TIM & CINDY CARLSON 293 LAMSON LANE NEW LONDON, NEW HAMPSHIRE MAY 2017 OWNER: TIM & CINDY CARLSON 6 IRONWOOD ROAD SANDY HOOK, CT (203)

Size: px
Start display at page:

Download "TIM & CINDY CARLSON 293 LAMSON LANE NEW LONDON, NEW HAMPSHIRE MAY 2017 OWNER: TIM & CINDY CARLSON 6 IRONWOOD ROAD SANDY HOOK, CT (203)"

Transcription

1 293 LAMSON LANE NEW LONDON, NEW HAMPSHIRE OWNER: 6 IRONWOOD ROAD SANDY HOOK, T (203) ENGINEER: 76 NEWPORT ROAD, PO BOX (603) SITE ARHITET: BONIN ARHITETS & ASSOIATES PLL 20 MAIN STREET, PO BOX (603) R:\ arlson Permitting\DWGS\Final\ arlson Final 06_22x34.dwg, over22x34, 5/9/207 3:00:59 PM, Hernick NEW LONDON NEW HAMPSHIRE SHEET LIST LOATION PLAN SALE: " = 2000' OVER EXISTING ONDITIONS PLAN SITE PLAN ENVIROFIN SYSTEM (SEPTI PLAN)

2 PLEASANT LAKE REFERENE SURFAE ELEVATION = (SEE NOTE 2) FEMA FLOOD ZONE A 00YEAR FLOOD ELEVATION = (SEE NOTE 4) Littleton NH New London NH Newport VT R:\ arlson Permitting\DWGS\Final\ arlson Final 06_22x34.dwg, Ex ond, 5/9/207 3:0:05 PM, Hernick GENERAL NOTES. SURVEYED PAREL IS LOATED IN ZONING DISTRIT R2 AS WELL AS THE SHORELAND OVERLAY DISTRIT. THE PROPERTY IS ON TAX MAP 62, LOT 8 IN NEW LONDON. 2. BASIS OF BEARINGS: THE BEARINGS SHOWN HEREON REFER TO MAGNETI NORTH, OBSERVED IN OTOBER OF 204. THE VERTIAL DATUM IS BASED ON A MEASUREMENT OF THE WATER LEVEL OF PLEASANT LAKE RELATIVE TO A BENH MARK OF ESTABLISHED ON A ONRETE ABUTMENT OF THE SPILLWAY OUTLET OF THE LAKE IN ELKINS. 3. THIS PLAN IS BASED ON A FIELD SURVEY ONDUTED ON OTOBER 2, 204, BY HORIZONS ENGINEERING, IN. USING ONVENTIONAL LEIA TOTAL STATION. 4. THE 00YEAR BASE FLOOD ELEVATION SHOWN IS FROM THE DUBOIS & KING IN. "PLEASANT LAKE DAM ALTERNATIVES SUMMARY REPORT", DATED JULY, 206. BASED ON THIS FLOOD ELEVATION, THE SUBSTAINAL IMPROVEMENTS TO THE SITE LIE OUTSIDE OF THE NEW LONDON FLOODPLAIN OVERLAY DISTRIT. 207 EXISTING ONDITIONS PLAN DATE REVISION DESRIPTION ENG DWG DATE: PROJET #: ENGIN'D BY: DRAWN BY: HEK'D BY: EJP ARHIVE #: H 0

3 LEGEND METAL STAKE FOUND BOLT IN BOULDER FOUND SEE STREAM OUTLET INSET (AT RIGHT) GRANITE MONUMENT FOUND UTILITY POLE EXISTING PROPERTY LINE EXISTING PROPERTY LINE EDGE OF GRAVEL ROAD STONE RETAINING WALL 0' ONTOUR INTERVAL STREAM OUTLET INSET 2' ONTOUR INTERVAL SALE: " = 0' TREE OUNT GRID BOUNDARY / LABEL FLOATING TURBIDITY BARRIER OHW TB ORDINARY HIGH WATER REFERENE LINE TB SPB50 TOP OF BANK 50' SHORELAND PROTETION BUFFER SPB50 SPB50 50' SHORELAND PROTETION BUFFER SPB250 SPB ' SHORELAND PROTETION BUFFER 60' SHORELAND PROTETION BUFFER TREE OUNT GRID BOUNDARY / LABEL EXISTING IMPERVIOUS OVER PROPOSED IMPERVIOUS OVER POSTONSTRUTION UNALTERED AREA RD RED OSIER DOGWOOD WH WITHHAZEL HB HIGH BUSH BLUEBERRY WITHIN 50' OF REFERENE LINE EXISTING PROPOSED 358 SF 263 SF 766 SF 464 SF HOUSE DEK Littleton NH New London NH NET AREA 95 SF 302 SF Newport VT GENERAL NOTES R:\ arlson Permitting\DWGS\Final\ arlson Final 06_22x34.dwg, Prop, 5/9/207 3:0:08 PM, Hernick. THE INTENT OF THIS PLAN IS TO DEPIT GRADING AND ONSTRUTION FOR NHDES SUBSURFAE AND NHDES SHORELAND PERMIT APPLIATIONS, LOAL REVIEWS, AND ONSTRUTION. 2. NOT DETERMINED DUE TO A RAKED ONRETE OVER ON FABRIATE THE PROPOSED MANHOLE. 3. SITE PLAN THE OWNER SHALL MAINTAIN A NATURAL VEGETATIVE BUFFER TO BE 20' WIDE ENTERED ON THE PROPOSED STREAM HANNEL ALIGNMENT. MAINTENANE AND SELETIVE UTTING MAY OUR WITHIN THE BUFFER. THE INTENT IS TO ALLOW NATURALLY OURRING VEGETATION TO GROW WITHIN THE BUFFER. 4. FLOW SHALL NOT BE ROUTED TO THE PROPOSED HANNEL UNTIL ONSTRUTION OF THE HANNEL IS OMPLETE AND THE HANNEL IS FULL STABILIZED. 5. STREAM DAYLIGHTING AND RESTORATION HAS BEEN APPROVED BY NHDES UNDER WETLAND PERMIT # ALL WORK SHALL BE OMPLETED IN OMPLIANE WITH THE ONDITIONS OF THE PERMIT. DATE REVISION DESRIPTION DATE: ENG DWG PROJET #: ENGIN'D BY: DRAWN BY: JH HEK'D BY: ARHIVE #: 207 H 20

4 FRAME AND OVER LOAM AREA PAVED AREA EROSION ONTROL GENERAL NOTES A. KEEP SITE MODIFIATION TO A MINIMUM. ONSIDER FITTING THE BUILDINGS AND STREETS TO THE NATURAL TOPOGRAPHY. THIS REDUES THE NEED FOR UTS AND FILLS. AVOID EXTENSIVE GRADING THAT WOULD ALTER DRAINAGE PATTERNS OR REATE VERY STEEP SLOPES. 2. EXPOSE AREAS OF BARE SOIL TO EROSIVE ELEMENTS FOR THE SHORTEST TIME POSSIBLE. 3. SAVE AND PROTET DESIRABLE EXISTING VEGETATION WHERE POSSIBLE. ERET BARRIERS TO PREVENT DAMAGE FROM ONSTRUTION EQUIPMENT. 4. LIMIT THE GRADES OF SLOPES SO VEGETATION AN BE EASILY ESTABLISHED AND MAINTAINED. 5. AVOID SUBSTANTIAL INREASE IN RUNOFF LEAVING THE SITE. B. MINIMIZE POLLUTION OF WATER DURING ONSTRUTION ATIVITIES. STOKPILE TOPSOIL REMOVED FROM ONSTRUTION AREA AND SPREAD OVER ANY DISTURBED AREAS PRIOR TO REVEGETATION. TOPSOIL STOKPILES MUST BE PROTETED FROM EROSION. 2. PROTET BARE SOIL AREAS EXPOSED BY GRADING ATIVITIES WITH TEMPORARY VEGETATION OR MULHES. 3. USE SEDIMENT BASINS TO TRAP DEBRIS AND SEDIMENT WHIH WILL PREVENT THESE MATERIALS FROM MOVING OFF SITE. 4. USE DIVERSIONS TO DIRET WATER AROUND THE ONSTRUTION AREA AND AWAY FROM EROSION PRONE AREAS TO POINTS OF SAFE DISPOSAL. 5. USE TEMPORARY ULVERTS OR BRIDGES WHEN ROSSING STREAMS WITH EQUIPMENT. 6. PLAE ONSTRUTION FAILITIES, MATERIALS, AND EQUIPMENT STORAGE AND MAINTENANE AREAS AWAY FROM DRAINAGE WAYS.. PROTET AREA AFTER ONSTRUTION.. ESTABLISH GRASS OR OTHER SUITABLE VEGETATION ON ALL DISTURBED AREAS. SELET SPEIES ADAPTED TO THE SITE ONDITIONS AND THE FUTURE USE OF THE AREA. FINAL GRADES SHALL BE SEEDED WITHIN 72 HOURS. STABILIZATION SHALL BE DEFINED AS 85% VEGETATIVE OVER. 2. MAINTAIN VEGETATED AREAS USING PROPER VEGETATIVE 'BEST MANAGEMENT PRATIES' DURING THE ONSTRUTION PERIOD. 3. MAINTAIN NEEDED STRUTURAL 'BEST MANAGEMENT PRATIES' AND REMOVE SEDIMENT FROM DETENTION PONDS AND SEDIMENT BASINS AS NEEDED. OLD WEATHER SITE STABILIZATION REQUIREMENTS TO ADEQUATELY PROTET WATER QUALITY DURING OLD WEATHER AND DURING SPRING RUNOFF, THE FOLLOWING ADDITIONAL STABILIZATION TEHNIQUES SHALL BE EMPLOYED DURING THE PERIOD FROM OTOBER 5 THROUGH MAY :. THE AREA OF EXPOSED, UNSTABILIZED SOIL SHALL BE LIMITED TO ONE ARE AND SHALL BE PROTETED AGAINST EROSION BY THE METHODS DESRIBED IN THIS SETION PRIOR TO ANY THAW OR SPRING MELT EVENT. THE ALLOWABLE AREA OF EXPOSED SOIL MAY BE INREASED IF A WINTER ONSTRUTION PLAN, DEVELOPED BY A QUALIFIED ENGINEER OR A PES SPEIALIST, IS REVIEWED AND APPROVED BY NHDES. 2. ALL PROPOSED VEGETATED AREAS HAVING A SLOPE OF LESS THAN 5% WHIH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATIVE GROWTH BY OTOBER 5, OR WHIH ARE DISTURBED AFTER OTOBER 5, SHALL BE SEEDED AND OVERED WITH 3 TO 4 TONS OF HAY OR STRAW MULH PER ARE SEURED WITH ANHORED NETTING OR TAKIFIER, OR 2 INHES OF EROSION ONTROL MIX MEETING THE RITERIA OF ENVWQ (D) THROUGH (H). 3. ALL PROPOSED VEGETATED AREAS HAVING A SLOPE OF GREATER THAN 5% WHIH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATIVE GROWTH BY OTOBER 5, OR WHIH ARE DISTURBED AFTER OTOBER 5, SHALL BE SEEDED AND OVERED WITH A PROPERLY INSTALLED AND ANHORED EROSION ONTROL BLANKET OR WITH A MINIMUM 4 INH THIKNESS OF EROSION ONTROL MIX MEETING THE RITERIA OF ENVWQ (D) THROUGH (H). 4. INSTALLATION OF ANHORED HAY MULH OR EROSION ONTROL MIX, MEETING THE RITERIA OF ENVWQ (D) THROUGH (H), SHALL NOT OUR OVER SNOW OF GREATER THAN ONE INH IN DEPTH. 5. INSTALLATION OF EROSION ONTROL BLANKETS SHALL NOT OUR OVER SNOW OF GREATER THAN ONE INH IN DEPTH OR ON FROZEN GROUND. 6. ALL PROPOSED STABILIZATION IN AORDANE WITH NOTES 2 OR 3 ABOVE, SHALL BE OMPLETED WITHIN A DAY OF ESTABLISHING THE GRADE THAT IS FINAL OR THAT OTHERWISE WILL EXIST FOR MORE THAN 5 DAYS. 7. ALL DITHES OR SWALES WHIH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATIVE GROWTH BY OTOBER 5, OR WHIH ARE DISTURBED AFTER OTOBER 5, SHALL BE STABILIZED TEMPORARILY WITH STONE OR EROSION ONTROL BLANKETS APPROPRIATE FOR THE DESIGN FLOW ONDITIONS, AS DETERMINED BY THE OWNER S ENGINEERING ONSULTANT. 8. AFTER NOVEMBER 5, INOMPLETE ROAD OR PARKING AREAS WHERE ATIVE ONSTRUTION OF THE ROAD OR PARKING AREA HAS STOPPED FOR THE WINTER SEASON SHALL BE PROTETED WITH A MINIMUM 3 INH LAYER OF BASE OURSE GRAVELS MEETING THE GRADATION REQUIREMENTS OF NHDOT STANDARD SPEIFIATION FOR ROAD AND BRIDGE ONSTRUTION, 2006, ITEM 304. OR ONSTRUTION SEQUENE. PREPARE AN EROSION ONTROL PLAN IN AORDANE WITH LOAL, STATE, AND FEDERAL REQUIREMENTS. 2. UT AND LEAR TREES WITHIN THE LEARING LIMITS. 3. INSTALL SILT FENES, ROK HEK DAMS, AND OTHER APPROPRIATE EROSIONS ONTROL MEASURES AT LOATIONS SHOWN ON THE PLANS AND AS NEEDED. 4. GRUB SITE WITHIN GRADING LIMITS. 5. STRIP AND STOKPILE TOPSOIL AND INSTALL ADDITIONAL EROSION ONTROL MEASURES AS NEEDED. 6. PROEED WITH DEMOLITION WORK, LIMITING THE DURATION OF DISTURBANE. THE MAXIMUM LENGTH OF TIME THAT A WORK UNIT MAY BE LEFT UNSTABILIZED IS 30 DAYS. 7. ONSTRUT PROPOSED STREAM HANNEL PRIOR TO DEMOLITION OF EXISTING ULVERT. 8. ONSTRUT PERMANENT DRAINAGE FEATURES AS SOON AS POSSIBLE TO ALLOW STABILIZATION BEFORE DIRETING FLOWS TO FEATURES. 9. BEGIN SEEDING AND MULHING IMMEDIATELY AFTER GRADING. ALL DISTURBED AREAS SHALL BE STABILIZED WITH APPROVED METHODS WITHIN 4 DAYS OF AHIEVING FINISHED GRADE. AN AREA SHALL BE ONSIDERED STABLE IF ONE OF THE FOLLOWING HAS OURRED: A) BASE OURSE GRAVELS HAVE BEEN INSTALLED IN AREAS TO BE PAVED; B) A MINIMUM OF 85% VEGETATED GROWTH HAS BEEN ESTABLISHED; ) A MINIMUM OF 3" OF NONEROSIVE MATERIAL SUH AS STONE OR RIPRAP HAS BEEN INSTALLED; OR D) EROSION ONTROL BLANKETS HAVE BEEN PROPERLY INSTALLED. 0. INSPET ALL EROSION ONTROL MEASURES ON A DAILY BASIS AND AFTER EVERY 0.5 INHES OF PREIPITATION. MAINTAIN SILT FENE, SEDIMENT TRAPS, HAY BALES, ET., AS NEESSARY.. PAVE DRIVEWAY AND/OR PARKING AREAS. 2. PLAE TOPSOIL, SEED AND MULH. 3. OMPLETE ALL REMAINING PERMANENT EROSION ONTROL STRUTURES. 4. MONITOR THE SITE AND MAINTAIN STRUTURES AS NEEDED UNTIL FULL VEGETATION IS ESTABLISHED. DRAIN PIPE, SEE PLAN FOR SIZE 2'0" MINIMUM 4'0" MAXIMUM 6" MIN. UNDISTURBED EARTH OR LEDGE 30" 6'0" FLEXIBLE WATERTIGHT BOOT (TYP) 3 4 " RUSHED STONE 8" MINIMUM DEPTH NOTE: ONTRATOR SHALL PROVIDE SHOP DRAWINGS TO ONFIRM ADEQUATE DIAMETER AND INVERTS. EXISTING GROUND OR FINISH GRADE DRAIN MANHOLE DETAIL NOT TO SALE BRIK AS REQUIRED TO ADJUST FRAME AND OVER TO GRADE, FIVE OURSES MAXIMUM EENTRI ONE SETION (REINFORED ONRETE SLAB RATED FOR H20 LOADING MAY BE USED WHERE MANHOLE DEPTH IS LESS THAN 6') OVERLAPPING TYPE JOINT SEALED WITH DOUBLE ROW OF BITUMASTI (TYPIAL) PREAST ONRETE BARREL SETIONS AS REQUIRED PREAST ONRETE BASE 4" OMPATED LOAM AND SEEDED SUITABLE BAKFILL UNDISTURBED SOIL SEURELY ATTAH TO BANK PER MFGR'S INSTRUTIONS ABLE D 3'0" MIN. OR D+2 (WHIHEVER IS GREATER) INTEGRAL FLOATATION PAVEMENT PER TYPIAL SETION 6" RUSHED GRAVEL 2" GRAVEL TYPIAL DRAINAGE TRENH DETAIL NOT TO SALE ROADWAY BAKFILL SHALL ONFORM TO TOWN REQUIREMENTS 2" MIN. SAND USHION 3/4" RUSHED STONE BEDDING FOR FULL WIDTH OF THE TRENH UP TO SPRING LINE OF PIPE 6" BELOW PIPE IN EARTH 2" BELOW PIPE IN LEDGE WATER LEVEL ROK 4. DETERMINE RESPONSIBILITY FOR LONG TERM MAINTENANE OF PERMANENT 'BEST MANAGEMENT PRATIES'. 5. IF ONSTRUTION IS ANTIIPATED DURING WINTER MONTHS, GRADED AREAS ARE TO BE STABILIZED WITH NORTH AMERIAN GREEN DS50 MATTING OR EQUAL. 4" LOAM, MULH AND SEED MIRAFI FILTERWEAVE FW 700 GEOTEXTILE FABRI, OR EQUAL EXTEND TO GROUND SURFAE 24" (TYP.).5 WEIGHTED BOTTOM LAKE BED. FLOATING TURBIDITY BARRIER SHALL BE TYPE I FLOATING TURBIDITY BARRIER AS MANUFATURED BY AF ENVIRONMENTAL OR APPROVED EQUAL. 2. INSTALL PER MANUFATURER'S REOMMENDATIONS. 3. TURBIDITY BARRIER SHALL BE DEPLOYED DURING ATIVITIES WHIH HAVE THE POTENTIAL TO AUSE TURBIDITY. BARRIER SHALL BE TEMPORARILY REMOVED WHEN SIGNIFIANT IE OR FLOATING DEBRIS IS EXPETED AND NO WORK IS TAKING PLAE. STONE FILL, SEE STONE SPEIFIATIONS FLOATING TURBIDITY BARRIER DETAIL NOT TO SALE 3'0" (TYP) STONE SPEIFIATIONS FOR STREAM RESTORATION 9'0" (TYP) R:\ arlson Permitting\DWGS\Final\ arlson Final 06_22x34.dwg, Detail, 5/9/207 3:0: PM, Hernick STONE FOR STONE FILL SHALL BE AN APPROVED OMBINATION OF QUARRY STONE, ROUNDED STONE OR BROKEN ROK OF A HARD, SOUND, AND DURABLE QUALITY. THE STONES AND SPALLS SHALL BE SO GRADED AS TO PRODUE A DENSE FILL WITH A MINIMUM OF VOIDS.. STREAM RESTORATION STONE SHALL BE IRREGULAR IN SHAPE WITH AT LEAST 75% OF THE MASS HAVING A MINIMUM DIMENSION OF 8INHES. STONE SIZE SHOULD VARY FROM A MINIMUM OF 6 INHES TO 24 INHES. STONE SHALL BE A OMBINATION OF ROUNDED AND ANGULAR STONE. STONE SHALL MATH THE STONE FOUND IN THE STREAM HANNEL UPSTREAM FROM THE LAMSON LANE ULVERT TO THE GREATEST EXTENT POSSIBLE. ONTRATOR MAY USE EXISTING STONE AND BOULDERS ON SITE INLUDING RETAINING WALL STONE. LARGE STONE VOIDS SHOULD BE FILLED WITH SPALLS. STONE SHALL BE PLAE 8" THIK. STONES LARGER THAN 8" ARE INTENDED TO PROJET INTO HANNEL SETION. THE INTENT IS TO MIMI THE UPSTREAM HANNEL 2. SPALLS FOR FILLING VOIDS SHALL ONSIST OF A MIXTURE OF STONES OR ROK FRAGMENTS AND PARTILES WITH 95 TO 00% PASSING THE 3INH SIEVE AND 25 TO 70% PASSING THE 4 SIEVE. REFERENE ELEVATION = " THIK STREAM RESTORATION STONE (SEE STREAM HANNEL SIMULATION DETAIL) 3'x3'xHANNEL WIDTH STONE STABILIZATION KEY 2' MINIMUM STONE LINED OUTLET DETAIL NOT TO SALE 6" GRAVEL BEDDING MIRAFI FILTERWEAVE FW 700 GEOTEXTILE FABRI, OR EQUAL. EXTEND TO GROUND SURFAE. STAKE WITH 8" GROUND STAPLES PER MANUFATURER'S REOMMENDATION. KEY GEOTEXTILE IN TO STONE AT 40' INTERVALS. NATIVE GROUND STABILIZE ENTIRE PILE WITH VEGETATION OR OVER MINIMUM SLOPE SOIL STOKPILING IS TO BE USED WHERE TOPSOIL IS NEESSARY FOR REGRADING AND VEGETATING DISTURBED AREAS. TEMPORARY STOKPILE STABILIZATION MEASURES INLUDE VEGETATIVE OVERS, MULH, NONVEGETATIVE OVERS, AND PERIPHERAL SEDIMENT TRAPPING BARRIERS. THE STABILIZATION MEASURE(S) SELETED SHOULD BE APPROPRIATE FOR THE TIME OF YEAR, SITE ONDITIONS, AND REQUIRED PERIOD OF USE. STRAWBALES OR SILT FENE NOT TO SALE 2 MAXIMUM SOIL STOKPILING DETAIL MINIMUM SLOPE INSTALLATION. AREA HOSEN FOR STOKPILING OPERATIONS SHALL BE DRY AND STABLE. 2. MAXIMUM SLOPE OF STOKPILE SHALL BE 2:. 3. UPON OMPLETION OF SOIL STOKPILING, EAH PILE SHALL BE SURROUNDED WITH EITHER SILT FENING OR STRAWBALES AND THEN STABILIZED WITH VEGETATION OR OVERED. ONSTRUTION NOTES FOR SEDIMENT FENE. WOVEN WIRE FENE, IF REQUIRED, TO BE FASTENED SEURELY TO FENE POSTS WITH WIRE TIES OR STAPLES. 2. FILTER LOTH TO BE FASTENED SEURELY TO WOVEN WIRE FENE WITH TIES SPAED EVERY 24" AT TOP, MID SETION, AND BOTTOM. 3. WHEN TWO SETIONS OF FILTER LOTH ADJOIN EAH OTHER, THEY SHALL BE OVERLAPPED BY 6 INHES, FOLDED AND STAPLED. 4. MAINTENANE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENE, OR 50% OF ITS STORAGE IS USED. STREAM HANNEL SIMULATION WOVEN WIRE FENE (4/2 GA. MIN., MAX. 6" MESH SPAING) WITH FILTER LOTH OVER UNDISTURBED GROUND FLOW NOT TO SALE FLOW SEDIMENT FENE NO SALE 36" MIN. FENE POSTS, DRIVEN MIN. 6" INTO GROUND 0' MAX.. TO. FLOW EMBED FILTER LOTH MIN. 8" INTO GROUND HEIGHT OF FILTER 8" = 6" MIN. 6" 20" 207 Littleton NH New London NH Newport VT DATE REVISION DESRIPTION DATE: ENGIN'D BY: HEK'D BY: 30 ENG PROJET #: DRAWN BY: JH ARHIVE #: H DWG

5 GENERAL NOTES ROKERY WALL. THE WALL DETAIL(S) DEPITED ON THESE PLANS ARE ONEPTUAL. SITE SPEIFI DESIGN SHOULD BE OMPLETED BY A GEOTEHNIAL ENGINEER BASED ON SITE SPEIFI SOIL AND GROUNDWATER ONDITIONS AT THE WALL LOATIONS. 2. WALL ONSTRUTION AND INSPETION SHOULD BE OMPLETED IN AORDANE WITH ROKERY DESIGN AND ONSTRUTION GUIDELINES, FHWAFL/TD06006, NOVEMBER EXAVATIONS SHALL BE EXTENDED TO AT LEAST 2.5 FEET BELOW FINISH GRADE TO ALLOW FOR WALL EMBEDMENT AND LEVELING OURSE. THE BASE OF THE EXAVATION SHALL BE INLINED BAK AWAY FROM THE FAE OF THE ROKERY, AT 5 PERENT. 4. ROKS SHOULD BE PLAED IN ROWS SUH THAT BASE ROKS ONSIST OF LARGEST DIAMETER AND WEIGHT ROKS AND EAH SUEEDING ROW ONSISTS OF SMALLER DIAMETER ROKS. BASE ROKS SHALL BE EQUAL TO ABOUT ½ THE WALL HEIGHT AND NOT LESS THAN 4 FEET IN DIAMETER. AP ROKS SHALL BE EQUAL TO ABOUT /3 THE WALL HEIGHT AND NOT LESS THAN 9 INHES IN DIAMETER. 5. ROKS SHALL BE HARD, ANGULAR AND DURABLE. THEY MUST BE ABLE TO RESIST PHYSIAL, LIMATI, AND HEMIAL DEOMPOSITION. ROKS SHOULD BE ROUGHLY RETANGULAR, TABULAR OR UBI IN SHAPE. ROUNDED OBBLES OR BOULDERS MUST NOT BE USED. 6. ROKS SHOULD BE PLAED WITH LONGEST DIMENSION PERPENDIULAR TO ROKERY FAE. THE ROKS SHOULD BE PLAED SUH THAT THEY SLOPE DOWNWARD AT LEAST 5 PERENT TOWARDS THE BAK OF THE ROKERY. 7. THE ROKERY FAE BATTER SHOULD BE 4V:H OR FLATTER. o EAH ROK SHOULD BEAR ON AT LEAST TWO OTHER ROKS. o EAH ROK SHOULD HAVE AT LEAST THREE BEARING POINTS TWO IN FRONT AND ONE IN BAK. o THE FRONTMOST BEARING POINTS FOR EAH ROK SHOULD BEWITHIN 50MM (6IN) OF THE AVERAGE FAE OF THE ROKERY. o THE REAR OF THE ROKS SHOULD BE ALIGNED ALONG AN IMAGINARY VERTIAL PLANE. IF ROKS LARGER THAN THE MINIMUM SPEIFIED BASE WIDTH (B) ARE USED, THEY AN EXTEND BEYOND THIS IMAGINARY PLANE PROVIDED THEY DO NOT INTERFERE WITH ROKERY DRAINAGE OR REINFORED ZONE. 8. THERE SHOULD BE NO VERTIAL OLUMNS OF ROK OR ONTINUOUS VERTIAL JOINTS BETWEEN MULTIPLE ROWS OF ROKS. 9. ROK WIDTH SHALL BE LARGE ENOUGH TO EXTEND FROM THE FRONT FAE TO THE BAK OF THE ROKERY AT EAH LEVEL. 0.PLAE BASE, FAING AND AP ROKS SO THAT THEIR HEIGHT DIMENSION IS NOT GREATER THAN THEIR WIDTH. THE LONGEST DIMENSION OF THE BASE, FAING, AND AP ROKS IS PERPENDIULAR TO FAE OF ROKERY..VOIDS BETWEEN ROKS SHOULD BE AVOIDED AS MUH AS POSSIBLE. HOWEVER, IN AREAS WHERE VOIDS EXIST, THE VOIDS SHALL BE HINKED. HINK ROKS SHOULD ONSIST OF SPALLS FROM THE PARENT (FAING) ROK. HINK ROKS SHOULD NOT BE MOVABLE BY HAND AND SHOULD BE GROUTED IN PLAE WHERE APPROPRIATE. HINKING ROKS SHOULD NOT BE USED AS A MEANS OF SUPPORT FOR OVERLYING FAING ROKS. 2.AP ROKS ARE THE TOP ROW OF FAING ROKS FOR ROKERIES. AP ROKS ARE TYPIALLY SMALLER AND FLATTER THAN THE OTHER FAING ROKS USED IN THE ROKERY. AP ROKS SHALL HAVE A WEIGHT OF AT LEAST 200 POUNDS. AP ROKS SHOULD NOT BE MOVABLE BY HAND. REGARDLESS OF SIZE, AP ROKS SHALL BE GROUTED IN PLAE TO REDUE THE POTENTIAL FOR DISLODGING. 3.RUSHED ROK SHOULD ONSIST OF RUSHED, WASHED, HARD, DURABLE ROK MEETING THE FOLLOWING GRADATION REQUIREMENTS: RUSHED ROK SIEVE SIZE PERENT FINER BY WEIGHT 50MM (6IN) 00 00MM (4 IN) MM (3/4 IN) MM ( 4) MM ( 200) IMPERMEABLE LAY OR LOAM AP RUSHED ROK (6INH MINUS) DRAINAGE SWALE (SEE SITE PLANS) GEOTEXTILE WRAP (MIRAFI 60N OR EQUAL) 4" (PV OR HDPE) PERFORATED DRAIN PIPE 2 5% 0.3 H (MIN. 9") 0.5 H (MINIMUM 4 FT.) ROKERY WALL DETAIL NOT TO SALE 4 MAX. 2" MIN. H (8 FT. MAX) EMBEDMENT 8" MIN. EDGE OF PAVEMENT 2'4" 36" BEAM GUIDE RAIL / WOOD POSTS 4'6" 2" 4x8 PRESSURE TREATED WOOD RAIL (REESS INTO POST) 0x0 PRESSURE TREATED WOOD POST SEE PLAN FOR SLOPE 2" BANK RUN GRAVEL SEE TYPIAL PAVEMENT SETION. WOOD POST SHALL BE SPAED 6'3" ENTER TO ENTER ROUGH UT LUMBER 2. SEE ROUGH UT ARPENTRY AND HEAVY TIMBER ONSTRUTION SPEIFIATIONS 3. ONTRATOR SHALL SUBMIT SHOP DRAWING PRIOR TO FABRIATION. NOT TO SALE " 6" RUSHED RUN GRAVEL SEE TYPIAL PAVEMENT SETION GALVANIZED BOLT ASSEMBLY BOTTOM EL= SURROUNDING GRADE ELEV: " MULH MEDIA BOTTOM EL= NATIVE SOIL LOAM & SEED (TYP.) PLANTINGS AS SPEIFIED BY BONIN ARHITETS 8" NYLOPLAST BASIN W/ GRATE GRATE ELEV. = " PV OUT INV. = YR STORM EL= FILTER MEDIA 8" DEEP SETION AA 2: A PLAN VIEW 6" PV OUTLET PIPE L=36', S=0.02 6" MIN. SUMP BIORETENTION AREA # A PROPOSED HOUSE. BIORETENTION AREA PLANTINGS SHALL BE SPEIFIED BY BONIN ARHITETS IN OMPLIANE WITH NEW HAMPSHIRE STORMWATER MANUAL GUIDANE FOR BIORETENION AREAS. 2. FILTER MEDIA SHALL MEET ONE OF THE FOLLOWING SPEIFIATIONS: A. 50% TO 55% BY VOLUME SAND ALSO IDENTIFIED AS ASTM 33 ONRETE SAND, 20% TO 30% BY VOLUME OF LOAMY SAND TOPSOIL WITH 5% TO 25% FINES PASSING THE NUMBER 200 SIEVE, AND 20% TO 30% BY VOLUME MODERATELY FINE SHREDDED BARK OR WOOD FIBER MULH WITH LESS THAN 5% PASSING THE NUMBER 200 SIEVE; B. 20% TO 30% BY VOLUME OF MODERATELY FINE SHREDDED BARK OR WOOD FIBER MULH THAT HAS NO MORE THAN 5% FINES PASSING THE NUMBER 200 SIEVE, WITH 70 TO 80% BY VOLUME LOAMY OARSE SAND USED IN THE MIXTURE MEETING THE FOLLOWING SIEVE ANALYSIS SPEIFIATION:. FROM 85 TO 00 PERENT BY WEIGHT SHALL PASS THE NUMBER 0 SIEVE; 2. FROM 70 TO 00 PERENT BY WEIGHT SHALL PASS THE NUMBER 20 SIEVE; 3. FROM 5 TO 40 PERENT BY WEIGHT SHALL PASS THE NUMBER 60 SIEVE;AND 4. FROM 8 TO 5 PERENT BY WEIGHT SHALL PASS THE NUMBER 200 SIEVE. DIRET ROOF DOWNSPOUTS TO BIORETENTION AREA. 2. THE BIORETENTION AREA FUNTIONS BY INFILTRATING STORMWATER. ENSURE THAT ADJAENT FOUNDATION WALLS ARE ADEQUATELY WATERPROOFED FOR ONTINUAL ONTAT WITH SATURATED SOIL. SEE PLANS AND BY OTHERS 4.WHERE LOOSE, SOFT, OR OTHERWISE UNSUITABLE FOUNDATION SOIL ONDITIONS ARE ENOUNTERED, ONTAT THE ENGINEER FOR SUPPLEMENTAL REOMMENDATIONS. 5.DISHARGE OUTLET PIPES TO A PROTETED OUTLET OR OTHER PERMANENET DRAINAGE STRUTURE AT LOW POINTS IN THE ROKERY. DRAIN OUTLETS SHOULD NOT EMPTY INTO STORM DRAINS THAT ARE DESIGNED TO BAKUP DURING HEAVY FLOWS. 6.STABILITY OF TEMPORARY UT SLOPES IS THE RESPONSIBILITY OF THE ONTRATOR. 7.DO NOT ONSTRUT ROKERIES OR SLOPES EXEEDING THE HEIGHTS SHOWN ON THE PLAN. NATIVE MATERIALS ON SLOPED SUBGRADE NONWOVEN FILTER FABRI SHALL BE USED IN SLOPED SETIONS; MIRAFI 60N OR APPROVED EQUAL 2808AG X () DUTILE IRON GRATE (3,4) 6" PV SDR 35 OUTLET ADAPTERS 8" USTOM DRAIN BASIN (2) 34.75".50" 6" MIN. 6.50" (2) 40.75" NYLOPLAST BASIN DETAIL DETAIL BY NYLOPLAST, FOR REFERENE ONLY GRATES/SOLID OVER SHALL BE DUTILE IRON PER ASTM A536 GRADE , WITH THE EXEPTION OF THE BRONZE GRATE. 2 USTOM DRAIN BASIN TO BE USTOM MANUFATURED AORDING TO PLAN. RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRITIONS. SEE DRAWING DRAINAGE ONNETION STUB JOINT TIGHTNESS SHALL ONFORM TO ASTM D322 FOR ORRUGATED HDPE (ADS & HANOR DUAL WALL) & SDR 35 PV 4 STANDARD DRAIN BASIN HAS FIXED ADAPTER LOATIONS OF 0 & 80. USTOM DRAIN BASIN ADAPTERS AN BE MOUNTED ON ANY ANGLE 0 TO 360. TO DETERMINE MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING DIMENSIONS ARE FOR REFERENE ONLY ATUAL DIMENSIONS MAY VARY BEDDING OURSE USED TO SET PAVERS AND TO FILL SPAES BETWEEN PAVERS ONRETE FLOW BARRIERS, HEK DAMS OR SOIL BERMS ONRETE PAVERS APPROVED BY THE INTERLOKING PAVEMENT INSTITUTE 6" PERFORATED PV OBSERVATION WELL WITH THREADED AP RISER TO GRADE 6" SOLID PV RELIEF OUTLET PIPE WITH PERFORATED SETION WITHIN THE LIMITS OF DRYWELL STONE; ONNET TO PERFORATED RISER ABOVE TOP OF INLET PIPE (SEE PLAN FOR LOATION) 4" THIK HOKER OURSE 2" THIK BEDDING OURSE 6" LOAM, SEED, AND MULH ENTER ON DRIPLINE 2' 4" MIN THIKNESS BANK RUN GRAVEL FILTER OURSE 6" Littleton NH New London NH Newport VT FILTER BLANKET: INTERMEDIATE SETTING BED: 3" THIKNESS OF 3/8" PEA GRAVEL R:\ arlson Permitting\DWGS\Final\ arlson Final 06_22x34.dwg, Detail (2), 5/9/207 3:0:5 PM, Hernick NOT TO SALE 8" 4" FOUNDATION DRAIN STONE DRIP EDGE DETAIL 3/4" /2" RUSHED WASHED STONE 40% VOID SPAE GEOTEXTILE FABRI (MIRAFI FW 700 OR EQUAL) U.S. STANDARD SIEVE SIZE 6" (50mm) 2 /2" (63mm) 2" (50mm) /2" (37.5mm) " (25mm) 3/4" (9mm) /2" (2.5mm) 3/8" (9.5mm) #4 (4.75mm) #8 (2.36mm) NOTE: RESERVOIR OURSE: 8" THIKNESS OF 3/4" RUSHED STONE FOR FROST PROTETION BEDDING OURSE (ASTM No. 8) TO 00 0 TO 30 0 TO 0 NATIVE MATERIALS HOKER OURSE (AASHTO No. 57) PERENT PASSING (%) FILTER OURSE (NHDOT 304.) RESERVOIR OURSE (AASHTO No. 3) RESERVOIR OURSE ALT.* (AASHTO No. 5) *ALTERNATE GRADATION (e.g. AASHTO No. 5) FOR RESERVOIR OURSE MAY BE AEPTED ENGINEER'S APPROVAL. THE ONTRATOR AND OWNER ARE ADVISED TO REFERENE THE "UNHS DESIGN SPEIFIATIONS FOR POROUS ASPHALT PAVEMENT AND INFILTRATION BEDS" FOR ONSTRUTION AND MAINTENANE OF THE PAVEMENT SETION. TYPIAL PATIO SETION PERVIOUS PAVERS NOT TO SALE 6" SOLID PV FROM ROOF DRAINS (SEE PLAN); ONNET TO PERFORATED SETION WITHIN THE LIMITS OF DRY WELL STONE; ONNET TO PERFORATED RISER NON WOVEN GEOTEXTILE FABRI (MIRAFI 35N OR APPROVED EQUAL) ON TOP AND SIDES LEAN 2" 3" STONE BOTTOM OPEN TO NATIVE SOIL (NO FABRI) REBAR ANHOR. SEE PLAN FOR LOATION OF DRYWELLS. 2. PLAE ONE OBSERVATION WELL IN THE ENTER OF EAH DRYWELL. LENGTH WIDTH STONE BOTTOM STONE TOP E.S.H.W.T INLET INV. OUTLET INV. DRY WELL # 5' 2' DRY WELL #2 0' 6' DRY WELL DETAIL NOT TO SALE 24" 6" 207 DATE REVISION DESRIPTION DATE: ENGIN'D BY: HEK'D BY: 302 ENG PROJET #: DRAWN BY: JH ARHIVE #: H DWG

6 TO BE FILLED IN AFTER REORDING

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

THE NEW I-64 T01 LIMITS OF MAINLINE CONSTRUCTION STA LIMITS OF MAINLINE CONSTRUCTION STA LIMITS OF MAINLINE CONSTRUCTION STA

THE NEW I-64 T01 LIMITS OF MAINLINE CONSTRUCTION STA LIMITS OF MAINLINE CONSTRUCTION STA LIMITS OF MAINLINE CONSTRUCTION STA VH-1002 EL. 623.2 V-2022 EL. 606.9 VH-5001 EL. 625.2 3 T-3 EL. 589.78 VH-5003 EL. 589.8 SOUTH OUTER RD. NORTH OUTER R.D. RAMP 1 V-2021 EL. 623.1 RAMP 2 NORTH OUTER R.D / RAMP 1 RAMP 3 607.1 RAMP 4 T-4

More information

The following general requirements will be met for all planter box installations:

The following general requirements will be met for all planter box installations: Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended

More information

Subsurface Infiltration Bed

Subsurface Infiltration Bed Subsurface Infiltration Bed The Subsurface Infiltration Bed BMP consists of a storage bed underlying either a vegetated or hardscaped surface for the purpose of temporary storage and infiltration of stormwater

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education Wisconsin Contractors Institute Continuing Education Erosion & Sediment Control Course # 12775 2 hours Wisconsin Contractors Institute N27 W23953 Paul Road, Suite 203 Pewaukee, WI 53072 Website: www.wicontractorsinstitute.com

More information

ABBREVIATIONS. Dwg LID of 1. Abbreviations

ABBREVIATIONS. Dwg LID of 1. Abbreviations ABBREVIATIONS DIA DIAMETER EL ELEVATION FT2 SQUARE FOOT GAL/MIN GALLONS PER MINUTE H HORIZONTAL HDPE HIGH DENSITY POLYETHYLENE HMAC HOT MIX ASPHALT CONCRETE IE INVERT ELEVATION MAX MAXIMUM NO. NUMBER ODEQ

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook 67 67 General Terms Specific Terms 66 Low Impact Development Approaches Handbook The vocabulary of low impact development is evolving, and many terms are used interchangeably and to describe the same or

More information

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing

More information

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS Introduction As required by federal and state law, the Borough of Swarthmore has adopted regulations that affect stormwater runoff and surface

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix C. LID Parking Lot Design and Teaching Tool

More information

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General

More information

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Table 4.7.1: Swales Potential Application and Storm Water Regulation 4.7. Swales A swale is a vegetated open channel, planted with a combination of grasses and other herbaceous plants, shrubs, or trees. A traditional swale reduces peak flow at the discharge point by increasing

More information

Technical Data Manual Model Nos. and pricing: see Price List. VITOCELL r 300-W, 300-V CAUTION. Vitocell 300-W, EVIA

Technical Data Manual Model Nos. and pricing: see Price List. VITOCELL r 300-W, 300-V CAUTION. Vitocell 300-W, EVIA Tehnial Data Manual Model Nos. and priing: see Prie List Vitoell 300-W, EVIA Single oil, indiret-fired domesti hot water storage tank 4 USG (60 L) apaity Vitoell 300-V, EVIA Single oil, indiret-fired domesti

More information

RZ Rezoning Petition /19/14 TRYON PLACE OFFICE 601 SOUTH TRYON CHARLOTTE, NC EXISTING CONDITIONS LDSI SURVEY

RZ Rezoning Petition /19/14 TRYON PLACE OFFICE 601 SOUTH TRYON CHARLOTTE, NC EXISTING CONDITIONS LDSI SURVEY www.littleonline.om NO. REASON PER REVIEW DATE 10.17.14 PER REVIEW 11.21.14 EXISTING CONDITIONS LDSI SURVEY RZ-00 Owner - NCDOT PID 073-032-01 600 Charlotte MRP LLC 902 CLINT MOORE RD SUITE 220 BOCA RATON

More information

ELECTRICAL CONTRACTOR REQUIREMENT ITEM CONNECTION IN PANEL CONNECTION IN DEVICE VOLTAGE AMPERAGE COMMENTS

ELECTRICAL CONTRACTOR REQUIREMENT ITEM CONNECTION IN PANEL CONNECTION IN DEVICE VOLTAGE AMPERAGE COMMENTS ORE TOTAL FLOOD PROTETION AL DETAIL IAN: 1. WIRE MAIN ONTROL PANEL PER INLUDED SHEMATI 2. WIRE ALL FANS PER INLUDED SHEMATI 3. WIRE SHUNT TRIP BREAKER (OPTIONAL) 4. WIRE UDS APPLIANE KILL, IF EQUIPPED

More information

Shear Headed Anchors with Large Diameter and Deep Embedment in Concrete

Shear Headed Anchors with Large Diameter and Deep Embedment in Concrete Shear Headed Anhors with Large Diameter and Deep Embedment in Conrete Namho Lee ), Kwang Ryun Park ) and Yong Pyo Suh 3) ) Atomi Energy of Canada Limited, Mississauga, Ontario, Canada ) Korea Power Engineering

More information

Chapter 2 Roof Downspout Controls

Chapter 2 Roof Downspout Controls Chapter 2 Roof Downspout Controls 2.1 Description This section presents the criteria for design and implementation of roof downspout controls. Roof downspout controls are simple pre-engineered designs

More information

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE

More information

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

Structural Stormwater Best Management Practices

Structural Stormwater Best Management Practices Structural Stormwater Best Management Practices for Small Commercial and Residential Applications Timothy Bruno Watershed Manager PA Department of Environmental Protection What are STRUCTURAL BMPs? Physical

More information

Structural Storm Water Best Management Practices (BMPs)

Structural Storm Water Best Management Practices (BMPs) Structural Storm Water Best Management Practices (BMPs) Storm Water Permitting: The SWPPP Revealed By Deron Austin, PE January 11, 2006 3:30-5:00 PM Orlando, Florida Presentation Outline Preface About

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary 0 25 50 00 Feet Parcel Boundary, Approximate 202 LIDAR 2 FT CONTOURS, VCGI BING AERIAL NRCS SOIL MAPPING MMI FIELD DATA Culvert Pipe Swale 0 Scale: "=40' SOURCE(S): NRCS Soil Area Boundary Overland st

More information

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design

More information

a. Site Topography and Relationship to Surrounding Topography

a. Site Topography and Relationship to Surrounding Topography C. Topography and Slopes 1. Existing Conditions a. Site Topography and Relationship to Surrounding Topography The Site is gently rolling, as is the surrounding topography (Figure I.A-8). The Property is

More information

Indiana Mechanical Code Edition Title 675 IAC

Indiana Mechanical Code Edition Title 675 IAC Indiana Mehanial Code 2008 Edition Title 675 IAC 18-1.5 Indiana Mehanial Code Amendments Rule 1.5. Indiana Mehanial Code, 2008 Edition 675 IAC 18-1.5-1 Adoption by referene Affeted: IC 22-12-7; IC 22-13;

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

The Low Risk Site Handbook

The Low Risk Site Handbook The Low Risk Site Handbook for Erosion Prevention and Sediment Control The content of this Handbook is adapted from the New York State Standards and Specifications for Erosion and Sediment Control-August

More information

Stormwater Control Plan: Small (Tier 1) Land Development Project

Stormwater Control Plan: Small (Tier 1) Land Development Project Stormwater Control Plan: Small (Tier 1) Land Development Project Project ID for Tracking (for City Staff only): The California Regional Water Quality Control Board for the Central Coast Region (Water Board)

More information

Analyzing the Bioretention Construction Sequence

Analyzing the Bioretention Construction Sequence Analyzing the Bioretention Construction Sequence Avoiding future problems through careful installation procedures, construction inspection and first year maintenance 20 Steps to Better Bioretention Step

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

Types and Basic Design of Post-Construction BMPs

Types and Basic Design of Post-Construction BMPs Types and Basic Design of Post-Construction BMPs F O R R E S I D E N T I A L L A N D S C A P E R S D A N B O G O E V S K I O H I O E P A N O R T H E A S T D I S T R I C T O F F I C E J U L Y 9, 2 0 1 3

More information

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Slow it, Spread it, Sink it using Green Stormwater Infrastructure Milly Archer Water Resources Coordinator Becky Tharp Green Infrastructure Collaborative Slow it, Spread it, Sink it using Green Stormwater Infrastructure Overview Defining LID and GSI Hydrology and impacts

More information

Worksheet #14 Water Runoff Management

Worksheet #14 Water Runoff Management Water Runoff Management Use this worksheet to assess how well your property minimizes the potential for water runoff and property damage.. Why should you be concerned? What can you do? Rural runoff, also

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL Surface Water Protection During Well Site Construction Kelly Kees, PE WVDEP, Office of Oil and Gas SEDIMENT & EROSION CONTROL PLANS Per West Virginia State Code 22-6-6(d) 22-6A-7(c),

More information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16 GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings

More information

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS 2010 EDITION CITY OF OZARK, MISSOURI REVISIONS TO THE 2009 EDITION The following revisions have been made to the 2009 edition of the city

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86

More information

State of Rhode Island Stormwater Management Guidance for Individual Single-Family Residential Lot Development

State of Rhode Island Stormwater Management Guidance for Individual Single-Family Residential Lot Development State of Rhode Island Stormwater Management Guidance for Individual Single-Family Residential Lot Development Section 300.6 of the RI Coastal Resources Management Program (RICRMP) and Rule 7.12 of the

More information

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School 930 Gallison Hill Rd, East Montpelier, VT Filter Berm, Sand Filter, Cistern / Rain Barrel, Gravel Wetland, Check

More information

Insert Community Name. Homeowner Guide for On-Site Stormwater BMP Maintenance and Care

Insert Community Name. Homeowner Guide for On-Site Stormwater BMP Maintenance and Care Insert Community Name Homeowner Guide for On-Site Stormwater BMP Maintenance and Care Insert Community Name Homeowner Guide for On-Site Stormwater BMP Maintenance and Care Hello! Welcome to the neighborhood.

More information

Low Impact Development Practices

Low Impact Development Practices Low Impact Development Practices Michael Dietz, Ph.D. CT Nonpoint Education for Municipal Officials (NEMO) Center for Land Use Education and Research May 8, 2013 Town of Bolton Planning and Zoning Commission

More information

Tree Pits Construction Guide

Tree Pits Construction Guide Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

WQ-07 INFILTRATION TRENCH

WQ-07 INFILTRATION TRENCH Greenville County Technical Specification for: WQ-07 INFILTRATION TRENCH 1.0 Infiltration Trench 1.1 Description Infiltration Trenches are excavations filled with stone to create an underground reservoir

More information

Case Study Bioretention Installation and Maintenance

Case Study Bioretention Installation and Maintenance Case Study Bioretention Installation and Maintenance Bioretention Crime Scene Investigation A reality TV series where you get to watch disturbing bioretention crimes and use advanced forensics to solve

More information

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual. 4.4. Filter Strips Filter Strips are densely vegetated lands that treat sheet flow storm water from adjacent pervious and impervious areas. They function by slowing runoff, trapping sediment and pollutants,

More information

Post Construction BMPs

Post Construction BMPs Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases

More information

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES Greenville County Technical Specification for: WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES 1.0 Mountainous and Steep Slope Sites 1.1 Description The geographic locations of portions of Greenville County are

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

2.1.4 Roof Downspout Rain Gardens

2.1.4 Roof Downspout Rain Gardens 2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Key Topics Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Bioretention Crime Scenes Investigation A 9 part reality TV series where you get to watch disturbing

More information

SGM BID AND CONSTRUCTION INC.

SGM BID AND CONSTRUCTION INC. IN. MEP ONSULTING ENGINEERS A-00000 9 Lake Baldwin Lane Orlando, Fl. Tel: 07-77- Fax: 07-77-77 opyright 07 Engineering, Inc. : 0-0-7- BID AND ONSTRUTION GENERAL NOTES. ABSOLUTELY NO SPLES WILL BE ALLOWED

More information

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e 12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8 Site Design Measures 32 P a g e Rooftop and Impervious Area Disconnection (Self-retaining areas) Description Disconnection

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION ILLINOIS URBAN MANUAL PRACTICE STANDARD RAIN GARDEN (feet) CODE 897 Source: Kendall County Soil and Water Conservation District DEFINITION Rain gardens are small, shallow, flat bottomed depressions constructed

More information

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST Planning Department Date Stamp Design Review Formal Application All information provided and submitted with this Application Checklist shall

More information

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET TABLE OF CONTENTS: ABBREVIATIONS: SHEET NO. A SHEET DESCRIPTION REFERENCE SHEETS TITLE SHEET COS CSO GPM PVC SF CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

More information

Chapter 14. Stormwater Quality Introduction

Chapter 14. Stormwater Quality Introduction 14.0 Introduction This chapter addresses requirements and design criteria related to post-construction stormwater best management practices (requirements for construction erosion and sediment control are

More information

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Lecture Today Urban Water management terms Examples of water management in urban areas Field

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Part IV(a): BMPs for Erosion, Sediment, Velocity Control Part IV(a): BMPs for Erosion, Sediment, Velocity Control Find Design Standards and Specifications for Iowa Erosion and Sediment Control Practices at: www.iowasudas.org Erosion Control Keeping the soil

More information

Appendix G. Detailed Design

Appendix G. Detailed Design Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information

More information

Contents. Adapted/abbreviated from GSWMM Coastal Stormwater Supplement, August

Contents. Adapted/abbreviated from GSWMM Coastal Stormwater Supplement, August CH. 3 STORMWATER MANAGEMENT PRACTICES Contents Soil Restoration... 30 Site Reforestation/Revegetation... 32 Green Roofs... 35 Permeable Pavements... 37 Undisturbed Pervious Areas... 44 Vegetated Filter

More information

Small Project Guidance Document

Small Project Guidance Document Small Project Guidance Document Introduction If you are considering a relatively small construction project on your property that creates new impervious area and you need to manage the stormwater that

More information

Use of Best Management Practices

Use of Best Management Practices Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions

More information

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Urban Water Management and Soils (ESRM 311 & SEFS 507) Urban Water Management and Soils (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Lecture Today Some Urban Water management terms Examples of water management in urban

More information

HYDRAULIC DESIGN involves several basic

HYDRAULIC DESIGN involves several basic Chapter 6 Tools for Hydr draulic and Road Design HYDRAULIC DESIGN involves several basic concepts that must be considered to build successful projects with a minimum risk of failure (Photo 6.1). Use of

More information

EROSION PREVENTION BMP SUGGESTED USES MATRIX

EROSION PREVENTION BMP SUGGESTED USES MATRIX EROSION PREVENTION SUGGESTED USES MATRIX Processed Based Tools Software Aids Slope Waterway Surface Concentrated Flows Large Flat Stock Pile Borrow Adjacent Property Impacts Erosion Prevention Measures

More information

vta L-6 CONSTRUCTION CALLOUT SCHEDULE 1 BID SET 0' CONSTRUCTION CALLOUT PLAN

vta L-6 CONSTRUCTION CALLOUT SCHEDULE 1 BID SET 0' CONSTRUCTION CALLOUT PLAN ONSTRUTION ALLOUT SHEDULE ONRETE PAVING. OLOR SHALL BE NATURAL GRAY WITH MEDIUM BROOM FINISH. SEE DETAIL A, SHEET L-0. a ONRETE PAVING. OLOR SHALL BE NATURAL GRAY WITH MEDIUM SANDBLAST FINISH. SEE DETAIL

More information

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations

More information

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT M-231 and Water Quality Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT M-231 Facts: 7-Miles long 2-Lane Limited Access Highway Connects I-96 and M-45 M-231 Facts: Includes Michigan

More information

STANDARD DETAILS QUICK REFERENCE

STANDARD DETAILS QUICK REFERENCE STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

Approved By:Craig Dossey, Executive Director Date: 05/29/2018 El Paso County Planning & Community Development. A Westrian Company

Approved By:Craig Dossey, Executive Director Date: 05/29/2018 El Paso County Planning & Community Development. A Westrian Company HRISTIAN BROTHERS AUTOMOTIVE - ALON LOT, WOODMEN HILLS ILING NO. 7J, BEING A PORTION O THE NORTHWEST QUARTER O SETION 7, TOWNSHIP 3 SOUTH, RANGE WEST O THE TH PRINIPAL MERIDIAN OUNTY O EL PASO, STATE O

More information

Sustainable Sites. hblanarc.ca. RDN Workshop June 25, David Reid, FCSLA, Landscape Architect, Environmental Designer

Sustainable Sites. hblanarc.ca. RDN Workshop June 25, David Reid, FCSLA, Landscape Architect, Environmental Designer Sustainable Sites RDN Workshop June 25, 2011 David Reid, FCSLA, Landscape Architect, Environmental Designer hblanarc.ca Surrey ESA Networks & linear corridors ESA Network: Develop with Care SITE Hub >10

More information

STREAM ALTERATION PRACTICES

STREAM ALTERATION PRACTICES STREAM ALTERATION PRACTICES Stream Diversion Channel SDC DEFINITION A temporary channel constructed to convey stream flow around in-stream construction. PURPOSE Stream diversion channels are used to allow

More information

SMALL PROJECTS SIMPLIFIED APPROACH

SMALL PROJECTS SIMPLIFIED APPROACH SMALL PROJECT APPLICATION AND STORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL FOR SMALL PROJECTS IN FULTON TOWNSHIP LANCASTER COUNTY, PENNSYLVANIA SMALL PROJECTS SIMPLIFIED APPROACH Prepared By: Light-Heigel

More information

Best Development Practices

Best Development Practices Town of Winchendon E. Himlan, Mass. Watershed Coalition Berkshire Design Group Best Development Practices Version 1, March 2010 Guidebook Table of Contents INTRODUCTION... 1 I. CHECKLIST FOR DESIGNERS...

More information

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.

More information

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda Presentation Topics Background information Designing LID for cold and snow prone conditions Applying LID in Pullman s low

More information

Stormwater Drainage Assessment For Single Family Residence

Stormwater Drainage Assessment For Single Family Residence Stormwater Drainage Assessment For Single Family Residence Project Name: SEADER SFD Project Address: 2301 NE Perkins Way, Lake Forest Park, King County WA. Parcel Number(s): Tax Parcel No. 86659-00181

More information

Geosynthetics for Erosion Control and Reinforcement

Geosynthetics for Erosion Control and Reinforcement Geosynthetics for Erosion Control and Reinforcement Stan Boyle, Ph.D., P.E. Shannon & Wilson, Inc. What are Geosynthetics? Geosynthetics are (generally) polymeric products used in civil engineering applications.

More information

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015 Using the Updated RI Soil Erosion and Sediment Control Handbook The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015 URI Cooperative Extension NEMO URI Cooperative Extension NEMO White Oak,

More information

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST Planning Department Date Stamp Design Review Formal Application Change of Use (No Site Improvements)* All information provided and submitted

More information

Plan Review Checklist

Plan Review Checklist Plan Review Checklist FOR EROSION AND SEDIMENT CONTROL PLANS _ Minimum Standards - All applicable Minimum Standards must be addressed. All minimum Standards must be adhered to during the entire project

More information

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity. City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:

More information

J. Paul Guyer, P.E., R.A.

J. Paul Guyer, P.E., R.A. J. Paul Guyer, P.E., R.A. Paul Guyer is a registered civil engineer, mechanical engineer, fire protection engineer, and architect with over 35 years experience in the design of buildings and related infrastructure.

More information

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards High Point Community Site Drainage Technical Standards Prepared by SvR Design Company for High Point Community Seattle, Washington 5/2004 Revised 12/2006 101 Acknowledgements: for innovative development

More information

STORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL. Guide to Choosing Stormwater BMPs

STORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL. Guide to Choosing Stormwater BMPs STORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL Guide to Choosing Stormwater BMPs TABLE OF CONTENTS TABLE OF CONTENTS...2 INTRODUCTION... 5 http://www.elibrary.dep.state.pa.us/dsweb/view/collection-8305

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL 1 EROSION & SEDIMENT CONTROL Effective Soil & Water Protection Whether you want to prevent soil erosion caused by rain, water and wind, or protect waterways from inevitable build

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information