1 ECG ENGINEERING, P.C. Inspection Report #3 ECG 2685 Wappingers Central School District Energy Performance Contract Inspection Dates: Inspector: 01/25/ :30am 1:00pm 01/29/2013 7:00am 9:00am Harold R. Friedman Met with Craig Rebecca of Ameresco at the Facilties & Operations Office located on the Roy C. Ketcham Senior High School Campus, and proceeded to review work performed on various energy conservation measures within the following buildings. This inspection occurred after our scheduled project meeting with Ron Broas, Director of Facilities & Operations of the Wappingers Central School District in which we discussed current status of project and any outstanding issues: Fishkill Elementary School ECM-4 Integrated and New Energy Management System During this inspection, work was estimated to be 50% complete within building. Installation of necessary wiring, conduit, raceways and relays were observed in progress. All work within project design specifications. Reference pictures as appropriate. ECM-7 Infiltration Reductions Work was reportedly 50% complete. Work was inspected and verified. It was observed due to each existing door structure conditions multiple weather stripping materials were installed. Reference pictures as appropriate. All work within project design specifications. ECM 14 Boiler Replacements At the time of this inspection it was observed that two (2) field erected Smith 28HE Series High Efficiency Steam Boilers were installed and set in place on new reinforced concrete housekeeping pads with a Power Flame dual fuel burner, Model C2-GO-20B with remote fuel oil pump connected to each boiler respectively. Integral to the steam system providing heat to the building is the installation of boiler feed tank with three (3) ½ HP centrifugal pumps, and condensate tank with two (2) ½ HP condensate pumps including all appurtenances. Boiler venting was reconnected to existing at points indicated as per the SED approved design (Refer to photos). The insulation of the piping system was currently in progress. During this inspection the steam boilers were operational, but currently not controlled through the building management system. The contractor also provided a separate electrical panel dedicated to all boiler related equipment (burners, remote fuel oil pump, existing duplex fuel oil pump, boiler feed, vacuum, and condensate pumps). The contractor also provided labeling of all electrical conduit runs from the boiler burners back to the dedicated electrical panel to assist in future service as necessary. Proper hangers and supports were installed, and the contractor stated that upon completion of all boiler work all ceiling penetrations where pipe hanger rods were mounted, the ceiling shall be repaired. The steam boilers have been commissioned with training remaining to be administered to the appropriate District s personnel.

2 Field erected Smith 28HE Series High Efficiency Boilers Power Flame dual fuel burner, Model C2-GO-20B with remote fuel oil pump

3 Emergency boiler water feeder and low water cut-off to blow down funnel and piped to the nearest floor drain. Installation of Siemen s Ventless Gas Train ready to be connected to burner.

4 Stainless steel boiler flue vent piping for each boiler with insulation of all steam piping currently in progress Stainless steel boiler flue vent piping reconnected to existing stainless steel chimney flue up through ceiling of boiler room.

5 Stainless steel flue vent piping from Boiler B-1 reconnect to existing brick chimney inside boiler room. Single pipe roll with threaded steel hanger rods mounted to the ceiling of the boiler room to support the steam pipe header above new boilers

6 New Shipco Boiler Feed Tank with three (3) ½ HP centrifugal pumps. New Shipco Condensate Tank with two (2) ½ HP centrifugal pumps located in boiler pit.

7 Existing duplex fuel oil pumps with electrical connection to new dedicated electrical panel. New dedicated Boiler Sub-Panel which currently provides power for Boiler No. 1 & No. 2, Oil Feed Control Panel, Water Feed Control Panel, and the Condensate Pumps

8 Re-piping of the existing domestic hot water heater Culligan Pre-Treatment system. Combustion air dampers manually opened during operation of Boilers. Electronic Actuation of combustion air dampers remains to be installed.

9 Exterior Combustion Air Louvers with manually opened dampers and sheet metal blank off of bottom half of louvers during boiler operations. Existing combustion air louver blanked off with sheet metal and placed by the contractor as inactive in lieu of the new combustion air louver/ dampers.

10 Existing combustion air louver blanked off with sheet metal and placed by the contractor as inactive in lieu of the new combustion air louver/ dampers. Installation of new RPZ valve with air gap temporarily piped with PVC piping to outside of building with hard piping of drain to remain to be completed.

11 Installation of new mushroom type emergency boiler shut down break glass station on inside wall of Boiler Room at the exterior means of egress. John Jay High School ECM 14 Boiler Replacements At the time of this inspection it was observed that two (2) Unilux Bent Water Tube Boilers, Model No. ZF 1200LS-FE3 was installed and set in place on new reinforced concrete housekeeping pads with a Power Flame C-Max dual fuel burner, Model CMR9A-GO-30 with remote air compressor with pulsation chamber and remote fuel oil pump connected to each boiler respectively. Integral to the steam system providing heat to the building is the installation of 500 gallon boiler feed tank with three (3) 1½ HP centrifugal pumps & two (2) 5 HP vacuum producer pumps, and a 65 gallon condensate tank with two (2) ¾ HP condensate pumps including all appurtenances. Boiler venting was reconnected to existing at points indicated as per the SED approved design (Refer to photos). The insulation of the piping system was currently in progress. During this inspection the steam boilers were operational, but currently not controlled through the building management system. The contractor also provided a separate electrical panel dedicated to all boiler related equipment (burners, remote fuel oil pump, existing duplex fuel oil pump, boiler feed, vacuum, and condensate pumps. The contractor also provided labeling of all electrical conduit runs from the boiler burners back to the dedicated electrical panel to assist in future service as necessary. Proper hangers and supports were installed, and the contractor stated that upon completion of all boiler work all ceiling penetrations where pipe hanger rods were mounted, the ceiling shall be repaired.

12 New dedicated Boiler Sub-Panel which currently provides power for Boiler No. 1 & No. 2, Oil Feed Control Panel, Water Feed Control Panel, and the Condensate Pumps Installation of new mushroom type emergency boiler shut down break glass station on inside wall of Boiler Room at the exterior means of egress.

13 Installation of new Unilux Boilers located in the basement Boiler Room Installation of new PowerFlame C-Max Dual Fuel Burner located in the basement Boiler Room

14 Installation of Siemen s Ventless Gas Train located in the basement Boiler Room Installation of new PowerFlame C-Max Dual Fuel Burner Control Panel floor mounted in basement Boiler Room

15 Piping work at the rear of Boiler No. 1 Installation of Skidmore, Model JVBF Triplex Vacuum/ Boiler Feed Pump System with 500 gallon steel receiver tank.

16 Front elevation of Skidmore, Model JVBF Triplex Vacuum/ Boiler Feed Pump System with 500 gallon steel receiver tank, and the two (2) 5 HP vacuum producer pumps mounted with vacuum tank on top of steel receiver tank. Side elevation of Skidmore, Model JVBF Triplex Vacuum/ Boiler Feed Pump System with 500 gallon steel receiver tank, and the three (3) 1½ HP condensate pumps mounted alongside the steel receiver tank.

17 Front elevation of the Skidmore, Model VJS Duplex Condensate Pump System which includes the 65 gallon steel receiver set on existing concrete housekeeping pad, two (2) ¾ HP condensate pumps, and a duplex motor control panel. New gas piping connected to existing gas valve for connection to new boilers.

18 Installation of boiler breeching with boiler flue connector observed connected to breeching located in the basement Boiler Room Combustion air dampers open as follows: Top half of dampers open during operation of Boiler No. 1, and bottom half of dampers open during operation of Boiler No. 2. Electronic actuation is installed with tie-in to EMS remaining.

19 Installation of new emergency eye wash manufactured by Encon Safety Products. Installation of new mushroom type emergency boiler shut down break glass station on inside wall of Boiler Room at the exterior means of egress.

20 Ret Van Wyck Junior High School ECM-5 Steam Trap Replacement At the time of this inspection it was observed this work to be 95% complete. Work was inspected and verified within the boiler room and at various locations throughout the school building where accessible. Reference pictures as appropriate. All work within project design specifications. Ameresco to provide an As Built of replaced/retrofitted steam traps. Retrofit of F & T steam traps on the condensate side of steam boiler (Typical) ECM-7 Infiltration Reductions Work was reportedly 100% complete. Work was inspected and verified. It was observed due to each existing door structure conditions multiple weather stripping materials were installed. Reference pictures as appropriate. All work within project design specifications. Weatherization of exterior door (second means of egress) existing Boiler Room.

21 Weatherization of exterior doors at Front Entrance of school building. ECM 14 Boiler Replacements At the time of this inspection it was observed that two (2) Unilux Bent Water Tube Boilers, Model No. ZF 1200LS-FE3 were installed and set in place on new reinforced concrete housekeeping pads with a Power Flame C-Max dual fuel burner, Model CMR9A-GO-30 with remote air compressor with pulsation chamber and remote fuel oil pump connected to each boiler respectively. Integral to the steam system providing heat to the building is the installation of 500 gallon boiler feed tank with three (3) 1½ HP centrifugal pumps, and 110 gallon condensate tank with two (2) 2 HP condensate pumps & two (2) 5 HP vacuum producer pumps including all appurtenances. Boiler venting was reconnected to existing at points indicated as per the SED approved design (Refer to photos). The insulation of the piping system was currently in progress. During this inspection the steam boilers were operational, but currently not controlled through the building management system. The contractor also provided a separate electrical panel dedicated to all boiler related equipment (burners, remote fuel oil pump, existing duplex fuel oil pump, boiler feed, vacuum, and condensate pumps). The contractor also provided labeling of all electrical conduit runs from the boiler burners back to the dedicated electrical panel to assist in future service as necessary. Proper hangers and supports were installed, and the contractor stated that upon completion of all boiler work all ceiling penetrations where pipe hanger rods were mounted, the ceiling shall be repaired.. The steam boilers have been commissioned with training remaining to be administered to the appropriate District s personnel.

22 New gas meter rig with concrete bollards and fenced enclosure with main gas piping routed to the boiler room horizontally on the roof above the kitchen cafeteria. Routing of new gas piping from above the roof down and penetrated into boiler room.

23 Side elevation of Siemen s Ventless Gas Train with gas piping connected on Boiler No. 2 Side elevation of Siemen s Ventless Gas Train with gas piping connected on Boiler No. 1

24 Installation of Siemen s Ventless Gas Train located in the basement Boiler Room Installation of new PowerFlame C-Max Dual Fuel Burner located in the Boiler Room

25 Installation of new PowerFlame C-Max Dual Fuel Burner Control Panel floor mounted in Boiler Room Rear elevation of Boiler No. 1 with pipe insulation installed to date.

26 New dedicated Boiler Sub-Panel which currently provides power for Boiler No. 1 & No. 2, Oil Feed Control Panel, Water Feed Control Panel, and the Condensate Pumps Front elevation of the Skidmore, Model JVC Duplex Vacuum/ Condensate Pump System which includes the 110 gallon steel receiver set in existing pit with two (2) 2 HP condensate pumps, two (2) 5 HP vacuum producer pumps and a duplex motor control panel.

27 Side elevation of the Skidmore, Model JVC Duplex Vacuum/ Condensate Pump System Installation of new domestic hot water heater and heat exchanger with all piping insulated to date.

28 Installation of Skidmore, Model VJSSM Triplex Boiler Feed Pump System with all components insulated to date. Routing of the PVC vent piping for the Elite Direct Vent Hot Water Boiler

29 Termination of the PVC vent piping for the Elite Direct Vent Hot Water Boiler Note: PVC termination at top of building elevation is venting out of flue gases, and PVC termination below with T-fitting is for combustion air intake. Installation of Elite Direct Vent Hot Water Boiler

30 Installation of new Taco heat exchanger with insulation completed to date. Installation of new emergency eyewash as manufactured by Encon Safety Products.

31 Exterior elevation of new combustion air louvers with dampers which currently open through electronic actuation during boiler operations. Combustion air dampers open as follows: In left hand photo, the far left damper opens and the top half of center dampers open during operation of Boiler No. 1, and in right hand photo, the far right damper opens and the bottom half of center dampers open during operation of Boiler No. 2. Electronic actuation of combustion air dampers are currently interlocked with boilers respectively.

32 Brickerhoff Elementary School ECM-7 Infiltration Reductions Work was reportedly 50% complete. Work was inspected and verified. It was observed due to each existing door structure conditions multiple weather stripping materials were installed. Reference pictures as appropriate. All work within project design specifications. James S. Evans Elementary School ECM-4 Integrated and New Energy Management System During this inspection, work was estimated to be 60% complete within building. Installation of necessary wiring, conduit, raceways and relays were observed in progress. All work within project design specifications. Reference pictures as appropriate. Installation of new JACE located in Storage/Copy Room adjacent to main lobby of school.

33 ECM-7 Infiltration Reductions Work was reportedly 50% complete. Work was inspected and verified. It was observed due to each existing door structure conditions multiple weather stripping materials were installed. Reference pictures as appropriate. All work within project design specifications. Weatherization of exterior doors (second means of egress) exiting Boiler Room. Weatherization of side entrance doors.

34 Gayhead Elementary School ECM-7 Infiltration Reductions Work was reportedly 50% complete. Work was inspected and verified. It was observed due to each existing door structure conditions multiple weather stripping materials were installed. Reference pictures as appropriate. All work within project design specifications. Sprayed seal method of roof/ wall joint (typical) Myers Corners Elementary School ECM-7 Infiltration Reductions Work was reportedly 50% complete. Work was inspected and verified. It was observed due to each existing door structure conditions multiple weather stripping materials were installed. Reference pictures as appropriate. All work within project design specifications. Weatherization of exterior doors at front entrance of school building.

35 Oak Grove Elementary School ECM-1 Lighting System Improvements Work was reportedly complete. Work was inspected and verified at multiple locations within the school. Reference pictures as appropriate. All work within project design specifications. Installation of new 6-lamp, 4-foot long, T8, 28W hi bay fixtures with integral occupancy sensor located above school cafetorium. Installation of new 6-lamp, and 3-lamp, 4-foot long, T8, 28W hi bay fixtures with integral occupancy sensor located above school cafetorium.

36 Installation of ceiling mounted exterior LED lighting fixtures located at loading dock/receiving area of school building. Installation of new 8 long standard wrap fixture, 2 lamp normal power instant start electronic ballast, white reflector, and (2) 4 long 28 watt T8 lamps surface mounted at ceiling. (Typical for majority of classrooms.)

37 Sheafe Road Elementary School ECM-7 Infiltration Reductions Work was reportedly 50% complete. Work was inspected and verified. It was observed due to each existing door structure conditions multiple weather stripping materials were installed. Reference pictures as appropriate. All work within project design specifications. Weatherization of exterior doors at front entrance of school building. Wappingers Junior High School ECM-5 Steam Trap Replacement At the time of this inspection it was observed this work to be 80% complete. Work was inspected and verified within the boiler room and at various locations throughout the school building where accessible. Reference pictures as appropriate. All work within project design specifications. Ameresco to provide an As Built of replaced/retrofitted steam traps.

38 Roy C. Ketcham High School ECM-1 Lighting System Improvements & ECM-2 Lighting Controls Work was reportedly complete. Work was inspected and verified at multiple locations within the school. Reference pictures as appropriate. All work within project design specifications. Installation of combination exit sign/emergency lighting with (2) 5-watt MR16 lamps. (Typical exit sign setup throughout school building). Installation of new 8 long standard wrap fixture, 2 lamp normal power instant start electronic ballast, white reflector, and (2) 4 long 28 watt T8 lamps surface mounted at ceiling. (Typical for majority of classrooms.

39 Installation of new 6-lamp, 4-foot long, T8, 28 watt hi bay fixtures with integral occupancy sensor located above Gymnasium. Installation of new 8 long standard wrap fixture, 2 lamp normal power instant start electronic ballast, white reflector, and (2) 4 long 28 watt T8 lamps surface mounted at ceiling. (Typical for majority of classrooms.

40 New LED lamps installed in existing fixtures above Auditorium main seating area. ECM-7 Infiltration Reductions Work was reportedly 100% complete. Work was inspected and verified. It was observed due to each existing door structure conditions multiple weather stripping materials were installed. Reference pictures as appropriate. All work within project design specifications. Weatherization of exterior doors at front entrance of school building. END OF INSPECTION REPORT

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1 L21366/101 090 00.00/Page 1 HVAC EXECUTIVE SUMMARY The North Middlesex Regional High School has received average maintenance of the HVAC systems over its occupied years. Even with adequate maintenance,

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania Project Determination Report Major Renovation October 26, 2018

James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania Project Determination Report Major Renovation October 26, 2018 EXHIBIT A James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania 19139 Project Determination Report Major Renovation October 26, 2018 School District of Philadelphia Office of Capital

More information

Cook - Wissahickon Elementary School

Cook - Wissahickon Elementary School Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER PART 1 GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 American National Standard for Gas-Fired Low Pressure Steam and Hot Water Boilers B. ASME Section

More information

GASEOUS HYDROGEN SYSTEMS

GASEOUS HYDROGEN SYSTEMS CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 GENERAL 701.1 Scope. The installation of gaseous hydrogen systems shall comply with this chapter and Chapters 30 and 35 of the Fire Compressed gases shall

More information

PART 5: HVAC & DHW SYSTEMS

PART 5: HVAC & DHW SYSTEMS PART 5: HVAC & DHW SYSTEMS Building Science Review Building Science Review: HVAC & DHW Systems This document will help you: Correctly answer all parts of the HVAC Systems section in the Home Energy Score

More information

CHURCH MUTUAL AND HARTFORD STEAM BOILER SENSOR TECHNOLOGY PROGRAM: IDENTIFYING FROZEN PIPE EXPOSURES

CHURCH MUTUAL AND HARTFORD STEAM BOILER SENSOR TECHNOLOGY PROGRAM: IDENTIFYING FROZEN PIPE EXPOSURES CHURCH MUTUAL AND HARTFORD STEAM BOILER SENSOR TECHNOLOGY PROGRAM: IDENTIFYING FROZEN PIPE EXPOSURES Where to Install Pipe Temperature Sensors for Freeze Protection 1 WHICH PIPES SHOULD I MONITOR FOR FREEZE

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

HVAC Equipment Access Equipment Location

HVAC Equipment Access Equipment Location City of Lancaster- Building Department 121 East Chestnut Street, Suite 102, Lancaster, Ohio 43130-3825 (740) 687-6649, Fax (740) 681-5030 Web site: www.ci.lancaster.oh.us/dept/building HVAC Heating, Ventilating,

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

Back to back. Cascade Venting System for RTG 199HE. Basic Set for units 1 and Installation instructions

Back to back. Cascade Venting System for RTG 199HE. Basic Set for units 1 and Installation instructions Installation instructions Cascade Venting System for RTG 199HE Back to back Basic Set for units 1 and 2-7 736 501 253 6 720 811 762 / 238-50973-00A (2014/05) Table of contents Table of contents 1 Key to

More information

S AGE E NGINEERING A SSOCIATES, LLP

S AGE E NGINEERING A SSOCIATES, LLP S AGE E NGINEERING A SSOCIATES, LLP 1211 Western Avenue Albany, NY (518) 453 6091 F (518) 453 6092 Kingston Library Mechanical and Electrical Systems Field Report Date of Visits: Mechanical - September

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

Equipment Specifications and Required Information Quantity Rebate

Equipment Specifications and Required Information Quantity Rebate Rebate not to exceed 50% of the cost of equipment. Recycling rebates qualify for the entire rebate, regardless of the recycling cost. Equipment must be purchased or recycled in 2016. Installed equipment

More information

Inspection Checklist Mechanical Rough in

Inspection Checklist Mechanical Rough in Property Owner Name: Property Address: Permit Number: Inspectors Name: Review Date: Permits and Plans 1. Job address is posted in a visible location. (R319.1) 2. Permit and approved plans are on site and

More information

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances Rebate not to exceed cost of high efficiency equipment. Equipment must be purchased or recycled in 2015. Installed equipment must be on cooperative's lines. Submit the documentation listed below no later

More information

Side by side. Cascade Venting System for RTG 199HE. Extension Set for units 3 or Installation instructions

Side by side. Cascade Venting System for RTG 199HE. Extension Set for units 3 or Installation instructions Installation instructions Cascade Venting System for RTG 199HE Side by side 6720804520-20.1V Extension Set for units 3 or 4-7 736 501 254 6 720 811 761 / 238-50976-00A (2014/05) Table of contents Table

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#56566/Page 1/May 23, 2017 HVAC Heating Plant The original Town Hall building and Addition building are primarily heated by a gas fired hot water plant that is located in the basement. The boiler plant

More information

Code verification sign-off

Code verification sign-off Code verification sign-off Following is a list of the most common manufactured home code non-compliant items found in used or altered manufactured homes. These are only the most commonly found items and

More information

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from

More information

Land Use and Environmental Service Agency (Code Enforcement) NC Mechanical Code. Table of Contents

Land Use and Environmental Service Agency (Code Enforcement) NC Mechanical Code. Table of Contents Table of Contents Chapter 1 Administration Chapter 2 Definitions Chapter 3 General Regulations Chapter 4 Ventilation. Chapter 5 Exhaust Systems Chapter 6 Duct Systems Chapter 7 Combustion Air Chapter 8

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION CHAPTER 23.20 LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION SECTIONS 23.20.100 Local Amendments To The International Mechanical Code, 2000 Edition 23.20.202 Definitions 23.20.301.14

More information

DIVISION 14 - CONVEYING SYSTEMS. 1. Passenger Elevators 2. Vertical Platform and Inclined Wheelchair Lifts.

DIVISION 14 - CONVEYING SYSTEMS. 1. Passenger Elevators 2. Vertical Platform and Inclined Wheelchair Lifts. DIVISION 14 - CONVEYING SYSTEMS I. GENERAL A. This division contains: 1. Passenger Elevators 2. Vertical Platform and Inclined Wheelchair Lifts. B. Elevators in schools are for the disabled, furniture

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 4 - MANHATTAN, 500 WEST 160TH STREET, New York, 10032 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-08 8:29 AM 2017-12-08 3:44 PM Asset Data Are there fuel tanks?

More information

mith Mills Smith Mills 6500A 6500A-4 OIL OR GAS CAST IRON BOILER/BURNER CAST IRON

mith Mills Smith Mills 6500A 6500A-4 OIL OR GAS CAST IRON BOILER/BURNER CAST IRON mith Mills Mills 00A OIL OR GAS CAST IRON BOILER/BURNER Smith CAST IRON 00A- - Gas I=B=R Ratings: Gross Output 7,19 to 1, FRONT VIEW WITH INDUS COMB BURNER SIDE VIEW WITH INDUS COMB BURNER SIDE VIEW -

More information

Series 300 VTB. Installation Instructions

Series 300 VTB. Installation Instructions Series 300 VTB Installation Instructions Sizes 7 12 16 20 30 HP #2 Fuel Oil Gas (500 to 2500 BTU) Gas Light Oil Combination High Pressure Steam Sizes 7 thru 16 HP (125 PSI) Sizes 20 and 30 HP (150 PSI)

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 92 - BROOKLYN, 601 PARKSIDE AVENUE, New York, 11226 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-13 8:31 AM 2017-11-27 11:43 AM Asset Data Are there fuel tanks?

More information

MFC Series Boiler Vent and Combustion Air Guide

MFC Series Boiler Vent and Combustion Air Guide Pre-Installation Application Guide MFC Series Boiler Vent and Combustion Air Guide Applies to Models 3000 through 10000 Exhaust venting, combustion air and piping Requirements for MFC Series boilers Other

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings) 1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings) 1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed

More information

SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT

SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT CHAPTER 9 SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT SECTION 901 GENERAL 901.1 Scope. This chapter shall govern the approval, design, installation, construction, maintenance, alteration

More information

UNIT HEATER CATALOG. Form C-UH-0516 COMMERCIAL/INDUSTRIAL HEATERS RESIDENTIAL GARAGE HEATERS. FUEL Natural Gas Propane Fuel Oil

UNIT HEATER CATALOG. Form C-UH-0516 COMMERCIAL/INDUSTRIAL HEATERS RESIDENTIAL GARAGE HEATERS. FUEL Natural Gas Propane Fuel Oil UNIT HEATER CATALOG COMMERCIAL/INDUSTRIAL HEATERS RESIDENTIAL GARAGE HEATERS FUEL Natural Gas Propane Fuel Oil CAPACITIES 25-1,200 MBH 80% - 93% Thermal Efficiency 380-16,750 CFM AIR DELIVERY Propeller

More information

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings) 1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed

More information

UNIT HEATER CATALOG. Form RZ-NA-C-UH (Version F)

UNIT HEATER CATALOG. Form RZ-NA-C-UH (Version F) UNIT HEATER CATALOG Form RZ-NA-C-UH (Version F) BACKGROUND Reznor was founded in 1888 to manufacture the Reznor reflector heater, which used a luminous flame gas burner developed by George Reznor. This

More information

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors 1. SUMMARY AND BACKGROUND: Princeton Joint Unified School District located in Princeton

More information

NYC Department of Education

NYC Department of Education Asset: I.S. 45 - BRONX, 2502 LORILLARD PLACE, New York, 10458 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-05 9:14 AM 2017-12-20 11:42 AM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 104 - BROOKLYN, 9115 5TH AVENUE, New York, 11209 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-21 8:55 AM 2018-02-21 1:09 PM Asset Data Are there fuel tanks? Total

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

Genevieve Melody Elementary School

Genevieve Melody Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education Mechanical Inspection Asset: P.S. 1 - MANHATTAN, 8 HENRY STREET, New York, 10038 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-09-28 8:39 AM 2017-10-12 5:28 PM Asset Data Are there

More information

Do not use this vent pipe or fittings for venting incinerators of any kind.

Do not use this vent pipe or fittings for venting incinerators of any kind. ! CAUTION! Do not use this vent pipe or fittings for venting incinerators of any kind. C.S.A. Certified For Natural Gas Or Propane Tested For 100 LBS. ASME Working Pressure For correct installation of

More information

L O S S C O N T R O L

L O S S C O N T R O L L O S S C O N T R O L GAS-FIRED SUSPENDED UNIT HEATER technical guide Gas-Fired Suspended Unit Heaters Permanently mounted, gas-fired unit heaters are self-contained units that consist of a burner, combustion

More information

2012 INTERNATIONAL FUEL GAS CODE VENTS

2012 INTERNATIONAL FUEL GAS CODE VENTS 2012 INTERNATIONAL FUEL GAS CODE SECTION 502 (IFGC) VENTS 502.1 General. All vents, except as provided in Section 503.7, shall be listed and labeled. Type B and BW vents shall be tested in accordance with

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Massachusetts School Building Authority

Massachusetts School Building Authority Massachusetts School Building Authority School District Revere District Contact Paul Dakin TEL: (781) 286-8226 Name of School Submission Date 3/6/2007 The following Priorities have been included in the

More information

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Longleaf Elementary 1.78

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

SECTION FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION FUEL-FIRED, DOMESTIC WATER HEATERS SECTION 22 34 00 FUEL-FIRED, DOMESTIC WATER HEATERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

INSTALLATION INSTRUCTIONS & USE & CARE GUIDE Air-O Ultra Series Range Hoods

INSTALLATION INSTRUCTIONS & USE & CARE GUIDE Air-O Ultra Series Range Hoods INSTALLATION INSTRUCTIONS & USE & CARE GUIDE Air-O Ultra Series Range Hoods Ultra Series Models: UL2824 UL2830 UL2836 CONTENTS: Part 1 - Planning The Installation Part 2 - Electrical Connection Part 3

More information

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015 Martha a s Vineyard Regional High School Vineyard Haven, MA 2 2015 HVAC Syste ems Evaluation Prepared For: Martha s Vineyard Regional School District Box 1385 Oaks Bluff, MA 02557 Prepared By: BLW Engineers,

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

HOME INSPECTOR EDUCATION EXPO 2016

HOME INSPECTOR EDUCATION EXPO 2016 An Education in Hot Water HOME INSPECTOR EDUCATION EXPO 2016 Residential Water Heater Inspection Course Objective Course Objective Completing this course should enable an inspector to identify components

More information

Inspection Checklist Mechanical Final

Inspection Checklist Mechanical Final Property Owner Name: Property Address: Property Parcel Number: Inspectors Name: Review Date: Permits and Plans 1. Job address is posted in a visible location. (R319.1) 2. Permit and approved plans, and

More information

SERIES 24. Series 24 Features. Commercial, Forced Draft, Hot Water or Steam Boiler. The right fit for any commercial job

SERIES 24. Series 24 Features. Commercial, Forced Draft, Hot Water or Steam Boiler. The right fit for any commercial job SERIES Commercial, Forced Draft, Hot Water or Steam Boiler Sizes from to,8 MBH output The right fit for any commercial job The Series is built to handle any installation - businesses, institutions, apartments,

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

COMBUSTION AIR SYSTEM

COMBUSTION AIR SYSTEM COMBUSTION AIR SYSTEM MODEL: CAS-4JR This product is designed for use with any natural gas or LP burning furnace, water heater, or boiler with a 24 VAC control system. It may be used with a residential

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

MX 200. MX-200 Technical Specifications FEATURES:

MX 200. MX-200 Technical Specifications FEATURES: MX-00 Technical Specifications MX 00 TOP VIEW 6.5 Includes: heater,, oil by-pass regulator, pump assembly, primary waste oil strainer, check valve,, oil supply strainer and..5 6.5 6 dia. flue 5.5.5 FEATURES:

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 198 - BRONX, 1180 TINTON AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:14 AM 2018-01-24 9:32 PM Asset Data Are there fuel tanks? Total

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 22 40 00 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Faucets for lavatories, bathtubs, bathtub/showers, showers and sinks. 2. Flushometers. 3. Toilet

More information

SECTION INSPECTION AND TESTING OF WORK

SECTION INSPECTION AND TESTING OF WORK SECTION 01455 PART I - GENERAL 1.01 SECTION INCLUDES A. Project Inspections and Procedures B. Scheduling Inspectors Notification requirements 1.02 RELATED SECTIONS A. Section 01310 COORDINATION B. Section

More information

CONNECTICUT. Downloaded

CONNECTICUT. Downloaded Housekeeping/Laundry/Maintenance J. Laundry. CONNECTICUT Downloaded 01.15.11 (1) This service, if provided, shall be used exclusively for laundry and shall be remote from resident and food service areas,

More information

GENERAL BASIC INSTALLATION INSTRUCTIONS DIRECT FIRED HOT WATER BOILERS PARKER BOILER CO.

GENERAL BASIC INSTALLATION INSTRUCTIONS DIRECT FIRED HOT WATER BOILERS PARKER BOILER CO. GENERAL BASIC INSTALLATION INSTRUCTIONS DIRECT FIRED HOT WATER BOILERS PARKER BOILER CO. GBI 201-5 3C For a proper installation and in order to receive the best in operating life and efficiency from your

More information

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1 Page 1 TABLE OF CONTENTS 1 ELECTRICAL 2 Summary Sustainability Electrical Distribution Lighting Detection and Alarm Communication Systems Lightning Protection Clock Systems Access Control Housekeeping

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

NYC Department of Education

NYC Department of Education Asset: A. PHILLIP RANDOLPH HS - MANHATTAN, 443 WEST 135 STREET, New York, 10031 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-02 8:11 AM 2018-06-14 1:21 PM Asset Data Are there

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Natural Gas Appliance Testing Action Guidelines (Non ESA/Low Income 5 )

Natural Gas Appliance Testing Action Guidelines (Non ESA/Low Income 5 ) Natural Gas Appliance Testing Action Guidelines (n ESA/Low Income 5 ) The purpose of these Action Guidelines is to describe the actions participating contractors and/or inspectors should take in the event

More information

Appendix A. Glossary of Common Terms

Appendix A. Glossary of Common Terms Glossary of Common Terms Glossary of Common Terms Absorption chiller A refrigeration machine using heat as the power input to generate chilled water. Adjustable speed drive A means of changing the speed

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Electrical Inspection Service & Distribution

Electrical Inspection Service & Distribution 0911 Distribution Panels & Switchgear Equipment, conduit, feeders, and grounding 480 Volt Switchboard: This switchboard contains the utility meter and two main, service, circuit breakers. One circuit breaker

More information

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL LINE ITEM # ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL LINE ITEM DETAIL Labor Material FURNACE COMPONENTS 1 Furnish & Install Sight-Impaired Thermostat For Heating and Cooling

More information

CADDY CORPORATION. Utility Distribution Systems

CADDY CORPORATION. Utility Distribution Systems Food Service Equipment Air Systems Utility Distribution Systems page 1 of 2 Equipment Specifications General Specifications Caddy Corporation of America Energy Distribution and Management System, which

More information

Eligible Prescriptive Measures List:

Eligible Prescriptive Measures List: Eligible Prescriptive Measures List: Business, Non-Profit, Institutional Energy Savings Program Products must meet the Canadian Certification Standards as outlined by the Standards Council Canada for product

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

Chapter FUEL GAS CODE*

Chapter FUEL GAS CODE* Chapter 19.09 FUEL GAS CODE* * Editors Note: Serial No. 2004-31, 1, adopted Oct. 11, 2004 amended Title 19 in its entirety to read as herein set out. See the editor's note at Tit. 19 and also the Code

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

2015 MECHANICAL CODE REQUIREMENTS

2015 MECHANICAL CODE REQUIREMENTS 2015 MECHANICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Mechanical requirements for residential buildings per

More information

WATER-TUBE POOL HEATERS

WATER-TUBE POOL HEATERS XTHERM, TYPE P - MODELS 1005A-2005A SUGGESTED SPECIFICATIONS Catalog No.: 6000.63B Effective: 3-01-15 Replaces: 9-01-09 WATER-TUBE POOL HEATERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes condensing,

More information

Heating system service plans that provide total peace of mind.

Heating system service plans that provide total peace of mind. Heating system service plans that provide total peace of mind. Value & Premier Oil Heating System Service Plans Choose the plan that s best for you and your home. The service plans you need to keep your

More information

LIGHTING CONTROL DEVICES

LIGHTING CONTROL DEVICES SECTION - PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

Energy Conservation Measures For the Town of Lakeville. Locations Town Hall Fire Department Police Department Council on Aging

Energy Conservation Measures For the Town of Lakeville. Locations Town Hall Fire Department Police Department Council on Aging Energy Conservation Measures For the Town of Lakeville Locations Town Hall Fire Department Police Department Council on Aging March 05 Location Town Hall 36 Bedford Street Energy Conservation Measures

More information

ROUTT COUNTY REGIONAL BUILDING DEPARTMENT

ROUTT COUNTY REGIONAL BUILDING DEPARTMENT ROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 6 th Street * P.O. Box 773840 * Steamboat SpringsCO80477 (970)870-5566 * FAX (970)870-5489* Email: Building@co.routt.co.us WORK EXEMPT FROM PERMITS Exemption

More information

CHAPTER 8 CHIMNEYS AND VENTS

CHAPTER 8 CHIMNEYS AND VENTS CHAPTER 8 CHIMNEYS AND VENTS SECTION 801 GENERAL 801.1 Scope. This chapter shall govern the installation, maintenance, repair and approval of factory-built chimneys, chimney liners, vents and connectors.

More information