GEn Proton Recoil Polarimeter Components

Size: px
Start display at page:

Download "GEn Proton Recoil Polarimeter Components"

Transcription

1 GEn Proton Recoil Polarimeter Components GMn Preparation Review Brad Sawatzky, Michael Kohl 1

2 Components for Recoil-Proton Portion Recoil proton detectors 2 packages total:» One on SBS Left» One on SBS Right Each package contains» 1x Hodoscope array timing, coarse location» 2x GEM planes tracking Inline GEMs (shared w/ ChEx GEn) 6x 'rear' GEMs» charged particle veto Active Analyzer np recoil vertex identification C-Det (Coordinate detector) 'stock' GMn configuration charged particle veto HCal 'stock' GMn configuration additional neutron id. BigBite 'stock' GMn configuration electron arm» primary trigger 2

3 Floor Layout Notes: Provision will be made to simplify craning in/out Beamline side GEMs + hodoscope to avoid interference with small angle SBS config. Hodoscope and Analyzer cables will run under pivot to the DAQ weldment GEM cables run to GEM racks on beam-right side of SBS (See Robin W. talk) Proton detectors GEM + Scint Analyzer Hodoscope/ Analyzer Cables 3

4 Required Detector Equipment Count Item Status 2 Hodoscope arrays scint bars from (Old) BB Hadron stack 2 PMTs/bar 96 HV, signal channels) 10 'Rear' GEM planes 6 in-line with SBS detector stack 2 in front of 'left' hodoscope array (proton pol.) 2 in front of 'right' hodoscope array (proton pol.) Active analyzer 'Glasgow' active analyzer is in the current CAD model (32 channel segmented unit; in-hand) 4

5 Hodoscopes / Active Analyzer BigBite (old) Hadron stack bars» 24 'de' 500x86x3 mm3» 24 'E' 500x86x30 mm3 Currently in TEDF Hall A area» Very good shape» E-bars re-stacked for left plane» de-bars re-stacked for right plane Each stack: 50cm wide x 200cm Matches GEM coverage» Will need testing and remounting over Summer Fall 2020 Active Analyzer Assembled and Ready in Glasgow 5

6 Required Electronics/Cabling Count Item Status 6+2 F250 FADC Draw from 'NPS/LAD' FY19 plans (*) 1 C1190 TDC In hand (1+spare: Glasgow + Hall C spares) 6+2 CAMAC Discrim. 4 in hand; 4 to locate 1 VXS crate In hand (1+spare: Glasgow + Hall C spares**) CAMAC crate In hand ch HV supply (neg) In hand 10+ Ribbon cables In hand 128 SHV cables (~100') In Hall C boxes in Phys Stor. (needs work) (***) 128 Signal cables (~100') In Hall C boxes in Phys Stor. (needs work) (***) Plan to use HV supply (252 ch) already ordered as part of NPS build up (arrives next month) (*) Could likely make do with FastBus 1881s if required (cable delays would need to be verified..) (**) VXS crate purchase in Hall C budget for FY19 order pending (***) Glasgow will support SHV and signal cable requirements if needed 6

7 Cables and Testbed/DAQ Multiple testbeds in ESB ideal for hodoscope checkout One available already 2nd available Summer 2019 Cables in Hall C boxes in Physics Storage ~100' from detector DAQ weldment (run under/near pivot) Needs sorting and labeling!» Spring/Summer 2019 Glasgow offered support cables from their inventory/ funds if needed SHV BNC 7

8 Required Infrastructure Count Item Status GEM crate rackspace Include with existing GEM Readout near SBS VXS crate rackspace 6+2 Slots FADC, 1 slot for 1190 CAMAC rackspace 6+2 Slots for Discriminators + 1 slot Controller (if not present) Stand modifications for additional GEMS and Analyzers Design nearly final, to be complete by Dec Assume JLab budget Related talks: GEM gas: Jack SBS GEMs: Kondo Weldments, Stands: Robin 8

9 Readout/FE Hardware Locations Count Item Status GEM crates Include with existing GEM Readout in shielded 'hut' on beam-right side of SBS support structure (moves with structure) VME/VXS crate In DAQ weldment 6+2 FADCs, 1 CAEN 1190 TDC CAMAC rackspace In HCAL racks, then ribbon DAQ weldment -OR- run RG-58 DAQ weldment 6+2 Slots for Discriminators + 2 slot Controller (if not already present) Additional Racks In hand (Phys. St; Hall C area), if needed 9

10 Personnel / Task List / Timeline Item People Completion Target Hodoscope Checkout Sawatzky, Kohl, Tireman (summer student) Summer 2019 Hodoscope ready for installation Sawatzky, Kohl, Tireman (summer student) Fall 2019 Collect DAQ electronics, hardware, cabling Sawatzky Dec 2018 Active Analyzer checkout Sawatzky, Hamilton, Tireman? Summer 2019 GEM materials procurement Kohl, T. Cao?? GEM construction Kohl, T. Cao?? GEM testing Kohl, T. Cao?? GEM ready for installation Kohl, T. Cao?? 10

11 Additional Comments Primary trigger assumed to be standard BigBite (electron) BB + SBS readout on each trigger 11

ESTB Proposal from the Stony Brook University: Test of a RICH-Prototype Based on CsI-GEMs

ESTB Proposal from the Stony Brook University: Test of a RICH-Prototype Based on CsI-GEMs ESTB Proposal from the Stony Brook University: Test of a RICH-Prototype Based on CsI-GEMs K. Dehmelt, N. Feege, H. Ge, T. K. Hemmick, T. Videbaek, S. Yalçin, S. Zajac Department of Physics and Astronomy

More information

R&D of GEM detector high rate for CBM Experiment at FAIR Muon Chamber R&D in India

R&D of GEM detector high rate for CBM Experiment at FAIR Muon Chamber R&D in India R&D of GEM detector high rate for CBM Experiment at FAIR Muon Chamber R&D in India Pradeep Ghosh Facility for Antiproton and Ion Research (FAIR) in Europe, Darmstadt - Germany ERICE, ISSP 2017 CBM @ FAIR

More information

ND280 Construction Status Report

ND280 Construction Status Report ND280 Construction Status Report Overview Since the last collaboration meeting, the ND280 detector project has undergone a huge transition: January 2009: most efforts focussed at home institutions July

More information

LCTPC Setup at the DESY Testbeam. AWLC 14, Fermilab , R. Diener, DESY

LCTPC Setup at the DESY Testbeam. AWLC 14, Fermilab , R. Diener, DESY Setup at the DESY AWLC 14, Fermilab 14.05.2014, R. Diener, DESY Page 1 DESY II facility offers 3 beam lines with 1-6 GeV electrons Infrastructure DESY II / Area 24/1 telescopes Solenoid and Dipole magnet

More information

Status of Texas active target data manager development. S. Ahn, G.V. Rogachev, E. Koshchiy, J. Hooker, and S. Upadhiajula

Status of Texas active target data manager development. S. Ahn, G.V. Rogachev, E. Koshchiy, J. Hooker, and S. Upadhiajula Status of Texas active target data manager development S. Ahn, G.V. Rogachev, E. Koshchiy, J. Hooker, and S. Upadhiajula In order to address questions in nuclear structure, nuclear reactions and nuclear

More information

US CMS Trigger. DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 9, 2003

US CMS Trigger. DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 9, 2003 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 9, 2003 Outline: Project Completion M&O Upgrades This talk is available on: http://hep.wisc.edu/wsmith/cms/trig_m&o_0403.pdf

More information

arxiv: v1 [physics.ins-det] 20 Mar 2017

arxiv: v1 [physics.ins-det] 20 Mar 2017 September 8, 28 :47 ws-rv9x6 Book Title AFP page Chapter arxiv:73.696v [physics.ins-det] 2 Mar 27 Prospects and Results from the AFP Detector in ATLAS Grzegorz Gach On behalf of the ATLAS Collaboration

More information

2008 JINST 3 S The CMS experiment at the CERN LHC THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS.

2008 JINST 3 S The CMS experiment at the CERN LHC THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 9, 2008 ACCEPTED: May 18, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS The CMS experiment

More information

Cryogenics. Overview of the Jefferson Lab 12GeV Upgrade. J. Creel, K. Dixon, P. Knudsen, J. Wilson Jr.

Cryogenics. Overview of the Jefferson Lab 12GeV Upgrade. J. Creel, K. Dixon, P. Knudsen, J. Wilson Jr. Cryogenics Overview of the Jefferson Lab 12GeV Upgrade D. Arenius,, V. Ganni, J. Creel, K. Dixon, P. Knudsen, J. Wilson Jr. Stanford Linear Accelerator Center May 9-11, 2006 Cryogenic Operations Workshop

More information

CMS, In Brief. Bill Gabella Vanderbilt Quarknet session, July 20, 2015 (disgracefully borrowing from Will Johns)

CMS, In Brief. Bill Gabella Vanderbilt Quarknet session, July 20, 2015 (disgracefully borrowing from Will Johns) CMS, In Brief Bill Gabella Vanderbilt Quarknet session, July 20, 2015 (disgracefully borrowing from Will Johns) CMS, status CMS is up and running after Long Shutdown One (LS1). Yes, there will be an LS2

More information

Texas active target (TexAT) detector part 1: Design and construction progress

Texas active target (TexAT) detector part 1: Design and construction progress Texas active target (TexAT) detector part 1: Design and construction progress E. Koshchiy, G.V. Rogachev, E. Uberseder, and E. Pollacco 1 1 IRFU, CEA Saclay,Gif-Sur-Ivette, France Construction of a general

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS CR -2016/298 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 28 October 2016 (v2, 25 November 2016)

More information

Technical Manual Ionisation Chamber MUSIC80

Technical Manual Ionisation Chamber MUSIC80 Technical Manual Ionisation Chamber MUSIC80 Entwicklungsbüro Dr. R. Schneider Lärchenstraße 9 85640 Putzbrunn Tel: 089 608 533 71 Fax: 089 608 533 72 E-Mail: robert@schneider.net Entwicklungsbüro Andreas

More information

Surface Concept Product Catalog 2014

Surface Concept Product Catalog 2014 Surface Concept Product Catalog 2014 Delayline Detectors MCP Detectors Time-to-Digital Converters Distributor of Surface Concept Products in the United States is Pulse Processing Electronics 727-532-6144

More information

RICH Status Report. Tyler Lemon Detector Support Group. Rich Status Report. Tuesday, August 23, 2016

RICH Status Report. Tyler Lemon Detector Support Group. Rich Status Report. Tuesday, August 23, 2016 RICH Status Report Tyler Lemon Detector Support Group 1 DSG Staff 2 Ring-Imaging Cherenkov Detector Contents: Mirrors Aerogel Electronics Interlocks Gas System Assembly structure and detector frame 3 Model

More information

Expected needs in Electronics for the CERN Experiments. 5 October 2015

Expected needs in Electronics for the CERN Experiments. 5 October 2015 Expected needs in Electronics for the CERN Experiments 5 October 2015 Philippe.Farthouat@cern.ch 2 The LHC Experiments 3 ATLAS Detector 4 CMS Detector 5 Collaborations Last generation of HEP detectors

More information

MERIT Experiment Status of Activities at CERN

MERIT Experiment Status of Activities at CERN MERIT Experiment Status of Activities at CERN Outline Activities in TT2/TT2A Access (material & personal) Beam line modifications Cryogenics Power supply Particle detectors Controls and timing Safety I.Efthymiopoulos,

More information

Slow Controls. N. Baltzell 5 th 1 st CLAS12 Experiment Workshop March 28, 2017

Slow Controls. N. Baltzell 5 th 1 st CLAS12 Experiment Workshop March 28, 2017 Slow Controls N. Baltzell 5 th 1 st CLAS12 Experiment Workshop March 28, 2017 1 Overview Organization Biweekly Meetings: 9:00 on Fridays in L210A Wiki: https://clasweb.jlab.org/wiki/index.php/clas12_slow_controls

More information

The LHCb Outer Tracker: Production & Ageing studies

The LHCb Outer Tracker: Production & Ageing studies The LHCb Outer Tracker: Production & Ageing studies Kaffeepalaver MPI-K Physikalisches Institut Physikalisches Institut 1 LHC at CERN p-p collisions beam energy 7 TeV 8.6km Four experiments: Atlas, CMS,

More information

Requirements for Active Safety Systems of the General Infrastructure in Secondary Beam Areas

Requirements for Active Safety Systems of the General Infrastructure in Secondary Beam Areas CERN CH1211 Geneva 23 Switzerland EDMS NO. REV. VALIDITY 1365914 0.2 DRAFT REFERENCE SBA FUNCTIONAL SPECIFICATION Requirements for Active Safety Systems of the General Infrastructure in Secondary Beam

More information

The DM-Ice Test Detector. Detector Concept Mechanical Assembly Vessel Options Logistics Considerations Schedule

The DM-Ice Test Detector. Detector Concept Mechanical Assembly Vessel Options Logistics Considerations Schedule The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations Schedule DM-Ice Test Detector Conceptual Overview breakout cable IceCube cable IceCube cable breakout

More information

US CMS Trigger. DOE-NSF Review. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February 14, 2007

US CMS Trigger. DOE-NSF Review. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February 14, 2007 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February 14, 2007 Outline: Calorimeter Trigger Status Endcap Muon Trigger Status M&O Plans Upgrade R&D This talk

More information

Active Scanning Beam 2: Controlling Delivery

Active Scanning Beam 2: Controlling Delivery martin.grossmann@psi.ch PSI Winter School for Protons 2010 1 Active Scanning Beam 2: Controlling Delivery Martin Grossmann, C. Bula, M. Eichin, K. Jäggy, G.Martin, A. Mayor, M. Rejzek Center for Proton

More information

Status of the PRad Experiment (E )

Status of the PRad Experiment (E ) Status of the PRad Experiment (E12-11-106) Jefferson Lab User Group Meeting 2016 Chao Peng Duke University For the PRad Collaboration Outline PRad Physics Motivation Experimental Setup Current Status Preliminary

More information

Micromegas detectors for the upgrade of the ATLAS Muon Spectrometer

Micromegas detectors for the upgrade of the ATLAS Muon Spectrometer Micromegas detectors for the upgrade of the ATLAS Muon Spectrometer André Zibell Julius-Maximilians-Universität Würzburg On behalf of the ATLAS Muon Collaboration INSTR2014 Conference Novosibirsk, 2014/2/28

More information

AIDA Advanced European Infrastructures for Detectors at Accelerators. Presentation. LumiCal alignment system, status report

AIDA Advanced European Infrastructures for Detectors at Accelerators. Presentation. LumiCal alignment system, status report AIDA-SLIDE-2015-016 AIDA Advanced European Infrastructures for Detectors at Accelerators Presentation LumiCal alignment system, status report Kielar, E (IFJPAN) et al 12 November 2012 The research leading

More information

Gas Ring-Imaging Cherenkov Detector Construction Introduction

Gas Ring-Imaging Cherenkov Detector Construction Introduction Gas Ring-Imaging Cherenkov Detector Construction Author: Brandon Tyler Blankenship, The University of the South Advisor: Dr. Todd Averett, College of William & Mary August 5, 2016 Introduction Scientists

More information

arxiv: v1 [physics.ins-det] 2 Oct 2013

arxiv: v1 [physics.ins-det] 2 Oct 2013 Preprint typeset in JINST style - HYPER VERSION The Micromegas Project for the ATLAS Upgrade arxiv:1310.0734v1 [physics.ins-det] 2 Oct 2013 G. Iakovidis a,b a National Technical University of Athens Zografou

More information

ANKE Technical Issues

ANKE Technical Issues ANKE Technical Issues An attempt to coordinate at least some of the ANKE activities COSY-ANKE Vacuum Signal Interfacing Targets Strip Targets Clustertarget Polarized Target Trigger & Data Acquisition Detectors

More information

INFN Rome Silicon Microstrip Detector for SBS F. De Persio S. Kiprich - F. Meddi G.M. Urciuoli

INFN Rome Silicon Microstrip Detector for SBS F. De Persio S. Kiprich - F. Meddi G.M. Urciuoli INFN Rome Silicon Microstrip Detector for SBS F. De Persio S. Kiprich - F. Meddi G.M. Urciuoli 1 Summary 1) About us: Presentation of the JLAB12 INFN Roma group. 2) Silicon Detector Advantages on SBS:

More information

International Journal of Advance Engineering and Research Development

International Journal of Advance Engineering and Research Development Scientific Journal of Impact Factor (SJIF): 4.72 International Journal of Advance Engineering and Research Development Volume 5, Issue 01, January -2018 e-issn (O): 2348-4470 p-issn (P): 2348-6406 APPLICATION

More information

MODEL 5100 VOTING LOGIC MODULE

MODEL 5100 VOTING LOGIC MODULE DESCRIPTION DESCRIPTION The SST Model 5100 Multi-Input Voting Logic Module is used to monitor the status of up to 14 different points in a hazard zone, and report when a selectable number of these points

More information

Detectors Plans for LS1

Detectors Plans for LS1 Detectors Plans for LS1 Chamonix, February 8 th, 2012 M.Nessi + A.Ball, R.Linder, W.Riegler 1 Our present understanding of LS1 Detectors access: 17-24 th November 2012 till mid July 2014 Delivered Luminosity

More information

Drift Chamber construction for ATLAS*

Drift Chamber construction for ATLAS* Drift Chamber construction for ATLAS* D. Sampsonidis for the ATLAS group of Thessaloniki Aristotle University of Thessaloniki CERN and the Technology Transfer in Greece Amphitheatre N.C.S.R. DEMOKRITOS,

More information

EDELWEISS-III dark matter search: first results and future

EDELWEISS-III dark matter search: first results and future EDELWEISS-III dark matter search: first results and future WIN 2015 Astroparticle Session 4 Geertje Heuermann, EKP, Karlsruher Institut für Technologie KIT University of the State of Baden-Württemberg

More information

Learning from High Energy Physics Data Acquisition Systems Is this the future of Photon Science DAQ?

Learning from High Energy Physics Data Acquisition Systems Is this the future of Photon Science DAQ? DOE BES Neutron & Photon Detectors Workshop, August 1 3, 2012 Learning from High Energy Physics Data Acquisition Systems Is this the future of Photon Science DAQ? Matt Weaver, August 3rd, 2012 Outline

More information

Gemini Instrument Program Status Report. Gemini Science Committee October 12, 2009

Gemini Instrument Program Status Report. Gemini Science Committee October 12, 2009 Gemini Instrument Program Status Report Gemini Science Committee October 12, 2009 1 Gemini Instruments Programs NICI Operations Flamingos-2 Testing & Acceptence GNIRS Restoration GMOS-N CCDs Procurement

More information

Status Report about the TPC Detector and Module at CEPC

Status Report about the TPC Detector and Module at CEPC Status Report about the TPC Detector and Module at CEPC Huirong QI On behalf of CEPC TPC subgroup, IHEP, CAS 2016.01.19, IAS, HK Content Goals and options Some considerations Preliminary simulation Hybrid

More information

ICS Integrated Cryocooling System

ICS Integrated Cryocooling System ICS Integrated Cryocooling System ORTEC s most advanced Integrated Cryocooling System offers premium detector resolution and LN 2 -free operation, for excellence in performance, safety, reliability and

More information

TRITIUM IN WATER MONITOR REAL TIME CONTINUOUS Model # LIQ-X-(H3)

TRITIUM IN WATER MONITOR REAL TIME CONTINUOUS Model # LIQ-X-(H3) FEATURES: REAL TIME - AUTOMATIC CONTINUOUS MONITORING NOT INFLUENCED BY OTHER NUCLIDES NO LIQUID SCINTILLANT REQUIRED EASY CALIBRATION SENSITIVE TO 2,000 pcurie/l Tritium 74 Bq/l NEW STATISTICAL SIGNIFICANCE

More information

The TOTEM Detector at LHC

The TOTEM Detector at LHC The TOTEM Detector at LHC CMS TOTEM Gennaro Ruggiero /CERN-PH on the behalf of the TOTEM Collaboration TOTEM Collaboration: Bari, Budapest, Case Western Reserve, CERN, Genova, Helsinki, Penn State, Pisa/Siena,

More information

US CMS Trigger LPC Meeting. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February 17, 2006

US CMS Trigger LPC Meeting. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February 17, 2006 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February 17, 2006 Outline: Calorimeter Trigger Status Endcap Muon Trigger Status Installation/Commissioning Plans

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not

More information

XX 0.25 GI VX. The other members of the series are also optimal for quad-element pyroelectric detectors of the type:

XX 0.25 GI VX. The other members of the series are also optimal for quad-element pyroelectric detectors of the type: XX 0.25 GI VX The lens arrays of Fresnel Technologies XX 0.25 GI VX series shown in the accompanying data sheets are intended to be used in passive infrared motion detector devices. They are optimized

More information

STATUS OF THE LHC EXPERIMENTS.

STATUS OF THE LHC EXPERIMENTS. STATUS OF THE LHC EXPERIMENTS. Mario Calvetti Chairman of the LHC Committee INFN and University of Florence calvetti@fi.infn.it Abstract A brief description of the status of the preparation of the large

More information

Testing strategy and timeline of E-det 80k. Christian Koffmane for the MPG HLL team

Testing strategy and timeline of E-det 80k. Christian Koffmane for the MPG HLL team Testing strategy and timeline of E-det 80k Christian Koffmane for the MPG HLL team Sensors - timeline Metallization started 1.05. sensors available August 2016 Wafer level testing 1. Testing after Al1

More information

TPC BASED IMP. Limin Duan, Gas Detector Group. Institute of Modern Physics, CAS TPC tracker detector technology mini-workshop

TPC BASED IMP. Limin Duan, Gas Detector Group. Institute of Modern Physics, CAS TPC tracker detector technology mini-workshop TPC BASED GEM @ IMP Limin Duan, Gas Detector Group Institute of Modern Physics, CAS 2016.09.01 Beijing,IHEP TPC tracker detector technology mini-workshop Outline 2 Gas detector group GEM-readout TPC a

More information

Introduction. Phil Spicer. Manager Railway Electronic Systems

Introduction. Phil Spicer. Manager Railway Electronic Systems Introduction Phil Spicer Manager Railway Electronic Systems C&S Engineering New & Innovative Technology Wayside Detectors Hot Bearing Hot Wheel WILD Sliding Wheel TBOGI Other Other Innovation Intertest

More information

The SLAC Detector R&D Program

The SLAC Detector R&D Program The SLAC Detector R&D Program David MacFarlane DOE Site Visit September 14, 2010 Detector R&D Program Page 1 Overview of detector R&D program KA15 detector R&D program includes Core engineering and generic

More information

I am Rick Jeffress and I handle sales for Fike Video Image Detection. We thank the AFAA for coordinating the venue for this presentation, and we

I am Rick Jeffress and I handle sales for Fike Video Image Detection. We thank the AFAA for coordinating the venue for this presentation, and we I am Rick Jeffress and I handle sales for Fike Video Image Detection. We thank the AFAA for coordinating the venue for this presentation, and we appreciate your taking the time to learn more about this

More information

The Flash Beam Loss Monitor System

The Flash Beam Loss Monitor System MDI Diagnose und Instrumentierung The Flash Beam Loss Monitor System Thomas Wamsat, MDI for the diagnostics team FLASH Operator Training 3.11.2017 Thomas Wamsat Flash Operator Training 3. Nov. 2017 Seite

More information

MAJORANA An Ultra-Low Background Enriched- Germanium Detector Array for Fundamental Physics Measurements

MAJORANA An Ultra-Low Background Enriched- Germanium Detector Array for Fundamental Physics Measurements MAJORANA An Ultra-Low Background Enriched- Germanium Detector Array for Fundamental Physics Measurements Jason Detwiler Lawrence Berkeley National Laboratory GERDA Collaboration Meeting March 2009 Padova,

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. Status of CMS Commissioning

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. Status of CMS Commissioning Available on CMS information server CMS CR-2008/045 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 21 July 2008 Status of CMS Commissioning

More information

ICS Integrated Cryocooling System

ICS Integrated Cryocooling System ICS Integrated Cryocooling System Premium detector resolution and LN 2 -free operation, for excellence in performance, safety, reliability and value. Introduction ICS ORTEC s newest integrated, mechanically

More information

Full Service Central Station Fire Alarm Listing Evaluation

Full Service Central Station Fire Alarm Listing Evaluation Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm

More information

50(394) IEC. ore content meter ore sorting equipment overvoltage (of a Geiger-Müller county tube)...

50(394) IEC. ore content meter ore sorting equipment overvoltage (of a Geiger-Müller county tube)... INDEX A (absorbed) dose ratemeter... 394-11-17 absorption band (of a scintillator)... 394-18-08 acceptance test... 394-20-09 accident monitor... 394-12-27 activator... 394-10-08 actuated equipment... 394-14-05

More information

Stato di LHCb. P. Campana CSN1 14 maggio Il Trigger L0 dei Calorimetri Il sistema dei RICH Il sistema a Muoni

Stato di LHCb. P. Campana CSN1 14 maggio Il Trigger L0 dei Calorimetri Il sistema dei RICH Il sistema a Muoni Stato di LHCb P. Campana CSN1 14 maggio 2007 Il Trigger L0 dei Calorimetri Il sistema dei RICH Il sistema a Muoni 1 Stato del Trigger L0 dei Calorimetri U.Marconi Schede di trasmissione su fibra ottica

More information

multi-purpose detector to search for Higgs and new physics

multi-purpose detector to search for Higgs and new physics Status Report on GR-BIS ATLAS Chambers Theodoros Alexopoulos on behalf of the Greek ATLAS Team 2005 Workshop on Recent Advances in Particle Physics and Cosmology ARISTOTLE UNIVERSITY OF THESSALONIKI 21-24

More information

MD456: Monitoring of abort gap population with diamond particle detectors at the BGI in IP 4

MD456: Monitoring of abort gap population with diamond particle detectors at the BGI in IP 4 CERN-ACC-NOTE-016-0011 February 15, 016 oliver.stein@cern.ch MD56: Monitoring of abort gap population with diamond particle detectors at the BGI in IP Oliver Stein / TE-MPE Keywords: abort gap, beam gas

More information

Bonn testbeam, QUAD development

Bonn testbeam, QUAD development Bonn testbeam, QUAD development NIKHEF Nikhef/Bonn LepCol meeting May 22, 2017 Monday June 5 Time schedule GridPix testbeam Bonn Fred and Kevin arriving at Bonn with equipment Unloading equipment in institute

More information

ICS Integrated Cryocooling System

ICS Integrated Cryocooling System ICS Integrated Cryocooling System Premium detector resolution and LN 2 -free operation, for excellence in performance, safety, reliability and value. Introduction ICS ORTEC s newest integrated, mechanically

More information

L0 TRIGGER ELECTRONICS FOR THE SETUP IN RUN MARCH 2017

L0 TRIGGER ELECTRONICS FOR THE SETUP IN RUN MARCH 2017 L0 TRIGGER ELECTRONICS FOR THE BM@N SETUP IN RUN MARCH 2017 D.N. Bogoslovski, V.Y. Rogov a, S.V. Sergeev, V.I. Yurevich Joint Institute for Nuclear Research, Dubna, Russia e-mail: a rogovictor@gmail.com

More information

LHCb Rich Detectors Control and High Voltage Systems

LHCb Rich Detectors Control and High Voltage Systems LHCb Rich Detectors Control and High Voltage Systems Mario Sannino On behalf of LHCb RICH Group Rich 2007 Trieste 19.10.2007 1 Rich 2007 Trieste 19.10.2007 LHCb Rich Detectors Control and High Voltage

More information

Taking Action on Fire and Life Safety

Taking Action on Fire and Life Safety AU13.11 Taking Action on Fire and Life Safety Facilities Management July 13, 2018 Taking Action on Fire & Life Safety We accept the Auditor General's recommendations and are acting quickly to address issues

More information

Hall A Tritium Target (HATT) Operator Training. Skill PHY020

Hall A Tritium Target (HATT) Operator Training. Skill PHY020 Hall A Tritium Target (HATT) Operator Training Skill PHY020 Overview Introduction and User Interface (GUI) Principles of Operation JT-valve controls PID and Heater Controls Target Motion Alarms and response

More information

Performance Requirements for Monitoring Pulsed, Mixed Radiation Fields Around High-Energy Accelerators

Performance Requirements for Monitoring Pulsed, Mixed Radiation Fields Around High-Energy Accelerators Performance Requirements for Monitoring Pulsed, Mixed Radiation Fields Around High-Energy Accelerators D. Forkel-Wirth Wirth, S. Mayer, H.G. Menzel, A. Muller, T. Otto, M. Pangallo, D. Perrin, M. Rettig,

More information

Mechanical Concept of the TESLA Detector

Mechanical Concept of the TESLA Detector Mechanical Concept of the TESLA Detector Klaus Sinram Snowmass August 2005 Ties Behnke, FLC Franz Czempik, ZMEA1 Peter Hassler, ZM1 Helmut Hirsemann, ZMEA1 Jan Kuhlmann, ZMEA1 Cornelius Martens, ZM1 Norbert

More information

LCLS Instruments. Jerry Hastings June 20, 2008 LCLS

LCLS Instruments. Jerry Hastings June 20, 2008 LCLS LCLS Instruments Jerry Hastings June 20, 2008 LCLS Thanks John Bozek AMO David Fritz XPP Aymeric Robert XCS Sebastien Boutet CXI Linac End Electron Beam Dump: 40-m m long underground facility to separate

More information

SuperCDMS SNOLAB: Road to 100 mm Germanium Detectors

SuperCDMS SNOLAB: Road to 100 mm Germanium Detectors SuperCDMS SNOLAB: Road to 100 mm Germanium Detectors H. Chagani University of Minnesota for the SuperCDMS Collaboration 23 July 2012 The SuperCDMS Soudan Detector: izip interleaved Z-sensitive Ionisation

More information

Victoreen 942A-200. Operators Manual. Universal Digital Ratemeter

Victoreen 942A-200. Operators Manual. Universal Digital Ratemeter Victoreen 942A-200 Universal Digital Ratemeter Operators Manual February 2005 Manual No. 942A-200-1 Rev. 4 2004, 2005 Fluke Corporation, All rights reserved. Printed in U.S.A. All product names are trademarks

More information

! "! # $ % & ' ( % % % % ( ( ( % & % ) *

! ! # $ % & ' ( % % % % ( ( ( % & % ) * Electronics Developments for PAX@COSY A.Nass >> Status of ordering chips Sergey Merzlyakov for PAX Coordination meeting March 20 Lensa Paolo >> 3) The statement that there are no VATA chips of the old

More information

Description. Optex Incorporated

Description. Optex Incorporated Optex Incorporated Description 1845 W. 205 th St. Torrance, CA 90501-1510 USA TEL (310) 533-1500 and (800) 966-7839 FAX (310) 533-5910 Doc: Model: Desc: Architect/ Engineer Specifications CX-502 PIR Intrusion

More information

Today s Outline - September 12, C. Segre (IIT) PHYS Fall 2016 September 12, / 21

Today s Outline - September 12, C. Segre (IIT) PHYS Fall 2016 September 12, / 21 Today s Outline - September 12, 2016 C. Segre (IIT) PHYS 570 - Fall 2016 September 12, 2016 1 / 21 Today s Outline - September 12, 2016 Detectors C. Segre (IIT) PHYS 570 - Fall 2016 September 12, 2016

More information

LARGE VOLUME HEMISPHERICAL NUCLEAR RADIATION DETECTOR CZT/500(S)

LARGE VOLUME HEMISPHERICAL NUCLEAR RADIATION DETECTOR CZT/500(S) LARGE VOLUME HEMISPHERICAL NUCLEAR RADIATION DETECTOR CZT/500(S) Ganibu Dambis 26, P.O.Box 33 Riga, LV-1005, LATVIA Tel. (+371)6738-3947 Fax:(+371)6738-2620 office@bsi.lv www.bsi.lv CONTENTS INTRODUCTION...

More information

Architectural and Engineering Specification for a. Flash / Flare

Architectural and Engineering Specification for a. Flash / Flare Architectural and Engineering Specification for a Flash / Flare June 27, 2014 Page 1 of 12 T1DA0115-001 Rev D This document is intended to provide performance specifications and operational requirements

More information

CERN GIF ++ : A new irradiation facility to test large-area particle detectors for the high-luminosity LHC program

CERN GIF ++ : A new irradiation facility to test large-area particle detectors for the high-luminosity LHC program CERN GIF ++ : A new irradiation facility to test large-area particle detectors for the high-luminosity LHC program a, M. Capeans a, I. Efthymiopoulos a, A. Fabich a, R. Guida a, G. Maire a, M. Moll a,

More information

RISING. Stopped beam design status. 29 th September 2005

RISING. Stopped beam design status. 29 th September 2005 RISING Stopped beam design status 29 th September 2005 Update on the design since document of 10 th May. The design of the RISING stopped beam structure was complete in June 2005 and the detailing of all

More information

TRIUMF-ISAC GAMMA-RAY ESCAPE SUPPRESSED SPECTROMETER (TIGRESS) TECHNICAL PROGRESS REPORT

TRIUMF-ISAC GAMMA-RAY ESCAPE SUPPRESSED SPECTROMETER (TIGRESS) TECHNICAL PROGRESS REPORT TRIUMF-ISAC GAMMA-RAY ESCAPE SUPPRESSED SPECTROMETER (TIGRESS) TECHNICAL PROGRESS REPORT August 31, 2006 TIGRESS Progress Report, August 2006 1 TIGRESS COLLABORATION P. Amaudruz 1, C. Andreoiu 2, A. Andreyev

More information

SAFETY MANUAL. Multispectrum IR Flame Detector X3301

SAFETY MANUAL. Multispectrum IR Flame Detector X3301 SAFETY MANUAL Multispectrum IR Flame Detector X3301 SAFETY-CERTIFIED MODEL X3301 MULTISPECTRUM INFRARED DETECTOR This manual addresses the specific requirements and recommendations applicable to the proper

More information

October Network of Companies

October Network of Companies Company Overview Network of Companies Founded in 1979, CAEN SpA (Costruzioni Appearecchiature Elettroniche Nucleare) is an important industrial spin-off of the INFN. Core business: Electronic Instrumentation

More information

The Majorana Demonstrator Update and Detector Technologies

The Majorana Demonstrator Update and Detector Technologies The Majorana Demonstrator Update and Detector Technologies Lawrence Livermore National Laboratory UC Berkeley Update on the status of Majorana Detector technologies Craig Aalseth DUSEL plans 1 Majorana

More information

Stand-off Detection of Trace Explosives by Infrared Photothermal Imaging. Trace Contamination

Stand-off Detection of Trace Explosives by Infrared Photothermal Imaging. Trace Contamination Stand-off Detection of Trace Explosives by Infrared Photothermal Imaging Chris Kendziora, Robert Furstenberg, Michael Papantonakis, Jennifer Stepnowski, Viet Nguyen and R. Andrew McGill US Materials and

More information

A. The requirements of this Section and the other Division 26, 27 & 28 Sections apply to all the video surveillance system work.

A. The requirements of this Section and the other Division 26, 27 & 28 Sections apply to all the video surveillance system work. PART 1 GNRAL 1.1. APPLICABL PROVISIONS A. The General, Supplementary and other Conditions of the Contract, modifications to the General Conditions, the Drawings, and the applicable provisions of the other

More information

CALICE: status of a data acquisition system for the ILC calorimeters. Valeria Bartsch, on behalf of CALICE-UK Collaboration

CALICE: status of a data acquisition system for the ILC calorimeters. Valeria Bartsch, on behalf of CALICE-UK Collaboration 1 CALICE: status of a data acquisition system for the ILC calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration ILC Calorimeter with PFA 2 ECAL Prototype use particle flow algorithms to improve

More information

DSP EC Pro. Advanced, Digital Gamma-Ray Spectrometer for HPGe Detector Systems

DSP EC Pro. Advanced, Digital Gamma-Ray Spectrometer for HPGe Detector Systems Advanced, Digital Gamma-Ray Spectrometer for HPGe Detector Systems DSPEC Pro: Advancing the Art of Digital Gamma-Ray Spectroscopy The immense versatility of DSPEC Pro, brought about by the number of unique

More information

ORTEC DSPEC LF. High-Performance Digital Signal Processor for Gamma Spectroscopy. ... in a compact package at an economical price.

ORTEC DSPEC LF. High-Performance Digital Signal Processor for Gamma Spectroscopy. ... in a compact package at an economical price. ORTEC High-Performance Digital Signal Processor for Gamma Spectroscopy Full-featured, digital spectrometer for HPGe and NaI detectors Automatic optimization for best detector performance (patented) ORTEC

More information

SAFETY MANUAL. X2200 UV, X9800 IR, X5200 UVIR SIL 2 Certified Flame Detectors

SAFETY MANUAL. X2200 UV, X9800 IR, X5200 UVIR SIL 2 Certified Flame Detectors SAFETY MANUAL X2200 UV, X9800 IR, X5200 UVIR SIL 2 Certified Flame Detectors SAFETY-CERTIFIED Flame DETECTORs This manual addresses the specific requirements and recommendations applicable to the proper

More information

More Precision. Innovative Sensor Technologies. Displacement Distance Position. Dimension Temperature Colour

More Precision. Innovative Sensor Technologies. Displacement Distance Position. Dimension Temperature Colour More Precision Innovative Sensor Technologies Displacement Distance Position Dimension Temperature Colour Optical Sensors and Systems optoncdt - Laser triangulation displacement sensors Worldwide largest

More information

Property Name & Address [ Property Name ] - [ Property Address ]

Property Name & Address [ Property Name ] - [ Property Address ] Emergency Procedure FIRE Property Name & Address [ Property Name ] - [ Property Address ] Purpose To ensure effective response and evacuation, by the property s Emergency Response Organization, to a fire

More information

LAUNDRY MONITORING SYSTEM Model # LIM-64S

LAUNDRY MONITORING SYSTEM Model # LIM-64S LAUNDRY MONITORING SYSTEM FEATURES: HIGH SENSITIVITY EVEN TO LOW ENERGY GAMMAS 6 EACH 8 X 8 SCINTILLATORS ABOVE 4 EACH 2 X 12 NaI(Tl) BELOW AUTOMATIC CONVEYOR FOR LAUNDRY AUTOMATICALLY SEPARATES CLOTHES

More information

RFP Addendum 2 March 31, 2016

RFP Addendum 2 March 31, 2016 RFP Addendum 2 March 31, 2016 For Best Value Procurement Option Three Security Upgrades Ph 1 UT Health Science Center SBC No. 540/013-04-2015 This Addendum forms a part of the Request for Proposals (RFP)

More information

February 12, PHY357 Lecture 11. Experimental Methods. Accelerators. Particle Interactions. Particle Detectors. Full experiment (eg.

February 12, PHY357 Lecture 11. Experimental Methods. Accelerators. Particle Interactions. Particle Detectors. Full experiment (eg. PHY357 Lecture 11 Experimental Methods Accelerators Particle Interactions Particle Detectors Full experiment (eg. ATLAS) Introduction! Several different general classes of particle detectors (sensors)!

More information

Detector infrastructures and safety systems

Detector infrastructures and safety systems Chapter 10 Detector infrastructures and safety systems The common term infrastructures includes very different systems, ranging from basic site facilities to more detector-specific and safety-related services.

More information

PIP PCTPA001 Testing of Process Analyzer Systems

PIP PCTPA001 Testing of Process Analyzer Systems January 2016 Process Control PIP PCTPA001 Testing of Process Analyzer Systems PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

Performance Analysis of the AD Detector Control System in the ALICE Experiment

Performance Analysis of the AD Detector Control System in the ALICE Experiment Performance Analysis of the AD Detector Control System in the ALICE Experiment XXXI Annual Meeting Division of Particles and Fields of the Mexican Physical Society Juan Carlos Cabanillas Noris For the

More information

GEM detectors activity at the Laboratori Nazionali di Frascati of INFN

GEM detectors activity at the Laboratori Nazionali di Frascati of INFN GEM detectors activity at the Laboratori Nazionali di Frascati of INFN M. Alfonsi', G. Bencivenni, P. de Simone, D. Domenici, F. Murtas, M. Pistilli and M. Poli Lener Laboratori Nazionali di Frascati,

More information

Advanced Virgo BASELINE DESIGN

Advanced Virgo BASELINE DESIGN advanced Advanced Virgo BASELINE DESIGN Giovanni Losurdo INFN Firenze Advanced Virgo Coordinator for the Virgo Collaboration ADVANCED VIRGO (AdV) Upgrade of Virgo+, minor modifications to the facilities

More information

Development of the CMS Phase-1 Pixel Online Monitoring System and the Evolution of Pixel Leakage Current

Development of the CMS Phase-1 Pixel Online Monitoring System and the Evolution of Pixel Leakage Current Development of the CMS Phase-1 Pixel Online Monitoring System and the Evolution of Pixel Leakage Current Fengwangdong Zhang On behalf of CMS Pixel Collaboration The 9th International Workshop on Semiconductor

More information

NASA Plans for Dosimetry in Support of Manned Spaceflight

NASA Plans for Dosimetry in Support of Manned Spaceflight NASA Plans for Dosimetry in Support of Manned Spaceflight Expedition 40 Lands - Three crew members from the International Space Station returned to Earth Wednesday after 169 days E. J. Semones, A. A. Bahadori,

More information

Product Guide. Ceiling PIR HS presence detector DALI / DSI dimming. PIR Sensor. IR Receiver. Light Level Sensor. Status LEDs.

Product Guide. Ceiling PIR HS presence detector DALI / DSI dimming. PIR Sensor. IR Receiver. Light Level Sensor. Status LEDs. PPAD-C-HB-DALI-230V Product Guide Ceiling PIR HS presence detector DALI / DSI dimming Overview The PPAD-C-HB-DALI-230V PIR (passive infrared) presence detector provides automatic control of lighting loads

More information