PROPOSED FACILITY IMPROVEMENTS

Size: px
Start display at page:

Download "PROPOSED FACILITY IMPROVEMENTS"

Transcription

1 No. WE-SI-05 EM-W2 Site Irrigation System onnect the irrigation system to the school district's energy management system with a weather station and add a rain gauge. ategory onnection to the EMS and the addition a rain gauge will reduce water consumption and utility costs. Operating ost 1 $5,710 Quantum 4-year WE-SI-07 Site Parking Sign dditions Provide signs on posts designating 3 parking stalls for visitors and one School does not have signs designating parking stalls reserved for visitors. D compliant sign disabled parking stall at south parking lot. missing at disabled parking stall. 1 $1,467 BLRB B. Sprague WE-SI-08 Site Pavement Marking Provide thermo-plastic pavement markings at parking lot stop bars and directional arrows. dd crosswalk from disabled parking stalls at south parking lot to front entry. Thermo-plastics markings are needed in critical locations because existing painted markings quickly wear out. rosswalk needed at front entry to provide designated route from disabled parking stalls and to comply with D. 2 $2,285 BLRB WE-EX-01 Exterior utomatic Door Opener ddition Provide automatic door opener at south and east entry doors. Building does not have automatic door opener at main entry doors. Enhancement 3 $26,882 BLRB J. Traufler B. Sprague WE-EX-02 Exterior Exterior Door Hardware Replace exterior door lock cylinders with Primus cylinders. Primus lock cylinders will improve building security. Enhancement 2 $5,938 BLRB WE-EX-08 Exterior Masonry Water Repellant pplication Pressure wash and provide application water repellant at exterior masonry. Existing masonry is dirty and lacks a water repellant coating to protect against moisture penetration. 3 $30,303 BLRB WE-IN-03 Interior Grab Bar dditions Provide D compliant grab bars at a total two handicap toilet stalls in student restrooms 305 and 308. Grab bars needed to assist the disabled and to comply with D. 4 $1,467 BLRB D WE-IN-06 Interior Interior Signage dditions Provide handicap accessible signage at student restrooms 305 and 308. Signage needed to designate location restrooms accessible to disabled. 4 $490 BLRB D WE-EQ-02 Equipment omputer Furniture Provide furniture designed for computer and other technology equipment use. Existing furniture used for computer and technology equipment is lacking and in many cases not designed for this use. 2 $4,456 SD WE-ME-01 EM-M2 utomatic ontrols the EMS control system to be BacNet compatible, web based and include new stware, new field controllers, and a new front end computer. ontrol system upgrade will improve occupant comfort and reduce maintenance and energy costs. Operating ost 2 $34,265 Quantum 10-year WE-ME-02 EM-M4 O2 ontrol ddition - Fan oil Units Expand the control system to add O2 control to the fan coil units serving the classrooms. O2 control will regulate the amount outside air being delivered to the occupied spaces based on O2 levels and reduce energy usage. Operating ost 2 $34,265 Quantum 9-year WE-ME-03 EM-M3 O2 ontrol ddition - Gym Library Expand the control system to add O2 control to the main air handling systems serving the gym and library. O2 control will regulate the amount outside air being delivered to the occupied spaces based on O2 levels and reduce energy usage. Operating ost 2 $9,138 Quantum WE-ME-04 EM-M7 Damper ctuator Replacement Replace Barber olman damper actuators. Existing actuators are failing. New actuators will improve indoor air quality. Operating ost 3 $26,549 Quantum 15-year WE-ME-05 EM-M6 Domestic Hot Water s onnect the domestic hot water systems together to serve the entire school with the gas fired system. onnection the domestic hot water systems will eliminate the need for existing electric hot water system and allow existing electric heater to be used as a back up heater. Operating ost 2 $18,275 Quantum 9-year WE-ME-06 EM-M9 Door Switch Sensor ddition Provide occupancy sensor door switch at roll-up door at shop building. Door switch sensor will disable the heat in the shop when unoccupied or when the bay door is open, which will reduce energy costs. Operating ost 1 $5,710 Quantum 5-year 11/24/ 3:43 PM WE - Facility s + ost Data Page 1 6

2 WE-ME-09 Heating System ontrol Valve Replacement Replace heating system control valves. Existing control valves leak and are unreliable. 1 $49,497 Quantum WE-ME-11 ooling ddition Provide mechanical cooling at main fice area and computer room 307. Main fice area is occupied and overheats during the summer months. omputer room 307 is an interior space with numerous computers and occupants, and overheats most the time. 2 $44,741 Quantum WE-ME-13 EM-M5 Occupancy Sensor Temperature ontrol ddition Install occupancy sensors in gym and library to set back the spaces when they are unoccupied. Occupancy sensors will reduce energy consumption and energy costs. Operating ost 1 $9,138 Quantum 4-year WE-ME-15 EM-W1 Plumbing Fixture Replacement - Partial Replace water closets and provide aerators for sinks. reduction in water use will reduce utility costs. Operating ost 1 $11,422 Quantum 4-year WE-ME-16 EM-M1 TB and ommissioning Perform air and water testing, adjusting and balancing (TB) on the mechanical systems. ommission the existing HV control system to verify proper operation. Retroactive TB and commissioning will improve system operation and reduce energy costs. Operating ost 2 $34,265 Quantum 6-year WE-EL-06 EM-L2 Electrical Exit Sign Replacement Replace incandescent and compact fluorescent exit signs with new LED exit signs. Exit sign replacement will reduce energy costs. Operating ost 1 $4,570 Quantum 4-year WE-EL-09 EM-L4 Electrical Gym Lighting Replacement Replace HID fixtures in the gym with fixtures using T-8 or T-5 technology and increase illumination level. Existing illumination level in gym does not meet district's minimum standard. Light fixture replacement will reduce energy costs and increase illumination. Operating ost 2 $11,422 Quantum 6-year WE-EL-12 EM-L1 Electrical Interior Lighting Replace T-12 fixtures, magnetic ballast and incandescent fixtures with T-8, electronic ballast and compact fluorescent technology. Light fixture replacement will reduce energy costs. Health / Safety 2 $86,807 Quantum 6-year WE-EL-15 EM-L3 Electrical Occupancy Sensor Lighting ontrol ddition Provide occupancy sensor in areas with fluctuating occupancy to turn f lights when the spaces are unoccupied. Occupancy sensors will reduce energy costs. Operating ost 2 $5,710 Quantum 7-year WE-MD-11 Modernization D Restroom Record Storage Modernization Modernize onference Room 104 to Building does not have a dedicated space for provide a 80 SF record storage room and record storage. unisex D compliant a 50 SF unisex D compliant restroom. restroom could be utilized by staff, students and public. 1 $61,414 SD ost D WE-EX-04 Exterior Exterior Plaster lean and resurface exterior plaster building elements. Existing exterior plaster is embedded with dirt and should be resurfaced to maintain waterpro integrity. 3 $61,095 BLRB B WE-IN-02 Interior lassroom Wainscot ddition Provide protective wainscot at exterior and back walls in classrooms. Existing sheet rock walls in classrooms are susceptible to and damaged in areas from normal wear and tear. Exterior walls and back walls, opposite front classroom, are most vulnerable because they have the greatest exposure to student's chairs. Other walls in rooms usually have computers, teacher's desk and whiteboards. Wainscot installation will reduce damage and maintenance costs. Enhancement 3 $26,942 BLRB B WE-ME-17 Unit Ventilator Replacement Replace unit ventilators. Existing unit ventilators are in poor condition, leak, unreliable and past life expectancy. 1 $97,194 Quantum B 11/24/ 3:43 PM WE - Facility s + ost Data Page 2 6

3 WE-SI-01 Site D Site s Provide miscellaneous site improvements School was built before implementation D to comply non-mandatory D regulations and does not require full compliance to standards. current standards. Miscellaneous site areas, which do not significantly affect access to the building, could be improved to comply with current D standards. Site improvements needed to provide D required program access are identified separately. Enhancement 3 $64,699 BLRB Minor need and nonmandatory improvements. D WE-SI-02 Site Delivery Parking ddition Provide designated parking stall, Designated parking area not provided for delivery separate from driveway, in front school vehicles. urrently, delivery vehicle park in for delivery vehicle. driveway in front school and block traffic. 1 $19,531 BLRB Minor deficiency. B. Sprague WE-SI-03 Site Dumpster rea ddition Provide designated area with screen walls for dumpster storage. Dumpsters are located parking lot without a designated area or screen walls. 3 $91,397 BLRB Minor deficiency. WE-SI-04 Site Exterior Bench dditions Provide 2 ribbon-metal exterior benches at front entry and 4 at student courtyard. Exterior benches needed at front entry for students and visitors to use when waiting to be picked up. Exterior benches needed at courtyard for students to use. 2 $17,595 BLRB Minor deficiency. WE-SI-09 Site Site Sign ddition Provide masonry base site sign with school name and address. Site sign needed to identify school and address. 1 $61,095 BLRB Minor deficiency. WE-SI-10 Site Street Frontage s Provide sidewalks adjacent to school There is no sidewalks for pedestrian use on property at south side 2nd St. NW and streets at west and north sides school so east side F St. NW. students walk on paved and dirt road shoulder. 4 $51,398 BLRB Minor deficiency. WE-SI-12 Site Playfield Drainage s Provide sub-drain system at grass stball and soccer play fields. Existing grass play field drains poorly and is saturated with water for much the school year. Enhancement 3 $172,356 BLRB Not WE-EX-07 Exterior Exterior Window - Shop Building Replace single pane windows at shop building with dual-glazed thermal pane windows. Thermal pane windows will reduce energy costs. 3 $87,139 BLRB Not WE-EX-09 Exterior Ro Fall rrest nchors ddition Provide fall arrest system at ro. Pitched ros do not have fall arrest safety system. Health / Safety 4 $97,140 BLRB Minor deficiency. WE-IN-01 Interior D Building s Provide miscellaneous building improvements to comply non-mandatory D standards. School was built before implementation D regulations and does not require full compliance to current standards. Miscellaneous building areas, which do not significantly affect access within the building, could be improved to comply with current D standards. s needed to provide D required program access within the building are identified separately. Enhancement 4 $447,744 BLRB Minor need and nonmandatory improvements. D WE-IN-04 Interior Gym Floor Provide wood floor in gym. Existing rubber floor is in fair condition with repair required in some areas. 1 $144,303 BLRB Minor deficiency. WE-IN-07 Interior Walk Off Mat Provide larger walk f mats at building entrances. Larger mats will improve dirt control and reduce maintenance and carpet wear. Enhancement 4 $30,792 BLRB Not cost effective until carpeting in building is replaced. WE-EQ-03 Equipment Fiber Optic onnection ddition Provide data communications equipment to accommodate installation a leased fiber optic circuit. Equipment needed when school upgrades its internet connection with a fiber optic circuit leased from Qwest. Enhancement 2 $11,410 SD Minor need. N. Vein 11/24/ 3:43 PM WE - Facility s + ost Data Page 3 6

4 WE-EQ-04 Equipment Instructional Equipment Replace TV/DVD/VR in library. TV/DVD/VR over 10 years old and past life expectancy. 1 $592 SD Minor deficiency. WE-ME-07 Fire Sprinkler System Bracing Provide additional seismic bracing to existing fire sprinkler system in compliance with FM Global standards. dditional bracing will reduce risk broken fire sprinkler lines during an earthquake. Enhancement 1 $102,850 Quantum WE-ME-12 Natural Gas System Metering Provide electronic meter for natural gas system connected to energy management system. Electronic meter will allow remote monitoring gas service and improve potential for reducing natural gas use. Operating ost 4 $22,370 Quantum Not cost effective because long-term WE-ME-14 EM-M8 Outdoor ir Ductwork Improves Increase the size the outside air ductwork to improve indoor air quality. Ductwork modifications will improve indoor air quality. Operating ost 3 $13,707 Quantum Not cost effective because estimated payback period exceeds a 15 years. WE-EL-01 Electrical eiling Mounted LD Projector ddition Provide ceiling mounted LD projector and associated V and power outlets in each classroom with connection to teacher's work station. eiling mounted projectors desired for ease use, to reduce theft, and to protect equipment and cables from damage. Enhancement 2 $297,493 Quantum Not WE-EL-02 Electrical Data ommunications Equipment data communications equipment filter, router, switch, traffic shaping and connectivity speed. Existing filter, router, switch, traffic shaping and connectivity speed do not meet district's minimum standards. 2 $132,847 SD Minor deficiency. N. Vien WE-EL-03 Electrical Data Outlet ddition at Teacher's Work Station Provide data outlets for computers and lassrooms do not have V outlets at teacher's V equipment at teacher's work station in work station and do not have floor box with data each classroom. outlets at front classroom. Enhancement 3 $160,446 Quantum Not See WE-EQ-07 for an alternate approach using wireless work station. WE-EL-05 Electrical Electrical Service Metering Provide electronic meter for electrical service connected to energy management system. Electronic meter will allow remote monitoring electrical service and improve potential for reducing electrical use. Operating ost 2 $24,941 Quantum Not cost effective at a school this size. WE-EL-07 Electrical Exterior Lighting s Provide additional illumination at bus area Existing lighting at bus area and delivery / and delivery / dumpster area. dumpster area lacks adequate illumination levels and is below district's minimum standards. 3 $16,045 Quantum Minor deficiency. WE-EL-10 Electrical H and M Room Relocate M and H data communications equipment to building catwalk area. Existing M equipment is located in a custodial room and H equipment is located in a kitchenette. These spaces do not have mechanical cooling to protect equipment from overheating. Expansion and maintenance access to equipment in both locations is difficult. 3 $42,940 Quantum Minor deficiency. WE-EL-11 Electrical Interior Lighting s Provide additional illumination at corridors, library, and restrooms. Existing lighting at interior areas lacks adequate illumination levels except at gym and does not meet the district's minimum standards. Health / Safety 3 $64,282 Quantum osts included in WE-EL-12. WE-EL-14 Electrical Intrusion larm udible Signal intrusion alarm system to provide audible alarm. Use audible alarm could reduce intrusions and false alarms. Enhancement 4 $48,083 Quantum Minor need. WE-EL-16 Electrical Surveillance amera ddition Provide surveillance camera system to monitor parking lots and areas around building. Surveillance cameras could reduce vandalism and theft around building. Enhancement 3 $97,194 Quantum Minor need. WE-EL-17 Electrical Telephone System telephone system to provide voice mail. Existing telephone system does not have voice mail feature and does not meet district's minimum standards. 4 $192,586 Quantum 11/24/ 3:43 PM WE - Facility s + ost Data Page 4 6

5 No. WE-EL-18 EM-G1 ategory Electrical Vending Machine Sensor ddition Provide sensors at vending machines to shut f vending machine illumination when the spaces are unoccupied. Sensors will reduce energy costs. Operating ost 1 $571 Quantum Maintenance item that can be completed at no cost by vending machine company. WE-MD-02 Modernization Health Room Restroom Modernization Provide larger restroom that is D compliant in health area. Existing health restroom is undersized and not D compliant. 4 $50,322 BLRB Not feasible because space constraints. See WE-MD-11 for an alternate improvement for D restroom in this area. D WE-MD-03 Modernization Record Storage Room ddition Provide records storage room. Building does not have a dedicated space for record storage. 1 N BLRB ost included in WE-MD-10. WE-MD-04 Modernization Relite Window ddition Provide interior relite window at north wall registrar 101. Relite window will allow visual supervision main fice area from registrar's fice and provide indirect daylight connection from to main fice area. 2 $4,372 BLRB Minor deficiency. WE-MD-05 Modernization Skylight dditions - ommons Provide skylights at commons. Existing commons does not have exterior windows and exposure to daylight. Window addition not feasible because these are interior spaces. Enhancement 3 $50,342 BLRB Minor deficient and not WE-MD-06 Modernization Skylight dditions - Teaching Stations Provide skylight at library and computer classroom. Existing room does not have exterior windows and exposure to daylight. Window addition not feasible because these are interior spaces. Skylight addition difficult because high ro above this classroom. Enhancement N N No ost Minor deficient and not WE-MD-07 Modernization Staff Restroom Modifications Modify staff restrooms 109 and 110 to be D compliant. Staff restrooms are not fully accessible for the disabled and not fully D compliant. 4 N BLRB ost included in WE-MD-10. D WE-MD-09 Modernization Storage ddition - Emergency Supplies Provide space within building for storage emergency supplies. Building does not have space for storage emergency supplies. Existing supplies kept in exterior storage container. 1 N BLRB ost included in WE-MD-10. WE-MD-10 Modernization Emergency Storage / Record Storage / Staff Restroom Modernizations dditions Provide emergency storage, record storage and D compliant staff restroom. See s for WE-MD-03, 07 and $248,397 BLRB Not See WE-MD-11 for a portion these improvements. D WE-SI-06 Site Landscape Plant s Prune and replace overgrown shrubs and trees around perimeter building. Existing shrubs and trees are overgrown. Enhancement N N No ost Maintenance item. N WE-SI-11 Site Vehicle ccess s Modify parking areas to separate buses from student vehicles. Bus loading area is located in driveway that serves student parking lot. This can cause congestion during morning and afternoon when buses are present. 3 N No ost cost effective because existing site constraints. B. Sprague N WE-EX-03 Exterior Exterior Painting Paint exterior shop building. Exterior paint at shop building is in good condition. Enhancement N N No ost Maintenance item and not an eligible capital improvement expenditure. N WE-EX-05 Exterior Exterior Window Glass Replacement Replace glass at windows in classrooms 202 and 203. Existing glazing is etched from irrigation water which obscures view through windows. N N No ost Maintenance item. B. Sprague N WE-EX-06 Exterior Exterior Window - Main Building Replace dual glazed exterior windows with dual glazing and integral blinds. Integral blinds will reduce damage to and maintenance window blinds. Enhancement N N No ost N 11/24/ 3:43 PM WE - Facility s + ost Data Page 5 6

6 WE-IN-05 Interior Interior Painting Paint building interior. Existing interior paint is in good condition. Enhancement N N No ost Maintenance item and not an eligible capital improvement expenditure. N WE-EQ-01 Equipment lassroom Equipment Provide 6 additional computers in each three computer classrooms. omputer classrooms need additional computers for students and have less than district's minimum standard. N N No ost Obtained with Technology Levy funds. N WE-EQ-05 Equipment Library Equipment Provide 4 additional computers in library. dditional computers needed for student use. N N No ost Obtained with Technology Levy funds. N WE-EQ-06 Equipment Office Equipment Replace copy machine in main fice and add copy machine in library. opy machine in main fice over 8 years old and past life expectancy. Library does not have a copy machine but needs one. N N No ost Obtained as leased equipment. N WE-EQ-07 Equipment Wireless omputer Station dditions Provide wireless computer equipment and workstation furniture for use at front each classroom. Wireless computer equipment will allow teachers to use ceiling mounted LD projectors from work station and front classroom in lieu adding power and data outlets in floor at much higher cost. Enhancement 1 N No ost Obtained with Technology Levy funds. N WE-ME-08 Gym Ventilation System s Improve gym ventilation system. Existing ventilation system operates properly. Gym users desire more air movement. Enhancement N N No ost Minor deficiency. B. Sprague N WE-ME-10 HV System s Improve building HV system. Primary system operates properly. Some rooms overheat because building does not have mechanical cooling. Enhancement N N No ost Minor deficiency and localized problems addressed under other proposed improvements. B. Sprague N WE-EL-04 Electrical Electrical Panel Relocations Relocate electrical panel that are located in custodial rooms with mop sinks. Electrical panels should be separated from mop sink areas. N N No ost N WE-EL-08 Electrical Fire larm System Replace fire alarm system smoke detectors and detector bases. Existing smoke detectors are obsolete and replacement parts are not available. N N Quantum ompleted by Maintenance Department. N WE-EL-13 Electrical Internet onnection Increase bandwidth school's internet connection. Increased bandwidth desired to provide long-term and efficient access for information technology via the internet. Enhancement N N No ost Minor deficiency. Existing internet connection meets district's minimum standard. N WE-MD-01 Modernization Building Enclosure Modernization Provide access to all buildings within enclosed space. Shop building is separate from main building. This inhibits supervision, requires students and staff to go outdoors to travel between buildings, and does not meet district's minimum standards. N N No ost Minor deficiency. Shop building is close to main building. N WE-MD-08 Modernization Staff Telephone Room Modernization Provide larger staff telephone room. Existing staff telephone room is undersized. N N No ost Minor deficiency. N 11/24/ 3:43 PM WE - Facility s + ost Data Page 6 6

Facility Improvements

Facility Improvements AP-SI-03 BICYCLE RACK ADDITION AP-SI-05 EXTERIOR BENCH ADDITIONS Installation of bike rack will allow for designated and secure storage of bicycles. Installation of exterior benches will provide an outdoor

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 135 - QUEENS, 207-11 89TH AVENUE, New York, 11427 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-03-20

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

Forest Hills Facilities Plan

Forest Hills Facilities Plan Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation

More information

Facilities Management State-Funded and Billable Services

Facilities Management State-Funded and Billable Services Facilities Management State-Funded and Billable Services Facilities Management receives funding to provide maintenance in eligible state-supported areas only, per UCOP guidelines. State-supported areas,

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

Vacant Building Loss Prevention Best Practices

Vacant Building Loss Prevention Best Practices Vacant Building Loss Prevention Best Practices Vacant properties are susceptible to a unique set of hazards that should be considered and addressed to avoid losses. Occupants are often the eyes and ears

More information

NYC Department of Education

NYC Department of Education Asset: LEARNING SUPPORT CENTER - K, 1665 ST. MARKS AVENUE, New York, 11233 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-05-07 1:06 PM 2018-05-10 12:20 PM Asset Data Type of Service

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 314 - BROOKLYN, 330 59 STREET, New York, 11220 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-23

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 Year Built 1960 // Age 58 years Building Area 31,688 Square Feet Student Capacity 389 Current Enrollment (2017-2018) 466 Priority

More information

S AGE E NGINEERING A SSOCIATES, LLP

S AGE E NGINEERING A SSOCIATES, LLP S AGE E NGINEERING A SSOCIATES, LLP 1211 Western Avenue Albany, NY (518) 453 6091 F (518) 453 6092 Kingston Library Mechanical and Electrical Systems Field Report Date of Visits: Mechanical - September

More information

SENSORS. Vacancy Sensors. Occupancy Sensors A4-A7 A-1

SENSORS. Vacancy Sensors. Occupancy Sensors A4-A7 A-1 SENSORS ENERLITES offers a wide variety of Occupancy and Vacancy sensor models that can monitor virtually any area within a building. We cover the spectrum of technologies with our passive infrared, basic

More information

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION Lake Erie Corridor Secondary Schools Accommodation Review November 2012 LAKE ERIE CORRIDOR SECONDARY SCHOOLS ACCOMMODATION REVIEW Fort Erie Secondary School

More information

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers

More information

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools 143 Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

CENTRAL KITSAP SCHOOL DISTRICT BOARD PROCEDURE

CENTRAL KITSAP SCHOOL DISTRICT BOARD PROCEDURE MANAGEMENT SUPPORT SERVICES Utilities Management Introduction In support of Central Kitsap School District (CKSD) Utilities Conservation Policy, the following procedure is set forth to establish operating

More information

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551 Master Plan Architect School Name Moreno Valley College District Riverside Community College District Architecture and Urban Design 5898 Blackwelder Street Ground Floor Culver City, CA 90232 T: 310.559.5720

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 80 AX(PETR COMPL-BLDG E)-S.I., 715 OCEAN TERRACE, New York, 10301 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 47 - QUEENS, 9 POWER ROAD, New York, 11693 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-20 12:40

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 131 - QUEENS, 170-45 84TH AVENUE, New York, 11432 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-18

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 174 - QUEENS, 65-10 DIETERLE CRESCENT, New York, 11374 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-01-25

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

Building Self-Inspection Program

Building Self-Inspection Program Building Self-Inspection Program www.tridentinsurance.net Lines of Business: Property, General Liability, Worker s Compensation, Public Official Liability Risk Control Strategy/Key Issues: Reduce physical

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 56 - STATEN ISLAND, 250 KRAMER AVE., New York, 10309 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-20

More information

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES Below is a list of services delivered by the University s Facilities Services Department. While all of these services are delivered

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

Electrical Inspection Special Electrical

Electrical Inspection Special Electrical 0941 Fire Alarm System Devices, panels, wiring, conduit, etc. The present fire alarm system manufactured by Gamewell was installed with the 1982 renovation. It is a non addressable, zoned system. It includes

More information

HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013

HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013 HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT May 2013 HPS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT PURPOSE During the week of May 20th, 2013 BRUCO INC.

More information

Ceiling Mount Sensors B4-B9. Occupancy and Vacancy Sensors B10-B15 B16-B17. Wall Mount Occupancy Sensors B-1

Ceiling Mount Sensors B4-B9. Occupancy and Vacancy Sensors B10-B15 B16-B17. Wall Mount Occupancy Sensors B-1 Occupancy and Vacancy Sensors ENERLITES offers a wide variety of lighting sensors. They are designed to bring convenience to your life and business while helping to reduce energy consumption in commercial,

More information

Lighting Control Strategies. to meet code requirements save energy and improve building performance

Lighting Control Strategies. to meet code requirements save energy and improve building performance Lighting Control Strategies to meet code requirements save energy and improve building performance 1 Lighting Control Strategies Agenda Why Lighting Control Manual Light Reduction Scheduling Occupancy

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 59 ANNEX - BRONX, 2120 QUARRY RD, New York, 10457 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-02-12

More information

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: I.S. 364 - BROOKLYN, 1426 FREEPORT LOOP, New York, 11239 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-11-16

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: PS 152 ANNEX -BROOKLYN, 1087 OCEAN AVENUE, New York, 11210 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-03-20

More information

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: JUDICIAL CHAMBER SPACE TYPE: JUDICIAL CHAMBER Construction Criteria The unit costs for Judicial Chamber space types are based on the construction quality and design features in the following table. This information has

More information

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms $4,013,500.00 $4,013,500.00 $ 1,155,000.00 $ 1,000,000.00 $ 205,000.00 $ 275,000.00 $ 300,000.00 $ 360,000.00 $ 438,500.00 $ 280,000.00 School Status Item HS Boilers boiler controls replaced 2017 2002

More information

Beaufort County Community College. Maintenance and House Keeping Plan

Beaufort County Community College. Maintenance and House Keeping Plan Beaufort County Community College Maintenance and House Keeping Plan Summary: The College s facility management is handled by the Maintenance Department. The Director of Plant and Maintenance Operations

More information

PROCTOR TERRACE ELEMENTARY SCHOOL

PROCTOR TERRACE ELEMENTARY SCHOOL SCHL DAA Address: Bryden Lane Santa Rosa, CA 95404 Established: 50 Permanent Classrooms: 3 Portable Classrooms: 9 Building Area: Site Area: 40, sq ft 5 acres Students in 5: 484 Students in (Projected):

More information

Lighting Application Guide for K-12 Classrooms

Lighting Application Guide for K-12 Classrooms Lighting Application Guide for K-12 Classrooms Lighting Controls for Today's Classroom Commercial building energy codes contain detailed mandatory lighting control requirements related to buildings such

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS University of Iowa FSG - Design & Construction Services Design Reference Manual 2 Design Standards 2.02 Classroom Design Standards Classroom Design Standards GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

More information

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings) 1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 184 - QUEENS, 163-15 21 ROAD, New York, 11357 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-05 11:46

More information

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for

More information

Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT

Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT DESIGN ASSOCIATES INC MECH/ELEC DESIGN & CONSULTING 422 Highland Ave, Cheshire, CT. 06410 (203) 271-3787, fax (203) 271-2886 Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: NEW SCH FOR ARTS AND SCIENCE - X, 965 LONGWOOD AVENUE, New York, 10459 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-12-01 8:13 AM 2017-12-01

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 81 ANNEX (OLD 75) - QUEENS, 511 SENECA AVENUE, New York, 11385 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Garfield Elementary School Feasibility Study for New Library Building Project Number A C Larry Teixeira Selma Unified School District 3036 Thompson Avenue Selma, CA 93662 Subject: Feasibility Study for New Library Building Project Number A 12-8581.00 C Dear Mr. Teixeira: At your request, we

More information

Ohlone College Measure G Project Scope Revisions

Ohlone College Measure G Project Scope Revisions Scope Revisions Current Title Revised Title Current Scope Revised Scope 6101 Relocated Baseball Field Athletic Fields Create new sustainable baseball field with synthetic turf, bleacher seating and batting

More information

HIGH-RISE RETROFIT ORDINANCES - NO and NO

HIGH-RISE RETROFIT ORDINANCES - NO and NO INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 91.8604 Effective: 9-06-90 DOCUMENT NO. P/BC 2002-054 Revised: 4-15-03 Previously Issued As: MGD 88 HIGH-RISE RETROFIT ORDINANCES - NO.

More information

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings) 1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 127 - BROOKLYN, 7805 7 AVENUE, New York, 11209 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-30

More information

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM Built in 1992 108, 407 Square Feet 771 Student Population 91 Staff Population 2 Building Supervisors, 3 Custodians 102, 663 Square Feet of

More information

Norwood Public Library Rendering

Norwood Public Library Rendering The new Norwood Public Library is based on a lot that is a few blocks south of Highway 145 (Main Street) in Norwood, Colorado at the intersection of Pine Street and San Miguel Street. It is owned by the

More information

School Property REVIEWING YOUR BUILDINGS & GROUNDS

School Property REVIEWING YOUR BUILDINGS & GROUNDS School Property REVIEWING YOUR BUILDINGS & GROUNDS Risk Management CHECKLIST Instructions: Use this checklist to record issues that may affect your school s security and safety. Check needs attention and

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 371 (OLD 615) - BROOKLYN, 355 37 STREET, New York, 11232 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-23

More information

Electrical Inspection Special Electrical

Electrical Inspection Special Electrical 0941 Fire Alarm System Devices, panels, wiring, conduit, etc. Description of the building system The school is equipped with a hard wired fire alarm control panel, and automatic dialer. The fire alarm

More information

Master Project List Report

Master Project List Report Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD LIGHTING FIXTURES AND CIRCUITRY & SWITCHING SECONDARY SCHOOLS 1. GENERAL 1.1.1. Consultants MUST prepare a Summary of Fixtures which will include catalogue

More information

Custodial Guide

Custodial Guide Custodial Guide 2018-2019 Table of Contents Page Number 1 General Items to Note 2-3 Maintenance for Office Areas 4-5 Maintenance for Classrooms and Hallways 6 Maintenance for Lounge Areas 7 Maintenance

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60'

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60' ±60' Lease Line Lease Outline Drawing Needles Towne Center 1004 E. Broadway St.,, Needles, CA 92363 ± 900 SF Width ± 15' Depth ± 60' Plans produced by: ID Plans 6/16/2017 (813) 657-2545 C 2017 Site map

More information

Appendix E: Photo Documentation

Appendix E: Photo Documentation Appendix E: Photo Documentation Brown County Library Central Branch Building Assessment Appendix E: Photo Documentation Architectural and Structural Brown County Library Central Branch Building Assessment

More information

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN 04.13.2017 1 MONTICELLO INTERIOR FINISHES PAINT MOULDING WALLS ACCENT DOORS DOOR TRIM/STAIRS

More information

High Five for Saving Energy!

High Five for Saving Energy! High Five for Saving Energy! 1. Heat offices and classrooms to 68 F Turing the heat down by 1 F will save 3% of the energy needed to heat that space. 2. Keep doors and windows closed Every hour a window

More information

Ashland School District Facility & Capacity Assessment Report 2005

Ashland School District Facility & Capacity Assessment Report 2005 Ashland School District Facility & Capacity Assessment Report 2005 Briscoe Elementary School (Closed Facility) Address: 265 N Main Street Area: 33,980 square feet Buildings: Original Building 1948 Music

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT PORTLAND TEXTILE LTD. ACCORD ID: 11873 PLOT NO. 14-15, SECTOR 6, CHITTAGONG EXPORT PROCESSING ZONE, CHITTAGONG OTHER FACTORIES: NONE November 3, 2015 Page 2 SUMMARY was surveyed

More information

Building and Grounds Self-Inspection Program

Building and Grounds Self-Inspection Program www.alterisus.com Building and Grounds Self-Inspection Program Each building and its accompanying grounds should be inspected at regular intervals, ideally on a monthly or quarterly basis. In this way,

More information

Some Basics of School Library Design

Some Basics of School Library Design Some Basics of School Library Design Fred Schlipf and Ann Ohms 2018 Pull functional requirements together and put them in print BEFORE building planning begins In addition to the various items listed below,

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: HS OF AMERICAN STUDIES - BRONX, 2925 GOULDEN AVENUE, New York, 10468 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

TIFT COUNTY SCHOOLS E-SPLOST HISTORY TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Fire/General Safety Review Program Key Performance Indicators Environmental Health and Safety

Fire/General Safety Review Program Key Performance Indicators Environmental Health and Safety Fire/General Safety Review Program Key Performance Indicators Environmental Health and Safety Fire and CO Detection Systems Fire alarm pull station obstructed. Annunciation panel obstructed. Lack of approved

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Summary of Repairs and Deficiencies

Summary of Repairs and Deficiencies Summary of s and Deficiencies Organization Building: Station #1 178 Safety & Compliance Inspections and Certifications Sprinkler System Certifications This building is sprinkled but no inspection/ certification

More information

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors 1. SUMMARY AND BACKGROUND: Princeton Joint Unified School District located in Princeton

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 86 - BROOKLYN, 220 IRVING AVENUE, New York, 11237 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-11-14

More information

University of Delaware

University of Delaware KEY STATION Campus must have a key station minimum 20 x 16 1 Computer hook up for time and attendance Furniture Seating for 20 Employee mailbox 3 Key Boxes (2 boxes should hold 30 keys; 1 box should hold

More information

FOR LEASE ROCKWOOD OFFICE PARK

FOR LEASE ROCKWOOD OFFICE PARK WILMINGTON, DE 19809 www.cbre.us/rockwood 11 PROPERTY HIGHLIGHTS Owner: Asset Manager: Address: Rockwood Office Park Associates, L.P. AIG Global Real Estate Investment Group 501, 503 & 505 Carr Road Site:

More information

Library stacks and records storage 150 LB/SF live load

Library stacks and records storage 150 LB/SF live load SPACE TYPE: LIBRARY Construction Criteria The unit costs for Library space types are based on the construction quality and design features in the following table. This information has been generally organized

More information

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015 Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis 204-205 YEAR-TO-DATE Custodial Supplies 88.00 9.50 $,643. $26,39.60 $27,782.7 Preventive Maintenance 67.00,74.00 $20,372.68

More information

(SCHOOL DISTRICT NAME) MAINTENANCE/MANAGEMENT SPECIFICATIONS FOR ATHLETIC FIELDS AND OUTDOOR FACILITIES (SUGGESTED TEMPLATE)

(SCHOOL DISTRICT NAME) MAINTENANCE/MANAGEMENT SPECIFICATIONS FOR ATHLETIC FIELDS AND OUTDOOR FACILITIES (SUGGESTED TEMPLATE) (SCHOOL DISTRICT NAME) MAINTENANCE/MANAGEMENT SPECIFICATIONS FOR ATHLETIC FIELDS AND OUTDOOR FACILITIES (SUGGESTED TEMPLATE) I. ATHLETIC FACILITIES: PROFESSIONAL FIELDS A. Turf 1. Mow baseball outfield

More information