"CENTAURUS SOLAR" PHOTOVOLTAIC SOLAR ARRAY PROJECT FOR LODESTAR ENERGY AT 175 BUTTERFIELD DRIVE

Size: px
Start display at page:

Download ""CENTAURUS SOLAR" PHOTOVOLTAIC SOLAR ARRAY PROJECT FOR LODESTAR ENERGY AT 175 BUTTERFIELD DRIVE"

Transcription

1 "CENTAURUS SOLAR" PHOTOVOLTAIC SOLAR ARRAY PROJECT FOR LODESTAR ENERGY AT 175 BUTTERFIELD DRIVE ZONG SSACHUSETTS C-1.1 C '± PREPARED BY: Design Consultants, Inc. Consulting Engineers and Surveyors TITLE DEX: 663'± No. DESCRIPTION 1'=100' C-0.0 C-1.0 C-1.1 C-2.0 C-3.0 C-3.1 C-4.0 C-4.1 COVER EXISTG CONDITIONS PLAN I EXISTG CONDITIONS PLAN II SITE PREPARATION PLAN SITE, GRADG & DRAAGE PLAN I SITE, GRADG & DRAAGE PLAN II DETAILS I DETAILS II C-1.0 C-3.0 C-0.0

2 EXISTG CONDITIONS PLAN I 1'=40' C-1.0

3 EXISTG CONDITIONS PLAN II 1'=40' C1.1

4 SITE PREPARATION PLAN 1'=80' STABILIZED CONSTRUCTION ENTRANCE C2.0

5 SITE, GRADG & DRAAGE PLAN I 1'=40' 11/12/2015 PROVIDE SU-30 ACCESS 10/8/2015 TOTAL SOLAR PANELS = 7,968 PANELS PANELS & DRIVEWAY LAYOUT C-3.0

6 SEE ABOVE VIEW FOR CONTUATION SITE, GRADG & DRAAGE PLAN II 1'=40' 11/12/2015 PROVIDE SU-30 ACCESS 10/8/2015 PANELS & DRIVEWAY LAYOUT C3.1

7 RA GARDEN NEW PLANTED AREA SECTION WETLAND FGER CROSSG SITE DETAILS I 24" OR AS SPECIFIED BY UTILITY COMPANY N.T.S. D/2 + 6" GRAVEL DRIVE ELECTRIC & COMMUNICATIONS TRENCH TEMPORARY CONSTRUCTION SILT FENCE C4.0

8 Common Name Latin Name Comments Quantity Plant Size Wetland Status 11'-8 1 2" 6' " 5' " Steeplebush Spiraea tomentosa 4 to 6 feet on center, small shrub - plant in clusters along edge and do not surround with larger shrubs ' FACW Winterberry Holly Ilex verticillata Group in 6 or more, 5 to 7 feet on center ' FACW+ 25 Silky Dogwood Cornus amomum Plant 8 to 10 feet on center with tubelings planted 3 feet on center to fill in area around and between plants ' FACW Red-osier Dogwood Cornus sericea Plant 8 to 10 feet on center with tubelings planted 3 feet on center to fill in area around and between plants ' FACW+ 12'-11" LENGTH DETERMED BY PV MODULE DIMENSIONS PORTRAIT ORIENTATION 3' " 2' " 3' " 8'-5 1 2" VARIES EROSION CONTROL SILT SOCK (TYP) Silky Dogwood Cornus amomum Plant 3 feet on center around larger of same species to create dense clusters 110* tubelings FACW Red-osier Dogwood Cornus sericea Plant 3 feet on center around larger of same species to create dense clusters 144* tubelings FACW+ Pussy Willow Salix discolor Plant in groups of 6 or more, 4 to 6 feet on center 30* Tubelings FACW plant size based on availability - sizes based on New England Wetland Plants - typical. *Actual quantities to plant and purchase are higher, - available in trays of 38, round up for ordering purposes BVW restoration area** **Species and sizes may be adjusted based on plant availability WETLAND BOUNDARY (VEGE. & SOILS) UPLAND ADJUST FISHED GRADE TO MIMIC EXISTG WETLAND TOPOGRAPHY (PIT & MOUNDG, ETC. - DO NOT COMPACT SOILS WITH REPLICATION AREAS). NOTES: Excavate to match surrounding BVW elevation. If original wetland soil is not encountered, overexcavate 12 inches and use rich organic soil or soil/weed free compost mix to bring area to grade. Grades to be adjusted and plants located under the supervision of wetland scientist. Mulch area after planting with leaf litter or leafy compost. Scatter woody debris amongst plants as directed by wetland scientist. 3'-0" M. 10" POST SECTION W8 X 10 STEEL POST LE OF GRADE POST TYPE 'A' = 6'-0" MIMUM EMBEDMENT 4'-7 3 4" VARIES MATCH ELEVATION EXIST WETLAND HYDRIC SOILS SLOPE < 3% WETLAND REPLICATION UNDISTURBED GROUND WETLAND REPLICATION CONSTRUCTION 11'-8 1 2" 10.00' (TYP) 11'-8 1 2" 36" (M.) SOLAR PANEL AND PILE SUPPORT SECTION END POST CAP (TYP) SOLOAR ARRAY SPACG & RACKG FABRIC FOR FENCES 5 FEET OR OVER HEIGHT: BOTH THE TOP AND BOTTOM SELVAGE TO HAVE TWISTED AND BARBED FISH UNLESS OTHERWISE NOTED Stake on 3' Lineal Spacing Area to be Protected 2" x 2" Wooden Stake Filtrexx SiltSoxx (18" Typical) Work Area 3" - 4" Area to be Protected 12" 10'-0" CENTER TO CENTER (MAX) STALL THREE BARBED WIRES WITH 45 DEGREE, ONE PIECE, THREE WIRE EXTENSION ARMS ABOVE FENCE TOP RAIL 1 3 4"Ø SITE DETAILS II Water Flow Work Area Filtrexx SiltSoxx Plan View Filtrexx Compost SiltSoxx Filtrexx SiltSoxx Section Notes: 1. All material to meet Filtrexx specifications 2. SiltSoxx compost/jsoil/rock/seed fill to meet application requirements. 3. Compost material to be dispersed on site, as determined by Engineer. Filtrexx SiltSoxx 12"± 6'-0" 3'-0" BAR 12" TERVALS STRETCHER BAR CORNER OR END POST 3"Ø CEM CONC BASE (CLASS A) TRUSS ROD EXPANSION SLEEVE TURNBUCKLE (6" TAKUP) LE POST 2 3 8"Ø (TYP) WIRE 15" TERVALS CHA LK FABRIC (2 1 2" MESH) FISHED GRADE N.T.S. GRAVEL ACCESS DRIVE EROSION CONTROL SILT SOCK 6" M. 12" SONOTUBE 12"Ø M. NOTES: ALL FENCE MATERIALS SHALL BE HOT-DIPPED GALVANIZED CHA LK FENCE C4.1

Legend 22'-2" Sta 10+43 Bark mulch (Typ) 4 R20'-6" Landscape Edging Schedule A Seed Mix - Mowable Schedule B Seed Mix (Typ) Schedule A Seed Mix (Typ) 3' width, 4" depth rock mulch (Typ) 5'-0" Schedule

More information

Information for File # JTF

Information for File # JTF Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil

More information

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

Operations and Maintenance Plan

Operations and Maintenance Plan Civil Engineering Land Surveying Environmental Consulting Landscape Architecture Operations and Maintenance Plan for Solar Panel Facility Haverhill, MA Prepared By: Hancock Associates #19168 Prepared For:

More information

Rain Gardens. Reconnecting with the Rain. Rachel Calabro Massachusetts Riverways Program

Rain Gardens. Reconnecting with the Rain. Rachel Calabro Massachusetts Riverways Program Rain Gardens Reconnecting with the Rain Rachel Calabro Massachusetts Riverways Program Natural Conditions Developed Conditions Atmospheric Deposition Pollutants carried away by wind and traffic Pollutants

More information

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET SUPPTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WKSHEET For Department of Ecology Stormwater BMP T5.13 This submittal worksheet will help determine what soil amendments are needed to meet the

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary 0 25 50 00 Feet Parcel Boundary, Approximate 202 LIDAR 2 FT CONTOURS, VCGI BING AERIAL NRCS SOIL MAPPING MMI FIELD DATA Culvert Pipe Swale 0 Scale: "=40' SOURCE(S): NRCS Soil Area Boundary Overland st

More information

STREAM ALTERATION PRACTICES

STREAM ALTERATION PRACTICES STREAM ALTERATION PRACTICES Stream Diversion Channel SDC DEFINITION A temporary channel constructed to convey stream flow around in-stream construction. PURPOSE Stream diversion channels are used to allow

More information

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline Agricultural Impact Minimization Plan Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline operation. PennEast

More information

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers Stormwater Standards Clackamas County Service District No. 1 APPENDIX B Planting Guide for Buffers Table of Contents Appendix B - Planting Guide for Buffers... Page B.1 General... 1 B.1.1 Introduction...

More information

Analyzing the Bioretention Construction Sequence

Analyzing the Bioretention Construction Sequence Analyzing the Bioretention Construction Sequence Avoiding future problems through careful installation procedures, construction inspection and first year maintenance 20 Steps to Better Bioretention Step

More information

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer Protect Stormwater Quality Project and Site Management Training for General Contractors Presenter Becky Pearson Professional Civil Engineer Part II Best Management Practices (BMPs) What is a Best Management

More information

RAIN GARDEN PLANT A AND JOIN EFFORTS FOR CLEANER RHODE ISLAND WATERS

RAIN GARDEN PLANT A AND JOIN EFFORTS FOR CLEANER RHODE ISLAND WATERS PLANT A RAIN GARDEN AND JOIN EFFORTS FOR CLEANER RHODE ISLAND WATERS Northern Rhode Island Conservation District 17 Smith Avenue Greenville, R.I. 02828 (401) 949-1480 www.nricd.org Rain Gardens Filter

More information

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures MARBLE RIVER WIND POWER PROJECT Siting Considerations 1. Locate access roads and, to the extent allowed by local laws, wetlands and topography, individual wind turbines and other structures along field

More information

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON OKANOGAN RIVER PROJECT LOCATION SR53 COLUMBIA RIVER SR73 METHOW RIVER PATEROS SR7 SR7 BRIDGEPORT VICINITY MAP NEAR: VICINITY 2 GEBBERS FARMS INC APN 302570024 STATE HWY 7 DOUGLAS CO. PUD NO. APN 302570037

More information

Bio-Engineering Techniques to Revegetate Streambanks

Bio-Engineering Techniques to Revegetate Streambanks Bio-Engineering Techniques to Revegetate Streambanks DORMANT CUTTINGS Dormant cuttings are harvested from living woody plants. The cuttings are prepared from branches of woody plants when the plant is

More information

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management VORS 2018 Stormwater Management Session 2 Stormwater Management, Green Infrastructure,

More information

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity. City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL Surface Water Protection During Well Site Construction Kelly Kees, PE WVDEP, Office of Oil and Gas SEDIMENT & EROSION CONTROL PLANS Per West Virginia State Code 22-6-6(d) 22-6A-7(c),

More information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16 GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings

More information

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness.

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness. Buffer Zone (BZ) Figure BZ-1 Buffer Zone in Agricultural Area Practice Description A buffer zone is a strip of plants adjacent to land-disturbing sites or bordering streams, lakes, and wetlands that provides

More information

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION NO CONSTRUCTION OR EXCAVATION IS TO OCCUR ON LOTS THAT REQUIRE TREE PRESERVATION UNTIL PROPER APPROVALS HAVE BEEN GIVEN BY A CITY ARBORIST 1. When trees

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

Being A Good Garden Neighbor To A Stream: IPM and Water Quality. George Kingston Master Gardener

Being A Good Garden Neighbor To A Stream: IPM and Water Quality. George Kingston Master Gardener Being A Good Garden Neighbor To A Stream: IPM and Water Quality George Kingston Master Gardener Every Drop of Water Goes Somewhere Runoff Infiltration and Migration Evaporation Uptake Know Your Watershed

More information

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers FHWA 534_J31 TEA-5A1(833), P1,M51 See Tabulation Below for Section Numbers ALL CONSTRUCTION IS TO BE PERFORMED WITHIN EXISTING RIGHT OF WAY STP-5A1(611) M51 TEA-5A1(833) RECOMMENDED FOR CONSTRUCTION 12/28/216

More information

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT 8 8 CONCRETE RAMP WOOD STEPS SWIMMING POOL 8 METAL POOL ENCLOSURE FENCE 9 SINGLE LEAF METAL GATE 0 LAWN HANGING CANOPY WITH DOWN LIGHTS METAL & GLASS AWNING AMENITY ROOM WITH FOLDING GLASS WALLS CONCRETE

More information

Property. Line. Fence. Plantings. Vegetated Buttress. With Sun Tolerant. Vegetated Terrace. Tolerant Plantings Existing

Property. Line. Fence. Plantings. Vegetated Buttress. With Sun Tolerant. Vegetated Terrace. Tolerant Plantings Existing PREFERRED ALTERNATIVE - CROSS SECTIONS 92 Existing Pool Property Line 2 6 10 14 0 4 8 12 16 Existing Armour Stone Wall Existing Proposed 18 22 20 24 26 30 28 32 34 36 38 Property Line 40 44 48 52 56 42

More information

Alternative Stormwater Management Practice RAIN GARDENS

Alternative Stormwater Management Practice RAIN GARDENS Alternative Stormwater Management Practice RAIN GARDENS Description The rain garden is a stormwater management practice to manage and treat small volumes of stormwater runoff using a conditioned planting

More information

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE AFTER FEBRUARY 1, 2010 ITEM 709 TRIANGULAR FILTER FABRIC FENCE 709.1 Description. This work shall consist of furnishing, installing, and removing temporary erosion protection and sediment control triangular

More information

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline Agricultural Impact Minimization Plan Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline operation. PennEast

More information

2.1.4 Roof Downspout Rain Gardens

2.1.4 Roof Downspout Rain Gardens 2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

Installation of the Indoor Unit

Installation of the Indoor Unit stallation of the door Unit Firmly secure the evaporator mountg plate on a wall strong enough to withstand the weight of the unit. The plate must be level and allow for the clearances shown the figure

More information

Stormwater Drainage Assessment For Single Family Residence

Stormwater Drainage Assessment For Single Family Residence Stormwater Drainage Assessment For Single Family Residence Project Name: SEADER SFD Project Address: 2301 NE Perkins Way, Lake Forest Park, King County WA. Parcel Number(s): Tax Parcel No. 86659-00181

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

Philbrook Avenue Wetlands and Stream Riparian Restoration Project Planting Plan 2009 REVISED AUGUST 24, 2009

Philbrook Avenue Wetlands and Stream Riparian Restoration Project Planting Plan 2009 REVISED AUGUST 24, 2009 Philbrook Avenue Wetlands and Stream Riparian Restoration Project Planting Plan 2009 REVISED AUGUST 24, 2009 Submitted by Boyle Associates Per Request of Gorrill Palmer Consulting Engineers & the Cumberland

More information

South Waterfront Park

South Waterfront Park South Waterfront Park The South Waterfront Greenway Development Plan (GDP) has achieved an integrated and balanced design that fuses the goal of creating a new high-density urban community with the desire

More information

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General

More information

Guidance on Preparation of Construction and Maintenance Costs

Guidance on Preparation of Construction and Maintenance Costs INVER GROVE HEIGHTS Northwest Area Appendix F Guidance on Preparation of Construction and Maintenance Costs Northwest Area (NWA) Inver Grove Heights Stormwater Manual Guidance on Preparation of Construction

More information

Riggs Brook Mitigation Site, Augusta

Riggs Brook Mitigation Site, Augusta MAINE DEPARTMENT OF TRANSPORTATION 2006 POST-CONSTRUCTION MONITORING REPORT: Riggs Brook Mitigation Site, Augusta (MDOT PIN 556.47) Year 3 of 5 Compensation for Augusta Third Bridge Project, Augusta (MDOT

More information

Rainwater Harvesting: Soil Storage and Infiltration Systems

Rainwater Harvesting: Soil Storage and Infiltration Systems Rainwater Harvesting: Soil Storage and Infiltration Systems Justin K. Mechell Texas Cooperative Extension Department of Biological and Agricultural Engineering Texas A&M University How Rainwater Harvesting

More information

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion Topics Erosion, TESC and Construction sequencing Procedures and timing Remedies for failing sites Curtis Hinman WSU Extension and Bio Systems Eng. Faculty Low Impact Development Specialist chinman@wsu.edu

More information

Case Study Bioretention Installation and Maintenance

Case Study Bioretention Installation and Maintenance Case Study Bioretention Installation and Maintenance Bioretention Crime Scene Investigation A reality TV series where you get to watch disturbing bioretention crimes and use advanced forensics to solve

More information

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK 13440 DELTA PROJECT NO. 2017.226.001 SEPTEMBER 2017 ISSUED FOR BID INDEX OF DRAWINGS GENERAL CIVIL ARCHITECT/ENGINEER PROJECT

More information

LILAC Housing: Site Management Plan

LILAC Housing: Site Management Plan LILAC Housing: Site Management Plan Prepared by: Joe Atkinson. Date: 30/10/2011 Version 1.0 Relevant Legislation & Policy Conservation Regulations 1994, 2007, 2009, 2010 Wildlife & Countryside Act 1981;

More information

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP

More information

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Key Topics Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Bioretention Crime Scenes Investigation A 9 part reality TV series where you get to watch disturbing

More information

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION SECTION 32 93 43 SOIL BIOENGINEERING OR SHORELINE STABILIZATION PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish all labor, materials, supplies, equipment, tools and transportation; perform

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street Project Summary Project Type: Technologies: Institutional parking lot retrofit demonstration project Vegetated infiltration swale with

More information

Tree Pits Construction Guide

Tree Pits Construction Guide Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment

More information

Preventing Storm Water Pollution: What We Can Do

Preventing Storm Water Pollution: What We Can Do Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL PROTECTION

More information

ARBORICULTURAL METHOD STATEMENT FOR CONSTRUCTION OF NEW DWELLING

ARBORICULTURAL METHOD STATEMENT FOR CONSTRUCTION OF NEW DWELLING YEW TREE AND GARDENS CLIENT: MR B. EMMETT. LAND AT 45 WENNINGTON ROAD, WRAY, LANCASHIRE ARBORICULTURAL METHOD STATEMENT FOR CONSTRUCTION OF NEW DWELLING Prepared by Antony Wood Cert Arb RFS Yew Tree+Gns

More information

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages 4.2-d VEGETATED SLOPE STABILIZATION Alternative Names: Willow Wattles, Live Bundles, Fascines, Live Staking, Joint Planting, Branch Packing, Brush Layering, and Brush Matting DESCRIPTION Vegetated slope

More information

Use Resources Responsibly

Use Resources Responsibly 22 Use Resources Responsibly www.gardenorganic.org.uk Use Resources Responsibly use of materials and energy helps to maintain the natural environment and conserve resources. Where possible, the organic

More information

Plan Review Checklist

Plan Review Checklist Plan Review Checklist FOR EROSION AND SEDIMENT CONTROL PLANS _ Minimum Standards - All applicable Minimum Standards must be addressed. All minimum Standards must be adhered to during the entire project

More information

Use of Best Management Practices

Use of Best Management Practices Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions

More information

Erosion Control Beyond Silt Fence. Trish Morris Community Development Project Manager Ideal Homes

Erosion Control Beyond Silt Fence. Trish Morris Community Development Project Manager Ideal Homes Erosion Control Beyond Silt Fence Trish Morris Community Development Project Manager Ideal Homes When you hear erosion control what is the first product that comes to mind? SILT FENCE? Why is silt fence

More information

5380 Twp. Rd. 143 NE Somerset, Ohio Brasenia schreberi Water-Shield

5380 Twp. Rd. 143 NE Somerset, Ohio Brasenia schreberi Water-Shield 5380 Twp. Rd. 143 NE Somerset, Ohio 43783 www.envirotechcon.com Brasenia schreberi Water-Shield Pricing For Native Wetland Plants 2013 Envirotech is a native plant nursery and environmental consulting

More information

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360) Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA 98225 (360) 778-7900 STORMWATER PERMIT SUBMITTAL REQUIREMENTS Most development within the City of Bellingham that involves disruption

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education Wisconsin Contractors Institute Continuing Education Erosion & Sediment Control Course # 12775 2 hours Wisconsin Contractors Institute N27 W23953 Paul Road, Suite 203 Pewaukee, WI 53072 Website: www.wicontractorsinstitute.com

More information

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET TABLE OF CONTENTS: ABBREVIATIONS: SHEET NO. A SHEET DESCRIPTION REFERENCE SHEETS TITLE SHEET COS CSO GPM PVC SF CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

More information

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP) 4.5-s EROSION CONTROL BLANKET SYSTEM Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP) DESCRIPTION Erosion control blanket systems are woven or

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

N 2x ball dia. min. Rubber hoses Guy wires Leave minimal slack/ play, do not tighten () Hardwood stakes, 2"x2"x8' ht. () Set rootflare " higher than surrounding grade. Remove excess soil to expose trunk

More information

SITE PREPARATION GRADING

SITE PREPARATION GRADING 17 SITE PREPARATION GRADING Objectives 1. Be able to describe and explain why grading is done in the landscape. 2. Be able to define and summarize how cutting and filling affect plant growth. 3. Be able

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

Architecture Terms and Ideas

Architecture Terms and Ideas Architecture Terms and Ideas Major Architectural Influences Historically, our architecture has been derived from & is derivative of More recently The face of a building, especially the principal face.

More information

Chapter 2 Roof Downspout Controls

Chapter 2 Roof Downspout Controls Chapter 2 Roof Downspout Controls 2.1 Description This section presents the criteria for design and implementation of roof downspout controls. Roof downspout controls are simple pre-engineered designs

More information

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing

More information

A Production of the University WI-Ext.

A Production of the University WI-Ext. A Production of the University WI-Ext. Water is the most critical resource issue of our lifetime and our children s lifetime. The health of our waters is the principal measure of how we live on the land

More information

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Part IV(a): BMPs for Erosion, Sediment, Velocity Control Part IV(a): BMPs for Erosion, Sediment, Velocity Control Find Design Standards and Specifications for Iowa Erosion and Sediment Control Practices at: www.iowasudas.org Erosion Control Keeping the soil

More information

Zoning Ordinance Chapter 10

Zoning Ordinance Chapter 10 CHAPTER 10 - WASHES SECTION 10.0 GENERAL: A. The purpose of this Ordinance is to establish standards for development in or near Major and Minor Washes as defined in Appendix A Glossary of Terms and Definitions

More information

Guidelines for planting within the 100 Ft. Buffer

Guidelines for planting within the 100 Ft. Buffer CAPE COD COOPERATIVE EXTENSION PO Box 367 Barnstable, MA 02630 508 375-6690 (www.capecodextension.org) Guidelines for planting within the 100 Ft. Buffer Introduction: The Barnstable County Extension Service

More information

Reevesland (ca.1900) 400 N. Manchester Street, Arlington, VA Clarendon Blvd., Suite 400, Arlington, VA See below

Reevesland (ca.1900) 400 N. Manchester Street, Arlington, VA Clarendon Blvd., Suite 400, Arlington, VA See below COUNTY, HISTORICAL AFFAIRS AND LANDMARK REVIEW BOARD APPLICATION FOR CERTIFICATE OF APPROPRIATENESS DATE March 9, 2018 Z- - -HD RPC# (TO BE COMPLETED BY STAFF) DESIGNATED PROPERTY: Name of Historic District

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

Worksheet #14 Water Runoff Management

Worksheet #14 Water Runoff Management Water Runoff Management Use this worksheet to assess how well your property minimizes the potential for water runoff and property damage.. Why should you be concerned? What can you do? Rural runoff, also

More information

EROSION PREVENTION BMP SUGGESTED USES MATRIX

EROSION PREVENTION BMP SUGGESTED USES MATRIX EROSION PREVENTION SUGGESTED USES MATRIX Processed Based Tools Software Aids Slope Waterway Surface Concentrated Flows Large Flat Stock Pile Borrow Adjacent Property Impacts Erosion Prevention Measures

More information

Cedar Niles Future Park Site Wetland #1

Cedar Niles Future Park Site Wetland #1 Date: October 20, 2014 Site: Landowner: Johnson County Parks Designer: Thomas R. Biebighauser Individuals Present: Thomas R. Biebighauser, Dr. Eliodora Chamberlain (US EPA), Jason Daniels (US EPA), Jeannette

More information

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN OPPORTUNITIES AT OXBOW EXISTING WETLANDS Site is undeveloped and we can design a park that works well from the start. SAND BEACH Potential to eliminate invasive species. DEBRIS (CONCRETE, OLD CARS) VEGETATION

More information

SITE IMPROVEMENTS TO UAS AREA CP1512R

SITE IMPROVEMENTS TO UAS AREA CP1512R RANGE ROAD SITE IMPROVEMENTS TO UAS AREA CP1512R ROOSEVELT BLVD ACCESS ROAD DUFFY ROAD MARINE CORPS AIR STATION CHERRY POINT, NORTH CAROLINA INDEX OF DRAWINGS 748 LORD DUNMORE DRIVE, SUITE 101 RW 14L RW

More information

Section 3 Non-Structural BMPs

Section 3 Non-Structural BMPs 3.1 Stream Buffers A stream buffer or stream setback is a designated area around a stream, lake, or wetland left in a natural, densely vegetated state so as to protect the receiving water quality and provide

More information

2008 SWMM, 2010 Revision City of Tacoma

2008 SWMM, 2010 Revision City of Tacoma 2008 SWMM, 2010 Revision City of Tacoma 2.2.3.1 BMP L630 Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

MIXED NATIVE/ ORNAMENTAL POLLINATOR MEADOW

MIXED NATIVE/ ORNAMENTAL POLLINATOR MEADOW SCHEME A CURB OUT ON CLOVERDALE ENTRY STRUCTURE FARM STAND LOCKABLE ENTRY GATE DEMONSTRATION GARDEN CLASSROOM STORAGE WASH/PACK BATHROOM FENCE MIXED NATIVE/ ORNAMENTAL POLLINATOR REMNANT NURSERY TREES

More information

BMP #: Recharge Garden/Rain Garden/Bioretention Garden

BMP #: Recharge Garden/Rain Garden/Bioretention Garden Structural BMP Criteria BMP #: Recharge Garden/Rain Garden/Bioretention Garden A Recharge Garden (also called a Rain Garden or a Bioretention Garden) is an excavated shallow surface depression planted

More information

Plants and Plantings on Lakeshores. Go Wild!

Plants and Plantings on Lakeshores. Go Wild! VT Agency of Natural Resources Plants and Plantings on Lakeshores Go Wild! The value and importance of well-vegetated lakeshores cannot be overstated. A mix of trees, shrubs and unmown groundcover is ideal;

More information

2...Stone Pad Construction Exit Specifications 3...Silt Fence Specifications. 7...Swales 10...Root Zone of a Tree 13...Proper Tree Planting Technique

2...Stone Pad Construction Exit Specifications 3...Silt Fence Specifications. 7...Swales 10...Root Zone of a Tree 13...Proper Tree Planting Technique Table of Contents 1...Introduction 2...Erosion Control.. Construction Exits Silt Fences 4...Protective Vegetation.. Vegetative Buffers Mulch and Temporary Vegetation 5...Stone Check Dams Index for diagrams

More information

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN 01/17/2003 VERSION UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN TABLE OF CONTENTS I. APPLICABILITY... 1 II. SUPERVISION AND INSPECTION...

More information

Piles, Trenching, Inverters, Cables, Material Deliveries

Piles, Trenching, Inverters, Cables, Material Deliveries Agricultural Inspection Report General Information Project Name Albany Date of Inspection 20161012 Start/End Time 7:50 am Inspector s Name(s) Inspector s Title(s) Describe present phase of construction

More information

Florence County Small Commercial Land Disturbance Permit Application

Florence County Small Commercial Land Disturbance Permit Application Florence County Small Commercial Land Disturbance Permit Application Florence County Engineering Division 518 South Irby Street Florence, S.C. 29501 Phone (843) 676-8600 Fax (843) 676-8667 Tax Map Number:

More information

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC. GRAND ARBOR RESERVE BIRCHWOOD POINT, LOT-1 10203 MINERAL POINT ROAD MADISON, WISCONSIN GRAND ARBOR RESERVE, LLC 6417 ODANA RD MADISON, WISCONSIN 53719 CONTACT: DAN SCHMIDT PHONE: 608-285-8680 FAX: 608-255-3387

More information

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake Bioretention Matt Scharver Northeast Ohio Regional Sewer District Stormwater Management Training for MS4 Municipal Employees Training Session Agenda Pre-Training Survey Presentation & Site Visit Post-Training

More information

Native Shrubs: Guide to Landscape Uses by Jessica Lubell, Dept Plant Science & Landscape Architecture

Native Shrubs: Guide to Landscape Uses by Jessica Lubell, Dept Plant Science & Landscape Architecture Native Shrubs: Guide to Landscape Uses by Jessica Lubell, Dept Plant Science & Landscape Architecture Native shrubs can be used to create attractive, sustainable landscapes that blend naturally with the

More information

HILCORP ALASKA, LLC KALOTSA PAD

HILCORP ALASKA, LLC KALOTSA PAD , LLC ACCESS ROAD, PAD & FLOWLINE FLOWLINE END SEC 7 T1S R13W SM NINILCHIK, ALASKA FLOWLINE & ACCESS ROAD START PROPOSED 200' x 300' DRILL PAD M.P. 130 STERLING HWY ACCESS ROAD END INDEX S 0 1000 VICINITY

More information

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM Name: CCW Development Associates, L.L.C. Street Address: Telephone Number(s): 1209 Laskin Road, Virginia Beach, VA 23451 (757) 491-1996 Email: chris@vbhomesliving.com

More information

STANDARD DETAILS QUICK REFERENCE

STANDARD DETAILS QUICK REFERENCE STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)

More information

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA REFERENCE DRAWINGS FOR REET ROCK HILL, SOUTH CAROLINA COVER SHEET 1 OF 6 GENERAL NOTES 2 OF 6 REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION.

More information

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers 3.15 Sediment Control Description: Buffer strips (existing vegetation) and filter strips (planted vegetation) are sections of vegetated land adjacent to disturbed areas. They are designed with low slopes

More information