Donaldson Run Tributary B Stream Restoration Project Update. February 23, 2011 Taylor Elementary School

Size: px
Start display at page:

Download "Donaldson Run Tributary B Stream Restoration Project Update. February 23, 2011 Taylor Elementary School"

Transcription

1 Donaldson Run Tributary B Stream Restoration Project Update February 23, 2011 Taylor Elementary School

2 Big picture concepts Past land use and drainage decisions have severely impacted County streams Watershed improvements and in-stream restoration efforts are both essential Urban stream corridor damage must be addressed comprehensively Stream restoration accomplishes multiple resource management objectives Neighborhood partnership is essential

3 County/Donaldson Run Civic Association Partnership 10+ year partnership Stream restoration top neighborhood priority NCAC approved Tributary B funding in December 2007; County Board 2008; DES providing additional funds Extensive County/DRCA public process: meetings, workshops, stream walks, newsletter articles, park signs, Citizen articles, and other media coverage

4 Donaldson Run watershed Donaldson Run Watershed Boundary Tributary C Tributary B Taylor School Tributary A

5 KEY PROJECT FACTS: Approved Neighborhood Conservation Program Project 1,400 linear feet to Upton street 26% impervious cover in watershed Natural channel design approach

6 Review of changes from 30% to 60% design Reducing width of channel/floodplain to reduce footprint and tree/valley impacts Limiting re-location of pathway and narrowing pathway Reducing disturbance and tree impacts below the footbridge

7 Updates from 60% design to current design level (~75%) Step pool grade control and riffle structures Analysis of hillside and storm pipe drainage inputs Water main survey Planting plan Invasive plant management

8 Step Pool Grade Control and Control stream energy Protect streambanks Provide improved stream habitat Riffle Structures

9

10 Hillside drainage inputs Working with specific property owners Accommodating flow inputs in project design

11 Storm pipe drainage inputs Verifying easements/pipe conditions Incorporating needed repairs/modifications into project design

12 30 Water Main Primary Source of Supply to Lee Water Station Long-exposed pipe segments in valley identified as 30 water main and surveyed to determine location Interim work completed to protect exposed pipe Few apparent conflicts with stream restoration design except at stilling basin Small borings will be excavated to confirm pipe elevations Stream restoration design will improve protection

13

14 Trees No change in tree impacts from project from 60% designs to current design One tree removed to protect water main (previously listed as a potential removal) One tree has fallen (previously listed as a removal) Project impact: 36 trees>10 diameter, 72 trees overall

15 Invasive Management & Planting Plan Goals: To restore forest structure and function To support recreational use and aesthetics

16 Invasive Management & Planting Plan Why invasive management? Displace native species Reduce wildlife habitat Alter ecosystem processes On a global basis...the two great destroyers of biodiversity are, first habitat destruction, and, second invasion by exotic species. E. O. Wilson Courtesy NPS Japanese Barberry Japanese (Berberis stiltgrass thunbergii) (Microstegium vimineum)

17 Current Forest Conditions

18 Resources Natural Resource Management Plan ments/file76445.pdf Ecological community mapping Modified urban landscape Species inventory for Zachary Taylor Park Keeping it Natural es/epo/pdffiles/keeping%20it%20natural.pdf

19 Wisteria

20 Kudzu Invasive Plants 85-95% invasive species in the shrub and ground layers invasive species present on both park and private properties 27 different species

21 Implications Invasive management considerable component of the project Project requires integrated planting and invasive plant removal 4-6 year planting and invasive plant maintenance schedule Complete removal of invasive species is likely not possible Most successful if private citizens are involved in invasive management

22 Planting Plan Site specific All plants will be native to Zachary Taylor Park Planting zones to account for habitat changes with elevation and distance from the stream. Special plantings for sensitive areas Multi-year to account for invasive control and natural forest succession

23 Zoned Planting - Example Slope Floodplain

24 Special Areas Stream Banks

25 Special Areas Bare Slopes

26 Scarlet oak Quercus coccinea Arrowwood Viburnum dentatum Bluestem goldenrod Solidago caesia

27 Pre-project Invasive Management removal of invasive shrubs outreach to homeowners During construction/planting Clean equipment Mulch or mats for trees/shrubs Seed heavily Protect deer candy Multiple planting cycles

28 Invasive Management Post-Project/Maintenance Protect trees and shrubs Focus on stream banks Target species Coordinate invasive removal and planting Timing of control will depend on plant life cycle Flexible and adaptive

29 English Ivy (Hedera helix)

30 Next Steps Continue work with property owners on hillside drainage inputs and design work for storm pipe drainage inputs Finalize planting plan and invasive plant management plan Develop construction access/staging plan Hold stakeholder advisory group meeting prior to full design completion Target design completion by end of summer Construction schedule still TBD

31 Tributary A, June 2010 For more information contact: Jason Papacosma / Christin Jolicoeur Arlington County Dept. of Environmental Services Environmental Management Bureau (703) jpapacosma@arlingtonva.us cjolicoeur@arlingtonva.us Learn more at: search Donaldson Run.

Donaldson Run Tributary B Stream Restoration Project Update. Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011

Donaldson Run Tributary B Stream Restoration Project Update. Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011 Donaldson Run Tributary B Stream Restoration Project Update Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011 Review of changes from 30% to 60% design Reducing width of channel/floodplain to

More information

Working Group Meeting

Working Group Meeting April 4,, 2017 Parks Operations Bldg Working Group Meeting Arts Districts Overview Stormwater/RPA/Stream Considerations First Principles Agenda 7:00pm 7:05pm 7:10pm 7:40pm 8:30pm 9:40pm 9:45pm Welcome

More information

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA STREAM BANK STABILIZATION THORPS CREEK @ MORTIMER RECREATION AREA SITE LOCATION & DRAINAGE AREA SITE LOCATION Drainage Area = 1.14 sq. miles STREAM BANK STABILIZATION THORPS CREEK @ MORTIMER RECREATION

More information

Stream Corridor Management Plan

Stream Corridor Management Plan Stream Corridor Management Plan A unified and comprehensive approach to protecting, restoring and managing the Upper Delaware River Graydon Dutcher Delaware County Soil and Water Conservation District

More information

Watershed Planning Workshop

Watershed Planning Workshop Watershed Planning Workshop Upper Four Mile Run, Gulf Branch and Donaldson Run March 18, 2010 Langston Brown Community Center Outline Overview of Arlington s s Watersheds Watershed Management in Arlington

More information

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers Stormwater Standards Clackamas County Service District No. 1 APPENDIX B Planting Guide for Buffers Table of Contents Appendix B - Planting Guide for Buffers... Page B.1 General... 1 B.1.1 Introduction...

More information

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

319 Grant: Baker Creek & Centenary Creek Restoration Initiative 319 Grant: Baker Creek & Centenary Creek Restoration Initiative Objectives: Overview of Watershed Characteristics: Discussion of Project Tasks: Discussion of Watershed Management Plan: Presented by: Erich

More information

The Rain Garden Landscape

The Rain Garden Landscape The Rain Garden Landscape Courtesy Wetland Studies and Solutions, Inc. Courtesy Low Impact Development Center, Inc.. Planting Your Rain Garden ASTRA Communications The Rain Garden Landscape The Rain Garden

More information

Middle Mississippi River. Regional Corridor

Middle Mississippi River. Regional Corridor Middle Mississippi River St. Louis District Regional Corridor Lessons Learned from a Collaborative Planning Study Brian Johnson US Army Corps of Engineers 12 th Biennial Governor s Conference on the Management

More information

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability

More information

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability

More information

Water in storm drains does not go to a treatment plant

Water in storm drains does not go to a treatment plant Watershed Planning Workshop Upper Mainstem & Middle Four Mile Run November 30, 2011 Fairlington Community Center Arlington s watersheds Chesapeake Bay watershed Watershed Planning Initiated May 2008 Contracted

More information

Chapter 5: Natural Resources and Environment

Chapter 5: Natural Resources and Environment NATURAL RESOURCES AND ENVIRONMENT 5-1 5 Chapter 5: Natural Resources and Environment BACKGROUND AND INTENT Urban expansion represents the greatest risk for the future degradation of existing natural areas,

More information

6Natural. Environment Development Permit Guidelines

6Natural. Environment Development Permit Guidelines 6Natural Bylaw 2600-2016, being "Official Community Plan Bylaw, 2016" Schedule "A" CITY OF ABBOTSFORD OFFICIAL COMMUNITY PLAN Environment Development Permit Guidelines Part V - 6-1 Area Subdivision or

More information

SUSTAINABILITY PLAN OTTAWA COUNTY PARKS AND RECREATION COMMISSION FALL 2017

SUSTAINABILITY PLAN OTTAWA COUNTY PARKS AND RECREATION COMMISSION FALL 2017 SUSTAINABILITY PLAN OTTAWA COUNTY PARKS AND RECREATION COMMISSION FALL 2017 Table of Contents Introduction Natural Resources Quality of Life Community Continuing the Mission Sustainability Measuring Sustainability

More information

Biodiversity Conservation

Biodiversity Conservation Biodiversity Conservation and Site Plan Review Biodiversity conservation principles Threats to biodiversity Location of development Reviewing site plans Lunch Reviewing site plans (continued) LEED and

More information

Woodland Conservation and the Master Plan

Woodland Conservation and the Master Plan 1 WHAT IS A MASTER PLAN? A Vision for the Future of Your Community Woodland Conservation and the Master Plan Goals Objectives Strategies 2 How Will Your Community Look? TREE PRESERVATION AND THE MASTER

More information

Planting Your Rain Garden

Planting Your Rain Garden Planting Your Rain Garden The Rain Garden Environment Are rain gardens wet? The Rain Garden Environment Rain Garden Zones Edge Emergent Semi-aquatic The Rain Garden Environment Moisture regime also depends

More information

Rain Gardens. A Welcome Addition to Your Landscape

Rain Gardens. A Welcome Addition to Your Landscape Rain Gardens A Welcome Addition to Your Landscape Where Does The Rainwater Go? Naturally, forests provide a way for rainwater to percolate into the soil, filtering pollutants while trees are allowed to

More information

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore Habitat Restoration and Green Infrastructure Planning for Staten Island s North Shore Community Board 1 March 1, 2018 NYC Parks Forestry, Horticulture, and Natural Resources Funded by the NYS Department

More information

ARLINGTON COUNTY NATURAL HERITAGE RESOURCE INVENTORY AND NATURAL RESOURCES MANAGEMENT PLAN

ARLINGTON COUNTY NATURAL HERITAGE RESOURCE INVENTORY AND NATURAL RESOURCES MANAGEMENT PLAN ARLINGTON COUNTY NATURAL HERITAGE RESOURCE INVENTORY AND NATURAL RESOURCES MANAGEMENT PLAN BACKGROUND PUBLIC SPACES MASTER PLAN (2005) CREATE A NATURAL RESOURCE INVENTORY AND TO DEVELOP A MANAGEMENT STRATEGY

More information

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE TABLE OF CONTENTS SECTION TITLE PAGE 1 INTRODUCTION AND OVERVIEW 1-1 1.1 Purpose and Need 1-1 1.2 Goals and Objectives 1-3 1.3 Overview of the Planning Process 1-5 1.4 Federal and State Requirements and

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection Arlington County Watershed Retrofits Greg Hoffmann Center for Watershed Protection March 18, 2010 About the Center for Watershed Protection Non-profit 501(c)3, non-advocacy organization Work with watershed

More information

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -

More information

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School West Little Pimmit Storm Sewer & John Marshall Green Street Projects July 7, 2015 Nottingham Elementary School Project Timeline February 2015: Archeological study of island, including historic spring location,

More information

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration Rocky Powell Clear Creeks Consulting, LLC Keith D. Tate, P.E. BayLand Consultants & Designers, Inc.

More information

Principles for Ecological Landscape Design in Brownfield Business Parks

Principles for Ecological Landscape Design in Brownfield Business Parks Principles for Ecological Landscape Design in Brownfield Business Parks Part of USDA Forest Service research project # 00-JV-11231300-033: Aligning Social and Ecological Drivers of Urban Landscape Change

More information

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge Meeting Agenda City of Guelph River Systems Advisory Committee September 19, 2018 City Hall, Meeting Room B From 4:00 to 6:00 p.m. Meeting Chair: Mariette Pushkar Agenda Items Welcome to all Item 1, 2

More information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16 GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213

More information

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL R-1: DEVELOP A RECREATION, OPEN SPACE AND GREENWAYS SYSTEM AS AN INTEGRAL COMPONENT OF AN OVERALL, COUNTY-WIDE ECONOMIC

More information

Green Design Principles

Green Design Principles Green Design Principles restoration planting Ecosystem restoration, including preserving and enhancing existing vegetation and where feasible, introducing new vegetative communities, benefits the stream

More information

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW Steering Committee Presentation February 14, 2018 Purpose of General Plan Guide land use and development decisions Coordinate transportation, infrastructure,

More information

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass Alice Thompson, PWS & Heather Patti, PWS Pike River Re-imaginedfrom Cabbage

More information

Client #: Dawson /91. NRCS Tract #(s): Location: Fleming Memorial Park Field #(s): Program(s): Urban Project Name: Date:

Client #: Dawson /91. NRCS Tract #(s): Location: Fleming Memorial Park Field #(s): Program(s): Urban Project Name: Date: Natural Resource Stewardship Plan Jackson Soil and Water Conservation District 89 Alder Street Central Point, Oregon 97502 Ph. (541) 664-1070 www.jswcd.org Client Name: Elisa Dawson, City of Rogue River

More information

Weston s Wetlands, Stormwater, & Open Space

Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Conservation Commission Role and Responsibilities Laws that protect wetlands What residents can do to protect wetlands

More information

Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan. Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona

Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan. Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona The Los Angeles River Watershed Arroyo Seco Watershed Map

More information

Southern Appalachian Cooperative Weed Management Partnership

Southern Appalachian Cooperative Weed Management Partnership Southern Appalachian Cooperative Weed Management Partnership SACWMP s Mission Work cooperatively to protect and restore the significant natural heritage of the Southern Appalachians by preventing, detecting,

More information

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015 Guiding Landowners in Stream Restoration The Science, Practice & Art of Restoring Native Ecosystems 2015 January 24, 2015 Guiding Landowners in Stream Restoration January 24, 2015 Agenda 1Watershed Planning

More information

Rocky Areas Project Guidance HABITAT

Rocky Areas Project Guidance HABITAT Rocky Areas Project Guidance HABITAT Introduction Rocky habitats are surface areas dominated by exposed rock, such as mountain peaks, inland cliffs, buttes and rocky outcrops. In many cases, rocky areas

More information

Lake and Stream Restoration Project

Lake and Stream Restoration Project Pre-project Fact Sheet May 2012 Toledo Botanical Garden (TBG) is a 60 acre public garden visited by more than 120,000 people annually. It is located in Toledo, Ohio in the Ottawa River watershed within

More information

Riparian Restoration Plan for the Quiet Waters Homeowners Association Reach of the Yachats River. Site Overview

Riparian Restoration Plan for the Quiet Waters Homeowners Association Reach of the Yachats River. Site Overview Walama Restoration Project Community Supported Rehabilitation And Native Re-vegetation of our Watersheds PO Box 894 Eugene, OR 97440 541.484.3939 info@walamarestoration.org www.walamarestoration.org Riparian

More information

4. What are the goals of the Kawarthas, Naturally Connected project? 7. What are watersheds and why are they being used as the project boundaries?

4. What are the goals of the Kawarthas, Naturally Connected project? 7. What are watersheds and why are they being used as the project boundaries? Frequently Asked Questions (FAQs) 1. What are Natural Heritage Systems (NHS)? 2. Why are they important? 3. Which areas of the province have undertaken NHS projects? 4. What are the goals of the Kawarthas,

More information

RIVER RECREATION AND CONSERVATION: LESSONS FROM COLORADO S 2013 FLOODS

RIVER RECREATION AND CONSERVATION: LESSONS FROM COLORADO S 2013 FLOODS RIVER RECREATION AND CONSERVATION: LESSONS FROM COLORADO S 2013 FLOODS SORP RMIS May 2016 L O G A N S I M P S O N Agenda Why Are You Here? Land Use Resiliency Public Outreach Dialogue Recreation and Land

More information

TOWN OF SPRINGFIELD, NEW HAMPSHIRE

TOWN OF SPRINGFIELD, NEW HAMPSHIRE TOWN OF SPRINGFIELD, NEW HAMPSHIRE NATURAL RESOURCES INVENTORY EXECUTIVE SUMMARY March 2008 Prepared by: Watershed to Wildlife, Inc. Natural Resource Consultants 42 Mill Street, Suite 3 Littleton, NH 03561

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

Weston Conservation Commission

Weston Conservation Commission Weston Conservation Commission Commission Roles and Responsibilities Laws that protect Wetlands What residents can do to protect wetlands and open space 1 Conservation Commission Made up of 7 volunteer

More information

Oakland County s Green Infrastructure Vision. L. Brooks Patterson Oakland County Executive

Oakland County s Green Infrastructure Vision. L. Brooks Patterson Oakland County Executive Oakland County s Green Infrastructure Vision L. Brooks Patterson Oakland County Executive Southeast Michigan 20 miles northwest of Detroit Consists of 910 square miles Population of 1.2 million More than

More information

Section 3 Non-Structural BMPs

Section 3 Non-Structural BMPs 3.1 Stream Buffers A stream buffer or stream setback is a designated area around a stream, lake, or wetland left in a natural, densely vegetated state so as to protect the receiving water quality and provide

More information

An Ambitious Plan: Transforming the blighted South Platte River and surrounding environment into Denver s greatest natural resource.

An Ambitious Plan: Transforming the blighted South Platte River and surrounding environment into Denver s greatest natural resource. CONNECTING THE PEOPLE TO THEIR RIVER SOUTH PLATTE RIVER VISION IMPLEMENTATION PROGRAM: GRANT-FRONTIER PARK TO OVERLAND POND PARK REACH The South Platte River Vision Implementation Program (River Vision)

More information

Conservation Corridor Planning and Green Infrastructure Themes

Conservation Corridor Planning and Green Infrastructure Themes Conservation Corridor Planning and Green Infrastructure Themes Prepared by the Green Infrastructure Center Inc. and the Northern Virginia Regional Commission February 22, 2011 Brief Overview Project Background

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 11 PARKS & OPEN SPACES 11.1 DEFINITIONS... 1 11.1.1 Neighbourhood Parks... 1 11.1.2 District Parks... 1 11.1.3. Sport Parks... 1 11.1.4 Urban Parks... 1 11.1.5 Civic Spaces... 1 11.1.6 Open Space System...

More information

Biodiversity and Urban Streets

Biodiversity and Urban Streets Biodiversity and Urban Streets Urban Street Design for Engineers CPD Session 3 Constituent Elements Engineers Ireland Maryann Harris BSLA MSc Dip Law Past-President, Irish Landscape Institute Parks Services

More information

Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design?

Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design? Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design? Sarah Spear Cooke, Ph.D. Seattle, Washington Presentation Outline Introduction The site pre-restoration Restoration

More information

Integrated Vegetation Management Project Guidance

Integrated Vegetation Management Project Guidance Integrated Vegetation Management Project Guidance Stakeholder Informed OTHER OPTIONS Introduction Integrated Vegetation Management (IVM) is a system of land management generally associated with infrastructure

More information

Zoning Ordinance Article 3

Zoning Ordinance Article 3 Article 3 Natural Resources Protection Section 301 Natural Resources Protection 301.1. Purpose - The following natural resources protection standards are established to protect the public health, safety

More information

St. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013

St. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013 St. Croix County Shoreland Overlay Zoning Districts Public Hearing Community Development Committee December 19, 2013 Timeline CDC Review October 17 Public Information Meeting October 29 (6:00-8:00 pm)

More information

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting Rio De Flag Existing Conditions. Ephemeral stream; Limited riparian plants, habitats.. & Opportunities Water (effluent) available Restore

More information

One County s Success in Linking Watershed Protection and Land Use Planning

One County s Success in Linking Watershed Protection and Land Use Planning One County s Success in Linking Watershed Protection and Land Use Planning Bob Thompson Porter County Plan Commission March 28, 2012 Indiana Watershed Leadership Academy Population 160,000 Approximately

More information

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total HARLEM RIVER, EAST RIVER AND WESTERN LONG ISLAND SOUND PLANNING REGION Flushing Bay and Creek Ecosystem Restoration Source Feasibility Study Background Study Resolution (1994), Reconnaissance Report (1996),

More information

IMPLEMENTATION STRATEGY: GOAL 1: TO SUSTAIN A HEALTHY NATIVE PRAIRIE GRAZING RESOURCE

IMPLEMENTATION STRATEGY: GOAL 1: TO SUSTAIN A HEALTHY NATIVE PRAIRIE GRAZING RESOURCE IMPLEMENTATION STRATEGY: GOAL 1: TO SUSTAIN A HEALTHY NATIVE PRAIRIE GRAZING RESOURCE Objectives Actions Timetable Lead and Supporting Agencies 1. Maintain or adopt sound rangeland practices that are reflective

More information

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017 WILLIAM STREET STORM SEWER OUTFALL Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE March 23, 2017 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer Service Regulation

More information

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1 W&OD PARK MASTER PLAN Adopted XXX-XX-XXXX The City s Greenest Street DRAFT W&OD Trail Master Plan v4.docx Page 1 Introduction and Purpose The Washington & Old Dominion Railroad Regional Park (W&OD) (which

More information

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES TABLE C-1: Resource Actions and Priorities GOAL NRM-4 Objective 4.1: Restore Natural floodplain functions. Objective 4.2: Define and

More information

2017 Summer Projects

2017 Summer Projects 2017 Summer Projects Mission: The Anchorage Park Foundation builds healthy parks and healthy people by mobilizing public support and financial resources for Anchorage parks, trails and recreation opportunities.

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON LONG RANGE PLANNING DIVISION North Bethany Subarea Stream Corridors: Existing Regulations In Oregon, there is a distinct difference between the land use rules that apply in rural

More information

systems is available on the Colorado Wetland Information Center (CWIC) website.

systems is available on the Colorado Wetland Information Center (CWIC) website. Colorado Natural Heritage Program Wetland Program Plan -- Dec 2015 Status Update and Addendum -- The Colorado Natural Heritage Program (CNHP) developed a Wetland Program Plan (WPP) in 2010 for the planning

More information

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent COMMUNITY DESIGN Intent An attractive, well-designed County will attract quality development, instill civic pride, improve the visual character of the community, and create a strong, positive image for

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651) DATE: December 20, 2011 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000; TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Tori Dupre, Senior

More information

Tonya Hunter, LLA, CA Environmental Consulting & Technology, Inc.

Tonya Hunter, LLA, CA Environmental Consulting & Technology, Inc. Presented to: Michigan Water Environment Association Watershed Seminar December 5, 2013 Tonya Hunter, LLA, CA Environmental Consulting & Technology, Inc. What is Green Infrastructure? Green infrastructure

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 11 PARKS & OPEN SPACES 11.1 DEFINITIONS... 1 11.1.1 Neighbourhood Parks... 1 11.1.2 District Parks... 1 11.1.3. Sport Parks... 1 11.1.4 Urban Parks... 1 11.1.5 Civic Spaces... 1 11.1.6 Open Space System...

More information

Southeast Michigan Council of Governments

Southeast Michigan Council of Governments Southeast Michigan Council of Governments SEMCOG Green Infrastructure Activities Regional Green Infrastructure Vision GLRI Green Streets EPA Technical Assistance MDOT Grants Green Infrastructure Vision

More information

Mendota Heights 2040 Comprehensive Plan Draft Vers

Mendota Heights 2040 Comprehensive Plan Draft Vers 4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs

More information

The Development of Riparian Stream Buffers in Greensboro, NC

The Development of Riparian Stream Buffers in Greensboro, NC The Development of Riparian Stream Buffers in Greensboro, NC Why our stream banks have grown up? Presented by: Peter Schneider, Water Quality Supervisor City of Greensboro Stormwater Management Division

More information

Introduction to the Shoreline Master Program (SMP) Update. City of Bellingham Planning Department 2005

Introduction to the Shoreline Master Program (SMP) Update. City of Bellingham Planning Department 2005 Introduction to the Shoreline Master Program (SMP) Update City of Bellingham Planning Department 2005 Purpose of tonight s meeting: Specify which water-bodies are subject to the SMP. Identify the State

More information

Advanced Site Inventory Activity

Advanced Site Inventory Activity 9-12 ACTIVITY Advanced Site Inventory Activity 9-12 ACTIVITY Summary: Students investigate various elements of their Schoolyard Habitats site, including climate, land use, and human impact. Grade Level:

More information

Green Infrastructure Mapping Exercise

Green Infrastructure Mapping Exercise Green Infrastructure Mapping Exercise One Water Summit March 3, 2017 Mead Mier Sustainability Coordinator, Watershed Planning Lead Josh Pope GIS Manager Pima Association of Governments Outline What is

More information

PUBLIC SPACES MASTER PLAN UPDATE (POPS) Joint Facilities Advisory Commission (JFAC) November 28, 2018

PUBLIC SPACES MASTER PLAN UPDATE (POPS) Joint Facilities Advisory Commission (JFAC) November 28, 2018 PUBLIC SPACES MASTER PLAN UPDATE (POPS) Joint Facilities Advisory Commission (JFAC) November 28, 2018 1 AGENDA POPS Planning Context Timeline Public Input Final POPS Draft Next Steps 2 PLANNING CONTEXT

More information

TO BE COMPLETED BY APPLICANT

TO BE COMPLETED BY APPLICANT Planning Division #200-2564 Shaughnessy Street Port Coquitlam BC V3C 3G4 Tel 604.927.5442 Fax 604.927.5404 Email planning@portcoquitlam.ca Application for Watercourse Development Permit Watercourse Development

More information

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank.

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank. Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank. By Greg Northcutt When White Creek Mitigation, LLC,

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

SECTION 5: REACH RECOMMENDATIONS/MAPS

SECTION 5: REACH RECOMMENDATIONS/MAPS SECTION 5: REACH RECOMMENDATIONS/MAPS This section describes areas of concern and provides specific recommendations for each project reach. Locations of stormwater drains were from GIS coverage supplied

More information

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept TO: FROM: SUBJECT: April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept RECOMMENDATION A. THAT the Vancouver

More information

Open Space, Natural Areas, Parks, and Recreation

Open Space, Natural Areas, Parks, and Recreation Open Space, Natural Areas, Parks, and Recreation WHAT ARE THE CITY S CURRENT VALUES? This section addresses open spaces, natural areas, parks and recreation, and stormwater multi-use projects under separate

More information

Big Picture Protected Areas Strategy Collaborating to Protect and Conserve Nature in Ontario s Carolinian Zone

Big Picture Protected Areas Strategy Collaborating to Protect and Conserve Nature in Ontario s Carolinian Zone Big Picture Protected Areas Strategy Collaborating to Protect and Conserve Nature in Ontario s Carolinian Zone Jarmo Jalava Protected Areas Consultant Carolinian Canada Coalition National Workshop October

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651) DATE: October 24, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000; TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Tori Dupre, Senior

More information

Restoration in the Sky Islands:

Restoration in the Sky Islands: Restoration in the Sky Islands: Bringing volunteers, landowners, practitioners and agencies together to benefit wildlife and habitats in a global biodiversity hotspot Sky Island Alliance Dedicated to the

More information

City of Missoula and Missoula County Open Space Planning Open House

City of Missoula and Missoula County Open Space Planning Open House City of Missoula and Missoula County Open Space Planning Open House FEBRUARY 6, 2018 The following slides contain the display board content from the open house. Please use boards to answer questions in

More information

Pedestrian Trails Within Regulated Areas

Pedestrian Trails Within Regulated Areas New Jersey Department of Environmental Protection Pedestrian Trails Within Regulated Areas Joslin Tamagno, Environmental Specialist Division of Land Use Regulation, Bureau of Inland Regulation www.nj.gov/dep/landuse

More information

Study Area Map. Wasatch Hollow Open Space Restoration, Use, & Management Plan. Legend. Harrison Ave East. Roosevelt East.

Study Area Map. Wasatch Hollow Open Space Restoration, Use, & Management Plan. Legend. Harrison Ave East. Roosevelt East. Harrison Ave Roosevelt Emerson «4 «5 Rosecrest 1900 East «3 1800 East Wasatch Hollow Open Space Restoration, Use, & Management Plan Study Area Map Legend «2 «1 Potential Access Location Emigration Creek

More information

PUBLIC SPACES MASTER PLAN UPDATE (POPS) Crystal City Citizen s Review Council October 24, 2018

PUBLIC SPACES MASTER PLAN UPDATE (POPS) Crystal City Citizen s Review Council October 24, 2018 PUBLIC SPACES MASTER PLAN UPDATE (POPS) Crystal City Citizen s Review Council October 24, 2018 1 PLANNING CONTEXT Arlington County Comprehensive Plan UPDATE Related Documents: CIP Sector Plans Area Plans

More information

Bristol Marsh Heritage Conservancy

Bristol Marsh Heritage Conservancy Bristol Marsh Heritage Conservancy The Pennsylvania Environmental Council (PEC) protects and restores the natural and built environments through innovation, collaboration, education and advocacy. PEC believes

More information

Use of Best Management Practices

Use of Best Management Practices Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions

More information

Outline MANAGING INVASIVE PLANTS ON YOUR LAND. Invasive Species. Definitions 1/12/2015

Outline MANAGING INVASIVE PLANTS ON YOUR LAND. Invasive Species. Definitions 1/12/2015 Outline General Invasive Plant Ecology Identification of New Invasive Plants Management Principles MANAGING INVASIVE PLANTS ON YOUR LAND Chris Evans, Illinois Invasive Species Campaign Invasive Species

More information

1.16 million KM 2 5 States, 2 Provinces Integrated Partnerships with neighboring LCCs, NW and NC Climate Science Centers, PNW

1.16 million KM 2 5 States, 2 Provinces Integrated Partnerships with neighboring LCCs, NW and NC Climate Science Centers, PNW GNLCC Goal: Coordinate, facilitate, promote and add value to large landscape conservation to build resource resilience in the face of climate change and other landscape level stressors through: Support

More information

Rule D Wetland and Creek Buffers

Rule D Wetland and Creek Buffers Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions

More information

Public Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan

Public Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan Prepared for City of Oceanside Planning Department 300 N. Coast Highway Oceanside, CA 92054 Prepared by Ogden Environmental

More information

North Carolina Sandhills Weed Management Area. Tracy Rush Program Coordinator

North Carolina Sandhills Weed Management Area. Tracy Rush Program Coordinator North Carolina Sandhills Weed Management Area Tracy Rush Program Coordinator Weed Management Area Partnership of federal, state and local government agencies; conservation organizations; individuals and

More information