SGM BID AND CONSTRUCTION INC.

Size: px
Start display at page:

Download "SGM BID AND CONSTRUCTION INC."

Transcription

1 IN. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : BID AND ONSTRUTION

2 GENERAL NOTES. ABSOLUTELY NO SPLES WILL BE ALLOWED IN ANY SYSTEMS WIRES. PROVIDE FULL LENGTH WIRING BETWEEN DEVES AND TERMINALS.. HEIGHTS REQUIRED BY EQUIPMENT SUPPLIERS TAKE PREEDENE OVER ALL OTHER DIMENSIONS.. ALL HEIGHTS INDATED ARE FROM FINISHED FLOOR OR GRADE TO TOP OF EXPOSED PORTION OF ITEM (i.e. OVERPLATE, HOUSING, OR ENLOSURE).. ITEMS IN TILE SURFAES SHALL BE INSTALLED AS LOSE AS POSSIBLE TO THE DIMENSION GIVEN AND SHALL BE HORIZONTALLY AND VERTALLY ENTERED AND ALIGNED WITH THE TILE JOINTS.. 0 VOLT BRANH IRUITS, WHERE THE LENGTH OF IRUIT ONDUTORS OMPLETE FROM IRUIT BREAKER IN SOURE PANEL TO ANY DEVE ON THE IRUIT IS 0-00 FEET FROM THE PANEL, ARE TO HAVE MINIMUM BRANH IRUIT WIRING THROUGHOUT IRUIT. (ONDUIT SIZE PER SPE AND NE.). 0 VOLT BRANH IRUITS, WHERE THE LENGTH OF IRUIT ONDUTORS OMPLETE FROM IRUIT BREAKER IN SOURE PANEL TO ANY DEVE ON THE IRUIT IS 0-7 FEET FROM THE PANEL, ARE TO HAVE 0 MINIMUM BRANH IRUIT WIRING HOMERUN (/".) FROM PANEL IRUIT BREAKER TO FIRST DEVE AND BRANH IRUIT WIRING THROUGHOUT THE REMAINDER OF THE IRUIT (ONDUIT SIZE PER SPE AND NE). FIRST 7 FT. OF OMBINED HOMERUN AND BRANH IRUIT TO BE MINIMUM 0 WIRE (/".) VOLT BRANH IRUITS, WHERE THE LENGTH OF IRUIT ONDUTORS OMPLETE FROM IRUIT BREAKER IN SOURE PANEL TO ANY DEVE ON THE IRUIT IS 7- FEET FROM THE PANEL, ARE TO HAVE 0 MINIMUM BRANH IRUIT WIRING HOMERUN (/".) FROM PANEL IRUIT BREAKER TO FIRST DEVE AND 0 BRANH IRUIT WIRING THROUGHOUT THE REMAINDER OF THE IRUIT (/".).. 0 VOLT BRANH IRUITS, WHERE THE LENGTH OF IRUIT ONDUTORS OMPLETE FROM IRUIT BREAKER IN SOURE PANEL TO ANY DEVE ON THE IRUIT IS FEET OR MORE FROM THE PANEL, ARE TO HAVE MINIMUM BRANH IRUIT WIRING HOMERUN (".) FROM PANEL IRUIT BREAKER TO FIRST DEVE AND 0 BRANH IRUIT WIRING THROUGHOUT THE REMAINDER OF THE IRUIT (/".). FIRST FT. OF OMBINED HOMERUN AND BRANH IRUIT TO BE MINIMUM WIRE (".). 9. EXEPT WHERE SPEIFALLY NOTED OTHERWISE, THE ONTRATOR SHALL PROVIDE NEW ONDUIT FOR ALL ONDUTORS THAT ARE INSTALLED AS A PART OF THIS PROJET. INSULATED PLAST BUSHINGS ARE TO BE PROVIDED ON ALL ONDUIT STUB-OUTS AND STUB-UPS. 0. ALL BREAKERS THAT PROVIDE POWER TO FIRE ALARM ONTROL PANELS, POWER SUPPLIES OR OTHER FIRE ALARM DEVES OR EQUIPMENT SHALL BE FURNISHED, INSTALLED, ONNETED AND IDENTIFIED IN AORDANE WITH 00 NFPA UNLESS SPEIFALLY INDATED AS EXISTING, ALL EQUIPMENT, ONDUIT, WIRE AND ALL AESSORIES, REQUIRED AS PART OF THE INSTALLATION, AND USE OF STATED EQUIPMENT, SHALL BE PROVIDED BY THE ONTRATOR AS A PART OF THIS PROJET.. WHERE THE ONTRATOR PROPOSES ALTERNATE SOLUTIONS, DIFFERENT ROUTINGS OF ONDUIT, DIFFERENT LOATIONS OF EQUIPMENT, ET., THE ONTRATOR SHALL BE RESPONSIBLE FOR ALL OF THE RAMIFATIONS OF THE PROPOSED HANGE THAT ARE NOT INLUDED IN HIS PROPOSAL, BUT BEOME APPARENT AT A LATER DATE, AND SHALL BEAR THE ONSEQUENES OF ORRETING ANY AND ALL ONFLTS, DEFIENIES OR OTHER PROBLEMS AT NO INREASE IN OST OR INREASE IN ONSTRUTION TIME ALLOTTED.. THE INSTALLATION OF ALL DEVES, INLUDING MOUNTING HEIGHTS, SHALL BE OMPLIANT WITH 0 FB AESSIBILITY ODE.. THE ONTRATOR SHALL INLUDE IN HIS SOPE; () THE LABOR AND MATERIALS REQUIRED FOR REATING OPENINGS FOR ONDUIT PENETRATIONS THROUGH WALLS, SLABS AND ROOF STRUTURES; AS WELL AS THE SEALING OF THESE PENETRATIONS; () THE ROUTING OF ONDUITS AROUND INPENETRATABLE OBSTALES, SUH AS POURED-IN-PLAE BEAMS, OLUMNS, LINTELS AND SIMILAR OBSTRUTIONS AND; () THE SEALING OF PENETRATIONS OF ONDUITS INTO WHH NEW WIRE IS PULLED AS A PART OF THIS PROJET, TO INLUDE FIREPROOFING WHERE NEESSARY.. IF THE INTENT OF THE ARHITET/ENGINEER WITH REGARD TO ANY DETAIL IS NOT LEAR, OR IS APABLE OF MORE THAN ONE INTERPRETATION, SUH MATTERS SHALL BE BROUGHT TO THE A/E IN WRITING BEFORE THE SUBMISSION OF BIDS, AND THE A/E SHALL ISSUE ORRETION OR LARIFATION IN WRITING. OTHERWISE, NO EXTRA OSTS OR EXTENSIONS OF TIME WILL BE BE ALLOWED FOR THE WORK OR MATERIAL THAT THE A/E WILL REQUIRE, PROVIDED THAT IT OMES WITHIN A REASONABLE INTERPRETATION OF THE DRAWINGS AND SPEIFATIONS.. WHERE THE ONTRATOR DETERMINES THAT HIS SYSTEM WILL REQUIRE ADDITIONAL 0VA POWER SUPPLIES IN LOATIONS OTHER THAN AT THE FIRE ALARM ONTROL PANEL, HE SHALL OORDINATE THESE REQUIREMENTS FOR ADDITIONAL POWER AND ALL OSTS FOR NEW BREAKERS, ONDUIT, WIRE, SURGE SUPPRESSORS AND ANY OTHER REQUIREMENTS SHALL BE INLUDED IN THIS ONTRATORS BID. 7. THE ONTRATOR SHALL THOROUGHLY LEAN ALL EQUIPMENT TO BE OMPLETELY FREE OF INTERNAL DEBRIS AND EXTERIOR PAINT, MARKS, DIRT AND ALL SRATHES SHALL BE TOUHED UP.. MINIMUM /" ONDUIT FOR IRUIT HOMERUNS. 9. ALL EMPTY/SPARE ONDUITS SHALL HAVE PULL STRINGS WITH LABELING TAGS AT EAH END. 0. ALL PV RAEWAYS SHALL HAVE A BARE OPPER GROUNDING ONDUTOR INSTALLED.. ALL ONDUTORS SHALL BE OPPER.. ALL METALL RAEWAYS SHALL HAVE AN INSULATED OPPER EQUIPMENT-GROUNDING ONDUTOR.. ONDUIT FITTINGS SHALL BE STEEL.. FLEXIBLE METALL ONDUIT SHALL BE STEEL.. EXPANSION FITTINGS SHALL BE PROVIDED IN EXPOSED ONDUIT RUNS OVER 00 FEET, AT BUILDING EXPANSION JOINTS AND IN ONDUIT RUNS BETWEEN BUILDINGS. 7. DEVES SHALL BE SPEIFATION GRADE 0 AMPS, RATED MINIMUM.. EXTERIOR TERMINAL ABINETS SHALL HAVE LOKABLE OVERS. 9. DESIGN MEETS FLORIDA BUILDING ODE 07 AND NE SEAL ALL PENETRATIONS. REFER TO DETAILS SHEET.. PAINT AND PATH SURFAES AS REQUIRED WHERE EXISTING DEVES, SURFAE RAEWAYS, AND EQUIPMENT ARE REMOVED AS PART OF THE PROJET. REFER TO PAINTING SPEIFATION.. ALL TRENHING TO BE BY HAND.. ALL BURIED ONDUITS TO BE " BELOW GRADE TO TOP OF ONDUIT.. PROVIDE ORANGE BARRIER FENE WITH DRIVEN RODS AROUND OPEN TRENHES.. PROVIDE STAINLESS STEEL BLANK PLATES FOR ALL ABANDONED FIRE ALARM AND INTEROM BOXES.. TAP-ONS ARE NOT PERMITTED, USE PLAST ANHORS WITH STAINLESS STEEL SREWS IN EXTERIOR APPLATIONS. 7. PROVIDE SLEEVE ANHOR WITH STAINLESS STEEL BOLTS FOR IN-GROUND PULL BOX OVER.. DESIGN OMPLIES WITH NFPA UPON ATIVATION OF THE KITHEN HOOD ANSUL SYSTEM THE AMPUS WIDE FIRE ALARM SYSTEM SHALL BE ATIVATED. 0. UPON ATIVATION OF THE ALARM SYSTEM ALL AIRHANDLER UNITS WILL SHUTDOWN. ELETRAL SYMBOL LEGEND INTEROM DEVES ER T TB S S S M M TV A INTEROM EQUIPMENT RAK INTEROM TERMINAL ABINET INTEROM TERMINAL BOARD EXTERIOR WALL MOUNTED ONE DIRETION INTEROM SPEAKER (HORN) WITH SINGLE HORN WIRE GUARD. VALOM WIRE GUARDS POWDER OATED WHITE PAINT. PROVIDE STAINLESS STEEL SREWS FOR MOUNTING. EXTERIOR WALL MOUNTED TWO DIRETION INTEROM SPEAKER (HORN) WITH DOUBLE HORN WIRE GUARD. VALOM WIRE GUARDS POWDER OATED WHITE PAINT. PROVIDE STAINLESS STEEL SREWS FOR MOUNTING. EILING MOUNTED INTEROM SPEAKER SURFAE MOUNTED INTEROM SPEAKER INTEROM ALL-IN STATION " AFF ADMINISTRATIVE PHONE STAFF STATION INTEROM WIRE LEGEND a = WEST PENN -OND b = WEST PENN 0 -OND c = WEST PENN AQ -OND EXTERIOR USE d = WEST PENN 90 -OND e = AT FOR VOIP ADMIN PHONE/DISPLAY WEATHERPROOF LOUDSPEAKER SURFAE MOUNTED BOX TYPE INTEROM HANDSET WITH PAGE MUTE RELAY MROPHONE OUTLET - WALL MOUNTED MROPHONE OUTLET - FLOOR MOUNTED LOK WALL TELEPHONE OUTLET. TELEVISION OUTLET MOUNTED AT " ABOVE FINISHED FLOOR. PROVIDE " SQUARE BAKBOX, SINGLE GANG P-RING, " ONDUIT TO AESSIBLE EILING SPAE, AND () AT- ABLE TO LOSEST IDF ROOM. (NOTE: NOT ALL SYMBOLS SHOWN ON LEGEND ARE NEESSARILY USED ON FLOOR PLANS) FIRE ALARM SYSTEM MANUAL FIRE ALARM PULL STATION. " TO ATUATOR HANDLE FIRE ALARM OMBINATION HORN/STROBE DEVE - 0" TO BOTTOM OF ILLUMINATION DEVE (7 ANDELA MINIMUM, 0 ANDELA WHERE NOTED) FIRE ALARM OMBINATION HORN/STROBE DEVE EILING MOUNTED, INSTALLED WITH SAFETY TEHNOLOGY INTERNATIONAL 00 SERIES WEATHERPROOF PROTETIVE OVER. FIRE ALARM EILING MOUNTED OMBINATION HORN/STROBE DEVE (7 ANDELA MINIMUM, 0 ANDELA WHERE NOTED) FIRE ALARM EILING MOUNTED SPEAKER DEVE (7 ANDELA MINIMUM, 0 ANDELA WHERE NOTED) FIRE ALARM WALL MOUNTED SPEAKER/STROBE DEVE (7 ANDELA MINIMUM, 0 ANDELA WHERE NOTED) FIRE ALARM STROBE ONLY, 7 ANDELA MINIMUM - 0" TO BOTTOM OF ILLUMINATION DEVE FIRE ALARM EILING MOUNTED STROBE, 7 ANDELA MINIMUM FIRE ALARM HORN - WALL MOUNTED HEAT DETETOR ROR HEAT DETETOR 9 HEAT DETETOR ATT SMOKE DETETOR DUT SMOKE DETETOR - PROVIDE LED SUPERVISORY INDATOR FOR BOTH DETETORS IN AN AESSIBLE LOATION AND LEARLY LABELED. "R" = RETURN "S" = SUPPLY ONTROL MODULE RELAY MONITOR MODULE FIRE ALARM ONTROL UNIT "FAU" FIRE ALARM ANNUNIATOR PANEL "FAAP" FIRE ALARM TERMINAL ABINET "FAT", NEMA RATED FIRE ALARM ONTROL PANEL "FAP" FIRE ALARM PULL STATION INSIDE SIGN DUT DETETOR REMOTE INDATOR MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN BID AND ONSTRUTION. ELETRAL NONMETALL ONDUIT (ENT) SHALL NOT BE USED. ELETRAL SOPE OF WORK. PROVIDE FOR THE DEMOLITION AND RENOVATION OF EXISTING INTEROM AND FIRE ALARM SYSTEM. EXISTING FIRE ALARM AND INTEROM SHALL REMAIN OPERATIONAL FOR THE DURATION OF THE PROJET. ONTRATOR SHALL PHASE PROJET TO MEET THIS REQUIREMENT. FIRE ALARM AND INTEROM WORK IS EXLUDED FROM THE PORTABLE LASSROOMS. PORTABLE LASSROOMS WILL BE DISONNETED AND REONNETED TO NEW EQUIPMENT VIA EXISTING ONDUTORS. THIS IS A BRIEF DESRIPTION OF ELETRAL WORK REQUIRED. REFER TO SPEIFATIONS BOOK AND OMPLETE PLANS FOR ENTIRE SOPE OF WORK. PROVIDE DEDATED POWER IRUITS FOR FA AND PROVIDE ADDITIONAL GROUNDING.. PROVIDE EILING TILES TO MATH EXISTING TILES WHERE EILING SPEAKERS HAVE BEEN DELETED.. REMOVE ALL EXISTING DUKANE DIGITAL LOK SYSTEM, INLUDING LOKS, POWER SUPPLIES, WIRING AND RAEWAY OMPLETE. PROVIDE BLANK OVER PLATES AND PAINT TO MATH EXISTING WALL. EXISTING RAEWAYS THAT ARE IN GOOD ONDITION AND PROPERLY SUPPORTED MAY BE REUSED FOR FIRE ALARM AND INTEROM. NOTE: PROVIDE FIRE STOPPING FOR ALL ONDUIT PENETRATIONS OF FLOORS, WALLS AND EILINGS WEATHER RATED OR NOT. REFER TO FIRE SYSTEMS ON E.0. WHERE SLEEVES ARE INSTALLED, THEY SHALL BE SUPPORTED FROM THE ASSEMBLY THROUGH WHH THEY PASS. SEAL THE SLEEVE ANULAR PENETRATION AND THE SLEEVE AFTER THE INSTALLATION OF ABLING. NOTE: PROVIDE PULL STRINGS IN ALL RAEWAYS WHERE EXISTING FIRE ALARM AND INTEROM ONDUTORS ARE REMOVED. PROVIDE IDENTIFATION LABEL TO INDATE OPPOSITE END LOATION. FOR IN-GROUND PULLBOXES, PROVIDE ARLON FLEX SIZED AS REQUIRED TO PROVIDE SEPARATION BETWEEN FIRE ALARM AND INTEROM SYSTEMS. ABOVE GRADE, PROVIDE SEPARATE PULL OR JUNTION BOXES. P ABBREVIATIONS A, AMP AFF AFG EW EWH EXP FAP FAAP G, GFI H IG KW N NF NL P PH SP TL U UNO VA W TYPAL TYP. ROR PROJETOR OUTLET EILING MOUNTED. ORIENT PROJETOR PLATE WITH ELETRAL AND DATA KNOK OUTS FURTHEST FROM SREEN. AMPERE HEIGHT ABOVE FINISHED FLOOR, MEASURED TO BOTTOM HEIGHT ABOVE FINISHED GRADE ELETR WATER OOLER ELETR WATER HEATER EXPLOSION PROOF FIRE ALARM ONTROL PANEL FIRE ALARM ANNUNIATOR PANEL GROUND FAULT IRUIT INTERRUPTER HORIZONTALLY MOUNTED ISOLATED GROUND KILOWATT NOT IN ONTRAT NON-FUSED NIGHTLIGHT POLE PHASE SURGE PROTETION TWIST LOK UNDER ABINET UNLESS NOTED OTHERWISE VOLT AMPERE (WATTAGE) WALL MOUNTED WEATHERPROOF ENLOSURE TYPAL FOR ALL SIMILAR DEVES, FIXTURES, ITEMS, SYMBOLS SHOWN ON THE PLANS. RATE OF RISE DUT DETETOR REMOTE TEST SWITH KNOX BOX POWER DEVES J JUNTION BOX PB PULL BOX DUPLEX REEPTALE EILING REEPTALE GROUND ROD NOTE: ROUTE ALL NEW FIRE ALARM AND INTEROM RAEWAYS TO FAILITATE INSTALLATION OF NEW MEHANAL EQUIPMENT INLUDING AIR HANDLERS AND HILLED WATER. OORDINATION WITH MEHANAL PROJET WILL BE REQUIRED, INLUDING PHASING WITH MEHANAL WORK.

3 7 EXISTING PORTABLE BUILDINGS BUILDING BUILDING GENERAL NOTES: a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. 0 FAT- d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL FIRE ALARM WIRING SHALL BE ROUTED WITHIN A RAEWAY. 7 EXISTING PORTABLE BUILDINGS T- f. LOATE SMOKE DETETORS A MINIMUM OF ' AWAY FROM ANY A/ DIFFUSER. g. FIRE ALARM STROBES WITHIN SIGHT OF EAH OTHER SHALL FLASH IN SYNHRONIZATION AS REQUIRED BY NFPA 7. h. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. i. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. BUILDING 7 BUILDING j. PROVIDE FIBER BAKBONE NODES AND GATEWAYS AS SHOWN ON PLANS. FAT-7 T-7 BUILDING T- FAT- k. OORDINATE EXAT PLAEMENT OF ALL DEVES, EQUIPMENT, FIXTURES, SWITHES AND OUTLETS WITH EXISTING SITE ONDITIONS PRIOR TO ROUGH-IN. 9 T- FAT- 7 EXISTING PORTABLE BUILDINGS 9. EXISTING GAS METER. NO EXISTING FA OR T ABINETS AN BE LOATED 0-7- BID AND ONSTRUTION BUILDING 0 BUILDING TYP. BUILDING 0. FIRE ALARM AND INTEROM APPEARS TO BE FED OVERHEAD FROM BLDG 7.. RAEWAY ROUTING AS SHOWN TAKEN FROM EXISTING AS-BUILT DOUMENTS AND FEILD INVESTIGATION. TYP. BUILDING 7 FAT- T-7 T- 0 FAT-7 T- FAT- TELEENTER RAK T- BUILDING BUILDING 9 T-0 FAT-0. EXISTING ANOPIES BETWEEN BUILDINGS AS SHOWN.. REMOVE EXISTING FIRE ALARM ABLING BETWEEN EXISTING FIRE ALARM TERMINAL ABINETS. EXISTING RAEWAYS TO REMAIN. PROVIDE NEW FIRE ONDUTORS IN RENOVATION PHASE. REFER TO RENOVATION PLANS FOR ADDITIONAL REQUIREMENTS. 7. EXISTING PORTABLE BUILDINGS ARE NOT IN SOPE OF WORK. MAINTAIN EXISTING INTEROM AND FIRE ALARM IRUITS WITH NEW SYSTEMS. REFER TO RENOVATIONS PLANS FOR ADDITIONAL REQUIREMENTS.. EXISTING HILLED WATER ENLOSED HASE BETWEEN BLDG AND. 9. EXISTING INGROUND ELETRAL BOXES LABELED "ELETRAL". 0. EXISTING INGROUND BOX NOT IDENTIFIED POSSIBLE HASE WAY BETWEEN BUILDINGS FIRE ALARM AND INTEROM. FAT- FAT-7 T-9 FAT-9 TYP. BUILDING BUILDING BUILDING BUILDING T- FAT- NO TERMINAL ABINET T- FAP NO TERMINAL ABINETS AG T- FAT-7 BUILDING SYSTEMS SITE EXISTING PLAN

4 GENERAL NOTES: a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. 0 D PANEL -0 c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW BID AND ONSTRUTION PANEL -0 0 D. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. REMOVE OLD DUKANE MASTER LOK SYSTEM OMPLETE AND POWER SUPPLY. BAK BOX FOR SPEAKER AND ALL BUTTON TO REMAIN. INTEROM HORN AT ANOPY. PULL STATION INSIDE SIGN TO BE REMOVED. BUILDING DEMO SYSTEMS PLAN BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

5 7 GENERAL NOTES: a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. PANEL L 0V A e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW. A AUTO FIRE T- DUKANE PS DUKANE PANEL SE, SE, RADIO, PS PANEL -0 A A POWER FIRE ALARM BATTERY A OVERRIDE AUTO ALL FAP FAP AUTO ALL FIRE ODE YELLOW 0-7- BID AND ONSTRUTION. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. REMOVE OLD DUKANE MASTER LOK SYSTEM OMPLETE, POWER SUPPLY AND WIRING. A. REMOVE HVA OVERIDE PANEL OMPLETE.. EXISTING T- TO REMAIN AND BE REUSED. REMOVE EXISTING INTEROM ONDUTORS.. REMOVE DUKANE LOK. EXISTING ANALOG LOKS TO REMAIN.. EXISTING KEY VAULT TO BE REUSED IN RENOVATION. 7. REMOVE EXISTING LOUD SPEAKER HORN AT ANOPY.. EXISTING ADMIN PHONE WITH KEY PAD. BUILDING DEMO SYSTEMS PLAN BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

6 TVT-D GENERAL NOTES: a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW BID AND ONSTRUTION PNL -0. REMOVE INDATING LIGHT FOR DUT SMOKE DETETOR. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN. BUILDING DEMO SYSTEMS PLAN BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

7 GENERAL NOTES: GAS BOILER FA EVA LOK PS FARP FAT ATV T- PANEL -0 TTB MATHLINE E0 MATHLINE E0 a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER DIAGRAM SHEETS, DETAIL SHEETS, AND THE INSTRUTIONAL STATION DETAIL FOR ALL REQUIREMENTS. 9 9 c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. INTEROM SPEAKER AT ANOPY f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. INTEROM SPEAKER AT ANOPY g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE BID AND ONSTRUTION i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW. WG 7. REMOTE SMOKE DETETOR/ALARM INDATING LIGHT AND TEST SWITH STATION. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. FAN SHUT-DOWN RELAY.. EILING MOUNTED NOTIFATION APPLIANE SPEAKER.. EXISTING T- TO REMAIN AND BE REUSED. REMOVE EXISTING INTEROM ONDUTORS. PA SYSTEM TO REMAIN.. REMOVE LOUD SPEAKER HORN AT ANOPY. 7. REMOVE WALL MOUNTED LOUD SPEAKER HORN. PNL -0 PNL PA. REMOVE EXISTING DUKANE LOK POWER SUPPLY. PNL L 7 9. EXISTING DUKANE LOK TO BE REMOVED BAK BOX TO REMAIN. REMOVE ONDUTORS. PNL Z- GYM PA SYSTEM WG BUILDING SETION B DEMO SYSTEMS PLAN BLDG BLDG 7 BLDG BLDG BLDG MATHLINE E0 MATHLINE E0 BLDG BLDG 0 BUILDING SETION A DEMO SYSTEMS PLAN BLDG BLDG BLDG BLDG

8 GENERAL NOTES: a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. FAT- TV T- d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. STAFF PHONE PNL -07 i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW. PNL BID AND ONSTRUTION. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. REMOVE OLD DUKANE MASTER LOK SYSTEM OMPLETE AND POWER SUPPLY. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN.. REMOVE WALL MOUNTED LOUDSPEAKER HORN.. EXISTING T- TO REMAIN AND BE REUSED. BUILDING DEMO SYSTEMS PLAN BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

9 GENERAL NOTES: FAT-7 a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. T-7 e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. PANEL 7-0 PANEL PA f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. PANEL L g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. PANEL MAI h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW BID AND ONSTRUTION TV FAT TTB. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN.. EXISTING T-7 ABINET TO REMAIN AND BE REUSED, REMOVE EXISTING INTEROM ONDUTORS.. EXISTING STAFF PHONE TO BE REMOVED AND REPLAED WITH ALL BUTTON. BUILDING 7 DEMO SYSTEMS PLAN BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

10 GENERAL NOTES: a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. TTB c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. RAK TELEENTER IV T- d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW. FAT BID AND ONSTRUTION PANEL -0. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN.. EXISTING T- ABINET TO REMAIN AND BE REUSED, REMOVE EXISTING INTEROM ONDUTORS.. EXISTING TELEENTER IV TO BE REMOVED AND REPLAED. REFER TO RENOVATION PLANS. BUILDING DEMO SYSTEMS PLAN BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

11 GENERAL NOTES: TVT-I PANEL L- a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. PANEL 9-0 e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW. A T-9 DUKANE LOK P.S. FAT-9 TO PORTABLES () / DOWN. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS BID AND ONSTRUTION. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN. BUILDING 9 DEMO SYSTEMS PLAN. EXISTING T-9 ABINET TO REMAIN AND BE REUSED, REMOVE EXISTING INTEROM ONDUTORS.. REMOVE EXISTING DUKANE LOK SYSTEM POWER SUPPLY. REMOVE ONDUTORS.. EXISTING ADMIN INTEROM PHONE WITH KEY PAD. BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

12 GENERAL NOTES: a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. T-0 FAT-0 TVT-K f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW BID AND ONSTRUTION. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN. BUILDING 0 DEMO SYSTEMS PLAN. EXISTING T-0 ABINET TO REMAIN AND BE REUSED, REMOVE EXISTING INTEROM ONDUTORS.. EXTERIOR WALL MOUNTED LOUD SPEAKER HORN. BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

13 GENERAL NOTES: S a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. M- TVT-M PNL -0 M- T- FAT- S d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW BID AND ONSTRUTION. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. EILING MOUNTED FIRE ALARM STROBE.. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN. BUILDING DEMO SYSTEMS PLAN. EXISTING T- ABINET TO REMAIN, REMOVE EXISTING INTEROM ONDUTORS.. EXISTING LOUDSPEAKER HORN TO BE REMOVED.. EXISTING LOAL SOUND SPEAKER TO REMAIN. BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

14 GENERAL NOTES: FAT- S a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. PANEL -0 e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW. S TVT-N T BID AND ONSTRUTION. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN.. EXISTING T- ABINET TO REMAIN AND BE REUSED. REMOVE EXISTING INTEROM ONDUTORS. BUILDING DEMO SYSTEMS PLAN. EXISTING LOUDSPEAKER HORN TO BE REMOVED.. BLANK OFF OLD LOK BAK BOX. BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

15 GENERAL NOTES: MATHLINE E MATHLINE E a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. 9 9 b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER DIAGRAM SHEETS, DETAIL SHEETS. c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. M- 7 S PNL -0 PNL -0 e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. 0 GAS H.W. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. PNL -0 PNL L-0 PNL L-7 i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW. S S 0-7- BID AND ONSTRUTION T- TVT-L FAT- S PNL -0. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. KITHEN HOOD FIRE SUPPRESSION ATIVATION SWITH.. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN.. AUDITORIUM SPEAKER. EXISTING NATURAL GAS SUPPLY METER. REFER TO SITE PLAN FOR EXAT LOATION. MATHLINE E MATHLINE E. EXISTING T- ABINET TO REMAIN AND BE REUSED. REMOVE EXISTING INTEROM ONDUTORS. 7. AUDITORIUM SOUND SYSTEM RAK.. AUDITORIUM SPEAKERS TO REMAIN. 9. EXISTING LOAL SOUND SYSTEM SPEAKER TO REMAIN. BUILDING SETION A DEMO SYSTEMS PLAN BUILDING SETION B DEMO SYSTEMS PLAN 0. REMOVE EXISTING DUKANE LOK BAK BOX TO REMAIN. BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

16 GENERAL NOTES: TYP EXISTING POLE a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. TYP e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW. BUILDING DEMO SYSTEMS PLAN 0-7- BID AND ONSTRUTION. REMOVE DEVE AND TRAE OUT SOURE OF FIRE ALARM IRUIT.. REMOVE INTEROM DEVE AND TRAE OUT SOURE OF INTEROM IRUIT.. EXISTING POLE MOUNTED LOUDSPEAKER HORN AIMED AT PORTABLE LASSROOMS.. EXISTING REMOTE INDATOR AND KEY TEST SWITH. BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

17 GENERAL NOTES: a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. TVT-J FAT- f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. T- TTB g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW BID AND ONSTRUTION BUILDING DEMO SYSTEMS PLAN. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR. EXISTING DUT DETETORS AND MEHANAL MEZZANINE LOATED ABOVE. REMOVE DUT DETETORS AND ASSOIATED MEHANAL MEZZANINE HEAT DETETORS.. FLASHING LIGHT ALARM.. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN.. EXISTING T- ABINET TO REMAIN AND BE REUSED. REMOVE EXISTING INTEROM ONDUTORS.. EXISTING LOUDSPEAKER HORNS TO BE REMOVED. BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

18 GENERAL NOTES: TVT-J PNL LP PNL PP PNL PP TT ABINETS NOT GROUNDED a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. FAT- T- d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW BID AND ONSTRUTION. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR.. EXISTING LOUDSPEAKER HORN TO BE REMOVED.. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN.. EXISTING T- ABINET TO REMAIN AND BE REUSED. REMOVE EXISTING INTEROM ONDUTORS. BUILDING DEMO SYSTEMS PLAN BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

19 GENERAL NOTES: LP- PP- FAT-7 T-7 TELEPHONE TVT (NO GROUND) a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. f. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. EMS g. EXISTING FIRE ALARM TERMINAL ABINETS MAY BE REUSED IF ADEQUATE. h. REMOVE ALL EXISTING FIRE ALARM AND INTEROM ABLING OMPLETE BELOW GRADE. i. REMOVE ALL FIRE ALARM AND INTEROM ABLING ABOVE EILING. REPLAE WITH NEW.. REMOTE INDATING LIGHT FOR DUT SMOKE DETETOR.. MEHANAL UNIT ABOVE.. OMBINATION SPEAKER/DIGITAL LOK, WALL-FLUSH. MOUNTED REMOVE EXISTING DUKANE DIGITAL LOK AND SPEAKER EXISTING BAK BOX TO REMAIN REFER TO RENOVATION PLAN.. EXISTING T-7 ABINET TO REMAIN AND BE REUSED. REMOVE EXISTING INTEROM ONDUTORS BID AND ONSTRUTION BUILDING 7 DEMO SYSTEMS PLAN BLDG BLDG 7 BLDG BLDG BLDG BLDG BLDG 0 BLDG BLDG BLDG BLDG

20 0 EXISTING PORTABLE BUILDINGS BUILDING BUILDING GENERAL NOTES: a. ALL EXISTING FIRE ALARM TO BE REMOVED. PROVIDE, INSTALL AND TERMINATE ALL SYSTEMS AND FIRE ALARM EQUIPMENT INLUDING, BUT NOT LIMITED TO, RAEWAYS, WIRE ABLE, IRUIT BREAKERS, MODULES, RELAYS (LISTED FOR USE WITH FIRE ALARM) ET. NEESSARY TO SHUT DOWN SUPPLY FANS, FAN TERMINAL BOXES (FTB) DAMPERS, AND OTHER DEVES REQUIRED TO BE ONNETED TO THE FIRE ALARM SYSTEM BUT NOT SPEIFALLY SHOWN ON THE DRAWINGS. OORDINATE THE EXAT LOATIONS OF DEVES WITH OTHER DIVISIONS AS NEESSARY PRIOR TO ROUGH-IN. REFER TO SPEIFATIONS. b. REFER TO: SYMBOL LEGEND, BOOK SPEIFATIONS, RISER c. DEVES ARE SHOWN IN APPROXIMATE LOATIONS. MEP ONSULTING ENGINEERS A Lake Baldwin Lane Orlando, Fl. Tel: Fax: opyright 07 Engineering, Inc. : 0- IN. 0 FAT- d. EILING MOUNTED DEVES ARE SHOWN IN THEIR APPROXIMATE LOATIONS. e. ALL FIRE ALARM WIRING SHALL BE ROUTED WITHIN A RAEWAY. 0 EXISTING PORTABLE BUILDINGS BUILDING T- f. LOATE SMOKE DETETORS A MINIMUM OF ' AWAY FROM ANY A/ DIFFUSER. g. FIRE ALARM STROBES WITHIN SIGHT OF EAH OTHER SHALL FLASH IN SYNHRONIZATION AS REQUIRED BY NFPA 7. h. ALL EXISTING INTEROM IS TO BE REMOVED. PROVIDE A OMPLETE NEW INTEROM SYSTEM INLUDING SPEAKERS, ALL BUTTONS, ADMIN. PHONES, STAFF STATIONS, GATEWAYS AND WIRING. 7 i. FIRE ALARM AND INTEROM WORK SHALL BE PHASED SO THAT FIRE ALARM AND INTEROM ARE FULLY OPERATIONAL FOR THE DURATION OF THE PROJET. THE ONLY EXEPTION WILL BE DURING THE HANGE OVER AFTER HOURS AND WEEKEND WORK. BUILDING 7 FAT-7 T-7 BUILDING T- GATEWAY FAT- FAP- BUILDING T- FAT- 0 EXISTING PORTABLE BUILDINGS j. PROVIDE FIBER BAKBONE NODES AND GATEWAYS AS SHOWN ON PLANS. k. OORDINATE EXAT PLAEMENT OF ALL DEVES, EQUIPMENT, FIXTURES, SWITHES AND OUTLETS WITH EXISTING SITE ONDITIONS PRIOR TO ROUGH-IN. BUILDING BUILDING 7 BUILDING 0. EXISTING GAS METER REFER TO DETAIL SHEET E-0.. PROVIDE NEW FIRE ALARM ONTROL PANEL (FAP) NODE. NODE TO SUPPORT BUILDINGS, AND. REFER TO BUILDING FLOOR PLAN AND FIRE ALARM RISER DIAGRAM.. PROVIDE NEW FIRE ALARM ONTROL PANEL (FAP) NODE. NODE TO SUPPORT BUILDINGS 7,, AND 7. REFER TO BUILDING FLOOR PLAN AND FIRE ALARM RISER DIAGRAM BID AND ONSTRUTION FAT- T- 0 FAT- T- T-0 FAT-0. PROVIDE NEW FIRE ALARM ONTROL PANEL (FAP) NODE. NODE TO SUPPORT BUILDING 9, 0,, AND PORTABLE BUILDINGS. REFER TO BUILDING FLOOR PLAN AND FIRE ALARM RISER DIAGRAM.. PROVIDE NEW FIRE ALARM ONTROL PANEL (FAP) NODE. NODE TO SUPPORT BUILDING AND. REFER TO BUILDING FLOOR PLAN AND FIRE ALARM RISER DIAGRAM. AG T- FAT-7 BUILDING T- GATEWAY 9 FAT- FAP- 7 9 BUILDING 7 FAT-7 9 T-7 T- GATEWAY FAT- FAP- FAT-7 BUILDING BUILDING GATEWAY T- FAP- FAT- T- FAT- 9 9 BUILDING TYPAL BUILDING 9 T- T- BUILDING 9 7 T-9 GATEWAY FAT-9 FAP- FA TO PORTABLES. PROVIDE NEW FIRE ALARM ONTROL PANEL (FAP) NODE. NODE TO SUPPORT BUILDING AND. REFER TO BUILDING FLOOR PLAN AND FIRE ALARM RISER DIAGRAM. 7. PROVIDE NEW () ONDUIT WITH TWO () SIX () STRAND INDOOR/OUTDOOR RATED FIBER OPT ABLE. ROUTE ONE ABLE TO THE INTEROM FIBER PATH PANEL AND ONE ABLE TO THE FIRE ALARM FIBER PATH PANEL.. EXISTING ONDUITS TO BE REUSED WITH NEW FIRE ALARM ABLE. PROVIDE ALTERNATE PRING IN THE EVENT THAT THE EXISTING ONDUITS ARE NOT USABLE. 9. EXISTING ONDUITS NOT BEING USED IN RENOVATION SHALL BE EMPTIED OF EXISTING ABLES. 0. EXISTING PORTABLE BUILDINGS ARE NOT IN SOPE OF WORK. MAINTAIN EXISTING INTEROM AND FIRE ALARM IRUITS WITH NEW SYSTEMS. REFER TO RISER DIAGRAMS AND NOTES ABOVE FOR ADDITIONAL REQUIREMENTS.. NEW FIRE ALARM NODE.. NEW INTEROM GATEWAY.. ROUTE FIBER VIA EXISTING ANOPIES BETWEEN BUILDINGS. PROVIDE SEPARATE RAEWAY FOR FIRE ALARM AND INTEROM FIBER.. PROVIDE " ONDUIT WITH FIRE ALARM IRUITS.. PROVIDE /" ONDUIT FOR INTEROM BETWEEN BUILDING 0 T AND BUILDING T ROUTE VIA ANOPY SHROUD AS SHOWN.. PROVIDE /" ONDUIT FOR INTEROM BETWEEN BUILDING BUILDING T AND BUILDING T. ROUTE VIA ANOPY SHROUD AS SHOWN. 7. PROVIDE " ONDUIT FOR INTEROM BETWEEN BUILDING T AND BUILDING T. ROUTE VIA ANOPY SHROUD AS SHOWN. BUILDING. PROVIDE /" ONDUIT FOR INTEROM BETWEEN BUILDING T AND BUILDING T. ROUTE OVERHEAD. KEY: UNDERGROUND OVERHEAD SYSTEMS SITE RENO PLAN

ELECTRICAL CONTRACTOR REQUIREMENT ITEM CONNECTION IN PANEL CONNECTION IN DEVICE VOLTAGE AMPERAGE COMMENTS

ELECTRICAL CONTRACTOR REQUIREMENT ITEM CONNECTION IN PANEL CONNECTION IN DEVICE VOLTAGE AMPERAGE COMMENTS ORE TOTAL FLOOD PROTETION AL DETAIL IAN: 1. WIRE MAIN ONTROL PANEL PER INLUDED SHEMATI 2. WIRE ALL FANS PER INLUDED SHEMATI 3. WIRE SHUNT TRIP BREAKER (OPTIONAL) 4. WIRE UDS APPLIANE KILL, IF EQUIPPED

More information

ACTIVA Rooftop. YKN2open. SlYORK* ARC-ARG-ARH-ARD A complete range from 17 kw up to 40 kw. A R C 032 A B Nomenclature. Features

ACTIVA Rooftop. YKN2open. SlYORK* ARC-ARG-ARH-ARD A complete range from 17 kw up to 40 kw. A R C 032 A B Nomenclature. Features TIV Rooftop R-RG-RH-RD omplete range from 17 up to 4 YKN2open Features High effieny EER and P Low noise level E supply fan ll onfgurations: ooling only, ooling + gas, Heating, Heating + Gas BMS onnetion

More information

Control Equipment PTC PTC. modulating wall thermostat. NEP04/

Control Equipment PTC PTC. modulating wall thermostat. NEP04/ modulating wall thermostat NEP04/03 www.hvaquik.om 877-711-4822 PAGE 1 speifiations: power input: power onsumption: signal outputs: output impedane: ambient temp: setpoint range: deadband: proportional

More information

Indiana Mechanical Code Edition Title 675 IAC

Indiana Mechanical Code Edition Title 675 IAC Indiana Mehanial Code 2008 Edition Title 675 IAC 18-1.5 Indiana Mehanial Code Amendments Rule 1.5. Indiana Mehanial Code, 2008 Edition 675 IAC 18-1.5-1 Adoption by referene Affeted: IC 22-12-7; IC 22-13;

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

RZ Rezoning Petition /19/14 TRYON PLACE OFFICE 601 SOUTH TRYON CHARLOTTE, NC EXISTING CONDITIONS LDSI SURVEY

RZ Rezoning Petition /19/14 TRYON PLACE OFFICE 601 SOUTH TRYON CHARLOTTE, NC EXISTING CONDITIONS LDSI SURVEY www.littleonline.om NO. REASON PER REVIEW DATE 10.17.14 PER REVIEW 11.21.14 EXISTING CONDITIONS LDSI SURVEY RZ-00 Owner - NCDOT PID 073-032-01 600 Charlotte MRP LLC 902 CLINT MOORE RD SUITE 220 BOCA RATON

More information

CT CABINET AND UTILITY METERING WELL AND BOOSTER PUMP CONTROL 12"x12" WIREWAY 200A MCB 200A, 120/208V, 3Ø, 4W BOARD TVSS CIA ALARM 400A, DOUBLE-THROW SWITCH PORTABLE GENERATOR CONNECTION ENCLOSURE EXISTING

More information

Installation & Maintenance Instructions

Installation & Maintenance Instructions 00 Series abinet Unit Heaters Model B Installation & Maintenance Instructions Dear Owner, ongratulations! Thank you for purchasing this new heater manufactured by a division of Marley Engineered Products.

More information

ACNF Series Ceiling-Mount Air Handlers 1½ to 2½ Tons

ACNF Series Ceiling-Mount Air Handlers 1½ to 2½ Tons ANF Series eiling-mount Air Handlers 1½ to 2½ Tons Standard Features Suitable for use with refrigerants R-410A and R-22 heck flowrater for heat pump and cooling-only applications All-Aluminum tube/aluminum

More information

The following information shall become and form part of the contract documents.

The following information shall become and form part of the contract documents. October 4, 206 To: Attention: Re: All Bidders All Bidders JCBE Gymnasium HVAC Upgrades BC#: 206433 Edmonds Project No.: BHM6090 All bidders, The following information shall become and form part of the

More information

K These short instructions do not replace the IMPRESSA Z7 Instructions. IMPRESSA Z7 Quick Reference Guide

K These short instructions do not replace the IMPRESSA Z7 Instructions. IMPRESSA Z7 Quick Reference Guide IMPRSSA 7 Quik Referene Guide K These short instrutions do not replae the IMPRSSA 7 Instrutions for Use. Make sure you read and observe the safety information and warnings first in order to avoid hazards.

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

GME8. Two-Stage Convertible, Multi-Speed ECM Gas Furnace 80% AFUE. Heating Input: 60, ,000 BTU/h

GME8. Two-Stage Convertible, Multi-Speed ECM Gas Furnace 80% AFUE. Heating Input: 60, ,000 BTU/h Two-Stage onvertible, Multi-Speed EM Gas Furnace 80% AFUE Heating Input: 60,000 100,000 BTU/h ontents Nomenclature... 2 Product Specifications... 3 Dimensions... 4 Airflow Data... 5 Wiring Diagrams...

More information

ASUF Series. Multi-Position, Multi-Speed ECM-Based Air Handler 1½ to 5 Tons. Contents. Product Features

ASUF Series. Multi-Position, Multi-Speed ECM-Based Air Handler 1½ to 5 Tons. Contents. Product Features ASUF Series Multi-Position, Multi-Speed EM-Based Air Handler ½ to Tons ontents Air Handler Nomenclature... Heater Kit Nomenclature... Product Specifications... Dimensions... Heat Kit Data... Wiring Diagram...

More information

Technical Data Manual Model Nos. and pricing: see Price List. VITOCELL r 300-W, 300-V CAUTION. Vitocell 300-W, EVIA

Technical Data Manual Model Nos. and pricing: see Price List. VITOCELL r 300-W, 300-V CAUTION. Vitocell 300-W, EVIA Tehnial Data Manual Model Nos. and priing: see Prie List Vitoell 300-W, EVIA Single oil, indiret-fired domesti hot water storage tank 4 USG (60 L) apaity Vitoell 300-V, EVIA Single oil, indiret-fired domesti

More information

MODEL :MANUAL ALARM CONTROL PANEL

MODEL :MANUAL ALARM CONTROL PANEL MODEL :MANUAL ALARM CONTROL PANEL ERTL TESTED AS PER IS:2189 NATIONAL SECURITY DEVICES Se urity Devies OFFICE : 485/14, SARPANCH KA BARA, MANDAWALI FAZALPUR, DELHI-110092 WORKS : 2-A, Patparganj, Mayur

More information

I.C. Thomasson Associates, Inc. CONSULTING ENGINEERS 2950 KRAFT DRIVE, SUITE 500 NASHVILLE, TN. 37204 PHONE (615) 346-3400 FAX (615) 346-3550 www.icthomasson.com ICT PROJECT # 170647 HODGSON DOUGLAS landscape

More information

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608) Ho-Chunk Gaming POWER SYMBOLS X ELECTRICAL PANEL - REFER TO DRAWINGS FOR WIDTH AND PANEL SCHEDULES PANEL NAMING: XXP-#X: DENOTES PANEL FUNCTION: L = LIGHTING P = GENERAL POWER E = EMERGENCY S = OPTIONAL

More information

TELEPHONE: (215) Addendum No. 01. Andrew J. Morrison Elementary School Fire Alarm System Replacement SDP Contract No. B-009 (C) of 2017/18

TELEPHONE: (215) Addendum No. 01. Andrew J. Morrison Elementary School Fire Alarm System Replacement SDP Contract No. B-009 (C) of 2017/18 TE OOL DITRIT O PILADLPIA OOL REORM OMMIION Offce of ptl Poms 0 Noth Bod teet, d loo ute Phldelph, PA 0 TELEPONE: () 00-0 Addedum No. 0 ubject: Aw J. Moso Elemety chool e Alm ystem Replcemet DP otct No.

More information

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER PROJECT NO. CWA 2013-04 SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER BIDS RECEIVED: CITY HALL, CITY OF BESSEMER TIME: 2:00pm DATE: October 2, 2014 City of Bessemer --------------------------------------------------------------------------------------------------------------------------------------------

More information

SECTION : FIRE ALARM & DETECTION SYSTEMS

SECTION : FIRE ALARM & DETECTION SYSTEMS SECTION 28 31 10: FIRE ALARM & DETECTION SYSTEMS 1. GENERAL A. This section applies to fire detection/alarm system and carbon monoxide system components and equipment installed during new construction

More information

TIM & CINDY CARLSON 293 LAMSON LANE NEW LONDON, NEW HAMPSHIRE MAY 2017 OWNER: TIM & CINDY CARLSON 6 IRONWOOD ROAD SANDY HOOK, CT (203)

TIM & CINDY CARLSON 293 LAMSON LANE NEW LONDON, NEW HAMPSHIRE MAY 2017 OWNER: TIM & CINDY CARLSON 6 IRONWOOD ROAD SANDY HOOK, CT (203) 293 LAMSON LANE NEW LONDON, NEW HAMPSHIRE OWNER: 6 IRONWOOD ROAD SANDY HOOK, T 06482 (203) 7679068 ENGINEER: 76 NEWPORT ROAD, PO BOX 825 03257 (603) 87706 SITE ARHITET: BONIN ARHITETS & ASSOIATES PLL 20

More information

Installation and Operating Instructions

Installation and Operating Instructions Installation and Operating Instrutions Models: PD6-PSL PD6-PWL For your onveniene, we reommend to attah the serial number label HERE. As part of Parmo Applianes ommitment to improving and updating produt

More information

1000 SERIES FLOW THROUGH POWER HUMIDIFIER 12-1/8 14-1/8

1000 SERIES FLOW THROUGH POWER HUMIDIFIER 12-1/8 14-1/8 1000 SERIES R Fresh Indoor Air Quality INSTALLER: PLEASE FILL OUT AND MAIL WARRANTY ARD AFTER INSTALLATION IS OMPLETE. LEAVE INSTALLATION INSTRUTIONS WITH HOME OWNER. PREAUTION: The installer should be

More information

INSTALLATION INSTRUCTIONS Low Ambient Kit NASA201LA, NASA401LA

INSTALLATION INSTRUCTIONS Low Ambient Kit NASA201LA, NASA401LA INSTALLATION INSTRUTIONS Low Ambient Kit NASA201LA, NASA401LA These instructions must be read and understood completely before attempting installation. DANGER, WARNING, AUTION, and NOTE The signal words

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

109-B Concord Drive Casselberry, FL DynaFire.com INSPECTION AND TESTING FORM PER NFPA 72. Owner s Address: Owner's Phone Number:

109-B Concord Drive Casselberry, FL DynaFire.com INSPECTION AND TESTING FORM PER NFPA 72. Owner s Address: Owner's Phone Number: 109-B Concord Drive Casselberry, FL 32707 407.830.6500 DynaFire.com INSPECTION AND TESTING FORM PER NFPA 72 Pg 1 of 4 Equity One 11180600 Owner/Representative: WO#: _Customer#: 1550 NE Miami Garden Dr

More information

TELEPHONE: (215) Addendum No. 01. Edwin Forrest Elementary School Fire Alarm System Replacement SDP Contract No. B-008 (C) of 2017/18

TELEPHONE: (215) Addendum No. 01. Edwin Forrest Elementary School Fire Alarm System Replacement SDP Contract No. B-008 (C) of 2017/18 TE OOL DITRIT O PILADLPIA OOL REORM OMMIION Office of pitl Poms 0 Noth Bod teet, d loo uite Phildelphi, PA 0 TELEPONE: () 00-0 Addedum No. 0 ubject: Edwi oest Elemety chool ie Alm ystem Replcemet DP otct

More information

DONALD H. BERG, ARCHITECT

DONALD H. BERG, ARCHITECT DONALD H. BERG, ARCHITECT DVA PROJECT 632-CSI-402 PET/CT ROOM #A0-10 RENOVATION BASEMENT LEVEL, BUILDING 200 ARCHITECT S PROJECT No. 0917-02 ADDENDUM NO. 1 JUNE 25, 2018 Page 1 of 1 ARCHITECTURAL 1. Specifications:

More information

R500E MANUAL (Software Version 2.0)

R500E MANUAL (Software Version 2.0) R500E MANUAL (Software Version 2.0) ONTENTS INTRODUTION 1 SPEIFIATIONS 2 INSTALLATION INSTRUTIONS 3 ELETRIAL WIRING 4 HEKLIST 5 ONTAT INFORMATION DRAWINGS D E F G GENERAL INTERONNETION DIAGRAM R500 RELAY

More information

TotalPac 3 Deluge, Electric release Self-contained system

TotalPac 3 Deluge, Electric release Self-contained system (Optional) DESRIPTION This TOTALPA 3 integrated fire protection system by FireFlex Systems Inc. consists of a deluge system trim totally preassembled, pre-wired and factory tested. All electrical and mechanical

More information

PH 6000 US XP GEDA USA, LLC

PH 6000 US XP GEDA USA, LLC GEDA USA, LL 1151 Butler Rd. League ity, TX 77573 Phone: 713-621-7272 Fax: 713-621-7279 Toll-Free: 1-866-973-4332 www.gedausa.com sales@gedausa.com PLA BASE UNIT ABINET A 2357 [7'-8 3/4"] GEDA Explosion

More information

Leviton Combination Switch And Tamper Resistant Outlet Wiring Diagram

Leviton Combination Switch And Tamper Resistant Outlet Wiring Diagram Leviton Combination Switch And Tamper Resistant Outlet Wiring Diagram Leviton SmartLockPro 15 Amp Tamper-Resistant Combination GFCI Duplex Outlet and Switch - White-R02-X7299-00W - The Home Depot. From

More information

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Nameplates and labels B. Wire and cable markers C. Conduit markers 1.2 REFERENCES A. NFPA 70 - National Electrical

More information

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A. System: UL listed B. Conform to requirements of NFPA 101

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

Z24 Wireless Zone Controller Professional Installation Guide

Z24 Wireless Zone Controller Professional Installation Guide Pelican Wireless Systems Pelican Wireless Systems Wireless Zone ontroller Professional Installation Guide Pelican Wireless Systems, 2655 ollier anyon Rd. Livermore, A 94551 Phone: 888.512.0490 Email: support@pelicanwireless.com

More information

CHAPTER 8 ELECTRICAL

CHAPTER 8 ELECTRICAL CHAPTER 8 0 8.1 GENERAL... 3 8.2 REQUEST FOR PROPOSAL DEVELOPMENT... 3 8.3 DESIGN DEVELOPMENT... 3 8.3.1 CONCEPT (30%) DESIGN SUBMITTAL REQUIREMENTS... 3 8.3.1.1 Concept Design Analysis... 3 8.3.1.1.1

More information

vta L-6 CONSTRUCTION CALLOUT SCHEDULE 1 BID SET 0' CONSTRUCTION CALLOUT PLAN

vta L-6 CONSTRUCTION CALLOUT SCHEDULE 1 BID SET 0' CONSTRUCTION CALLOUT PLAN ONSTRUTION ALLOUT SHEDULE ONRETE PAVING. OLOR SHALL BE NATURAL GRAY WITH MEDIUM BROOM FINISH. SEE DETAIL A, SHEET L-0. a ONRETE PAVING. OLOR SHALL BE NATURAL GRAY WITH MEDIUM SANDBLAST FINISH. SEE DETAIL

More information

KITCHEN A104 CAFETERIA A103 RECEIVING WALK-IN FREEZER WALK-IN COOLER ENTRY EXIT EXIT COOKING PREP ENTRY WAREWASHING DRY STORAGE TRAY RETURN

KITCHEN A104 CAFETERIA A103 RECEIVING WALK-IN FREEZER WALK-IN COOLER ENTRY EXIT EXIT COOKING PREP ENTRY WAREWASHING DRY STORAGE TRAY RETURN 4/19/2014 6:48:50 PM FROM FILE: S:\2013\-4j_Howard_Elementary_School\Drawings\Revit\_HES_ARH_Bldg_14.rvt REEIVING DRY STORAGE WALK-IN OOLER PREP WALK-IN FREEZER KITHEN A104 OOKING WAREWAING AFETERIA A103

More information

INSTALLATION ADJUSTMENT SERVICE TYPE TM-15, TM-20 (As furnished with models TM-554, TM-356, TM-356-W/HA, TM PRV, 8015, 12520, 15020)

INSTALLATION ADJUSTMENT SERVICE TYPE TM-15, TM-20 (As furnished with models TM-554, TM-356, TM-356-W/HA, TM PRV, 8015, 12520, 15020) OT BULLETIN P-15 June, 2006 INSTALLATION ADJUSTMENT SERVIE TYPE TM-15, TM-20 (As furnished with models TM-554, TM-356, TM-356-W/HA, TM-186-5015-PRV, 8015, 12520, 15020) IMPORTANT! Provide valve serial

More information

RA889A Switching Relay

RA889A Switching Relay Switching Relay INSTALLATION INSTRUTIONS APPLIATION The Switching Relay provides intermediate switching of line- and low-voltage devices from a line- or low-voltage controller and is typically applied

More information

PS914 Power Supply. 900-KL Keylock (optional) Page BB Battery Backup (optional) Page 3

PS914 Power Supply. 900-KL Keylock (optional) Page BB Battery Backup (optional) Page 3 F1! DANGER 44487056 These instructions cover the following parts: PS914 Power Supply Installation Instructions! DANGER: To avoid risk of electric shock, turn off A power before installing or servicing

More information

TT /97. Features INSTALLATION INSTRUCTIONS. Horn. Lamps

TT /97. Features INSTALLATION INSTRUCTIONS. Horn. Lamps TT-1023 1/97 INSTALLATION INSTRUCTIONS Original Issue Date: 2/94 Model: 6-2000 kw Market: Industrial Subject: Flush- or Surface-Mount Remote Annunciator Kits PA-293991 and PA-293991-SD The remote annunciator

More information

INSTALLATION ADJUSTMENT SERVICE NEXT-GENERATION MANIFOLD SYSTEMS TM-520B-LF, TM-820B-LF, TM-920B-LF, TM-1520B-LF

INSTALLATION ADJUSTMENT SERVICE NEXT-GENERATION MANIFOLD SYSTEMS TM-520B-LF, TM-820B-LF, TM-920B-LF, TM-1520B-LF 2 6 4 1 O. RANSTON RI USA TYP TM U S. Pat en ts 2. 97, 3, 6 1,1 95 3.15 2,76 8 2 3 R 4 5-1 6 F 14 1 12 Bulletin G-12 August, 218 INSTALLATION ADJUSTMENT SERVIE NEXT-GENERATION MANIFOLD SYSTEMS TM-52B-,

More information

DOMESTIC OUTLET. kg/cm 2 11 psi LEONARD LEONARD -10 C F LEONARD R THERMOSTATIC LEONARD LEONARD C F C F 60 COLD INLET HOT INLET

DOMESTIC OUTLET. kg/cm 2 11 psi LEONARD LEONARD -10 C F LEONARD R THERMOSTATIC LEONARD LEONARD C F C F 60 COLD INLET HOT INLET 4 1-1 3 R 8 14 4 5 4 1 2 1 4 8 6 kg/cm 2 11 psi 8 1 1 1 14 1 4 ASSE 117 1-1 3 R 8 14 4 5 THERMOSTATI H 1 1 4 1-1 3 R 8 14 4 5 1 1 4 1-1 3 R 8 14 4 5 1 1 M-122Z September 1 MEGATRON MODEL 6N INSTALLATION

More information

DIVISION 26 ELECTRICAL SECTION FIRE ALARM SYSTEM

DIVISION 26 ELECTRICAL SECTION FIRE ALARM SYSTEM DIVISION 26 ELECTRICAL SECTION 26 81 11 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install all equipment and accessories for a complete local, analog addressable, manually and automatically actuated,

More information

AHP SERIES INSTALLATION INSTRUCTIONS ELECTRIC FURNACES / AIR HANDLERS

AHP SERIES INSTALLATION INSTRUCTIONS ELECTRIC FURNACES / AIR HANDLERS AP SERIES INSTALLATION INSTRUTIONS ELETRI FURNAES / AIR ANDLERS A. Introduction These Air andlers come in a variety of models and sizes for upflow, or horizontal use and come from the factory with cooling

More information

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III SECTION 28 3111 - DIGITAL ADDRESSABLE FIRE ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

ComfortNet -Compatible

ComfortNet -Compatible GMV8 omfortnet -ompatible Two-Stage, Variable-Speed Gas Furnace 80% AFUE Heating Input: 60,000 00,000 BTU/h Standard Features Aluminized steel, dual-diameter tubular heat exchanger Two-stage gas valve

More information

Wiring Diagrams. 9AB4-12 Air-Cooled Remote Condenser INDEX OPERATING SEQUENCE ACCESSORIES LEGEND AND NOTES FOR FIG. 1-6

Wiring Diagrams. 9AB4-12 Air-Cooled Remote Condenser INDEX OPERATING SEQUENCE ACCESSORIES LEGEND AND NOTES FOR FIG. 1-6 9AB4-12 Air-ooled Remote ondenser Wiring Diagrams INDEX UNIT 9AB DRAWING TYPE DRAWING NUMBER FIG. NO. 4,6 Label Diagram 9AB6-10816 1 8,12 Label Diagram 9AB12-10816 2 AESSORIES OMPONENT PART NO. FIG. NO.

More information

SIGA-CC1 Single Input Signal Module Installation Sheet

SIGA-CC1 Single Input Signal Module Installation Sheet SIGA-CC1 Single Input Signal Module Installation Sheet Personality codes Use the personality codes described below to configure the SIGA-CC1 module. See Table 1 for listing information Table 1: Personality

More information

Installation Instructions

Installation Instructions KSALA0201R22 KSALA0301410 Low--Ambient Pressure Switch Installation Instructions NOTE: Read the entire instruction manual before starting the installation. SAFETY ONSIDERATIONS Improper installation, adjustment,

More information

A X LWR 09/23/13 gaps at sills and head conditions are needing to be cleaned.

A X LWR 09/23/13 gaps at sills and head conditions are needing to be cleaned. hickasaw Nation Visitor enter omment No. omment 1 Gutter has low spot in center between grid 11 and 15 along grid Q. 2 Verify all reveals painted black. 3 Pen showing through paint at column grid 9&Q.

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

INSTALLATION GUIDE & USER S MANUAL

INSTALLATION GUIDE & USER S MANUAL INSTALLATION GUIDE & USER S MANUAL WALL MOUNT RANGE HOOD Pro-X Series: PX01-W30/36 PX02-W30/36 PX03-W30/36 PX0-W30/36/2 PX0-W30/36/2-B PX06-W30/36/2/8 Ultra Series: D02-W30/36 UL02-W30/36 UL03-W30/36 Deluxe

More information

TECHNICAL GUIDE. Acclimate MODELS: FL9S GAS-FIRED CONDENSING / HIGH EFFICIENCY UPFLOW SINGLE STAGE FURNACES 92% AFUE

TECHNICAL GUIDE. Acclimate MODELS: FL9S GAS-FIRED CONDENSING / HIGH EFFICIENCY UPFLOW SINGLE STAGE FURNACES 92% AFUE TEHNIAL GUIDE Acclimate MODELS: FL9S GAS-FIRED ONDENSING / HIGH EFFIIENY UPFLOW SINGLE STAGE FURNAES 92% AFUE NATURAL GAS 40-135 MBH INPUT EFFIIENY RATING ERTIFIED ISO 9001 ertified Quality Management

More information

RA889A Switching Relay

RA889A Switching Relay Switching Relay FEATURES PRODUT DATA High load switching capability. Troubleshooting LED. Push-to-test button. Replaceable transformer fuse. Long-life D relay drive control technology. Relay for use with

More information

TotalPac 3 Single interlock Preaction, Electric release Self-contained system

TotalPac 3 Single interlock Preaction, Electric release Self-contained system (Optional) DESRIPTION This TOTALPA integrated fire protection system by FireFlex Systems Inc. consists of a preaction system trim totally preassembled, pre-wired and factory tested. All electrical and

More information

Air-Conditioners SUZ- KA25, KA35, KA50, KA60, KA71VA

Air-Conditioners SUZ- KA25, KA35, KA50, KA60, KA71VA ir-onditioners SUZ- K25, K35, K50, K60, K71V INSTLLTION MNUL FOR INSTLLER For safe and orret use, read this manual and the indoor unit installation manual thoroughly efore installing the air-onditioner

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

for an improved energy efficiency

for an improved energy efficiency Innovation + Quality for an improved energy effiieny Valves, ontrols + systems Automati hydroni balaning with Q-Teh Produt range Introdution Automati / manual hydroni balaning zu heiß! Automati hydroni

More information

SECTION RECORD DOCUMENTS and FIELD ENGINEERING

SECTION RECORD DOCUMENTS and FIELD ENGINEERING PART 1-- SECTION 01050 RECORD DOCUMENTS and FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. THE GENERAL CONDITIONS DIVISION I, and SPECIAL PROVISIONS DIVISION II and SAMPLE CONTRACT FORMS

More information

LOW VOLTAGE CONTROL CIRCUIT WIRING

LOW VOLTAGE CONTROL CIRCUIT WIRING INSTALLATION INSTRUTIONS LOW VOLTAGE ONTROL IRUIT WIRING W**A W**AD WA*S* MODELS W**L WL*S* Bard Manufacturing ompany, Inc. Bryan, Ohio 506 Since 9...Moving ahead just as planned. Manual : 00-58 Supersedes:

More information

TotalPac 3 Non interlock Preaction, Electric release Self-Contained system

TotalPac 3 Non interlock Preaction, Electric release Self-Contained system (Optional) DESRIPTION This TOTALPA integrated fire protection system by FireFlex Systems Inc. consists of a preaction system trim totally preassembled, pre-wired and factory tested. All electrical and

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 28 31 00 FIRE ALARM AND SMOKE DETECTION SYSTEMS A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A.

More information

W-BEAM BACKED GUARDRAIL W-BEAM BACKED GUARDRAIL AND GUARDRAIL LONG SPAN INSTALLATIONS AND GUARDRAIL LONG SPAN INSTALLATIONS

W-BEAM BACKED GUARDRAIL W-BEAM BACKED GUARDRAIL AND GUARDRAIL LONG SPAN INSTALLATIONS AND GUARDRAIL LONG SPAN INSTALLATIONS * SEE STANDARD PLAN R-6-SERIES FOR POST SPAING AND GUARDRAIL LAYOUT TO FROM TO GUARDRAIL APPROAH TERMINAL, TYPE 1 OR GUARDRAIL APPROAH TERMINAL, TYPE 2. SEE POST PLAEMENT DETAIL 2'- 5 4 3 2 1 1 2 3 4 5

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Essence. Fryer HD6180

Essence. Fryer HD6180 Essene Fryer HD6180 2 3 4 ENGLISH 6 16 24 32 HD6180 6 ENGLISH Important Read these instrutions for use arefully before using the appliane and save them for future referene. Chek if the voltage indiated

More information

9 E. Scarborough Park Concession Stand and Restroom And / Or Lake Kirby Park Softball Fields Restroom Addition

9 E. Scarborough Park Concession Stand and Restroom And / Or Lake Kirby Park Softball Fields Restroom Addition Addendum NO. 1 Issue Date: October 20, 2016 Project: City of Abilene 10 20 2016 Scarborough Park Concession Stand and Restroom And / Or Lake Kirby Park Softball Fields Restroom Addition I WILL STAT AMR.DUNCA

More information

Fire Sprinkler Plan Submittal Form

Fire Sprinkler Plan Submittal Form Contents Fire Sprinkler Plan Submittal Form... 2 Standpipe Plan Review Submittals... 4 Fire Pump Plan Submittal Requirements... 6 Fire Alarm Plan Submittal Form... 8 Kitchen Hood Wet Chemical Submittal...10

More information

Print Specification. Publication. Instructions. Specific requirements. General requirements

Print Specification. Publication. Instructions. Specific requirements. General requirements Print Specification Publication GSA-CC1 Single Input Signal Module Installation Sheet P/N P-047550-1802-EN REV 04 ISS 23JUN15 Instructions This page is the print specification for the publication. It is

More information

Dimensions & Specifications

Dimensions & Specifications Dimensions & Speifiations Model Produt # Capaity Quantity Cu. Ft. Shipping Weight 2.2 liter Push-Button Airpot 28696.0002 2.2 liters (74 oz.) single unit 1.3 4.5 lbs. 2.2 liter Push-Button Airpot 28696.0000

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3 HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California 95833 September 15, 2016 Woodland Joint Unified School District Spring Lake Area Elementary School HMC No. 3535003.000 DSA Appl.

More information

MODEL 21 NON-CATALYTIC UNIT MODEL 21 NON-CAT FIREPLACE INSERT & FREESTANDING FEATURES SAFETY NOTICE

MODEL 21 NON-CATALYTIC UNIT MODEL 21 NON-CAT FIREPLACE INSERT & FREESTANDING FEATURES SAFETY NOTICE MODEL 21 NON-ATALYTI UNIT Buck Stove MODEL 21 NON-AT Buck Stove FIREPLAE INSERT & FREESTANDING FEATURES PREPARATIONS INSTALLATION OPERATION MAINTENANE SAFETY SAFETY NOTIE IF THIS HEATER IS NOT PROPERLY

More information

ULTRA-SAFE EXP. Applications E X P L O S I O N - P R O O F H E A T E R S

ULTRA-SAFE EXP. Applications E X P L O S I O N - P R O O F H E A T E R S ULTRA-SAFE EXP U N I T E X P L O S I O N - P R O O F S Applications Aircraft Hangars/Service Areas hemical Storage/Handling Areas oal Preparation Plants ompressor Stations Grain Elevators Oil Refineries

More information

TYPE L1 XC NOTES: 1. DESCRIPTION SURFACE MOUNTED 2' X 4' FLUORESCENT TASK LIGHT EMERGENCY BATTERY PACK / EXIT LIGHT COMBO LIGHTING FIXTURE SC

TYPE L1 XC NOTES: 1. DESCRIPTION SURFACE MOUNTED 2' X 4' FLUORESCENT TASK LIGHT EMERGENCY BATTERY PACK / EXIT LIGHT COMBO LIGHTING FIXTURE SC TYPE X NOTES: ESRIPTION SURFAE MOUNTE ' X 4' FLUORESENT TASK LIGHT EMERGENY BATTERY PAK / EXIT LIGHT OMBO LIGHTING FIXTURE SHEULE MANUFATURER'S AT. NO. LITHONIA LIGHTING SB430/4RE LITHONIA BW-R-ELM VOLTAGE

More information

Product Data. 38AUQ Heat Pump Outdoor Unit Split System with Puronr Refrigerant 60 Hz FEATURES/BENEFITS

Product Data. 38AUQ Heat Pump Outdoor Unit Split System with Puronr Refrigerant 60 Hz FEATURES/BENEFITS 07 --- Heat Pump Outdoor Unit Split System with Puronr Refrigerant 60 Hz Product Data the environmentally sound refrigerant Fig. - 07-008 Gemini split system heat pump systems save energy and provide outstanding

More information

TPLP PRE-ASSEMBLED LOW PROFILE EVAPORATORS

TPLP PRE-ASSEMBLED LOW PROFILE EVAPORATORS PRODUT DATA & INSTALLATION PRE-ASSEMBLED LOW PROFILE S N O W F E A T U R I N G Air & Electric DEFROST ELETRIAL POWER: 115/1/60, 208-230/1/60, 208-230/3/60, 460/1/60 See Page 16 for details Bulletin T30--PDI-6

More information

ENGINE GENERATORS AND ACCESSORIES

ENGINE GENERATORS AND ACCESSORIES ENGINE GENERATORS AND ACCESSORIES GENERAL INFORMATION 1.1 This section applies to engine generators and accessories. DESIGN REQUIREMENTS 2.1 The Engineer of Record will consult with the University s Engineering

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS Key Questions for Residential Inspections 1. What wiring methods will be used, and are the wiring methods suitable for the conditions? 2. Will multiwire branch

More information

A Case Study: How the Maximum Spacing of Heat Detectors Should Be Determined

A Case Study: How the Maximum Spacing of Heat Detectors Should Be Determined 5C-1 6th Asia-Oeania Symposium on Fire Siene and Tehnology 17-2, Marh, 24, Daegu, Korea A Case Study: How the Maximum Spaing of Heat Detetors Should Be Determined Soonil Nam FM Global Researh, 1151 Boston-Providene

More information

ARCHITECT S PRE-BID ADDENDUM

ARCHITECT S PRE-BID ADDENDUM ARCHITECT S PRE-BID ADDENDUM 14203 487 Main Street Suite 500 Buffalo, New York Addendum No: 001 Date Issued: Feb. 8, 2019 Project: The West End (CWM Project No. 18.122) Location: 240-260 Lakefront Blvd.

More information

nordica 36 ceiling fan

nordica 36 ceiling fan 09/15 nordica 36 ceiling fan model no. 052-1191-4! INSTRUTIONS PERTAINING TO RISK OF FIRE OR INJURY TO PERSONS. READ ALL INSTRUTIONS IMPORTANT SAFETY INSTRUTIONS SAVE THESE INSTRUTIONS INSTALLATION AND

More information

Fire Alarm System Inspection and Testing Report

Fire Alarm System Inspection and Testing Report Fire Alarm System and ing Report Date of : Time of : 1. PROPERTY INFORMATION: Name of Property: Address: of property: Occupancy Type: Name of property representative: Address: Phone: Fax: E-mail: Local

More information

I-745. Series 745 FireLock Fire-Pac for FireLock NXT Valves WARNING INSTALLATION, MAINTENANCE, TESTING, AND WIRING MANUAL WARNING

I-745. Series 745 FireLock Fire-Pac for FireLock NXT Valves WARNING INSTALLATION, MAINTENANCE, TESTING, AND WIRING MANUAL WARNING INSTALLATION, MAINTENANE, TESTING, AND WIRING MANUAL I-745 Series 745 FireLock Fire-Pac for FireLock NXT Valves WARNING WARNING Read and understand all instructions before attempting to install Victaulic

More information

GCVC96 (B) Two-Stage, Variable-Speed ECM Gas Furnace Up to 96% AFUE. Heating Input: 40, ,000 BTU/h

GCVC96 (B) Two-Stage, Variable-Speed ECM Gas Furnace Up to 96% AFUE. Heating Input: 40, ,000 BTU/h (B) Heating Input: 0,000 0,000 BTU/h Two-Stage, Variable-Speed EM Gas Furnace Up to 9% AFUE ontents Nomenclature... Accessories... Product Specifications... Dimensions... flow Specifications...5 Wiring

More information

Texas Fire Chiefs Association DOCUMENT SUBMISSION FORM. Coppell Fire Department

Texas Fire Chiefs Association DOCUMENT SUBMISSION FORM. Coppell Fire Department 1 Texas Fire Chiefs Association DOCUMENT SUBMISSION FORM Candidate Department: Coppell Fire Department Best Practice Standard: 6.04 (insert the Best Practice Standard you are working on - example 1.01

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

The KEYMARK. Your key to the European market. Robert Biedermann/Shutterstock.com

The KEYMARK. Your key to the European market. Robert Biedermann/Shutterstock.com The KEYMARK. Your key to the European market. Robert Biedermann/Shutterstok.om The KEYMARK is a voluntary European quality mark for produts and servies, that demonstrates ompliane with European Standards.

More information

Fire Alarm Testing and Inspection Report

Fire Alarm Testing and Inspection Report Fire Alarm Testing and Inspection Report Property Name: Property Address: Property Manager: Contact: Phone Number: Central Station: Phone Number: PELICAN ISLE II 35 DOCKSIDE RD. NAPLES, FLORIDA 3110 BILL

More information

Installation, Start-Up, and Operating Instructions For Sizes , Series 111

Installation, Start-Up, and Operating Instructions For Sizes , Series 111 Visit www.carrier.com 58BMA 3-Way Multipoise Oil-Fired Furnace Installation, Start-Up, and Operating Instructions For Sizes 075 155, Series 111 NOTE: Read the entire instruction manual before starting

More information

IN2 Lighting Control Devices

IN2 Lighting Control Devices Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Lighting Control Devices Illinois Mathematics and Science Academy Follow this and additional works at: http://digitalcommons.imsa.edu/facility_in2_manuals

More information

INSTALLATION AND MAINTENANCE INSTRUCTIONS. MCE4 Series. Electric Cooling Package Unit. Save these instructions for future reference

INSTALLATION AND MAINTENANCE INSTRUCTIONS. MCE4 Series. Electric Cooling Package Unit. Save these instructions for future reference INSTALLATION AND MAINTENANE INSTRUTIONS ME4 Series Electric ooling Package Unit Save these instructions for future reference This is a safety alert symbol and should never be ignored. When you see this

More information