1 4 th International Conference A BRIDGE TO THE CAVE THE NEW MARINIČ BRIDGE IN THE ŠKOCJAN CAVES PARK IN SLOVENIA Rok MLAKAR Structural Engineer Ponting d.o.o. (Ltd.) Maribor, Slovenia rok.mlakar@ponting.si Viktor MARKELJ Design Manager Ponting d.o.o. (Ltd.), University of Maribor Maribor, Slovenia viktor.markelj@ponting.si Summary The paper presents reconstruction of the new Marinič Bridge in the Škocjan Caves Park in Slovenia. The bridge, together with belonging footpaths and other cave infrastructure, was rebuilt in 2010 on initiative of the Public Service Agency Škocjan Caves Park to expand their tourist activity and enable visits to the eastern parts of the caves, which has been closed to the public since 1965, when much of the existing cave infrastructure was destroyed by devastating floods. The new Marinič Bridge is designed as curved, lightweight, rock anchored and transparent steel structure. The footbridge is almost 30 m long and overcomes a height difference of 4.50 m between both end supports. Structural design and shape of the new bridge answer to all conditions given by the distinctive natural karst environment. With its curvature, towards the cave entrance, the bridge avoids falling debris and unstable support conditions, and with its lightness preserves the fragile, natural, UNESCO protective ambience. Due to inaccessibility of the bridge location, high environmental terms and exact and strict national legislations, the construction of the bridge demanded a great deal of engineering know-how, patience and inventiveness of all project participants the result of all efforts is a unique, well engineered, transparent and extraordinary pedestrian bridge. Keywords: footbridge; reconstruction; structural concepts; sensitive natural environment; sophisticated design approach; difficult boundary and construction conditions; steel structure; aesthetic. 1. Introduction The new Marinič Bridge, named after one of the earliest cave explorer Joseph Marinitsch, is situated in the heart of Škocjan Caves Park in Slovenia. The bridge, originally built as Bridge Concordia (1891), then rebuilt as Bertarelli Bridge (between wars), connects the footpath at the edge of the Mala dolina Gorge and entrance to the Mariničeva jama Cave, underneath, over 100 m deep, impressive, vertical rock wall of the distinctive Škocjan karst depression. The new bridge replaced the existing bridge of two steel I-sections and wooden deck, warren down, feared unstable supported and partially heavily damaged by falling icicles and rocks from vertical, over 100 m deep, rock wall above the cave entrance. Due to bad shape of the existing bridge, given environment conditions and Owners ambitions, the best and almost only choice was to give up the old bridge and build a completely new one for the future. In this aspect the Owner engaged the Engineer to design and build a new, lightweight, transparent and attractive footbridge which would fulfil its basic function of assuring a safe passage over the wild Reka River Gorge, fit into the sensitive natural cave environment, offer the visitor a closer, intensive, exciting almost adventurous cave experience and all in all give the whole Škocjan Caves Park a new, additional value and become one of the high points of the renewed eastern cave tour the new Marinič Bridge is all that. 479

2 Footbridges and Environment The Engineer faced a difficult, challenging yet very interesting and pleasant task, since bridge design had to meet Owners high expectations and at the same time fulfil harsh geological and hydrological site conditions, answer all durability terms and meet all extensive and strict law regulations, high environmental terms and exact national legislations in forced for this very sensitive and highly protected natural environment, protected also as the UNESCO World Heritage all these within budget of app EUR. Fig. 1 Existing, damaged and unsuitable bridge (- 2010) Fig. 2 Finished new Marinič footbridge (October 2010) 480

3 4 th International Conference Fig. 3 Škocjan Caves system with marked Marinič Bridge location 2. Bridge Design 2.1 Design Approach Due to pretentious natural boundary conditions (natural irregular cave formations) and difficult site access, a new sophisticated design approach was chosen, using 3d-SCAN for detailed geodetic site definition which then was used to create a real digital space model as basis for the actual bridge design, for the Engineer. From the digital 3d-Model a plaster model of the location, using 3d-Print technology, was produced and used for principal structure design considerations, which then, over several debates, resulted in a original shape and structural scheme of the new Marinič Bridge. The design was then presented and with great deal of enthusiasm accepted by the Owner. Fig. 4 Site 3d-SCAN 3d Solid-model 3d Mesh-model of the site 481

4 Footbridges and Environment Fig. 5 Plaster-model and principal design idea 2.2 Structural Concept and Design The new Marinič Bridge is designed as curved, lightweight, rock anchored and transparent steel structure. The footbridge is almost 30 m long, with clear span over the gorge of m, and overcomes a height difference of 4.50 m between both end supports. Fig. 6 3D computer model of the bridge 482

5 th 4 International Conference m long, main steel structure of the bridge has a curve-shaped geometry, consisting of straight and radius R = 4.00 m sections, tangential connected into a S-shaped structure, assuring adequate deviations from all natural obstacles and withdrawing the footpath towards the cave entrance, avoiding falling debris and icicles. The S-shape of the structure also adds a great deal of rigidness to the otherwise very slender bridge structure and gives the bridge it s unique and distinctive character. In longitudinal view, the main bearing structure of the bridge lies in a constant inclination of 15.5%, while the bridge deck is designed as a stair-landing system uniformly distributed over the whole length of the bridge, enabling the pedestrians a smooth and pleasant walk. The main bearing structure is a steel tube 457.1/20 mm, consisting of three separate manufactured sections, connected over round steel plates and pre-stressed bolts. In layout the structure is divided into 12 sections between cross beams positioned 2.25 m apart. The cross-beams are T-shaped steel sections of varying depths, manufactured of mm thick plates, directly welded onto the main tube, supporting the bridge deck. The cross-beams are longitudinally connected via 400/10 mm steel band, which increases the overall bridge rigidity, supports the bridge deck lattice and serves as outer fascia beam, concluding the smooth curved bridge geometry. Bridge bearing structure is made of structural steel S 355, while bridge deck, railings and other equipment are manufactured of prefabricated stainless steel elements. Fig. 7 Bridge longitudinal section and layout 483

6 Footbridges and Environment End supports of the bridge are designed as small concrete-stone abutments, integrated into the natural rock wall and cave footpath scarps which are also being reconstructed. On the north side the abutment forms also a small belvedere plateau, overlooking the Mala dolina Gorge, raising the footpath above reoccurring floods level which continuously threatened and damaged the existing cave infrastructure especially in this area. The bridge main bearing structure is rigidly fixed into the reinforced and rock-anchored concrete abutments base slabs at both end supports. Beside both end-supports, fixed into the ground rock, the bridge is additionally supported by two elastic M 28 tie bars in the bridge span, allowing the lightweight and transparent bridge appearance and assuring overall bridge stability. The tie bars are hinge-connected to the bridge over specially designed and strengthened cross beams and hinge-anchored into the south cave wall by two permanent, pre-stressed, 13.0 m deep, ground anchors, following the tie bar geometry into the firm rock wall. The bridge deck stair-landing system is designed as lightweight, custom tailed, 33 mm deep stainless steel lattice, mounted to the longitudinal fascia steel sheets and equipped with anti sliding stripes, enabling safe and easy way for the pedestrian. The bridge deck consists of ten characteristic deck section of two stairs B/H = 33/15 cm and a 159 cm long landing, which originate from the designed bridge end supports height difference and general architectural design criteria. Fig. 8 Bridge characteristic cross-sections The bridge railings consist of vertical railing columns, longitudinal handle and outer framed net cover. The railings are architecturally designed, full of common yet fine stainless steel details in shape of authentic wrought iron Škocjan fence, one of the characteristic and protected historical trademarks of the Škocjan Caves Region, stretching along most of the cave footpaths. The safety and pedestrian s welfare are additionally guaranteed by 1.10 m 1.38 m high, framed, fine net cover, reaching beneath the main bridge structure, giving the bridge an extra aesthetic value and character, accenting its curved shape. 484

7 th 4 International Conference Fig. 9 Rock anchorage and tie bar details 3. Construction Construction of the bridge is an engineering story of its own. The bridge site lies over 100 m beneath vertical walls of the Škocjan Karst depression and is accessible only by foot along a narrow footpath, therefore the construction demanded a lot of engineering know-how, patience and inventiveness. 3.1 Steel Structure Fig. 10 Steel structure assembly and test-mounting Almost 10 tons heavy welded steel structure was manufactured in a workshop and consists of three separate sections weighting up to 3.5 t each. The structure was also completely checked for structure and weld failure and test-mounted in the workshop. After test completion and geometry conformation, the structure was dissembled again for corrosion protection implementation, under strict controlled conditions, and transport to the construction site. 485

8 Footbridges and Environment 3.2 Construction Site The most efficient way to reach the bridge location was to lend the whole steel structure from a small plateau, over a vertical overhang of the karst depression into the over 100 m deep abyss to the cave entrance. The steel structure was transported to the plateau in the middle of the Matavun Village, reached only by a steep and narrow local road that had to be widened and a bit adjusted a few times to enable the transport vehicle to pass and deliver the steel structure to the site. The structure was then mounted together just over the bridge location and placed into its final position, 107 m beneath the plateau, using a mobile crane. Fig. 11 Construction site of the New Marinič Bridge 486

9 th 4 International Conference Other works footpath reconstruction, old bridge demolition, bridge abutments and rock bearing construction, were carried out entirely prior to steel structure assembly, using existing footpaths to reach the bridge location and a smaller, fixed crane for the vertical material transport. Extremely demanding preliminary anchoring works in the south rock wall have been performed by professional climbers. The whole bridge construction and lending of the new steel structure was carried out without any problems and delay, according to the exact construction scheme, prepared by Contractor and bridge Designer. The new bridge assembly was very important to the Owner and the locals and was accompanied and documented by the local and national media. Fig. 12 Raging waters of the Reka River during construction 4. Materials and Bridge Basics 4.1 Materials bridge main bearing structure: S 355 J2 corrosion protection coating min. 250 m in silver metal colour tie bars: S 460 (Macalloy), stainless steel version anchorages: stainless steel anchors: CATI-ZRMK tipa RCP/D permanent pre-stressed geotechnical anchors bridge deck and railings: stainless steel (inox) concrete abutments: C 25/30 XD1, XF1 BSt 500 S (B) steel reinforcement 487

10 Footbridges and Environment 4.2 Bridge Basics length / span: 30.0 m / 27.0 m height difference: 4.50 m width / clear width: 1.50 m / 1.25 m railings height: min 1.10 m 1.38 m deck area: 45 m 2 structure weight: cca kg overall cost: EUR 5. Conclusion A unique, well engineered and extraordinary new Marinič Footbridge blends engineering know-how, inventiveness; patience and efforts of all project participants and meets all of the Owners expectations and requests as well. Fig. 13 New Marinič Bridge 488

National Register of Historic Places Continuation Sheet

National Register of Historic Places Continuation Sheet NPS Form 10-900-a (Rev. 8/2002) OMB No. 1024-0018 (Expires 5-31-2012) United States Department of the Interior National Park Service National Register of Historic Places Continuation Sheet Bridge No. 5721

More information

6 BRIDGES. 6.1 Design philosophy. Proposed bridges

6 BRIDGES. 6.1 Design philosophy. Proposed bridges SECTION 6 BRIDGES 6 BRIDGES Throughout the Project, bridges are a key visual element and marker for road users, pedestrians and cyclists. The design of bridges, as with other visible structures, has been

More information

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017 GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017 Glen Road Pedestrian Bridge Class Environmental Assessment 1 WELCOME! Welcome to the second Public

More information

Corridor Enhancements

Corridor Enhancements Corridor Enhancements Safety is MoDOT s first priority in widening and rebuilding I-70 across the state of Missouri. MoDOT also understands that the interstate - and its interchanges and overpasses - are

More information

UNUSUALLY SHAPED ARCH BRIDGES

UNUSUALLY SHAPED ARCH BRIDGES UNUSUALLY SHAPED ARCH BRIDGES Jan Biliszczuk *, Wojciech Barcik +, Jerzy Onysyk # & Robert Toczkiewicz * Prof., Civ. Eng., Wrocław University of Technology, Research & Design Office MOSTY-WROCŁAW, Wrocław,

More information

Footbridge 2005 Second International Conference

Footbridge 2005 Second International Conference CONCEPTUAL DESIGN OF THE NEW COIMBRA FOOTBRIDGE António ADÃO DA FONSECA Structural Engineer and Chairman of AFAssociados Consultores de Engenharia Professor at Faculty of Engineering - University of Porto,

More information

Design of Takimi Footbridge locating the world heritage Shiraito Falls

Design of Takimi Footbridge locating the world heritage Shiraito Falls IABSE Symposium Report, IABSE Conference Nara, 2015: Elegance in Structures, pp. 1-6(6) ISBN 978-3-85748-138-3 Design of Takimi Footbridge locating the world heritage Shiraito Falls Daisaku ISHIHARA Civil

More information

Final Design Meeting. September 25, Creating Bridges As Art. Welcome & Introductions. Terry Ward - Project Manager

Final Design Meeting. September 25, Creating Bridges As Art. Welcome & Introductions. Terry Ward - Project Manager Final Design Meeting September 25, 2014 Creating Bridges As Art 1 Welcome & Introductions Terry Ward - Project Manager 2 VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting

More information

Project Name: Pembroke College Footbridge

Project Name: Pembroke College Footbridge Project Name: Pembroke College Footbridge Categories: Structural Heritage Award Pedestrian Bridges Commercial or Retail Education or Healthcare Community or Residential Arts or Entertainment Sports or

More information

A detailed Access Guide to The Iron Bridge & Tollhouse

A detailed Access Guide to The Iron Bridge & Tollhouse A detailed Access Guide to The Iron Bridge & Tollhouse This Guide contains an overview of Access for: Visitors with physical and sensory disabilities Assistance Dogs are welcome at all Museum sites. www.ironbridge.org.uk

More information

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee Ninth Meeting Date: 5 October 2005 Time: 3:30pm Venue: Conference Room 15/F, North Point Government Offices, 333 Java Road, North

More information

Visitor's Guide to Historic Bridge Park

Visitor's Guide to Historic Bridge Park Visitor's Guide to Historic Bridge Park Located in Calhoun County, Michigan, southeast of Battle Creek, the park is open year-round from 8:00 AM to 8:00 PM. Entry to the park is free of charge. Guide produced

More information

I-70 Corridor Enhancement Plan

I-70 Corridor Enhancement Plan i - Table of Contents Table of Contents Chapter I Overview Chapter II Bridge and Roadway Improvements Chapter III Landscape Enhancements Chapter IV Riparian Corridors Chapter V Showcase Missouri Plan Chapter

More information

Need for better accessibility on Karl Johans gate (street) Project Levende Oslo (Oslo Alive)

Need for better accessibility on Karl Johans gate (street) Project Levende Oslo (Oslo Alive) Need for better accessibility on Karl Johans gate (street) Project Levende Oslo (Oslo Alive) Map of the city centre of Oslo, Karl Johans gate marked. International Conference on Universal Design (UD 2014)

More information

g) "Minor repair" means repairs dealing primarily with nonstructural portions of the fence, as well as appearance.

g) Minor repair means repairs dealing primarily with nonstructural portions of the fence, as well as appearance. 6.2.4 FENCES, WALLS AND SCREENS: To protect the use and enjoyment of residential property by providing for the passage of air and light; to protect public welfare and safety by providing for the safe movement

More information

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN Introduction: Rejuvenating an extraordinary Creekside neighborhood THE CREEKSIDE DISTRICT The Ivywild On The Creek Neighborhood District Master

More information

The Talk on 6 October 2010 was by Malcolm Tucker, on Movable Bridges in London's Docks.

The Talk on 6 October 2010 was by Malcolm Tucker, on Movable Bridges in London's Docks. The Talk on 6 October 2010 was by Malcolm Tucker, on Movable Bridges in London's Docks. Edward Sargent introduced Malcolm Tucker, who, as well as being our present Treasurer, has been a member of the group

More information

ARCHITECTURAL GUIDELINES

ARCHITECTURAL GUIDELINES ARCHITECTURAL GUIDELINES 1. Introduction. The development of Raithby Vines adjacent to the village of Raithby has the overall goal of integrating the new residential units into the existing village, while

More information

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London Chapter 27 Route Window SE7 Church Manorway Bridge Transport for London CHURCH MANORWAY BRIDGE 27 Route Window SE7 Church Manorway bridge Introduction 27.1 The North Kent Line will be converted to four

More information

Concrete bridges design assessments and its relationship with the surrounding space

Concrete bridges design assessments and its relationship with the surrounding space Concrete bridges design assessments and its relationship with the surrounding space Abstract: Assist. Prof. Dr. Akram Farouk Ain Shams University Faculty of Engineering Department of Architecture Cairo,

More information

presents a new range By Proludic Play value naturally

presents a new range By Proludic Play value naturally presents a new range By Proludic Play value naturally Proludic introduces a new range created by our design team and manufactured in our own production facilities. The Origin range comprises of a series

More information

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,

More information

Victoria Street Pedestrian Bridge

Victoria Street Pedestrian Bridge Township of Centre Wellington Victoria Street Pedestrian Bridge Class Environmental Assessment County of Wellington & Township of Centre Wellington Badley Bridge Replacement/Rehabilitation (County of Wellington),

More information

Nelson Residential Street Frontage Guideline

Nelson Residential Street Frontage Guideline DRAFT 22-06-2012 Nelson Residential Street Frontage Guideline June 2012 1317273 Contents and purpose Residential s are important Residential s are much more than corridors which move traffic. Streets allow

More information

C i t y o f C l e v e l a n d H e i g h t s

C i t y o f C l e v e l a n d H e i g h t s FENCE REGULATIONS FENCE PERMIT APPLICATION C i t y o f C l e v e l a n d H e i g h t s The information in this document is current as of August 2, 2017. Fence permit requirement A fence permit is required

More information

Community Sensitive Design: (Context Sensitive Design)

Community Sensitive Design: (Context Sensitive Design) What is? Community Sensitive Design: (Context Sensitive Design) The process by which urban design, land-use planning and aesthetic enhancements are applied to a project to make it an integral part of the

More information

DESIGN OF FOOTBRIDGES

DESIGN OF FOOTBRIDGES Civil Engineering Technical Requirement CIVIL-SR-006 DESIGN OF FOOTBRIDGES Revision: 9 Updated: 26/08/2015 Queensland Rail 2015 Reproduction by any means (including electronic, mechanical, photocopying,

More information

Important Forces. Distance Range. Design Features. Suspension Bridge. Truss Bridge. Beam Bridge. Bridge Type. Arch Bridge

Important Forces. Distance Range. Design Features. Suspension Bridge. Truss Bridge. Beam Bridge. Bridge Type. Arch Bridge Bridge Type Beam Bridge Truss Bridge Arch Bridge Suspension Bridge Design Features Distance Range Important Forces Last name: First name: Date: Period: BRIDGES INTRO Welcome to Craggy Rock! COM INC COM*

More information

Steel arches for small and medium span bridges

Steel arches for small and medium span bridges Steel arches for small and medium span bridges E. Siviero University IUAV of Venice - dca - Department of Architectural Construction, Venice, Italy ABSTRACT: On the following pages will be presented some

More information

SUMMARY OF PILOT PROJECT IMPLEMENTATION PHASE

SUMMARY OF PILOT PROJECT IMPLEMENTATION PHASE SUMMARY OF PILOT PROJECT IMPLEMENTATION PHASE Project /Title: Forest Park Renewal activity 4.2.2 Site (region/city or town): at street Raisova in Brno Nový Lískovec, city district of Brno city, Czech republic

More information

Bridge Type Assessment and Evaluation

Bridge Type Assessment and Evaluation 16M-01410-01 (3216026) Glen Road Pedestrian Bridge EA Study Bridge Type Assessment and Evaluation Factor Group/Criteria Alternative 1: Steel girder with two inclined steel legs Alternative 2: Steel girder

More information

Uttarakhand Tech. University, Dehradun Faculty of Architecture

Uttarakhand Tech. University, Dehradun Faculty of Architecture AR 801 ARCHITECTURAL DESIGN VIII 1-10 11 100 100 50 250 3x6 Hours Understanding design as a function of specific agenda of complex services. acoustics, building byelaws and structure. To understand design

More information

Overview Report. Proposed Development

Overview Report. Proposed Development Overview Report Proposed Development the construction of a 1km cycle/pedestrian trail including a new footbridge, new car park and entrance road at Drumshanbo Lock and a new pedestrian/cycle road crossing,

More information

Creating an integrated waterfront. Recommendations

Creating an integrated waterfront. Recommendations Creating an integrated waterfront Recommendations Railway Square Post Office + Shell Station Post Office Square Civic Square Ilot Green Wakefield St Wakefield St (Tory Cars) Wakefield St (New World Supermarket)

More information

Amendment 2008 EN 1176 and EN 1177

Amendment 2008 EN 1176 and EN 1177 Training presentation Amendment 2008 EN 1176 and EN 1177 Version 1.0 SCOPE 2 new parts: 1176-10 - Fully enclosed play equipment 1176-11 - Spatial network Surface requirements only in 1176; in 1177 - only

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS CR -2016/298 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 28 October 2016 (v2, 25 November 2016)

More information

Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation Love Locks Concept Plan

Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation Love Locks Concept Plan Date: June 30, 2015 TO: FROM: SUBJECT: Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation Love Locks Concept Plan RECOMMENDATION A. THAT the Vancouver Park Board

More information

Extension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar

Extension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar Task Force on Harbourfront Developments on Hong Kong Island For discussion on 31 July 2012 TFHK/10/2012 Extension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar PURPOSE This

More information

Section 4 - Public Realm & Landscape proposals Landscape Masterplan. Section 4 52

Section 4 - Public Realm & Landscape proposals Landscape Masterplan. Section 4 52 - Public Realm & Landscape proposals Landscape Masterplan 52 Proposed Masterplan - Green Infrastructure Strategy District Park 4.33 Ha to provide Passive and active recreation with a large play area which

More information

Victoria Bridge Municipal Class EA Civic Works Committee

Victoria Bridge Municipal Class EA Civic Works Committee Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction

More information

The Effect of Pedestrian Traffic on the Dynamic Behavior of Footbridges M. Studničková

The Effect of Pedestrian Traffic on the Dynamic Behavior of Footbridges M. Studničková The Effect of Pedestrian Traffic on the Dynamic Behavior of Footbridges M. Studničková The dynamic response of a footbridge depends namely on the natural frequencies of the structure in vertical, in horizontal

More information

SEWER PUMP STATION FALL PREVENTION SYSTEM. Jarrah Feather. East Gippsland Water

SEWER PUMP STATION FALL PREVENTION SYSTEM. Jarrah Feather. East Gippsland Water SEWER PUMP STATION FALL PREVENTION SYSTEM Paper Presented by : Jarrah Feather Author: Jarrah Feather, Water & Wastewater Operator, East Gippsland Water 68 th Annual Water Industry Engineers and Operators

More information

Bridge Mechanics By Lydia Lukidis

Bridge Mechanics By Lydia Lukidis Bridges are built over obstacles like roads, rivers, or railroad tracks. They allow people or vehicles to cross from one side to another. Without them, we would have a hard time moving aroun Bridges existed

More information

Option A FINAL AESTHETIC SIGNATURE BRIDGE PROPOSAL. SR 836/I-395/I-95 Project

Option A FINAL AESTHETIC SIGNATURE BRIDGE PROPOSAL. SR 836/I-395/I-95 Project ELECTRONIC COPY AESTHETIC VOLUME 2 2.28.17 APPROVED SIGNATURE BRIDGE PACKAGE, APTES, AND SIGNATURE BRIDGE RELATED ATCS SR 836/I-395/I-95 Project Florida Department of Transportation District 6 & Miami-Dade

More information

PEDRO GÓMEZ DEL BOSQUE PEDESTRIAN FOOTBRIDGE OVER THE RIVER PISUERGA IN VALLADOLID. SPAIN

PEDRO GÓMEZ DEL BOSQUE PEDESTRIAN FOOTBRIDGE OVER THE RIVER PISUERGA IN VALLADOLID. SPAIN PEDRO GÓMEZ DEL BOSQUE PEDESTRIAN FOOTBRIDGE OVER THE RIVER PISUERGA IN VALLADOLID. SPAIN TYPE OF STRUCTURE: SUSPENSION BRIDGE LOCATION: VALLADOLID. SPAIN. 41.628313,-4.745431 COMPLETED ON: 2009 TEAM:

More information

PRINCE GEORGE LIBRARY NEW ENTRANCE REPORT Patricia Boulevard Prince George, BC V2L 3V9

PRINCE GEORGE LIBRARY NEW ENTRANCE REPORT Patricia Boulevard Prince George, BC V2L 3V9 #230 177 Victoria Street P rince George, BC V2L 5R8 Tel. (250) 564-7285 F ax. (250) 564-7286 1100 Patricia Boulevard Prince George, BC V2L 3V9 PRINCE GEORGE LIBRARY NEW ENTRANCE REPORT CITY OF PRINCE GEORGE

More information

Form-finding study of Taizhou Bridge A 3-pylon suspension bridge

Form-finding study of Taizhou Bridge A 3-pylon suspension bridge 28 September 2 October 2009, Universidad Politecnica de Valencia, Spain Alberto DOMINGO and Carlos LAZARO (eds.) Form-finding study of Taizhou Bridge A 3-pylon suspension bridge Airong CHEN, Xiaoyu LUO

More information

Visual and Aesthetic Resources

Visual and Aesthetic Resources Visual and Aesthetic Resources 7.1 INTRODUCTION This chapter evaluates the effects of the Modified Design on visual and aesthetic resources, in comparison to the effects of 2004 FEIS Design. The 2004 FEIS

More information

Fiber SenSys. Fiber Optic Perimeter Detection Systems. Substation Physical Security Best Practices Baltimore 2017

Fiber SenSys. Fiber Optic Perimeter Detection Systems. Substation Physical Security Best Practices Baltimore 2017 Fiber SenSys Fiber Optic Perimeter Detection Systems Substation Physical Security Best Practices Baltimore 2017 Detection Sensor Deployment Options for Various Substation Barrier Systems Rod Hurley North

More information

section five BEAUTIFICATION PLAN

section five BEAUTIFICATION PLAN section five BEAUTIFICATION PLAN BEAUTIFICATION PLAN Section Five Beautification Plan The goal of the Beautification Plan is to improve the Route 8-Sunnyland Corridor in terms of aesthetics and to create

More information

Mississauga Waterfront. Parks Strategy - Draft

Mississauga Waterfront. Parks Strategy - Draft Potential configuration for river s edge seating. Boating on Credit River: A regatta Boating on Credit River: Active enjoyment 5.2 Port Credit Memorial Park West Priority Park 5.2.1 Site Opportunities

More information

A PART OF THE GENERATIVE CODE

A PART OF THE GENERATIVE CODE A PART OF THE GENERATIVE CODE The process starts with operations that fix positions, shapes and sizes of the main house volumes, the verandas, the secondary house volumes, and the gardens. Houses in Santa

More information

Nu Skin Innovation Center. Location: Provo, Utah Lot Size: 435,600 GSF Building Size: 168,000 GSF Project Type: Commercial LEED Gold Certified

Nu Skin Innovation Center. Location: Provo, Utah Lot Size: 435,600 GSF Building Size: 168,000 GSF Project Type: Commercial LEED Gold Certified Nu Skin Innovation Center Location: Provo, Utah Lot Size: 435,600 GSF Building Size: 168,000 GSF Project Type: Commercial LEED Gold Certified The Nu Skin Innovation Center transforms Nu Skin Enterprises

More information

Column headings match the SEQ descriptions Both ends of guardrail accounted for All notes accounted for and make sense SP/funding splits shown

Column headings match the SEQ descriptions Both ends of guardrail accounted for All notes accounted for and make sense SP/funding splits shown GUARDRAIL GUARDRAIL - TABS Column headings match the SEQ descriptions Both ends of guardrail accounted for All notes accounted for and make sense SP/funding splits shown TRAFFIC BARRIER REMOVE SALVAGE

More information

PEDESTRIAN ROUTE. Fig 202. Route to entrance of building

PEDESTRIAN ROUTE. Fig 202. Route to entrance of building PEDESTRIAN ROUTE The prospect of a pedestrian entrance directly from the north, from the public transport node, was also considered. However, it was decided that this configuration was too conventional

More information

ST. ANDREWS HISTORIC NEIGHBORHOOD OVERLAY DESIGN STANDARDS

ST. ANDREWS HISTORIC NEIGHBORHOOD OVERLAY DESIGN STANDARDS ST. ANDREWS HISTORIC NEIGHBORHOOD OVERLAY DESIGN STANDARDS The following recommended list of development criteria are presented for consideration in guiding residential development in the St. Andrews historic

More information

MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION

MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION Common Name: Fort Snelling-Mendota Bridge Bridge Number: 4190 Identification Number: Location: Feature Carried:

More information

at Mesa Verde Displayed with permission The American Surveyor March Copyright 2008 Cheves Media

at Mesa Verde Displayed with permission The American Surveyor March Copyright 2008 Cheves Media at Mesa Verde Using Lasers to Help Save History >> By Elizabeth Lee hen the CyArk team was asked to fly to Mesa Verde National Park for an on-location shoot for PBS s WIRED Science, they brought the scanner

More information

Queensborough Eastern Neighbourhood Node. Community Open House

Queensborough Eastern Neighbourhood Node. Community Open House Queensborough Eastern Community Open House The Vision The Queensborough Eastern will become the heart of eastern Queensborough. Through a sensitive mix of viable commercial and residential areas, the neighbourhood

More information

Village of Kenilworth: Site Development Regulations

Village of Kenilworth: Site Development Regulations Village of Kenilworth: Site Development Regulations WHITE PAPER ON STEEP SLOPES Prepared by Teska Associates, Inc. JANUARY 12, 2016 GENERAL OUTLINE Introduction The Slope of Land Defining Steep Slopes

More information

historic name: STARR MILL ROAD BRIDGE other name/site number: Beverly Heights Bridge. Bridge No. 4541

historic name: STARR MILL ROAD BRIDGE other name/site number: Beverly Heights Bridge. Bridge No. 4541 NFS Form 10-900 < (Rev. 8-86)! REGISTRATION FORM RECEIVED OCT 2 8 1993 NATIONAL REGISTER *! 0 2 4 0 0 1 8 =============================================$======================= === 1. Name of Property '

More information

GEOMEMBRANE FIELD INSTALLATION

GEOMEMBRANE FIELD INSTALLATION GEOMEMBRANE FIELD INSTALLATION CONTENTS Introduction Quality Control and Quality Assurance Types of lining systems Basic Lining Design Executive Lining Design Basic Lining Design Specification Executive

More information

NOVA PRO drawer system

NOVA PRO drawer system NOVA PRO drawer system The complete drawer system sets standards in modern furniture-making. www.grass.eu NOVA PRO Drawer System Nova Pro the original A classic solution as a source of inspiration for

More information

Public Meeting #3 May 9, 2009 MVVA Team

Public Meeting #3 May 9, 2009 MVVA Team Public Meeting #3 May 9, 2009 MVVA Team Welcome to the third Public Meeting for the Lower Don Lands Municipal Class Environmental Assessment (EA) Infrastructure Master Plan and Keating Channel Precinct

More information

Municipal Heritage Bridges Cultural, Heritage and Archaeological Resources Assessment Checklist Revised April 11, 2014

Municipal Heritage Bridges Cultural, Heritage and Archaeological Resources Assessment Checklist Revised April 11, 2014 Municipal Heritage Bridges Cultural, Heritage and Archaeological Assessment Checklist Revised April 11, 2014 This checklist was prepared in March 2013 by the Municipal Engineers Association to assist with

More information

Branch Capital Projects Feasibility Study

Branch Capital Projects Feasibility Study Mission Branch Library Chinatown Him Mark Lai Branch Ocean View Branch Library 1 Outline: Feasibility Study Guiding Principles Potential Concepts Preliminary Budget Findings Recommendations Next Steps

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

Purpose of Open House #3

Purpose of Open House #3 Public Meeting #3 May 9, 2009 MVVA Team Purpose of Open House #3 The main purpose of this Open House is to present and seek input on the: Evaluation of transportation and infrastructure design alternatives

More information

ELK GROVE TOWN CENTER DESIGN GUIDELINES

ELK GROVE TOWN CENTER DESIGN GUIDELINES ......... ELK GROVE TOWN CENTER DESIGN GUIDELINES LAGUNA RIDGE SPECIFIC PLAN... June 2008 ............ DESIGN GUIDELINES Table of Contents Contents Section A: Town Center Overview...1 A.1. Purpose and

More information

REVIEW GUIDELINES FOR THE DONATION OF PUBLIC ART

REVIEW GUIDELINES FOR THE DONATION OF PUBLIC ART REVIEW GUIDELINES FOR THE DONATION OF PUBLIC ART OR MEMORIALS This document outlines the process for the review of proposed donations of public art or memorials to be sited in Vancouver parks. Many conditions

More information

APPENDIX K WINDSOR OFFICIAL PLAN

APPENDIX K WINDSOR OFFICIAL PLAN CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX K WINDSOR OFFICIAL PLAN Avalon Consulting Professionals of Ontario,

More information

This image is an illustration of a similar scale scheme on a different site by Stitch

This image is an illustration of a similar scale scheme on a different site by Stitch Stitch design approach Site 74 - MALTON HOUS This image is an illustration of a similar scale scheme on a different site by Stitch Stitch has been appointed as architect for six sites across the northern

More information

CITY OF EDMONTON FIRST PLACE PROGRAM

CITY OF EDMONTON FIRST PLACE PROGRAM CITY OF EDMONTON FIRST PLACE PROGRAM Kirkness (3015 151 Ave NW) Consultation Meeting #2 June 23, 2015 Clareview Community Rec Centre (Rm MP #2) 3804 139 Ave NW AGENDA 1. Opening comments. 2. Firm Up Site

More information

PLACE WORKSHOP REPORT. A+DS SNH sustainable placemaking programme

PLACE WORKSHOP REPORT. A+DS SNH sustainable placemaking programme PLACE briefing WORKSHOP REPORT A+DS SNH sustainable placemaking programme INTRODUCTION This report summarises the outcome of a Scottish Natural Heritage workshop on placemaking which was held on Wednesday

More information

JINCHENG PLAZA TRANSPORT HUB IN CHENGDU

JINCHENG PLAZA TRANSPORT HUB IN CHENGDU JINCHENG PLAZA TRANSPORT HUB IN CHENGDU CHINA 2018 JINCHENG PLAZA TRANSPORT HUB IN CHENGDU AREP communication Presse Contact: Dominique du Jonchay - +33 6 16 17 11 14 - dduj@ipconseil.com Communication

More information

Pedestrian Project Award Institute of Transportation Engineers

Pedestrian Project Award Institute of Transportation Engineers Pedestrian Project Award Institute of Transportation Engineers Rideau Canal Pedestrian Crossing Planning and Environmental Assessment Report The Setting The Rideau Canal and its adjacent pathways are highly

More information

ACCESS TO THE HISTORICAL AND NATURAL HERITAGE IN JAPAN. HIDETO KIJIMA Japan Accessible Tourism Center / Osaka, Japan

ACCESS TO THE HISTORICAL AND NATURAL HERITAGE IN JAPAN. HIDETO KIJIMA Japan Accessible Tourism Center / Osaka, Japan ACCESS TO THE HISTORICAL AND NATURAL HERITAGE IN JAPAN HIDETO KIJIMA Japan Accessible Tourism Center / Osaka, Japan mail@japan-accessible.com SUMMARY Today the concerning about accessible tourism in Japan

More information

Visualisations of reimagined Italian Garden & Rose Garden. Italian & Rose Gardens

Visualisations of reimagined Italian Garden & Rose Garden. Italian & Rose Gardens Visualisations of reimagined Italian Garden & Rose Garden Italian & Rose Gardens High quality heritage restoration toprotct & enhance these jewels of South Cliff Gardens New stone flag footpaths Restoration

More information

Modern. Brewing Production. Restoration Project. Old Saint Paul s Church Edinburgh

Modern. Brewing Production. Restoration Project. Old Saint Paul s Church Edinburgh Restoration Project Modern Old Saint Paul s Church Edinburgh Brewing Production TABLE OF CONTENTS: Chapter 1 Introduction...1 The Restoration Mission...2 Disabled Access Problems...3 Chapter 2 The Solution...5

More information

Effect of Foundation Embedment of PWR Structures in SSI Analysis considering Spatial Incoherence of Ground Motions

Effect of Foundation Embedment of PWR Structures in SSI Analysis considering Spatial Incoherence of Ground Motions The th World Conference on Earthquake Engineering October -7,, Beijing, China Effect of Foundation Embedment of PWR Structures in SSI Analysis considering Spatial of Ground Motions Joo-Hyung Kang and Sang-Hoon

More information

5.7.6 St Peters Interchange Portal

5.7.6 St Peters Interchange Portal 5.7.6 St Peters Interchange Portal Design intent At St Peters interchange the design approach to the tunnel portals differs from that adopted for the western portals at Kingsgrove. An entirely different

More information

Design of Movable Bridges - selected examples

Design of Movable Bridges - selected examples Design of Movable Bridges - selected examples Adriaan Kok Designer, Project Manager ipv Delft Delft, The Netherlands adriaankok@ipvdelft.nl Niels Degenkamp Designer, Project Manager ipv Delft Delft, The

More information

ROAD AND CAR PARK DESIGN GUIDELINES

ROAD AND CAR PARK DESIGN GUIDELINES 3.2 ROAD AND CAR PARK DESIGN GUIDELINES PIHA AREA DESIGN GUIDELINES AUCKLAND REGIONAL COUNCIL 37 Existing Road and Car Park Photos: North Piha carpark Anawhata carpark Winstone Track carpark off Piha Road

More information

DESIGN GUIDELINES FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY AND SAMPLE DRAWINGS

DESIGN GUIDELINES FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY AND SAMPLE DRAWINGS DESIGN GUIDELINES FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY AND SAMPLE DRAWINGS For additional information: Phone: 3-1-1 (outside Vancouver, 604-873-7000) E-mail: street.activities@vancouver.ca or Visit

More information

Paving - 8 easy steps for DIY and professional landscapers

Paving - 8 easy steps for DIY and professional landscapers Pavers Victoria Paving - 8 easy steps for DIY and professional landscapers 18 Before you begin... These general instructions will allow an average home handyperson to design, plan and construct a path,

More information

RA1.01. Project Description:

RA1.01. Project Description: Project Description: Designed around a philosophy of "healthy building for healthy bodies," the University s recreation center inspires personal health and wellness. As the University s campus continues

More information

Project Purpose. Project Need

Project Purpose. Project Need Project Purpose The purpose of the project is to implement a bridge improvement solution that corrects the existing safety problem at the Strasburg Pike Bridge. The project will provide a structurally

More information

Design Review Report Llanfoist to Abergavenny Footbridge DCFW Ref: 118 Meeting of 10th August 2016

Design Review Report Llanfoist to Abergavenny Footbridge DCFW Ref: 118 Meeting of 10th August 2016 Design Review Report Llanfoist to Abergavenny Footbridge DCFW Ref: 118 Meeting of 10 th August 2016 Declarations of Interest Panel members, observers and other relevant parties are required to declare

More information

Welcome to the Public Consultation Exhibition

Welcome to the Public Consultation Exhibition Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised

More information

MA4-URB2, June 2010 Anne Lærke Jørgensen & Stine Sonne PROCESS CLIMATE DESIGN WORKING WITH VULNERABLE DESIGN URBANITIES IN MOZAMBIQUE

MA4-URB2, June 2010 Anne Lærke Jørgensen & Stine Sonne PROCESS CLIMATE DESIGN WORKING WITH VULNERABLE DESIGN URBANITIES IN MOZAMBIQUE MA4-URB2, June 2010 Anne Lærke Jørgensen & Stine Sonne DESIGN PROCESS CLIMATE WORKING WITH VULNERABLE DESIGN URBANITIES IN MOZAMBIQUE Introduction This book is a sum up of the process we have been through

More information

Ashburton Railway Footbridge

Ashburton Railway Footbridge Heritage Item 13 Ashburton Railway Footbridge Location Address: 549 East Street, Ashburton Co-ordinates: Northing 5700023, Easting 2409830 Legal Description: Pt Reserve 953 Owner: KiwiRail Purpose Current

More information

Tufts Buildable Bridge Segmental Box Beam Bridge Construction Manual

Tufts Buildable Bridge Segmental Box Beam Bridge Construction Manual Tufts Buildable Bridge Segmental Box Beam Bridge Construction Manual Professor Brian Brenner, PE Tufts University Medford, MA 02155 Kevin Walsh Ishmael Alleyne Mark Pinkos Jason Karp History of Segmental

More information

Poole Park Furniture Strategy February Design Stage C. Prepared by the Borough of Poole. First issue. Doc.no. PPL-SW-03

Poole Park Furniture Strategy February Design Stage C. Prepared by the Borough of Poole. First issue. Doc.no. PPL-SW-03 Poole Park Furniture Strategy February 2017 Prepared by the Borough of Poole Design Stage C Doc.no. PPL-SW-03 First issue Prepared by the Borough of Poole, Environmental Services Team Address: Environmental

More information

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement (blank page) WestConnex New M5 5-42 (blank page) WestConnex New M5 5-44 5.5 Tunnels 5.5.1 Main alignment tunnels The main alignment tunnels would be about nine kilometres long, with the western tunnel

More information

CALL TO ARTISTS: REQUEST FOR QUALIFICATIONS

CALL TO ARTISTS: REQUEST FOR QUALIFICATIONS CALL TO ARTISTS: REQUEST FOR QUALIFICATIONS CALL TO ARTISTS: REQUEST FOR QUALIFICATIONS Public Artwork for Haymarket Plaza: Eau Claire, WI Proposals due: October 29th, 2018 Summary / Description of Haymarket

More information

BRIDGE REHABILITATION ANALYSIS AND FEASIBILITY REPORT

BRIDGE REHABILITATION ANALYSIS AND FEASIBILITY REPORT BRIDGE REHABILITATION ANALYSIS AND FEASIBILITY REPORT SR 0016-037 Main Street Bridge Project Memorial Bridge over the West Branch of Little Antietam Creek in Waynesboro Borough and Washington Township

More information

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3 Table of Contents Programmatic Section 4(f) Evaluation for use of a Historic Bridge Replacement of Route 30/130 Bridge over the Cooper River Structure No. 0405-153 City of Camden, Borough of Collingswood,

More information

New Auburn Village Center Study Auburn, Maine

New Auburn Village Center Study Auburn, Maine Auburn, Maine Option Review Summary Prepared for: Androscoggin Transportation Resource Center and City of Auburn Prepared by: T.Y. Lin International MRLD October 10, 2013 1. Introduction This memo summarizes

More information

Section Three, Appendix 16C Medium Density Housing, Design Assessment Criteria (Residential 8A zone)

Section Three, Appendix 16C Medium Density Housing, Design Assessment Criteria (Residential 8A zone) APPENDIX 16C MEDIUM DENSITY HOUSING, DESIGN ASSESSMENT CRITERIA (RESIDENTIAL 8A ZONE) PURPOSE OF APPENDIX 16C (RESIDENTIAL 8A ZONE) In the Residential 8A Zone the following are defined as restricted discretionary

More information

Supporting our communities. Bridges

Supporting our communities. Bridges Supporting our communities Bridges 1,000+ We ve partnered with thousands of owners/clients to inspect, analyze, design, and manage their bridges, providing lasting community connections. We design bridges

More information