Plenty Gorge Park Draft Master Plan Consultation Report. Draft Master Plan April 2018
|
|
- Christal Bryan
- 5 years ago
- Views:
Transcription
1 Plenty Gorge Park Draft Master Plan Consultation Report Draft Master Plan April 8
2 Introduction As part of the development of the Plenty Gorge Park Master Plan, Parks Victoria designed a consultation and engagement program to provide the community, Traditional Owners and key stakeholders with the opportunity to inform the ongoing development of the master plan. The master plan will inform and guide investment decisions on how to design and develop engaging visitor experiences, through the provision of supporting facilities, programs and services. The consultation process sought to:. Identify the current visitor offer of the park and assess the level of provision against community and visitor expectations. Identify facilities in need of immediate remediation, refurbishment or replacement and priorities for development 3. Identify the strategic direction for the parks recreational offer in accordance with Parks Victoria corporate goals. What We Did During the draft master plan phase of consultation, Parks Victoria engaged with Traditional Owners, the local community and existing and future visitors to the park. Feedback was collected through a number of tools and forums including: Postcards at the Parks Victoria Office in Plenty Gorge Park highlighting the available feedback mechanisms. An online survey via the Engage Victoria website. Community consultation daya at two separate venues, located in close proximity to the park. A meeting with Wurundjeri Tribe Land and Compensation Cultural Heritage Council to discuss the concept plan. Meetings with Whittlesea Council, Nillumbik Council and Melbourne Water representatives. Meetings with Parks Victoria staff and park rangers. Separate stakeholder meetings and events. All phases of community and stakeholder engagement are now complete. This report summarises the findings of the consultation program to inform the development and finalisation of the Plenty Gorge Park Master Plan.
3 What we Heard This document summarises survey data collected from 7 respondents during the Plenty Gorge Draft Master Plan engagement period between November 7 and 9 January 8. The overall support for the draft master plan was very high, with not a single respondent unsupportive. Further information provided in this document summaries the data collected which was used to inform the final master plan. 6 Level of overall support 4 3 Very supportive Supportive Not sure / Don't know Unsupportive Very unsupportive No answer Demographics Of the 8 people who responded to the survey, 9 provided their postcode. The highest survey response came from residents living immediately to the east and north of Plenty Gorge. 8 people responded from Mernda, 4 from South Morang and from Mill Park For residents living to the east of the park, the highest survey response came from the south east in Greensborough with 7 responses. 7 The age range was -74, with the highest level of survey respondents aged between It should be noted that 7% did not provide their age. 4 4, 8,4, m
4 Key Summary of Responses The following information provides a summary of the feedback collected during public consultation, together with the recommended amendments made to the final master plan: 4% of survey respondents identified mountain bike riding as the main activity they do in the park. This was the most popular visitor activity identified in the consultation feedback. Proposals in the master plan include formalising a series of mountain bike tracks as part of the parks visitor service offer. Feedback noted that more effective trail networks and wayfinding signage is required in the park. The master plan proposes a series of pedestrian walking tracks offering access to a diverse range of visitor experiences. Submissions noted the parks limited visitor offer with respondents requesting services to facilitate activities including orienteering, fishing, swimming, rock climbing, nature appreciation, dog walking and geocaching. The master plan has increased the diversity and range of visitor experiences for the growing local and regional community. 7% of respondents support a review of the wildlife fence. The master plan explores options for improved visitor access through the fence in some locations, particularly in the southern sections of the park. 36% of respondents want the entire length of the trail built. The master plan includes a series of linked trails providing access both north / south and east / west linking the residential communities of Whittlesea, Nillumbik, Darebin and Banyule. % of respondents highlighted the Bridge Inn Rd to Wiltonvale trail connection as a high priority. The master plan explores recommendations and priorities for trail linkages in high residential areas and key transport / commuter links, including the Bridge Inn Rd to Wiltonvale link. 7% of respondents were supportive or very supportive of the proposal to upgrade the Hawkstowe Picnic Area. The master plan recommends the enhancement of the visitor offer at the Hawkstowe Picnic Area. Further detailed site planning will be required to explore and define the visitor experience of this precinct. 7% of respondents were supportive of moving the Blue Lake facilities to Yellowgum. The master plan proposes enhancement of the Yellowgum visitor precinct, defining this as a key visitor destination. Approximately 8% of respondents were supportive of the proposal for Middle Gorge. The master plan has increased the diversity and range of visitor experiences for the growing local and regional community surrounding middle gorge. The community supports more east / west crossings of Plenty River. The master plan provides recommendations for where river crossings are proposed. River crossings will be further investigated as part of a detailed site planning project.
5 Which section of the Plenty River Trail do you consider a priority? Bridge Inn Rd to Wiltonvale (PRT) Morang Wetlands to Middle Gorge (PRT) Middle Gorge to Tanunda Wetlands (PRT3) Tananda Wetlands to the southeast end of the park (PRT4+) All of it Not sure or not answered Which crossing of the Plenty River do you consider a priority? age Northern pipe track linking Dooreen Mernda Yarrambat Wiltonvale Nioka Hawkstowe Mill Park Yellow Gum Southern pipe track linking University Hill to Planty River Trail All Other Not answered Do you agree with the proposal to review the Plenty Gorge Park Wildlife Fence? age 4 3 Yes No Not sure Not answered Level of support [percent] Justified by a comment [percent]
Yarra Strategic Plan community engagement summary
Yarra Strategic Plan community engagement summary Between May and August 2018 Melbourne Water undertook community engagement to build the content of the draft Yarra Strategic Plan. This engagement included
More informationThe Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report
The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report CONTENTS 1.0 OVERVIEW... 2 2.0 KEY FINDINGS... 3 2.1 Conserving Places of Value... 3 2.2 Places for Academic
More informationBIRRARUNG MARR MASTER PLAN
BIRRARUNG MARR MASTER PLAN COMMUNITY ENGAGEMENT SUMMARY 1 CONTENTS Engagement Summary p.3 Birrarung Marr Precincts p.4 Engagement Snapshot p.5 KEY FINDINGS AND RECOMMENDATIONS 1 Greenery and Nature p.6
More informationCHAPPLES PARK MASTER PLAN
CHAPPLES PARK MASTER PLAN Presentation of Preliminary Development Options Public Open House #2 Wednesday November 2 nd, 2016 TONIGHT S AGENDA 1. Welcome & Introductions 2. Presentation by Sierra Planning
More informationWhat We Heard Public Engagement - Stage 1
What We Heard Public Engagement - Stage 1 Background Early planning is underway for a potential new river crossing over the North Saskatchewan River, in the northeast part of the Edmonton region. The City
More information... on the draft Arden Vision & Framework
April 2017 Integrated world-class urban renewal Feedback... on the draft Arden Vision & Framework On 1 September 2016 the Victorian Planning Authority (VPA) released the draft Arden Vision & Framework
More informationPHASE ONE. A summary report: What the community told Alcoa during Phase One of the community engagement program for Point Henry 575.
PHASE ONE A summary report: What the community told Alcoa during Phase One of the community engagement program for Point Henry 575. DECEMBER 2015 FEBRUARY 2016 INTRODUCTION In 2014 Alcoa closed its Point
More informationIntroduction. Community Outreach Approach. Sacramento Valley Station Master Plan. Online Questionnaire Summary of Feedback.
Introduction Located in the northwest sector of downtown Sacramento, the Sacramento Valley Station (SVS) is the primary rail station in northern California and the seventh busiest station in the country.
More informationNorth Adelaide Playspace and Pocket Orchard
The Adelaide City Council invites engagement from the community about Playspace and Pocket Orchard Project Summary Adelaide City Council invites feedback from the community on the Tidlangga (Park 9) Playspace
More informationWhitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018
Whitemarsh Comprehensive Plan Update: Housing & Land Use Public Workshop #3: September 20, 2018 Agenda Welcome Process Recap What We ve Heard The Plan Framework Review of Recommended Actions Land Use Housing
More informationCity Council March 27, Parks, Recreation, and Trails Master Plan
City Council March 27, 2018 Parks, Recreation, and Trails Master Plan Planning Process Develop Goals and Objectives Inventory of Areas and Facilities Needs Assessment And Identification Public Participation
More informationReimagining Arnolds Creek. Community engagement report. May 2018
Reimagining Arnolds Creek Community engagement report May 2018 Melbourne Water is owned by the Victorian Government. We manage Melbourne s water supply catchments, remove and treat most of Melbourne s
More informationImplementation plan. 3.1 Staging
3 Implementation plan 3.1 Staging The Olympic Park Master Plan has been developed to provide actions that are practical and realistic and considers the financial responsibilities and capacity of Council
More informationBurnside Gorge Neighbourhood Plan. Engagement Summary
Burnside Gorge Neighbourhood Plan Engagement Summary Table of Contents Engagement Summary... 3 Phase One Engagement (April May 2015)... 4 Phase Two Engagement (January March 2016)... 4 Appendix One: Summary
More informationDon Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions
Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript
More informationMinto-Brown Island. November 18, City of Salem, Parks & Transportation Services
Minto-Brown Island Park Master Plan Public Meeting #1 November 18, 2014 City of Salem, Parks & Transportation Services Division, i i Public Works Welcome... and thanks for participating in the master planning
More informationWentworth Point July Community Information Session Feedback Summary
Wentworth Point July Community Information Session Feedback Summary Introduction On Saturday, 28 July 2018, Landcom held a community information session from 11am to 1pm, at the Pulse Club, Wentworth Point,
More informationUNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014
5.2 ECO-CORRIDOR 37 ECO-CORRIDOR EXISTING CONDITIONS & VISION NEIGHBOURHOOD VISION Investment in the Eco-corridor Neighbourhood will signify the University s commitment to supporting local ecology and
More informationObjective: Resolution to recommend adoption of the Big Thompson Assessment to the Planning Commission
Type of Meeting: Administrative Matters Name of requestor: Zac Wiebe - 619-4534, Kerri Rollins - 619-4577, Gary Buffington - 619-4560 Department: Natural Resources Preferred appearance date: 8/18/2015
More informationUrban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.
South Platte River Meeting Comments & s #1 I am a huge fan of river areas and would love the Platte and surrounding waterways to improve to allow habitat for wildlife and recreation opportunities for citizens.
More informationPlease read the entire document
projects impacting the waterfront revitalization area. The waterfront revitalization area of the town will have to subareas to the west and east of the village. Page 6 of 6 Wayfinding master plan create
More informationSeven Creeks Neighbourhood. Community Plan
Seven Creeks Neighbourhood Community Plan INTRODUCTION SEVEN CREEKS The Seven Creeks Estate is home to a steadily expanding community of families, couples and individuals who enjoy the very best of both
More informationSouth th E ast Communit ity Centre (SECC)
South East Community Centre (SECC) 1 New Park Design & Community Centre Update Thursday, February 8, 2018 Public Open House Thank you for attending this Open House! The town and the Consulting Team will
More informationHobart A Strategic Framework
Hobart 2025 A Strategic Framework Adopted by the Hobart City Council 15 October 2007 Table of Contents Introduction...2 Vision and Future Directions...3 FD1 Offers opportunities for all ages and a city
More informationMidtown Greenway to lake street
Making the connection: Midtown Greenway to lake street May 2016 Design experiment: site amenities, wayfinding, and activities at Cepro, near the Midtown Global Market Recent Greenway Development Highlights
More informationTown of Cobourg Heritage Master Plan. Statutory Public Meeting
Town of Cobourg Heritage Master Plan Statutory Public Meeting April 25 th 2016 Presentation Overview 1. Introduction 2. Project background and schedule overview 3. Review of strategic direction content
More informationUniversity of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT
University of Saskatchewan CAMPUS MASTER PLAN Senate Meeting Preliminary Presentation April 21, 2018 DIALOG ECS DA WATT project process presentation agenda Stakeholder Engagement Project Control phase1
More informationEmerson Park Master Plan Update. Public Meeting III August 27, 2014
Emerson Park Master Plan Update Public Meeting III August 27, 2014 Meeting Agenda: Project Update Presentation of Master Plan Components Discussion and Feedback The Path Forward: Building on the Concept
More informationNew Brighton Park Shoreline Habitat Restoration Project
Vancouver Board of Parks and Recreation and Port Metro Vancouver New Brighton Park Shoreline Habitat Restoration Project Conceptual Design Public Consultation August 26 September 9, 2015 Discussion Paper
More informationJacksons Hill Master Plan
About this document This document forms Appendix 2 of the Jacksons Hill Master Plan Phase 1 Community Engagement Report. The report was prepared by CrowdSpot for the VPA and provides an analysis of the
More informationCHAPPLES PARK MASTER PLAN. Presentation to Council April 10, 2017
CHAPPLES PARK MASTER PLAN Presentation to Council April 10, 2017 1 PRESENTATION AGENDA 1. Project Background, Aim and Process 2. The Site Issues and Opportunities 3. Community Engagement 4. Vision and
More informationCITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020
CITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020 A BLUE PRINT FOR THE NEXT 20 YEARS The PRCA Vision 2020 Master Plan, adopted in November 2012, addresses the current state
More informationFOSTER COMPREHENSIVE PLAN UPDATE CIRCULATION
5.8.1 INTRODUCTION CIRCULATION The Circulation Element of the Comprehensive Plan studies the routes and modes of travel. The circulation network of the town affects the ease of movement through Foster
More informationLand Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC
2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from
More informationPARK AND RECREATION MASTER PLAN UPDATE
PARK AND RECREATION MASTER PLAN UPDATE 2014-2018 Prepared for: Avon Parks, Recreation and Beautification Council (PRBC) and Town of Avon Prepared by: Lehman & Lehman, Inc. 24-Apr-14 Mission Statement The
More informationedmonton.ca/ribbonofgreen #ribbonofgreen
WHAT IS THE RIBBON OF GREEN? The Ribbon of Green is Edmonton s entire river valley and ravine system. The Ribbon of Green (2018) Project will provide strategic guidance for the southwest and northeast
More informationEast Bench Master Plan Update
Community & Economic Development Office of the Director East Bench Master Plan Update To: From: Planning Commission Wayne Mills, Senior Planner Date: November 18, 2015 CC: Re: Nora Shepard, City Planning
More informationAlbion Hills Conservation Area Master Plan. Public Information Session
Albion Hills Conservation Area Master Plan Public Information Session 1 03.25.2014 Meeting Agenda 1. Project Introduction Property History Current Use Master Plan Process 2. Draft Vision Goals and Objectives
More informationYadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run
Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run Project Background The Yadkin River Greenway Feasibility Study is a joint project with the Village of Clemmons, the Town of Bermuda
More informationEdgeley Pond + Park Public Meeting
Edgeley Pond + Park Public Meeting February 21, 2017 Purpose of the meeting This Public Meeting is an opportunity for you to review the project background, process and provide input. City of Vaughan staff
More informationGoals AND Guiding principles
Historic photo of Eastlake Train Station sign Chapter 2: Goals AND Guiding principles 2-1 The Plan goals includes a desire to bridge present day conditions with a vision of the area s future. A central
More informationHighland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017
Village Board Meeting March 20, 2017 Agenda I. Public Meeting #1 Visioning Summary II. Public Meeting #2 Comment Summary III. IV. IV. Case Study: Milton Train Station Schematic Design Concepts Schedule/Next
More information1. Lenox Dale Community Character Strengths and Opportunities Identified by Residents: Strong neighborhood identity and sense of community.
LENOX DALE ISSUES AND OPPORTUNITIES -- EIGHT CATEGORIES: Concerns and opportunities identified by Lenox residents and in previous Community Surveys, along with thought-starter suggestions on possible Town
More informationSmall Area Plan. South Gateway
Small Area Plan Adopted May 12, 2008 South Gateway Purpose. The South Gateway Small Area Plan defines the City s expectations for the future of the southern entrance to the City at Interstate 85 and Highway
More informationMarch 21, 2018 ALCA Meeting. March 21, 2018
March 21, 2018 ALCA Meeting March 21, 2018 Agenda 1. Process and Timeline 2. Original Submission 3. Revised Submission 4. Next Steps The City of Calgary Role: The City is responsible for capturing and
More informationOverview. Have your say. Distributed sites network key objectives. Planning vision. QUT Draft Estate Master Plan. Facilities Management
Facilities Management Overview QUT Draft Estate Master Plan QUT has developed a Draft Estate Master Plan for its main campuses (Gardens Point and Kelvin Grove) and the 17 distributed sites. The draft plan
More informationPublic Workshop #2 Summary
Public Workshop #2 Summary Project Number: Project Title: 2320.01 (R&M) MOA Parks and Recreation Muldoon Town Square Park Master Plan Subject: Muldoon Town Square Park Master Plan Public Workshop #2 Author:
More informationMendota Heights 2040 Comprehensive Plan Draft Vers
4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs
More informationParks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #
0 'O DI Lan-171-14 1 - THE CORPORATION OF THE TOWN OF COBOURG..,. STAFF REPORT TO: FROM: Mayor and Members of Council Dean A. Hustwick, Director of Recreation and Culture DATE OF MEETING: Committee of
More informationLas Colonias Park Master Plan
2013 Las Colonias Park Master Plan City of Grand Junction June 2013 Introduction Las Colonias Park, a 101 acre parcel on the edge of the Colorado River south of downtown, was deeded to the City of Grand
More informationAnimating the Rideau Canal December 2013
Executive Summary Animating the Rideau Canal December 2013 Why study the Rideau Canal? The Rideau Canal has been an important part of Ottawa throughout its history, and has shaped and been shaped by the
More informationApril 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept
TO: FROM: SUBJECT: April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept RECOMMENDATION A. THAT the Vancouver
More informationAbout Momentum Midland
About Momentum Midland Achieving a community s full potential in terms of economic development and quality of life is critically important to its long term sustainability. Core to achieving this is a vibrant
More informationAppendix A: Park Improvement Plan. Cecelia Ravine Park Improvement Plan. Summary Report. April Cecelia Ravine Park Improvement Plan
Appendix A: Park Improvement Plan Cecelia Ravine Park Improvement Plan Summary Report April 2018 Cecelia Ravine Park Improvement Plan 1 CITY OF VICTORIA 2 Appendix A: Park Improvement Plan Table of Contents
More informationNORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY
WELCOME Northeast River Crossing Functional Planning Study Phase 2 Public Meeting 4 to 8 PM Informal drop-in format and discussion tables Meeting Purpose Introduce the Northeast River Crossing Functional
More informationSee the West Melbourne Transport and Access Study (Phillip Boyle and Associates) for more information on the proposed Spencer Street tram.
West Melbourne Ideas Workshop - Saturday 18 February 2017 Issues, concerns, ideas and comments On Saturday 18 February, around 150 people attended an ideas workshop at the Angliss Conference Centre to
More informationTown of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder
Town of Lyons Parks Flood Recovery Planning Process Photograph courtesy of Ed Bruder Lyons Parks and Recreation Flood Recovery Update 1. Meadow Park Phase II - Project PW20B1 Estimated Completion: Summer
More informationREGIONAL ACTIVITY CENTER
DRAFT REGIONAL ACTIVITY CENTER 70 EAST BENCH MASTER PLAN DRAFT 06 Introduction The East Bench Regional Activity center is comprised of large educational, research, medical, and employment centers. These
More information1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project
1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA 1.1.1 Project Description The Trunk Highway (TH) 14 West Corridor is a two-lane roadway approximately 22 miles in length. Located in Nicollet County, the corridor
More informationSapperton Pump Station & Cumberland Point Green Space
December 15, 2015 Sapperton Pump Station & Cumberland Point Green Space ENGAGEMENT SUMMARY REPORT 7259570 TABLE OF CONTENTS INTRODUCTION... 1 About the Project... 1 A Parallel Process... 1 WHAT WE DID:
More informationSALISBURY TOMORROW Our Vision
SALISBURY TOMORROW Our Vision Salisbury is committed to supporting a high quality of life and sense of community for all residents. These commitments need to be reflected in our community programs, services
More informationKIPPAX GROUP CENTRE MASTER PLAN
KIPPAX GROUP CENTRE MASTER PLAN Community Engagement Report - Stage 2, 3 and 4 MARCH 209 Australian Capital Territory, Canberra 208 This work is copyright. Apart from any use as permitted under the Copyright
More informationClair-Maltby Community visioning
Clair-Maltby Community visioning workshop #1 Summary April 27th, 2017 Table of Contents INTRODUCTIon 1 PURPOSE 1 CONSULTATION STRUCTURE 2 PARTICIPANT FEEDBACK 3 VISIONING EXERCISE 8 ONLINE SURVEY RESULTS
More informationBergen County Parks Master Plan
Bergen County Parks Master Plan Submission for NJASLA Professional Award Currently: Over 9,000 acres, 36 parks,1 nationally accredited zoo, 5 golf courses, 2 equestrian centers, 1 Environmental center,
More information3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies
Vision Statement Queen Creek s interconnected network of parks, trails, open spaces and recreation opportunities provide safe and diverse activities and programs that sustain its unique, small town, equestrian
More informationNORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016
NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016 1. Introduction To the team and to the Plan Planning Partners The Claymont Community WILMAPCO New Castle County Claymont Renaissance
More informationBISCUIT RUN PARK MASTER PLAN
BOARD OF SUPERVISORS November 14, 2018 BISCUIT RUN PARK MASTER PLAN COUNTY OF ALBEMARLE ANHOLD ASSOCIATES Contents Project Introduction Property Background County Park Planning Process Existing Site &
More informationCHAPTER 7: Transportation, Mobility and Circulation
AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to
More informationTHE COMMUNITY-DRIVEN DESIGN PROCESS
THE COMMUNITY-DRIVEN DESIGN PROCESS A PUBLIC DRIVEN PROCESS STEERING COMMITEE THE COMPREHENSIVE PLAN OPPORTUNITIES AND CONSTRAINTS THE COMMUNITY DRIVEN DESIGN PROCESS A Public Driven Process Beginning
More information10.0 Open Space and Public Realm
10.0 Open Space and Public Realm 10.0 Open Space and Public Realm The Public Open Space System is comprised of: outdoor spaces available for public use that are either publicly owned (e.g., parks and
More informationCCI Concerned Citizens Group, Inc. Report on Community Survey Regarding Future Use of CCI Property after Cleanup July 1, 2005
CCI Concerned Citizens Group, Inc. Report on Community Survey Regarding Future Use of CCI Property after Cleanup July 1, 2005 Introduction CCI is a 1.5 acre Superfund site at 320 South Blake Street, Olathe,
More informationDowntown Streetscape Manual & Built Form Standards
City of Guelph Downtown Streetscape Manual & Built Form Standards July 2014 Prepared by Brook McIlroy Inc. in association with Unterman McPhail Associates and McCormick Rankin Inc. City of Guelph Downtown
More informationBuilding Great Neighbourhoods. Strathcona
Building Great Neighbourhoods Strathcona March 21, 2018 Becky Redford Project Manager, Planning & Design Building Great Neighbourhoods Integrated Infrastructure Services Welcome and Purpose To provide
More informationDefence Site Maribyrnong
Defence Site Maribyrnong Engagement Summary October 2018 Executive Summary Defence Site Maribyrnong (DSM) is a 127.8 hectare parcel of Commonwealth land located in the City of Maribyrnong. The site has
More informationCHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES
CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES Introduction This River Conservation Plan was developed during a time of tremendous activity and effort in planning the transformation of the Delaware
More informationHUMBER BAY PARK PROJECT - BUILDING CONCEPT
WELCOME 1 Humber Bay Park, with its system of trails, rugged shoreline, and dramatic views, is a unique and rare waterfront experience within the larger metropolitan Toronto area offering a place for quiet,
More informationMISSISSIPPI GORGE REGIONAL PARK MASTER PLAN
MISSISSIPPI GORGE REGIONAL PARK MASTER PLAN Minneapolis Park and Recreation Board CAC MEETING #1 APRIL 23, 2018 AGENDA Mississippi Gorge Regional Park Master Plan CAC #1 01 / Welcome and Calling Circle
More informationWELCOME. Welcome to this public exhibition about the future of the Aylesham Shopping Centre.
WELCOME Welcome to this public exhibition about the future of the Aylesham Shopping Centre. This exhibition has been organised by Tiger Developments Ltd and members of the project team are available today
More informationBurloak Drive Grade Separation
Burloak Drive Grade Separation Transit Project Assessment Process Public Meeting #1 March 30, 2017 GO Lakeshore West Service Plan Weekday Rush Hour 15-minute, two-way service between Aldershot* and Union
More informationOUR GREATER SYDNEY A metropolis of three cities. OVERVIEW. connecting people. DRAFT Greater Sydney Region Plan
OUR GREATER SYDNEY 2056. A metropolis of three cities. OVERVIEW. connecting people. DRAFT Greater Sydney Region Plan October 2017 This document is an overview of the draft Greater Sydney Region Plan. To
More informationLynn Waterfront Master Plan
Lynn Waterfront Master Plan Public Meeting #2 December 10th, 2018 1 Project Schedule Update September 26, 2018 December 10, 2018 Development of the Master Harbor Plan Amendment and Revised Waterfront Master
More informationThe Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass
The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn
More informationGoals and Action Items
Goals and Action Items Developing goals and action items is an important part of the recreation planning process. The overall goals of a recreation department are to provide recreation opportunities for
More informationTopham Mall, Bentham, Pitt and Waymouth Street Place Plan
The Adelaide City Council invites engagement from the community about Topham Mall, Bentham, Pitt and Waymouth Street Prioritising the top priorities for the area Topham Mall, Bentham, Pitt and Waymouth
More informationACU DEVELOPMENT PLAN OBJECTION RESPONSE
Inappropriate location for consolidation of ACU campus Intentions for remaining ACU land unknown; residents would like to see a full master plan of all ACU sites proposed for the next 10-15 years ACU has
More informationConnecting people to parks
Connecting people to parks Introduction from the Governor It is up to all of us to ensure the conservation of our State s wonderful national parks, marine parks and other conservation reserves continues
More informationNew Linear Park, public consultation results 26 February 2015
FO Developments LLP New Linear Park, public consultation results 26 February 2015 Broadway (A663), J20 M62 / J21 M60, Oldham, Greater Manchester Number of people attended 58 Number of people answered 37
More informationPlanning Board Briefing
Planning Board Briefing Why Now? The Sector Plan Implementation Chapter States: Before Stage 1 begins, the following must occur: Approval of the Sectional Map Amendment. Approval of the Greater Lyttonsville
More informationExecutive Summary. Parks and Recreation Plan. Executive Summary
Parks and Recreation Plan Executive Summary The Whitemarsh Township Parks and Recreation Plan sets forth a vision for how Whitemarsh Township can provide a premiere parks and recreation system reflective
More informationSUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:
Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:
More informationUAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose
UAA School of Engineering Parking Garage Master Plan Amendment 1. Purpose Since the UAA campus master plan was drafted in 2003, adopted in 2004, and amended in 2009 a number of significant changes regarding
More informationProject purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept
Project purpose owns Road Beaumaris Road The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept + Guide Rehabilitation of Landscape and Community
More informationPREVIOUS PUBLIC PARTICIPATION BRIEF October 2014
Comprehensive Planning During the development of the county comprehensive plan, Cultivating Community: A Plan for Union County s Future from 2007 through 2009, and three concurrent multi municipal plans
More informationOlympic Park. Volume 2 Background and Key Findings Report. February 2017
Olympic Park Volume 2 Background and Key Findings Report February 207 Contents Contents page. Background and key drivers 2 2. Planning context 3. Stakeholder consultation 0 4. Facilities and infrastructure
More information2 Vision. Master Plan
19 2 Vision Master Plan 20 Chapter 2 MASTER PLAN VISION 2.1 Master Plan Organization Lake Calhoun/Bde Maka Ska and Lake Harriet are places where complex human and natural systems intersect and converge.
More informationEAST VILLAGE STRATEGIC SITE NOVEMBER 2017
EAST VILLAGE STRATEGIC SITE NOVEMBER 2017 East Village will be a sustainable, mixeduse precinct with a focus on innovative employment and education opportunities. Enhanced by green spaces and places for
More informationIntroducing the Main Street Strategic Toolbox
Ulster County Main Streets: A Regional Approach Ulster County Planning Department, 244 Fair Street, Kingston NY 12401 Why do we take a regional approach to Main Streets? There are many different approaches
More informationJohnson Street Bridge Public Realm Update
Johnson Street Bridge Public Realm Update August 20, 2015 Background Johnson Street Bridge Replacement Project impacts a diverse range of stakeholders In addition to a new bridge, the project also includes
More informationPMP PRINTING SITE COMMUNITY ENGAGEMENT - PHASE 2
PMP PRINTING SITE COMMUNITY ENGAGEMENT - PHASE 2 FEBRUARY 2019 0317-0511 - PMP Printng - M001 (8 -Floors) -Final date 14.11.2018 Vision: The PMP Printing site will be transformed into a contemporary mixed-use
More informationCity of Missoula and Missoula County Open Space Planning Open House
City of Missoula and Missoula County Open Space Planning Open House FEBRUARY 6, 2018 The following slides contain the display board content from the open house. Please use boards to answer questions in
More information