1 5C-1 6th Asia-Oeania Symposium on Fire Siene and Tehnology 17-2, Marh, 24, Daegu, Korea A Case Study: How the Maximum Spaing of Heat Detetors Should Be Determined Soonil Nam FM Global Researh, 1151 Boston-Providene Turnpike, Norwood, Massahusetts, USA ABSTRACT The urrent method of assigning the maximum heat detetor spaing based on fire tests omparing the detetor responses to that of a sprinkler does not produe lear performane riteria for the tested detetors. The wide variations of the maximum spaing assigned for the same type of detetors among testing laboratories, whih is another strong indiation of the lak of priniple behind the onept developed for the testing method, simply add more onfusion. Instead, it is proposed in this paper that the maximum detetor spaing should be determined based on a speifi mission that is expeted to be aomplished by using detetors. An example introdued in this work shows: (1) how that an be aomplished, and (2) how the spaing determined here makes a lot more engineering sense than that determined by the urrent method. 1. BACKGROUND Currently, eah heat detetor is haraterized by its temperature rating and its maximum spaing. Measuring the temperature rating of a detetor is quite straight forward. In general, oven tests are used for the task. The temperature of air irulating inside an oven, to whih a detetor sample is exposed, is slowly inreased until the sample responds. Sine there is very little room for any error and the test itself is quite simple, same results are obtained regardless whih testing laboratory onduts the measurement. The maximum spaing assigned to detetors, however, seldom shows agreements among leading listing organizations. Coneptually, the maximum spaing is the maximum distane from a referene fire that a detetor an take while it is expeted to respond either equal to or faster than the response expeted by a referene detetion devie that is installed at a fixed distane from the fire. Currently, an ordinary response sprinkler with a temperature rating of 71 o C is used in the UL test[1], while a sprinkler with a temperature rating lose to the temperature rating of the detetor under onsideration is used in the FM Approvals test[2]. The referene sprinkler is to be installed at the enter of a 3. m by 3. m spaing. Understandably, the maximum spaing 1 Copyright International Assoiation for Fire Safety Siene

2 assigned to a detetor through these tests an vary widely depending on: (1) test room size, (2) eiling height, (3) test fire size, (4) test environments suh as ambient temperature and humidity, and (5) temperature rating of the referene sprinkler, among other things. Not surprisingly, there are large variations in the maximum spaing assigned by UL and FM Approvals for idential detetors. The distanes assigned by UL tend to be a larger value than that assigned by FM Approvals, mainly beause UL onduts the tests in a smaller room than that of FM Approvals while using a larger test fire than that of FM Approvals. It is not unommon that a detetor with a 15-m spaing by UL is given only a 9-m spaing by FM Approvals. In onsequene, a detetor spaing that is perfetly aeptable to one jurisdition may not meet the standards of other jurisditions, depending on what AHJ adopts whih standards. The urrent situation an generate onfusion to end users and an reate a potentially unpleasant issue in ertain fire inident ases. Even if somehow the tests were standardized to eliminate the onfusion surrounding the maximum spaing, still the fundamental question remains. What does the maximum spaing really mean? Does this guarantee that the detetor will respond preisely when it is needed? No one seems to be able to provide affirmative answers to those questions beause the urrent maximum spaing does not have lear objetives behind it. A more relevant question should be, What spaing do I need in order for the detetor to respond before the fire size beomes larger than X kw? A detetor spaing should be mission speifi, and should be determined on a ase by ase basis. A reent study[3] showed that the response time index (RTI) of heat detetors an be used as a means of assessing heat detetors thermal response sensitivity to fires. The study also showed how the RTIs an be measured and how the measured RTI values an be utilized to alulate detetor response times, provided that either the heat release rate of a fire with respet to time is known or it ould be estimated. Thus, the RTI values assigned to detetors would be very handy to answer the questions raised above. By disussing a problem that was enountered reently, this paper intends to show how the maximum spaing of a detetor should be determined. 2. DESCRIPTION OF THE PROBLEM AND THE SOLUTION PROCESS The details of the problem that was asked to be resolved were as follows: A warehouse, whih stores 5.8-m-highheavy-weight-roll-paper staks under a m high eiling, is proteted by a dry-pipe system equipped with a pre-ation valve that is to be tripped by a heat detetor. It was requested to determine the largest allowable spaing without ompromising the full advantage of the pre-ation system. The main advantage of a detetor-tripped pre-ation dry-pipe system over an ordinary dry-pipe system is that the pre-ation system is to be tripped by a detetor well in advane of a sprinkler atuation, so that the system an be ready to disharge water as soon as sprinklers open. A sketh of the feed-main piping system is given in Figure 1 and a sketh of the dry-pipe branh pipe system is given in Fig. 2. As shown in Figure 2, the 2

3 system onsisted of two sets of separate branh lines. The nominal diameter of the branh pipes is 32 mm (1.25 in.) and that of the two ross mains is 76 mm (3 inh). Six sprinklers are attahed at eah branh pipe, 3.53 m apart eah other. The distane between the branh pipes is 2.3 m. Thus, the sprinkler spaing is 3.53 m by 2.3 m. The total volume oupied by ompressed air, whih is the entire volume shown in Figure 2 inluding the riser, is approximately 1.3 m 3. The supervisory air pressure of the system is 129 kpa (4 psig). The design stati water pressure just below the riser is 894 kpa (115 psig). Thus, under the most ideal situation, approximately 87 % of the dry-air volume an be oupied by water before a sprinkler atuates one the pre-ation valve tripped. 8 in. pipe, 122 m 8 in. pipe, 31 m Fig 1. Sketh of the feed-main pipe setion of the dry-pipe sprinkler system in. pipe, 1 in. pipe, 229 m Riser (6 in. pipe, 12 m up) Pre-ation valve 1 in. pipe, 134 m Pump Sprinkler Fig 2. Sketh of the branh lines of the drypipe system. A pre-ation system annot be fully equivalent to a orresponding wet system. The system annot be filled with 1 % water before a sprinkler atuates beause the air inside the system will be ompressed and will math the water pressure after all. Besides, if the atuated sprinklers happened to be loated where the ompressed air poket is, then the air must be disharged first before any water omes out through the open sprinklers. If those onerns an be set aside, the system with its 87 % volume filled with water before sprinkler atuation is the most one an expet from the given system. In order to take this advantage, the valve must trip well before a sprinkler atuates so that the system an be filled with water up to its maximum allowable volume when the sprinkler atuates. Thus, the time differene between the response of a heat detetor that trips the pre-ation valve and the atuation of the first sprinkler must be larger than the time required for the water to fill 87 % of the system, provided that the time required to open the valve ompletely is negligible. It is, therefore, neessary to find out the response times of the detetor and the sprinkler, and the time required for water to fill the system. The following steps will show how those values were obtained. Riser 3 in. pipe, 22.3 m 2. 1 Water Filling Time The time required for water to fill the 87 % of the dry-pipe volume was omputed by using a omputer program developed at FM Global Researh to alulate the water delay times in dry-pipe systems[4]. (The referene 4 and the omputer program in it are proprietary; however, a ommerially available ode [5] an be used for the 3

4 alulation.) In order to alulate the time required to fill the 87 % of the dry-pipe system with water, details of the piping system, dry-pipe air pressure, and the relation between water flow rates and the water pump pressures must be provided to the program. The pump performane urve shows that 1.85 pump pressures were linear to Q & w, where Q & w is the water flow rate in gpm and pressure is in psig. Table 1 shows a few referene points between the water flow rate and the pump pressure. The omputation showed that the time required would be 17 seonds. Thus, the detetor must respond at least 17 s earlier than the first sprinkler atuates. TABLE 1. PUMP PRESSURES VS. WATER FLOW RATES Water Flow Rate Pump Pressure m 3 /s 97 kpa (126 psig) 5.68 x1-2 m 3 /s (9 gpm) 8.2 x1-2 m 3 /s (13 gpm) 1.1 x1-1 m 3 /s (174 gpm) 2.2 Sprinkler Atuation Time 929 kpa (12 psig) 888 kpa (114 psig) 757 kpa (95 psig) The temperature rating of the sprinklers installed on the eiling of the warehouse is 141 o C. The response time index (RTI) of the sprinklers is 234 (m.s) 1/2. The sprinkler response time with negligible ondution effets an be omputed by solving the following equation[6]. 1/ 2 dte u = ( Tg Te ) (1), dt RTI where T e is the sprinkler heat sensing element temperature, t is time, u is the eiling flow veloity surrounding the sprinkler, and T g is the surrounding hot air temperature. In order to solve the above equation, the data of u and T g with respet to time are needed. One of the most onservative fire senarios regarding a pre-ation system is that a fire is loated diretly under a sprinkler, whih happens to be at the enter of the detetor spaing---thereby the most remote loation from the surrounding heat detetors. Thus, the sprinkler an atuate at the earliest possible time, while the heat detetor would respond at the latest possible time, whih would in turn trip the pre-ation valve at the latest possible moment. Following the above senario, the sprinkler is assumed to be loated at the fire plume enter axis where the elevation is the same as the eiling learane height. The following plume orrelations[7] an be used to estimate the enterline temperature and veloity of the plume at the eiling, if the onvetive portion of heat release rate (HRR), q&, is known. ΔT = /3 ( T ) 2/3 5/ 3 ( ) ( ) gc ρ 2 p 2 q& z z 1/3 ( g) 1/3 1/ 3 ( ) (2), V = 3.4 q& z ( z z) C T (3), pρ where Δ T is the exess temperature at the plume enterline (K), T is the ambient temperature (K), g is the gravitational aeleration (m/s 2 ), C p is the onstant pressure speifi heat of air (kj/kg K), ρ is the density of ambient air (kg/m 3 ), q& is the 4

5 onvetive heat release rate (kw), z is the elevation from the soure of the plume, z is the virtual origin of the plume, and Vz is the axial plume enterline veloity (m/s). In order to solve Eqs. (2) and (3), the heat release rate (HRR) of burning 5.8-m-high, heavy-paper- roll staks, whih are stored in the warehouse, has to be found. Beause any diret HRR data from the same fuel were not available, the HRR had to be indiretly estimated by the following way. Old data related to fire tests under a 9.1-m high eiling that used 5.8-m-high, newsprint-roll-paper staks as a fuel were loated. It was found that the plume axis temperature at the eiling height in the dada ould be expressed as ΔT = 57( t 24) (4), where t is time in seond. Then the q& an be obtained by onverting Eq. (2) to the following equation, 1/ 2 3/ 2 5/ 2 3/ g = C ( z z) T T pρ Δ q& (5). Inserting Eq. (4) into Eq (5) yields 3 / 2 q& = 7τ (6), where q& is in kw, τ t 24, and z / z is assumed negligible. Now q& is known, Eq. (2) and (3) will provide u and T g at the eiling height [h=11.6 m; z=5.8 m] for Eq. (1), and then a proper numerial integration until T e beomes the rating temperature will yield the time of the sprinkler atuation. A omputational program using a fourth order Runge-Kutta sheme was developed, and it showed that the sprinkler would atuate when t=5 s with an assumption that the ambient temperature was 2 o C. 2.3 Detetor Response Times A sample of the same type of the detetors that are urrently installed at the warehouse, whih is shown in Fig. 3, was subjeted to the plunge test as desribed in Ref. 3. The test results indiated that the RTI of the detetor was 14 (m.s) 1/2. The temperature rating of the detetor is 57 o C. Sine the RTI value and the temperature rating of the detetor are known, the response time of the detetor an be alulated with a high preision using Eq. (1), as shown in Ref. 3, one the temperature and the veloity of a fire plume at detetor loation are known. Fig 3. The heat detetor urrently installed at the warehouse that is the example of the analysis in is work. The omputations were arried out for two ases of the maximum detetor spaings, 15.2 m by 15.2 m and 7.6 m by 7.6 m. Following the fire senario, the detetor was assumed to be loated at the enter of either the 15.2 m by 15.2 m spaing or the 7.6 m by 7.6 m spaing; thus, the detetor, whih was mounted on the eiling, was loated at either 1.7 m or 5.4 m radial distane away from the fire plume axis. In order to estimate the fire plume veloities and the temperatures at the detetor loations, the orrelations that show the veloities and the temperatures as a funtion of a radial 5

6 distane r from a plume enterline need to be known, preferably in funtional forms. Although there are many eiling flow orrelations, new eiling flow orrelations were devised in this work mainly beause: (1) the degree of sattering of the data assoiated with the orrelations ould be seen at first hand, and (2) many raw data of eiling flows were readily available. Anyone who does not want to go through developing his/her own orrelations, Ref. 8 provides a list of eiling jet flow orrelations and he/she an pik one that seems to be suitable for his/her work. Fig. 4 shows data of Δ T (r), the exess eiling flow temperature at loation r, normalized by Δ T, whih is the exess temperature of an unobstruted fire plume axis at the elevation orresponding to a eiling height h. The radial distane, r, was normalized by b, whih is a plume halfwidth of an unobstruted fire plume at the elevation orresponding to the eiling height h. The plume half width an be alulated by[7], 1/ 2 T b =.12 ( z z ) T where T is ΔT + T. (7), Temperature (ΔΤ/ΔΤ ) Pikard et al. (Ref. 9) Thomas (Ref. 1) Heskestad and Hamada (Ref. 11) Nam Radial Distane from Plume Axis (r/b) Fig 4. Ceiling flow data of temperature vs. radial distane and a orrelation urve. The data in the figure inlude the work of Pikard et al.[9], Thomas[1], Heskestad and Hamada[11], and Nam. Pikard et al. measured eiling flows generated by alohol pan fires the diameters of whih ranged from.15 m to.9 m (HRRs varied between 4.85 and 128 kw) under the eiling heights varying between 1.2 m and 2.4 m. Thomas used.42 m diameter alohol pan fires (HRR=16 kw) under a 1.37-m high eiling. Heskestad and Hamada used propane burners the diameters of whih varied from.15 m to.61 m (HRRs varied between 11.6 and 382 kw) under the eilings varying from.56 m to 2.5 m high. Nam used heptane spray fires ranging from 4 kw to 613 kw under a 4.6-m high eiling. As the fire plumes from spray fires inherits momentum assoiated with sprays from nozzles, the temperatures and veloities from Nam s data were expeted to be slightly higher than the orresponding temperatures and veloities from the other data sets, whih were obtained from purely buoyant fire plumes. The data from Pikard et al. and Thomas were onverted to fit the normalizations shown in the figure. 6

7 A orrelation was developed based on the data and is drawn in the figure. The funtional form is 2 ( x x ) y = y + a ( ) exp 2 w π / 2 w (8), where y log( ΔT / ΔT ), y =-.781, a= , w= , x log( r / b), and x = Veloity (V r / V z ) Kung et al. (Ref. 12) Pikard et al. (Ref. 9) Nam Radial Distane from Plume Axis (r/b) Figure 5 shows a olletion of data showing V r vs. (r/b). V V r is the radial diretional z flow veloity at r and V z is the enterline axial veloity of an unobstruted fire plume at the elevation orresponding to a eiling height h. The data of Kung et al.[12] in the figure are a olletion of nine fire tests burning two- to four-tier rak storage of FM Global Class 2 Commodity, whih is a double tri-wall arton with metal liner on wood pallet, under a 9.1-m high eiling for 3 minutes. The eiling learanes during the tests varied from 1.3 m to 5.9 m and the estimated maximum HRR of eah test varied from 8.4 MW to 14 MW. A orrelation urve is given in the figure the funtional form of whih is the same as Eq. (8), however, with different values of the parameters. Here y log( V r / V z ), y =-.5514, a= , w=.79131, and x = Fig 5. Ceiling flow data of radial veloity vs. radial distane and a orrelation urve. Now all the data neessary to arry out the omputations are olleted. The temperature and veloity variations with time at r=5.4 m or r=1.7 m an be obtained by applying Eqs. (2) through (8). Then Eq. (1) an be numerially integrated until T e reahes the detetor rating temperature, 57 o C. The following Table 2 shows the response times of the sprinkler, the detetor loated at r=5.4 m, whih orresponds to the 7.6 m by 7.6 m spaing, and the detetor loated at r=1.7 m, whih orresponds to the 15.2 m by 15.2 m spaing, under various ambient temperatures. TABLE 2: RESPONSE TIMES OF THE SPRINKLER AND THE DETECTORS Amb. Temp. ( o C) Sprinkler Diretly above Fire Response Time (s) Detetor (7.6 m Spaing) Detetor (15.2 m Spaing)

8 Table 2 shows that the time differene between the response from the sprinkler and the response from the detetor installed with the 7.6 m by 7.6 m spaing is about 19 seonds. It is larger than the time required for water to fill up the system, whih is 17 seonds. Thus, the detetors installed with the 7.6 m by 7.6 m spaing is likely to provide a timely response to open the preation valve and in turn it would provide the maximum advantage of the pre-ation drypipe system. The time differene between the response of the sprinkler and the response of the detetor installed with the 15.2 m by 15.2 m spaing, however, is about 13 seonds, whih is shorter than the time required for water fill up the system. In onsequene, the detetor spaing of 15.2 m by 15.2 m is not likely to allow the system to take its full advantage. Our alulation, therefore, indiates that the warehouse in this example should use the 7.6 m by 7.6 m as its maximum detetor spaing rather than the 15.2 m by 15.2 m spaing. Whenever an engineer should make this kind of deision, all the unertainties assoiated with the engineering orrelations, the experimental data, and the final omputational results, should be arefully weighted. Considering other fators relevant to risk analysis assoiated with fire senarios would be helpful too. 3. CONCLUDING REMARKS The urrent maximum heat detetor spaing assigned by listing organizations does not seem to provide lear performane riteria. The maximum distanes are determined through fire tests, in whih detetor samples are spread out with various distanes from the soure of a fire and the response times are measured. Among the detetor samples that respond prior to the response of a referene sprinkler loated at 2.2 m radial distane away from the fire soure, the distane orresponding to the most remote detetor sample beomes the basis for the maximum spaing. Understandably, it would be unlikely that someone an tell with speifi engineering terms what the signifiane of this spaing is. In addition, the test results an vary widely depending on test onditions. In onsequene, the maximum spaing even for the same type of detetors seldom agrees among the leading testing organizations, whih just add more onfusion to end users. The analysis introdued here shows how the maximum detetor spaing was assigned--- mission speifi and site speifi. The example used here is a real ase problem that was requested to be solved. The proesses used here are quite straight forward and easy to understand, beause the deision was made based on a speifi engineering problem with a lear objetive in the user s mind. The maximum detetor spaing in other sites also an be and even, perhaps, should be determined following similar proesses illustrated in this work--- ahieving a speifi goal by using the detetors. REFERENCES 1. UL 539, UL Standard for Safety for Single and Multiple Station Heat Detetors, 5 th Ed., 2, Underwriters Laboratories In. (UL), 333 Pfingsten Road, Northbrook, Illinois. 8

9 2. Thermostats for Automati Fire Detetion, Class Number 321, FM Approvals, 1151 Boston-Providene Turnpike, Norwood, Massahusetts, Nam, S., Donovan, L. P., and Kim, G., Establishing Heat Detetors Thermal Sensitivity Index through Benh-Sale Tests, Fire Safety Journal, in print. 4. Nam, S. and Kung, H. C., Theoretial Predition of Water Delay Time of Dry-Pipe Sprinkler Systems in the Event of Fire, FMRC Tehnial Report, J. I. TR8.RA, Fatory Mutual Researh Corporation, Norwood, Massahusetts, Golinveaux, J., Calulated Water Delivery Time for Large Dry Pipe Systems, NFPA World Safety Conferene & Exposition, Dallas Convention Center, Dallas, Texas, May 18-21, Heskestad, G. and Bill, R. G., Quantifiation of Thermal Responsiveness of Automati Sprinklers Inluding Condution Effets, Fire Safety Journal, Vol. 14, pp , Heskestad, G., Engineering Relations for Fire Plumes, Fire Safety Journal, vol. 7, 1984, pp Alpert, R., Ceiling Jet Flow, Chapter 2, The SFPE Handbook of Fire Protetion Engineering, Third Ed., Soiety of Fire Protetion Engineers, Bethesda, Maryland, Pikard, R. W., Hird, D. and Nash, P., Note NO. 247, Fire Researh Station, Boreham Wood, Herts, Thomas, P. H., Note No. 141, Note NO. 247, Fire Researh Station, Boreham Wood, Herts, Heskestad, G. and Hamada, T., Ceiling Flows of Strong Fire Plumes, Fire Safety Journal, vol. 21, p. 69, Kung, H. C., You, H. Z., and Spaulding, R. D., Ceiling Flows of Growing Rak Storage Fires, 21 st Symposium (International) on Combustion, Combustion Institute, Pittsburgh, Pennsylvania, p. 121,

10 1

Application of Water Mist to Extinguish Large Oil Pool Fires for Industrial Oil Cooker Protection

Application of Water Mist to Extinguish Large Oil Pool Fires for Industrial Oil Cooker Protection Appliation of Water Mist to Extinguish Large Oil Pool Fires for Industrial Oil Cooker Protetion ZHIGANG LIU, DON CARPENTER, and ANDREW K. KIM Fire Researh Program, Institute for Researh in Constrution

More information

Analysis of a Refrigerant Compressor Load Stand Incorporating Hot Gas Bypass and a Single Full Condensation Heat Exchanger

Analysis of a Refrigerant Compressor Load Stand Incorporating Hot Gas Bypass and a Single Full Condensation Heat Exchanger Purdue University Purdue e-pubs International Compressor Engineering Conferene Shool of Mehanial Engineering 1984 Analysis of a Refrigerant Compressor Load Stand Inorporating Hot Gas Bypass and a Single

More information

PERFORMANCE EVALUATION OF HYBRID SOLAR AIR- WATER HEATER WITH VARIOUS INLET AIR TEMPERATURE DURING HEATING PROCESS

PERFORMANCE EVALUATION OF HYBRID SOLAR AIR- WATER HEATER WITH VARIOUS INLET AIR TEMPERATURE DURING HEATING PROCESS Choi Hwi-Ung et al. Speial Issue Vol. 1, Issue 1, pp. 1-5 PERFORMANCE EVAUATION OF HYBRID SOAR AIR- WATER HEATER WITH VARIOUS INET AIR TEMPERATURE DURING HEATING PROCESS Choi Hwi-Ung Graduate Shool of

More information

Ultra Thin Heat Pipe and its Application

Ultra Thin Heat Pipe and its Application 1th IHPS, Taipei, Taiwan, Nov. 6-9, 11 Ultra Thin Heat Pipe and its Appliation Hirofumi Aoki, Masami Ikeda and Yuihi Kimura FURUKAWA ELECTRIC Co., Ltd., Higashi-yawata 5-1-9, Hiratsuka, Kanagawa, 254-16,

More information

Solids circulation in a recirculating fluidized bed under sticky conditions

Solids circulation in a recirculating fluidized bed under sticky conditions Indian Journal of Engineering Vol. 3, June 1996,pp.91-95 & Materials Sienes Solids irulation in a reirulating fluidized bed under stiky onditions Bahu J Alappat- & v CRam:'" "Centre for Environmental Siene

More information

Experimental Analysis of Performance of Heat Exchanger with Plate Fins and Parallel Flow of Working Fluids

Experimental Analysis of Performance of Heat Exchanger with Plate Fins and Parallel Flow of Working Fluids World Journal of Engineering and Tehnology, 2017, 5, 435-444 http://www.sirp.org/journal/wjet ISSN Online: 2331-4249 ISSN Print: 2331-4222 Experimental Analysis of Performane of Heat Exhanger with Plate

More information

Characteristics of Air Flow through Windows Heiselberg, Per Kvols; Dam, Henrik; Sørensen, Lars C. ; Nielsen, Peter Vilhelm; Svidt, Kjeld

Characteristics of Air Flow through Windows Heiselberg, Per Kvols; Dam, Henrik; Sørensen, Lars C. ; Nielsen, Peter Vilhelm; Svidt, Kjeld Aalborg Universitet Charateristis of Air Flow through Windows Heiselberg, Per Kvols; Dam, Henrik; Sørensen, Lars C. ; Nielsen, Peter Vilhelm; Svidt, Kjeld Publiation date: 1999 Doument Version Publisher's

More information

Concentration analysis of extinguishing agents and toxic gases in small cabin aircraft

Concentration analysis of extinguishing agents and toxic gases in small cabin aircraft 2009 Brazilian Symposium on Aerospae Eng. & Appliations 3 rd CTA-DLR Workshop on Data Analysis & Flight Control Conentration analysis of extinguishing agents and toxi gases in small abin airraft Cássio

More information

Heat and Mass Transfer Drying Cotton in Drum Drier

Heat and Mass Transfer Drying Cotton in Drum Drier Heat and Mass Transfer Drying Cotton in Drum Drier Mardono B., Parpie A., Kayumo A., Djuraea N P.G. Professor, Tashkent Institute of Tetile and Light Industry, Tashkent, Uzbekistan Professor, Tashkent

More information

A New Type of Dehumidifier for Enclosed High-voltage Switchgear Cabinet

A New Type of Dehumidifier for Enclosed High-voltage Switchgear Cabinet TELKOMNIKA, Vol.10, No.7, November 01, pp. 1637~164 e-issn: 087-78X aredited by DGHE (DIKTI), Deree No: 51/Dikti/Kep/010 1637 A New Type of Dehumidifier for Enlosed High-voltage Swithgear Cabinet Jinbo

More information

ELECTRICAL CONTRACTOR REQUIREMENT ITEM CONNECTION IN PANEL CONNECTION IN DEVICE VOLTAGE AMPERAGE COMMENTS

ELECTRICAL CONTRACTOR REQUIREMENT ITEM CONNECTION IN PANEL CONNECTION IN DEVICE VOLTAGE AMPERAGE COMMENTS ORE TOTAL FLOOD PROTETION AL DETAIL IAN: 1. WIRE MAIN ONTROL PANEL PER INLUDED SHEMATI 2. WIRE ALL FANS PER INLUDED SHEMATI 3. WIRE SHUNT TRIP BREAKER (OPTIONAL) 4. WIRE UDS APPLIANE KILL, IF EQUIPPED

More information

Shear Headed Anchors with Large Diameter and Deep Embedment in Concrete

Shear Headed Anchors with Large Diameter and Deep Embedment in Concrete Shear Headed Anhors with Large Diameter and Deep Embedment in Conrete Namho Lee ), Kwang Ryun Park ) and Yong Pyo Suh 3) ) Atomi Energy of Canada Limited, Mississauga, Ontario, Canada ) Korea Power Engineering

More information

Technical Data Manual Model Nos. and pricing: see Price List. VITOCELL r 300-W, 300-V CAUTION. Vitocell 300-W, EVIA

Technical Data Manual Model Nos. and pricing: see Price List. VITOCELL r 300-W, 300-V CAUTION. Vitocell 300-W, EVIA Tehnial Data Manual Model Nos. and priing: see Prie List Vitoell 300-W, EVIA Single oil, indiret-fired domesti hot water storage tank 4 USG (60 L) apaity Vitoell 300-V, EVIA Single oil, indiret-fired domesti

More information

A CALCULATION METHOD OF FULLY DEVELOPED FIRE TEMPERATURE FOR MULTI-ROOM FIRE SPREAD SCENARIOS

A CALCULATION METHOD OF FULLY DEVELOPED FIRE TEMPERATURE FOR MULTI-ROOM FIRE SPREAD SCENARIOS A CALCULATION METHOD OF FULLY DEVELOPED FIRE TEMPERATURE FOR MULTI-ROOM FIRE SPREAD SCENARIOS K. Harada Department of Arhiteture and Arhitetural Engineering, Kyoto University Building C2-46, Kyoto University

More information

Effect of Variable-Drainage Freeze-Thaw Tests on Post-Thaw Shear Strength

Effect of Variable-Drainage Freeze-Thaw Tests on Post-Thaw Shear Strength Transportation Researh Reord 89 13 Publishers, Barking, Essex, England, 1977, pp. 43-47. 13. E. Penner and T. Ueda. A Soil Frost Suseptibility Test and a Basis for Interpreting Heave Rates. Pro., 3rd International

More information

Impact of Supervisory Gas Pressure on Dry Pipe Sprinkler System Water Delivery Time. Steve Wolin Director, Development and Compliance

Impact of Supervisory Gas Pressure on Dry Pipe Sprinkler System Water Delivery Time. Steve Wolin Director, Development and Compliance Impact of Supervisory Gas Pressure on Dry Pipe Sprinkler System Water Delivery Time Steve Wolin Director, Development and Compliance 1 Why Does Water Delivery Time Matter? Delays application of water to

More information

Control Equipment PTC PTC. modulating wall thermostat. NEP04/

Control Equipment PTC PTC. modulating wall thermostat. NEP04/ modulating wall thermostat NEP04/03 www.hvaquik.om 877-711-4822 PAGE 1 speifiations: power input: power onsumption: signal outputs: output impedane: ambient temp: setpoint range: deadband: proportional

More information

FIRE PROTECTION FOR NON-STORAGE OCCUPANCIES WITH HIGH CEILING CLEARANCES

FIRE PROTECTION FOR NON-STORAGE OCCUPANCIES WITH HIGH CEILING CLEARANCES FIRE PROTECTIO FOR O-STORAGE OCCUPACIES WITH HIGH CEILIG CLEARACES SOOIL AM, ATOIO BRAGA, HSIAG-CHEG KUG, and JOA M. A. TROUP FM Global Research, 1151 Boston-Providence Turnpike, orwood, Massachusetts

More information

A Monte Carlo Approach for the Design of Thermal Fire Detection System

A Monte Carlo Approach for the Design of Thermal Fire Detection System A Monte Carlo Approach for the Design of Thermal Fire Detection System Walter W. Yuen Department of Mechanical & Environmental Engineering University of California at Santa Barbara California, USA and

More information

RESEARCH TECHNICAL REPORT. SMART Sprinkler Protection for Highly Challenging Fires - Phase 2: Full-Scale Fire Tests in Rack Storage

RESEARCH TECHNICAL REPORT. SMART Sprinkler Protection for Highly Challenging Fires - Phase 2: Full-Scale Fire Tests in Rack Storage RESEARCH TECHNICAL REPORT SMART Sprinkler Protection for Highly Challenging Fires - Phase 2: Full-Scale Fire Tests in Rack Storage SMART Sprinkler Protection for Highly Challenging Fires - Phase 2: Full-Scale

More information

Indiana Mechanical Code Edition Title 675 IAC

Indiana Mechanical Code Edition Title 675 IAC Indiana Mehanial Code 2008 Edition Title 675 IAC 18-1.5 Indiana Mehanial Code Amendments Rule 1.5. Indiana Mehanial Code, 2008 Edition 675 IAC 18-1.5-1 Adoption by referene Affeted: IC 22-12-7; IC 22-13;

More information

tc/ Tengine STARK SLE PREMIUM Technical Design-in Guide

tc/ Tengine STARK SLE PREMIUM Technical Design-in Guide ,6 10 lm 20 00 23 3 t/ 6, 5 35 19 5 Tengine STARK SLE PREMIUM 9, /t p tp Ø 2 3, 14 00 m lm 35 23 t/ tp,3 Tehnial Design-in Guide tp t/,2 26 7 Table of Contents Table of ontents Desription...........................................................................

More information

for an improved energy efficiency

for an improved energy efficiency Innovation + Quality for an improved energy effiieny Valves, ontrols + systems Automati hydroni balaning with Q-Teh Produt range Introdution Automati / manual hydroni balaning zu heiß! Automati hydroni

More information

Alternative technologies for refrigeration and air conditioning applications

Alternative technologies for refrigeration and air conditioning applications Retrospetive Theses and Dissertations 1993 Alternative tehnologies for refrigeration and air onditioning appliations Don arlyle Gauger Iowa State University Follow this and additional works at: http://lib.dr.iastate.edu/rtd

More information

Historic Structure Reports: A Redefinition

Historic Structure Reports: A Redefinition B U L L E T I N Volume 13: No. 4 Cultural Resoures Management National Park Servie 1990 A Tehnial Bulletin for Parks, Federal Agenies, States, Loal Governments, and the Private Setor Histori Struture Reports:

More information

RESEARCH. A comparison of three visual assessments for riparian and stream health

RESEARCH. A comparison of three visual assessments for riparian and stream health RESEARCH A omparison of three visual assessments for riparian and stream health T.A. Ward, K.W. Tate, E.R. Atwill, D.F. Lile, D.L. Lanaster, N. MDougald, S. Barry, R.S. Ingram, H.A. George, W. Jensen,

More information

Fuzzy C-Means Classifier for Soil Data

Fuzzy C-Means Classifier for Soil Data International Journal of Computer Appliations (97 8887) Volume 6 No.4, September Fuzzy C-Means Classifier for Soil Data P.Bhargavi,M.S.,M.Teh Assoiate Professor Department of CSE Madanapalle Institute

More information

Design and Development of a Heat Pump Rough Rice Dryer: A Study of Energy and Quality

Design and Development of a Heat Pump Rough Rice Dryer: A Study of Energy and Quality Design and Development of a Heat Pump Roug Rie Dryer: A Study of Energy and Quality M. TORKİ, M. SADEGHİ, M. DAVAZDAH EMAMİ 2, A. MOHEB 3 Farm Mainery Department, Isfaan University of Tenology, Isfaan

More information

PROPOSAL BALLOT DUE BY: Thursday, September 18, 2008

PROPOSAL BALLOT DUE BY: Thursday, September 18, 2008 PROPOSAL BALLOT DUE BY: Thursday, September 18, 2008 NFPA 204 SMO-AAA Standard for Smoke and Heat Venting Staff Liaison: Return Completed Ballot To: Jill McGovern E-Mail to jmcgovern@nfpa.org Fax to 617-984-7110

More information

A COMPARISON OF FIELD AND LABORATORY MEASUREMENTS OF RESIDENTlAL REFRIGERATOR ENERGY USE

A COMPARISON OF FIELD AND LABORATORY MEASUREMENTS OF RESIDENTlAL REFRIGERATOR ENERGY USE HEINEMEIER ET AL. A COMPARISON OF FIELD AND LABORATORY MEASUREMENTS OF RESIDENTlAL REFRIGERATOR ENERGY USE Kristin E. Heinemeier and Alan K. Meier Lawrene Berkeley Laboratory ABSTRACT The laboratory-rated

More information

The Development and Calculation of an Energy-saving Plant for Obtaining Water from Atmospheric Air

The Development and Calculation of an Energy-saving Plant for Obtaining Water from Atmospheric Air IOP Conferene Series: Materials Siene and Engineering PAPER OPEN ACCESS The Development and Calulation of an Energy-saving Plant for Obtaining Water from Atmospheri Air To ite this artile: D A Uglanov

More information

The KEYMARK. Your key to the European market. Robert Biedermann/Shutterstock.com

The KEYMARK. Your key to the European market. Robert Biedermann/Shutterstock.com The KEYMARK. Your key to the European market. Robert Biedermann/Shutterstok.om The KEYMARK is a voluntary European quality mark for produts and servies, that demonstrates ompliane with European Standards.

More information

WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS

WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS Jukka Vaari 1, Amit Lior 2 1 2 VTT Technical Research Centre of Finland, Espoo, Finland Marioff Corporation Oy, Vantaa,

More information

WAVERLY LIBRARY CHARRETTE REPORT

WAVERLY LIBRARY CHARRETTE REPORT W Arhiteture and Landsape Arhiteture, LLC WAVERLY BRANCH ENOCH PRATT FREE LIBRARY REPORT BALTIMORE MARYLAND Community Charrette 2008 February 23 127 W 25 th St. 12 th Floor NY, NY 10001 11x17 TEMPLATE

More information

Recent BRANZFIRE enhancements and validation

Recent BRANZFIRE enhancements and validation Recent BRANZFIRE enhancements and validation Michael Spearpoint University of Canterbury Summary BRANZFIRE is a multi-compartment fire zone model that has been under development since 1996 predominately

More information

Randomized controlled trial of ionization and photoelectric smoke alarm functionality

Randomized controlled trial of ionization and photoelectric smoke alarm functionality 1 Harborview Injury Prevention and Researh Center, Seattle, Washington, USA; 2 Department of Epidemiology, Shool of Publi Health and Community Mediine, University of Washington, Seattle, Washington, USA;

More information

Developing a Fire Test Strategy for Storage Protection Under Sloped Ceilings

Developing a Fire Test Strategy for Storage Protection Under Sloped Ceilings Developing a Fire Test Strategy for Storage Protection Under Sloped Ceilings Justin A. Geiman, Noah L. Ryder Fire & Risk Alliance, Rockville, MD, USA André W. Marshall Custom Spray Solutions, Silver Spring,

More information

J. R. Qualey III, L. Desmarais, J. Pratt Simplex Time Recorder Co., 100 Simplex Drive, Westminster, MA 01441

J. R. Qualey III, L. Desmarais, J. Pratt Simplex Time Recorder Co., 100 Simplex Drive, Westminster, MA 01441 J. R. Qualey III, L. Desmarais, J. Pratt Simplex Time Recorder Co., 100 Simplex Drive, Westminster, MA 01441 Response-Time Comparisons of Ionization and Photoelectric/Heat Detectors 1. Introduction Despite

More information

Breathe Fresh & Clean Air

Breathe Fresh & Clean Air Established sine 1968 Beyond Your Expetation Breathe Fresh & Clean Air in Comfortable Environment Reg. No.: 200800970G CORPORATE INTRODUCTION Midea Eletri Trading (Singapore) Co. Pte. Ltd 10 Anson Road

More information

An experimental study of the impact of tunnel suppression on tunnel ventilation

An experimental study of the impact of tunnel suppression on tunnel ventilation An experimental study of the impact of tunnel suppression on tunnel ventilation Yoon J. Ko and George Hadjisophocleous Civil and Environmental Engineering, Carleton University 1125 Colonel By Drive, Ottawa,

More information

Simple Equations for Predicting Smoke Filling Time in Fire Rooms with Irregular Ceilings

Simple Equations for Predicting Smoke Filling Time in Fire Rooms with Irregular Ceilings Fire Science and Technorogy Vol.24 No.4(2005) 165-178 165 Simple Equations for Predicting Smoke Filling Time in Fire Rooms with Irregular Ceilings Jun-ichi Yamaguchi 1, Takeyoshi Tanaka 2 1 Technical Research

More information

SIMULTANEOUS HEAT AND MASS TRANSFER IN AGITATED DRY- ER

SIMULTANEOUS HEAT AND MASS TRANSFER IN AGITATED DRY- ER G-2010-Proess Tehnoloies SIMULTANEOUS HEAT AND MASS TRANSFER IN AGITATED DRY- ER Mária Örvös Assoiate Professor Tibor Poós Ph.D. student Abstrat: Dru dryers are often used for oisture redution of ranulated

More information

AGRICULTURAL URBANISM

AGRICULTURAL URBANISM AGRICULTURAL URBANISM Agriultural Urbanism Researh is ongoing to develop tehniques for assimilating agriulture into an urbanism aeptable to the expetations of modern life and meeting the hoie of lifestyles

More information

SCREENING FOR IRON CHLOROSIS TOLERANCE OF IN VITRO PYRUS ROOTSTOCK GERMPLASM

SCREENING FOR IRON CHLOROSIS TOLERANCE OF IN VITRO PYRUS ROOTSTOCK GERMPLASM SCREENING FOR IRON CHLOROSIS TOLERANCE OF IN VITRO PYRUS ROOTSTOCK GERMPLASM Sugae Wada, Department of Hortiulture, Oregon State University, 4017 Agriulture & Life Siene Bldg. Corvallis Oregon 97331-7304

More information

ZONE MODEL VERIFICATION BY ELECTRIC HEATER

ZONE MODEL VERIFICATION BY ELECTRIC HEATER , Volume 6, Number 4, p.284-290, 2004 ZONE MODEL VERIFICATION BY ELECTRIC HEATER Y.T. Chan Department of Building Services Engineering, The Hong Kong Polytechnic University, Hong Kong, China ABSTRACT Selecting

More information

Warehouse Protection of Exposed Expanded Group-A Plastics with Electronic Sprinkler Technology

Warehouse Protection of Exposed Expanded Group-A Plastics with Electronic Sprinkler Technology Warehouse Protection of Exposed Expanded Group-A Plastics with Sprinkler Technology Zachary L. Magnone, Jeremiah Crocker, Pedriant Peña Tyco Fire Protection Products, Cranston, RI, USA Abstract The focus

More information

SCHULTE & ASSOCIATES Building Code Consultants 880D Forest Avenue Evanston, IL /

SCHULTE & ASSOCIATES Building Code Consultants 880D Forest Avenue Evanston, IL / SCHULTE & ASSOCIATES Building Code Consultants 880D Forest Avenue Evanston, IL 60202 fpeschulte@aol.com 504/220-7475 A CRITIQUE OF HUGHES ASSOCIATES, INC. PAPER TITLED: Analysis of the Performance of Ganged

More information

ACTIVA Rooftop. YKN2open. SlYORK* ARC-ARG-ARH-ARD A complete range from 17 kw up to 40 kw. A R C 032 A B Nomenclature. Features

ACTIVA Rooftop. YKN2open. SlYORK* ARC-ARG-ARH-ARD A complete range from 17 kw up to 40 kw. A R C 032 A B Nomenclature. Features TIV Rooftop R-RG-RH-RD omplete range from 17 up to 4 YKN2open Features High effieny EER and P Low noise level E supply fan ll onfgurations: ooling only, ooling + gas, Heating, Heating + Gas BMS onnetion

More information

The Science Behind Water Mist Protection of Typical Building Hazards

The Science Behind Water Mist Protection of Typical Building Hazards The Science Behind Water Mist Protection of Typical Building Hazards SUPDET 2014 Zachary Magnone, P.E. Zachary.Magnone@tycofp.com Presentation Goals What is water mist? How does it work? How is it tested

More information

Essence. Fryer HD6180

Essence. Fryer HD6180 Essene Fryer HD6180 2 3 4 ENGLISH 6 16 24 32 HD6180 6 ENGLISH Important Read these instrutions for use arefully before using the appliane and save them for future referene. Chek if the voltage indiated

More information

Smoke Layer Height and Heat Flow through a Door

Smoke Layer Height and Heat Flow through a Door Smoke Layer Height and Heat Flow through a Door 2018 Smoke Layer Height and Heat Flow through a Door In this tutorial you will simulate a growing fire in the corner of a 5m x 5m room. The room has a 1m

More information

Subscripts 1-4 States of the given system Comp Compressor Cond Condenser E Evaporator vol Volumetric G Gas L Liquid

Subscripts 1-4 States of the given system Comp Compressor Cond Condenser E Evaporator vol Volumetric G Gas L Liquid Simulation Analysis of Compression Refrigeration Cycle with Different Refrigerants P.Thangavel, Dr.P.Somasundaram, T.Sivakumar, C.Selva Kumar, G.Vetriselvan Abstract --- In this analysis, the performance

More information

SHOULD SMOKE MANAGEMENT SYSTEM BE PROVIDED IN KARAOKE ESTABLISHMENTS?

SHOULD SMOKE MANAGEMENT SYSTEM BE PROVIDED IN KARAOKE ESTABLISHMENTS? International Journal on Engineering Performance-ased Fire odes, Volume 4, Number 2, p.30-34, 2002 SHOULD SMOKE MNGEMENT SYSTEM E PROVIDED IN KROKE ESTLISHMENTS? W.K. how Department of uilding Services

More information

By: Russell Bainbridge March 18th, 2016 FPE 596

By: Russell Bainbridge March 18th, 2016 FPE 596 By: Russell Bainbridge March 18th, 2016 FPE 596 Egress Analysis and Design California Polytechnic State University's Engineering IV building Fire Detection, Alarm and Communication Systems A warehouse

More information

Air-Conditioners SUZ- KA25, KA35, KA50, KA60, KA71VA

Air-Conditioners SUZ- KA25, KA35, KA50, KA60, KA71VA ir-onditioners SUZ- K25, K35, K50, K60, K71V INSTLLTION MNUL FOR INSTLLER For safe and orret use, read this manual and the indoor unit installation manual thoroughly efore installing the air-onditioner

More information

Factors Affecting Efficiency of Water Mist Suppression of Solid Combustible Fires in Open Environment

Factors Affecting Efficiency of Water Mist Suppression of Solid Combustible Fires in Open Environment Factors Affecting Efficiency of Water Mist Suppression of Solid Combustible Fires in Open Environment Hong-Zeng (Bert) Yu FM Global 16 th International Water Mist Conference September 21-22, 2016 Vienna,

More information

LAND AT BRirrONS HALL FARM, CHIGNALL ST. JAMES NR. CHELMSFORD, ESSEX SOILS AND AGRICULTURAL LAND CLASSIFICATION

LAND AT BRirrONS HALL FARM, CHIGNALL ST. JAMES NR. CHELMSFORD, ESSEX SOILS AND AGRICULTURAL LAND CLASSIFICATION ^ ^ ^ / ^ LAND AT BRirrONS HALL FARM, CHIGNALL ST. JAMES NR. CHELMSFORD, ESSEX SOILS AND AGRICULTURAL LAND CLASSIFICATION 1. FEBRUARY 1987 RURAL PLANNING SERVICES, V BROADWAY HOUSE, "' 130C BROADWAY, J

More information

FIRE RESEARCH STATION

FIRE RESEARCH STATION F;" r!:'~ ~''":- :!~,. ":''> "'-;1 ~~.~: ';::'.,'\'" ;.;'"!..;..:.~,;.= L",;~.: ~...;:;.; -::, ',,,., ::;.,;:: Fire Researh Note No 1047 ---_.._- TH FFCT OF FOAM LQUD CONCNTRATONS ON FR PRFORMANC ON LA

More information

Installation and Operating Instructions

Installation and Operating Instructions Installation and Operating Instrutions Models: PD6-PSL PD6-PWL For your onveniene, we reommend to attah the serial number label HERE. As part of Parmo Applianes ommitment to improving and updating produt

More information

PERFORMANCE STUDIES FOR AN EXPERIMENTAL SOLAR OPEN-CYCLE LIQUID DESICCANT AIR DEHUMIDIFICATION SYSTEM

PERFORMANCE STUDIES FOR AN EXPERIMENTAL SOLAR OPEN-CYCLE LIQUID DESICCANT AIR DEHUMIDIFICATION SYSTEM Solar Energy Vol. 44, No. 3, pp. 123-135, 199 Printed in the U.S.A. 38--92X/9 $3. +. Copyright 199 Pergamon Press pie PERFORMANCE STUDES FOR AN EXPERMENTAL SOLAR OPEN-CYCLE LQUD DESCCANT AR DEHUMDFCATON

More information

INVESTIGATION OF INDIRECT SOLAR DRYING OF GINGER RHIZOMES (ZINGIBER OFFICINALE): A COMPARATIVE STUDY

INVESTIGATION OF INDIRECT SOLAR DRYING OF GINGER RHIZOMES (ZINGIBER OFFICINALE): A COMPARATIVE STUDY Journal of Engineering Siene and ehnology Vol. 12, No. 7 (2017) 1956-1971 Shool of Engineering, aylor s University INVESIGAION OF INDIREC SOLAR DRYING OF GINGER RHIZOMES (ZINGIBER OFFICINALE): A COMPARAIVE

More information

RZ Rezoning Petition /19/14 TRYON PLACE OFFICE 601 SOUTH TRYON CHARLOTTE, NC EXISTING CONDITIONS LDSI SURVEY

RZ Rezoning Petition /19/14 TRYON PLACE OFFICE 601 SOUTH TRYON CHARLOTTE, NC EXISTING CONDITIONS LDSI SURVEY www.littleonline.om NO. REASON PER REVIEW DATE 10.17.14 PER REVIEW 11.21.14 EXISTING CONDITIONS LDSI SURVEY RZ-00 Owner - NCDOT PID 073-032-01 600 Charlotte MRP LLC 902 CLINT MOORE RD SUITE 220 BOCA RATON

More information

Performance Enhancement of Refrigeration Cycle by Employing a Heat Exchanger

Performance Enhancement of Refrigeration Cycle by Employing a Heat Exchanger Performance Enhancement of Refrigeration Cycle by Employing a Heat Exchanger Abstract Shoeb J. Inamdar 1 H.S. Farkade 2 M. Tech student. (Thermal Engineering) 1, Asst. Professor 2 Department of Mechanical

More information

EXPERIMENTAL STUDIES ON THE EFFECT OF THE FIRE POSITION ON PLUME ENTRAINMENT IN A LARGE SPACE

EXPERIMENTAL STUDIES ON THE EFFECT OF THE FIRE POSITION ON PLUME ENTRAINMENT IN A LARGE SPACE , Volume, Number 4, p.138-14, 23 EXPERIMENTAL STUDIES ON THE EFFECT OF THE FIRE POSITION ON PLUME ENTRAINMENT IN A LARGE SPACE Yuanzhou Li, Ran Huo, Liang Yi and Guodong Wang State Key Laboratory of Fire

More information

High Ceiling Protection

High Ceiling Protection High Ceiling Protection High Ceiling Protection An Investigation of Automatic Sprinkler Protection of Buildings with Non-Storage Occupancies and High Clearances Company Confidential 2 Background New architectural

More information

RADIATION BLOCKAGE EFFECTS BY WATER CURTAIN

RADIATION BLOCKAGE EFFECTS BY WATER CURTAIN , Volume 6, Number 4, p.248-254, 04 RADIATION BLOCKAGE EFFECTS BY WATER CURTAIN C.L. Choi Department of Building Services Engineering, The Hong Kong Polytechnic University, Hong Kong, China ABSTRACT Water

More information

Subwoofer OWNER'S MANUAL CO104D CO104S CO124S CO124D CO154S CO154D MODEL

Subwoofer OWNER'S MANUAL CO104D CO104S CO124S CO124D CO154S CO154D MODEL Subwoofer MODEL CO104S CO104D CO124S CO124D CO154S CO154D OWNER'S MANUAL WHAT S IN THE BOX Inluded in this box are all the neessary mounting hardware and ables for your basi installation. Listed below

More information

SGM BID AND CONSTRUCTION INC.

SGM BID AND CONSTRUCTION INC. IN. MEP ONSULTING ENGINEERS A-00000 9 Lake Baldwin Lane Orlando, Fl. Tel: 07-77- Fax: 07-77-77 opyright 07 Engineering, Inc. : 0-0-7- BID AND ONSTRUTION GENERAL NOTES. ABSOLUTELY NO SPLES WILL BE ALLOWED

More information

TECHNICAL DATA. * Refer the Approval Chart on page 120c and Design Criteria on page 120d for culus and FM approval requirements that must be followed.

TECHNICAL DATA. * Refer the Approval Chart on page 120c and Design Criteria on page 120d for culus and FM approval requirements that must be followed. March 7, 2008 Sprinkler 120a Telephone: 269-945-9501 Technical Services 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com 1. DESCRIPTION Viking Early Suppression Fast Response (ESFR) Pendent

More information

Thermal Sensitivity Evaluation of Recessed, Flush and Concealed Sprinklers

Thermal Sensitivity Evaluation of Recessed, Flush and Concealed Sprinklers Thermal Sensitivity Evaluation of Recessed, Flush and Concealed Sprinklers ROBERT G. BILL, JR, and GUNNAR HESKESTAD Factory Mutual Research Corporation 11 51 Boston-Providence Turnpike Norwood, MA 02062

More information

Will Clay Spring 2014

Will Clay Spring 2014 Will Clay Spring 2014 1. Project Overview 2. Prescriptive Requirements 3. Existing Requirements 4. Performance Evaluation 5. Conclusions RJA-Houston since 2010 Hired as FP/LS consultants by architect in

More information

RESEARCH TECHNICAL REPORT. SMART Sprinkler Protection for Highly Challenging Fires Phase 1: System Design and Function Evaluation

RESEARCH TECHNICAL REPORT. SMART Sprinkler Protection for Highly Challenging Fires Phase 1: System Design and Function Evaluation RESEARCH TECHNICAL REPORT SMART Sprinkler Protection for Highly Challenging Fires Phase : System Design and Function Evaluation SMART Sprinkler Protection for Highly Challenging Fires Phase : System Design

More information

Modeling of Thermal Responsiveness of Automatic Sprinklers

Modeling of Thermal Responsiveness of Automatic Sprinklers Modeling of Thermal Responsiveness of Automatic Sprinklers GUNNAR HESKESTAD and ROBERT G. BILL, JR. Factory Mutual Research Corporation 1151 Boston-Providence Turnpike Norwood, Massachusetts 02062, USA

More information

The Effect of Large Orifice Sprinklers on High-Challenge Fires

The Effect of Large Orifice Sprinklers on High-Challenge Fires SUPPLEMENT 2 The Effect of Large Orifice Sprinklers on High-Challenge Fires Bill Thomas, P.E. Bill Tomes Editor s Note: Supplement 2 provides background information related to the development and application

More information

GIACOMINI PRICE LIST 2013 HIU COMPONENTS

GIACOMINI PRICE LIST 2013 HIU COMPONENTS PAGE 1 GIACOMINI PRICE LIST 2013 HIU COMPONENTS T: 01454 311012 E: enquiries@giaomini.o.uk W: www.giaomini.o.uk PAGE: 1 PAGE 2 GE552Y159 This ommuniation has an indiative value. Giaomini U.K Ltd reserves

More information

FEMA RECOMMENDATIONS FOR PROTECTION OF CURTAINED LIMITED FINISHING WORKSTATIONS USING UL 1254 LISTED PRE-ENGINEERED DRY CHEMICAL SYSTEMS

FEMA RECOMMENDATIONS FOR PROTECTION OF CURTAINED LIMITED FINISHING WORKSTATIONS USING UL 1254 LISTED PRE-ENGINEERED DRY CHEMICAL SYSTEMS FEMA RECOMMENDATIONS FOR PROTECTION OF CURTAINED LIMITED FINISHING WORKSTATIONS USING UL 1254 LISTED PRE-ENGINEERED DRY CHEMICAL SYSTEMS FEMA RECOMMENDATIONS ARE BASED UPON LIVE FIRE TESTING OF PREP STATIONS

More information

The Effect of Microwave Treatment on Ryegrass and Wild Radish Plants and Seeds

The Effect of Microwave Treatment on Ryegrass and Wild Radish Plants and Seeds 16 Gloal Journal of Agriultural Innovation, Researh & Development, 015,, 16-4 The Effet of Mirowave Treatment on Ryegrass and Wild Radish Plants and Seeds Graham Brodie * and Eloise Hollins Melourne Shool

More information

Published in: Assessing and Controlling Community Noise with Low Frequency Components

Published in: Assessing and Controlling Community Noise with Low Frequency Components Aalborg Universitet On the use of A-weighted levels to desribe low frequeny noise Møller, Henrik Published in: Assessing and Controlling Community Noise with Low Frequeny Components Publiation date: 1996

More information

TECHNICAL TRADE-OFFS USING FIXED FIRE FIGHTING SYSTEMS

TECHNICAL TRADE-OFFS USING FIXED FIRE FIGHTING SYSTEMS - 12 - TECHNICAL TRADE-OFFS USING FIXED FIRE FIGHTING SYSTEMS H. Ingason and Y.Z. Li, SP Technical Research Institute of Sweden ABSTRACT The increasing use of fixed fire-fighting system (FFFS) in tunnels

More information

CJ:{?;_. City of Richmond. Report to Committee \ -

CJ:{?;_. City of Richmond. Report to Committee \ - City of Rihmond Report to Committee To: From: Re: Community Safety Committee Tim Wilkinson - Fire Chief Sarah Morris - Risk Manager Fire Underwriters Survey Grade Report Date: February 14, 218 File: 99-Fire

More information

JOB THERMO BULBS PRODUCT RANGE

JOB THERMO BULBS PRODUCT RANGE JOB THERMO BULBS PRODUCT RANGE Eduard J. Job Founder Bodo Müller General Manager Jürgen Teschner Director Sales & Application HISTORY Sprinkler-History Since their introduction in the mid-1970 s JOB THERMO

More information

ASHRAE JOURNAL ON REHEAT

ASHRAE JOURNAL ON REHEAT Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide

More information

4th International Conference on Sensors, Measurement and Intelligent Materials (ICSMIM 2015)

4th International Conference on Sensors, Measurement and Intelligent Materials (ICSMIM 2015) 4th International Conference on Sensors, Measurement and Intelligent Materials (ICSMIM 2015) Multi-stage Series Heat Pump Drying System with Dehumidification Simulation and Experiment Verification Chao

More information

Assessing Energy Efficiency of Compression Heat Pumps in Drying Processes when Zeotropic Hydrocarbon Mixtures are Used as Working Agents

Assessing Energy Efficiency of Compression Heat Pumps in Drying Processes when Zeotropic Hydrocarbon Mixtures are Used as Working Agents MATEC Web of Conferenes 73 DOI: 10.1051/ ateonf/20167302015 Assessing Energy Effiieny of Copression Heat Pups in Drying Proesses when Zeotropi Hydroarbon Mixtures are Used as Working Agents Alexander Shurayts

More information

TECHNICAL DATA OBSOLETE

TECHNICAL DATA OBSOLETE November 2, 2007 Sprinkler 113a 1. DESCRIPTION The Viking Standard Response High Challenge Upright Large-Drop Sprinkler VK540 is a thermosensitive, glass-bulb sprinkler intended for use in protecting high

More information

STUDY REPORT SR 292 (2013) B-RISK 2013 Software Benchmarking Examples. C.A. Wade

STUDY REPORT SR 292 (2013) B-RISK 2013 Software Benchmarking Examples. C.A. Wade STUDY REPORT SR 292 (213) B-RISK 213 Software Benchmarking Examples C.A. Wade The work reported here was funded by BRANZ from the Building Research Levy. BRANZ 213 ISSN: 1179-6197 Preface This report presents

More information

MODEL :MANUAL ALARM CONTROL PANEL

MODEL :MANUAL ALARM CONTROL PANEL MODEL :MANUAL ALARM CONTROL PANEL ERTL TESTED AS PER IS:2189 NATIONAL SECURITY DEVICES Se urity Devies OFFICE : 485/14, SARPANCH KA BARA, MANDAWALI FAZALPUR, DELHI-110092 WORKS : 2-A, Patparganj, Mayur

More information

MACH CI. (Condensing-Indirect) Water Heating

MACH CI. (Condensing-Indirect) Water Heating Republished June 21st, 2017 MACH CI (Condensing-Indirect) Water Heating Abstract: Limited pressure vessel life expectancy due to scale-up and high pressure vessel replacement costs mean that owners of

More information

2016 CAROLINA NORTH ANNUAL REPORT

2016 CAROLINA NORTH ANNUAL REPORT 2016 CAROLINA NORTH ANNUAL REPORT REPORTING PERIOD: JULY 1, 2015-JUNE 30, 2016 Prepared by UNC-CH Failities Planning & Design 8/30/2016 I. 2015-2016 Ativities to Report A. Housing Units onstruted: None.

More information

Model JL-14 (SIN RA1812) K14.0 (200 metric) Early Suppression Fast Response Sprinkler

Model JL-14 (SIN RA1812) K14.0 (200 metric) Early Suppression Fast Response Sprinkler Bulletin 018 Rev. H Model JL-14 (SIN RA1812) K14.0 (200 metric) Early Suppression Fast Response Sprinkler Bulletin 018 Rev. H Product Description The Reliable Model JL-14 Early Suppression Fast Response

More information

An Analysis of Compartment Fire and Induced Smoke Movement in Adjacent Corridor

An Analysis of Compartment Fire and Induced Smoke Movement in Adjacent Corridor 2C-1 6th Asia-Oceania Symposium on Fire Science and Technology 17-20, March, 2004, Daegu, Korea An Analysis of Compartment Fire and Induced Smoke Movement in Adjacent Corridor Soo-Young Kim *, Eung-Sik

More information

Lesson 25 Analysis Of Complete Vapour Compression Refrigeration Systems

Lesson 25 Analysis Of Complete Vapour Compression Refrigeration Systems Lesson 25 Analysis Of Complete Vapour Compression Refrigeration Systems Version 1 ME, IIT Kharagpur 1 The specific objectives of this lecture are to: 1. Importance of complete vapour compression refrigeration

More information

TECHNICAL DATA OBSOLETE. * Refer the Approval Chart on page 121c and Design Criteria on page 121d for FM approval requirements that must be followed.

TECHNICAL DATA OBSOLETE. * Refer the Approval Chart on page 121c and Design Criteria on page 121d for FM approval requirements that must be followed. Sprinkler 121a 1. DESCRIPTION Viking Early Suppression Fast Response (ESFR) Upright Sprinkler VK520 is a fast response fusible element type sprinkler designed for early fire suppression. With a 14.0 (202

More information

How design fires can be used in fire hazard analysis

How design fires can be used in fire hazard analysis How design fires can be used in fire hazard analysis Yung, D.T.; Bénichou, N. NRCC-44511 A version of this document is published in / Une version de ce document se trouve dans : Fire Technology, v. 38,

More information

PREDICTING GASEOUS AIR CLEANER PERFORMANCE IN THE FIELD

PREDICTING GASEOUS AIR CLEANER PERFORMANCE IN THE FIELD PREDITING GASEOUS AIR LEANER PERFORMANE IN THE FIELD Howard-Reed *, SJ Nabinger, SJ Emmerich Building and Fire Research Laboratory, National Institute of Standards and Technology, 100 Bureau Dr., MS 8633,

More information

K These short instructions do not replace the IMPRESSA Z7 Instructions. IMPRESSA Z7 Quick Reference Guide

K These short instructions do not replace the IMPRESSA Z7 Instructions. IMPRESSA Z7 Quick Reference Guide IMPRSSA 7 Quik Referene Guide K These short instrutions do not replae the IMPRSSA 7 Instrutions for Use. Make sure you read and observe the safety information and warnings first in order to avoid hazards.

More information

ESFR PENDENT SPRINKLER VK500 (K14.0) TECHNICAL DATA

ESFR PENDENT SPRINKLER VK500 (K14.0) TECHNICAL DATA Page 1 of 6 1. DESCRIPTION Viking Early Suppression Fast Response (ESFR) Pendent Sprinkler VK500 is a fast response fusible element type sprinkler designed for early fire suppression. With a 14.0 (202

More information

Evaluation of Protection for Plastic Containers Using Sprinkler Systems with 1.0% AFFF and Plain Water

Evaluation of Protection for Plastic Containers Using Sprinkler Systems with 1.0% AFFF and Plain Water Evaluation of Protection for Plastic Containers Using Sprinkler Systems with 1.0% AFFF and Plain Water BENNIE G. VINCENT* FM Global, Norwood, MA 02062-9102, USA ABSTRACT: Four large-scale fire tests were

More information

5B-3 6th Asia-Oceania Symposium on Fire Science and Technology 17-20, March, 2004, Daegu, Korea

5B-3 6th Asia-Oceania Symposium on Fire Science and Technology 17-20, March, 2004, Daegu, Korea 5B-3 6th Asia-Oceania Symposium on Fire Science and Technology 17-20, March, 2004, Daegu, Korea PRACTICAL APPLICATIONS OF FIRE MODELING IN INDUSTRIAL APPLICATIONS By James M. Dewey, Advisor Risk Management