRM PROGRESS WITH UKPN SECONDARY SUPPLY GRP ENCLOSURE CONTAINMENT ROUTE FROM GENERATOR TO LIFE-SAFETY RISER OVER THE TOP OF LIFT OVERUN SMOKE EXTRACT FANS SEF4 A&B, RUN AND STANDBY SECONDARY SUPPLY CONTAINMENT DROPS TO BELOW WITHIN RISER HEALTH CENTRE AIR HANDLING UNIT (AHU1) WITH HEATING AND COOLING COILS AND THERMAL WHEEL HEAT RECOVERY HEALTH CENTRE AIR HANDLING UNIT (AHU1) WITH HEATING AND COOLING COILS AND THERMAL WHEEL AHU1 EXHAUST DUCT AT H.L. KITCHEN SUPPLY AIR HANDLING UNIT (AHU4) AT M.L. WITH AHU1 EXHAUST DUCT ABOVE AT H.L. KITCHEN EXTRACT FAN EF2 AT L.L. THERMAL WHEEL SECTION OF AHU AIR INTAKE LOUVRES FOR AHU1 (H.L.) AND AHU4 (M.L.) KITCHEN SUPPLY AIR HANDLING UNIT (AHU4) AT M.L. WITH AHU1 EXHAUST DUCT ABOVE AT H.L. AIR COOLED CHILLER ON ANTI-VIBRATION MOUNTS KITCHEN EXTRACT EF2 FAN AT L.L. EXHAUST LOUVRE FOR AHU1 (H.L.) AND KITCHEN EXTRACT FAN EF2 (L.L.) FLOOR MOUNTED CHILLED WATER CIRCULATION PUMPS AS FOLLOWS FROM TOP TO BOTTOM: - SECONDARY CHW PUMPS P16 (A&B) - SECONDARY E.CHW PUMPS P17 (A&B) - PRIMARY CHW PUMPS P15 (A&B) C.T. LTHW F&R F.B. TO L.L. TO SERVE AHU HEATING COILS E.CHW F&R AT L.L. TO RISER BELOW 800x400 SUPPLY DUCT FROM AHU3 T.B. 800x400 EXTRACT DUCT FROM AHU3 T.B. EARLY YEARS AIR HANDLING UNIT (AHU3) WITH HEATING COILS AND PLATE HEAT EXCHANGER HEAT RECOVERY AIR INTAKE LOUVRES FOR AHU3 This drawing has been prepared for the use of AECOM s client. It may not be used, modified, reproduced or relied upon by third parties, except as agreed by AECOM or as required by law. AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies on this drawing without AECOM s express writen consent. Do not scale this document. A l measurements must be obtained from the stated dimensions PLOT 18 SOUTH BUILDING CLIENT NOTTING HILL HOUSING ASSOCIATION CONSULTANT AECOM 36 Storey's Way Cambridge, Cambridgeshire CB3 0DT United Kingdom Tel +44 (0) NOTES 1. WORK TO FIGURED DIMENSIONS ONLY 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT, MEP AND STRUCTURAL ENGINEERING DRAWINGS, REPORTS, SPECIFICATIONS AND SCHEDULES 3. PLANT EQUIPMENT TO BE INSTALLED WITH ADEQUATE MAINTENANCE ACCESS 4. ALL EXTERNAL PIPEWORK TO BE TRACE HEATED 5. ALL EXTERNAL PIPEWORK AND DUCTWORK TO BE PROVIDED WITH WEATHERPROOF INSULATION AS DETAILED IN THE SPECIFICATION. ISSUE/REVISION B 26/04/2016 STAGE D ISSUE A 06/04/2016 PRELIMINARY ISSUE I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER SHEET TITLE SOUTH BUILDING ROOF LEVEL COMBINED SERVICES LAYOUT SHEET NUMBER NHH-P18-ACM-SB-MEP-0001 Printed on % Post-Consumer Recycled Content Paper

14 Power: 1750x600mm Comms: 650x600mm Comms: 650x600mm Power: 1750x600mm Basement Smoke Extract 800x500mm Secondary elec supp. 350 x 500mm Cooling: 700x600mm Heating: 700x600mm Heating: 700x600mm Cooling: 700x600mm Water: 350x600 mm ISO A1 594m m x 841m m A B C D E F G H PROJECT JU Checked: AN Approved: CP $Last_Saved_Last_Plo ted_ne$ Project M anagem ent Initials: Designer: $Filenam e_ne$ 5500x600 CAR PARK EXHAUST PLENUM CONNECTS TO LANDSCAPE FEATURE (DETAIL BY LANDSCAPE ARCHITECT) 3000x600 BASEMENT GENERAL AND SMOKE EXHAUST PLENUM CONNECTS TO LANDSCAPE FEATURE (DETAIL BY LANDSCAPE ARCHITECT) FLOOR MOUNTED SPINKLER JOCKEY PUMP 1000x450 EXHAUST DUCT AT H.L. FROM AHU2 EXTRACT DECK CONNECTS TO EXHAUST PLENUM FLOOR MOUNTED SPINKLER PUMP SET 1 INCOMING FIRE WATER MAIN SUPPLY FLOOR MOUNTED SPINKLER PUMP SET 2 SPRINKLER STORAGE TANK (8000L x 6000W x 4000H) BASEMENT AIR HANDLING UNIT AHU2 EXTRACT DECK WITH RUN AROUND COILS CONNECTED TO SUPPLY DECK AT ROOF LEVEL 1000x450 EXTRACT DUCT AT H.L. HEALTH CENTRE AND EARLY YEARS ELECTRICAL LV PANEL NUMBER AND SIZE OF SERVER ROOM CABINETS TO BE CONFIRMED BY THE ICT CONSULTANT INCOMING BT ROUTE INCOMING MAINS WATER SUPPLY EARLY YEARS HOT WATER RETURN CIRCULATION PUMP P22 2no. HOT WATER CALORIFIERS WITH INTEGRAL ANTI-STRATIFICATION PUMP SERVING HEALTH CENTRE HEATING PLANTROOM MCC 2no. HOT WATER CALORIFIERS WITH INTEGRAL ANTI-STRATIFICATION PUMP SERVING EARLY YEARS LTHW SYSTEM EXPANSION VESSEL LTHW SYSTEM PRESSURISATION UNIT EARLY YEARS HOT WATER RETURN CIRCULATION PUMP P23 HEATING PLATE HEAT EXCHANGERS PHX 5 A&B (DUTY / STANDBY) INCOMING C.T. LTHW F&R FROM NORTH BLOCK HEATING PLANTROOM PRIMARY C.T. LTHW CIRCULATION PUMPS P15 (A&B) SECONDARY C.T. LTHW CIRCULATION PUMPS P16 (A&B) SECONDARY V.T. LTHW CIRCULATION PUMPS P17 (A&B) SPIRNKLER PLANTROOM EXTRACT DUCT AT H.L. 1200mm HIGH RAIL ABOVE SPRINKLER TANK FOR SAFE ACCESS ABOVE TANK ZONE FOR ELECTRICAL SUB MAINS VERTICALLY ALONG WALL SPRINKLER STORAGE TANK (8000L x 6000W x 4000H) SECONDARY STEELWORK PLANTROOM AROUND SPRINKLER TANK FOR SAFE MAINTENANCE ACCESS PLINTHS FOR RAISING SPINKLER TANK ABOVE GROUND BY 500mm EXHAUST SHAFT TO GROUND LEVEL Sprinkler Room (12x10.5) 111.3sqm B-04 Electrical Switch Room 6x4m, 23.9sqm ELECTRICAL LV PLANTROOM B-11 GSTT server room 9.7sqm B-05 Plate Exchange room 7x5m, 39.1sqm UKPN SUBSTATION ABOVE SPINKLER PLANTROOM B-10 Coms Room 3x2m, 9.7sqm HEAD HEIGHT) B-08 MainServer (GP) 18.7sqm SERVER ROOMS (BY ICT HEATING PLANTROOM CONSULTANT) (INDICATIVE RACK LAYOUT PLATE HEAT EXCHANGER PLANTROOM (WITH RESTRICTED SPINKLER PLANTROOM - TBC BY ICT SPECIALIST) COLD WATER B-06PLANTROOM Boosted cold water 4x4m, 21.2sqm PLANTROOM AND BMS HEAD END (IF REQUIRED) PLANTROOM DDA shower B-13 Showers 31.2sqm REFER TO BASEMENT LAYOUT FOR DUCTWORK LAYOUT DDA WC 7.6 sqm B-14 GP Archive Files 7.8sqm B-15 FM Maintenance 8.1sqm m PLANTROOM SECTION A B-02 Cycle Store 43.1sqm B Long stay Incoming 3 Long stay EY landlord comms 2.1sqm B-17 Deliveries GP 11.6sqm LargeCar B-21 Secondary Switch room 4.3sqm B-18 Deliveries C 18.8sqm B-19 Cleaner's Room 6.2sqm BASEMENT SMOKE EXTRACT FANS EF2 (S) (A&B) DOUBLE STACKED SECONDARY STEELWORK PLANTROOM AROUND SPRINKLER TANK FOR SAFE MAINTENANCE ACCESS B-22 Storage 5.5sqm B-16 Medical records 17.3sqm * m 6000 CAR PARK B-01 Carpark 23 spaces subject to ongoing coordination 683.0sqm CAR PARK * CAR PARK EXTRACT GRILLE BASEMENT SMOKE EXTRACT FANS EF2 (S) A&B DOUBLE STACKED CAR PARK EXTRACT GRILLE BASEMENT EXTRACT DUCT AT H.L. 1000x450 BASEMENT AHU2 EXHAUST DUCT RISES TO H.L. WITH BRANCH TO SEPARATE SMOKE EXTRACT FANS BASEMENT SMOKE EXTRACT FANS EF3 (S) A&B DOMESTIC COLD WATER STORAGE TANK. PRELIMINARY SIZE 2000W x 2000L x 2000H PACKAGED CAT 5 WATER TANK AND BOOSTER SET DOMESTIC COLD WATER BOOSTER SET CHLORINE DIOXIDE DOSING SYSTEM Plan Scale: A1 This drawing has been prepared for the use of AECOM s client. It may not be used, modified, reproduced or relied upon by third parties, except as agreed by AECOM or as required by law. AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies on this drawing without AECOM s express writen consent. Do not scale this document. A l measurements must be obtained from the stated dimensions NHH AYLESBURY PLOT 18 SOUTH BUILDING CLIENT NOTTING HILL HOUSING ASSOCIATION CONSULTANT AECOM 36 Storey's Way Cambridge, Cambridgeshire CB3 0DT United Kingdom Tel +44 (0) NOTES 1. WORK TO FIGURED DIMENSIONS ONLY 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT, MEP AND STRUCTURAL ENGINEERING DRAWINGS, REPORTS, SPECIFICATIONS AND SCHEDULES 3. PLANT EQUIPMENT TO BE INSTALLED WITH ADEQUATE MAINTENANCE ACCESS 4. ALL EXTERNAL PIPEWORK TO BE TRACE HEATED 5. ALL EXTERNAL PIPEWORK AND DUCTWORK TO BE PROVIDED WITH WEATHERPROOF INSULATION AS DETAILED IN THE SPECIFICATION... ISSUE/REVISION B 26/04/2016 STAGE D ISSUE A 06/04/2016 PRELIMINARY ISSUE I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER SHEET TITLE SOUTH BUILDING BASEMENT COMBINED SERVICES LAYOUT SHEET NUMBER NHH-P18-ACM-SB-MEP-0002 Printed on % Post-Consumer Recycled Content Paper

15 ISO A1 594m m x 841m m PROJECT NHH AYLESBURY Checked: Approved: $Last_Saved_Last_Plo ted_ne$ Project M anagem ent Initials: Designer: $Filenam e_ne$ PV ARRAY 3 (28 PANELS) ROOF MOUNTED AT 30DEG INCLINATION SECONDARY PV PANEL CABLE TRAY PRIMARY PV PANEL CABLE TRAY PV INVERTER FOR PV ARRAY 3 ELECTRICAL CONTAINMENT AT L.L. DROPS TO BELOW WITHIN RISER CHW F&R AT L.L. DROPS TO BELOW WITHIN RISER AOV AT TOP OF STAIR WELL FOR SMOKE EXTRACT MAKE-UP AIR CONTAINMENT FOR PV ELECTRICAL CABLES AT L.L. PV INVERTER FOR PV ARRAY 2 SECONDARY PV PANEL CABLE TRAY PRIMARY PV PANEL CABLE TRAY SATELITE DISH ARRAY SERVING BLOCK 3 SEPARATE CONTAINMENT AT L.L. FOR SATELITTE DISH ARRAY SYSTEM, PHARMACY COOLING SYSTEM AND LIBRARY CHILLER, ALL AT L.L. ALONG PARAPET WALL PV ARRAY 2 (24 PANELS) ROOF MOUNTED AT 30DEG INCLINATION AIR COOLED CHILLER ON ANTI-VIBRATION MOUNTS SERVING LIBRARY CHILLED WATER SYSTEM SATELITE DISH ARRAY SERVING BLOCK 2 TRAY FOR CHILLER ELECTRICAL SUPPLY AND CONTROL CABLES 2no. DUTY / STANDBY DX OUTDOOR UNITS (REF 9 & 10) SERVING COMMUNITY SERVER ROOM CHILLED WATER PIPEWORK AT L.L. SERVING LIBRARY DX REFRIDGERANT PIPEWORK AND POWER AND CONTROLS CABLE CONTAINMENT AT L.L. TO RISER BELOW. ZONE FOR ROOF MOUNTED COOLING EQUIPMENT PROVIDED BY THE PHARMACY FIT-OUT CONTRACTOR AOV AT TOP OF STAIR WELL FOR SMOKE EXTRACT MAKE-UP AIR TRAY FOR SECONDARY SUPPLY CABLES FROM BLOCK 1 ROOF LEVEL AND ROUTES ACROSS TO BLOCK 2 & 3 ROOFS Roof Garden SECONDARY SIPPLY GRP ENCLOSURE 3no. TEMPORARY BOILER FLUES TERMINATING 1m ABOVE ROOF LEVEL LOUVRE AT TOP OF FLUE / HEATING PIPEWORK RISER AOV AT TOP OF STAIR WELL FOR SMOKE EXTRACT MAKE-UP AIR SMOKE EXTRACT BUILDERSWORK SHAFT THROUGH BUILDING BELOW SECONDARY SUPPLY ATS FOR SMOKE EXTRACT FANS WITHIN GRP ENCLOSURE DAY-TO-DAY ENVIRONMENTAL EXTRACT FAN EF 1 WITH ATTENUATORS EITHER SIDE OF FAN PACKAGED LIFE SAFETY GENERATOR WITH INTEGRAL DIESIL OIL DAY TANK. IF UKPN CONFIRM THEY WILL PROVIDE A SECONDARY LIFE-SAFETY SUPPLY FOR THE BUILDING THIS GENERATOR WILL NOT BE REQUIRED. WSP TO CONFIRM PROGRESS WITH UKPN ZONE FOR ROOF MOUNTED COOLING EQUIPMENT PROVIDED BY THE CAFE Communal Amenity AND FUTURE RETAIL UNIT FIT-OUT CONTRACTOR SATELITE DISH ARRAY SERVING BLOCK 1 SMOKE EXTRACT FANS SEF4 A&B RUN AND STANDBY SMOKE EXTRACT EXHAUST VISUAL SCREEN AND MAINTENANCE ACCESS DOORS BY ARCHITECT ENVIRONMENTAL EXTRACT FAN EXHAUST PV ARRAY 1 (12 PANELS) ROOF MOUNTED AT 30DEG INCLINATION SECONDARY PV PANEL CABLE TRAY PV INVERTER FOR PV ARRAY 1 VISUAL SCREEN AND MAINTENANCE ACCESS DOORS BY ARCHITECT PRIMARY PV PANEL CABLE TRAY A1 PLAN Scale 1:100 This drawing has been prepared for the use of AECOM s client. It may not be used, modified, reproduced or relied upon by third parties, except as agreed by AECOM or as required by law. AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies on this drawing without AECOM s express writen consent. Do not scale this document. A l measurements must be obtained from the stated dimensions PLOT 18 NORTH BUILDING CLIENT NOTTING HILL HOUSING ASSOCIATION CONSULTANT AECOM 36 Storey's Way Cambridge, Cambridgeshire CB3 0DT United Kingdom Tel +44 (0) www. aecom.com NOTES 1. WORK TO FIGURED DIMENSIONS ONLY 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT, MEP AND STRUCTURAL ENGINEERING DRAWINGS, REPORTS, SPECIFICATIONS AND SCHEDULES 3. PLANT EQUIPMENT TO BE INSTALLED WITH ADEQUATE MAINTENANCE ACCESS 4. ALL EXTERNAL PIPEWORK TO BE TRACE HEATED 5. ALL EXTERNAL PIPEWORK AND DUCTWORK TO BE PROVIDED WITH WEATHERPROOF INSULATION AS DETAILED IN THE SPECIFICATION. ISSUE/REVISION C 23/04/2016 STAGE D ISSUE B 18/04/2016 PRELIMINARY ISSUE A 12/04/2016 PRELIMINARY ISSUE I/R DATE DESCRIPTION KEY PLAN PROJECT NUMBER SHEET TITLE NORTH BUILDING ROOF LEVEL COMBINED SERVICES LAYOUT SHEET NUMBER NHH-P18-ACM-NB-MEP-0001 Printed on % Post-Consumer Recycled Content Paper

FUME EXTRACT STRATEGY STATEMENT

FUME EXTRACT STRATEGY STATEMENT FUME EXTRACT STRATEGY STATEMENT : New Islington Free School No: 7/4781 The site is located in central Manchester on an area of disused land adjacent to the Rochdale canal. The site forms a roughly rectangular

More information

Oakdale Primary School Expansion Project Appendix A - MEP Schedule of Works

Oakdale Primary School Expansion Project Appendix A - MEP Schedule of Works Oakdale Primary School Expansion Project Appendix A - MEP Schedule of Works HBS-SH-MEP-801 May 2017 For Peterborough City Council ver. author date checked comment P1 KA 19-05-17 TC TENDER ISSUE 1 1. Mechanical

More information

Mechanical Ventilation with Heat Recovery: Designing and implementing a robust and effective ventilation system

Mechanical Ventilation with Heat Recovery: Designing and implementing a robust and effective ventilation system Viewpoint August 2012 Mechanical Ventilation with Heat Recovery: Designing and implementing a robust and effective ventilation system Dr Sarah Price and Helen Brown Summary Mechanical Ventilation and Heat

More information

Installation and Maintenance

Installation and Maintenance 1.0 Introduction MRXBOX-ECO2 (Standard Unit) MRXBOX-ECO2-OH (Opposite hand Unit) MRXBOXAB-ECO2 (Standard Unit) MRXBOXAB-ECO2-OH (Opposite hand Unit) Mechanical Ventilation Units with Heat Recovery for

More information

Roof: sound attenuation Category B. 4.0 DOORS

Roof: sound attenuation Category B. 4.0 DOORS APPENDIX I DEFINITION OF LANDLORD BASE BUILD 1.1 PARTICULAR LANDLORD/TENANT WORKS - RETAIL LEASED AREAS S 1.0 WALLS 1.1 Internal skin of external wall. Fairfaced block work with rubbed joints. 1.2 To service

More information

Installation and Maintenance

Installation and Maintenance MRXBOXAB-ECO4 (Standard Unit) MRXBOXAB-ECO4-OH (Opposite hand Unit) Mechanical Ventilation Units with Heat Recovery and Heat Exchanger Bypass for Wall Mounting Installation and Maintenance The EMC Directive

More information

Installation and Maintenance

Installation and Maintenance MRXBOXAB-ECO4-SW (Standard Unit) MRXBOXAB-ECO4-OHSW (Opposite hand Unit) Mechanical Ventilation Units with Heat Recovery and Heat Exchanger Bypass for Wall Mounting The EMC Directive 014/30/EU The Low

More information

Installation and Maintenance

Installation and Maintenance 38 70 = 100 410 = 60 1.0 INTRODUCTION MRXBOXAB-ECO4-AESW (Standard Unit) MRXBOXAB-ECO4-AEOHSW (Opposite hand Unit) Mechanical Ventilation Units with Heat Recovery for Wall Mounting Installation and Maintenance

More information

Intake air from outside. Supply air to house. Extract air. from house. Extract air from house. Exhaust air from house to outside

Intake air from outside. Supply air to house. Extract air. from house. Extract air from house. Exhaust air from house to outside MRXBOX95-WM1 (Standard Unit) MRXBOX95-WM1-OH (Opposite hand Unit) MRXBOX95AB-WM1 (Standard Unit) MRXBOX95AB-WM1-OH (Opposite hand Unit) Mechanical Ventilation Units with Heat Recovery for Wall Mounting

More information

incorporating Guidance to Shafts for Smoke Control A useful guide to practical smoke shaft principals and specifications

incorporating Guidance to Shafts for Smoke Control A useful guide to practical smoke shaft principals and specifications incorporating Guidance to Shafts for Smoke Control A useful guide to practical smoke shaft principals and specifications Smoke shafts - an overview Scope of this guide Smoke shaft is the common term for

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 75 Fox Street Building OCTOBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report:

More information

Prescriptive Requirement for Smoke Control

Prescriptive Requirement for Smoke Control HKIE CPD Training Course (II) 7July 2009 Organization by The Hong Kong Institution of Engineers Fire Division Co-organized by the Association of Registered Fire Services Installation contractors of Hong

More information

Loss Prevention Standards

Loss Prevention Standards Introduction Fire compartmentation is an essential part of an effective fire safety design of a building. The primary objective of fire compartmentation or passive fire protection is to prevent a building

More information

technical specification smoke venting systems

technical specification smoke venting systems technical specification smoke venting systems An Introduction to FDS FDS sets the standards the rest of the industry follows Providing a complete service for all of your smoke ventilation system needs.

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

MRXBOX95-WH1. Mechanical Ventilation Unit with Heat Recovery for Wall Mounting Installation and Maintenance. Bracket

MRXBOX95-WH1. Mechanical Ventilation Unit with Heat Recovery for Wall Mounting Installation and Maintenance. Bracket MRXBOX95-WH1 Mechanical Ventilation Unit with Heat Recovery for Wall Mounting Installation and Maintenance The EMC Directive 2004/108/EC The Low Voltage Directive 2006/95/EC 1.0 Introduction The unit must

More information

MRXBOX95B-LOFT. Mechanical Ventilation Unit with Heat Recovery & Summer Bypass for Loft Mounting. Installation and Maintenance

MRXBOX95B-LOFT. Mechanical Ventilation Unit with Heat Recovery & Summer Bypass for Loft Mounting. Installation and Maintenance MRXBOX95B-LOFT Mechanical Ventilation Unit with Heat Recovery & Summer Bypass for Loft Mounting Installation and Maintenance The EMC Directive 2004/108/EC The Low Voltage directive 2006/95/EC 1.0 Introduction

More information

thehydebuilding Executive Own Door Office Suites

thehydebuilding Executive Own Door Office Suites thehydebuilding Executive Own Door Office Suites the hyde building The Park Carrickmines Masterplan M50 Proposed LUAS Stop Future Commercial Retail 2 16 Storey Landmark Tower M50 Exit 15 Retail 1 the hyde

More information

Intake air from outside. Supply air to house. Extract air. from house. Extract air from house. Exhaust air from house to outside

Intake air from outside. Supply air to house. Extract air. from house. Extract air from house. Exhaust air from house to outside Installation and Maintenance MRXBOX95-WM1 (Standard Unit) MRXBOX95-WM1-OH (Opposite hand Unit) MRXBOX95AB-WM1 (Standard Unit) MRXBOX95AB-WM1-OH (Opposite hand Unit) Mechanical Ventilation Units with Heat

More information

Larch house and Lime house review of systems design and implementation

Larch house and Lime house review of systems design and implementation Larch house and Lime house review of systems design and implementation This report reviews the design of building services at Larch and Lime houses, Ebbw Vale, and the onsite systems assessment carried

More information

CI/SfB X. DF / IDF Series GAS FIRED COMBINED HEATING AND VENTILATION

CI/SfB X. DF / IDF Series GAS FIRED COMBINED HEATING AND VENTILATION CI/SfB 56.83 X DF / IDF Series GAS FIRED COMBINED HEATING AND VENTILATION DF / IDF Series GAS FIRED COMBINED HEATING AND VENTILATION Introduction Nordair Niche is one of the UK's leading specialists in

More information

FIRE AND SECURITY CONSULTING SERVICES

FIRE AND SECURITY CONSULTING SERVICES FIRE AND SECURITY CONSULTING SERVICES http://fscs-techtalk.com 17 McKenna Court NOOSAVILLE QUEENSLAND, 4566 AUSTRALIA Phone: +61 (0)7 5455 5148, Mobile: 0409 399 190, Email: rafoster@bigpond.net.au MISCELLANEOUS

More information

Installation and Maintenance

Installation and Maintenance MRXBOX95B-LP1 (Standard Unit) MRXBOX95B-LP1-OH (Opposite Hand Unit) Mechanical Ventilation Unit with Heat Recovery & Summer Bypass for Ceiling Void Mounting Installation and Maintenance The EMC Directive

More information

Installation and Maintenance Instructions for the Installer. Please refer to the User Manual for instructions on how to operate the system

Installation and Maintenance Instructions for the Installer. Please refer to the User Manual for instructions on how to operate the system Heat Recovery Ventilation Applicable to aircycle 1.1/1.2 (Ws - For Wall Mounting with In-built Control & Summer Bypass) Installation and Maintenance Instructions for the Installer. Please refer to the

More information

Installation and Maintenance

Installation and Maintenance 1.0 INTRODUCTION MRXBOXAB-ECO-LP1SW (Standard Unit) MRXBOXAB-ECO-LP1-OHSW (Opposite Hand Unit) Mechanical Ventilation Unit with Heat Recovery for Ceiling Void Mounting Installation and Maintenance The

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 69 PRESIDENT SEPTEMBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report: 69

More information

Radiators (RAD) - RHND Drapers Ward and First Floor Therapy Hub rev. T1

Radiators (RAD) - RHND Drapers Ward and First Floor Therapy Hub rev. T1 Radiators (RAD) - RHND Drapers Ward and First Floor Therapy Hub rev. T1 Rad Ref No Room Ref Room Name Radiator Dimensions Type Heat Output Length Depth Height (Jaga) W mm mm mm RAD 01 1494 1040 119 600

More information

If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option.

If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option. Air handling units Aesthetic Not to add significantly to the existing ambient noise levels. Functional requirements If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally

More information

Fire Risk Assessment

Fire Risk Assessment Fire Risk Assessment Carr House HS.F.119 (rev03) delivering promises, improving lives Contents 1 Premises particulars... 1 2 General statement of policy... 1 3 Management system... 1 4 General description

More information

Installation and Maintenance

Installation and Maintenance 1.0 INTRODUCTION MRXBOXAB-ECO-LP1 (Standard Unit) MRXBOXAB-ECO-LP1-OH (Opposite Hand Unit) Mechanical Ventilation Unit with Heat Recovery for Ceiling Void Mounting Installation and Maintenance The LP1

More information

6.0 Access & Maintenance

6.0 Access & Maintenance Design and Access Statement April 2017 125 6.1 Inclusive Design - Site This proposal has been designed with consideration of the principles of inclusive design, as to be as inclusive as possible including

More information

Fire Risk Assessment

Fire Risk Assessment Fire Risk Assessment Maritime Studios Pendennis Rise Falmouth TR11 4FB Carried out by: Date: October 2015 Review Date: October 2016 Les Carter CMIOSH Health & Safety Consultant Mobile 07831 636751, Email

More information

WHHR Midi & Midi Lite

WHHR Midi & Midi Lite WHHR Midi & Midi Lite Residential Whole House Heat Recovery Units with Low Energy EC Motors Optional - Integral LCD Installation, Operating and Maintenance Instructions Image of model with LCD screen Page

More information

MRXBOX95-WH1. Mechanical Ventilation Unit with Heat Recovery for Wall Mounting Installation and Maintenance. Intake air from outside

MRXBOX95-WH1. Mechanical Ventilation Unit with Heat Recovery for Wall Mounting Installation and Maintenance. Intake air from outside MRXOX95-WH1 Mechanical Ventilation Unit with Heat Recovery for Wall Mounting Installation and Maintenance The EMC Directive 2004/108/EC The ow Voltage Directive 2006/95/EC 1.0 Introduction The unit must

More information

CHAPTER 7 MECHANICAL VENTILATION AND SMOKE CONTROL SYSTEMS 7.1 AIR CONDITIONING & MECHANICAL VENTILATION SYSTEMS

CHAPTER 7 MECHANICAL VENTILATION AND SMOKE CONTROL SYSTEMS 7.1 AIR CONDITIONING & MECHANICAL VENTILATION SYSTEMS CHAPTER 7 MECHANICAL VENTILATION AND SMOKE CONTROL SYSTEMS 7.1 AIR CONDITIONING & MECHANICAL VENTILATION SYSTEMS 7.1.1 General (a) Where air conditioning system is provided in lieu of mechanical ventilation

More information

0.4 m 3 /s. Plastic and Steel cased fan Units. Round Fans. Latest EC Fan Technology. Compact and Powerful. Easy to install

0.4 m 3 /s. Plastic and Steel cased fan Units. Round Fans. Latest EC Fan Technology. Compact and Powerful. Easy to install Round Fans compliant Round Fans DUTIES UP TO 0.4 m 3 /s Plastic and Steel cased fan s Latest E Fan Technology ompact and Powerful Easy to install Range of accessories and solutions Round Fans part of a

More information

Residential Carbon Friendly Ventilation SAP Q Eligible. ventilation

Residential Carbon Friendly Ventilation SAP Q Eligible. ventilation Residential Carbon Friendly Ventilation SAP Q Eligible ventilation Whole House Mechanical Ventilation - MVHR, MEV, dmev SAP Q ELIGIBLE PRODUCTS Energy Efficient Ventilation About Appendix Q SAP is the

More information

APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue I April 16. Appendix C

APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue I April 16. Appendix C APPENDIX C APPROVAL PROCESS SUBMISSION FORMS STEP 2A CONCEPT DESIGN SUBMISSION To: Edward Utteridge From: Jonathan Everitt jeveritt@oriumdesign.co.uk Terry Lailey t.lailey@oriumdesign.co.uk Checklist (tick

More information

MECHANICAL VENTILATION WITH HEAT RECOVERY (MVHR) NEW ECO RANGE

MECHANICAL VENTILATION WITH HEAT RECOVERY (MVHR) NEW ECO RANGE NEW ECO RANGE MECHANICAL VENTILATION WITH HEAT RECOVERY (MVHR) Mechanical Ventilation with Heat Recovery Proud to Build British u Nuaire is a world leader in the design and manufacture of fans and ventilation

More information

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION)

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION) GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION) February, 2017 Contents Clauses Page 1. Basic Concepts 1 2. Design Considerations 1 3. Car Parks Ventilation 2 4. Kitchen

More information

Smoke Master SMIA Compact pressurisation and smoke exhaust system

Smoke Master SMIA Compact pressurisation and smoke exhaust system Smoke Master SMIA Compact pressurisation and smoke exhaust system Fläkt Woods FIFLO EN 2009.09 2 All rights reserved. Contents System overview... 4 Design and operation... 5 Technical specification...

More information

LANDLORDS & LETTINGS VENTILATION SOLUTIONS

LANDLORDS & LETTINGS VENTILATION SOLUTIONS LANDLORDS & LETTINGS VENTILATION SOLUTIONS CREATING A HEALTHY INDOOR ENVIRONMENT CONTENTS INTRODUCTION... 3 WHY IS VENTILATION IMPORTANT?...4 CURE CONDENSATION FOR GOOD... 5 THE DRIMASTER RANGE... 6 SINGLE

More information

Fire Risk Assessment

Fire Risk Assessment Fire Risk Assessment Manor House HS.F.119 (rev03) delivering promises improving lives Contents 1 Premises particulars... 1 2 General statement of policy... 1 3 Management systems... 1 4 General description

More information

The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex:

The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex: The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex: Mr. Junkers Lam Senior Building Surveyor of Buildings Department (9 Sept 2013) Part A Introduction Part B Means

More information

MRXBOX95-LH1/LH2. Mechanical Ventilation Unit with Heat Recovery for Loft Mounting Installation and Maintenance. Spigot 4.

MRXBOX95-LH1/LH2. Mechanical Ventilation Unit with Heat Recovery for Loft Mounting Installation and Maintenance. Spigot 4. MRXBOX95-LH1/LH2 Mechanical Ventilation Unit with Heat Recovery for Loft Mounting Installation and Maintenance The EMC Directive 2004/108/EC The Low Voltage Directive 2006/95/EC 1.0 Introduction Unit must

More information

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar Hoval SR-plus heating boilers Outputs from 30 to 4000kW Working pressures to 8 bar ...built in the UK where high quality and reliability have been a way of life for generations. Hoval SR-plus Simplicity

More information

ACS.CCLP1 PD SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC LPG PERMANENT DWELLINGS

ACS.CCLP1 PD SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC LPG PERMANENT DWELLINGS ACS.CCLP1 PD SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC LPG PERMANENT DWELLINGS Issue 7 ACS.SMB 1 CCLP1 PD INITIAL & RE-ASSESSMENT Introduction Tests gas safety competence in core domestic

More information

Quality Products AHU Repair, Refurbishment and Replacement

Quality Products AHU Repair, Refurbishment and Replacement Quality Products AHU Repair, Refurbishment and Replacement We are engineers specialising in the repair, refurbishment and replacement of ventilation systems. We have considerable experience in solving

More information

MRXBOXAB-ECO-LP1 100% Typical Installation. (including opposite handed versions)

MRXBOXAB-ECO-LP1 100% Typical Installation. (including opposite handed versions) NUAIRE MVHR (including opposite handed versions) ACHIEVES 100% DUTY IN BYPASS MODE and MRXBOXAB- ECO-LP1-OH are specically designed for apartment applications where space is a premium. The new MRXBOX95-LP1

More information

Mechanical Smoke Extract Shaft Systems

Mechanical Smoke Extract Shaft Systems Mechanical Smoke Extract Shaft Systems Presented by Mechanical Smoke Extract Shaft Systems Why Choose Crossflow? Crossflow is a family run company with over 45 years technical expertise. We are a solutions

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Residential Heat Recovery Ventilation. REHVA European Guidebook No 25

Residential Heat Recovery Ventilation. REHVA European Guidebook No 25 Residential Heat Recovery Ventilation REHVA European Guidebook No 25 REHVA European Guidebook No 25 2 Limited to mechanical supply and exhaust ventilation Targeted to engineers, HVAC consultants and contractors

More information

Newport City Council Bettws High School Fire Fighting Performance Specification CONTRACT C1

Newport City Council Bettws High School Fire Fighting Performance Specification CONTRACT C1 Fire Fighting Performance Specification CONTRACT C1 Fire Fighting Performance Specification August 2008 4 Pierhead Street, Capital Waterside, CF10 4QP Tel +44 2920 473727 Fax +44 2920 472277 This report

More information

MRXBOX95-WM2. Mechanical Ventilation Unit with Heat Recovery for Wall Mounting Installation and Maintenance. Intake air from outside

MRXBOX95-WM2. Mechanical Ventilation Unit with Heat Recovery for Wall Mounting Installation and Maintenance. Intake air from outside MRXBOX95-WM2 Mechanical Ventilation Unit with Heat Recovery for Wall Mounting Installation and Maintenance The EMC Directive 2004/108/EC The Low Voltage Directive 2006/95/EC 1.0 Introduction The unit must

More information

INTEGRA PLUS ABC. 230V~ 50Hz. Stock Ref. N. Installation and Wiring Instructions IPX2

INTEGRA PLUS ABC. 230V~ 50Hz. Stock Ref. N. Installation and Wiring Instructions IPX2 INTEGRA PLUS Installation and Wiring Instructions Stock Ref. N INTEGRA PLUS 437666 230V~ 50Hz ABC PLEASE READ INSTRUCTIONS IN CONJUNCTION WITH ILLUSTRATIONS. PLEASE SAVE THESE INSTRUCTIONS. IPX2 VENT-AXIA

More information

AIR HANDLING UNITS ASSET REFERENCE: DESIGN AHU 1 AHU 2

AIR HANDLING UNITS ASSET REFERENCE: DESIGN AHU 1 AHU 2 AIR HANDLING UNITS DESIGN System INFORMATION No off Access Handing Viewed in direction of supply air Finish / Colour Duct Connections Height: Width Velocity: Design Airflow (m3/s) Supply Fan Ability Supply

More information

Fire precautions in dwellings

Fire precautions in dwellings NORWICH City Council Fire precautions in dwellings Private sector housing Providing homes building communities Version 2 Published by Norwich City Council June 2010 Contents Page Introduction 1 2 Types

More information

Best Practice Guidance. Best Practice Guidance Positive Input Ventilation (PIV) System

Best Practice Guidance. Best Practice Guidance Positive Input Ventilation (PIV) System Best Practice Guidance Best Practice Guidance Positive Input Ventilation (PIV) System October 2017 1. INTRODUCTION 2. DEFINITIONS 3. CONCEPT AND BACKGROUND OF PIV 4. INSPECTION CONSIDERATIONS 5. OCCUPIER

More information

Uniclass L7535: N3253 EPIC L13:Y42. CI/SfB (57) X (K5) Residential Smoke Ventilation

Uniclass L7535: N3253 EPIC L13:Y42. CI/SfB (57) X (K5) Residential Smoke Ventilation Uniclass L7535: N3253 EPIC L13:Y42 CI/SfB (57) X (K5) Residential Smoke Ventilation Residential Smoke Ventilation SE Controls provides specialised products and services for natural smoke ventilation in

More information

Code of Practice - Ventilation- Mechanical Extract Ventilation (MEV) + Mechanical Ventilation with Heat Recovery (MHVR)

Code of Practice - Ventilation- Mechanical Extract Ventilation (MEV) + Mechanical Ventilation with Heat Recovery (MHVR) Code of Practice - Ventilation- Mechanical Extract Ventilation (MEV) + Mechanical Ventilation with Heat Recovery (MHVR) Contractors Requirements & Competency This section outlines the general Standards

More information

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,

Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: , Purpose 355 West Queens Road Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: 604-990-2480, building@dnv.org The purpose of this document is to provide

More information

Commercial Kitchen Ventilation Services. Ventilation Systems. Canopies. Ductwork. Gas Interlock Systems

Commercial Kitchen Ventilation Services. Ventilation Systems. Canopies. Ductwork. Gas Interlock Systems Commercial Kitchen Ventilation Services ACK offers a full range of commercial kitchen ventilation services including design and planning, manufacture, installation, maintenance and servicing as well as

More information

Existing Mechanical System Operation

Existing Mechanical System Operation majority of the air handlers. There are louvers along the north side of the building that allow for outdoor air to come in and feed the air handlers. On levels 4-8 the research laboratories are variable

More information

Secondary Suites. Guidelines for the construction of Accessory Secondary Suites in the City of Abbotsford August

Secondary Suites. Guidelines for the construction of Accessory Secondary Suites in the City of Abbotsford August Secondary Suites Guidelines for the construction of Accessory Secondary Suites in the City of Abbotsford August 2015 PLANNING & DEVELOPMENT SERVICES Building Permits & Licences 1st Floor, 32315 South Fraser

More information

PFS Single stage axial fan The axial fan for modern boiler plants

PFS Single stage axial fan The axial fan for modern boiler plants PFS Single stage axial fan The axial fan for modern boiler plants This large axial fan, type PFS- 400-236, was installed in 1987 at the Salmisaari coal-fired power station in Helsinki, Finland. The photo

More information

incorporating Contractors guide to car park ventilation A no-nonsense guide to the safe ventilation of underground and covered car parks

incorporating Contractors guide to car park ventilation A no-nonsense guide to the safe ventilation of underground and covered car parks incorporating Contractors guide to car park ventilation A no-nonsense guide to the safe ventilation of underground and covered car parks Car park ventilation What are the regulations? Ventilation of car

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.

More information

Model: Kair Whole House Ventilator Model Number: KHRVWH2000

Model: Kair Whole House Ventilator Model Number: KHRVWH2000 Model: Kair Whole House Ventilator Model Number: KHRVWH2000 Installation, Maintenance Instructions and User Guide Unit 6 Chiltonian Industrial Estate 203 Manor Lane, Lee, London. SE12 0TX Tel: 08451 60

More information

MRXBOX95-WM2H. Mechanical Ventilation Unit with Heat Recovery and Integral Humidistat for Wall Mounting Installation and Maintenance

MRXBOX95-WM2H. Mechanical Ventilation Unit with Heat Recovery and Integral Humidistat for Wall Mounting Installation and Maintenance MRXBOX95-WM2H Mechanical Ventilation Unit with Heat Recovery and Integral Humidistat for Wall Mounting Installation and Maintenance The EMC Directive 2004/108/EC The Low Voltage Directive 2006/95/EC 1.0

More information

Building Regulations Approved Document F1 Means of Ventilation April 2006

Building Regulations Approved Document F1 Means of Ventilation April 2006 Building Regulations Approved Document F1 Means of Ventilation April 2006 BPD Structure BUILDING PRODUCT DESIGN LTD 4 trading divisions.. Natural ventilation products and systems Roofing products, flat

More information

MRXBOX95AB-WH1. Mechanical Ventilation Unit with Heat Recovery & Summer Bypass for Wall Mounting. Installation and Maintenance

MRXBOX95AB-WH1. Mechanical Ventilation Unit with Heat Recovery & Summer Bypass for Wall Mounting. Installation and Maintenance MRXBOX95AB-WH1 Mechanical Ventilation Unit with Heat Recovery & Summer Bypass for Wall Mounting Installation and Maintenance The EMC Directive 2004/108/EC The Low Voltage Directive 2006/95/EC 1.0 Introduction

More information

SPECIFICATION casing manufactured from aludip steel in white low energy DC external motor aluminium plate heat exchanger

SPECIFICATION casing manufactured from aludip steel in white low energy DC external motor aluminium plate heat exchanger WHHR150DC SAP Q Eligible WHOLE HOUSE HEAT RECOVERY UNIT FEATURES Highly efficient, low energy solution to condensation and pollutant control Continuous ventilation in kitchen plus up to 5 additional wet

More information

DRAFT BMS SPECIFICATION

DRAFT BMS SPECIFICATION DRAFT BMS SPECIFICATION \\JONES-PC\Fairlawn Controls\Honeywell\Draft BMS spec.docx Content 1.0 AUTOMATIC CONTROLS... 1 1.1 Project outline 1 1.2 Extent of work 2 1.3 Scope 3 1.4 Standards, Codes and Regulations

More information

Operating Performance

Operating Performance INFORMATION SHEET 1 Jackson Engineering Advisers are specialist Building Services Engineers. This information sheet is offered as an aid to Building Owners and Managers as a guide to plant life expectancies.

More information

An introduction to Part L insulating pipes and ducts

An introduction to Part L insulating pipes and ducts October 2010 An introduction to Part L insulating pipes and ducts The insulation of pipes and ducts is essential to minimise heat losses for heated systems and heat gains for cooled systems. For cooled

More information

Document Information Cover Sheet

Document Information Cover Sheet Document Information Cover Sheet Asite/Document Reference Number: LOR-CO-SW-RP-0015 Document Title: Equipment Interface Document Revision: F02 Publisher: Laing O Rourke Published: 23/04/2013 Outline Description/Comments

More information

UNIJET CAR PARK VENTILATION SYSTEM

UNIJET CAR PARK VENTILATION SYSTEM Overview Discharge to Atmosphere UniJet is a packaged car park ventilation system designed to provide smoke clearance and pollution ventilation to covered car parks to comply with current building regulations

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

NES. What s New June Contents: Detailed Technical guidance. Work section updates. (key points)

NES. What s New June Contents: Detailed Technical guidance. Work section updates. (key points) Contents: Section 1. Section 2. Section 3. Section 4 SUMMARY DETAIL OF WORK SECTION UPDATES & AUDITS SCHEDULES DETAIL CHANGES TO REFERENCE DOCUMENTS A full record of the content revisions can be obtained

More information

ARCHIVED. Compliance Document for New Zealand Building Code Clause G4 Ventilation Second Edition. Prepared by the Department of Building and Housing

ARCHIVED. Compliance Document for New Zealand Building Code Clause G4 Ventilation Second Edition. Prepared by the Department of Building and Housing Compliance Document for New Zealand Building Code Clause G4 Ventilation Second Edition Prepared by the Department of Building and Housing This Compliance Document is prepared by the Department of Building

More information

Natural Ventilation. e-stack A-Series Ventilation System for Buildings with Atria. Installation and Maintenance. Palletised

Natural Ventilation. e-stack A-Series Ventilation System for Buildings with Atria. Installation and Maintenance. Palletised Natural Ventilation e-stack A-Series Ventilation System for Buildings with Atria Installation and Maintenance The EMC Directive 004/108/EC The Low Voltage directive 006/95/EC Important Notes to Designers

More information

DF-IDF air handling units

DF-IDF air handling units APPLICATIONS Heating, ventilation >> WAREHOUSES >> DISTRIBUTION CENTRES >> FACTORIES >> SPORTS HALLS >> EXHIBITION HALLS DF-IDF air handling units www.reznor.eu DF - IDF air handling units GAS FIRED COMBINED

More information

Checked By: S. Norsworthy Approved By: C. Reimer

Checked By: S. Norsworthy Approved By: C. Reimer ocument 112577-0116-40RA-01 Prepared By: T. Schick Name Signature ate Checked By: S. Norsworthy 2012-10-18 Name Signature ate Approved By: C. Reimer 2012-10-18 Professional Seal Original ocument Sealed

More information

Mechanical System Description

Mechanical System Description 1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure

More information

- CONSTRUCTION FIRE SAFETY STANDARDS

- CONSTRUCTION FIRE SAFETY STANDARDS SGG15 - CONSTRUCTION FIRE SAFETY STANDARDS 1) Construction Planning All construction sites shall plan and sequence their construction activities to ensure the early installation and operation of permanent

More information

Fire resistance. Appendix E. E.1 Fire resistance. Appendix. (A copy of this Appendix is available on /)

Fire resistance. Appendix E. E.1 Fire resistance. Appendix. (A copy of this Appendix is available on /) Fire resistance (A copy of this is available on www.routledge.com/books/details/ 9780415809696/).1 Fire resistance The overall aim of fire safety precautions is to ensure that: all corridor doors shall

More information

Project Briefing Document. Section 3 Electrical Services design guide and specifications

Project Briefing Document. Section 3 Electrical Services design guide and specifications ESTATES SUPPORT SERVICE Project Briefing Document Section 3 Electrical Services design guide and specifications Issue 1.1 June 2014 Project Ref. Project Name Project Manager Date issued... Consultant/Contractor...

More information

Hengrove Park Phase 1. BUDF Briefing. Kier Living. Stride Treglown job no Prepared by Checked by Date January 2017 Revision -

Hengrove Park Phase 1. BUDF Briefing. Kier Living. Stride Treglown job no Prepared by Checked by Date January 2017 Revision - Hengrove Park Phase 1 BUDF Briefing Kier Living Stride Treglown job no. 32507 Prepared by ACR Checked by RD Date January 2017 Revision - Revisions Revision Rev A Description Description of revision(s).

More information

CI/SfB X. EnviroPak Series GAS FIRED HEATING, VENTILATION AND COOLING UNITS

CI/SfB X. EnviroPak Series GAS FIRED HEATING, VENTILATION AND COOLING UNITS CI/SfB 56.83 X EnviroPak Series GAS FIRED HEATING, VENTIATIN AND CING UNITS EnviroPak Series GAS FIRED HEATING, VENTIATIN AND CING UNITS Introduction The Reznor EnviroPak is a new generation of gas fired

More information

Technical Seminar on the Code of Practice for Fire Safety in Buildings 2011

Technical Seminar on the Code of Practice for Fire Safety in Buildings 2011 Technical Seminar on the Code of Practice for Fire Safety in Buildings 2011 The Code of Practice for Fire Safety in Buildings 2011 The FS Code comprises 7 parts and 1 annex: Part A Introduction Part B

More information

Design of Fire safety in Multi Occupancy Residential Accommodation

Design of Fire safety in Multi Occupancy Residential Accommodation Design of Fire safety in Multi Occupancy Residential Accommodation Myth vs Reality Myth. Fire is bright Reality. It isn t. Flames are bright Outside fires have bright flames because of the availability

More information

BUILDING STANDARDS SUPPORTING GUIDANCE DOMESTIC VENTILATION

BUILDING STANDARDS SUPPORTING GUIDANCE DOMESTIC VENTILATION BUILDING STANDARDS SUPPORTING GUIDANCE DOMESTIC VENTILATION 2 ND EDITION 1 Contents 1. Purpose of this document 3 Page 2. Ventilation 4 3. Purpose provided ventilation 6 4. Natural ventilation- windows,

More information

NORTH CIRCULAR ROAD - REGENERATION IN ACTION

NORTH CIRCULAR ROAD - REGENERATION IN ACTION NORTH CIRCULAR ROAD - REGENERATION IN ACTION Notting Hill Housing is a social enterprise which has been at the forefront of vibrant urban regeneration since 1963. Notting Hill has over 25,000 homes across

More information

Full Service Central Station Fire Alarm Listing Evaluation

Full Service Central Station Fire Alarm Listing Evaluation Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm

More information

AIR COMPACT. Air handling units. Ultra high performance USE RANGE DESCRIPTION

AIR COMPACT. Air handling units. Ultra high performance USE RANGE DESCRIPTION Ultra high performance Environmentally friendly with heat recovery solutions Optimised performance thanks to the control system Air flowrate: 1500 to 6000 m 3 /hr and a compact 400 mm profile Available

More information

i PSV WHOLE-HOUSE VENTILATION SYSTEM

i PSV WHOLE-HOUSE VENTILATION SYSTEM CI/SfB (57) Uniclass Ss_65_40_33_56 November 2017 i PSV WHOLE-HOUSE VENTILATION SYSTEM Humidity-sensitive wall ventilator Energy saver vent................................ HOW TRADITIONAL PASSIVE STACK

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

MECHANICAL VENTILATION WITH HEAT RECOVERY (MVHR)

MECHANICAL VENTILATION WITH HEAT RECOVERY (MVHR) MECHANICAL VENTILATION WITH HEAT RECOVERY (MVHR) IMPROVING INDOOR AIR QUALITY IN NEW HOMES 1 NUAIRE S PEDIGREE Proud to Build British Nuaire is a world leader in the design and manufacture of fans and

More information

Checklist For Building Inspection & Fire Safety

Checklist For Building Inspection & Fire Safety INSPECTION CHECKLIST Date of Inspection: Location/Address: Weather Condition: Inspector: AFTER COMPLETING YOUR INSPECTION, TRANSFER YOUR CONCERNS/OBSERVATIONS TO THIS AREA Facility: Name: Staff Contact:

More information

SCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY

SCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY SCHEDULE Essential s taken from Schedule 9 of the Building Regulations 2006 43 PART 1 BUILDING FIRE INTEGRITY 1 Building elements required to satisfy prescribed fire-resistance levels 2 Materials and assemblies