1 TERMS OF REFERENCE for Execution of Pre-Commissioning Works on Energy-Efficient Engineering Systems in Multi-Storey Residential Buildings under Construction Project Name and Number: UNDP/GEF Project No Improving Energy Efficiency in Residential Buildings in the Republic of Belarus Minsk, July 2016

2 List of Energy-Efficient Systems: LOT 1. Project Energy-Efficient Multi-Storey Residential Building No. 1 in the Territory Adjacent to the Regional Hospital within an Area of the Sputnik Microdistrict with Development of an Adjacent Territory in Mogilev, Section Energy Efficiency : 1.1 Building heat supply system with the use of a solar collector and waste water heat 1.2 Supply and exhaust ventilation system with exhaust air heat recovery 1.3 Engineering equipment dispatching system 1.4 Heat energy measuring dispatching system LOT 2. Project Development of Loshitsa-9 Micro-District. Residential Building No. 7 According to the Master Plan, Section Energy Efficiency 2.1 Building heat supply system with the use of waste water heat 2.2 Supply and exhaust ventilation system with exhaust air heat recovery 2.3 Engineering equipment dispatching system 2.4 Heat energy measuring dispatching system LOT 3. Project 120-Apartment 10-Storey Energy-Efficient Residential Building in Dzerzhinsky Str. in Grodno, Section Energy Efficiency 3.1 Building heat supply system with the use of heat pump and waste water heat 3.2 Supply and exhaust ventilation system with exhaust air heat recovery 3.3 Engineering equipment dispatching system 3.4 Heat energy measuring dispatching system Location of execution of pre-commissioning works: LOT 1: Mogilev, A. Kuleshov Str., residential building under construction LOT 2: Minsk, M. Ptashuk Str., residential building under construction LOT 3: Grodno, Dzerzhinsky Str., residential building under construction Works Commencement: LOT 1: Mogilev September 2016 LOT 2: Minsk October 2016 LOT 3: Grodno January-February 2017 The works may be simultaneously executed regarding LOTs 1 and 2 (September-October 2016). General information about design documentation: The design and estimate documentation for the construction project under the Section Energy Efficiency was prepared by RUE Institute of Housing - NIPTIS named after S.S. Ataev and UE Institute Grodnograzhdanproekt. 2

3 CONTENT 1 LOT 1. Project Energy-Efficient Multi-Storey Residential Building No. 1 in the Territory Adjacent to the Regional Hospital within an Area of the Sputnik Microdistrict with Development of an Adjacent Territory in Mogilev, Section Energy 5 Efficiency Pre-Commissioning Works on the Building Heat Supply System with the Use of a Solar Collector and Waste Water Heat General Description of the Heat Supply 6 System Subsystem 1. Block-Diagram of the Manifold of the Solar Collector Storage Tank Subsystem Subsystem 2. Block-Diagram of the Manifold of the Storage Tank-Building Domestic Hot Water Supply System Block-Diagram of Automation of 1 and 2 Subsystems Solar Collector Storage Tank, Storage Tank Building Hot Water Supply System Subsystem 3. Block-Diagram of the Manifold of Subsystem Waste Water Heat Recovery Unit - Building Hot Water Supply 13 System Pre-Commissioning Works on Supply and Exhaust Ventilation System with Exhaust Air Heat 15 Recovery General Description of Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery Engineering Equipment Dispatching System General Description of the Engineering Equipment Dispatching System Engineering Equipment Dispatching System ADS Engineering Equipment Dispatching System ADS Heat Energy Measuring Dispatching System General Description of the Heat Energy Measuring Dispatching 22 System Heat Energy Measuring System AEECS 23 2 LOT 2. Project Development of Loshitsa-9 Micro-District. Residential Building No. 7 According to the Master Plan, Section Energy Efficiency Pre-Commissioning Works of the Building Heat Supply System with the Use of Waste Water Heat General Description of the System Waste Water Heat Recovery Unit - Building Hot Water Supply System Block-Diagram of the Manifold of Waste Water Heat Recovery Unit - Building Hot Water Supply System 25 Subsystem. 3

4 2.2 Pre-Commissioning Works on Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery General Description of the Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery Engineering Equipment Dispatching System General Description of the Engineering Equipment Dispatching System CONTENT (TO BE CONTINUED) Engineering Equipment Dispatching System Р ADS Engineering Equipment Dispatching System РО ADS Heat Energy Measuring Dispatching System General Description of Heat Energy Measuring Dispatching 33 System Heat Energy Measuring System Р AEECS LOT 3. Project 120-Apartment 10-Storey Energy-Efficient Residential Building in Dzerzhinsky Str. in Grodno, Section Energy 35 Efficiency 3.1 Building Heat Supply System with the Use of Heat Pump and Waste Water Heat General Description of the Heat Supply System Subsystem 1. Block Diagram of the Manifold of Sewer Heat Pump Buffer Vessel Subsystem Subsystem 2. Block Diagram of the Manifold of Subsystem Energy Piles Heat Pump Buffer Vessel Subsystem 3. Block Diagram of the Manifold of Buffer vessel Building Heat Supply System 41 Subsystem Subsystem 4. Block Diagram of the Manifold of Buffer Vessel Building Hot Water Supply System 43 Subsystem Subsystem 5. Block Diagram of the Manifold of Waste Water Heat Recovery Unit - Building Hot Water Supply System 45 Subsystem Supply and Exhaust Ventilation System with Exhaust Air Heat 47 Recovery General Description of the Ventilation 47 System Engineering Equipment Dispatching System General Description of the Engineering Equipment Dispatching System Engineering Equipment Dispatching System Р ADS Engineering Equipment Dispatching System Р ADS

5 3.4 Heat Energy Measuring Dispatching System General Description of the Heat Energy Measuring Dispatching 54 System Heat Energy Measuring System Р AEECS Responsibilities of the Contractor while Executing the Pre-Commissioning 56 Works.. 5 Requirements to the Contractor s 56 Qualification 6 Warranties Content Scope of the Bid to be Submitted by a Bidder. 57 5

6 1. LOT 1. Project Energy-Efficient Multi-Storey Residential Building No. 1 in the Territory Adjacent to the Regional Hospital within an Area of the Sputnik Microdistrict with Development of an Adjacent Territory in Mogilev, Section Energy Efficiency 1.1 Pre-Commissioning Works of Building Heat Supply System with the Use of a Solar Collector and Waste Water Heat The pre-commissioning works (thermal engineering, automation) on the heat supply system of the building under construction need to be executed and a complete package of the postcompletion documentation required to commission the project and turn over the building heat supply system with the use of a solar collector and waste water heat to the service providers needs to be prepared. Fig. 1 System Block Diagram To hot water supply system From water pipeline Subsystem 1 Subsystem 2 Subsystem flat-plate solar collector, 2 - storage tank with water thermal stratification, 3 - solar circuit heat exchanger, 4 - intermediate heat exchanger of hot water supply circuit, 5 solar circuit circulator pump, 6 - circulator pump of solar heat exchanger - storage tank circuit, 7 - circulator pump of storage tank - hot water supply intermediate heat exchanger circuit, 8 diaphragm-type expansion vessel, 9 - pre-cooling tank, 10 glycol mixture tank, 11 - system filling and automatic make-up unit, 12 - deaerator, 13 - air-relief valve, 14 - balancing valve, 15 - heat exchanger of waste water heat recovery unit, 16 - buffer vessel, 17 - circulator pump of waste water heat recovery unit circuit - heat exchanger of waste water heat recovery unit, 18 - waste water heat recovery unit General Description of the Heat Supply System. 6

7 The system is intended for the hot water supply of the residential building under construction using the equipment for extracting the residential building grey water heat, solar energy heat and a heating unit equipped with the devices for extracting heat from the CHP district heating network. According to the design documentation the system comprises the following functionally integrated systems: -Subsystem 1 solar collector storage tank (see project Sections HS1, HSA); -Subsystem 2 storage tank building hot water supply system (see project Sections HS1, HSA); -Subsystem 3 grey waste water heat recovery unit building hot water supply systems (see project Sections HS2, HS1, HSA). Note: for the automation system subsystems 1 and 2 are integrated. The automation system comprises as follows: - Temperature controller DX4306 for subsystem 1; - Hot water supply system controller for subsystem 2; - Solar system controller common for subsystems 1 and 2. 7

8 1.1.2 Subsystem 1. Block Diagram of Solar Collector Storage Tank Subsystem Manifold Fig. 2 Subsystem 1 1 flat-plate solar collector; 2 storage tank; 3 heat exchanger; 4, 5 circulator pump; 6 deaerator; 7 expansion vessel; 8 cooling tank; 9 glycol mixture tank; 10 system filling and automatic make-up unit; 11- air-relief valve; 12 balancing valve. 8

9 List of Main Equipment of Subsystem 1 Ser. Name and Specifications Type, brand Qty No. 1 Flat-plate solar collector 232 pcs 2 Storage tank, 14.2m 3 1 pc 3 Plate double-pass heat exchanger, Q=326kW 1 pc 4 Circulator pump, G=18m 3 /h, H=8m 1 pc 5 Circulator pump, G=10m 3 /h, H=4m 1 pc 6 Expansion vessel, V=1000 L 1 pc 7 Cooling tank, V=500 L 1 pc 8 System filling and automatic make-up unit 1 pc 9 Balancing valve 2 pcs Design Indices of Subsystem 1 Index name Index value Note Heat exchanger propylene glycol - intermediate heat-carrying medium, heatcarrying medium temperature: -heating side Tinlet, C -heating side Toutlet, C -heated side Tinlet, C -heated side Toutlet, C Heating circuit flow rate, m 3 /h 18 Heated circuit flow rate, m 3 /h 10 Heating circuit pressure, bar 2 Heated circuit pressure, bar 2 Indices are subject to updating during the system adjustment. 9

10 1.1.3 Subsystem 2. Block-Diagram of Storage Tank Building Hot Water Supply System Subsystem Manifold To individual heat substation Fig. 3 Subsystem 3 To individual heat substation From solar circuit heat exchanger/to solar circuit heat exchanger for system filling (water) From heat exchanger of waste water heat recovery unit 1 storage tank; 2 circulator pump; 3 heat exchanger. 10

11 List of Main Equipment of Subsystem 2 Ser. Name and Specifications Type, brand Qty No. 1 Storage tank, 14.2m 3 1 pc 2 Circulator pump, G=19m 3 /h, H=3.5m 1 pc 3 Plate double-pass heat exchanger, Q=609kW 1 pc Design Indices of Subsystem 2 Index name Index value Note Heat exchanger intermediate heat-carrying medium water, heat-carrying medium temperature: -heating side Tinlet, C -heating side Toutlet, C -heated side Tinlet, C -heated side Toutlet, C Heating circuit flow rate, m 3 /h 19 Heated circuit flow rate, m 3 /h 10 Heating circuit pressure, bar 2 Heated circuit pressure, bar 2 Indices are subject to updating during the system adjustment. 11

12 1.1.4 Block-Diagram of Solar Collector Storage Tank, Storage Tank Building Hot Water Supply System Subsystems 1 and 2 Automation Fig. 4 Block diagram of subsystems 1 and 2 automation 12

13 Solar collector section Roof storage tank filling Hot water supply system 1, 14 heat-carrying medium temperature transducers in solar collector; 2, 8, 19 heat-carrying medium temperature transducers in storage tank; 3, 9, 10, 11, 12, 15, 16, 17, 18 heat-carrying medium temperature transducers on heat exchanger inlets and outlets; 4, 20 pressure transducers; 5 flow meter; 6, 7, 13, 23 circulator pump; 21 level sensor; 22 two-way electromagnetic servo-operated valve; 24 electric contact pressure gauge; 25, 26, 27 heat meter set; -- instrumentation and shut-off valves. List of Main Equipment of Automation System of Subsystems 1 and 2 Ser. Name and Specifications Type, brand Qty No. 1 Temperature controller DX set 2 Hot water supply system controller 1 set 3 Solar system controller 1 set 4 Microprocessor heat meter 1 set 5 Level sensor 1 pc 6 Two-way electromagnetic servo-operated valve 1 pc Design Indices See design indices of Subsystem 1. Block-Diagram of the Solar Collector Storage Tank Subsystem Manifold, Subsystem 2. Block-Diagram of the Storage Tank Building Hot Water Supply System Subsystem Manifold 13

14 1.1.5 Subsystem 3. Block-Diagram of Waste Water Heat Recovery Unit - Building Hot Water Supply System Subsystem Manifold Fig. 5 Subsystem 3 To solar system heat exchanger Section 1, 2/Section 3, 4 Filling system with service water from heating unit From cold water supply system 1 waste water heat recovery unit; 2 circulator pump; 3 expansion vessel; 4 buffer vessel; 5 plate-type heat exchanger; 6 heat-carrying medium temperature transducers in waste water heat recovery unit; 7 heat-carrying medium temperature transducers on heat exchanger inlets and outlets; 8 electric contact pressure gauge; 9 heat meter set; -- instrumentation and shut-off valves. 14

15 List of Main Equipment of Subsystem 3 Ser. Name and Specifications Type, brand Qty No. 1 Three-way plate-type heat exchanger, Q= pcs kw 2 Buffer vessel V-100, Ф400mm, Н-970mm 2 pcs 3 Circulator pump, G=4.9m3/h H=13m. 2 pcs N=440Вm 4 Expansion vessel 2 pcs 5 Electric contact pressure gauge 2 pcs 6 Microprocessor heat meter 2 sets 7 Waste water heat recovery unit controller 2 sets Design Indices of Subsystem 3 Index name Index value Note Heat exchanger waste water intermediate heat-carrying medium, heat-carrying medium temperature: -waste water Tinlet, C -waste water Toutlet, C -intermediate heat-carrying medium Tinlet, C -intermediate heat-carrying medium Toutlet, C Heat exchanger intermediate heat-carrying medium water, heat-carrying medium temperature: -heating side Tinlet, C -heating side Toutlet, C -heated side Tinlet, C -heated side Toutlet, C Intermediate heat-carrying medium flow rate, m3/h 4.9 Intermediate heat-carrying medium circuit pressure, bar 2 Indices are subject to updating during the system adjustment. A package of the design documentation, including the block diagram of the system with the list of the main equipment, heating equipment/pipelines layout plans, power supply scheme and power equipment layout plans, equipment specifications, etc. are provided in Annex 1 to the Terms of Reference. 15

16 1.2 Pre-Commissioning Works Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery The pre-commissioning works (ventilation, automation) on the ventilation system of the building under construction need to be executed and a complete package of the postcompletion documentation required to commission the project and turn over the building ventilation system with the use of a supply and exhaust ventilation units with exhaust air heat recovery to the service providers needs to be prepared General Description of Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery The system is intended to provide the specified indoor climate parameters and ventilation of residential and auxiliary premises. The design documentation for ventilation system with exhaust air heat recovery - see project Sections HV1 and HVA (Annex 1 to the Terms of Reference). 16

17 Fig. 6 Block diagram of the ventilation system Fire damper Duct filter; noise suppressor; supply and exhaust ventilation unit; grease filter; duct filter, noise suppressor; grease filter 17

18 List of Main Equipment of Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery Ser. Name and Specifications Type, brand Qty No. 1 Rotary-type supply and exhaust ventilation system with exhaust air heat recovery: 180 sets - Nominal unit rated capacity 300 m 3 /h - Heat exchanger thermal efficiency, not less than 82% - Fan head at capacity of 135 m 3 /h, not less than 120 Pa - Heater capacity, not more than 0.5 kw - Fan with EC drive capacity, not more than 2х70W - power supply 230 V/50Hz/1 phase 2 Exhaust duct fan: 6 pcs - motor capacity 60W - productivity up to 280 m 3 /h - pressure up to 310 Pa 3 Axial-flow fan with automatic louvers: 180 pcs - voltage at 50Hz V - capacity, not more than 18 W - productivity, not less than 98 m 3 /h - pressure 35 Pa 4 Fire protection valve with electromechanical drive 360 pcs 220V and with pull-back spring 5 Pocket-type duct circular section filter 180 pcs 6 Grease filter 180 pcs 7 Noise suppressor 360 pcs Design Indices of Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery Index name Index value Note Supply and exhaust ventilation unit: - unit outlet supply air temperature Toutlet, C - air flow rate L, m 3 /h 18 According to the design and estimate documentation Indices are subject to updating during the system adjustment within the limits of allowable standardized deviations. A package of the design documentation, including an axonometric diagram of the system with the List of Main Equipment, Plans, sectional arrangement of equipment, products and materials, equipment specifications, etc. is provided in Annex 1 to the Terms of Reference. 18

19 1.3 Engineering Equipment Dispatching System A complete package of the post-completion documentation for pre-commissioning works on the engineering equipment dispatching system of the residential building under construction needs to be prepared which is required for commissioning the project and turning over the building dispatching system to the service providers. Fig. 7 Dispatching system block diagram 19

20 Dispatching system block diagram; Section ; Dispatching system cabinet; electric energy measuring instruments; heat energy measuring instruments; circulator pump with variable-frequency drive; heating unit control cabinet; solar system control cabinet; waste water heat recovery unit control cabinet; Section ; apartment air-change and heat supply controllers General Description of the Engineering Equipment Dispatching System The dispatching system is intended for the dispatch control of engineering systems of the residential building under construction to remotely read the equipment operating mode data, power consumption data during operation of the building from external networks and energy sources, and also internal sources located in the building. External sources include as follows: - heating network; - municipal electric power system. Internal sources: - waste water heat recovery unit; - system of solar collectors. The obtained data are used to further analyze and adjust the engineering systems operating modes. The dispatching system includes the data obtained from the apartment ventilation and heat supply system controllers. The design documentation for the engineering equipment dispatching system - see project Sections ADS1, ADS2 is provided in Annex 1 to the Terms of Reference Engineering Equipment Dispatching System ADS1 List of Main Engineering Equipment ADS1 Ser. Name and Specifications Type, brand Qty No. 1 Dispatching system cabinet 1 set 2 Information screen 1 pc 3 Temperature controller DX set 4 Hot water supply system controller 1 set 5 Solar system controller 1 set 6 Waste water heat recovery unit controller 2 sets 7 Regulator of packaged heat supply station 1 set 8 Heat meter computer 6 pcs 9 Electricity meter 8 pcs 10 Circulator pump 11 pcs 20

21 Fig. 8 Dispatching system ADS1 21

22 1.3.3 Engineering Equipment Dispatching System ADS2 Fig. 9 Dispatching system ADS2 ТР BRIZ regulator apartment terminal; КК switching box; ШСД dispatching system cabinet. List of Main Engineering Equipment ADS2 Ser. No. Name and Specifications Type, brand Qty 22

23 1 BRIZ regulator apartment terminal 180 sets 2 Switching box 80 pcs A package of the design documentation, including the System block diagram with the List of Main Equipment, a schematic circuit diagram and electric equipment layout plans, equipment specifications, etc. is provided in Annex 1 to the Terms of Reference. 1.4 Heat Energy Measuring Dispatching System Pre-commissioning works on the automated heat energy measuring system of the residential building (hereinafter referred to as the System ), including preparation of a complete package of the post-completion documentation required for the project commissioning and turning over automated building heat energy measuring system to the service providers General Description of Heat Energy Measuring Dispatching System The system is intended for the apartment heat energy measuring of the residential building under construction to remotely read the data on heat energy consumption by each individual apartment during the heating season. The design documentation for the apartment heat energy measuring system - see project Section AEECS is provided in Annex 1 to the Terms of Reference. List of Main Heat Energy Measuring Equipment AEECS Ser. Name and Specifications Type, brand Qty No. 1 Heat energy measuring system cabinet 1 set 2 Apartment heat meter computer 180 pcs 3 Building-level heat meter computer 1 pc 4 Distribution box 85 pcs 23

24 1.4.2 Heat Energy Measuring System AEECS Fig. 10 Heat energy measuring system AEECS ТСК - apartment heat meter computer ТСТУ - building-level heat meter computer КР-01 - switch box ШСУ - heat energy measuring system cabinet A package of the design documentation, including the System block diagram with the List of Main Equipment, schematic circuit diagram and electric equipment layout plans, equipment specifications, etc. is provided in Annex 1 to the Terms of Reference. 24

25 2. LOT 2. Project Development of Loshitsa-9 Micro-District. Residential Building No. 7 According to the Master Plan, Section Energy Efficiency 2.1 Pre-Commissioning Works on the Building Heat Supply System with the Use of Waste Water Heat Pre-commissioning works (thermal engineering, automation) on the heat supply system with the use of waste water heat of the residential building under construction need to be completed, including preparation of a complete package of the post-completion documentation required for the project commissioning and turning over the system to the service providers, for the system Waste Water Heat Recovery Unit - Building Hot Water Supply System General Description of the System Waste Water Heat Recovery Unit - Building Hot Water Supply System The system is intended for hot water supply of the residential building under construction using the equipment for extracting the residential building grey water heat and heat of a heating unit equipped with the devices for extracting heat from the CHP district heating network. The design documentation for the system Grey Waste Water Heat Recovery Unit Building Hot Water Supply Systems - see project Sections Р ТС, Р HSA (Annex 2 to the Terms of Reference). 25

26 2.1.2 Block-Diagram of the Manifold of the System Waste Water Heat Recovery Unit - Building Hot Water Supply System Fig. 11 System Manifold Block-Diagram From cold water supply system; To heat pump heat exchanger; Filling system with service water from heating unit 1 waste water heat recovery unit; 2 circulator pump; 3 expansion vessel; 4 buffer vessel; 5 plate-type heat exchanger; 6 heat-carrying medium temperature transducers in waste water heat recovery unit; 7 heat-carrying medium temperature transducers heat exchanger inlets and outlets; 8 electric contact pressure gauge; 9 heat meter set; instrumentation and shut-off valves. 26

27 List of Main Equipment Waste Water Heat Recovery Unit - Building Hot Water Supply System Ser. Name and Specifications Type, brand Qty No. 1 Plate-type three-way heat exchanger, Q=62.8 kw 1 pc 2 Buffer vessel V-100, Ф400 mm, Н-970 mm 1 pc 3 Circulator pump, G=4.9 m3/h H=13m N=440Вm 1 pc 4 Expansion vessel 1 pc 5 Electric contact pressure gauge 1 pc 6 Microprocessor heat meter 1 set 7 Waste water heat recovery unit controller 1 set Design Indices for Waste Water Heat Recovery Unit - Building Hot Water Supply System Index name Index value Note Heat exchanger waste water intermediate heat-carrying medium, heat-carrying medium temperature: -waste water Tinlet, C -waste water Toutlet, C -intermediate heat-carrying medium Tinlet, C -intermediate heat-carrying medium Toutlet, C Heat exchanger intermediate heat-carrying medium water, heat-carrying medium temperature: -heating side Tinlet, C -heating side Toutlet, C -heated side Tinlet, C -heated side Toutlet, C Intermediate heat-carrying medium flow rate, m3/h 4.9 Intermediate heat-carrying medium circuit pressure, bar 2 Indices are subject to updating during the system adjustment. A package of the design documentation, including the System block diagram with the List of Main Equipment, heating equipment/pipeline layout plans, a power supply scheme and power equipment layout plans, equipment specifications, etc. is provided in Annex 2 to the Terms of Reference. 2.2 Pre-Commissioning Works on the Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery 27

28 Pre-commissioning works on supply and exhaust ventilation system with the residential building exhaust air heat recovery need to be executed, including preparation of a complete package of the post-completion documentation required for the project commissioning and turning over the building ventilation system with the use of supply and exhaust units with exhaust air heat recovery to the service providers General Description of the Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery The system is intended to provide the specified indoor climate parameters and ventilation of residential and auxiliary premises. The design documentation for ventilation system with exhaust air heat recovery - see project Sections Р HV2 and PO HVA (Annex 2 to the Terms of Reference). 28

29 Fig. 12 Ventilation system block diagram Машинное помещение лифтов elevator motor room; холодный чердак unheated attic; приточно-вытяжная установка supply and exhaust unit; жилая комната living room; коридор corridor; кухня kitchen; ванная bathroom; санузел toilet facilities; лифтовая шахта elevator shaft; техподполье crawl space; электрощитовая switchboard room 29

30 List of Main Equipment Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery Ser. Name and Specifications Type, brand Qty No. 1 Rotary-type supply and exhaust ventilation system with exhaust air heat recovery: REGO200VE 133 sets - Nominal unit rated capacity 300 m 3 /h - Heat exchanger thermal efficiency, not less than 82% - Fan head at capacity of 135 m 3 /h, not less than 120 Pa - Heater capacity, not more than 0.5 kw - Fan with EC drive capacity, not more than 2х70W - Power supply 230 V/50Hz/1 phase 2 Axial-flow fan with automatic louvers: VENTS 100MA 133 pcs - voltage at 50Hz V - capacity, not more than 18 W - productivity, not less than 98 m 3 /h - pressure 35 Pa 3 Air flap with electric drive 133 pcs 4 Pocket-type duct circular section filter 133 pcs 5 Grease filter 132 pcs 6 Noise suppressor 266 pcs Design Indices Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery Index name Index value Note Supply and exhaust unit: - unit outlet supply air temperature Toutlet, C - air flow rate L, m 3 /h 18 According to the design and estimate documentation Indices are subject to updating during the system adjustment within the limits of allowable standardized deviations. A package of the design documentation, including an axonometric diagram of the system with the List of Main Equipment, Plans, sectional arrangement of equipment, products and materials, equipment specifications, etc. is provided in Annex 1 to the Terms of Reference. 30

31 2.3 Engineering Equipment Dispatching System Pre-commissioning works on the dispatching system of the residential building under construction need to be executed, including preparation of a complete package of the postcompletion documentation required for the project commissioning and turning over of the building dispatching system здания to the service providers. Fig. 13 Dispatching system block diagram Dispatching system block diagram; Section ; Dispatching system cabinet; electric energy measuring instruments; heat energy measuring instruments; circulator pump with variable-frequency drive; heating unit control cabinet; solar system control cabinet; waste water heat recovery unit control cabinet; Section ; apartment air-change and heat supply controllers General Description of the Engineering Equipment Dispatching System The dispatching system is intended for the dispatch control of engineering systems of the residential building under construction to remotely read the equipment operating mode data, power consumption data during operation of the building from external networks and 31

32 energy sources, and also internal sources located in the building. External sources include as follows: - heating network; - municipal electric power system. Internal sources include as follows: - waste water heat recovery unit. The obtained data are used to further analyze and adjust the engineering systems operating modes. The dispatching system includes the data obtained from the apartment ventilation and heat supply system controllers. The design documentation for engineering equipment dispatching system see project Sections Р ADS1, Р ADS2 (Annex 2 to the Terms of Reference) Engineering Equipment Dispatching System Р ADS1 Fig. 14 Dispatching system Р ADS1 Помещение для установки обвязки утилизатора теплоты сточных вод Room for installation of manifold of waste water heat recovery unit; Регулятор управления утилизатором Waste water heat recovery unit controller; Циркуляционный насос утилизатора Circulator pump of waste water heat recovery unit; Счетчик электроэнергии насоса Pump electricity meter; Помещение товарищества собственников Room of partnership of housing owners; Точка доступа в сеть Интернет Internet access point; По разделу ЭО Under Section Electric equipment; Диспетчеризация квартирных регуляторов воздухообмена и теплоснабжения «БРИЗ» - Dispatch control of BRIZ air-change and heat supply regulators; Раздел - Section ; Комплектно с информационным табло As part of information screen; Тепловой узел блочного теплопункта Heating unit of packaged heat supply station; Циркуляционные насосы системы отопления и ГВС Circulator pumps of heating and hot water supply system; Учет тепловой энергии Heat energy measuring; Регулятор управления блочным тепловым пунктом- - Regulator of packaged heat supply station 32

33 List of Main Engineering Equipment Р ADS1 Ser. Name and Specifications Type, brand Qty No. 1 Dispatching system cabinet 1 set 2 Information screen 1 pc 3 Waste water heat recovery unit controller 1 pc 4 Regulator of packaged heat supply station 1 pc 5 Heat meter computer 5 pcs 6 Electricity meter 1 pc 7 Circulator pump 5 pcs Engineering Equipment Dispatching System РО ADS2 Fig. 15 Dispatching system Р ADS2 В канале электропанели In electric panel duct: К вышележащим этажам To upper storeys; До входа в техподполье в канале электропанели - Before entrance to crawl space in electric panel duct; По техподполью - в лотках слаботочных сетей Along crawl space in low-current network trace; Точка доступа в сеть Интернет Internet access point; по Разделу - Under Section; Помещение товарищества собственников Room of partnership of housing owners; К коробкам коммутационным второй части блок-секции to switching boxes of second part of section. ТР BRIZ regulator apartment terminal; КК switching box; ШСД dispatching system cabinet 33

34 List of Main Engineering Equipment РО ADS2 Ser. Name and Specifications Type, brand Qty No. 1 BRIZ regulator apartment terminal 133 sets 2 Switching box 38 pcs A package of the design documentation, including the System block diagram with the List of Main Equipment, schematic circuit diagram and electric equipment layout plans, equipment specifications, etc. is provided in Annex 2 to the Terms of Reference. 2.4 Heat Energy Measuring Dispatching System Pre-commissioning works on the automated heat energy measuring system of the residential building, including preparation of a complete package of the post-completion documentation required for the project commissioning and turning over automated building heat energy measuring system to the service providers General Description of Heat Energy Measuring Dispatching System The system is intended for the apartment heat energy measuring of the residential building under construction to remotely read the data on heat energy consumption by each individual apartment during the heating season. The design documentation for the apartment heat energy measuring system see project Section Р AEECS (Annex 2 to the Terms of Reference). List of Main Heat Energy Measuring Equipment Р AEECS Ser. Name and Specifications Type, brand Qty No. 1 Heat energy measuring system cabinet 1 set 2 Apartment heat meter computer 133 pcs 3 Building-level heat meter computer 1 pc 4 Distribution box 39 pcs 34

35 2.4.2 Heat Energy Measuring System Р AEECS Fig. 16 Heat energy measuring system Р AEECS В канале слаботочных сетей In duct of low-current networks; К вышележащим этажам To upper storeys; Квартира Apartment; До входа в техподполье в канале электропанели Before entrance to crawl space in electropanel duct; По техподполью в лотках слаботочных сетей Along crawl space in low-current network trays; К коробкам распределительным второй части блок-секции To distribution boxes of second part of section; Антенна - Antenna; Комплектный кабель complete cable; По разделу ЭО under section of electric equipment; Помещение товарищества собственников - Room of partnership of housing owners; ТСК - apartment heat meter computer ТСТУ - building-level heat meter computer КР-01 - switching box ШСУ - heat energy measuring system cabinet A package of the design documentation, including the System block diagram with the List of Main Equipment, schematic circuit diagram and electric equipment layout plans, equipment specifications, etc. is provided in Annex 2 to the Terms of Reference. 35

36 3. LOT 3. Project 120-Apartment 10-Storey Energy-Efficient Residential Building in Dzerzhinsky Str. in Grodno, Section Energy Efficiency 3.1 Building Heat Supply System with the Use of Heat Pump and Waste Water Heat Pre-commissioning works (thermal engineering, automation) on heat supply system of the building under construction need to be executed, including preparation of a complete package of the post-completion documentation required for the project commissioning and turning over of the building heat supply system with the use of a heat pump and waste water heat to the service providers. Fig. 17 Heat supply block diagram Подсистема - Subsystem; В систему отопления штатного ИТП To heating system of standard individual heat substation; Из системы отопления штатного ИТП From heating system of standard individual heat substation; В систему горячего водоснабжения штатного ИТП To hot water supply system of standard individual heat substation; Из водопровода From water pipeline 1 municipal sewer, 2 foundation energy piles, 3 - heat pump for foundation piles, 4 - lowtemperature circuit circulator pumps, 5 heat pumps for municipal sewer, 6 - buffer vessel, 7 - circulator pump of heat pump - heating system circuit, 8 - circulator pump of heat pump - hot water supply system circuit, 9 intermediate heat exchanger of heating system, 10 - intermediate heat exchanger of hot water supply system, 11 - heat exchanger of waste water heat recovery unit, 12 - buffer vessel, 13 - circulator pump of waste water heat recovery unit - heat exchanger of waste water heat recovery unit circuit, 14 - waste water heat recovery unit. 36

37 3.1.1 General Description of the Heat Supply System The system is intended for heating and hot water supply of the residential building under construction using the equipment for extracting the residential building grey water heat, equipment for extracting heat of municipal waste water and soil, vapor-compression heat pumps and a heating unit equipped with the devices for extracting heat from the CHP district heating network. According to the design documentation, the system comprises the following functionally integrated systems: Subsystem 1 sewer heat pump buffer vessel (see project Sections Р HS1, Р HS2, Р HSA (Annex 3 to the Terms of Reference)); Subsystem 2 energy piles heat pump buffer vessel (see project Sections Р HS1, Р ТС3, Р HSA (Annex 3 to the Terms of Reference)); Subsystem 3 buffer vessel building heating systems (see project Sections Р HS1, Р HSA (Annex 3 to the Terms of Reference)); Subsystem 4 buffer vessel building hot water supply systems (see project Sections Р HS1, Р HSA (Annex 3 to the Terms of Reference)); Subsystem 5 grey waste water heat recovery unit building hot water supply systems (see project Sections Р HS4, Р HSA (Annex 3 to the Terms of Reference)). 37

38 3.1.2 Subsystem 1. Block-Diagram of the Sewer Heat Pump Buffer Vessel Subsystem Manifold Fig. 18 Subsystem 1 1, 2 heat pump; 3 buffer vessel; 4, 5 expansion vessel; 6, 7 circulator pump; 8 ambient air temperature transducer; 9 heat-carrying medium temperature transducer in buffer vessel; 10 heat-carrying medium temperature transducers at heat exchanger inlets and outlets; -- instrumentation and shut-off valves 38

39 List of Main Equipment of Subsystem 1 Ser. Name and Specifications Type, brand Qty No. 1 Heat pump, Q=60.0 kw, G=6.5 m 3 /h 2 sets 2 Buffer vessel V pc 3 Circulator pump, G=10 m 3 /h. Н=7.0 m 2 pcs 4 Expansion vessel 2 pcs 5 Manometer See design and estimate documentation Design Indices of Subsystem 1 Index name Index value Note Heat pump, heat-carrying medium temperature: - evaporator circuit Tinlet, C - evaporator circuit Toutlet, C - condenser circuit Tinlet, C - condenser circuit Toutlet, C Evaporator circuit flow rate, m3/h 20 Condenser circuit flow rate, m3/h 13 Pressure in evaporator circuit, bar 2 Pressure in condenser circuit, bar 2 Indices are subject to updating during the system adjustment. 39

40 3.1.3 Subsystem 2. Block Diagram of the Manifold of Subsystem Energy Piles Heat Pump Buffer Vessel Fig. 19 Subsystem 2 1 heat pump; 2 buffer vessel; 3, 4 expansion vessel; 5 ambient air temperature transducer; 6 heat-carrying medium temperature transducer in buffer vessel; -- instrumentation and shut-off valves. List of Main Equipment of Subsystem 2 No. Name and Specifications Type, brand Qty 1 Heat pump, Q=16.0 kw 1 set 2 Buffer vessel V pc 3 Expansion vessel 2 pcs 4 Manometer See design and estimate documentation 40

41 Design Indices of Subsystem 2 Index name Index value Note Heat pump, heat-carrying medium temperature: - evaporator circuit Tinlet, C - evaporator circuit Toutlet, C - condenser circuit Tinlet, C - condenser circuit Toutlet, C Evaporator circuit flow rate, m3/h 1.7 Condenser circuit flow rate, m3/h 1.7 Pressure in evaporator circuit, bar 2 Pressure in condenser circuit, bar 2 Indices are subject to updating during the system adjustment. 41

42 3.1.4 Subsystem 3. Block-Diagram of the Buffer Vessel Building Heat Supply System Subsystem Manifold Fig. 20 Subsystem 3 1-buffer vessel; 2-plate-type heat exchanger СО; 3-circulator pump; 4-anbient air temperature transducer; 5-heat-carrying medium temperature transducer in buffer vessel; 6, 7-heat-carrying medium temperature transducers at heat exchanger inlets and outlets; heat meter set; -- instrumentation and shut-off valves. 42

43 List of Main Equipment of Subsystem 3 Ser. No. Name and Specifications Type, brand Qty 1 Plate double-pass heat exchanger, Q=80.0 kw 1 pc 2 Circulator pump, G=8.6 m3/h H=1.7m. 1 pc 3 Buffer vessel V pc 4 Microprocessor heat meter 1 set 5 Manometer See design and estimate documentation 6 CO system controller 1 set Design Indices of Subsystem 3 Index name Index value Note Heat exchanger intermediate heat-carrying medium water, heat-carrying medium temperature: -heating side Tinlet, C -heating side Toutlet, C -heated side Tinlet, C -heated side Toutlet, C Intermediate heat-carrying medium flow rate, m3/h 8.6 Intermediate heat-carrying medium circuit pressure, bar 2 Indices are subject to updating during the system adjustment. 43

44 3.1.5 Subsystem 4. Block-Diagram of the Buffer Vessel Building Hot Water Supply System Subsystem Manifold Fig. 21 Subsystem 4 1-buffer vessel; 2-plate-type heat exchanger ГВС; 3 circulator pump; 4 heat-carrying medium temperature transducer in buffer vessel; 5 heat-carrying medium temperature transducers at heat exchanger inlets and outlets; 6 heat meter set; 7 cold water meter; -- instrumentation and shut-off valves. 44

45 List of Main Equipment of Subsystem 4 Ser. No. Name and Specifications Type, brand Qty 1 Plate double-pass heat exchanger, Q=120.0 kw 1 pc 2 Circulator pump, G=12.9 m3/h H=2.5m. 1 pc 3 Buffer vessel V pc 4 Microprocessor heat meter 1 set 5 Manometer See design and estimate documentation 6 Hot water supply system controller 1 set Design Indices of Subsystem 4 Index name Index value Note Heat exchanger intermediate heat-carrying medium water, heat-carrying medium temperature: -heating side Tinlet, C -heating side Toutlet, C -heated side Tinlet, C -heated side Toutlet, C Intermediate heat-carrying medium flow rate, m3/h 12.9 Intermediate heat-carrying medium circuit pressure, bar 2 Indices are subject to updating during the system adjustment. 45

46 3.1.6 Subsystem 5. Block-Diagram of the Waste Water Heat Recovery Unit - Building Hot Water Supply System Subsystem Manifold Fig. 22 Subsystem 5 1-waste water heat recovery unit; 2-circulator pump; 3-expansion vessel; 4-buffer vessel; 5-plate-type heat exchanger; 6, 7- heat-carrying medium temperature transducers in waste water heat recovery unit; 8, 9, 10, 11- heat-carrying medium temperature transducers at heat exchanger inlets and outlets; 12- electric contact pressure gauge; 13, 14, 15- heat meter set; 46

47 List of Main Equipment of Subsystem 5 Ser. No. Name and Specifications Type, brand Qty 1 Three-way plate-type heat exchanger, Q= pc kw 2 Buffer vessel V-100, Ф400mm, Н-970mm 1 pc 3 Circulator pump, G=4.9 m3/h H=13m 1 pc N=440Вm 4 Expansion vessel 1 pc 5 Electric contact pressure gauge See design and estimate documentation 6 Microprocessor heat meter 1 set 7 Waste water heat recovery unit controller 1 set Design Indices of Subsystem 5 Index name Index value Note Heat exchanger waste water intermediate heat-carrying medium, heat-carrying medium temperature: -waste water Tinlet, C -waste water Toutlet, C -intermediate heat-carrying medium Tinlet, C -intermediate heat-carrying medium Toutlet, C Heat exchanger intermediate heat-carrying medium water, heat-carrying medium temperature: -heating side Tinlet, C -heating side Toutlet, C -heated side Tinlet, C -heated side Toutlet, C Intermediate heat-carrying medium flow rate, m3/h 4.9 Intermediate heat-carrying medium circuit pressure, bar 2 Indices are subject to updating during the system adjustment. 47

48 A package of the design documentation, including the System block diagram with the List of Main Equipment, heating equipment and pipelines layout plans, power supply scheme and power equipment layout plans, equipment specification etc. is provided in Annex 3 to the Terms of Reference. 3.2 Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery Pre-commissioning works on the ventilation system of the residential building under construction (hereinafter referred to as the System ) need to be executed, including preparation of a complete package of the post-completion documentation required for the project commissioning and turning over the building ventilation system with the use of supply and exhaust units with exhaust air heat recovery to the service providers General Description of the Ventilation System The system is intended to provide the specified indoor climate parameters and ventilation of residential and auxiliary premises. The design documentation for ventilation system with exhaust air heat recovery - see project Sections HV and A (Annex 3 to the Terms of Reference). 48

49 Fig. 23 Ventilation system block diagram Приточно-вытяжная шахта supply and exhaust shaft; Машинное помещение лифтов elevator motor room; холодный чердак unheated attic; приточно-вытяжная установка supply and exhaust unit; жилая комната living room; коридор corridor; кухня kitchen; ванная bathroom; санузел toilet facilities; лифтовая шахта elevator shaft; техподполье crawl space; электрощитовая switchboard room 49

50 List of Main Equipment Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery Ser. Name and Specifications Type, brand Qty No. 1 Rotary-type supply and exhaust heat recovery unit: REGO400VE 120 sets - nominal unit rated capacity300 m 3 /h - heat exchanger thermal efficiency, not less than 82% - fan head at capacity of 135 m 3 /h, not less than 120 Pa - heater capacity, not more than 0.5 kw - fan with EC drive capacity, not more than 2х70W - power supply 230 V/50Hz/1 phase 2 Axial-flow fan with automatic louvers: VENTS 120 pcs - voltage at 50Hz V - capacity, not more than 18 W - productivity, not less than 98 m 3 /h - pressure 35 Pa 100MA 3 Air flap with electric drive According to the design and estimate documentation 4 Pocket-type duct circular section filter According to the design and estimate documentation 5 Grease filter According to the design and estimate documentation 6 Noise suppressor According to the design and estimate documentation Design Indices Supply and Exhaust Ventilation System with Exhaust Air Heat Recovery Index name Index value Note Supply and exhaust units: - supply air temperature at unit outlet, Toutlet, C - air flow rate L, m 3 /h 18 According to the design and estimate documentation 50

51 Indices are subject to updating during the system adjustment within the limits of allowable standardized deviations. A package of the design documentation, including an axonometric diagram of the system with the List of Main Equipment, Plans, sectional arrangement of equipment, products and materials, equipment specifications, etc. is provided in Annex 3 to the Terms of Reference. 3.3 Engineering Equipment Dispatching System Pre-commissioning works on the dispatching system of the residential building under construction need to be executed, including preparation of a complete package of the postcompletion documentation required for the project commissioning and turning over of the building dispatching system to the service providers. 51

52 Fig. 24 Dispatching system block diagram Dispatching system block diagram; Section ; Dispatching system cabinet; Heat pump controller; Circulator pump controller of heat pump heating system circuit; Circulator pump controller of heat pump hot water supply circuit; Waste water heat recovery unit controller; Circulator pump with variable-frequency drive; Energy pile temperature recorder; Sewer temperature recorder; Heat energy measuring instrumentation; Electric energy measuring instrumentation; Booster pumping plant; Standby heat supply station controller; Photovoltaic station; Section; Apartment air change and heat supply controller 52

53 3.3.1 General Description of the Engineering Equipment Dispatching System The dispatching system is intended for the dispatch control of engineering systems of the residential building under construction to remotely read the equipment operating mode data, power consumption data during operation of the building from external networks and energy sources, and also internal sources located in the building. External sources include as follows: - heating network; - municipal electric power system. Internal sources include as follows: - waste water heat recovery unit; - heat pump operating based on the energy pile energy; - photovoltaic power supply system. The obtained data are used to further analyze and adjust the engineering systems operating modes. The dispatching system includes the data obtained from the apartment ventilation and heat supply system controllers. The design documentation for engineering equipment dispatching system see project Sections Р ADS1, Р ADS2 (Annex 3 to the Terms of Reference). List of Main Engineering Equipment Р ADS1 Ser. Name and Specifications Type, brand Qty No. 1 Dispatching system cabinet 1 set 2 Information screen 1 pc 3 Heat pump controller 2 pcs 4 Heating system controller 1 set 5 Waste water heat recovery unit controller 1 set 6 Photovoltaic station 1 set 7 Foundation pile temperature recorder 32 sets 8 Sewer temperature recorder 1 set 9 Boosting pumping plant recorder 1 set 10 Packaged heat supply station regulator 1 set 11 Heat meter computer 6 pcs 12 Electricity meter 4 pcs 13 Circulator pump 9 pcs 53

54 3.3.2 Engineering Equipment Dispatching System Р ADS1 Fig. 25 Block diagram of dispatching system Р ADS1 54

55 3.3.3 Engineering Equipment Dispatching System Р ADS2 Fig. 26 Dispatching system Р ADS2 ТР BRIZ regulator apartment terminal; КК switching box; ШСД dispatching system cabinet List of Main Engineering Equipment Р ADS2 Ser. Name and Specifications Type, brand Qty No. 1 BRIZ regulator apartment terminal 120 sets 2 Switching box 30 pcs 55

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE ELECTRONIC CONTROL

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE ELECTRONIC CONTROL MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE ELECTRONIC CONTROL PASSPORT OF ELECTRIC BOILER WITH THREE STAGE ELECTRONIC CONTROL ECOTERMAL MRT/MODULE-T 6, 8,

More information

Series VUT PW EC. wool internal heat and sound-insulating layer for VUT PE/PW 350, 600, 1000 units and 50 mm for VUT PE/PW 200, 3000 units.

Series VUT PW EC. wool internal heat and sound-insulating layer for VUT PE/PW 350, 600, 1000 units and 50 mm for VUT PE/PW 200, 3000 units. AIR HANDLING UNITS WITH HEAT RECOVERY Series VUT PE EC Series SAS908 control panel SAS908 control panel Ceiling mounted energy saving Air Handling Units (AHU) with the air capacity up to 4000 m 3 /h and

More information

Series VENTS VUT R WH ЕС

Series VENTS VUT R WH ЕС AIR HANDLING UNITS WITH HEAT RECOVERY Series VENTS EH ЕС Series VENTS WH ЕС Air handling units with the air capacity up to 1500 m 3 /h in soundand heat-insulated casing with integrated electric heater.

More information

VERSO Air Handling Units

VERSO Air Handling Units Energy efficient solutions for profitable indoor climate VERSO-S air supply units VERSO-R air handling units equipped with regeneration system VERSO-P air handling units equipped with recuperation system

More information

VERSO Air Handling Units

VERSO Air Handling Units VERSO Air Handling Units Energy efficient solutions for profitable indoor climate VERSO Air Handling Units VERSO-S air supply units VERSO-R air handling units equipped with regeneration system VERSO-P

More information

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE CONTROL

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE CONTROL MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE CONTROL PASSPORT OF ELECTRIC BOILER WITH THREE STAGE CONTROL ECOTERMAL MRT/MODULE-T 6, 8, 10, 12, 15, 18, 24, 30

More information

SPECIFICATION GUIDE FLEXAIR. Possibility to add auxiliary heaters: Gas, Electrical Heater, Hot Water Coil Possibility to add Heat Recovery Module

SPECIFICATION GUIDE FLEXAIR. Possibility to add auxiliary heaters: Gas, Electrical Heater, Hot Water Coil Possibility to add Heat Recovery Module SPECIFICATION GUIDE FLEXAIR Air-cooled packaged Rooftop unit Cooling only or Heat Pump Nominal cooling capacity: 85 to 234 kw Nominal heating capacity: 83 to 226 kw Possibility to add auxiliary heaters:

More information

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER WITH RELAY CONTROL

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER WITH RELAY CONTROL MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER WITH RELAY CONTROL PASSPORT OF ELECTRIC BOILER WITH RELAY CONTROL ECOTERMAL MR 6, 8, 10, 12, 15, 22, 30 kw MX 37, 45, 52, 60 KW MODULE

More information

According to the following European Regulations which come into force:

According to the following European Regulations which come into force: WHAT HAPPENS? From September 26th 2015, in order to be placed on the European market, all products and systems used for heating, production and storage of hot water must comply with the MINIMUM ENERGY

More information

Residential Heat Recovery Ventilation. REHVA European Guidebook No 25

Residential Heat Recovery Ventilation. REHVA European Guidebook No 25 Residential Heat Recovery Ventilation REHVA European Guidebook No 25 REHVA European Guidebook No 25 2 Limited to mechanical supply and exhaust ventilation Targeted to engineers, HVAC consultants and contractors

More information

USER'S MANUAL PS

USER'S MANUAL PS USER'S MANUA 067-0. PS ROOF FANS VENTS VKV \ VKH \ VKV EC \ VKH EC \ VKMK \ VKMKp \ VOK \ VOK SERIES VKV, VKH, VKV EC, VKH EC, VKMK, VKMKp, VOK, VOK CONTENT. Application р.. Delivery set р.. Designation

More information

Domestic & Commercial Fans

Domestic & Commercial Fans Max. airflow l/s Axial Fan Centrifugal Fan Speed Controllable Reversible Airflow Page Number BF IF CF CBF BF 64 * 16 IF 64 * 16 EAF LV 23 * 169 ECF LV 31 * 169 CF 25 * 170 CBF 31 * 170 RVF 0 * * 171 BRAVO

More information

i-chiller 181 to 210 kw ic770 to ic780 ABOUT THE i-chiller RANGE RELIABILITY: ENERGY & PROCESS EFFICIENCY: EASE OF OPERATION & MAINTENANCE:

i-chiller 181 to 210 kw ic770 to ic780 ABOUT THE i-chiller RANGE RELIABILITY: ENERGY & PROCESS EFFICIENCY: EASE OF OPERATION & MAINTENANCE: ABOUT THE i-chiller RANGE The fully packaged, EcoDesign compliant, air-cooled i-chiller range is designed specifically for reliable and efficient process cooling. The unique evaporator is immersed within

More information

Water chillers water/water type SIGMA Technical information manual

Water chillers water/water type SIGMA Technical information manual Water chillers water/water type SIGMA Technical information manual 2 INDEX Technical features 1 Versions 3 Accessory versions 4 Technical data 7 Electrical data 11 Cooling capacity 12 Heating capacity

More information

Prescriptive Requirement for Smoke Control

Prescriptive Requirement for Smoke Control HKIE CPD Training Course (II) 7July 2009 Organization by The Hong Kong Institution of Engineers Fire Division Co-organized by the Association of Registered Fire Services Installation contractors of Hong

More information

PROJECT MANUAL GUIDE SPECIFICATIONS FOR: PFANNENBERG SERIES CC COMPACT PACKAGED CHILLERS PART 1 GENERAL

PROJECT MANUAL GUIDE SPECIFICATIONS FOR: PFANNENBERG SERIES CC COMPACT PACKAGED CHILLERS PART 1 GENERAL PROJECT MANUAL GUIDE SPECIFICATIONS FOR: PFANNENBERG SERIES CC COMPACT PACKAGED CHILLERS PART 1 GENERAL 1.1 SUMMARY A. Packaged Chillers offer a self-contained means of producing cooling liquid primarily

More information

Mechanical System Description

Mechanical System Description 1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure

More information

Air handling unit. BlauAir RH USER S MANUAL

Air handling unit. BlauAir RH USER S MANUAL Air handling unit EN USER S MANUAL CONTENTS Safety requirements... 2 Purpose... 4 Delivery set... 4 Designation key... 4 Technical data... 5 Unit design and operation logic... 7 Installation and set-up...

More information

DOMEKT ReCU 400VE(W)CF-EC-C4 Series Air Handling Units Installation and Maintenance Service Manual

DOMEKT ReCU 400VE(W)CF-EC-C4 Series Air Handling Units Installation and Maintenance Service Manual DOMEKT ReCU 400VE(W)CF-EC-C4 Series Air Handling Units Installation and Maintenance Service Manual EN Content Safety Requirements...3 Transportation...3 Brief Description of the Unit...5 Installation...6

More information

CRIMSON & CRIMSON MAX

CRIMSON & CRIMSON MAX High efficiency water/water and geothermal heat pumps 5 114 General High efficiency water/water and geothermal heat pumps. Ideal for heating, cooling and production of domestic hotwater with total or partial

More information

SPECIFICATIONS FOR THE NF ELECTRICITE PEFORMANCE MARK N LCIE / C AUTONOMOUS STORAGE WATER HEATER WITH ELECTRICALLY DRIVEN COMPRESSOR

SPECIFICATIONS FOR THE NF ELECTRICITE PEFORMANCE MARK N LCIE / C AUTONOMOUS STORAGE WATER HEATER WITH ELECTRICALLY DRIVEN COMPRESSOR SPECIFICATIONS FOR THE NF ELECTRICITE PEFORMANCE MARK N LCIE 103-15 / C AUTONOMOUS STORAGE WATER HEATER WITH ELECTRICALLY DRIVEN COMPRESSOR Page 1 sur 16 CdC 103-15/C 2018_06 Contents 1 Scope 5 2 General

More information

Aquamatic Instantaneous DHW production unit with integrated storage tank

Aquamatic Instantaneous DHW production unit with integrated storage tank Aquamatic Instantaneous DHW production unit with integrated storage tank The Aquamatic is an innovative plug and play system, which unites both the functions of an inertial tank and an instantaneous DHW

More information

Installation and Service Manual

Installation and Service Manual Heat Pump Water Heater Installation and Service Manual Model HP200M2 HP250M2 HP250CM2 Please read this manual carefully prior to your use of this water heater. The appearance of the water heater given

More information

Systems engineering Slide 1

Systems engineering Slide 1 Slide 1 Overview / Calculation energy flow control / emission distribution building energy use (conditioning boundary) storage generation balance boundary primary energy delivered energy (building boundary)

More information

DOMEKT ReGO 400VE(W)-B Series Air Handling Units Installation and Maintenance Service Manual

DOMEKT ReGO 400VE(W)-B Series Air Handling Units Installation and Maintenance Service Manual DOMEKT ReGO 400VE(W)-B Series Air Handling Units EN Content Safety Requirements...3 Transportation...3 Brief Description of the Unit...5 Installation...6 Maintenance...11 Technical Information......13

More information

COMMERCIAL SOLAR SOLUTIONS

COMMERCIAL SOLAR SOLUTIONS Worldwide experience Biggest range of options Total package solutions 52 Commercial Solar NPT200 collectors provide hot water to Urbanest Student Accommodation Cleveland Street, Redfern NSW COMMERCIAL

More information

LZT High efficiency air to water heat pumps with E.V.I. compressors

LZT High efficiency air to water heat pumps with E.V.I. compressors High efficiency air to water heat pumps with E.V.I. compressors -20 C +43 C +65 C E.V.I. C.O.P. 4,1 The series of high efficiency heat pumps has been specifically designed for use with radiant floor heating

More information

for a considerable reduction of the supply air temperature which, in turn, reduces the air conditioning

for a considerable reduction of the supply air temperature which, in turn, reduces the air conditioning AIR HANDLING UNITS WITH HEAT RECOVERY Series VENTS enthalpy membrane in the warm season. This allows for a considerable reduction of the supply air temperature and humidity which, in turn, reduces the

More information

PRODUCT DATA COMPACT P - SERIES BY NILAN. Sanitary hot water production. Heating. Ventilation < 300 m 3 /h. Passive heat recovery.

PRODUCT DATA COMPACT P - SERIES BY NILAN. Sanitary hot water production. Heating. Ventilation < 300 m 3 /h. Passive heat recovery. PRODUCT DATA COMPACT P - SERIES BY NILAN Domestic Passive heat recovery Active heat recovery Ventilation < 300 m 3 /h Comfort heating Comfort cooling Sanitary hot water production Heating THE VENTILATION

More information

VENTS VUT R TN H ЕС VENTS VUT R TN EH ЕС

VENTS VUT R TN H ЕС VENTS VUT R TN EH ЕС HEAT RECOVERY AIR HANDLING UNITS Series VUT R TN H ЕС VUT R TN EH ЕС HEAT-RECOVERY VENTILATION Two-Stage Energy Saving System: HEATING COOLING Stage 1: Heat energy recovery by means of the rotary heat

More information

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may

More information

CZT CZT. High efficiency air to water heat pumps with E.V.I. compressors E.V.I. HP OTHER VERSIONS ACCESSORIES

CZT CZT. High efficiency air to water heat pumps with E.V.I. compressors E.V.I. HP OTHER VERSIONS ACCESSORIES High efficiency air to water heat pumps with E.V.I. compressors infolinia: +48 691 262 691-15 C +63 C +43 C E.V.I. HP The series of high efficiency heat pumps has been specifically designed for use with

More information

Both regulations are due to be reviewed by Key topics to be assessed during the reviews include:

Both regulations are due to be reviewed by Key topics to be assessed during the reviews include: 1 1 Contents 1 INTRODUCTION... 3 2 SCOPE... 4 2.1 Types of domestic cooking appliances not covered by the Regulations... 4 2.1.1 Ovens without adjustable temperature... 4 2.1.2 Combined heat storage cookers

More information

AIR CONDITIONING UNIT WITH AN INTEGRATED HEAT PUMP

AIR CONDITIONING UNIT WITH AN INTEGRATED HEAT PUMP AIR CONDITIONING UNIT WITH AN INTEGRATED HEAT PUMP 2 AIR CONDITIONING UNIT WITH AN INTEGRATED HEAT PUMP Description of the Unit: The air conditioning unit with an integrated reversible heat pump is a variant

More information

Before proceeding with the selection process, let s briefly look at the various explosion protection options:

Before proceeding with the selection process, let s briefly look at the various explosion protection options: Explosion Protection System Selection Guide By Emre Ergun, MS, MBA New Product Development Manager, FENWAL Explosion Protection Systems A UTC Fire & Security Company 400 Main Street, Ashland MA 01721 Tel:

More information

DESIGN, OPERATION & MAINTENANCE MANUAL

DESIGN, OPERATION & MAINTENANCE MANUAL Powder fire extinguishing module MPFE(b)-15-I-GE-UZ TU 4854-002-73334499-2004 15И DESIGN, OPERATION & MAINTENANCE MANUAL Buran-15I MPFE(b)-15.00.00.000RE 1. DESIGNATION 1.1. Powder extinguishing module

More information

USER S MANUAL. Centrifugal inline fan. VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125. VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315

USER S MANUAL. Centrifugal inline fan. VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125. VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315 USER S MANUAL VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125 VKMz 150 VKMz 160 VKMz 200 Q VKMz 200 VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315 Centrifugal inline fan VKMz CONTENTS Contents... 2 Safety requirements...

More information

Building services installation. Sustainable retrofitting of buildings- Sub module 3

Building services installation. Sustainable retrofitting of buildings- Sub module 3 Building services installation Sustainable retrofitting of buildings- Sub module 3 District heating Towards lower temperature on primary side New demands to secondary side Prerequisits Low flow temperature

More information

panel filters with filtering class G4. Supply filter F7 can be supplied with the few models.

panel filters with filtering class G4. Supply filter F7 can be supplied with the few models. AIR HANDLING UNITS WITH HEAT RECOVERY Series Series VUT 350 PE EC VUT 600 PE EC VUT 1000 PE EC VUT 2000 PE EC VUT 3000 PE EC VUT 600 PW EC VUT 1000 PW EC VUT 2000 PW EC VUT 3000 PW EC Ceiling mounted air

More information

GPE Kc UNITS FOR 4-PIPE SYSTEMS WITH SCROLL COMPRESSORS. COOLING CAPACITY FROM 77 TO 426 kw - 2 COOLING CIRCUITS. GPE 802 Kc + CF + GP + MV + P1

GPE Kc UNITS FOR 4-PIPE SYSTEMS WITH SCROLL COMPRESSORS. COOLING CAPACITY FROM 77 TO 426 kw - 2 COOLING CIRCUITS. GPE 802 Kc + CF + GP + MV + P1 UNITS FOR 4-PIPE SYSTEMS WITH SCROLL COMPRESSORS COOLING CAPACITY FROM 77 TO 426 kw - 2 COOLING CIRCUITS GPE 802 Kc + CF + GP + MV + P1 130 Above picture is only indicative and is not binding. AIR R-410A

More information

AIR COOLED CHILLERS WITH SCROLL COMPRESSORS AND CENTRIFUGAL FANS

AIR COOLED CHILLERS WITH SCROLL COMPRESSORS AND CENTRIFUGAL FANS RAE 201 C K RAE 482 C K AIR R-407C Series RAE... C K from 19 to 83 kw - 1 and 2 circuits The air cooled chillers of RAE... C K series, with centrifugal fans, are designed for indoor installation and are

More information

Epsilon Echos kw. General information Air-Water unit with scroll compressors driven by DC inverter. Unique selling points

Epsilon Echos kw. General information Air-Water unit with scroll compressors driven by DC inverter. Unique selling points Epsilon Echos+ 5 38 kw General information Air-Water unit with scroll compressors driven by DC inverter Configuration /LN: Low noise unit /HP: Reversible heat pump /LE /HP: Reversible condensing unit Unique

More information

39HX. High-efficiency dual-flow air handling unit PRODUCT SELECTION DATA. Plug & play unit (built-in control) Class A+ across entire range

39HX. High-efficiency dual-flow air handling unit PRODUCT SELECTION DATA. Plug & play unit (built-in control) Class A+ across entire range PRODUCT SELECTION DATA Plug & play unit (built-in control) Class A+ across entire range Classic/Vertical/ceiling-mounted dualflow units High-efficiency heat recovery unit High performance plug fan High-efficiency

More information

Performance of Heat Recovery Ventilation System with Ground Source Brine Heat Exchanger Pre- Heating System in the Context of nzeb

Performance of Heat Recovery Ventilation System with Ground Source Brine Heat Exchanger Pre- Heating System in the Context of nzeb Performance of Heat Recovery Ventilation System with Ground Source Brine Heat Exchanger Pre- Heating System in the Context of nzeb Kalle Kuusk 1, Jaanus Hallik 2, Targo Kalamees 3, Tõnu Mauring 4, 1,3

More information

NES. What s New June Contents: Detailed Technical guidance. Work section updates. (key points)

NES. What s New June Contents: Detailed Technical guidance. Work section updates. (key points) Contents: Section 1. Section 2. Section 3. Section 4 SUMMARY DETAIL OF WORK SECTION UPDATES & AUDITS SCHEDULES DETAIL CHANGES TO REFERENCE DOCUMENTS A full record of the content revisions can be obtained

More information

precision controlled industrial process chillers cooling capacity: ,255,668 BTU /hr ( tons) improved productivity & reduced costs

precision controlled industrial process chillers cooling capacity: ,255,668 BTU /hr ( tons) improved productivity & reduced costs next generation C precision controlled industrial process chillers cooling capacity: 6824 -,255,668 BTU /hr (0.6-04.6 tons) cooling capacity: 6,824 -,254,303 BTU/hr (0.6-04.5 tons) precision controlled

More information

AXIAL FANS USER S MANUAL

AXIAL FANS USER S MANUAL AXIAL FANS USER S MANUAL WARNING! Disconnect the fan from power supply prior to any connection, servicing and repair operations. Only duly qualified electricians with valid electrical permit for electric

More information

Installation Manual. Instrucciones de instalación y manual de usuario 1

Installation Manual. Instrucciones de instalación y manual de usuario 1 Installation Manual Instrucciones de instalación y manual de usuario 1 Installation instructions and user manual V8 2 INDEX 1 GENERAL SAFETY WARNINGS... 4 2 OPERATING PRINCIPLE... 5 3 TECHNICAL FEATURES...

More information

60Hz. R134a HXWC SERIES. 205 to 560 Tons. Products That Perform...By People Who Care WATER-COOLED SEMI-HERMETIC SCREW COMPRESSOR WATER CHILLERS

60Hz. R134a HXWC SERIES. 205 to 560 Tons. Products That Perform...By People Who Care WATER-COOLED SEMI-HERMETIC SCREW COMPRESSOR WATER CHILLERS R Products That Perform...By People Who Care FORM NO: MS0455A WATER-COOLED SEMI-HERMETIC SCREW COMPRESSOR WATER CHILLERS R134a HXWC SERIES 205 to 560 Tons 60Hz INTRODUCTION Dunham-Bush's HXWC water cooled

More information

Extended Range. PRESFIX Packaged Pressurisation Sets AUTOMATIC MAKE-UP UNITS FOR SEALED HEATING AND CHILLED WATER SYSTEMS.

Extended Range. PRESFIX Packaged Pressurisation Sets AUTOMATIC MAKE-UP UNITS FOR SEALED HEATING AND CHILLED WATER SYSTEMS. Extended Range PRESFIX Packaged Pressurisation Sets AUTOMATIC MAKE-UP UNITS FOR SEALED HEATING AND CHILLED WATER SYSTEMS. 2 Presfix Beta MK 2 microprocessor single & twin pump unit Heating system Chilled

More information

AIR COOLED CHILLERS WITH SCROLL COMPRESSORS AND CENTRIFUGAL FANS

AIR COOLED CHILLERS WITH SCROLL COMPRESSORS AND CENTRIFUGAL FANS RAE 1402 C O K AIR R-407C Series RAE... C K Cooling capacity from 81 to 250 kw - 2 circuits The air cooled chillers of RAE C K series, with centrifugal fans, are designed for indoor installation and are

More information

panel filters with filtering class G4. Supply filter F7 can be supplied with the few models.

panel filters with filtering class G4. Supply filter F7 can be supplied with the few models. AIR HANDLING UNITS WITH HEAT RECOVERY Series Series VUT 350 PE EC VUT 600 PE EC VUT 1000 PE EC VUT 2000 PE EC VUT 3000 PE EC VUT 600 PW EC VUT 1000 PW EC VUT 2000 PW EC VUT 3000 PW EC Ceiling mounted air

More information

ESTEEM AUTOCLAVE SLIDING SINGLE DOOR:-

ESTEEM AUTOCLAVE SLIDING SINGLE DOOR:- ESTEEM AUTOCLAVE SLIDING SINGLE DOOR ESTEEM AUTOCLAVE SLIDING SINGLE DOOR:- ESTA-108A For Sterilization of glass wares / containers, vessels, linen, rubber articles culture media etc. Sliding doors with

More information

Energy saving ventilation Air handling units (Catalogue no. 2) Industrial and commercial ventilation. (Catalogue no. 1)

Energy saving ventilation Air handling units (Catalogue no. 2) Industrial and commercial ventilation. (Catalogue no. 1) c a i r c im M Si l g n e r m o o ai a h r r ving i a a ze h s gy s t si e Fr e r p a c En m Co a r th i y w r t s ov e i un rec g t n li ea d n h in t e til oun a rs m ise e V sy no Ea w Lo g Industrial

More information

PHRIE / PHIE InvERTER monoblock air To water HEaT PumP medium TEmPERaTuRE

PHRIE / PHIE InvERTER monoblock air To water HEaT PumP medium TEmPERaTuRE TEcHnIcal InsTRucTIons PHRIE / PHIE InvERTER monoblock air To water HEaT PumP medium TEmPERaTuRE PHRIE 095 PHRIE 1 PHIE 095 PHIE 1 PHRIE 155 PHRIE 157 PHRIE 175 PHRIE 177 PHRIE 195 PHRIE 197 PHRIE 7 PHRIE

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

Ingersoll Rand kw Single Stage Contact-cooled rotary screw air compressors

Ingersoll Rand kw Single Stage Contact-cooled rotary screw air compressors Ingersoll Rand 37-75 kw Single Stage Contact-cooled rotary screw air compressors Reliability and Energy Efficiency at Your Fingertips Ingersoll Rand Competing in today s business environment requires manufacturers

More information

AHRI Certification Program Scopes - COOLING

AHRI Certification Program Scopes - COOLING Air-to-Air Energy Recovery Ventilators (AHRI Std. 1060) Automatic Commercial Ice-Cube Machines and Ice Storage Bins (AHRI Stds. 810 & 820) Central Station Air-Handling Units (AHRI Std. 430) Commercial

More information

CHG AIR COOLED WATER CHILLER WITH CONDENSATION BY HELICOIDAL AIR 8 to 17 kw

CHG AIR COOLED WATER CHILLER WITH CONDENSATION BY HELICOIDAL AIR 8 to 17 kw TECHNICAL INSTRUCTIONS CHG AIR COOLED WATER CHILLER WITH CONDENSATION BY HELICOIDAL AIR 8 to 17 kw CHG 1 CHG 1 8. kw. kw.7 kw 1. kw April 7 19 - GB - 2 MARKING This product marked conforms to the essential

More information

2x58 MW Coal Fired Power Plant at Mauritius

2x58 MW Coal Fired Power Plant at Mauritius 2x58 MW Coal Fired Power Plant at Mauritius The coal-fired power plant produces electricity by the burning of coal and air in a Circulating Fluidized Bed Combustion Boiler (CFBC), where it heats water

More information

RSES Technical Institute Training Manual 3 72 hours, 72 NATE CEHs, 7.2 CEUs

RSES Technical Institute Training Manual 3 72 hours, 72 NATE CEHs, 7.2 CEUs Lesson 1 - Basic Heat Pump Theory (Part 1) Describe the basic operation of a heat pump. Explain the function of various heat pump controls. Interpret the wiring diagrams and performance data provided by

More information

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces

More information

Cultivator & Hybrid Cultivator

Cultivator & Hybrid Cultivator Cultivator & Hybrid Cultivator Precision Temperature & Humidity Packaged Unit INTRODUCTION The Cultivator Series package unit is the industry s MOST ENERGY EFFICIENT and HIGHEST capacity dehumidifier on

More information

SINGLE-ROOM REVERSIBLE UNIT WITH HEAT AND HUMIDITY RECOVERY VENTO V50-1 OPERATION MANUAL

SINGLE-ROOM REVERSIBLE UNIT WITH HEAT AND HUMIDITY RECOVERY VENTO V50-1 OPERATION MANUAL SINGLE-ROOM REVERSIBLE UNIT WITH HEAT AND HUMIDITY RECOVERY VENTO V50-1 EN OPERATION MANUAL CONTENTS Introduction 3 General 3 Safety rules 3 Transportation and storage rules 3 Manufacturer's warranty 3

More information

ErP. ErP READY. The Eco-Design Directive ErP for refrigerator systems and heat pumps. READY

ErP. ErP READY. The Eco-Design Directive ErP for refrigerator systems and heat pumps. READY ErP READY The Eco-Design Directive ErP for refrigerator systems and heat pumps. The EU-Regulation 2281/2016/EU defines the new requirements for refrigerator systems and heat pumps and focuses on the new

More information

VERSO-P, VERSO-R Series Air Handling Units with C3 Control System Electrical Installation and Operation Manual

VERSO-P, VERSO-R Series Air Handling Units with C3 Control System Electrical Installation and Operation Manual VERSO-P, VERSO-R Series Air Handling Units with C3 Control System Electrical Installation and Operation Manual EN Table of Contents 1. INSTALLATION MANUAL...3 1.1. Air Handling Units Sections Connection...3

More information

Solar Heat Pumps Domestic Range

Solar Heat Pumps Domestic Range Solar Heat Pumps Domestic Range Who are Quantum? Quantum are the experts in Heat Pump Water Heating technology. Since 1977 we have been developing our patented technology, our products have been tried

More information

High temperature air-to-water heat pumps

High temperature air-to-water heat pumps Designed to replace conventional boilers and produce domestic hot water 4 High temperature hot water (+65 C) 4 Winter operation (-20 C) 4 High energy efficiency (CP) 4 Compact and quiet 4 Scroll compressors

More information

Page 2 of 16. DOMEKT price-list PRICE-LIST Prices in POUND STERLING excluding VAT. Prices are valid for year 2018.

Page 2 of 16. DOMEKT price-list PRICE-LIST Prices in POUND STERLING excluding VAT. Prices are valid for year 2018. Domekt Units PRICE GUIDE 2018 price-list 2018 PRICE-LIST air handling units are designed for the ventilation of residential premise. series offers the standardized range of air handling units with heat

More information

BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS

BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used by

More information

NEW CHILLER SCHEDULE

NEW CHILLER SCHEDULE TITLE: REPLACE CHILLER MACC MAXIMO # 4542690 PROJECT # 14M108CN MACC # 14-0459 ATTACHMENTS: 1. MAXIMO Equipment update form SCOPE OF WORK: The contractor shall provide all material, labor, equipment, and

More information

Laboratory exercise 3: Condensing water heater

Laboratory exercise 3: Condensing water heater Chapter 1 Laboratory exercise 3: Condensing water heater The laboratory exercise Condensing water heater is placed on the Faculty of Mechanical Engineering in the Laboratory for Water and Turbine Machinery.

More information

AIR COOLED FREE-COOLING CHILLERS WITH SCROLL COMPRESSORS AND AXIAL FANS

AIR COOLED FREE-COOLING CHILLERS WITH SCROLL COMPRESSORS AND AXIAL FANS RAE 1352 F.K + MV AIR R-407C FC Series RAE... F.K Cooling capacity from 77 to 289 kw - 2 circuits The air cooled chillers of RAE... F.K series, are designed for outdoor installation and are particularly

More information

48 50 UH UA PACKAGED ROOFTOP

48 50 UH UA PACKAGED ROOFTOP 48 50 UH UA PACKAGED ROOFTOP SPARE PARTS GENERAL VIEW FIGURE.1 50 UH-UA 045 FIGURE.2 48-50 UH 045 1 Suction and discharge line piping 2 Liquid line piping 3 Heaters 4 Outdoor fan assembly 5 Indoor fan

More information

Building & Safety PERMIT APPLICATION

Building & Safety PERMIT APPLICATION (661) 255-4935 PERMIT APPLICATION 1 Project Location Please complete all applicable fields. Optional fields are surrounded by dashes --------. Address: Assessor s Parcel No. (APN): Street Number Street

More information

york airside products Tailored air conditioning solutions Introducing the YORK YPRE range of custom air-to-air packaged roof top units

york airside products Tailored air conditioning solutions Introducing the YORK YPRE range of custom air-to-air packaged roof top units york airside products Tailored air conditioning solutions Introducing the YORK YPRE range of custom air-to-air packaged roof top units YORK YPRE RTR/RTP SERIES Air to air packaged rooftop units Cooling

More information

Outline principle. Application Houses with water-borne heating systems. Alternative Select the desired configuration by highlighting the boxes below.

Outline principle. Application Houses with water-borne heating systems. Alternative Select the desired configuration by highlighting the boxes below. Outline principle Application Houses with water-borne heating systems. Alternative Select the desired configuration by highlighting the boxes below. NOTE! This is an outline diagram. Actual installation

More information

Refrigeration Training System

Refrigeration Training System 3401-20 Refrigeration Training System LabVolt Series Datasheet Festo Didactic en 120 V - 60 Hz 04/2018 Table of Contents General Description 2 Topic Coverage 2 Features & Benefits 2 List of Manuals 3 Table

More information

QAF63.2 QAF63.6. Frost sensors for use on the air side. Building Technologies HVAC Products

QAF63.2 QAF63.6. Frost sensors for use on the air side. Building Technologies HVAC Products 1 821 1821P01 Frost sensors for use on the air side Active capillary tube sensor for measuring the lowest temperature within a range of 0 15 C Operating voltage AC 24 V Signal output DC 0...10 V Use On

More information

COMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply:

COMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply: Planning/Building Department 115 Ramsdell Street Fircrest WA 98466 (253) 564-8902 COMMERCIAL PERMIT APPLICATION AND CHECKLIST Depending on the scope of your project, the following submittal requirements

More information

Packaged air cooled liquid chillers for outdoor installation kw. technicalcatalogue T_EGL_1012_GB

Packaged air cooled liquid chillers for outdoor installation kw. technicalcatalogue T_EGL_1012_GB Packaged air cooled liquid chillers for outdoor installation 42 574 kw technicalcatalogue T_EGL_1012_GB INDEX EUROVENT CERTIFICATION... 3 GENERAL CHARACTERISTICS... 3 SERIES IDENTIFICATION... 3 MODEL IDENTIFICATION...

More information

VERSO DOMEKT. Residential ventilation units m³/h. Non residential ventilation units m³/h

VERSO DOMEKT. Residential ventilation units m³/h. Non residential ventilation units m³/h VENTILATION equipment VENTILATION equipment content DOMEKT Residential ventilation units 50 1 000 m³/h 15 VERSO Non residential ventilation units 1000 34 000 m³/h 61 Domekt R 17 Domekt R 200 V 19 Domekt

More information

ENTROPIE boiler TT300

ENTROPIE boiler TT300 ENTROPIE boiler TT300 20 60 MW 160 о С 16 bar Сontents Field application TT300 boilers... 82 Operation of ENTROPIE boiler TT300... 82 Boiler diagram...... 83 Diagram of boiler TT300... 84 Technical characteristics...

More information

TopVent Design Handbook

TopVent Design Handbook TopVent Design Handbook Recirculation Units and Supply Air Units for Heating and Cooling High Spaces TopVent Content TopVent DHV Recirculation unit for heating high spaces TopVent NHV Recirculation unit

More information

Heat Recovery Air Handling Units

Heat Recovery Air Handling Units Heat Recovery ir Handling Units OMEKT Heat recovery air handling Units OMEKT 1 KOMFOVENT OMEKT ir Handling Units Komfovent ir Handling units are made to create healthy indoor climate and ensure efficient

More information

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve Connection and energy management compact unit 2850 series ACCREDITED CALEFFI 01259/14 GB ISO 9001 FM 21654 ISO 9001 No. 0003 Function The connection and energy management compact unit enables combining

More information

Technical description

Technical description Rail profile grinding machine NRG Technical description Nencki Ltd Railway Technology Gaswerkstrasse 27 4901 Langenthal Switzerland Tel. +41 62 919 93 93 Fax +41 62 919 93 90 railway@nencki.ch www.nencki.ch

More information

HOT WATER SYSTEMS.

HOT WATER SYSTEMS. HOT WATER SYSTEMS www.thermann.com.au GAS STORAGE HOT WATER SYSTEM The Thermann 4* Gas hot water heater can suit any family type. With an adjustable thermostat for safety and efficiency it allows you to

More information

APPLICATION BROCHURE Chillers and Heat Pumps Hydraulics Manual. Suggestions for the hydraulic integration of chillers and heat pumps

APPLICATION BROCHURE Chillers and Heat Pumps Hydraulics Manual. Suggestions for the hydraulic integration of chillers and heat pumps APPLICATION BROCHURE Chillers and Heat Pumps Hydraulics Manual Suggestions for the hydraulic integration of chillers and heat pumps Table of Contents From practical experience, for your practical needs...

More information

SMART. 4,9 49,5 kw. Air cooled liquid chillers and heat pumps equipped with scroll compressor and axial fans T_SMT_0609_GB

SMART. 4,9 49,5 kw. Air cooled liquid chillers and heat pumps equipped with scroll compressor and axial fans T_SMT_0609_GB T_SMT_0609_GB 4,9 49,5 kw Air cooled liquid chillers and heat pumps equipped with scroll compressor and axial fans INDEX SERIES IDENTIFICATION... 3 MODEL IDENTIFICATION... 3 CE CONFORMITY... 3 WORKING

More information

Kälte Klima. Air cooled water chillers air cooled reversible heat pumps from 45 kw to 320 KW. Compressors Scroll SCAEY DE 88 04/11 12/10

Kälte Klima. Air cooled water chillers air cooled reversible heat pumps from 45 kw to 320 KW. Compressors Scroll SCAEY DE 88 04/11 12/10 Air cooled water chillers air cooled reversible heat pumps from 45 kw to 320 KW Compressors Scroll Serie: Series: Emissione: Issue: SCAEY Catalogo: Leaflet: Sostituisce: Supersedes: DE 88 04/11 12/10 Index

More information

AIR COOLED CHILLERS FOR OUTDOOR INSTALLATION WITH INTEGRATED FREE COOLING MULTISCROLL SERIES

AIR COOLED CHILLERS FOR OUTDOOR INSTALLATION WITH INTEGRATED FREE COOLING MULTISCROLL SERIES AIR COOLED CHILLERS FOR OUTDOOR INSTALLATION WITH INTEGRATED FREE COOLING MULTISCROLL SERIES COOLING CAPACITY FROM 76 TO 612 Kw 1 AND 2 COOLING CIRCUITS RAE 1702 F Kc + P2 28 Above picture is only indicative

More information

CIRCO 6 Solar Circulation Unit

CIRCO 6 Solar Circulation Unit TECHNICAL INFORMATION / INSTALLATION INSTRUCTIONS CIRCO Solar Circulation Unit CIRCO Solar Circulation Unit in combination with the intelligent SUNGO controllers, it is the safe and reliable heart of a

More information

OPTIMISE VACUUM TO IMPROVE PLANT PERFORMNCE

OPTIMISE VACUUM TO IMPROVE PLANT PERFORMNCE OPTIMISE VACUUM TO IMPROVE PLANT PERFORMNCE Vacuum Pumps and systems are widely used in the chemical process industry for various applications such as drying, solvent recovery, distillation, short path

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

FUME EXTRACT STRATEGY STATEMENT

FUME EXTRACT STRATEGY STATEMENT FUME EXTRACT STRATEGY STATEMENT : New Islington Free School No: 7/4781 The site is located in central Manchester on an area of disused land adjacent to the Rochdale canal. The site forms a roughly rectangular

More information

> > > Heat pump systems. Water Chillers. Dehumidifiers

> > > Heat pump systems. Water Chillers. Dehumidifiers > > > Heat pump systems Water Chillers Dehumidifiers Company Profile What is a heat pump? A heat pump is a device that moves heat from one location (called the source ) to another location (called the

More information

РУКОВОДСТВО USER ПО MANUAL ЭКСПЛУАТАЦИИ CENTRIFUGAL INLINE FANS VKM / VKMZ / VC SERIES

РУКОВОДСТВО USER ПО MANUAL ЭКСПЛУАТАЦИИ CENTRIFUGAL INLINE FANS VKM / VKMZ / VC SERIES РУКОВОДСТВО USER ПО MANUAL ЭКСПЛУАТАЦИИ CENTRIFUGAL INLINE FANS / Z / VC SERIES 2 / z / VC CONTENT Use Delivery set Structural designation key Main technical data Safety requirements Fan design Connection

More information

AQUACIAT. Water chillers. Free cooling modules for AQUACIAT2 700V to 1100V AQUACIAT POWER 1200V to 1800V USE RANGE FREE COOLING

AQUACIAT. Water chillers. Free cooling modules for AQUACIAT2 700V to 1100V AQUACIAT POWER 1200V to 1800V USE RANGE FREE COOLING Free cooling modules for 2 700V to 1100V POWER 1200V to 1800V Cooling capacity: 185 to 485 kw Cooling only Hydraulic module Free cooling ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY L'ENVIRONNEMENT

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20 INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8