NORTH BAY PARRY SOUND HEALTH
|
|
- Russell Oliver
- 6 years ago
- Views:
Transcription
1 NORTH BAY PARRY SOUND HEALTH LEGEND: (ARCHITECTURAL) DA-01 X-RAY APPROVAL PLAN DA-02 DETAILS DA-03 AIR TECHNIQUES AS30 AIR COMPRESSOR D AIR TECHNIQUES VS50H VACUUM UNIT
2 11'-3" [3.43] EXAM.1 EXAM.2 9'-7" [2.93] EXAM.3 9'-7" [2.93] 6'-8" [2.03] 9'-7" [2.93] 9'-7" [2.93] 10'-0" [3.05] 10'-2" [3.1] 10'-2" [3.1] 10'-2" [3.1] 6'-8" [2.03] THE FACILITY MUST BE CONSTRUCTED IN ACCORDANCE WITH THE INFORMATION PROVIDED WITH THE PLAN APPROVAL SUBMISSION. ANY CHANGES IN THE SUBMITTED PLANS OR INFORMATION PROVIDED REQURIES RESUBMISSION FOR APPROVAL THE OWNER OR RADIATION PROTECTION OFFICER OF ALL NEWLY INSTALLED EQUIPMENT MUST, WITHIN 60 DAYS OF INSTALLATION SUBMIT ACCEPTANCE TEST RESULTS TO THE MINISTRY OF HEALTH X-RAY INSPECTION ALL X-RAY FACILITIES IN ONTARIO ARE REQUIRED TO CONFIRM TO THE HEALING ARTS RADIATION PROTECTION ACT DURING INSTALLATION AND OPERATION EXAM.4 6'-8" [2.03] 14'-2" [4.33] PAN 7'-6" [2.28] 1'-8" [.51] 4'-11" [1.51] DIRECTION OF TRAVEL FOR X-RAY TUBE 7'-6" [2.28] DIRECTION OF TRAVEL FOR IMAGE RECEPTOR 0 2' 4' 8' SCALE: 1/4" = 1'-0"
3 CONFIRM LOCATIONS & WIRING WITH FSC CONFIRM LOCATIONS & WIRING WITH FSC
4
5
6 NORTH BAY PARRY SOUND HEALTH LEGEND: (MECHANICAL) DE-01 ELECTRICAL PLAN DM-01 PLUMBING PLAN - AIR & VACUUM LINES DM-02 PLUMBING PLAN - HOT/COLD & DRAIN LINES
7 ELECTRICAL SPECIFICATIONS: ELECTRICAL SCHEDULE: 1. ALL ELECTRICAL MUST CONFORM TO ONTARIO BUILDING CODES AND BASE BUILDING STANDARDS. DUPLEX RECEPTACLE, 115V, 15AMP STANDARD DUPLEX RECEPTACLE 12" AFF OR AS NOTED (APPROXIMATELY 6 PER CIRCUIT) 2. PROVIDE WATERPROOFING / FIRE PROOF SEALANT FOR ALL SERVICES PENETRATING FLOOR. SINGLE CIRCUIT, DUPLEX RECEPTACLE SINGLE CIRCUIT 115V, 15AMP 12" AFF OR AS NOTED. NOTE: 1. CONFIRM THE FOLLOWING WITH THE SALES REP.: - LOCATIONS AND HEIGHTS OF ALL ELECTRICAL OUTLETS AND NETWORK CABLE JACKS 2. GENERAL CONTRACTOR TO OUTFIT ALL NON- SPACE WITH ELECTRICAL TO CONFORM WITH LOCAL BY-LAWS AND ONTARIO BUILDING CODE 3. PLEASE NOTE LEAD LINING WITHIN PARTITION WALLS. LEAD LINING REQUIRED AS PER THE MINISTRY OF HEALTH INSPECTION SERVICE. REFER TO APPROVED 'A-03 X-RAY RADIATION PLAN' TO FOLLOW. 4. PLUMBER AND ELECTRICIAN TO BE ON-SITE DURING INSTALLATION OF ALL EQUIPMENT FOR FINAL CONNECTIONS. 5. ALL NETWORK CABLES TO BE CAT 6 EXAM.1 D5 D2 3. ALL WALL COVER PLATES ARE TO BE WHITE PLASTIC, UNLESS OTHERWISE AGREED UPON WITH CLIENT. WHERE TWO OR MORE OUTLETS OR SWITCHES OCCUR IN ONE LOCATION, A GANG SHALL BE USED. 4. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR THE FINAL CONNECTION OF ALL EQUIPMENT AT TIME OF INSTALLATION. THE ELECTRICAL CONTRACTOR SHALL COORDINATE ALL CONNECTIONS WITH HENRY SCHEIN CANADA INC. INSTALLATION SUPERVISOR AND SALES REP. 5. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE TO PRE-INSPACT THE SITE TO DETERMINE THE AVAILABILITY AND ELECTRICAL SUPPLY REQUIRED TO COMPLETE THIS PROJECT. 6. THE ELECTRICAL/GENERAL CONTRACTOR SHALL DETERMINE THE LOCATION AND INSTALL ALL EMERGENCY EXIT LIGHTS AND EMERGENCY LIGHT FIXTURES AS REQUIRED BY LOCAL CODES. 7. THE ELECTRICAL CONTRACTOR IS TO COORDINATE WITH PLUMBER FOR ELECTRICAL SUPPLY TO HOT WATER HEATER AND COLD WATER ELECTRIC SOLENOID. PROVIDE 110V COLD WATER ELEC. SOLENOID SHUTOFF VALVE. HOSPITAL GRADE GFCI GROUND FAULT DUPLEX RECEPTACLE, NEMA 5-15R, 2P, 3W, 125VAC, 15AMP 12" AFF. OR AS NOTED. (APPROXIMATELY 6 PER CIRCUIT) GROUND FAULT INSULATED DUPLEX RECEPTACLE, 115V, 15AMP 12" AFF OR AS NOTED. CEILING MOUNTED DUPLEX RECEPTACLE FOR T.V. MONITORS, GANGED W/ KNOCK-OUT BOX FOR TV CABLE CEILING PLATE. DUPLEX RECEPTACLE ABOVE FINISHED CEILING WITHIN 6" OF CEILING MOUNTED LIGHT LOCATION. HOSPITAL GRADE GFCI GROUND FAULT, NEMA 5-15R, 2P, 3W, 125VAC, 15AMP. FLOOR MOUNTED QUAD RECEPTACLE THROUGH FLOOR, FREE HANGING BY BX CABLE. HOSPITAL GRADE GFCI GROUND FAULT, NEMA 5-15R, 2P, 3W, 125VAC, 15AMP. 115V, 20AMP SINGLE CIRCUIT, HARDWIRED TO EQUIPMENT. DUPLEX RECEPTACLE. 220V SINGLE CIRCUIT 12" AFF OR AS NOTED. 220V, 20AMP 3 WIRE PLUS GROUND SINGLE CIRCUIT CONNECTED TO STEP UP TRANSFORMER 7500 VA, HARDWIRED TO EQUIPMENT. EXAM.2 D2 D5 COMMUNICATIONS OUTLET, VOICE LINE SINGLE JACK 12" AFF OR AS NOTED. COMMUNICATIONS OUTLET, CAT 6 DATA LINE SINGLE JACK 12" AFF OR AS NOTED. COMMUNICATIONS OUTLET, VOICE AND CAT 6 DATA DOUBLE JACK 12" AFF OR AS NOTED. ENGINEERING DRAWINGS BY OTHERS TO FOLLOW HENRY SCHEIN DRAWINGS, NOT OMITTING ANY ELECTRICAL OUTLETS SHOWN FOR ANY EQUIPMENT PROVIDED BY HENRY SCHEIN D2 INTRA ORAL CAMERA OUTLET, CONTRACTOR TO PROVIDE 3/4" CONDUIT FROM CEILING TO KNOCK-OUT BOX W/ COVER PLATE, 44" AFF OR AS NOTED (WIRE SUPPLIED BY OTHERS). MASTER ON-OFF SWITCHES, 52"AFF. WITH RED INDICATOR LIGHTS TO COMPRESSOR, VACUUM AND MAIN WATER SOLENOID. COORDINATE WITH PLUMBER FOR LOCATION OF SOLENOID. 2" CONDUIT REMOTE EXPOSURE SWITCH FOR X-RAY, 52"AFF. PROVIDE CONDUIT WITH 4 STRAND WIRE TO X-RAY CONTROL BOX. SEE X-RAY SPECIFICATIONS. ELECTRICAL CONTRACTOR TO SUPPLY AND INSTALL ALL LOW VOLTAGE WIRING REQUIRED FOR COMPRESSOR, SUCTION UNIT AND MASTER WATER SHUTOFF SWITCHES AND FOR MEDICAL GASES ALARM SYSTEM EXAM.3 X-RAY CONTROL BOX, 52"AFF. OR AS NOTED. PROVIDE 115V POWER TO BE HARDWIRED TO X-RAY CONTROL BOX, SEE X-RAY SPECIFICATIONS. X-RAY. SEE X-RAY DETAILS AND SPECIFICATIONS (CONSULT TECHNICIAN). 2" DIA. EMPTY CONDUIT WITH PULL WIRE IN WALL FROM 4" X 4" BOX UP 12 1/2" A.F.F. UP TO CEILING SPACE. D2 VERIFY LOCATION OF CPU WITH HENRY SHEIN CANADA INC. SALES REP. AUTOMATIC DOOR OPENER PUSH BUTTON EXAM.4 HEATER DIRECT CONNECTION SINGLE CIRCUIT TWO TONE CHIME, MOUNTED 84" A.F.F. XRAY MONITOR/ WORKSTATION DOOR TRIPPER CONNECTED TO CHIME HAND WASH STATION EYE WASH STATION Steri.
8 PLUMBING SPECIFICATIONS: PLUMBING SCHEDULE: 1. GENERAL CONTRACTOR TO LOCATE AND TIE IN ALL PLUMBING SERVICES. 4'-10" 2. SALES REP. TO SPOT LOCATION OF SERVICES IN OPERATORIES. 3. ALL HOT AND COLD WATER LINES TO BE INSULATED. 4. PLUMBER AND ELECTRICIAN TO BE ON-SITE DURING INSTALLATION OF ALL EQUIPMENT FOR FINAL CONNECTIONS. 3'-7" EXAM.1 EXAM.2 EXAM.3 4'-10" EXAM.4 HAND WASH STATION GENERAL CONTRACTOR TO LOCATE AND TIE IN ALL PLUMBING SERVICES.
9 PLUMBING SPECIFICATIONS: PLUMBING SCHEDULE: 1. GENERAL CONTRACTOR TO LOCATE AND TIE IN ALL PLUMBING SERVICES. 4'-10" 2. SALES REP. TO SPOT LOCATION OF SERVICES IN OPERATORIES. 3. ALL HOT AND COLD WATER LINES TO BE INSULATED. 4. PLUMBER AND ELECTRICIAN TO BE ON-SITE DURING INSTALLATION OF ALL EQUIPMENT FOR FINAL CONNECTIONS. 3'-7" EXAM.1 EXAM.2 EXAM.3 4'-10" EXAM.4
Spring Test 6 due 04/26/2013
Spring Test 6 due 04/26/2013 Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. The article that covers TV wiring installations in residences
More informationManifold Installation Controller MIC-180. Installation and Operation Instructions
Manifold Installation Controller MIC-180 Installation and Operation Instructions For Use With Rheem-Ruud and Paloma Commercial Tankless Water Heaters Table of Contents Safety Information... 1-2 Manifold
More informationPRE-INSTALLATION GUIDE
Dry Vacuum System Part Numbers V15, 2V15, 3V15 and 4V15 PRE-INSTALLATION GUIDE All pumps comply with NFPA 99C level 3 reuirements. All installations must conform to local codes. System being installed:
More informationModule number 8 provides an on-line, self-paced training seminar on portions of Chapter 14-Fuel Gas, Chapter 25-Ohio Plumbing Code; Chapter 29-Fire
Module number 8 provides an on-line, self-paced training seminar on portions of Chapter 14-Fuel Gas, Chapter 25-Ohio Plumbing Code; Chapter 29-Fire Suppression Systems; and Chapter 34-National Electric
More informationSOUTHVIEW MEDICAL CENTER
PROJECT TITLE: SOUTHVIEW MEDICAL CENTER ENTRANCE VESTIBULE 1997 Miamisburg Centerville Rd. Dayton, Ohio DRAWING INDEX: STRUCTURAL ARCHITECTURAL JUNE 26, 2014 Bulletin #1 - September 12, 2014 AREA OF WORK
More informationFOUNTAINS UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS APRIL 30,
13 12 00 FOUNTAINS A. Due to water conservation efforts and the high maintenance requirements of fountains, new interior and / or exterior fountains are not allowed. B. If a variance is granted for a fountain,
More informationSF180 Installation Instructions
SF180 Installation Instructions 1 Fan Installation & Operating Instructions Please Read and Save These Instructions. DO NOT CONNECT POWER SUPPLY UNTIL FAN IS COMPLETELY INSTALLED. MAKE SURE ELECTRICAL
More informationSECTION ISOLATED POWER SYSTEMS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to
More informationLeviton Combination Switch And Tamper Resistant Outlet Wiring Diagram
Leviton Combination Switch And Tamper Resistant Outlet Wiring Diagram Leviton SmartLockPro 15 Amp Tamper-Resistant Combination GFCI Duplex Outlet and Switch - White-R02-X7299-00W - The Home Depot. From
More informationPort of Portland Conveying Equipment Guidelines
Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate
More informationU N I V E R S I T Y O F HOUSTON
U N I V E R S I T Y O F HOUSTON Facilities Management Planned and Emergency Utility Outage Policy Presentation Agenda Purpose What do we want to do? Summary of Planned Outage Procedure Summary of Project
More informationClassic Twelve O clock Cabinet Installation Instructions
Classic Twelve O clock Cabinet Installation Instructions CF36 CF42 THIS MANUAL IS FOR AUTHORIZED AND QUALIFIED INSTALLATION PERSONEL ONLY! Table of Contents General Information... 3 CF36 Cabinet Overview...
More informationFIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT
More informationAn Owner s Guide to Maintaining a Mobile / Manufactured Home August 2010
An Owner s Guide to Maintaining a Mobile / Manufactured Home August 2010 Putnam County Planning & Development Services Building & Zoning Division Compliance Section PO Box 1486 Palatka, FL 32178 1486 Office
More informationA. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.
DIVISION 26 ELECTRICAL SECTION 26 27 26 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. B. Specialty switches and outlets
More informationPRE-INSTALLATION GUIDE
Dry Vacuum System Part Numbers V3, V5, V7, 2V3, 2V3CT, 2V5, 2V5CT, 2V7, 3V5 and 4V5 PRE-INSTALLATION GUIDE All pumps comply with NFPA 99C level 3 requirements. All installations must conform to local codes.
More informationDansereau Dental. P r e - C o n s t r u c t i o n G u i d e
P r e - C o n s t r u c t i o n G u i d e 2 0 1 4 A m e r i c a s D e n t a l E q u i p m e n t C o m p a n y Dansereau Dental (800) 423-5657 / WWW.DHPDENTAL.COM M a n u fa c t u r e d i n U S A f o r
More informationTREATMENT ROOM DATA SHEETS
WET ROOM: SINGLE SUITE WITH SHOWER & TUB Total Room Area including Shower & Tub: 15.3 m² / 165 ft² A. Basics Room includes a therapeutic hydro tub, a treatment table and shower. Three feet of space [914mm]
More informationPre-Delivery Orientation (PDO)
Pre-Delivery Orientation (PDO) At your PDO we will review in-suite systems and explain how they operate. The industry standard name for this meeting is Pre-Delivery Inspection, or PDI. With Minto, this
More information2017 UPDATE AUDIO/ VIDEO &SMART HOME PREWIRE. QUICK GUIDE A reference for low voltage wiring.
2017 UPDATE AUDIO/ VIDEO &SMART HOME PREWIRE QUICK GUIDE A reference for low voltage wiring. INTRODUCTION Thanks for downloading our Prewire Quick Guide. We created it to be a helpful resource for our
More informationI.C. Thomasson Associates, Inc. CONSULTING ENGINEERS 2950 KRAFT DRIVE, SUITE 500 NASHVILLE, TN. 37204 PHONE (615) 346-3400 FAX (615) 346-3550 www.icthomasson.com ICT PROJECT # 170647 HODGSON DOUGLAS landscape
More informationMEDIA CENTER September 30, 2010
MEDIA CENTER September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as
More informationInstallation S19-324D1. Class I, Division 1, Groups C & D Explosion Proof. Emergency Signaling System
Installation S19-324D1 Class I, Division 1, Groups C & D Explosion Proof Emergency Signaling System Table of Contents Pre-Installation Information... 2-3 ssembly of Components...4 Install the Flow Switch
More informationDENTAL VACUUM SYSTEM Part Numbers: VS2O, VS40, VS50, VS50H, VS80 and VS80H RECOMMEND DAILY USE OF MONARCH CLEANSTREAM USER S MANUAL
DENTAL VACUUM SYSTEM Part Numbers: VS2O, VS40, VS50, VS50H, VS80 and VS80H RECOMMEND DAILY USE OF MONARCH CLEANSTREAM USER S MANUAL TABLE OF CONTENTS SECTION PAGE Congratulations.... 3 Purpose of this
More informationInstallation & Operations Manual
Installation & Operations Manual Emergency Call Box 2100-986DA 2100-986DAI Made in the USA 2 Year Warranty N56W24720 N. Corporate Circle Sussex, WI 53089 800-451-1460 www.rathcommunications.com RP85000986DA
More informationPRE-INSTALLATION GUIDE for MODELS
DENTAL VACUUM SYSTEMS PRE-INSTALLATION GUIDE for MODELS VS20NEO & VS40NEO Check VacStar NEO Model Being Installed: VS20NEO VS40NEO Model VS20NEO Model VS40NEO Doctor: Address: Phone#: Dealer: Dealer Address:
More informationPRE-INSTALLATION GUIDE for MODELS
DENTAL VACUUM SYSTEMS PRE-INSTALLATION GUIDE for MODELS VS50NEO & VS80NEO Check VacStar NEO Model Being Installed: VS50NEO VS80NEO Doctor: Address: Phone#: Dealer: Dealer Address: PRODUCT SPECIFICATIONS
More informationHydroMassage Electrical / Installation Preparation Requirements
HydroMassage Electrical / Installation Preparation Requirements Electrical Requirements Series 340 / 350 Models (*Important- the items below are required for EACH HydroMassage unit). Requires a single-phase,
More informationSECTION 7 ~ PATHOLOGY GROSSING STATIONS
SECTION 7 ~ PATHOLOGY GROSSING STATIONS SECTION INDEX GROSSING STATIONS... PAGE Elevating Pathology Station... 2-3 Countertop Pathology Station... 4-5 Pathology Work Station... 6-7 Pathology Station Bases...8
More informationCode verification sign-off
Code verification sign-off Following is a list of the most common manufactured home code non-compliant items found in used or altered manufactured homes. These are only the most commonly found items and
More informationRP, GP, XP Pro Series Installation Instructions
RP, GP, XP Pro Series Installation Instructions IN095 Rev B 0718 3 Saber Way, Ward Hill, MA 01835 radonaway.com 1 Fan Installation & Operating Instructions RP, GP, XP Series Fans Please Read and Save These
More informationFIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,
More informationFirst Aspen Federal Regulation Set: K LSC 2000 Health Existing
First Aspen Federal Regulation Set: K 01.01 LSC 2000 Health Existing K 0000 Title CFR Type INITIAL COMMENTS Memo K 0011 If the building has a common wall with a nonconforming building, the common wall
More informationBay Wide Commercial and Home Inspection Thackeray Avenue/ Mail address Hayward, Calif TH AVENUE SAN LEANDRO, CALIFORNIA
27966 Thackeray Avenue/ Mail address Hayward, Calif. 94544 2011 150TH AVENUE SAN LEANDRO, CALIFORNIA 21:12 August 07, 2015 Page 1 of 11 Table of Contents Definitions 2 General Information 2 Lots and Grounds
More informationDaily Office Cleaning
Daily Office Cleaning Procedure Cards If you have any questions, comments or need to reorder this set of cards, please call -800-558-2332. Getting Started Verify your equipment, supplies and cleaning products
More informationMODEL DOWNDRAFT NECROPSY WORKSTATION 9-02 NECROPSY DISSECTION TABLES
Model 1036-210 Downdraft Table is a ventilated workstation for animal necropsies. The unit pulls air and odors down and away from the user when performing medical procedures. STANDARD DESIGN FEATURES Type
More informationTHE BEAUTY OF WATER THE SCIENCE OF RENEWAL. Heating Circulation System. Installation Instruction Manual
THE BEAUTY OF WATER HOT BATHE Heating Circulation System Installation Instruction Manual For use by Tub Manufacturers or Qualified Service Personnel ONLY. NuWhirl Systems Corp www.nuwhirl.com 95-87-5600
More informationTREATMENT ROOM DATA SHEETS
DELUXE MULTI PURPOSE ROOM Total Room Area including Shower: 13.94 m² / 150 ft² Basics Deluxe Multi-purpose treatment rooms are set up to allow for the maximum variety of treatments - massage, body treatments
More informationTREATMENT ROOM DATA SHEETS
MULTI PURPOSE ROOM Total Room Area: 12.3 m² / 132 ft² Basics Multi-purpose treatment rooms are set up to allow for the maximum variety of treatments - massage, simple body treatments or aesthetics. Each
More informationSECTION COMMERCIAL-KITCHEN HOODS
SECTION 23 38 13 COMMERCIAL-KITCHEN HOODS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Delete other items or paragraphs in the section that are not applicable and renumber
More informationSTERI-VAC CENTRAL SUCTION SYSTEM
STERI-VAC CENTRAL SUCTION SYSTEM INSTALLATION MANUAL This is a general installation manual for Steri-Vac Central Suction Systems. For detailed information see specific technical sheet. These are high-volume
More informationSECTION (15530) - REFRIGERANT PIPING
SECTION 23 23 00 (15530) - REFRIGERANT PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Tubes. 2. Fittings. 3. Joining Materials. 4. Specialties. B. Related Sections: 1. Section 07 92 00 (07920)
More informationIntroduction Limited-Use / Limited-Application
NBL DEC 2015 V1 Introduction Niagara Belco Ltd has been in the elevating industry for 30 years, we take pride in our work and aim to please all of our customers. We appreciate your business and always
More informationCLASSIC. SIDE CABINET Installation Instructions
CLASSIC SIDE CABINET Installation Instructions THIS MANUAL IS FOR AUTHORIZED AND QUALIFIED INSTALLATION PERSONAL ONLY! Table of Contents General Information...3 CCS Overview...4 CCS Cabinet Dimensions...5
More informationAttendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes
MEMORANDUM To: From: Attendees/Absentees Derek Gallagher DG Date: June 14, 2016 Comm. No: 152235 Subject: Independent School District #879 Delano Secondary School Additions and Renovations June 6, 2016
More informationL04 X01 X03 X01 R21A R21A F09 L27 R18 R16A R18 R21A KING 107 F09 F09 L27 D03A Z-38 KING 109 R21A R18 R16A R18 R21A F09 F09 X03 L27 F09 R21A R18 R18
REFERENCE NOTES A. SEE 0 SERIES DRAWINGS FOR CEILING & LIGHTING IN GUESTROOMS. B. SEE 00 SERIES DRAWINGS FOR CEILING & LIGHTING INFORMATION & DETAILS IN PUBLIC SPACE. C. PROVIDE EMERGENCY LIGHTING AND
More informationFAIR LABOR ASSOCIATION INDEPENDENT EXTERNAL MONITORING REPORT
[Type text] 2010 FAIR LABOR ASSOCIATION INDEPENDENT EXTERNAL MONITORING REPORT COMPANY: Jostens, Inc. COUNTRY: United States FACTORY CODE: 2200821138I MONITOR: Accordia Global Compliance Group AUDIT DATE:
More informationAutomatic Temperature Controls, Energy Management Systems and Metering
Design Standards Automatic Temperature Controls Energy Management Systems and Metering Automatic Temperature Controls Provide a temperature control/energy management system and control function for the
More informationMounting Plate ADA/HOSPITAL SIGNALING DEVICES 14-8 FEATURES. > Momentary switch push button > Stainless steel faceplate
Mounting Plate 147-10 > Momentary switch push button > Stainless steel faceplate The Edwards Cat. No. 147-10 Mounting Plate when used with the catalog series 620 Push Buttons (page 10-9) forms a convenient
More informationTAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE
TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE The University of Arizona has implemented a Keyless Access and Security System program to provide a cost effective, efficient, and maintainable means
More informationFIGURE 1 OUTAGAMIE COUNTY LANDFILL PROJECT LOCATION EAST LANDFILL LANDFILL OFFICE AND SCALE WEST LANDFILL EXISTING MRF COUNTY ROAD OO EXISTING FLARE
EAST LANDFILL LANDFILL OFFICE AND SCALE WEST LANDFILL HOLLAND ROAD EXISTING MRF COUNTY ROAD OO PROJECT LOCATION EXISTING FLARE EXISTING COMPRESSOR BUILDING FIGURE 1 PROJECT LOCATION 15 0 JANUARY, 2015
More informationHMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3
HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California 95833 September 15, 2016 Woodland Joint Unified School District Spring Lake Area Elementary School HMC No. 3535003.000 DSA Appl.
More informationBulletin An application for inspection not required Rule 2-005
Bulletin 2-3-16 An application for inspection not required Rule 2-005 Scope Issued May 2016 Supersedes Bulletin 2-3-15 (1) Rule 2-005 - An application for inspection not required (Basic exemption) (a)
More informationCHROMOPHARE D650, D660, D530, & D540 PREINSTALLATION MANUAL
CHROMOPHARE D650, D660, D530, & D540 PREINSTALLATION MANUAL Pre-Install Manual: 700000006 Related Publications: 700000088 Operator Manual This manual contains proprietary information of BERCHTOLD Corporation.
More informationNOTICE TO ALL FIRMS. Bid RFI Questions and Answers
Purchasing Department 227 West 27 th Street New York, NY 10001 Purchasing Dept. Tel. 212-217-3630 Purchasing Dept. Fax 212-217-3631 Purchasing@fitnyc.edu NOTICE TO ALL FIRMS Date: March 8, 2018 To: From:
More informationINSTALLATION, OPERATION INSTRUCTIONS FOR FLOW SWITCHES 62-9FS & FS
THERMAL INSTRUMENT Co. 217 Sterner Mill Road, Trevose, PA 19053 Telephone No. (215) 355-8400 Fax No. (215) 355-1789 Email: office@thermalinstrument.com INSTALLATION, OPERATION INSTRUCTIONS FOR FLOW SWITCHES
More informationInspection Summary. Canyon State Property Inspections 3114 South 98th Street Mesa, AZ (480)
Inspection Summary Canyon State Property Inspections 3114 South 98th Street Mesa, AZ 85212 (480) 699-1651 www.canyonstateinspections.com ELECTRIC Main Electrical Panel Circuits Safety Concern The electrical
More informationSECTION (16140) - WIRING DEVICES
SECTION 26 27 26 (16140) - WIRING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Receptacles, Connectors, Switches, and Finish Plates. B. Related Sections: 1. Section 00 31 13.43 (00370) -
More informationFactory Direct Walk-In Tubs WALK-IN TUB. Installation Manual. For Model Numbers VT2848, VT2853, VT3153 and VT3255
Factory Direct Walk-In Tubs WALK-IN TUB Installation Manual For Model Numbers VT2848, VT2853, VT3153 and VT3255 FACTORY DIRECT WALK-IN TUBS Thank you for choosing an Vitality Tubs Walk-In Tub. Vitality
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to define the general installation and minimum product
More informationPipeline. Medical Gas Pipeline Products
Pipeline Medical Gas Pipeline Products The Amico Group Manufactures the Building Blocks of the Hospital Architectural Beds Lights Interiors Accessories Furniture Diagnostic Clinical - OR Suction & Oxygen
More informationSCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003
SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on
More informationSECTION HYDRAULIC PASSENGER ELEVATOR
SECTION 14200 HYDRAULIC PASSENGER ELEVATOR PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 05500 - Metal Fabrications. 2. Division 15 - Mechanical. 3. 16721 - Fire Alarm Detection System 4. Division
More informationThe Owner will provide the QEI inspection and certification services.
General The Owner will provide the QEI inspection and certification services. Elevators Electric operated traction elevators are preferred; holeless hydraulic oil operation may be considered where use
More informationInstallation. 324 Series Built-In Dishwashers U L. Viking Range, LLC 111 Front Street Greenwood, Mississippi USA (662)
Installation Viking Range, LLC Front Street Greenwood, Mississippi 890 USA (66) 455-00 For product information, call -888-845-464 or visit the Viking Website at vikingrange.com U L C U L 4 Series Built-In
More informationCT CABINET AND UTILITY METERING WELL AND BOOSTER PUMP CONTROL 12"x12" WIREWAY 200A MCB 200A, 120/208V, 3Ø, 4W BOARD TVSS CIA ALARM 400A, DOUBLE-THROW SWITCH PORTABLE GENERATOR CONNECTION ENCLOSURE EXISTING
More informationIbis Styles Prakanong
UP DRAWING : 160519 458/2425 Moobaan Kulapapruk Tel : +6623381465, Fax : +6623381849 EMail : gm@thanakornholding.com NAME: EQUIPMENT LAYOUT 1:125 K IBS1501 KQ03 UP DRAWING : 160519 458/2425 Moobaan Kulapapruk
More informationINNOVEL DELIVERY & INSTALLATION SERVICES COSTCO GUIDELINES
INNOVEL DELIVERY & INSTALLATION SERVICES COSTCO GUIDELINES 1 INNOVEL DELIVERY & INSTALLATION GUIDELINES THANK YOU FOR CHOOSING INNOVEL! We want to ensure a smooth delivery and installation of your appliance.
More informationTamper & Weather Resistant Receptacles
Tamper & eather esistant Tamper esistant eather esistant Tamper & eather esistant eceptacles Proven safety solutions for compliance with 2011 National Electrical Code requirements 2011 NEC eceptacle equirements
More informationElement D Services Electrical ODG010107
Element D Services Electrical ODG010107 D5090 Other Electrical Systems Part 1. General This section includes design standards and requirements for other electrical systems. This is a design standard and
More informationElement Z General Design Requirements Existing Facilities Information
PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical
More informationFAIRA TRANSPARENCY REPORTS th St SW, 301, Lynnwood, WA May 31 st, 2017
608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 5801 200th St SW, 301, Lynnwood,
More informationRELAX. REVITALIZE. RESTORE. LUXURY SPA UNIT Installation Manual. English. For Model Numbers 2848, 2853, 3153 and 3255
RELAX. REVITALIZE. RESTORE. LUXURY SPA UNIT Installation Manual For Model Numbers 2848, 2853, 3153 and 3255 English RELAX. REVITALIZE. RESTORE. Thank you for choosing a Secure Spa Luxury Spa Unit. Secure
More informationSpecial Provision No. 682S27 June This Special Provision refers to the following standards, specifications or publications:
CONTROLLER CABINETS, POLE MOUNTED - Item No. Special Provision No. 682S27 June 2017 1. SCOPE This Special Provision covers the requirements for the installation of pole mounted controller cabinets and
More informationUniversal Fan and Light Remote Control
Universal Fan and Light Remote Control Hand-Held Remote and Wall Cradle Owner s Guide and Installation Manual English Form# 41316-01 20100930 2010 Hunter Fan Co. 1 Welcome Table of Contents Read and Save
More informationINSTALLING ELECTRICAL OUTLET IN CONCRETE FLOOR EBOOK
20 January, 2018 INSTALLING ELECTRICAL OUTLET IN CONCRETE FLOOR EBOOK Document Filetype: PDF 116.31 KB 0 INSTALLING ELECTRICAL OUTLET IN CONCRETE FLOOR EBOOK Enjoy the Raco 1-Gang Wood Floor Outlet Box
More informationTREATMENT ROOM DATA SHEETS
SPECIALTY ROOM - Total Room Area: 14.3 m² / 154 ft² Basics A grooming room is set up to be able to do all beauty or grooming treatments in private luxury (pedicures, manicures, facials) Each room is equipped
More informationViking Installation Guide
Viking Installation Guide Viking Range Corporation 111 Front Street Greenwood, Mississippi 38930 USA (662) 455-1200 For product information, call 1-888-VIKING1 (845-4641) or visit the Viking Web site at
More informationINSTALLATION INSTRUCTIONS
9100 SERIES ARCHITECTURAL DRAFT BARRIER WALL AND PEDESTAL MOUNT INSTALLATION INSTRUCTIONS CAUTION: HIGH TEMPERATURES KEEP ELECTRICAL CORDS, FURNITURE, DRAPERIES OR ANY OTHER BLOCKING MATERIAL AWAY FROM
More informationCONTENTS DESCRIPTION UNPACKING DIMENSIONS
INSTALLATION INSTRUCTIONS Ventilating Fan ModelNo.FV-08VRE CONTENTS GENERAL SAFETY INFORMATION DESCRIPTION UNPACKING SUPPLIED ACCESSORIES DIMENSIONS WIRING DIAGRAM INSTALLATION (BETWEEN JOISTS MOUNTING)
More informationErgoline Affinity 500
Ergoline Affinity 500 Forever Tan 113 Freeland Lane Charlotte, NC 28217 1-800-447-0040 For questions concerning this guide please contact Jeremy Welch: jeremyw@forevertan.net 704-971-4744 local Electrical
More informationELECTRICAL DH VERSUS DR SERIES OPTIONS LISTED IN THE ONLINE AND PRINT CATALOG FOR ENVIRONMENT ONE DH071/DR071 STATIONS. WHICH DO YOU SELECT?
ELECTRICAL DH VERSUS DR SERIES OPTIONS LISTED IN THE ONLINE AND PRINT CATALOG FOR ENVIRONMENT ONE DH071/DR071 STATIONS. WHICH DO YOU SELECT? The DH071 is the hardwired or wired model where a cable connects
More informationElement D Services Electrical
PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.
More informationINDEX. Page 2 to 7 Electrical Specifications. Page 8 Electrical Schemes: Basement Plan. Page 9 Electrical Schemes: First Floor Plan
30 Greenway, NW Suite 11 Glen Burnie, Maryland 21061 tel 410.528.8899 fax 410.558.6312 www.gbalternatives.com INDEX Page 2 to 7 Electrical Specifications Page 8 Electrical Schemes: Basement Plan Page 9
More informationIN020 Rev F Page 1 of 8
IN020 Rev F Page 1 of 8 RadonAway Ward Hill, MA. Series Fan Installation Instructions Please Read and Save These Instructions. DO NOT CONNECT POWER SUPPLY UNTIL FAN IS COMPLETELY INSTALLED. MAKE SURE ELECTRICAL
More informationBuilding Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
More informationIN014 Rev P Saber Way, Ward Hill, MA radonaway.com
GP/GPc, XP/XPc, XR Series Installation Instructions IN014 Rev P 0717 3 Saber Way, Ward Hill, MA 01835 radonaway.com 1 Fan Installation & Operating Instructions GP/GPc, XP/XPc, XR Series Fans Please Read
More informationFAIRA TRANSPARENCY REPORTS st Ave, #605, Seattle, WA June 2 nd, 2017
608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 1107 1st Ave, #605, Seattle, WA
More informationDEMA 844 Laundry Master Laundry Chemical Dispensing
DEMA 844 Laundry Master Laundry Chemical Dispensing Overview The DEMA Laundry Master is a digital laundry dispenser designed to dispense chemicals when signals are received from commercial laundry machines.
More informationA m e r i c a s D e n t a l E q u i p m e n t C o m p a n y. Rev 2/15. D a n s e r e a u
A m e r i c a s D e n t a l E q u i p m e n t C o m p a n y Rev 2/15 D a n s e r e a u (8 0 0 ) 423-5657 / WWW.DHPDENTAL.COM CUSTOMER SUPPORT INF ORMATION Dansereau Health Products, Inc. has been manufacturing
More informationMAZAGON DOCK SHIPBUILDERS LIMITED
MAZAGON DOCK SHIPBUILDERS LIMITED (Formerly known as Mazagon Dock Ltd.) CIN : U35100MH1934GOI002079 (A Government of India Undertaking) Shipbuilders to the Nation Dockyard Road, Mazagon, Mumbai 400 010.
More informationDENTAL AIR SYSTEM. AS12, AS22, AS50 AS70, AS12C, AS22C & AS50C International. Installation and Operation Manual
DENTAL AIR SYSTEM AS12, AS22, AS50 AS70, AS12C, AS22C & AS50C Installation and Operation Manual TABLE OF CONTENTS SECTION PAGE SECTION PAGE Safety Instructions... 2 Site Requirements... 6 Congratulations...
More information.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.
Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code
More informationFAIRA TRANSPARENCY REPORTS Greenwood Ave N, N304, Seattle, WA March 21, 2018
608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 8760 Greenwood Ave N, N304, Seattle, WA 98103 March 21, 2018 Thank you for your interest
More informationPRE-INSTALLATION GUIDE
DENTAL VACUUM SYSTEMS PRE-INSTALLATION GUIDE for MODELS VS20 & VS40 Check VacStar Model Being Installed: VS20 VS40 Model VS20 Model VS40 Doctor: Address: Phone#: Dealer: Dealer Address: PRODUCT SPECIFICATIONS
More informationLINE OF CEILING CHANGE LINE OF CEILING CHANGE TO BARREL VAULT CEILING
REMOVE EXISTING WALL MOUNTED RADIATOR SILL HEIGHT @ 2'-0 1/2" LINE OF CEILING CHANGE LINE OF CEILING CHANGE TO BARREL VAULT CEILING Family Room EXISTING WOOD BURNING FIREPLACE TO BE REMOVED AND INSTALL
More informationDivision 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21
Division 21: FIRE SUPRESSION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM Table of Contents 1 Division 21 SECTION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A.
More informationFAIRA TRANSPARENCY REPORTS Hazel Loop SE, #D, Auburn, WA 98092
608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 6137 Hazel Loop SE, #D, Auburn, WA 98092 Thank you for your interest in this Faira Certified
More informationCONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA
American Electrical Institute 2014 PART 2 83 CONTINUING EDUCATION FOR OREGON ELECTRICIANS AMERICAN ELECTRICAL INSTITUTE PO Box 31131 Spokane, WA 99223 www.aeitraining.com 84 PART 3 American Electrical