A.H.U / Fan Room (p1 of 2) (approx. sizing using rules of thumb)
|
|
- Adela Matthews
- 6 years ago
- Views:
Transcription
1 A.H.U / Fan Room (p1 of 2) M1 STEP 1 Determine air flow req'd for each space, for total size of fan unit(s) in tons. Equation: Area (program) / (sf/ton) = tons req'd for space Classroom 8100sf / 350sf/ton = 23.2 tons Classroom 8100sf / 350sf/ton = 23.2 tons Museum Museum Office Office Lobby Lobby (Note: not including Freight for now) This could be adequate for a Lobby that is less than 50% glass Assuming that the Lobby is mostly glass, and exposed on 3 sides, we will DOUBLE the air requirement in the Lobby tons - Methods of approximating / rough-sizing. Final design process much more involved. - What is a "ton" in HVAC. - Where do these numbers come from (sf/ton by use) cfm/person outside air included in numbers. TOTAL Bldg. Cooling Load: 60 TONS Quick check: Overall Area / Tons =? 20,000 / 60 = 333.3
2 A.H.U / Fan Room (p2 of 2) STEP 2 Size the fan unit by approximating the size of the coil. o A. For 20 T, use 400 cfm/ton (rule of thumb) for air capacity: Calculate: 60 tons x 400 cfm/ton = 24,000 cfm B. Use (rule of thumb) 500 ft./ for air speed at coil: Calculate: 24,000 cfm / 500 ft/ = 48 sf SIZE OF COIL = Hdim x Wdim of A.H.U. = 48 SF LENGTH OF A.H.U. = ~ 2 x COIL SIZE M2 1 unit: 48 sf = 6.9'... use 1 unit with 7' x 7' coil x 14'L 2 units: (2) at 24 sf = 4.9'... use 2 units with 5' x 5' coil ea. x 10'L 3 units: (3) at 16 sf = 4'... use 3 units with 4' x 4' coil ea. x 8'L STEP 3 Size the coil area and initial supply duct: - Delta T for Austin: 75F to 55F - Speed at air coil. - Machine access / maintenance. A. Max. velocity for forced air = 1,000 ft/ From Step 2: 24,000 cfm / 1000 ft/min = 24sf coil area 1 unit option: 24sf = 4.9'... use 5' x 5' duct (big!) 2 unit option: 12sf ea. = 3.46'... use 3.5' x 3.5' duct ea. coil coil width ~ 4' 2 x coil width A.H.U. coil 3 unit option: 8sf ea. = use 3' x 3' duct ea. NOTE: Main Duct dimension can vary up to 2:1 ratio in section. Fan Room - Preliminary Design Plan Size
3 Boiler / Boiler Room (p1 of 2) M3 Single-unit design: Determine heat req'd for each space, for total heat in btu's. 5 Equation: Area (program) / (btu/sf) = heat req'd for space Classroom Museum 8100sf 8100 x 28 btu/sf 24 = 226,800 btu 194,400 for shallow, wide unit: Boiler Pumps Office ,500 Boiler Room - Preliminary Design Plan Size Lobby ,500 TOTAL HEAT: 543,200 BTU divide by 1,000 = ~ 543 mbh unit needed. - BTU values for spaces by use (typ. range 24-30). - Units (sizing boiler): 1 mbh = 1000btu - If > 400,00 btu = "boiler" = required 1-hour rated enclosure, and periodic inspections. - If < 200,000 btu = "hot water heater"? Example: HydroTherm ID-85A Boiler 500 mbh 1'-6"W 3'-6"L 2'-6"H Lochinvar 750 btu/hr unit: (Revit module for class) 2'-0"W, 2'-4"L, 4'-4"H Boiler for deep unit: Pumps Boiler Room - Preliminary Design Plan Size
4 Boiler / Boiler Room (p2 of 2) M4 Multiple-unit design: Total btu reqd. = 543,000 3 units under 199btu has advantages. Lochinvar mfg. 1 unit option: 1 at 500 btu, or 2 unit option: 2 at 300 btu ea., or 3 units option: 3 at 165 btu ea. (199 btu and under = hot water heater status) 2'-0" Clear, typ. 3 water heaters Manuf: Lochinvar 4'-4"H, 2'-4"L, 2'W Water Heater Room - Preliminary Design Plan Size + 2 pumps in adjacent Chiller Room
5 Chiller / Chiller Room STEP 1 Determine efficiency / life-span of unit: Least efficient year life DX system $3200/ton 25 year life air-cooled system $4800/ton Most efficient 35 year life water-cooled system $6800/ton (Source: S.Allen, rules of thumb based on project histories) York chiller, 118 tons M5 Typically, building will have an air-cooled system if below 300 tons. Water is better (more efficient, longer life-span), typical on big commercial systems over 300 tons. PUMPS: Bell & Gosett (2) HW 1'-5"W, 4'-7"L, 1'-9"H Each (2) CW (2) condensor STEP 2 Choose unit. 5'-0" 60 ton req'd, size water unit is 100 ton (oversized, but fine) York manufacturer, 100 ton unit: 138" L (11'-6) 44" W (3'-8) 73" H Plan for Tube replacement Chiller: McQuay Int. 6'-2"W, 11'-8"L, 8'H Chiller - Difference between 3 systems: how they work. Chiller Room Plan - Preliminary Design Size
6 Cooling Tower + Enclosure M6 Choose unit based on # tons required. For our project, 60 ton req'd, size unit is 100 ton. This oversized, but fine as most units run best at about 75% capacity). Manuf: Marley, 100 ton unit: 12' L 4' D 10' H Min. clear around cooling tower: 6' for small units. More clearance for larger units. Cooling Tower Cooling Tower: Morley 12'-10"L, 10'-7"W, 10'-2"H 8'-0" Typ. clearance all around + must be open to sky. Cooling Tower Enclosure - Preliminary Design Plan Note: THIS UNIT IS OUTSIDE (ROOF OR GROUND LEVEL) 2 How cooling towers work, types of systems, vibration and weight. Note: Revit files and product pdf:
7 Electrical and Other Service Rooms M7 OUTSIDE DOOR ELECTRICAL TRANSFORMER: 3'W X 3'L X 5'H ELEC. PANELS, SECURITY, TEL, A.V. OUTSIDE DOOR 5'-0" PANELS 1'-0" Main Electrical Room CITY ELECT SERVICE: 12,000 VOLTS STEP DOWN 1ST OUTSIDE, THEN AGAIN INSIDE MAIN ELECT. RM. Water Service + Fire Protection Room Secondary Elec. Room CONC. PAD ELECTRICAL TRANSFORMER: 6'W X 6'L X 6'H 3'x3' PAD (METER) OUSTIDE PAD-MOUNTED ELEC. TRANSFORMER 8'-0" 8'-0" Pump(s) Hydraulic Elev. Machine Room For Hydraulic elevators (70' max lift): Locate machine room near bottom landing. (hydraulic fluid pumps and panels) For Electric elevators: Locate machine room at roof above top of cab. (electric motorized hoist and panels) I.T. Room: Many buildings will have one I.T. Room per floor (8'x10') with it's own DX cooling system (for internet servers).
Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3
Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located
More informationAir System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 Prepared by: psuae
APPENDIX C Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 12:56PM Air System Information Air System Name Equipment Class Air System Type Lobby System CW AHU SZCAV Number
More informationMECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE
MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE 18422 Bear Valley Road Victorville, CA 92395 Date 25 September 2012 dha Job No. 12155 TABLE OF CONTENTS I. Purpose.... Page 1 II. Existing
More informationIntroduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN
Introduction to HVAC Agenda Psychrometrics Human Comfort Heat Transfer Refrigeration Cycle HVAC Terminology HVAC Systems Introduction to HVAC Psychrometrics 2000 TRG-TRC002-EN Properties of Air Dry-bulb
More informationMechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation
Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department
More informationAppendices. Included in this section are
Appendices Included in this section are Appendix A Building Overview Appendix B Alternative Mechanical Designs Appendix C Integration of Structural System and Constructability 68 Appendix A Building Overview
More informationHVAC 101. H V A C S y s t e m s
H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost
More informationSECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...
SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...
More informationHVAC Rule of Thumb Calc-1
HVAC Rule of Thumb Calculator Table of Contents 1.0 Introduction... 2 1.1 Units... 2 2.0 Disclaimer... 3 3.0 How to use this Calculator... 4 4.0 Selecting Inputs... 5 4.1 Building Information... 5 4.1.1
More informationTechnical Assignment #2a. Atlanta, GA Green Building Mechanical
Tubman African American Museum Technical Assignment #2a Chris Champagne Atlanta, GA Green Building Mechanical Green Building Certification Analysis- The major categories of the U.S. Green Building Council
More informationDescription of All Alternatives Considered-
Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142
More informationMECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY
MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY 2018 57 MECHANICAL ASSESSMENT MECHANICAL ASSESSMENT This report section includes an overview of the existing
More informationCARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.
Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using
More informationEvaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015
Martha a s Vineyard Regional High School Vineyard Haven, MA 2 2015 HVAC Syste ems Evaluation Prepared For: Martha s Vineyard Regional School District Box 1385 Oaks Bluff, MA 02557 Prepared By: BLW Engineers,
More informationFLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK
FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and
More informationModular Active. Chilled. Beams
Modular Active Chilled Beams How Twa MAC Beams Work Primary air (100% outside air) is dehumidified to between 50-57 F dew point and is used to: control the latent requirements of the space, provide fresh
More informationTECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio
Technical Report 3 Northfield Mental Healthcare Center Dr. Stephen Treado Ji Won Park Mechanical Option Fall 2012 TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare
More informationNovember 11, City of Sparks 215 S. 21 st St. Sparks, NV
November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of
More informationCONTENTS. B. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More information7. MECHANICAL SYSTEM DESIGN
7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved
More information05/14/2012 BOILER TUNE UPS & REPLACEMENTS PRESENTATION BOILER BASICS FOR LARGE INDUSTRIAL FACILITIES. Mark Bergum, P.E.
BOILER TUNE UPS & REPLACEMENTS FOR LARGE INDUSTRIAL FACILITIES Mark Bergum, P.E. PRESENTATION BOILER BASICS 1 BASE ASSUMPTION BOILER Steam Heat Output Exhaust Heat Losses 70% 20% Other Heat Losses 3% Blowdown
More informationELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.
B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.
More informationMechanical Systems Design
Mechanical Systems Design After much deliberation and a long process of brainstorming ideas for potential mechanical system designs for the, it was finally decided to design a central chilled water plant
More informationENERGY RECOVERY HEAT PIPE HEAT EXCHANGERS
WAHX (WRAP-AROUND) AAHX (AIR-TO-AIR) ENERGY RECOVERY HEAT PIPE HEAT EXCHANGERS HVAC PRODUCT GUIDE THERMAL MANAGEMENT EXPERTS ADVANCED COOLING TECHNOLOGIES, INC. IS A PREMIER THERMAL MANAGEMENT SOLUTIONS
More informationHE-B Series Commissioning Report & User Guide
Small Duct High Velocity Heating, Cooling and Home Comfort Systems HE-B Series Commissioning Report & User Guide Manufactured By www.hi-velocity.com Module-HEB-COM-Commissioning-Report-and-User-Guide-061616
More informationInspection Phase Three. Mechanical, Electrical & Plumbing Section 503
Inspection Phase Three Mechanical, Electrical & Plumbing Section 503 COMCheck Mechanical Field Inspection Checklist Mechanical Mechanical, Electrical & Plumbing Equipment Efficiencies But a lot ore too
More informationThe School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA
2.0 Depth Work - Alternative Mechanical Designs 2.1 Objectives The goal of designing alternative systems is to compare energy usage, system costs, emissions, lost rentable space, and constructability.
More informationEnergyPlus Testing with Global Energy Balance Test
Table of Contents Table of Contents Plus Testing with Global Balance Test 1 Test Objectives and Overview 1.1 Test Type: Comparative 1.2 Test Suite: Plus Global Balance Test Description 1.2.1 Base Case
More informationThe School District of Philadelphia Administration Headquarters
Jayme Antolik Architectural Engineering Mechanical Option Senior Thesis 2006 Presentation Outline Reason for Renovations School District Administration Relocation Previous to move Originally in 4 offices
More informationCase 13 Food Storage & Processing Center
Case 13 Food Storage & Processing Center Copy Right By: Thomas T.S. Wan ( ) Feb. 2, 2002 All Rights Reserved Case Background: The refrigeration system is for a food processing and storage facility. The
More informationChallenges and Methods of Estimating a Conceptual HVAC Design
Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.
More informationChilled Water system
Chilled Water system Introduction For large installations the Condenser, Evaporator, Compressor and Expansion device can be purchased as a package unit, known as a Chiller. The usual package consists of
More informationA. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.
15684 ROTARY SCREW WATER CHILLERS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 236423 An optional
More informationContact Information. Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone
Contact Information Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone 509 335 9300 steve_potratz@wsu.edu WSU Utilities WSU primary systems are all based on district type
More informationAC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT
AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT Central Chiller Plant (with Cooling Tower and Chilled Water distribution) The other AC configuration is called a Chilled Water or Larger Cooler system. It
More informationASHRAE Illinois Chapter 2015 Excellence in Engineering Awards
ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating
More informationA/C Cooling Load calculation and measurement
Testo Inc. 40 White Lake Rd. Sparta NJ 07871 (800) 227-0729 A/C Cooling Load calculation and measurement When we talk about sizing an air conditioning appliance (tons of cooling, BTU/h or KW), we are specifying
More information11/2 ORT THREEE. Virtua Repla. acement Hospi. ital. Voorhees NJ. Justin Prior. Mechanical
11/2 29 Virtua West Jersey Repla acement Hospi ital Voorhees NJ TECHNICAL REPO ORT THREEE System Overview Justin Prior Mechanical Table of Contents Executive Summary 3 System Overview 4 Design Factors
More informationChiller Plant Design. Julian R. de Bullet President debullet Consulting
Chiller Plant Design Julian R. de Bullet President debullet Consulting 703-483-0179 julian@debullet.com This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer ASHRAE
More informationShippensburg University
Shippensburg University Horton Hall HVAC Feasibility Study PREPARED FOR: Shippensburg University 1871 Old Main Dr. Shippensburg, PA 17257 SHIPPENSBURG PROJECT: SU-2017/25 RPA PROJECT: 17118.001 DATE: December
More informationMechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation
Mechanical Technical Report 3 Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department of Architectural Engineering Pennsylvania
More informationApacheHVAC in VE 2012
ApacheHVAC in VE 2012 Cooling tower loop Condenser water loop Electric water cooled chiller Chilled water loop Open cooling tower Towb L T 1 T lct V c Compressor T let V e Cooling tower loop pump Water-to-water
More informationMEP CONDITION ASSESSMENT
MAINE EAST MEP CONDITION ASSESSMENT MAINE EAST HIGH SCHOOL This report section includes an overview of the existing mechanical cooling and heating systems serving Maine East High School. The sections will
More informationTechnical Development Program
Technical Development Program PRESENTED BY: James Parker Insert your logo here AIR HANDLERS Coils: Direct Expansion Chilled Water and Heating Menu Section 1 Introduction Section 2 Typical Coil Applications
More informationISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS
ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS BULLETIN 20-131.001 Page 1 Copyright 2017 Unico Inc. TABLE OF CONTENTS APPLICATIONS... 3 CABINET CONSTRUCTION... 3 FEATURES AND CONTROLS... 3 DIMENSIONAL
More informationPRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series
PRODUCT SERIES VPR Series VPRX Series VPRE Series VPRP Series VPRC Series Valent Air Management Products Valent Air Management Systems designs and manufactures reliable, high-outdoor-air ventilators. Our
More informationEMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons
560.20-TG1Y (388) EMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons Each circuit includes a fully hermetic compressor with a crankcase
More informationCook - Wissahickon Elementary School
Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District
More informationDIVISION 15 MECHANICAL
DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with
More informationEADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option
EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option
More informationNYC Department of Education
Asset: MID MAN ADULT LRNG CTR (81) - M, 212 W 120TH ST, New York, 10027 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-17 8:16 AM 2018-01-17 8:17 PM Asset Data Are there fuel
More informationPresentation Outline. Coppin State University Physical Education Complex Kaylee Damico Mechanical Option April 12 th, 2011
Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Coppin State University Physical Education Complex Kaylee
More informationEnergy Efficiency Baselines for CLEANROOMS. Non-Residential New Construction and Retrofit Incentive Programs. Version 2 October 1, 2008.
Energy Efficiency Baselines for CLEANROOMS Non-Residential New Construction and Retrofit Incentive Programs Version 2 October 1, 2008 Funded By: Written By: 99 Linden Street Oakland, CA 94607 510.663.2070
More informationAir System Sizing Summary for AHU/CU-1 Project Name: Wilton Manors Fire Station#16 06/26/2016 Prepared by: L.N.I.
Air System Sizing Summary for AHU/CU-1 AHU/CU-1 Floor Area 1678.0 ft² Central Cooling Coil Total coil load 4.8 Tons Total coil load 57.8 MBH Sensible coil load 41.8 MBH Coil CFM at Jul 1500 1909 CFM Max
More informationMASS AND HEAT RECOVERY SYSTEM SALAH MAHMOUD HINDAWI DIRECTOR HINDAWI FOR ENGINEERING SERVICES & CONTRACTING NEW DAMIETTA, EGYPT
ESL-IC-10-10-56 MASS AND HEAT RECOVERY SYSTEM SALAH MAHMOUD HINDAWI DIRECTOR HINDAWI FOR ENGINEERING SERVICES & CONTRACTING NEW DAMIETTA, EGYPT ABSTRACT : In the last few years heat recovery was under
More informationFINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois
FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE Palatine, Illinois Grumman/Butkus Associates Energy Efficiency Consultants and Sustainable Design Engineers 820 Davis Street, Suite 300 Evanston, Illinois
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.
More informationDACC Health Sciences Building Air Handler Assessment/Study
DACC Health Sciences Building Air Handler Assessment/Study NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 June 14, 2016 Final Submittal 1065 S. Main St., Bldg. D, Ste.
More informationENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY
SUPERIOR IAQ LOW FIRST COST BEST ROI ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY Pinnacle manages 100% of a building s ventilation and indoor humidity load in a single package. Chilled beams have
More informationUNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationNYC Department of Education
Asset: LIBERTY HS - MANHATTAN, 250 WEST 18 STREET, New York, 10011 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-29 11:32 AM 2018-02-01 10:16 AM Asset Data Are there fuel tanks?
More informationENGINEERING. Edition No. 13 October 2002
Edition No. 13 October 2002 ENGINEERING S Y S T E M S O L U T I O N S W e at McQuay are very proud of our tradition of producing industry leading water source heat pumps. Our heritage stretches back more
More informationS H R E V E P O R T, L O U I S I A N A File: ARCHIVE MAIN STORAGE 102 09 / 18 / 2018 REVISIONS BY SCHEMATIC DESIGN SET DESIGN DEVELOPMENT SET CONSTRUCTION DOCUMENT SET CLIENT REVIEW SET AS-BUILT DOCUMENT
More information400 Park Road, Watertown, CT
Industrial & Commercial: A Yankee Tradition Established in 1954 400 Park Road, Watertown, CT SUMMARY Modern class A office, manufacturing, warehouse, and laboratory space in approximately 140,000 SF building.
More informationExplanation of Cooling and Air Conditioning Terminology for IT Professionals
Explanation of Cooling and Air Conditioning Terminology for IT Professionals White Paper #11 Revision 1 Executive Summary As power densities continue to increase in today s data centers, heat removal is
More informationSPLIT-SYSTEM EVAPORATOR BLOWERS K2EU060, K4EU090, K3EU120 & K1EU180 5 Thru 15 Nominal Tons DESCRIPTION ACCESSORIES FIELD INSTALLED
(491) SPLIT-SYSTEM EVAPORATOR BLOWERS K2EU060, K4EU, K3EU & K1EU180 5 Thru 15 Nominal Tons DESCRIPTION These completely assembled units include a well-insulated cabinet, a DX cooling coil with copper tubes
More informationSystem Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.
System Components with ` Emphasis on Packaged Rooftop Application and Installation Jerry Cohen President Jacco & Assoc. Agenda Define and relate in practical terms the following components: System Effect
More informationTechnical Report #2. Newseum and Freedom Forum Headquarters. Washington, D.C. Ryan Wise Lighting/Electrical Prof. Dannerth November 2, 2007
Technical Report #2 Ryan Wise Lighting/Electrical Prof. Dannerth November 2, 2007 Newseum and Freedom Forum Headquarters Washington, D.C. Table of Contents Power Distribution Systems Executive Summary
More informationCTI Sponsored Educational Program
Presented By: Kent Martens SPX Cooling Technologies, Inc. Slide No.: 1 CTI Mission Statement To advocate and promote the use of environmentally responsible Evaporative Heat Transfer Systems (EHTS) for
More information21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device
DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity
More informationDaikin Blueprint: Delivering Hot Water with a Chiller
Daikin Blueprint: Delivering Hot Water with a Chiller Analyzing the design of heat recovery on air-cooled chillers and the effect it has on building energy consumption By Paul Crisman Daikin Chiller Applications
More informationTHERMAL ICE STORAGE: Application & Design Guide
THERMAL ICE STORAGE: Application & Design Guide Table of Contents: 1. Introduction A. History of Thermal Energy Storage B. Operating and Cost Benefits 2. Applications A Fundamental System B. HVAC Cooling
More information3D Equipment Library Order Form
3D Equipment Library Order Form Select the images you wish to purchase and e-mail this form to chad@qagraphics.com You will be contacted to pay by credit card (Visa or MasterCard). When the purchase order
More informationResidence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN
Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN BREADTH STUDY - MECHANICAL REDESIGN Design Goals As previously mentioned, the construction of the Residence Inn was delayed by
More informationThe Premium Quality Fan Coil Units for Vertical, Horizontal (Left or Right) Application with Direct Expansion, Hydronic or Electric Heat
Producing Quality Heating & Cooling Equipment For Over 50 Years DUW/DUX SERIES 1.5 THROUGH 5 TON VERTICAL OR HORIZONTAL FAN COIL UNITS The Premium Quality Fan Coil Units for Vertical, Horizontal (Left
More informationThe electrical wattage needed by the circulator is:
The electrical wattage needed by the circulator is: w e = 0.4344 f P n w/w A current-generation wet-rotor circulator has a maximum wire-towater efficiency in the range of 25 percent. If we put the data
More informationTechnical Assignment 3 11/15/04. Executive Summary
Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria
More information9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS
9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS 9.1 Introduction Air conditioning and refrigeration consume significant amount of energy in buildings and in process industries. The energy consumed in
More informationDESIGN GUIDELINES SECTION HVAC
3/15/17 Cooling Methodology Chiller Plants Configurations monitoring Preferred DESIGN GUIDELINES SECTION 15700 HVAC Air-cooled chillers < or = 300 tons; water-cooled chillers > 300 tons Variable volume
More informationSingle zone RTU, controlled by a programmable thermostat. Single zone RTU, generic description, with power exhauster
Rooftop Units CV Reheat RTU Reheat Reheat system RTU, serving electric reheat coils, w/dehumidification cycle & RA CO2 override of OAD CV Single Zone RTU SZ (from PC) RTU SZ Generic RTU SZ Multiple Units
More information1 - This title will copy onto other forms Date
2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM Project Title: 1 - This title will copy onto other forms Date 1/1/2015
More informationHVAC DISTRIBUTION and DELIVERY SYSTEMS
HVAC DISTRIBUTION and DELIVERY SYSTEMS (Part 1) Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 REMINDER HVAC = Heating, Ventilating, Air-Conditioning The AC part of HVAC implies a system that
More informationPCAH SERIES AIR HANDLER
PCAH SERIES AIR HANDLER PCAH2/PCAH3/PCAH4 OPERATING MANUAL 1 2 3 4 5 6 7 8 9 10 TABLE OF CONTENTS GETTING STARTED... 3 ELECTRICAL CONNECTIONS... 3 2.1 POWER CONNECTIONS... 3 2.1.1 PCAH2/PCAH3... 3 2.1.2
More informationPhysical Plant Complex
Continuous Commissioning Report For the Physical Plant Complex Building #1156 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More informationCOMMERCIAL HVAC PACKAGED EQUIPMENT. Split Systems
COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application topics. They are
More informationSECTION ROTARY SCREW WATER CHILLERS. B. Removal of Existing Refrigerant in Existing Chiller:
SECTION 15684 ROTARY SCREW WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC). 3. 15711 - Induced Draft Cooling Tower. B.
More informationPreparing the Next Generation of Building Technicians
Preparing the Next Generation of Building Technicians Laney's Model for Advanced Curriculum and Laboratory Requirements In some cases defining the new technician Green Collar Job Training at Laney College
More informationTECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)
DESCRIPTION These units are completely assembled, piped and wired at the factory to provide one-piece shipment and rigging. Each unit is pressurized with a holding charge of refrigerant-22 for storage
More information1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT
Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story
More informationPITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS
PITTSBURG STATE UNIVERSITY HVAC and BUILDING AUTOMATION SYSTEM STANDARDS CHILLERS In new construction, liquid-cooled models are preferred for systems larger than 100 ton. o Trane, York and McQuay brands
More informationNYC Department of Education
Asset: P.S. 86 ANNEX - BRONX, 124 EAMES PLACE, New York, 10468 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-05 1:03 PM 2018-04-27 1:35 PM Asset Data Are there fuel tanks? Total
More informationRE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana
ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum
More information2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC
2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC Mechanical Systems Agenda Changes in NREC Chapter 11 Changes in NREC Chapter
More informationProduct Data. Features/Benefits. 36CBAC,AE,AF,AH,AQ,AN, PB,PD,PS Series Active and Passive Chilled Beams. 11 to 190 cfm
Product Data 36CBAC,AE,AF,AH,AQ,AN, PB,PD,PS Series Active and Passive Chilled Beams 11 to 190 cfm 36CBAC A36-449.eps Chilled beam units offer: An increase in total airflow Sensible cooling and heating
More informationPackaged Heat Pump. 20 Ton Rooftop Units with ReliaTel TM Controls NOTICE
Service Facts Customer Property: Contains wiring and service information. Please retain. WC*240-SF-1H Library Service Literature Product Section Unitary Product Package Air Conditioner Model WC* Literature
More informationHVAC Myths and Realities Trane Engineers Newsletter Live Series
HVAC Myths and Realities Trane Engineers Newsletter Live Series AGENDA Low delta T is unavoidable 55 F supply air temperature is adequate for today s loads ASHRAE Standard 15 has to be updated before new
More informationK*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS*
TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS K*ES120 10 NOMINAL TONS EER 8.5 DESCRIPTION These completely assembled dual circuit evaporator blower units include a well-insulated cabinet, a DX cooling
More informationSECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower
SECTION 15684 ROTARY SCREW WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC) 3. 15711 - Induced Draft Cooling Tower B.
More informationMHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH
MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH 318 MHNCCX NOMENCLATURE BREAKDOWN 4-Pipe Heat/Cool Ceiling Concealed Fan Coil MHNCCW- XX - XX Ceiling Concealed
More information