1 A.H.U / Fan Room (p1 of 2) M1 STEP 1 Determine air flow req'd for each space, for total size of fan unit(s) in tons. Equation: Area (program) / (sf/ton) = tons req'd for space Classroom 8100sf / 350sf/ton = 23.2 tons Classroom 8100sf / 350sf/ton = 23.2 tons Museum Museum Office Office Lobby Lobby (Note: not including Freight for now) This could be adequate for a Lobby that is less than 50% glass Assuming that the Lobby is mostly glass, and exposed on 3 sides, we will DOUBLE the air requirement in the Lobby tons - Methods of approximating / rough-sizing. Final design process much more involved. - What is a "ton" in HVAC. - Where do these numbers come from (sf/ton by use) cfm/person outside air included in numbers. TOTAL Bldg. Cooling Load: 60 TONS Quick check: Overall Area / Tons =? 20,000 / 60 = 333.3

2 A.H.U / Fan Room (p2 of 2) STEP 2 Size the fan unit by approximating the size of the coil. o A. For 20 T, use 400 cfm/ton (rule of thumb) for air capacity: Calculate: 60 tons x 400 cfm/ton = 24,000 cfm B. Use (rule of thumb) 500 ft./ for air speed at coil: Calculate: 24,000 cfm / 500 ft/ = 48 sf SIZE OF COIL = Hdim x Wdim of A.H.U. = 48 SF LENGTH OF A.H.U. = ~ 2 x COIL SIZE M2 1 unit: 48 sf = 6.9'... use 1 unit with 7' x 7' coil x 14'L 2 units: (2) at 24 sf = 4.9'... use 2 units with 5' x 5' coil ea. x 10'L 3 units: (3) at 16 sf = 4'... use 3 units with 4' x 4' coil ea. x 8'L STEP 3 Size the coil area and initial supply duct: - Delta T for Austin: 75F to 55F - Speed at air coil. - Machine access / maintenance. A. Max. velocity for forced air = 1,000 ft/ From Step 2: 24,000 cfm / 1000 ft/min = 24sf coil area 1 unit option: 24sf = 4.9'... use 5' x 5' duct (big!) 2 unit option: 12sf ea. = 3.46'... use 3.5' x 3.5' duct ea. coil coil width ~ 4' 2 x coil width A.H.U. coil 3 unit option: 8sf ea. = use 3' x 3' duct ea. NOTE: Main Duct dimension can vary up to 2:1 ratio in section. Fan Room - Preliminary Design Plan Size

3 Boiler / Boiler Room (p1 of 2) M3 Single-unit design: Determine heat req'd for each space, for total heat in btu's. 5 Equation: Area (program) / (btu/sf) = heat req'd for space Classroom Museum 8100sf 8100 x 28 btu/sf 24 = 226,800 btu 194,400 for shallow, wide unit: Boiler Pumps Office ,500 Boiler Room - Preliminary Design Plan Size Lobby ,500 TOTAL HEAT: 543,200 BTU divide by 1,000 = ~ 543 mbh unit needed. - BTU values for spaces by use (typ. range 24-30). - Units (sizing boiler): 1 mbh = 1000btu - If > 400,00 btu = "boiler" = required 1-hour rated enclosure, and periodic inspections. - If < 200,000 btu = "hot water heater"? Example: HydroTherm ID-85A Boiler 500 mbh 1'-6"W 3'-6"L 2'-6"H Lochinvar 750 btu/hr unit: (Revit module for class) 2'-0"W, 2'-4"L, 4'-4"H Boiler for deep unit: Pumps Boiler Room - Preliminary Design Plan Size

4 Boiler / Boiler Room (p2 of 2) M4 Multiple-unit design: Total btu reqd. = 543,000 3 units under 199btu has advantages. Lochinvar mfg. 1 unit option: 1 at 500 btu, or 2 unit option: 2 at 300 btu ea., or 3 units option: 3 at 165 btu ea. (199 btu and under = hot water heater status) 2'-0" Clear, typ. 3 water heaters Manuf: Lochinvar 4'-4"H, 2'-4"L, 2'W Water Heater Room - Preliminary Design Plan Size + 2 pumps in adjacent Chiller Room

5 Chiller / Chiller Room STEP 1 Determine efficiency / life-span of unit: Least efficient year life DX system $3200/ton 25 year life air-cooled system $4800/ton Most efficient 35 year life water-cooled system $6800/ton (Source: S.Allen, rules of thumb based on project histories) York chiller, 118 tons M5 Typically, building will have an air-cooled system if below 300 tons. Water is better (more efficient, longer life-span), typical on big commercial systems over 300 tons. PUMPS: Bell & Gosett (2) HW 1'-5"W, 4'-7"L, 1'-9"H Each (2) CW (2) condensor STEP 2 Choose unit. 5'-0" 60 ton req'd, size water unit is 100 ton (oversized, but fine) York manufacturer, 100 ton unit: 138" L (11'-6) 44" W (3'-8) 73" H Plan for Tube replacement Chiller: McQuay Int. 6'-2"W, 11'-8"L, 8'H Chiller - Difference between 3 systems: how they work. Chiller Room Plan - Preliminary Design Size

6 Cooling Tower + Enclosure M6 Choose unit based on # tons required. For our project, 60 ton req'd, size unit is 100 ton. This oversized, but fine as most units run best at about 75% capacity). Manuf: Marley, 100 ton unit: 12' L 4' D 10' H Min. clear around cooling tower: 6' for small units. More clearance for larger units. Cooling Tower Cooling Tower: Morley 12'-10"L, 10'-7"W, 10'-2"H 8'-0" Typ. clearance all around + must be open to sky. Cooling Tower Enclosure - Preliminary Design Plan Note: THIS UNIT IS OUTSIDE (ROOF OR GROUND LEVEL) 2 How cooling towers work, types of systems, vibration and weight. Note: Revit files and product pdf:

7 Electrical and Other Service Rooms M7 OUTSIDE DOOR ELECTRICAL TRANSFORMER: 3'W X 3'L X 5'H ELEC. PANELS, SECURITY, TEL, A.V. OUTSIDE DOOR 5'-0" PANELS 1'-0" Main Electrical Room CITY ELECT SERVICE: 12,000 VOLTS STEP DOWN 1ST OUTSIDE, THEN AGAIN INSIDE MAIN ELECT. RM. Water Service + Fire Protection Room Secondary Elec. Room CONC. PAD ELECTRICAL TRANSFORMER: 6'W X 6'L X 6'H 3'x3' PAD (METER) OUSTIDE PAD-MOUNTED ELEC. TRANSFORMER 8'-0" 8'-0" Pump(s) Hydraulic Elev. Machine Room For Hydraulic elevators (70' max lift): Locate machine room near bottom landing. (hydraulic fluid pumps and panels) For Electric elevators: Locate machine room at roof above top of cab. (electric motorized hoist and panels) I.T. Room: Many buildings will have one I.T. Room per floor (8'x10') with it's own DX cooling system (for internet servers).

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3 Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located

More information

Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 Prepared by: psuae

Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 Prepared by: psuae APPENDIX C Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 12:56PM Air System Information Air System Name Equipment Class Air System Type Lobby System CW AHU SZCAV Number

More information

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE 18422 Bear Valley Road Victorville, CA 92395 Date 25 September 2012 dha Job No. 12155 TABLE OF CONTENTS I. Purpose.... Page 1 II. Existing

More information

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN Introduction to HVAC Agenda Psychrometrics Human Comfort Heat Transfer Refrigeration Cycle HVAC Terminology HVAC Systems Introduction to HVAC Psychrometrics 2000 TRG-TRC002-EN Properties of Air Dry-bulb

More information

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department

More information

Appendices. Included in this section are

Appendices. Included in this section are Appendices Included in this section are Appendix A Building Overview Appendix B Alternative Mechanical Designs Appendix C Integration of Structural System and Constructability 68 Appendix A Building Overview

More information

HVAC 101. H V A C S y s t e m s

HVAC 101. H V A C S y s t e m s H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

HVAC Rule of Thumb Calc-1

HVAC Rule of Thumb Calc-1 HVAC Rule of Thumb Calculator Table of Contents 1.0 Introduction... 2 1.1 Units... 2 2.0 Disclaimer... 3 3.0 How to use this Calculator... 4 4.0 Selecting Inputs... 5 4.1 Building Information... 5 4.1.1

More information

Technical Assignment #2a. Atlanta, GA Green Building Mechanical

Technical Assignment #2a. Atlanta, GA Green Building Mechanical Tubman African American Museum Technical Assignment #2a Chris Champagne Atlanta, GA Green Building Mechanical Green Building Certification Analysis- The major categories of the U.S. Green Building Council

More information

Description of All Alternatives Considered-

Description of All Alternatives Considered- Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142

More information

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY 2018 57 MECHANICAL ASSESSMENT MECHANICAL ASSESSMENT This report section includes an overview of the existing

More information

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection. Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using

More information

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015 Martha a s Vineyard Regional High School Vineyard Haven, MA 2 2015 HVAC Syste ems Evaluation Prepared For: Martha s Vineyard Regional School District Box 1385 Oaks Bluff, MA 02557 Prepared By: BLW Engineers,

More information

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

Modular Active. Chilled. Beams

Modular Active. Chilled. Beams Modular Active Chilled Beams How Twa MAC Beams Work Primary air (100% outside air) is dehumidified to between 50-57 F dew point and is used to: control the latent requirements of the space, provide fresh

More information

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio Technical Report 3 Northfield Mental Healthcare Center Dr. Stephen Treado Ji Won Park Mechanical Option Fall 2012 TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare

More information

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

November 11, City of Sparks 215 S. 21 st St. Sparks, NV November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

7. MECHANICAL SYSTEM DESIGN

7. MECHANICAL SYSTEM DESIGN 7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved

More information

05/14/2012 BOILER TUNE UPS & REPLACEMENTS PRESENTATION BOILER BASICS FOR LARGE INDUSTRIAL FACILITIES. Mark Bergum, P.E.

05/14/2012 BOILER TUNE UPS & REPLACEMENTS PRESENTATION BOILER BASICS FOR LARGE INDUSTRIAL FACILITIES. Mark Bergum, P.E. BOILER TUNE UPS & REPLACEMENTS FOR LARGE INDUSTRIAL FACILITIES Mark Bergum, P.E. PRESENTATION BOILER BASICS 1 BASE ASSUMPTION BOILER Steam Heat Output Exhaust Heat Losses 70% 20% Other Heat Losses 3% Blowdown

More information

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager. B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.

More information

Mechanical Systems Design

Mechanical Systems Design Mechanical Systems Design After much deliberation and a long process of brainstorming ideas for potential mechanical system designs for the, it was finally decided to design a central chilled water plant

More information

ENERGY RECOVERY HEAT PIPE HEAT EXCHANGERS

ENERGY RECOVERY HEAT PIPE HEAT EXCHANGERS WAHX (WRAP-AROUND) AAHX (AIR-TO-AIR) ENERGY RECOVERY HEAT PIPE HEAT EXCHANGERS HVAC PRODUCT GUIDE THERMAL MANAGEMENT EXPERTS ADVANCED COOLING TECHNOLOGIES, INC. IS A PREMIER THERMAL MANAGEMENT SOLUTIONS

More information

HE-B Series Commissioning Report & User Guide

HE-B Series Commissioning Report & User Guide Small Duct High Velocity Heating, Cooling and Home Comfort Systems HE-B Series Commissioning Report & User Guide Manufactured By www.hi-velocity.com Module-HEB-COM-Commissioning-Report-and-User-Guide-061616

More information

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503 Inspection Phase Three Mechanical, Electrical & Plumbing Section 503 COMCheck Mechanical Field Inspection Checklist Mechanical Mechanical, Electrical & Plumbing Equipment Efficiencies But a lot ore too

More information

The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA

The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA 2.0 Depth Work - Alternative Mechanical Designs 2.1 Objectives The goal of designing alternative systems is to compare energy usage, system costs, emissions, lost rentable space, and constructability.

More information

EnergyPlus Testing with Global Energy Balance Test

EnergyPlus Testing with Global Energy Balance Test Table of Contents Table of Contents Plus Testing with Global Balance Test 1 Test Objectives and Overview 1.1 Test Type: Comparative 1.2 Test Suite: Plus Global Balance Test Description 1.2.1 Base Case

More information

The School District of Philadelphia Administration Headquarters

The School District of Philadelphia Administration Headquarters Jayme Antolik Architectural Engineering Mechanical Option Senior Thesis 2006 Presentation Outline Reason for Renovations School District Administration Relocation Previous to move Originally in 4 offices

More information

Case 13 Food Storage & Processing Center

Case 13 Food Storage & Processing Center Case 13 Food Storage & Processing Center Copy Right By: Thomas T.S. Wan ( ) Feb. 2, 2002 All Rights Reserved Case Background: The refrigeration system is for a food processing and storage facility. The

More information

Challenges and Methods of Estimating a Conceptual HVAC Design

Challenges and Methods of Estimating a Conceptual HVAC Design Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.

More information

Chilled Water system

Chilled Water system Chilled Water system Introduction For large installations the Condenser, Evaporator, Compressor and Expansion device can be purchased as a package unit, known as a Chiller. The usual package consists of

More information

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program. 15684 ROTARY SCREW WATER CHILLERS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 236423 An optional

More information

Contact Information. Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone

Contact Information. Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone Contact Information Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone 509 335 9300 steve_potratz@wsu.edu WSU Utilities WSU primary systems are all based on district type

More information

AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT

AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT Central Chiller Plant (with Cooling Tower and Chilled Water distribution) The other AC configuration is called a Chilled Water or Larger Cooler system. It

More information

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating

More information

A/C Cooling Load calculation and measurement

A/C Cooling Load calculation and measurement Testo Inc. 40 White Lake Rd. Sparta NJ 07871 (800) 227-0729 A/C Cooling Load calculation and measurement When we talk about sizing an air conditioning appliance (tons of cooling, BTU/h or KW), we are specifying

More information

11/2 ORT THREEE. Virtua Repla. acement Hospi. ital. Voorhees NJ. Justin Prior. Mechanical

11/2 ORT THREEE. Virtua Repla. acement Hospi. ital. Voorhees NJ. Justin Prior. Mechanical 11/2 29 Virtua West Jersey Repla acement Hospi ital Voorhees NJ TECHNICAL REPO ORT THREEE System Overview Justin Prior Mechanical Table of Contents Executive Summary 3 System Overview 4 Design Factors

More information

Chiller Plant Design. Julian R. de Bullet President debullet Consulting

Chiller Plant Design. Julian R. de Bullet President debullet Consulting Chiller Plant Design Julian R. de Bullet President debullet Consulting 703-483-0179 julian@debullet.com This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer ASHRAE

More information

Shippensburg University

Shippensburg University Shippensburg University Horton Hall HVAC Feasibility Study PREPARED FOR: Shippensburg University 1871 Old Main Dr. Shippensburg, PA 17257 SHIPPENSBURG PROJECT: SU-2017/25 RPA PROJECT: 17118.001 DATE: December

More information

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation Mechanical Technical Report 3 Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department of Architectural Engineering Pennsylvania

More information

ApacheHVAC in VE 2012

ApacheHVAC in VE 2012 ApacheHVAC in VE 2012 Cooling tower loop Condenser water loop Electric water cooled chiller Chilled water loop Open cooling tower Towb L T 1 T lct V c Compressor T let V e Cooling tower loop pump Water-to-water

More information

MEP CONDITION ASSESSMENT

MEP CONDITION ASSESSMENT MAINE EAST MEP CONDITION ASSESSMENT MAINE EAST HIGH SCHOOL This report section includes an overview of the existing mechanical cooling and heating systems serving Maine East High School. The sections will

More information

Technical Development Program

Technical Development Program Technical Development Program PRESENTED BY: James Parker Insert your logo here AIR HANDLERS Coils: Direct Expansion Chilled Water and Heating Menu Section 1 Introduction Section 2 Typical Coil Applications

More information

ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS

ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS BULLETIN 20-131.001 Page 1 Copyright 2017 Unico Inc. TABLE OF CONTENTS APPLICATIONS... 3 CABINET CONSTRUCTION... 3 FEATURES AND CONTROLS... 3 DIMENSIONAL

More information

PRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series

PRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series PRODUCT SERIES VPR Series VPRX Series VPRE Series VPRP Series VPRC Series Valent Air Management Products Valent Air Management Systems designs and manufactures reliable, high-outdoor-air ventilators. Our

More information

EMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons

EMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons 560.20-TG1Y (388) EMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons Each circuit includes a fully hermetic compressor with a crankcase

More information

Cook - Wissahickon Elementary School

Cook - Wissahickon Elementary School Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District

More information

DIVISION 15 MECHANICAL

DIVISION 15 MECHANICAL DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with

More information

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

EADQUARTERS. Technical Report One. Stephanie Kunkel   Mechanical Option EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

NYC Department of Education

NYC Department of Education Asset: MID MAN ADULT LRNG CTR (81) - M, 212 W 120TH ST, New York, 10027 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-17 8:16 AM 2018-01-17 8:17 PM Asset Data Are there fuel

More information

Presentation Outline. Coppin State University Physical Education Complex Kaylee Damico Mechanical Option April 12 th, 2011

Presentation Outline. Coppin State University Physical Education Complex Kaylee Damico Mechanical Option April 12 th, 2011 Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Coppin State University Physical Education Complex Kaylee

More information

Energy Efficiency Baselines for CLEANROOMS. Non-Residential New Construction and Retrofit Incentive Programs. Version 2 October 1, 2008.

Energy Efficiency Baselines for CLEANROOMS. Non-Residential New Construction and Retrofit Incentive Programs. Version 2 October 1, 2008. Energy Efficiency Baselines for CLEANROOMS Non-Residential New Construction and Retrofit Incentive Programs Version 2 October 1, 2008 Funded By: Written By: 99 Linden Street Oakland, CA 94607 510.663.2070

More information

Air System Sizing Summary for AHU/CU-1 Project Name: Wilton Manors Fire Station#16 06/26/2016 Prepared by: L.N.I.

Air System Sizing Summary for AHU/CU-1 Project Name: Wilton Manors Fire Station#16 06/26/2016 Prepared by: L.N.I. Air System Sizing Summary for AHU/CU-1 AHU/CU-1 Floor Area 1678.0 ft² Central Cooling Coil Total coil load 4.8 Tons Total coil load 57.8 MBH Sensible coil load 41.8 MBH Coil CFM at Jul 1500 1909 CFM Max

More information

MASS AND HEAT RECOVERY SYSTEM SALAH MAHMOUD HINDAWI DIRECTOR HINDAWI FOR ENGINEERING SERVICES & CONTRACTING NEW DAMIETTA, EGYPT

MASS AND HEAT RECOVERY SYSTEM SALAH MAHMOUD HINDAWI DIRECTOR HINDAWI FOR ENGINEERING SERVICES & CONTRACTING NEW DAMIETTA, EGYPT ESL-IC-10-10-56 MASS AND HEAT RECOVERY SYSTEM SALAH MAHMOUD HINDAWI DIRECTOR HINDAWI FOR ENGINEERING SERVICES & CONTRACTING NEW DAMIETTA, EGYPT ABSTRACT : In the last few years heat recovery was under

More information

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE Palatine, Illinois Grumman/Butkus Associates Energy Efficiency Consultants and Sustainable Design Engineers 820 Davis Street, Suite 300 Evanston, Illinois

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.

More information

DACC Health Sciences Building Air Handler Assessment/Study

DACC Health Sciences Building Air Handler Assessment/Study DACC Health Sciences Building Air Handler Assessment/Study NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 June 14, 2016 Final Submittal 1065 S. Main St., Bldg. D, Ste.

More information

ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY

ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY SUPERIOR IAQ LOW FIRST COST BEST ROI ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY Pinnacle manages 100% of a building s ventilation and indoor humidity load in a single package. Chilled beams have

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

NYC Department of Education

NYC Department of Education Asset: LIBERTY HS - MANHATTAN, 250 WEST 18 STREET, New York, 10011 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-29 11:32 AM 2018-02-01 10:16 AM Asset Data Are there fuel tanks?

More information

ENGINEERING. Edition No. 13 October 2002

ENGINEERING. Edition No. 13 October 2002 Edition No. 13 October 2002 ENGINEERING S Y S T E M S O L U T I O N S W e at McQuay are very proud of our tradition of producing industry leading water source heat pumps. Our heritage stretches back more

More information

S H R E V E P O R T, L O U I S I A N A File: ARCHIVE MAIN STORAGE 102 09 / 18 / 2018 REVISIONS BY SCHEMATIC DESIGN SET DESIGN DEVELOPMENT SET CONSTRUCTION DOCUMENT SET CLIENT REVIEW SET AS-BUILT DOCUMENT

More information

400 Park Road, Watertown, CT

400 Park Road, Watertown, CT Industrial & Commercial: A Yankee Tradition Established in 1954 400 Park Road, Watertown, CT SUMMARY Modern class A office, manufacturing, warehouse, and laboratory space in approximately 140,000 SF building.

More information

Explanation of Cooling and Air Conditioning Terminology for IT Professionals

Explanation of Cooling and Air Conditioning Terminology for IT Professionals Explanation of Cooling and Air Conditioning Terminology for IT Professionals White Paper #11 Revision 1 Executive Summary As power densities continue to increase in today s data centers, heat removal is

More information

SPLIT-SYSTEM EVAPORATOR BLOWERS K2EU060, K4EU090, K3EU120 & K1EU180 5 Thru 15 Nominal Tons DESCRIPTION ACCESSORIES FIELD INSTALLED

SPLIT-SYSTEM EVAPORATOR BLOWERS K2EU060, K4EU090, K3EU120 & K1EU180 5 Thru 15 Nominal Tons DESCRIPTION ACCESSORIES FIELD INSTALLED (491) SPLIT-SYSTEM EVAPORATOR BLOWERS K2EU060, K4EU, K3EU & K1EU180 5 Thru 15 Nominal Tons DESCRIPTION These completely assembled units include a well-insulated cabinet, a DX cooling coil with copper tubes

More information

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc. System Components with ` Emphasis on Packaged Rooftop Application and Installation Jerry Cohen President Jacco & Assoc. Agenda Define and relate in practical terms the following components: System Effect

More information

Technical Report #2. Newseum and Freedom Forum Headquarters. Washington, D.C. Ryan Wise Lighting/Electrical Prof. Dannerth November 2, 2007

Technical Report #2. Newseum and Freedom Forum Headquarters. Washington, D.C. Ryan Wise Lighting/Electrical Prof. Dannerth November 2, 2007 Technical Report #2 Ryan Wise Lighting/Electrical Prof. Dannerth November 2, 2007 Newseum and Freedom Forum Headquarters Washington, D.C. Table of Contents Power Distribution Systems Executive Summary

More information

CTI Sponsored Educational Program

CTI Sponsored Educational Program Presented By: Kent Martens SPX Cooling Technologies, Inc. Slide No.: 1 CTI Mission Statement To advocate and promote the use of environmentally responsible Evaporative Heat Transfer Systems (EHTS) for

More information

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity

More information

Daikin Blueprint: Delivering Hot Water with a Chiller

Daikin Blueprint: Delivering Hot Water with a Chiller Daikin Blueprint: Delivering Hot Water with a Chiller Analyzing the design of heat recovery on air-cooled chillers and the effect it has on building energy consumption By Paul Crisman Daikin Chiller Applications

More information

THERMAL ICE STORAGE: Application & Design Guide

THERMAL ICE STORAGE: Application & Design Guide THERMAL ICE STORAGE: Application & Design Guide Table of Contents: 1. Introduction A. History of Thermal Energy Storage B. Operating and Cost Benefits 2. Applications A Fundamental System B. HVAC Cooling

More information

3D Equipment Library Order Form

3D Equipment Library Order Form 3D Equipment Library Order Form Select the images you wish to purchase and e-mail this form to chad@qagraphics.com You will be contacted to pay by credit card (Visa or MasterCard). When the purchase order

More information

Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN

Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN BREADTH STUDY - MECHANICAL REDESIGN Design Goals As previously mentioned, the construction of the Residence Inn was delayed by

More information

The Premium Quality Fan Coil Units for Vertical, Horizontal (Left or Right) Application with Direct Expansion, Hydronic or Electric Heat

The Premium Quality Fan Coil Units for Vertical, Horizontal (Left or Right) Application with Direct Expansion, Hydronic or Electric Heat Producing Quality Heating & Cooling Equipment For Over 50 Years DUW/DUX SERIES 1.5 THROUGH 5 TON VERTICAL OR HORIZONTAL FAN COIL UNITS The Premium Quality Fan Coil Units for Vertical, Horizontal (Left

More information

The electrical wattage needed by the circulator is:

The electrical wattage needed by the circulator is: The electrical wattage needed by the circulator is: w e = 0.4344 f P n w/w A current-generation wet-rotor circulator has a maximum wire-towater efficiency in the range of 25 percent. If we put the data

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS

9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS 9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS 9.1 Introduction Air conditioning and refrigeration consume significant amount of energy in buildings and in process industries. The energy consumed in

More information

DESIGN GUIDELINES SECTION HVAC

DESIGN GUIDELINES SECTION HVAC 3/15/17 Cooling Methodology Chiller Plants Configurations monitoring Preferred DESIGN GUIDELINES SECTION 15700 HVAC Air-cooled chillers < or = 300 tons; water-cooled chillers > 300 tons Variable volume

More information

Single zone RTU, controlled by a programmable thermostat. Single zone RTU, generic description, with power exhauster

Single zone RTU, controlled by a programmable thermostat. Single zone RTU, generic description, with power exhauster Rooftop Units CV Reheat RTU Reheat Reheat system RTU, serving electric reheat coils, w/dehumidification cycle & RA CO2 override of OAD CV Single Zone RTU SZ (from PC) RTU SZ Generic RTU SZ Multiple Units

More information

1 - This title will copy onto other forms Date

1 - This title will copy onto other forms Date 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM Project Title: 1 - This title will copy onto other forms Date 1/1/2015

More information

HVAC DISTRIBUTION and DELIVERY SYSTEMS

HVAC DISTRIBUTION and DELIVERY SYSTEMS HVAC DISTRIBUTION and DELIVERY SYSTEMS (Part 1) Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 REMINDER HVAC = Heating, Ventilating, Air-Conditioning The AC part of HVAC implies a system that

More information

PCAH SERIES AIR HANDLER

PCAH SERIES AIR HANDLER PCAH SERIES AIR HANDLER PCAH2/PCAH3/PCAH4 OPERATING MANUAL 1 2 3 4 5 6 7 8 9 10 TABLE OF CONTENTS GETTING STARTED... 3 ELECTRICAL CONNECTIONS... 3 2.1 POWER CONNECTIONS... 3 2.1.1 PCAH2/PCAH3... 3 2.1.2

More information

Physical Plant Complex

Physical Plant Complex Continuous Commissioning Report For the Physical Plant Complex Building #1156 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

COMMERCIAL HVAC PACKAGED EQUIPMENT. Split Systems

COMMERCIAL HVAC PACKAGED EQUIPMENT. Split Systems COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application topics. They are

More information

SECTION ROTARY SCREW WATER CHILLERS. B. Removal of Existing Refrigerant in Existing Chiller:

SECTION ROTARY SCREW WATER CHILLERS. B. Removal of Existing Refrigerant in Existing Chiller: SECTION 15684 ROTARY SCREW WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC). 3. 15711 - Induced Draft Cooling Tower. B.

More information

Preparing the Next Generation of Building Technicians

Preparing the Next Generation of Building Technicians Preparing the Next Generation of Building Technicians Laney's Model for Advanced Curriculum and Laboratory Requirements In some cases defining the new technician Green Collar Job Training at Laney College

More information

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz) DESCRIPTION These units are completely assembled, piped and wired at the factory to provide one-piece shipment and rigging. Each unit is pressurized with a holding charge of refrigerant-22 for storage

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

PITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS

PITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS PITTSBURG STATE UNIVERSITY HVAC and BUILDING AUTOMATION SYSTEM STANDARDS CHILLERS In new construction, liquid-cooled models are preferred for systems larger than 100 ton. o Trane, York and McQuay brands

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 86 ANNEX - BRONX, 124 EAMES PLACE, New York, 10468 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-05 1:03 PM 2018-04-27 1:35 PM Asset Data Are there fuel tanks? Total

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC 2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC Mechanical Systems Agenda Changes in NREC Chapter 11 Changes in NREC Chapter

More information

Product Data. Features/Benefits. 36CBAC,AE,AF,AH,AQ,AN, PB,PD,PS Series Active and Passive Chilled Beams. 11 to 190 cfm

Product Data. Features/Benefits. 36CBAC,AE,AF,AH,AQ,AN, PB,PD,PS Series Active and Passive Chilled Beams. 11 to 190 cfm Product Data 36CBAC,AE,AF,AH,AQ,AN, PB,PD,PS Series Active and Passive Chilled Beams 11 to 190 cfm 36CBAC A36-449.eps Chilled beam units offer: An increase in total airflow Sensible cooling and heating

More information

Packaged Heat Pump. 20 Ton Rooftop Units with ReliaTel TM Controls NOTICE

Packaged Heat Pump. 20 Ton Rooftop Units with ReliaTel TM Controls NOTICE Service Facts Customer Property: Contains wiring and service information. Please retain. WC*240-SF-1H Library Service Literature Product Section Unitary Product Package Air Conditioner Model WC* Literature

More information

HVAC Myths and Realities Trane Engineers Newsletter Live Series

HVAC Myths and Realities Trane Engineers Newsletter Live Series HVAC Myths and Realities Trane Engineers Newsletter Live Series AGENDA Low delta T is unavoidable 55 F supply air temperature is adequate for today s loads ASHRAE Standard 15 has to be updated before new

More information

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS*

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS* TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS K*ES120 10 NOMINAL TONS EER 8.5 DESCRIPTION These completely assembled dual circuit evaporator blower units include a well-insulated cabinet, a DX cooling

More information

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower SECTION 15684 ROTARY SCREW WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC) 3. 15711 - Induced Draft Cooling Tower B.

More information

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH 318 MHNCCX NOMENCLATURE BREAKDOWN 4-Pipe Heat/Cool Ceiling Concealed Fan Coil MHNCCW- XX - XX Ceiling Concealed

More information