1 A MAIN PANEL/DB 1 Supply and Installation of main LT panel, floor mounted, front operated dead back, totally enclosed vermin proof, indoor, non drawout, cubicle type power dist. panel fabricated out of 2mm thick CRCA sheet having gasketed hinged door on each cubicle, fully powder coated after seven tank treatment, incorporating horizontal / vertical sleeved tinned copper busbar complete with all internal wiring, danger board, two earthing lugs, cable chamber etc. as required housing below mentioned switchgears / meters. ( GA diagram of the panel to be got approved from the Consultant) 1.1 MAIN LT PANEL a) 1nos. 160A, TPN, MCCB as incomer b) 4 Nos. 63A TPN MCCB/SFU For Lighting & Raw Power c) 2Nos. 100A TPN MCCB/SFU For A.C. & Spare d)4nos. 125amp TPN MCCB/SFU For A.C., & CAPACITOR e)1set, TPN, Tinned Copper 200 Amps copper busbars of size 25mm x 4 mm thick with PVC sleeving e) 1Set, RYB, indicating lamps & CT 1 NOS 1.2 APFC Panel for 60 KVR 6 stage APFC relay with timer for capacitor switching Apcos capacitor with on/off indication lamp, auto manual switch, Start/stop push button, 25A capacitor duty contactor with 25A TP MCB 15 KVA/2, 10/2, 5/2 Apcos capacitor with 60 KVAR/25000 on/off indication lamp, auto manual switch, Start/stop push button, 32A capacitor duty contactor with 32A TP MCB 1 NOS 1.3 Suply and installation of 12 way, TPN, MCB type Lighting Power Distribution Board (LDB / PDB ), flush mounted/ UPS on wall, sheet metal fabricated, powder coated, having dust-proof and vermin proof and hinged door with all internals such as DIN rails, neutral-link, inter - connected wiring complete with earthing lugs housing following switchgears: 3 no. 40A, FP ELCB as 60A FPMES-1 36 nos, 15/20A, SP, MCB outgoing 6 NOS 1.4 Same as above but for UPS out put DB a) 1nos. 40A, DP, MCB as incomer b) 8 Nos.,16/20A,SP, MCB as outgoing 2 NOS 1.5 S & I of 63A, FP, MCB in powder coated box as required. 1.6 S & I of 160A TPN MCCB/SFU in enclosure 6 NOS 1 Nos Page 1

2 1.7 Lumpsum charges for arranging temporary power supply and lighting for all the contractor at site including the required number of tubelight fittings, suffficient number of plug points with plug tops and including all the necessary safety devices like ELCB etc. to ensure SAFE & CONTINUED supply at site. 1 LUMSUM 2.O CABELS / MAINS 2.1 S & I of 1100V grade armoured cable having sector / circular shaped aluminium / copper conductor PVC insulated cores, laid up, PVC tape wrappe d inner sheathed, GI strip / wire armoured and overall extruded PVC sheathed confirming to IS: 1554, laid on wall / ceiling using GI clamps & spacers as per route shown at site and further as directed by Consultant at site in the following sizes: /2 C x 95 Sq.mm Aluminium 60 Mtrs Sq.mm Copper flexible 50 Mtrs C x 10 Sq.mm Copper 160 Mtrs C x 6 Sq.mm Copper 50 Mtrs C x 4Sq.mm Copper 100 Mtrs C x 6 Sq.mm Copper 20 Mtrs 2.2 S & I of end termination of above mentioned cables including compressed type brass glands, crimping type copper lugs, insulation tape etc. as 'required complete with earthing of glands in following sizes /2 C x 95 Sq.mm Aluminium 2 Nos Sq.mm Copper flexible 6 Nos C x 10 Sq.mm Copper 8 Nos C x 6 Sq.mm Copper 8 Nos C x 4Sq.mm Copper 10 Nos C x 6 Sq.mm Copper 4 Nos Page 2

3 3.O WIRING 3.1 Supply & Installation of concealed point wiring using 600v grade 3x1.5 sqmm copper conductor PVC insulated wires (with proper R,Y,B color code ) pulled through haevy gauge PVC conduits laid concealed over false ceiling or in wall chases including 2x 2.5 sqmm circuit wires from the relevant DB and also including 2.5 sqmm green color copper earth wire and provision of grid plate type switches & sockets as approved by the consultant.each circuit feeding not more than 8 points OR 800 watts as per following configuration Primary light points including the cost of 5A switch Secondary light points looped from the above point A plug point as primary point 140 Nos 40 Nos 10 Nos A Plug Point directly taken from DB for Pantry / zerox / fridge / power point 20 Nos Exhaust fan point consisting of 5A socket near fan and switch on light switch board 4 Nos S & I of AC point wiring using 20A, SP MCB, box with 20A metal clad plug-socket with 2 x 4 and 1 no 2.5 sqmm PVC copper wire in PVC conduit (Pantry) 3.2 S & I of point wiring for UPS or stabilized power plug points on workstations / table for computers using 3 X 2.5 Sqmm copper conductor PVC wires pulled through already laid floor raceways and taken upto table top using PVC rigid or flexible conduits run within wooden/metal partitions. Each point consisting of 3 nos of 6A, 5 pin sockets & 1 No 16A switch wired together forming one point ( MAX FOUR tables served by one circiut from DB ) 10 Nos 60 Nos 3.3 Same as above but 1 no 5A switch socket on raw power ( MAX EIGHT tables served by one circiut from DB ) 70 Nos Page 3

4 4.O FLOOR -RACEWAYS: 4.1 S & I of in-screed floor raceways consisting of 1 Runs x 80 mm x 40mm x 1.6 mm thick heavy gauge rectangular aluminium anodized pipe sections including chasing and refilling the trench as per the route shown in the drawing and approved by consultant at site including clamping & closing the open pipe ends temporarily by suitable end- covers against entry of dust or any other foreign material. 4.2 S & I of floor junction boxes with top cover for above raceways, of size 200mm x 200mm x 50mm x 2mm thick, fabricated out of M.S. sheetsfully powder coated with removable screwed cover plates on all four sides for blocking the entry. One side cover plate having 4 nos. 1' dia knockouts for flexible conduit outlets as per the requirement. All the junction boxes to be (with stud) 'properly earth - bonded with the raceways pipe using 12 SWG Copper bare wire as directed at site. 50 Mtrs 50 Nos 4.3 S & I of 25 mm PVC conduit 200 Mtrs 5 LIGHTING FIXTURES 5.1 S & I of lighting fixtures with lamps as per the details below including necessary hardware such as clamos,nuts, bolts, nails, screws and suspension rods as required for fixing the fixtures in position as directed by architect / consultant W LED light fixtue Philips Quarda 1 or Crompton or GE equivalent Nos W LED Spot Light Fixtures Philips FFREEN LED or CROMPTON or GE equivalent 90 Nos X 10/18W LED Patti Tubelight having electronic ballast 8 Nos mm dia wall mounted exhaust fan of decorative plastic body and blade with louvers on the outside 8 Nos Page 4

5 6.O EARTHING 6.1 S & I of earth pit comprising of 600mm x 600mm x 3mm thick copper plate buried at a minimum depth of 2.5 mtr including necessary materials like charcoal,salt etc as required conforming to BIS standards having brick masonary chamber with hinged cover and watering arrangement 6.2 S & I of earth pit comprising of 600mm x 600mm x 6mm thick GI buried at a minimum depth of 2.5 mtr including necessary materials like charcoal,salt etc as required conforming to BIS standards having brick masonary chamber with hinged cover and watering arrangement 1 Nos 1 Nos 6.3 S & I of copper /GI earthing wires/strips in following sizes SWG copper bare wire 25 Mtrs SWG copper bare wire 25 Mtrs x 3 mm GI strip 10 Mtrs 6.4 S & I of isolated earthing / grounding system for computers etc.using insulated green yellow copper earthing wire laid through 20mm PVC conduits from separately made earth pit to the equipment in following sizes sqmm,cu.,in 20mm PVC conduit 50 Mtrs 7 MUSIC - CUM - PA - SYSTEM 7.1 S & I of point wiring for music - cum PA system comprising of 2x 1.0 sqmm stranded, copper conductor, flexible PVC insulated and PVC Sheathed wire pulled through 20 mm dia PVC heavy gauge conduits and looped from one speaker to other and to the volume control switch wherever applicable and finally terminated an tagblock 7.2 S & I of 6" dia 6W music speakers to be flushed mounted on false ceiling similer to Philips LDB8353/10.All speaker to be equipped with matching transformer for direct connection to 100v output line 22 Nos 22 Nos Page 5

6 7.3 S & I of volume control - cum - ON - OFF switch flush mounted on wall along with other electrical switches, The size and plate of the regulating knob should match with other switches nearby. 4 Nos 7.4 S & I of Central Music Station comprising of 1 Nos. of 100W Amplifier all inter connected as directed 1 Nos 7.5 S & I of CD Player ( Basic cost Rs. 4000/-) 1 Nos 8 Smoke Detector System With All Accessories. 8.1 Supply and installation, testing and commissioing of ionisation type smoke detectors to be mounted below /Above false ceiling whever required 40 NO 8.2 Supply, installation, testing and commissioing of response indicators 40 NO 8.3 Supply, installation, testing and commissioing of manual call point with break glass arrangement 3 NO 8.4 Supply, installation and termination of 2x1.5 Sqmm twisted FRLS armoured copper conductor cable approved by ETDC/TAC to be clamped neatly on ceiling/ wall/ partitions etc with GI clamps 800 RMT 8.5 Supply, installation, testing and commissioing of dual tone electronic hooter 2 NO 8.6 S.I.T.C. of 4 Zone firealarm panel with battery backup includiing all accessories. Complete as directed by the Architect. Ravel/Honeywell or equivalent. 8.7 Supply,installation and testing and commissioning of Auto Dialler system for the Fire Alarm System with tone and pulse switch 16X2 LCD display to send the pre recorded message of 40 to 60 Seconds 1 NO 1 NO 9 NETWORK & TELEPHONE Cabling & Other Accessories. 9.1 S.I.T.C. of CAT 6 Cable From Network Rack Room To each Work Station for Data & Voice ( 1No Data Cable + 1 Tel. Cable on each work Stn ) RMT Page 6

7 9.2 Twin Face Plate CAT 6 Information Outlet unit with in built RJ 45 Connector inclusive of Cover Plate/box etc. 10 NOS 9.3 Single Face Plate CAT 6 Information Outlet unit with in built RJ 45 Connector inclusive of Cover Plate/box etc. 70 NOS 9.4 S.I.T.C. of Double ended Factory Crimped CAT6 mounting/ Patch cord of 2 metre length 70 NOS 9.5 S.I.T.C. of Double Ended Factory Crimped CAT6 Mounting/Patch Cord of 1 meter length to be used on Work Station as well as in Network Rack 9.6 S.I.T.C. of 24 U Network Rack with accessories as Fan A.C. Power Strip etc. 9.7 S.I.T.C. of 24 Port Patch Panels in Network Racks ( 17 no. in each Rack) 9.8 Termination of CAT6 cables in 24 Port Patch Panels 9.9 testing, labelling, Commissioning of I/O nodes /Scanning etc S.I.T.C. of 100 Pair Jelly Filled armored 0.5 mm cable to be taken from the Central Telephone/Network Shaft in Corridor to each of the Network Rooms housing the M.D.F. 70 NOS 1 NOS 3 NOS 3 NOS lumsum 50 RMT 9.11 S.I.T.C. of 100 terminal Telephone Krone M.D.F. housed in a Single Door Metallic box. 1 set 9.12 Supply & Installation of RJ-11 telephone Single socket outlet point alongwith PVC back box with plate including all necessary hardware & accessories, etc. complete as required. The rate includes Termination, Testing and Documentation of Telephone Points Supply & Installation of RJ-11 telephone Double socket outlet point alongwith PVC back box with plate including all necessary hardware & accessories, etc. complete as required. The rate includes Termination, Testing and Documentation of Telephone Points. 70 NOS 10 NOS Page 7

8 SUMMARY Sr. No. Particulars 1 PANELS/DBs 2 CABELS / MAINS 3 WIRING 4 FLOOR -RACEWAYS: 5 LIGHTING FIXTURES 6 EARTHING 7 MUSIC - CUM - PA - SYSTEM 8 Smoke Detector System With All Accessories. 9 NETWORK & TELEPHONE Cabling & Other Accessories. TOTAL COST OF ELECTRICAL WORK CGST 9% SGST 9% TOTAL COST OF ELECTRICAL WORK INCLUDING GST Page 8

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD.

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. (A Wholly Owned Subsidiary of SBI) CIRCLE OFFICE: 4TH FLOOR, SBI LOCAL HEAD OFFICE III/1-PANDIT J N MARG, KHARAVELA NAGAR BHUBANESWAR, ODISHA-751001 Part-II PRICE

More information

SCHEDULE OF QUANTIY S.N. DESCRIPTION QTY UNIT RATE TOTAL

SCHEDULE OF QUANTIY S.N. DESCRIPTION QTY UNIT RATE TOTAL SCHEDULE OF QUANTIY S.N. DESCRIPTION QTY UNIT RATE TOTAL SECTION - A ( PANELS & D.B's) 1 Supply, Installation, Testing & Commissioning of 125 Amps TPN SFU with 100 Amps HRC fuses in the Meter room. QRO

More information

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) Signature of Bidder 1 of 11 EPI

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) Signature of Bidder 1 of 11 EPI FIRE PROTECTION 1 G.I.PIPES Supplying, installing, testing and commissioning of G.I Pipes confirming to IS 3589 Pt - I Heavy grade with painting, suitable type of supports, anchor fasteners, bolts nuts

More information

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

INDIAN INSTITUTE OF TECHNOLOGY KANPUR INDIAN INSTITUTE OF TECHNOLOGY KANPUR Tender tice. 119/IWD/ED/644 SCHEDULE OF QUANTITY Name of work: Electrical work for: Part-A: Rewinding, overhauling and repairing of ceiling fan and exhaust fan installed

More information

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA Tel: TENDER NO: TTU/T/01A/

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA   Tel: TENDER NO: TTU/T/01A/ TAITA TAVETA UNIVERSITY P.O.BOX 635-80300, VOI, KENYA EMAIL: procurement@ttu.ac.ke; Tel: 020 8150257 TENDER NO: TTU/T/01A/2017-2018 CONSTRUCTION OF PROPOSED ADMINISTRATION BLOCK- TAITA TAVETA UNIVERSITY

More information

BOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E

BOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E A 1 2 4 PUMP HOUSE: BOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E Supply, erection,testing & commissioning of Single stage, end suction / back pull-out type motor driven Jockey Pump of capacity 10.8

More information

MAZAGON DOCK SHIPBUILDERS LIMITED

MAZAGON DOCK SHIPBUILDERS LIMITED MAZAGON DOCK SHIPBUILDERS LIMITED (Formerly known as Mazagon Dock Ltd.) CIN : U35100MH1934GOI002079 (A Government of India Undertaking) Shipbuilders to the Nation Dockyard Road, Mazagon, Mumbai 400 010.

More information

Table-1: Clarifications and modification in tender specifications based on Pre-bid meeting discussion

Table-1: Clarifications and modification in tender specifications based on Pre-bid meeting discussion Table-1: Clarifications and modification in tender s based on Pre-bid meeting discussion Sr. Ref Page. 1 4 Clause Site Preparation and Partitions walls 2 11 SLD 3 18 Batteries 4 18 Batteries 5 32 to 34

More information

NAME OF WORK - IIM AHMEDABAD - LIBRARY BOQ OF ELV WORKS Item #

NAME OF WORK - IIM AHMEDABAD - LIBRARY BOQ OF ELV WORKS Item # NAME OF WORK - IIM AHMEDABAD - LIBRARY BOQ OF ELV WORKS Description Unit Qty Rate 1 INFORMATION & COMMUNICATIONS TECHNOLOGY (DATA) 1.1 Supply & laying of 25 mm dia. Open/conceal manner medium gauge rigid

More information

Following are the systems proposed as per NBC & Local Fire Authority:

Following are the systems proposed as per NBC & Local Fire Authority: 1. OBJECTIVES AND STRATEGIES OF THE FIRE PROTECTION DESIGN This report describes the design parameters, system requirements of fire protection system for mixed occupancy (Assembly + Business) building

More information

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No.

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No. BILL 1 GROUND FLOOR Supply, Deliver, Install, Set to Work and Commission the Following: 1.01 Lighting point completely wired in 3x1.5mm² single core PVC insulated copper cables drawn in 20mm diameter HG

More information

PRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM

PRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM ANNEXUREIII D: FIRE PROTECTION SYSTEM SECTION ADDRESSABLE FIRE DETECTION AND ALARM SYSTEM Supply, Installation, testing and commissioning of Analogue Addressable Fire Alarm Control panel with battery backup

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Hatimara Road, Barenda, Kashimpur, Gazipur, Gazipur Dhaka The Alliance for Worker Safety Page 1/18 Introduction to the Report The following report contains

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Assessor: Karardi, Shibpur, Narsingdi Narsingdi Dhaka Bangladesh Emkay Enterprises The Alliance for Bangladesh Worker Safety Page 1/15 10 Apr 2016 Introduction

More information

HEAD OFFICE, SECURITY DEPARTMENT

HEAD OFFICE, SECURITY DEPARTMENT BANK OF INDIA HEAD OFFICE, SECURITY DEPARTMENT RATE TO BE QUOTED BY THE VENDOR Sr. no. Description Make Model Unit Rate Tax Total Amount I BURGLAR ALARM SYSTEM A Burglar/Intruder Alarm System.B Control

More information

DC POWER DISTRIBUTION BOARD

DC POWER DISTRIBUTION BOARD DC POWER DISTRIBUTION BOARD February 2016 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.

More information

TECHNICAL SPECIFICATION FOR FIRE DETECTION & ALARM SYSTEM INCLUDING FIRE EXTINGUISHERS

TECHNICAL SPECIFICATION FOR FIRE DETECTION & ALARM SYSTEM INCLUDING FIRE EXTINGUISHERS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATION FOR FIRE DETECTION & ALARM SYSTEM INCLUDING FIRE EXTINGUISHERS GETCO/ENGG/TS/

More information

SECTION LOW VOLTAGE LIGHTING CONTROLS

SECTION LOW VOLTAGE LIGHTING CONTROLS SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

CENTRAL BOARD OF SECONDARY EDUCATION SHIKSHA KENDRA, 2, COMMUNITY CENTRE, PREET VIHAR, DELHI

CENTRAL BOARD OF SECONDARY EDUCATION SHIKSHA KENDRA, 2, COMMUNITY CENTRE, PREET VIHAR, DELHI CENTRAL BOARD OF SECONDARY EDUCATION SHIKSHA KENDRA, 2, COMMUNITY CENTRE, PREET VIHAR, DELHI 110092 NOTICE INVITING TENDER CBSE invites sealed Item rate tender from eligible contractors who are registered

More information

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION Yunusco (BD) Ltd(Formerly Shore To Shore Textiles Ltd.) Plot# 224-233, Adamjee EPZ, Shiddirgonj, Narayangonj Siddirgonj The Alliance for Bangladesh Worker

More information

SCHEDULE OF RATES SHEET PRELIMINARIES

SCHEDULE OF RATES SHEET PRELIMINARIES Page : 1 PRELIMINARIES 1 CONTAINER BUDGET ALLOWANCE 1,100.00 1,100.00 1 SUPERVISION 3,900.00 3,900.00 1 ACCOMMODATION 5,390.00 5,390.00 1 TRAVEL ALLOWANCE 7,800.00 7,800.00 Sub- 18,190.00 18,190.00 Page

More information

SUPPLY,INSTALLATION,TESTING AND COMMISSIONING OF SPRINKLER SYSTEM AND FIRE ALARM SYSTEM FOR AIR INDIA LIMITED AT SHAMSHABAD, HYDERABAD.

SUPPLY,INSTALLATION,TESTING AND COMMISSIONING OF SPRINKLER SYSTEM AND FIRE ALARM SYSTEM FOR AIR INDIA LIMITED AT SHAMSHABAD, HYDERABAD. i 1 a SPRINKLER SYSTEM M S Pipes confirming to IS 1239 Pt - I Heavy grade with painting, suitable type of supports malleable srewed specials such as M S Reducers,Tees, elbows, flanges. Including cutting,

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory Sharoj Tower, Plot No, M-4/2, Section-14, Mirpur, Dhaka Dhaka Dhaka 20 May 2014 The Alliance for Worker Safety Page 1/18 20 May 2014 Introduction

More information

MAZAGON DOCK SHIPBUILDERS LIMITED

MAZAGON DOCK SHIPBUILDERS LIMITED MAZAGON DOCK SHIPBUILDERS LIMITED (Formerly known as Mazagon Dock Ltd.) CIN : U35100MH1934GOI002079 (A Government of India Undertaking) Shipbuilders to the Nation Dockyard Road, Mazagon, Mumbai 400 010.

More information

Item/clause/Page no. Description as per tender. To be read as

Item/clause/Page no. Description as per tender. To be read as Date- 02.11.2012 Amendment-2 Work - Tender for SITC of HT/LT substation equipments installation and allied electrical works for lecture theatre complex, FCI campus, University of Allahabad, Allahabad.

More information

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION Assessor: Nalzani, Chandana Joydebpur, Gazipur Joydebpur, Gazipur Dhaka Emkay Enterprises The Alliance for Worker Safety Page 1/13 Introduction to the Report

More information

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) PRICED BILL OF QUANTITIES

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) PRICED BILL OF QUANTITIES NAME OF PROJECT : CONSTRUCTION OF SUPER SPECIALITY HOSPITAL FOR GOVT. RAJAJI MEDICAL COLLEGE, MADURAI, TAMIL NADU - FIRE PROTECTION & FIRE ALARM SYSTEM. NIT NO. SRO/MKT/TH/290 dated 03.07.2014 Item no.

More information

MANUFACTURER OF LT PANELS

MANUFACTURER OF LT PANELS MANUFACTURER OF LT PANELS POWER CONTROL CENTRE PANEL(PCC): Power Control Centre is used for distribution & control of various power source used in industry. Normally PCC is installed near power source.

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory Assessor: 33/1, Darail, Shataish Tongi, Gazipur Tongi, Gazipur Dhaka Emkay Enterprises 26 Feb 2014 The Alliance for Worker Safety Page 1/12 26 Feb

More information

LAWSON FINAL DISTRIBUTION PRODUCTS RANGE

LAWSON FINAL DISTRIBUTION PRODUCTS RANGE FINAL DISTRIBUTION PRODUCTS RANGE ISO 14001:2004 Certified ISO 9001:2008 Certified FUSES INDIA LTD Lawson Fuses India Ltd is a wholly owned subsidiary of Lawson Fuses Ltd,a long established UK company

More information

UEE30811 Q-Tracker Work Tasks

UEE30811 Q-Tracker Work Tasks UEE30811 Q-Tracker Work Tasks UEENEEC020B Participate in electrical work and competency development activities Q-Tracker requirements: 40 hours of practical training. 1. Comply with electrical industry/enterprise

More information

Public Safety DAS Annunciator Panel

Public Safety DAS Annunciator Panel Public Safety DAS Annunciator Panel 120 VAC Models: 1221-A, 1221-B, 1221-C Revision D 91117 48 VDC Models: 1221-A-48, 1221-B-48, 1221-C-48 24 VDC Models: 1221A-24, 1221-B-24, 1221-C-24 CAUTION: (Read This

More information

Annexure - 1. Detectors: Fire Alarm Control Panel :

Annexure - 1. Detectors: Fire Alarm Control Panel : Item 1. Supply Part This Specification includes Supply, Warranty, Installation, Testing and Commissioning and integration of the Fire Alarm System mainly consisting of the Fire Alarm Control Panel (FACP),

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Address: 687, Al-Haj Nurl Amin Sowdagar Lane CDA, R/A, Road No 20, South Agrabad Chittagong Chittagong Bangladesh 03 Apr 2014 The Alliance for Bangladesh

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory C-13, South Badda, Gulshan-1, Badda, Dhaka Dhaka Dhaka 22 May 2014 The Alliance for Worker Safety Page 1/21 22 May 2014 Introduction to the Report The

More information

CHAPTER 20 SERVICE EQUIPMENT

CHAPTER 20 SERVICE EQUIPMENT SERVICE EQUIPMENT CHAPTER 20 SERVICE EQUIPMENT Service equipment includes service cabinets and the equipment and materials necessary for installation. 20.1 Signal Service Cabinet For MnDOT traffic control

More information

Self-Regulating Point Heating Performance Requirements

Self-Regulating Point Heating Performance Requirements Self-Regulating Point Heating Performance Requirements The severity of the winter weather conditions in the UK varies geographically and from year to year. To provide point heaters that will perform satisfactorily

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory 50-60, Dakkhin Panishail. N.K. Link Road, Kashimpur, Gazipur Gazipur 08 May 2014 The Alliance for Bangladesh Worker Safety Page 1/23 08 May 2014

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory SFB 2 Adamjee EPZ, Siddergonj, Narayangonj, Siddhirgonj Dhaka 22 Feb 2017 The Alliance for Worker Safety Page 1/18 Factory 22 Feb 2017 Introduction to

More information

SECTION PUBLIC ADDRESS SYSTEMS

SECTION PUBLIC ADDRESS SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Amplifier and control equipment B. Input equipment C. Raceways and communications cable D. List of equipment for gym PA system E. List of equipment for cafeteria

More information

KATALOGE. Trading of Electrical Switchgear, Lightings, Machineries & Construction Materials. Jamar Trading Co. W.L.L.

KATALOGE. Trading of Electrical Switchgear, Lightings, Machineries & Construction Materials. Jamar Trading Co. W.L.L. KATALOGE Trading of Electrical Switchgear, Lightings, Machineries & Construction Materials Jamar Trading Co. W.L.L. ACB & MCCB Main Panels We assemble Power Distribution Panels for local and export market.

More information

Walk in Steam Curing Chamber for Concrete Application. Detailed Working Specifications

Walk in Steam Curing Chamber for Concrete Application. Detailed Working Specifications Detailed Working Specifications The Chamber with extremely high fabrication standard, high quality of finish, which matches the performance with emphasis on reliability and economy of use. The use of the

More information

TOTAL OF GROUP A ESTIMATE PROPOSED AIR CONDITIONING WORKS FOR STATE BANK OF IND. SR. Description QTY UNIT GROUP A AIRCONDITIONING

TOTAL OF GROUP A ESTIMATE PROPOSED AIR CONDITIONING WORKS FOR STATE BANK OF IND. SR. Description QTY UNIT GROUP A AIRCONDITIONING ESTIMATE PROPOSED AIR CONDITIONING WORKS FOR STATE BANK OF IND SR. Description QTY UNIT GROUP A AIRCONDITIONING 1 Supplying and erecting split type room Airconditioning unit 1.5 TR 3/5 star capacity 230/250V,

More information

INSTALL AN ELECTRIC SHOWER

INSTALL AN ELECTRIC SHOWER INSTALL AN ELECTRIC SHOWER The plumbing and wiring involved in installing an electric shower requires sound basic skills in both areas of expertise. Ensure that wiring and plumbing are properly installed.

More information

TR CASSETTE AC 1 NOS TR CASSETTE AC 1 NOS. Rate in words : TR HIGH WALL (3 star rated) 2 NOS.

TR CASSETTE AC 1 NOS TR CASSETTE AC 1 NOS. Rate in words : TR HIGH WALL (3 star rated) 2 NOS. BILL OF QUANTITIES FOR AIR CONDITIONING WORKS S.N. DESCRIPTION QTY UNIT VENTILATION & AIR CONDITIONING A HIGH SIDE WORKS (SUPPLY OF EQUIPMENTS) 1 DX TYPE SPLIT AIR-CONDITIONERS: Supply of Aircooled Split

More information

DCA4. Digitally controlled Audio Matrix. Current Thinking. Product Specification March Document Number DDC DCA ACS

DCA4. Digitally controlled Audio Matrix. Current Thinking. Product Specification March Document Number DDC DCA ACS DCA4 Digitally controlled Audio Matrix Product Specification March 2002 Current Thinking Document Number DDC DCA 7001 01 ACS Introduction Voice Alarm (VA) systems are the quickest way to evacuate the public

More information

TIME KNITWEAR (PVT) LTD.

TIME KNITWEAR (PVT) LTD. ELECTRICAL SAFETY INSPECTION REPORT TIME KNITWEAR (PVT) LTD. Baribogh, Enayetnagar, Fatullah, Narayangonj-1400, Bangladesh Factory List: 1. Time Knitwear (Pvt) Ltd. Inspected by: Dawa Report Generated

More information

Fillmore Small Pendant Assembly and Installation Instructions

Fillmore Small Pendant Assembly and Installation Instructions CAUTION: Fillmore Small Pendant Assembly and Installation Instructions BEFORE INSTALLING FIXTURE, MAKE SURE THE POWER TO THE CIRCUIT IS TURNED OFF AT THE MAIN FUSE BOX / CIRCUIT BREAKER UTILITY BOX. Important

More information

RHT RAIL HEATER. Rail & Switch Point Heating System. Pre-Terminated Lengths or Cut-to-Length from the Reel

RHT RAIL HEATER. Rail & Switch Point Heating System. Pre-Terminated Lengths or Cut-to-Length from the Reel RHT HEATER Rail & Switch Point Heating System Pre-Terminated Lengths or Cut-to-Length from the Reel Introduction Rail switch points suffer during the winter months from snow and ice blocking the moving

More information

+91-8071806510 Neminath Electricals http://www.neminathelectricals.in/ We are one of the leading manufacturers, suppliers and traders of a wide range of optimum quality Outdoor & Industrial LED Lighting

More information

VOLUME 2 (BOQ & Price Bid)

VOLUME 2 (BOQ & Price Bid) TENDER DOCUMENT NIT No: PAT/CON/721/01 FOR Tender for Supply, Erection & Commissioning of Refrigeration Plant for chilled water system for Ice-Cream mix section complete for 20 KLPD Ice Cream Plant at

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT SIKDER APPAREL HOSIERY LTD. Khadun (Dug No. 342/343), Tarabo, Rupgonj, Narayanganj, Bangladesh. Factory List: 1. Sikder Apparel Hosiery Ltd. Inspected by: Pema Wangdi

More information

SECTION ELECTRICAL GENERAL PROVISIONS

SECTION ELECTRICAL GENERAL PROVISIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. General provisions for Electrical Systems B. Wire and cable for 600 volts and less. C. Wiring connectors. D. Electrical tape. E. Heat shrink tubing. F. Wire pulling

More information

Requirements for Electrical Installations

Requirements for Electrical Installations BRITISH STANDARD BS 7671:2018 Corrigendum (December 2018) Requirements for Electrical Installations IET Wiring Regulations Eighteenth Edition The Institution of Engineering and Technology and BSI NO COPYING

More information

FIRE ALARM CONTROL EQUIPMENT. Addendum October 2006 Instructions for new style EN54-4 Power supply unit module

FIRE ALARM CONTROL EQUIPMENT. Addendum October 2006 Instructions for new style EN54-4 Power supply unit module FIRE ALARM CONTROL EQUIPMENT Addendum October 2006 Instructions for new style EN54-4 Power supply unit module MXLK-05 Issue 2.0 June 2007 INSTALLATION Safety Suppliers of articles for use at work are required

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FOPTEX (PVT.) LTD. PLOT# A/24-25, VSCIC HOSIERYFATULLAH, CHITTAGONG, BANGLADESH. Factory List: 1. Foptex (Pvt.) Ltd. Inspected by: Tashi Penjor Report Generated by:

More information

TENDER ELECTRICAL & L.V. WORKS MUMBAI LARGE CORPORATE BRANCH

TENDER ELECTRICAL & L.V. WORKS MUMBAI LARGE CORPORATE BRANCH TENDER ELECTRICAL & L.V. WORKS FOR MUMBAI LARGE CORPORATE BRANCH AT 4 TH FLOOR BANK OF INDIA, MUMBAI MAIN BUILDING, M.G. ROAD, FORT, MUMBAI ARCHITECTS: M/s Prakash Walavalkar & Associates Email: pwassociates.in@gmail.com

More information

TrueCom. Building Communications Systems 5115-Series , Area of Rescue Communications System. Description

TrueCom. Building Communications Systems 5115-Series , Area of Rescue Communications System. Description TrueCom Building Communications Systems 5115-Series 5115-9001, -9002 Area of Rescue Communications System Description The Simplex 5115-9001 and -9002 Area of Rescue Communications System provides buildings

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Assessor: 5th floor, Ehasan Tower, 227/B, Hafez Nagar, Bakalia, Chittagong. Uttaron 22 Jul 2014 The Alliance for Bangladesh Worker Safety Page 1/19 Factory

More information

User Information Sheet 008 : 2010

User Information Sheet 008 : 2010 User Information Sheet 008 : 2010 Formerly UIS008, July 2009 ELECTRICAL INSTALLATIONS ASSOCIATED WITH BULK LPG INSTALLATIONS 1. Introduction This Information Sheet describes some of the principles and

More information

Guide to: 17 th Edition Consumer Units

Guide to: 17 th Edition Consumer Units Guide to: 17 th Edition Consumer Units Introduction For well over one hundred years the Wiring Regulations have provided the rules which must be followed to make sure that electrical installations are

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Factory 169-171 Tetulzhora Union, Hemayetpur, Savar Savar Dhaka 24 May 2014 The Alliance for Worker Safety Page 1/20 24 May 2014 Introduction to the Report

More information

Installation Instructions

Installation Instructions Installation Instructions Before you begin... 2 Location... 2 Recommended grounding instructions... 2 Electrical requirements... 2 Exhaust requirements... 3 Water supply and drain requirements... 3 Please

More information

ANNEXURE-III BUILDING MANAGEMENT SYSTEM (BMS) BMS Total ANNEXURE-III. SL DESCRIPTION OF ITEM UNIT QTY Rate in figures Rate in words AMOUNT

ANNEXURE-III BUILDING MANAGEMENT SYSTEM (BMS) BMS Total ANNEXURE-III. SL DESCRIPTION OF ITEM UNIT QTY Rate in figures Rate in words AMOUNT PRICE BID Name of the Project : Supply, Installation, Testing and Commissioning of BMS, PA, CCTV, AVS, Access Control System for Construction of Partially completed Building at Centre for Development of

More information

HINDUSTAN PETROLEUM CORPORATION LIMITED MUMBAI REFINERY DHT PROJECT ENGINEERING DESIGN BASIS ELECTRICAL

HINDUSTAN PETROLEUM CORPORATION LIMITED MUMBAI REFINERY DHT PROJECT ENGINEERING DESIGN BASIS ELECTRICAL Sheet 1 of 40 HINDUSTAN PETROLEUM CORPORATION LIMITED MUMBAI REFINERY DHT PROJECT ENGINEERING DESIGN BASIS ELECTRICAL DOCUMENT NO: 44LK-5100-00/E.02/0001/A4 Rev No. Issue Date Pages Rev Description Prepared

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Updated section on Manufacturers 3 1. 6/15/16 Updated division section from 16120 to 26 05 00, - mgl44

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name: Plot 33-35, Dhaka (EPZ), Savar Savar Dhaka Bangladesh 06 Jul 2014 The Alliance for Bangladesh Worker Safety Page 1/19 06 Jul 2014 Introduction to

More information

REPUBLIC OF KENYA MINISTRY OF HEALTH BIDDING DOCUMENT VOL 3.1 GENERAL ELECTRICAL INSTALLATIONS (ALL RATES EXCLUSIVE OF TAXES)

REPUBLIC OF KENYA MINISTRY OF HEALTH BIDDING DOCUMENT VOL 3.1 GENERAL ELECTRICAL INSTALLATIONS (ALL RATES EXCLUSIVE OF TAXES) REPUBLIC OF KENYA MINISTRY OF HEALTH EAST AFRICA S CENTERS OF EXCELLENCE FOR SKILLS AND TERTIARY EDUCATION IN BIOMEDICAL SCIENCES PROPOSED CONSTRUCTION OF EAST AFRICA S KIDNEY INSTITUTE COMPLEX AT KENYATTA

More information

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

More information

EviKontroll Silo. Monitor Your Grain Anytime, Anywhere

EviKontroll Silo. Monitor Your Grain Anytime, Anywhere C Grain temperature monitoring system Monitoring the temperature inside grain silos is the most important measure to assure the storage quality. EviKontroll Silo fully automatic temperature monitoring

More information

A. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod

A. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod Journeyman and Master Common Exam 2 1 The grounding terminal of a grounding-type receptacle installed in a metal box shall be? A. Connected to the equipment ground B. Bonded to the box C. Connected to

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

Electrical Equipment & Systems

Electrical Equipment & Systems ELECTRA has been associated with world renowned electrical equipment and systems manufacturers since 1965. Our international manufacturers and suppliers are known for their quality, creativity, unique

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory 81, Kalmessar, "Jalal Shopping Complex" Board Bazar, Gazipur. 20 May 2014 The Alliance for Bangladesh Worker Safety Page 1/21 20 May 2014 Introduction

More information

GAS FLOODING SYSTEM FOR CIFF AT BASEMENT

GAS FLOODING SYSTEM FOR CIFF AT BASEMENT CONSTRUCTION OF BUILDINGS FOR LABORATORIES AND ASSOCIATED FACILITIES INSTEM BANGALORE SCHEDULE OF QUANTITIES FOR (EQUIPMENT ROOM 3 & 4) Sl.No. Description Unit Quantity Rate (in INR) in figure HFC-227ea

More information

INTER PLANT STANDARD STEEL INDUSTRY

INTER PLANT STANDARD STEEL INDUSTRY INTER PLANT STANDARD STEEL INDUSTRY IPSS CODE OF PRACTICE FOR END TERMINATION AND JOINTING OF CABLES BY COMPRESSION MEHOD AND SPECIFICATION FOR DIELESS HYDRAULICALLY OPERATED CRIMPING TOOL (First Revision)

More information

KTDC/EW/RD/ELE/Sign Boards/AE(E)-1/02/ QUOTATION NOTICE

KTDC/EW/RD/ELE/Sign Boards/AE(E)-1/02/ QUOTATION NOTICE KRALA TOURISM DVLOPMNT CORPORATION LTD (A Government of Kerala Undertaking) ngineering Wing, Mascot Square, Thiruvananthapuram 695 033 Phone: 2318976, 2721243 Fax: ++91-471-2316168 website: www.ktdc.com

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Address: Plot 61-64 & 70-73, Sector 02, KEPZ Karnafully, North Patenga, Chittagong Chittagong Chittagong Bangladesh The Alliance for Bangladesh Worker Safety

More information

P-16 ENGINEER NO. DATE DESCRIPTION 1 01/19/2016 FOR CONSTRUCTION 2 03/11/2016 REVISION # 2 DRAWN BY: CHECKED BY: DATE: SCALE: DRAWING NUMBER

P-16 ENGINEER NO. DATE DESCRIPTION 1 01/19/2016 FOR CONSTRUCTION 2 03/11/2016 REVISION # 2 DRAWN BY: CHECKED BY: DATE: SCALE: DRAWING NUMBER PRESSIONAL P-16 PRESSIONAL PRESSIONAL PRESSIONAL 1 ONE LINE DIAGRAM 3 EMEGENCY LIGHTING SCHEME 2 FEEDER SCHEDULE PRESSIONAL PRESSIONAL PRESSIONAL PRESSIONAL LOCAL SINGLE POLE SWITCH 3-WAY SWITCH 3-WAY

More information

SECTION (15767) - UNIT HEATERS

SECTION (15767) - UNIT HEATERS SECTION 23 82 39 (15767) - UNIT HEATERS PART 1 GENERAL 1.01 SUMMARY A. Section includes: 1. Unit Heaters. 2. Cabinet Unit Heaters. 3. Duct Heaters. 4. Baseboard Heaters. B. Related Sections: 1. Section

More information

POINT OBSTRUCTION CONTROLLER POC TOUCHSCREEN CONTROLLERS

POINT OBSTRUCTION CONTROLLER POC TOUCHSCREEN CONTROLLERS POINT OBSTRUCTION CONTROLLER Compliances: FAA Advisory Circular 70/7460-1L ICAO Annex 14, Volume I, Chapter 6 The controller provides the control and monitoring functions for an LED red obstruction lighting

More information

Installation Instructions Part No

Installation Instructions Part No Model PS02SS00 Professional Series Refrigerated, Internet Controlled 0 Electric Built-In Double Wall Oven Installation Instructions Part No. 101206 2 4 5 6 7-14 15 15 15 Before You Start Electrical Requirements

More information

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department SOUTH DUBLIN COUNTY COUNCIL Roads (Traffic and Transportation) Department TECHNICAL SPECIFICATION 4 SDCC-TS-04 SIGNAL INSTALLATION REQUIREMENTS REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF TRAFFIC CONTROL

More information

Level 3 NVQ Diploma in Domestic Plumbing and Heating ( /025)

Level 3 NVQ Diploma in Domestic Plumbing and Heating ( /025) City & Guilds Tutor Training Guidance Level 3 6189 NVQ Unit 305/025 Understand and carry out electrical work on domestic plumbing and heating systems and components April 2013 This document is for tutors

More information

Special Provision No. 682S27 June This Special Provision refers to the following standards, specifications or publications:

Special Provision No. 682S27 June This Special Provision refers to the following standards, specifications or publications: CONTROLLER CABINETS, POLE MOUNTED - Item No. Special Provision No. 682S27 June 2017 1. SCOPE This Special Provision covers the requirements for the installation of pole mounted controller cabinets and

More information

A. This Section includes the following lighting control devices:

A. This Section includes the following lighting control devices: SECTION 26 09 23 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Total Fire Solutions. Includes BS 8519 and the updated BS :

Total Fire Solutions. Includes BS 8519 and the updated BS : Total Fire Solutions Includes BS 8519 and the updated BS 5266-1:2011 www.aeicables.co.uk Introduction: Total Fire Solutions Power and control cable systems for life safety and fire-fighting applications

More information

Installation Instructions

Installation Instructions Installation Instructions Ordering Code: RF16UQT1XXC RF32UQT1XXC RF32UHT1XX RF45UQT1XXC RF45UHT1XX PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLATION OF THE FOLLOWING: 4 STRIP FIXTURES 8 STRIP FIXTURES

More information

TENDER NO. PGVCL/PROC/SMC BOX FOR CT OPERATED METER & Junction Box/867

TENDER NO. PGVCL/PROC/SMC BOX FOR CT OPERATED METER & Junction Box/867 1.0 SCOPE: SCHEDULE - X TECHNICAL SPECIFICATION FOR SERVICE CONNECTION BOX MADE FROM THERMOSETTING PLASTIC FOR SERVICE CONNECTIONS. 1.1 This specification covers the design, manufacturing and testing of

More information

STATEMENT OF WORK. System Description:

STATEMENT OF WORK. System Description: STATEMENT OF WORK Scope of Work: To install a paging/sound system throughout the Rapid City Swim Center (RCSC). This work shall includes all labor, material equipment and related services necessary to

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior

More information

MXn RACK OVEN SPARES MANUAL MACHINE NO.FG164

MXn RACK OVEN SPARES MANUAL MACHINE NO.FG164 www.monoequip.com MXn RACK OVEN SPARES MANUAL MACHINE NO.FG164 When ordering spares please quote the machine serial number which can be found on the silver information plate of the machine and on the front

More information

Prem1er EVACS16. Installation Manual VOICE ALARM CONTROL PANEL 4 16 ZONES

Prem1er EVACS16. Installation Manual VOICE ALARM CONTROL PANEL 4 16 ZONES Prem1er EVACS16 VOICE ALARM CONTROL PANEL 4 16 ZONES Installation Manual Approved Document No: GLT.MAN-141 PAGE 1 INDEX INDEX... 2 Summary... 3 Safety information & use of this manual... 5 Installation

More information

A. This Section includes the following lighting control devices:

A. This Section includes the following lighting control devices: Attachment G LIGHTING CONTROL SPECIFICATIONS (Download Document separately) LIGHTING CONTROL SPECIFICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including

More information

ACSI MODEL 1410 POWER SUPPLY INSTALLATION INSTRUCTIONS

ACSI MODEL 1410 POWER SUPPLY INSTALLATION INSTRUCTIONS II 1400-3 ACSI MODEL 1410 POWER SUPPLY INSTALLATION INSTRUCTIONS Features: For use with doors or groups of doors that must interlock with each other to regulate control of accessing one area from another,

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW) SECTION 26 05 21 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of the low voltage power and lighting wiring. 1.2 RELATED WORK A. Excavation and backfill

More information