Presentation Outline. Coppin State University Physical Education Complex Kaylee Damico Mechanical Option April 12 th, 2011

Size: px
Start display at page:

Download "Presentation Outline. Coppin State University Physical Education Complex Kaylee Damico Mechanical Option April 12 th, 2011"

Transcription

1 Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Coppin State University Physical Education Complex Kaylee Damico Mechanical Option April 12 th, 2011

2 Project Team Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Owner: Maryland Stadium Authority Architect: Cochran, Stephenson & Donkervoet Construction Manager: Gilbane Mechanical Engineer: James Posey Associates Electrical Engineer: Diversified Engineering Structural Engineer: Hope Furrer Associates Civil Engineer: Site Resources Coppin State University Physical Education Complex Kaylee Damico Mechanical Option April 12 th, 2011

3 Project Overview Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Project Site New Main Entrances for University Adjacent track and field and other sporting fields Architecture 246,000 GSF $136 million 1-4 stories LEED Silver Certification

4 Project Overview Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Project Site New Main Entrances for University Adjacent track and field and other sporting fields Architecture 246,000 GSF $136 million 1-4 stories LEED Silver Certification Specialty Spaces 4,100 seat Arena 8-lane NCAA regulation pool Dance Studio Auxiliary Gym Fitness Center

5 Existing Mechanical Systems Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Air Systems 14 Variable Air Volume AHUs Single zone and multiple zone 2 Energy Recovery Units 1 Pool Dehumidification System

6 AHU-1: Level 1 Shops AHU-2: Level 1 Offices AHU-3: Project Team Level 2 Offices AHU-4: Project Overview Level 3 Offices AHU-5 Existing & Mechanical 6: Arena Systems AHU-7: Proposed Concessions Redesign AHU-8: Mechanical Level Depth 3 Coach Offices AHU-9 Electrical & 10: Breadth Auxiliary Gym AHU-11: Construction Classrooms Management & Dance Breadth Studio AHU-12: Cost and Multipurpose Energy Savings Room AHU-13: Summary Fitness and Conclusion Area AHU-14: Heating Unit for Shops PDU-1: Pool ERU-1 & 2: Locker Rooms Existing Mechanical Systems Air Systems 14 Variable Air Volume AHUs Single zone and multiple zone 2 Energy Recovery Units 1 Pool Dehumidification System AHU-1 AHU-2,3 & 4 AHU-5 & 6 AHU-7 & 8 AHU-9 & 10 AHU-11,12 & 13 AHU-14 PDU ERU-1&2

7 Existing Mechanical Systems Air Systems 14 Variable Air Volume AHUs Single zone and multiple zone 2 Energy Recovery Units 1 Pool Dehumidification System Central Plant Two 500 ton chillers 1000 ton cooling tower AHU-1 AHU-2,3 & 4 AHU-5 & 6 AHU-7 & 8 AHU-9 & 10 AHU-11,12 & 13 AHU-14 PDU ERU-1&2

8 Existing Mechanical Systems Boilers Primary Heating Water Pumps Secondary Heating Water Pumps Variable Flow Heating Water Pumps Pressure Relief Storage Tanks Air Systems 14 Variable Air Volume AHUs Single zone and multiple zone 2 Energy Recovery Units 1 Pool Dehumidification System Central Plant Two 500 ton chillers 1000 ton cooling tower Three dual fuel 250HP boilers Primary-Secondary system Space for future expansion

9 Proposed Redesign Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Design Objectives More efficient mechanical systems Lower Overall Energy Usage Lower Emissions Design Components Ground Source Heat Pump System Heat Recovery Chiller Electrical Redesign of MCC Construction Reorganization

10 Project Team Proposed Redesign Mechanical Depth GSHP HRC Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Mechanical Depth - GSHP Site Soil Type Resistance Depth Allowed Paleozoic basic igneous rock

11 Mechanical Depth - GSHP Site Soil Type Resistance Depth Allowed Calculations Only Zones A and B 55 bores at 400 each Equipment 5 water to water heat pumps Each with 11 bores Reverse Return Polyethylene Piping # of Bores: Total Flow Rate: (GPM) Piping Nominal Diameter: (Inches) Piping Internal Diameter: (Inches) Average Fluid Velocity: (FPS) Total Loss Per 100' of Pipe: (Feet) Piping Efficiency (20% P.G.): Max Dia for Turb Flow: High Efficiency High Efficiency High Efficiency High Efficiency High Efficiency High Efficiency High Efficiency High Efficiency High Efficiency High Efficiency High Efficiency Paleozoic basic igneous rock

12 Mechanical Depth - HRC Project Team Proposed Redesign Mechanical Depth GSHP HRC Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Sizing Hourly loads Available heating hot water HRC can handle 52% of load Reheat Load (MBH) 1000 = GPM 500 ΔT Reheat Load = 3500 MBH ΔT = (140 F F) = 20 F

13 Mechanical Depth - HRC Sizing Hourly loads Available heating hot water HRC can handle 52% of load Equipment (2) McQuay Templifier HRC (5) Weil McLain Condensing Boilers Downsize Reheat Load existing (MBH) Cleaver 1000 = Brooks GPM 500 ΔT boilers Reheat Load = 3500 MBH ΔT = (140 F F) = 20 F Boilers Boilers Primary Primary Heating Heating Water Water Pumps Pumps Secondary Secondary Heating Heating Water Water Pumps Pumps Variable Variable Flow Flow Heating Heating Water Water Pumps Pumps Pressure Pressure Relief Relief Storage Storage Tanks Tanks Heat Recovery Chillers Condensing Boilers

14 Mechanical Depth - HRC Q = 100 G^(0.5) Where, Q = airflow (CFM) G= 49.9kg of R134a Sizing Hourly loads Available heating hot water HRC can handle 52% of load Equipment (2) McQuay Templifier HRC (5) Weil McLain Condensing Boilers Downsize existing Cleaver Brooks boilers Refrigerant Leak Detection Exhaust 1400 CFM required for R-134a 2 Roof Upblast Fans Boilers Primary Heating Water Pumps Secondary Heating Water Pumps Variable Flow Heating Water Pumps Pressure Relief Storage Tanks Heat Recovery Chillers Condensing Boilers

15 Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Electrical Breadth Calculations Electrical Information HP KVA FLA Electrical Info of Equipment Added for HRC Equipment Removed HP KVA FLA Boiler Blower Motor Boiler Blower Motor Boiler Blower Motor Equipment Added New Boiler Blower Motor New Boiler Blower Motor New Boiler Blower Motor Condensing Boiler Motor Condensing Boiler Motor Condensing Boiler Motor Condensing Boiler Motor Condensing Boiler Motor HRC HRC Electrical Info of Equipment Added for GSHP Equipment Added HP KVA FLA HP HP HP HP HP

16 Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Electrical Breadth Calculations Electrical Information HP KVA FLA Scheduling Spares and spaces on previous MCC s MCC-2 Partial Schedule Electrical Info of Equipment Added for HRC Equipment Removed HP KVA FLA Boiler Blower Motor Boiler Blower Motor Boiler Blower Motor Equipment Added New Boiler Blower Motor New Boiler Blower Motor New Boiler Blower Motor Condensing Boiler Motor Condensing Boiler Motor Condensing Boiler Motor Condensing Boiler Motor Condensing Boiler Motor HRC HRC MCC-3 Partial Schedule Main Bus: 1200A Volts: 480VAC Phase: 3 Vertical Electrical Bus: 600A Info of Equipment Added Wires: for GSHP 4 Compartment Circuit Load Name Plate No. Equipment Number Added HP KVA HP FLA KVA FLA 5BR HP-1 MCC3-27 SPARE HL HP-2 MCC3-48 SPARE HR MCC3-49 SPARE ` DL HP-3 MCC3-55 SPARE G HP-4 - SPACE Total Load: HP KVA Total Load: Amps Demand Factor:70%

17 Feeders from HRC Equipment Compartment # 1BL 2BL 3BL 3M 4K 4M 5B 5D 5F 5J Feeder Size 3#12+1#12G, 1/2" C 3#12+1#12G, 1/2" C 3#12+1#12G, 1/2" C 3#8+1#10G, 1/2" C 3#8+1#10G, 1/2" C 3#8+1#10G, 1/2" C 3#8+1#10G, 1/2" C 3#8+1#10G, 1/2" C 3#8+1#8G, 1" C 3#8+1#8G, 1" C Feeders from GSHP Equipment Compartment # Feeder Size 5BR 3#8+1#8G, 1"C 7HL 3#8+1#8G, 1"C 7HR 3#8+1#8G, 1"C 8DL 3#8+1#8G, 1"C 9G 3#8+1#8G, 1"C Electrical Breadth Calculations Electrical Information HP KVA FLA Scheduling Spares and spaces on previous MCC s Installed and replaced with new equipment Sizing Feeders sized for each addition New MCC-2 MCC-2 Partial Partial Schedule Schedule Main Bus: 600A Volts: 480VAC Phase: 3 Vertical Bus: 300A Wires: 3 Compartment Circuit Load Name Plate No. Number HP KVA FLA 1BL MCC2-1 New Boiler #1 Blower Motor BL MCC2-2 New Boiler #2 Blower Motor BL MCC2-3 New Boiler #3 Blower Motor M MCC2-26 Condensing Boiler Motor K MCC2-31 Condensing Boiler Motor M MCC2-32 Condensing Boiler Motor B MCC2-33 Condensing Boiler Motor D MCC2-34 Condensing Boiler Motor F MCC2-35 HRC J MCC2-37 HRC Total Load: KVA Total Load: 524 Amps Demand Factor:70% New MCC-3 MCC-3 Partial Partial Schedule Schedule Main Bus: 1200A Volts: Volts: 480VAC 480VAC Phase: Phase: 3 3 Vertical Bus: Bus: 600A 600A Wires: Wires: 4 4 Compartment Circuit Load Compartment Circuit Name Plate Load No. Number Name Plate HP KVA FLA No. Number HP KVA FLA 5BR MCC3-27 HP BR MCC3-27 SPARE HL MCC3-48 HP HL 7HR MCC3-49 MCC3-48 HP-3 SPARE HR 8DL MCC3-55 MCC3-49 HP-4 SPARE ` DL 9G MCC3-62 MCC3-55 HP-5 SPARE GTotal Load: 1491 KVA - SPACE Total Load: Amps - - Total Load: 1399 KVA Demand Factor:70% Total Load: Amps Demand Factor:70%

18 Project Equipment Team Costs for HRC Equipment Removed Cost Boiler 1 $ 131, Boiler 2 $ 131, Boiler 3 $ 131, Equipment Added Proposed New Boiler -1 Redesign $ 129, New Boiler -2 $ 129, Mechanical New Boiler -3 Depth $ 129, Condensing Boiler $ 6, Electrical Condensing Boiler Breadth $ 6, Condensing Boiler $ 6, Construction Condensing Boiler Management $ 6, Breadth Condensing Boiler $ 6, Cost HRC-1 and Energy $ 250, Savings HRC-2 $ 250, Summary Total Cost Added and Conclusion $ 527, Equipment Costs for GSHP Equipment Added Cost HP-1 $ 24, HP-2 $ 24, HP-3 $ 24, HP-4 $ 24, HP-5 $ 24, Total Cost Added $ 124, Construction Management Breadth Costs GSHP Installation Piping Equipment HRC Equipment Length of Pipe (ft) Man Power (ft/day/rig) Cost of Labor and Equipment for GSHP Installation # of rigs Days Man Power Cost per linear foot Piping Installation Cost Renting rig ($/week) Cost rigs Total Price $24 $528,000 $4,500 $24,750 $ 552, Cost Polyethylene Pipe Size (in) # of Wells Depth (ft) Total Length (ft) Price per 40' Price per Size Total $ 25,080.00

19 Construction Management Breadth Equipment Costs for HRC Equipment Removed Cost Boiler 1 $ 131, Boiler 2 $ 131, Boiler 3 $ 131, Equipment Added New Boiler -1 $ 129, New Boiler -2 $ 129, New Boiler -3 $ 129, Condensing Boiler $ 6, Condensing Boiler $ 6, Condensing Boiler $ 6, Condensing Boiler $ 6, Condensing Boiler $ 6, HRC-1 $ 250, HRC-2 $ 250, Total Cost Added $ 527, Equipment Costs for GSHP Equipment Added Cost HP-1 $ 24, HP-2 $ 24, HP-3 $ 24, HP-4 $ 24, HP-5 $ 24, Total Cost Added $ 124, Costs GSHP Installation Piping Equipment HRC Equipment Site Installed in adjacent parking lot Trailers can be moved Excavation Finishing Zone B Length of Pipe (ft) Man Power (ft/day/rig) Cost of Labor and Equipment for GSHP Installation # of rigs Days Man Power Cost per linear foot Piping Installation Cost Renting rig ($/week) Cost rigs Total Price $24 $528,000 $4,500 $24,750 $ 552, Cost Polyethylene Pipe Size (in) # of Wells Depth (ft) Total Length (ft) Price per 40' Price per Size Total $ 25,080.00

20 Cost and Energy Savings Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion

21 Cost and Energy Savings Redesign Cost of Utilities Baseline Cost of Utilities

22 Cost and Energy Savings Pollutants Annual Emissions for Baseline lb of Pollutant per 1000 cubic feet of Natural gas Natural Gas per year (1000 cubic feet) Amount of Pollutant per year (lb) CO , ,638 Nox , Sox ,486 37,193 Pollutants Annual Emissions for Redesign lb of Pollutant per 1000 cubic feet of Natural gas Natural Gas per year (1000 cubic feet) Amount of Pollutant per year (lb) CO , ,148 Nox , Sox ,530 25,047 Emission Comparison in pounds of Pollutant

23 Summary and Conclusion Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Depth Cost and Energy Savings Summary and Conclusion

24 Summary and Conclusion Suggestions to Owner Definite Additions Heat Recovery Chiller Possible Additional Savings Ground Source Heat Pump Implementing both can possibly increase LEED points Owner s Discretion Initial Capital Cost 30-Year LCC Details Discount Rate Yearly Maintance 30-Year Life Cycle Cost (NPV) Discounted Payback Period (years) Baseline $ 1,567, % $ 87,283 $ 9,130,491 0 GSHP $ 2,293, % $ 90,976 $ 9,505, HRC $ 1,799, % $ 98,625 $ 9,635, Both $ 2,694, % $ 110,763 $ 10,049,

25 Special Thanks to: James Posey Associates Gilbane Company McClure Company Professors Family and Friends Questions or Comments?

Architectural Engineering Senior Thesis Mechanical System Redesign

Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Architectural Engineering Senior Thesis Mechanical System Redesign Chris Nicolais Building Description Existing Mechanical System Proposed Redesign Alternative Option Emergency

More information

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS CARROLL COUNTY PUBLIC SCHOOLS LIFE CYCLE COST ANALYSIS SUMMARY DGS PROCEDURES FOR THE IMPLEMENTATION OF LIFE CYCLE COST ANALYSIS AND ENERGY CONSERVATION OCTOBER, 2010 G.A.I.#09090 GIPE ASSOCIATES, INC.

More information

Energy Efficiency Through Waste Heat Recovery. Heat Recovery Centrifugal Chillers and Templifier Water Heaters

Energy Efficiency Through Waste Heat Recovery. Heat Recovery Centrifugal Chillers and Templifier Water Heaters Energy Efficiency Through Waste Heat Recovery Heat Recovery Centrifugal Chillers and Templifier Water Heaters Innovative Solutions for Saving Energy McQuay offers two innovative methods of saving energy

More information

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio Technical Report 3 Northfield Mental Healthcare Center Dr. Stephen Treado Ji Won Park Mechanical Option Fall 2012 TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare

More information

Appendices. Included in this section are

Appendices. Included in this section are Appendices Included in this section are Appendix A Building Overview Appendix B Alternative Mechanical Designs Appendix C Integration of Structural System and Constructability 68 Appendix A Building Overview

More information

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager. B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.

More information

TEMPERATURE CONTROL POWER COMPRESSED AIR EMERGENCY OR PLANNED, SHUT DOWN OR TURN AROUND. 24/7/ / ers-cat.com

TEMPERATURE CONTROL POWER COMPRESSED AIR EMERGENCY OR PLANNED, SHUT DOWN OR TURN AROUND. 24/7/ / ers-cat.com TEMPERATURE CONTROL POWER COMPRESSED AIR EMERGENCY OR PLANNED, SHUT DOWN OR TURN AROUND 24/7/365 877.291.3354 / ers-cat.com TEMPERATURE CONTROL CHILLERS Available in 30 to 1000-ton capacities Air cooled

More information

Description of All Alternatives Considered-

Description of All Alternatives Considered- Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142

More information

60 TON AIR-COOLED CHILLER. Call us today! (800) PA-ACCTR-60 GENERAL DIMENSIONS ELECTRICAL DATA 60 TON AIR-COOLED CHILLER FEATURES

60 TON AIR-COOLED CHILLER. Call us today! (800) PA-ACCTR-60 GENERAL DIMENSIONS ELECTRICAL DATA 60 TON AIR-COOLED CHILLER FEATURES 60 TON AIR-COOLED CHILLER PA-ACCTR-60 Call us today! (800)341-4297 The 60-Ton portable chiller package features a Trane CGAM chiller unit. Trane leads the industry in providing some of the most reliable,

More information

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

EarthWise System Seminar

EarthWise System Seminar EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States

More information

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION 100 TON AIR-COOLED SCROLL PACKAGED SPECIFICATIONS Call us today! (800)341-4297 Trane Portable Packaged Air Conditioner units contain the best compressor technology available, in order to achieve the highest

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

F.W. Olin Physical Science Laboratory

F.W. Olin Physical Science Laboratory Mechanical Systems Existing Conditions Evaluation Presented on Page 1 of 16 Table of Contents Executive Summary Depth p.3 Executive Summary Breadth p.4 Introduction & Background p.5 Alternatives p.7 Breadth

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.

More information

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY 2018 57 MECHANICAL ASSESSMENT MECHANICAL ASSESSMENT This report section includes an overview of the existing

More information

Update Dedicated Heat Recovery Chiller Technology. Don Frye. Gulf South

Update Dedicated Heat Recovery Chiller Technology. Don Frye. Gulf South 3/5/2018 1 Update Dedicated Heat Recovery Chiller Technology Don Frye Gulf South Good design is an intentional act Begin with the end in mind Basic Bldg Tenants IAQ (low VOC & CO 2 ) Controlled Temp &

More information

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES LIGHT LEVEL REQUIREMENTS LOCATION Classrooms and instrumental areas- Study Halls, Lecture Rooms, Art Rooms, Offices, Libraries, Conference Rooms, Work Rooms, Shops, Laboratories and Secondary School Cafeterias.

More information

Bosch BVA Series Air Handler

Bosch BVA Series Air Handler Bosch BVA Series Air Handler 2-3-4-5 Ton Capacity R410A Product Specifications 2 Bosch IDS BVA Product Specifications Data subject to change 12.2016 Bosch Thermotechnology Corp. Product Specifications

More information

MEP CONDITION ASSESSMENT

MEP CONDITION ASSESSMENT MAINE EAST MEP CONDITION ASSESSMENT MAINE EAST HIGH SCHOOL This report section includes an overview of the existing mechanical cooling and heating systems serving Maine East High School. The sections will

More information

Des Places Residence Hall

Des Places Residence Hall Senior Thesis Presentation Duquesne University Pittsburgh, PA Project Team Owner: Duquesne University Architect: WTW Architects Mechanical/Electrical Engineer: CJL Engineering Structural Engineer: Barber

More information

Energy Recovery with Cooling and Heating

Energy Recovery with Cooling and Heating Energy Recovery with Cooling and Heating VersiVent - Model VER Commercial Institutional 2,000-10,000 cfm 3.0 in. wg external static pressure Configurable September 2008 Page The VersiVent Header Model

More information

C13-Series Engineering Guide

C13-Series Engineering Guide Engineering Guide Effective January 2018 Horizontal Air-Cooled, Water-Cooled, Chilled Water and Heat Pump Contents Product Features............................... 3 Product Options................................

More information

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013 Mechanical Redesign, Proposal Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Mechanical Redesign, Proposal... 0 Executive Summary...

More information

MHNCCW (4-Pipe) Chilled/Hot Water Ceiling Concealed 208/230V 4-Pipe Heating & Cooling Fan Coil 12,000 BTUH

MHNCCW (4-Pipe) Chilled/Hot Water Ceiling Concealed 208/230V 4-Pipe Heating & Cooling Fan Coil 12,000 BTUH MHNCCW-04-01 (4-Pipe) Chilled/Hot Water Ceiling Concealed 208/230V 4-Pipe Heating & Cooling Fan Coil 12,000 BTUH Rev. 1.2 HVAC Guide Specifications Chilled and Hot Water Fan Coil 4-Pipe Nominal Size: 12,000

More information

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T.

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T. Urbana Free Library HVAC Analysis Prepared for the Urbana Free Library Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T. Report Dated August 8, 2016 1. Introduction The Urbana Free Library is

More information

Architectural Alliance Incorporated MDP CONSULTING ENGINEERS, INC N 11th Street Beaumont, TX 77702

Architectural Alliance Incorporated MDP CONSULTING ENGINEERS, INC N 11th Street Beaumont, TX 77702 04/08/2013 last saved: TRENT plotted: DRAWN BY: TLH CHECKED BY: DWD 04/08/2013 last saved: DMCPHERSON plotted: DRAWN BY: TLH CHECKED BY: DWD 04/08/2013 last saved: DMCPHERSON plotted: DRAWN BY: TLH CHECKED

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

The School District of Philadelphia Administration Headquarters

The School District of Philadelphia Administration Headquarters Jayme Antolik Architectural Engineering Mechanical Option Senior Thesis 2006 Presentation Outline Reason for Renovations School District Administration Relocation Previous to move Originally in 4 offices

More information

Cook - Wissahickon Elementary School

Cook - Wissahickon Elementary School Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District

More information

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

National Institutes of Health Building 37 Modernization Bethesda, Maryland MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM

National Institutes of Health Building 37 Modernization Bethesda, Maryland MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM The need to maintain occupancy during the renovation and the strict NIH Design Guidelines were the main driving forces behind the design. The mechanical engineering

More information

SUBMITTAL. Project. CLU Swenson Center. Date 01/07/2010. Mechanical Contractor. West Coast Air Conditioning. Mechanical Engineer

SUBMITTAL. Project. CLU Swenson Center. Date 01/07/2010. Mechanical Contractor. West Coast Air Conditioning. Mechanical Engineer SUBMITTAL Project CLU Swenson Center Date 01/07/2010 Mechanical Contractor West Coast Air Conditioning Mechanical Engineer J & S Consulting Engineers, Inc. Revision Notes RTU-101, 102, 103, 201, 202, 203,

More information

2 Existing Mechanical System

2 Existing Mechanical System 2 Existing Mechanical System 2.1 Design Objectives and Requirements The Gossett Field House project consists of a 25,000 sqft addition and a 40,000 sqft renovation of the existing facility for the University

More information

Daikin Blueprint: Delivering Hot Water with a Chiller

Daikin Blueprint: Delivering Hot Water with a Chiller Daikin Blueprint: Delivering Hot Water with a Chiller Analyzing the design of heat recovery on air-cooled chillers and the effect it has on building energy consumption By Paul Crisman Daikin Chiller Applications

More information

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx Case Study: Furman University Charles H. Townes Center for Science Michael K. Mantai, PE, CCP President System WorCx AIA Quality Assurance Learning Objectives 1. Case study example of Chilled Beam technology

More information

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3 Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located

More information

HVAC 101. H V A C S y s t e m s

HVAC 101. H V A C S y s t e m s H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost

More information

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TM TECHNICAL SPECIFICATIONS Model PGF1TE 2 Stage Series Upflow/Horizontal M1010 Product Line High Efficiency / 95.1 AFUE Direct Vent or Non Direct Vent Condensing Furnace 10 YEAR WARRANTY WORRY-FREE PERFORMANCE

More information

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating

More information

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation Mechanical Technical Report 3 Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department of Architectural Engineering Pennsylvania

More information

Session: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island

Session: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island Session: HVAC 101 HVAC 101 Steve Sain Sain Engineering Associates, Inc. August 9, 2016 Rhode Island Convention Center Providence, Rhode Island Why? 2 Acknowledgements 3 Disclaimer I m gonna shoot down

More information

Technical Assignment 3

Technical Assignment 3 0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Technical Assignment 3 Mechanical Systems and Existing Conditions Report David H. Koch Institute for Integrative

More information

The Ed Roberts Campus

The Ed Roberts Campus The Ed Roberts Campus Technical Report 3 Anderson Clemenceau Mechanical Option Advisor: Donghyun Rim November 11, 2014 2 Contents Technical Report 3... 1 Executive Summary... 3 Building Overview... 4 Design

More information

Massachusetts Energy Efficiency Partnership. 5. High Efficiency Systems for Large Boilers

Massachusetts Energy Efficiency Partnership. 5. High Efficiency Systems for Large Boilers 5. High Efficiency Systems for Large Boilers Terminology >Economizer Captures exhaust heat to warm feedwater >Heat Recovery Heat Exchanger Heat exchanger in the flue gas to warm some other load entirely

More information

7. MECHANICAL SYSTEM DESIGN

7. MECHANICAL SYSTEM DESIGN 7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved

More information

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members: SESSION 1-2015 Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE (90.1.2013) ASHRAE Detroit Members: AM Session is eligible for (X) Professional Development

More information

MHCCW Chilled Water Ceiling Concealed Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000 BTUH

MHCCW Chilled Water Ceiling Concealed Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000 BTUH MHCCW-06-00 Chilled Water Ceiling Concealed Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000 BTUH Rev. 1.21 HVAC Guide Specifications Chilled or Hot Water Fan Coil 2-Pipe Nominal Size: 18,000 BTUH

More information

MHCCW Chilled Water Ceiling Concealed With 5kW Electric Heat 2-Pipe Heat / Cool Fan Coil 30,000 BTUH

MHCCW Chilled Water Ceiling Concealed With 5kW Electric Heat 2-Pipe Heat / Cool Fan Coil 30,000 BTUH MHCCW-10-05 Chilled Water Ceiling Concealed With 5kW Electric Heat 2-Pipe Heat / Cool Fan Coil 30,000 BTUH Rev. 1.21 HVAC Guide Specifications Chilled Water Fan Coil with Electric Heat 2-Pipe Nominal Size:

More information

The Ed Roberts Campus Berkeley, CA

The Ed Roberts Campus Berkeley, CA The Ed Roberts Campus Berkeley, CA Anderson Clemenceau Mechanical Option Penn State A.E. Senior Thesis April 14, 2015 Leddy Maytum Stacy Architects, Photo by Tim Griffith ASHRAE Climate Zone 3C 99.6% Heating

More information

COMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume

COMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume COMMERCIAL HVAC PACKAGED EQUIPMENT Rooftop Units Level 1: Constant Volume Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application

More information

ENGINEERING. Edition No. 13 October 2002

ENGINEERING. Edition No. 13 October 2002 Edition No. 13 October 2002 ENGINEERING S Y S T E M S O L U T I O N S W e at McQuay are very proud of our tradition of producing industry leading water source heat pumps. Our heritage stretches back more

More information

Technical Guide SUNLINE 2000 DESCRIPTION ACCESSORIES FIELD INSTALLED SPLIT-SYSTEM EVAPORATOR BLOWER K4EU NOMINAL TONS (WORLD 50 HZ)

Technical Guide SUNLINE 2000 DESCRIPTION ACCESSORIES FIELD INSTALLED SPLIT-SYSTEM EVAPORATOR BLOWER K4EU NOMINAL TONS (WORLD 50 HZ) Technical Guide SUNLINE 2000 SPLIT-SYSTEM EVAPORATOR BLOWER K4EU180 15 NOMINAL TONS (WORLD 50 HZ) DESCRIPTION These completely assembled units include a well-insulated cabinet, a DX cooling coil with copper

More information

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department

More information

EMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons

EMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons 560.20-TG1Y (388) EMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons Each circuit includes a fully hermetic compressor with a crankcase

More information

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE Palatine, Illinois Grumman/Butkus Associates Energy Efficiency Consultants and Sustainable Design Engineers 820 Davis Street, Suite 300 Evanston, Illinois

More information

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO 2012 1 Learning Objectives for this Session Get acquainted with typical systems used in the

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A

9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A Nicholas Thornton, CEM 1 Overview Today s Goals Introductions HVAC Electrical Technology Q&A 2 1 Today s Goals An overview, a crash course Maybe a few tangents (ASK QUESTIONS!) Show typical arrangements

More information

VertiCool Aurora Engineering Guide

VertiCool Aurora Engineering Guide Engineering Guide Effective August 2016 Air-Cooled, Water-Cooled and Water Source Heat Pump Contents Product Features... 3 Options... 4 Physical Data...5-6 Air-Cooled Performance Data (a) (b) (c)...7-8

More information

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz) DESCRIPTION These units are completely assembled, piped and wired at the factory to provide one-piece shipment and rigging. Each unit is pressurized with a holding charge of refrigerant-22 for storage

More information

Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN

Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN BREADTH STUDY - MECHANICAL REDESIGN Design Goals As previously mentioned, the construction of the Residence Inn was delayed by

More information

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior

More information

4.0 Mechanical Redesign

4.0 Mechanical Redesign 4.0 Mechanical Redesign As my depth area of research, I have performed a detailed analysis of the existing air handling units and the existing conditions of the FIT Science Lab. After one semester of breaking

More information

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703 TECHNICAL GUIDE SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 DESCRIPTION These Sunline 2000 units are completely assembled, piped and wired at the factory to provide one-piece shipment and rigging.

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

A.H.U / Fan Room (p1 of 2) (approx. sizing using rules of thumb)

A.H.U / Fan Room (p1 of 2) (approx. sizing using rules of thumb) A.H.U / Fan Room (p1 of 2) M1 STEP 1 Determine air flow req'd for each space, for total size of fan unit(s) in tons. Equation: Area (program) / (sf/ton) = tons req'd for space Classroom 8100sf / 350sf/ton

More information

NET ENERGY WATER LOOPS A clear path to net zero energy buildings

NET ENERGY WATER LOOPS A clear path to net zero energy buildings Presents NET ENERGY WATER LOOPS A clear path to net zero energy buildings Alan Niles WaterFurnace International This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer

More information

RTC. Stainless Steel Condensing Floor Standing Boilers Technical data sheet. High efficiency commercial heating

RTC. Stainless Steel Condensing Floor Standing Boilers Technical data sheet. High efficiency commercial heating cod. Doc-0079191 rev. 3 12/2017 High efficiency commercial heating RTC Stainless Steel Condensing Floor Standing Boilers Technical data sheet High water content 3-pass stainless steel (316Ti) condensing

More information

CFFWA4P-16-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 48,000 BTUH

CFFWA4P-16-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 48,000 BTUH CFFWA4P-16-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 48,000 BTUH Rev. 1.3 HVAC Guide Specifications Chilled and Hot Water Universal Mount Fan Coil 4-Pipe Nominal

More information

CFFWA4P-12-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 36,000 BTUH

CFFWA4P-12-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 36,000 BTUH CFFWA4P-12-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 36,000 BTUH Rev. 1.3 HVAC Guide Specifications Chilled and Hot Water Universal Mount Fan Coil 4-Pipe Nominal

More information

Technical Report Three

Technical Report Three Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

CEILING FANS THE PREMIUM QUALITY LINE FROM COMMERCIAL/INDUSTRIAL & SPECIAL APPLICATION. World Leader in Ceiling Fan Systems

CEILING FANS THE PREMIUM QUALITY LINE FROM COMMERCIAL/INDUSTRIAL & SPECIAL APPLICATION. World Leader in Ceiling Fan Systems THE PREMIUM QUALITY LINE FROM COMMERCIAL/INDUSTRIAL & SPECIAL APPLICATION CEILING FANS World Leader in Ceiling Fan Systems Visit our website at: www.marleymep.com Only Leading Edge Offers These Exclusive

More information

CFFWA4P-08-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 24,000 BTUH

CFFWA4P-08-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 24,000 BTUH CFFWA4P-08-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 24,000 BTUH Rev. 1.3 HVAC Guide Specifications Chilled and Hot Water Universal Mount Fan Coil 4-Pipe Nominal

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

Strategies for Building Energy Efficiency

Strategies for Building Energy Efficiency Strategies for Building Energy Efficiency Ben Sliwinski Technical Director SEDAC University of Illinois at Urbana-Champaign How Buildings Use Energy Building Envelope (Walls, Roof, Windows, Floors) Lighting

More information

Challenges and Methods of Estimating a Conceptual HVAC Design

Challenges and Methods of Estimating a Conceptual HVAC Design Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.

More information

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

Wall Mounted Air Conditioners with Gas Heat Models AVGA

Wall Mounted Air Conditioners with Gas Heat Models AVGA PRODUCT DATA SHEET Wall Mounted Air Conditioners with Gas Heat Models AVGA24-30-36-42-48-60 General Description The Marvair GPac wall mounted air conditioner with gas heat is designed for use on a variety

More information

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. M&V Real Results of High Performance Design Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. Overview Measurement & Verification (M&V) Plan for New

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

Boiler & Water Heater

Boiler & Water Heater MIGHTY THERM2 Date: Project #: Pump-Mounted Boiler & Water Heater MT2H Hydronic Heater MT2V Volume Water Heater Indoor/Outdoor Sizes 500-2000 Submittal Engineer: Project Name: Prepared By: Location: Bid

More information

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE SCHEDULE OF S Penalty Fees. The fee for construction work performed before securing permit(s), where required, may be charged a fee of TWO TIMES THE COST OF THE PERMIT (S). Building Fee Schedule Residential

More information

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS*

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS* TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS K*ES120 10 NOMINAL TONS EER 8.5 DESCRIPTION These completely assembled dual circuit evaporator blower units include a well-insulated cabinet, a DX cooling

More information

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

EADQUARTERS. Technical Report One. Stephanie Kunkel   Mechanical Option EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

ReCooler Heat-Pump Energy efficient cooling unit for eq Air Handling Unit

ReCooler Heat-Pump Energy efficient cooling unit for eq Air Handling Unit ReCooler Heat-Pump Energy efficient cooling unit for eq Air Handling Unit 28 May 2013 Agenda Introduction to Fläkt Woods Our Product Solution Technical Features Benefits Fläkt Woods Index We save energy!

More information

The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA

The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA 2.0 Depth Work - Alternative Mechanical Designs 2.1 Objectives The goal of designing alternative systems is to compare energy usage, system costs, emissions, lost rentable space, and constructability.

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

JH Series Installation

JH Series Installation JH Series Installation Space Heating / Fresh Air Make-Up From the Manufacturers of Hi-Velocity Systems TM Includes: JH-15 JH-30 Module-JH-Series-Installation-Manual-010118 Installation JH fan coils by

More information

SR SERIES WATER SOURCE HEAT PUMP SYSTEM SELECTION AND OPTIMIZATION GUIDE

SR SERIES WATER SOURCE HEAT PUMP SYSTEM SELECTION AND OPTIMIZATION GUIDE SR SERIES WATER SOURCE HEAT PUMP SYSTEM SELECTION AND OPTIMIZATION GUIDE Fresh Access Pro http://freshaccesspro.com/erep/ This guide is intended for use by qualified professionals to assist in properly

More information

PRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series

PRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series PRODUCT SERIES VPR Series VPRX Series VPRE Series VPRP Series VPRC Series Valent Air Management Products Valent Air Management Systems designs and manufactures reliable, high-outdoor-air ventilators. Our

More information

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas

More information

Implementation of Energy Saving measures in Existing Buildings

Implementation of Energy Saving measures in Existing Buildings Building Surveyors Conference on Building a Green and Sustainable Future Implementation of Energy Saving measures in Existing Buildings 5 September 2009 Energy Efficient / Environmental Friendly Products

More information

FLD = Furnished by Trane U.S. Inc. / Installed by Equipment Submittal Page 3 of 13

FLD = Furnished by Trane U.S. Inc. / Installed by Equipment Submittal Page 3 of 13 Tag Data - Split System Air Conditioning Units (Large) (Qty: 6) Item Tag(s) Qty Description Model Number A1 20 ton vfd 6 6-25 Ton Unitary Split Systems ( SSC2 TTA24004H00-TWE240E404A TTA Air Condensing

More information

Classic 13 Heat Pumps High Efficiency Vertical Packaged Heat Pumps Models HVPA and HVPSA

Classic 13 Heat Pumps High Efficiency Vertical Packaged Heat Pumps Models HVPA and HVPSA Classic 13 Heat Pumps High Efficiency Vertical Packaged Heat Pumps Models HVPA24-30-36-42-49-60 and HVPSA36-42-49-60 General Description HIGH EFFICIENCY - The Marvair Classic 13 High Efficiency Series

More information

A TRUE GAME CHANGER - The Vortex Heat Recovery Center CONDENSING EFFICIENCIES FOR TRADITIONAL BOILERS & HEATERS

A TRUE GAME CHANGER - The Vortex Heat Recovery Center CONDENSING EFFICIENCIES FOR TRADITIONAL BOILERS & HEATERS A TRUE GAME CHANGER - The Vortex Heat Recovery Center CONDENSING EFFICIENCIES FOR TRADITIONAL BOILERS & HEATERS Flexibility and Performance - Unlike any other Heat Recovery System FEATURES Exceptional

More information