TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES

Size: px
Start display at page:

Download "TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES"

Transcription

1 TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES MEMORANDUM TO: FROM: Technical Committee on Internal Combustion Engines R. P. Benedetti DATE: August 17, 2016 SUBJECT: Agenda for NFPA 37 Second Draft Meeting Tuesday, September 20, :00 AM to 5:00 PM Wednesday, September 21, :00 AM to 5:00 PM Ladies and Gentlemen: Attached is the Agenda for the NFPA 37, Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines, Second Draft meeting, to be held Tuesday, September 20, and Wednesday, September 21, 2016, at the Hilton Garden Inn Cherry Creek, Denver CO. The meeting is scheduled to run from 8:00 AM to 5:00 PM both days. This Agenda will also be posted to the NFPA 37 Document Information Page at If you have additional items for the Agenda, please bring them with you to the meeting. rpb/ cc INT Meeting Folder INT/NM INT Agenda.doc

2 TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES AGENDA NFPA 37 Second Draft Meeting Technical Committee on Internal Combustion Engines Hilton Garden Inn Cherry Creek, Denver CO Tuesday, September 20, 2016, 8:00 AM to 5:00 PM Wednesday, September 21, 2016, 8:00 AM to 5:00 PM 1. Call to Order. 2. Introduction of Attendees. Update of Committee Roster. [Attachment A1] 3. Approval of Minutes of Last Meeting. [November, 2015, NFPA Offices, Quincy MA] [Attachment A2] 4. Report of Committee Chair. 5. Report of Staff Liaison. Technical Committee Membership Status. [Attachment A3] Document Revision Schedule for Annual 2017 Cycle. [Attachment A4] 6. Member Reports on Current Issues. [As Necessary] 7. Task Group Reports. [As Necessary] 8. Review and Act on Public Comments to the First Draft Report on Amendments to the 2015 edition of NFPA 37. [See Attachment A5 for Public Comments & Attachments to Same.] The following are included for reference purposes: [First Revisions to NFPA 30A Attachment A6] [Committee Inputs to NFPA 30A Attachment A7] 9. Recent Correspondence. NONE 10. Old Business. The following were reviewed as New Business at the previous meeting. The Technical Committee decided to defer these to the next document revision cycle for NFPA 37 (Annual 2020). Performance Criteria for Paragraph of NFPA 37. Mr. Elovitz contends that this paragraph should include allowable flowrates and back pressure for sizing the vent piping. Clarification of Paragraph of NFPA 37. INT Agenda.doc

3 Electrical Area Classification of Interior of Engine Enclosures. Turbine Lube Oil Tanks. Proposed Amendment to Paragraph of NFPA 37. Normal (Breather) vents for Fuel Tanks. Need for Clearance Between Fuel Gas and Electrical Services. 11. New Business. NONE 12. Schedule Next Meeting(s). [See Annual 2020 Revision Schedule Attachment A8] 13. Adjournment. INT Agenda.doc

4 Address List No Phone Internal Combustion Engines 08/25/2016 Robert P. Benedetti INT-AAA James B. Biggins SE 1/1/1992 Principal INT-AAA TUV SUD America Inc./Global Risk Consultants Corporation West Barr Road Manhattan, IL Kevin J. Carlisle Principal Karl Dungs, Inc Pheasant Ridge Drive, NE Blaine, MN M 07/29/2013 INT-AAA Larry M. Danner Principal GE Power & Water 300 Garlington Road GTTC Room 200D Greenville, SC Alternate: William S. Lockhart M 7/19/2002 INT-AAA Kenneth M. Elovitz Principal Energy Economics, Inc. 26 Elm Street Foxboro, MA SE 1/1/1994 INT-AAA Daniel D. Groff Principal AIG Energy and Engineered Risk 2525 Country Side Lane Wexford, PA Alternate: Arthur M. Partin I 07/29/2013 INT-AAA Fred L. Hildebrandt Principal Amerex/Janus Fire Systems 1102 Rupcich Drive, Millennium Park Crown Point, IN Fire Suppression Systems Association M 8/2/2010 INT-AAA David M. Nieman Principal Bechtel Corporation Plaza America Drive Reston, VA Alternate: Keegan M. Kinney U 8/5/2009 INT-AAA Steve Oxtoby Principal Kohler Power Systems N7650 County Trunk LS Mail Stop 072 Sheboygan, WI M 08/11/2014 INT-AAA Steven H. Pasternack Principal Intertek Testing Services 3933 US Route 11 Cortland, NY RT 4/17/2002 INT-AAA Owen M. Preston Principal 3221 Blair Drive Palatka, FL SE 7/1/1994 INT-AAA Y. R. Reddy Principal R-B Pumps, Inc. PO Box 557 Baxley, GA U 4/1/1994 INT-AAA Steve R. Sappington Principal Caterpillar Inc. 175 Cutstone Court Fayetteville, GA M 04/08/2015 INT-AAA Gerard J. Schnee Principal Solar Turbines Incorporated 9280 Skypark Court San Diego, CA M 10/27/2009 INT-AAA Richard Scott Principal Chubb Group of Insurance Companies One Financial Center Boston, MA I 1/1/1994 INT-AAA 1

5 Address List No Phone Internal Combustion Engines 08/25/2016 Robert P. Benedetti INT-AAA Matthew M. Shanks Principal Montgomery County 255 Rockville Pike, 2nd Floor Rockville, MD E 04/08/2015 INT-AAA Kow Ken Sun Principal AES Corporation Relay Road Humble, TX U 10/29/2012 INT-AAA Stephen Garner Voting Alternate Exponent, Inc North Honore Street, Unit 1 Chicago, IL SE 04/08/2015 INT-AAA Keegan M. Kinney Alternate Bechtel Power Corporation Plaza America Drive Reston, VA Principal: David M. Nieman U 10/29/2012 INT-AAA William S. Lockhart Alternate GE Power & Water 2429 NW 59th Street Oklahoma City, OK Principal: Larry M. Danner M 03/03/2014 INT-AAA Arthur M. Partin Alternate AIG Energy & Engineered Risk Rubury Place Tampa, FL Principal: Daniel D. Groff I 10/28/2014 INT-AAA Robert P. Benedetti Staff Liaison National Fire Protection Association 1 Batterymarch Park Quincy, MA /2/2002 INT-AAA 2

6 TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES MINUTES of MEETING Technical Committee on Internal Combustion Engines National Fire Protection Association Quincy, MA November 12 & 13, 2015 I. Attendance J. B. Biggins, Global Risk Consultants Corporation K. J. Carlisle, Karl Dungs, Inc. L. M. Danner, GE Power K. M. Elovitz, Energy Economics, Inc. S. Garner, Exponent, Inc. (Alternate to Z. M. Ibrahim) [via web conference] D. D. Groff, AIG Energy and Engineered Risk [via web conference] F. L. Hildebrandt, Janus Fire Systems (Rep. Fire Suppression Systems Association) Z. Ibraham, Exponent, Inc. D. M. Nieman, Bechtel Power Corporation S. Oxtoby, Kohler Power Systems A. M. Partin, AIG Energy and Engineered Risk (Alternate to D. D. Groff) S. Oxtoby, Kohler Power Systems [via web conference] A. Partin, AIG Energy & Engineered Risk [via web conference] S. H. Pasternack, Intertek Testing Services [via web conference] S. R. Sappington, Caterpillar Inc. [via web conference] G. J. Schnee, Solar Turbines Incorporated K. K. Sun, AES Corporation R. P. Benedetti, National Fire Protection Association, STAFF LIAISON GUESTS: E. Edwards, National Fire Protection Association J. E. Shapiro, National Fire Protection Association M. E. Woodruff, National Fire Protection Association MEMBERS NOT ATTENDING: K. M. Kinney, Bechtel Power Corporation (Alternate to D. M. Nieman) W. S. Lockhart, GE Power (Alternate to L. M. Danner) O. M. Preston, Palatka, FL Y. R. Reddy, R-B Pumps, Inc. R. Scott, Chubb Group of Insurance Companies M. M. Shanks, Montgomery County MD M. Tretinjak, Solar Turbines Incorporated II. Minutes 1. The Meeting was called to order at 9:00 AM on November 12, 2015 by Acting Chair Jim Biggins. INT Minutes.doc

7 2. Attendees introduced themselves and the Technical Committee roster was updated as needed. An updated roster will be posted to the Technical Committee s Document Information Web Page. 3. The Minutes of the last meeting (March 2013, Greenville SC) were unanimously approved as submitted. 4. The Acting Chair did not have a report. 5. The Staff Liaison reviewed with the Technical Committee the following items: Technical Committee Scope Statement. The Staff Liaison noted that NFPA 37 was beginning to find use in marine application. This might necessitate a change to the Technical Committee s scope statement. The Technical Committee deferred action on this. Technical Committee Membership. The Staff Liaison was directed to solicit participation by UL LLC. Review of Annual 2017 Document Revision Schedule. The Staff Liaison reviewed the schedule. Orientation. Ms. Shapiro presented an orientation on the new document handling system. 6. Mary Elizabeth Woodruff and Edie Edwards, of NFPA s C S Morgan Library, briefed the Technical Committee on the library s research capabilities that are available to NFPA committees. The Staff Liaison briefed the Technical Committee on the differences between NFPA s classification of flammable / combustible liquids and that being implemented by the U. S. Occupational Safety and Health Administration, under the Globally Harmonized System for container marking. 7. The Technical Committee reviewed and acted on all public inputs recommending amendments to the 2015 edition of NFPA 37. One Task Group was established to review the proposed new Section 5.6 on overpressure protection. The Task Group is chaired by Mr. Carlisle and includes Messrs. Elovitz, Hildebrandt, and Sun. 8. There was no Old Business requiring the Technical Committee s attention. 9. Under New Business : Use of NFPA 37 in Marine Applications. The Technical Committee discussed this afore-mentioned topic and determined the subject is beyond the scope of NFPA 37. Text was added to Annex Item A that NFPA 37 s applicability in marine venues is limited to non-propulsion engines and turbines. Clarification of Paragraph 4.3(3) of NFPA 37. This issue was given to a Task Group consisting of Messrs. Danner, Hildebrandt, and Schnee. Performance Criteria for Paragraph of NFPA 37. This was deferred to the next document revision cycle. Mr. Elovitz contends that this paragraph should include allowable flowrates and back pressure for sizing the vent piping. Clarification of Subsection of NFPA 37. This was addressed by a First Revision that changed the shutdown time from 1 sec. to 2 sec. Clarification of Paragraph of NFPA 37. Deferred to the next document revision cycle. Clarification of Paragraph of NFPA 37. No action necessary. Electrical Area Classification of Interior of Engine Enclosures. Deferred to the next document revision cycle. Definition of Pierced Wall. Term not used in NFPA 37; no need to define. Clarification of Annex Item A of NFPA 37. The Technical Committee drafted a First Revision to specify the maximum expected temperature within the enclosure. This also corrected an erroneous conversion: 28 C is 50 F. Corrections to ASHRAE References. Handled by First Revisions. Turbine Lube Oil Tanks. Deferred to the next document revision cycle. Proposed Amendment to Paragraph of NFPA 37. Deferred to the next document revision cycle. Normal (Breather) vents for Fuel Tanks. Deferred to the next document revision cycle. Need for Clearance Between Fuel Gas and Electrical Services. Deferred to the next document revision cycle. INT Minutes.doc

8 10. The Technical Committee tentatively scheduled its next meeting for the week of September 18 or the week of September 25, 2016, in Denver CO. 11. The meeting adjourned at 12:20 PM on November 13. INT Minutes.doc

9 TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES SCOPE STATEMENT This Committee shall have primary responsibility for documents on the fire safety of the installation, operation, and control of internal combustion engines, including gas turbine engines, using all types of fuel, within structures or immediately exposing structures. Responsible for NFPA 37, Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines. COMMITTEE MEMBERSHIP BALANCE Principals: 16 M: 6 (35%)* U: 3 (18%) Voting Alternates: 1 I/M: 0 L/C: 0 Alternates: 4 R/T: 1 (6%) E: 1 (6%) Non-Voting: 0 I: 2 (12%) SE: 4 (24%) Emeritus 0 Task Group: 0 Hold List: 1 Balance: Overbalanced by 1 M *(combustion controls: 1 generator sets: 2 internal combustion engines: 0 fire suppression systems: 1 turbines: 2) INT Scope Statement & Member Balance.doc - 8/12/2016

10 2017 ANNUAL REVISION CYCLE *Public Input Dates may vary according to standards and schedules for Revision Cycles may change. Please check the NFPA Website for the most up to date information on Public Input Closing Dates and schedules at # (i.e. and click on the Next Edition tab. Process Stage Process Step Dates for TC Dates for TC with CC Public Input Closing Date* 7/6/15 7/6/15 Final Date for TC First Draft Meeting 12/14/15 9/14/15 Public Input Posting of First Draft and TC Ballot 2/1/16 10/26/15 Stage Final date for Receipt of TC First Draft ballot 2/22/16 11/16/15 `(First Draft) Final date for Receipt of TC First Draft ballot recirc 2/29/16 11/23/15 Posting of First Draft for CC Meeting 11/30/15 Final date for CC First Draft Meeting 1/11/16 Posting of First Draft and CC Ballot 2/1/16 Final date for Receipt of CC First Draft ballot 2/22/16 Final date for Receipt of CC First Draft ballot recirc 2/29/16 Post First Draft Report for Public Comment 3/7/16 3/7/16 Public Comment closing date 5/16/16 5/16/16 Final Date to Publish Notice of Consent Standards (Standards that 5/30/16 5/30/16 received no Comments) Appeal Closing Date for Consent Standards (Standards that received 6/13/16 6/13/16 no Comments) Final date for TC Second Draft Meeting 10/31/16 7/25/16 Comment Posting of Second Draft and TC Ballot 12/12/16 9/5/16 Stage Final date for Receipt of TC Second Draft ballot 1/2/17 9/26/16 (Second Final date for receipt of TC Second Draft ballot recirc 1/9/17 10/3/16 Draft) Posting of Second Draft for CC Meeting 10/10/16 Final date for CC Second Draft Meeting 11/21/16 Posting of Second Draft for CC Ballot 12/12/16 Final date for Receipt of CC Second Draft ballot 1/2/17 Final date for Receipt of CC Second Draft ballot recirc 1/9/17 Post Second Draft Report for NITMAM Review 1/16/17 1/16/17 Tech Session Notice of Intent to Make a Motion (NITMAM) Closing Date 2/20/17 2/20/17 Preparation Posting of Certified Amending Motions (CAMs) and Consent 4/17/17 4/17/17 Standards (& Issuance) Appeal Closing Date for Consent Standards 5/2/17 5/2/17 SC Issuance Date for Consent Standards 5/12/17 5/12/17 Tech Session Association Meeting for Standards with CAMs 6/4 7/2017 6/4 7/2017 Appeals and Appeal Closing Date for Standards with CAMs 6/27/17 6/27/17 Issuance SC Issuance Date for Standards with CAMs 8/10/17 8/10/17 Approved: October 30, 2012 Revised

11 of 22 9/12/2016 2:51 PM Public Comment No. 6-NFPA [ New Section after 1.6 ] TITLE OF NEW CONTENT Type your content here Pressure Measurement. All pressures expressed in this document are gauge pressures unless specifically noted otherwise. Statement of Problem and Substantiation for Public Comment change is being made to coordinate with the proposed revisions to section 5.6. Related Item First Revision No. 11-NFPA [New Section after 5.5] Submitter Information Verification Submitter Full Name: Kevin Carlisle Organization: Karl Dungs, Inc. Street Address: City: State: Zip: Submittal Date: Fri May 06 15:30:13 EDT 2016

12 of 22 9/12/2016 2:51 PM Public Comment No. 10-NFPA [ New Section after ] TITLE OF NEW CONTENT Inlet Gas Pressure: The pressure at the outlet of the equipment isolation valve. Statement of Problem and Substantiation for Public Comment change is being made to coordinate with the proposed revisions to section 5.6 Related Item First Revision No. 22-NFPA [Global Input] Submitter Information Verification Submitter Full Name: Kevin Carlisle Organization: Karl Dungs, Inc. Street Address: City: State: Zip: Submittal Date: Fri May 06 15:37:38 EDT 2016

13 of 22 9/12/2016 2:51 PM Public Comment No. 8-NFPA [ New Section after ] TITLE OF NEW CONTENT Line Pressure Regulator: A pressure regulator placed in a gas line between the service regulator and the appliance regulator [ 54, 2015] Statement of Problem and Substantiation for Public Comment change is being made to coordinate with the proposed revisions to section 5.6 Related Item First Revision No. 22-NFPA [Global Input] Submitter Information Verification Submitter Full Name: Kevin Carlisle Organization: Karl Dungs, Inc. Street Address: City: State: Zip: Submittal Date: Fri May 06 15:33:20 EDT 2016

14 of 22 9/12/2016 2:51 PM Public Comment No. 9-NFPA [ New Section after ] Rated Pressure. The maximum internal and external pressures that the materials, devices, or components are designed to contain or control. Statement of Problem and Substantiation for Public Comment change is being made to coordinate with the proposed revisions to section 5.6 Related Item First Revision No. 22-NFPA [Global Input] Submitter Information Verification Submitter Full Name: Kevin Carlisle Organization: Karl Dungs, Inc. Street Address: City: State: Zip: Submittal Date: Fri May 06 15:36:08 EDT 2016

15 of 22 9/12/2016 2:51 PM Public Comment No. 7-NFPA [ Section No ] Protected Pressure. The set pressure of the nearest upstream overpressure protection device or the inlet pressure to the service regulator, whichever is lower. Statement of Problem and Substantiation for Public Comment change is being made to coordinate with the proposed revisions to section 5.6 Related Item First Revision No. 22-NFPA [Global Input] Submitter Information Verification Submitter Full Name: Kevin Carlisle Organization: Karl Dungs, Inc. Street Address: City: State: Zip: Submittal Date: Fri May 06 15:32:33 EDT 2016

16 of 22 9/12/2016 2:51 PM Public Comment No. 1-NFPA [ Section No ] Engines Located on Roofs, Platforms, and Other Supporting Structures Engines, and their weatherproof housings, if provided, that are installed on roofs of structures, on platforms, or on other supporting structures shall be located at least 1.5 m (5 ft) from openings in walls and at least 1.5 m (5 ft) from structures having combustible walls. A minimum separation shall not be required where the following conditions exist: The adjacent wall of the structure has combustible structures except as provided in or A clearance less than 1.5 m (5 ft) shall be permitted where all portions of the structure that are closer than 1.5 m (5 ft) from the engine enclosure have a fire resistance rating of at least 1 hour. * The weatherproof enclosure is constructed of noncombustible materials and it has been demonstrated hr A clearance less than 1.5m (5 ft) shall be permitted where it has been demonstrated through testing by a Nationally Recognized Testing Laboratory acceptable to the authority having jurisdiction that a fire within the enclosure will not ignite combustible materials outside the enclosure structures An oil A liquid containment system consisting of a curb or dike having a capacity at least equal to the total capacity of the lubricating oil system or, the liquid fuel system, whichever is greater and the engine coolant system, shall be provided. This system shall also comply with applicable requirements of Chapter 6 except as provided in * 2.1 Where engines are connected to a Chapter 5 fuel supply system, a liquid containment system shall not be required where engines provided with weatherproof housings have the available capacity to contain the total capacity of the oil lubricating system and engine coolant system within the weatherproof enclosure The surface beneath the engine and beyond the engine and the oil liquid containment dike shall be noncombustible to a minimum distance of 300 mm (12 in.), except as provided in The surface beneath the engine and beyond the engine and the liquid containment dike, if provided, shall not be required to be noncombustible where it has be demonstrated through testing by a Nationally Recognized Testing Laboratory acceptable to the authority having jurisdiction that a fire within the enclosure will not ignite the roofs of structures, platforms constructed of combustible materials, or other supporting structures. Additional Proposed Changes File Name 20_kw_residential_generac_on_a_raised_platform_serviced_by_NNG_automatic_standby_generators- 540x272.jpg Generac_air-cooled.gif Description Approved Generac air-cooled generator on a combustible platform air-cooled generator on a combustible platform

17 of 22 9/12/2016 2:51 PM kohler-generator-on-a-platform-installed-by-nng-in_richmond_county.jpg Kolher_.jpg 27_kw_kilowatt_generac_generator_on_a_custom_built_platform_by_northern_neck_generator_in_middlesex.jpg generac-48kw-generator-on-raised-platform-and-200-amp-transfer-switch-installed-by-northern-neck-generatorin-kilmarnock.jpg generac-70-kilowatt-generator-installed-on-a-raised-platform-by-nng-standby-generators.jpg Bad_Core_Power.JPG Statement of Problem and Substantiation for Public Comment Kolher air-cooled generator on a combustible platform air-cooled generator on a combustible platform Generac liquidcooled on a combustible platform Generac liquidcooled generator on a combustible platform Generac liquid cooled on a combustible platform Generac 7 kw installed on a wood deck The placement changes made in FR 1 to would also apply to as an engine located on top of a structure (roof) is also an engine located outdoors. The language should be identical for enforcement purposes. With the expansion of the installation of permanently installed residential generators throughout the country, there have been concerns with the placement of these units on combustible supporting structures. NFPA 37, covered the placement of large scale commercial and industrial generator on roofs, but did not address requirements for residential applications. Areas of the country that are in FEMA flood zones require equipment to be installed above the flood level. A common practice to raise the generator above these FEMA flood levels, has been the placement of the generator on a platform constructed of combustible materials, or on an existing wood deck, porch or other structure suitable for supporting the generator. These small residential generators are then connected to a fixed fuel piping system, either natural gas or LP vapor. The generators installed on platforms in the attached pictures do not have a noncombustible separation installed between the generator and the supporting structure. If the generator were to have a fire within the enclosure, the fire could spread to the combustible platform and the platform could collapse. When this occurs the generator connection to the fixed fuel piping system can be compromised, and now a fuel gas is discharging into atmosphere next to an open flame. The public comment would add clarity to the code that any combustible structure that is utilized to support any generator would be required to be fully protected from a fire within the generator enclosure. The change to liquid containment dike would add clarity that the engine coolant is as important to contain as the engine oil and fuel, and if all systems are compromised the total capacity of all systems shall be contained. Although the concept of a water-based fluid being flammable may be difficult for installers to comprehend, one must recognize that coolant is actually glycol based and only mixed with water. Raised to a high enough temperature, the glycol is still flammable even in the presence of water vapor. The exception to the requirement for the containment dike would allow the weatherproof enclosure of small air-cooled and liquid-cooled generators that are connected to a Chapter 5 fuel supply system to serve this purpose as long as the enclosure has the available capacity. Small air-generator cooled engine generators contain on average 2 quarts of oil or less. SwRI, and OSHA NRTL, has performed enclosure testing on engine enclosures for generator manufacturers. These tests were performed for generators installed at grade level, however if additional testing can demonstrate that the engine enclosure

18 of 22 9/12/2016 2:51 PM will not ignite a combustible supporting structure, consideration should be given to the listed engine enclosure serving as the required noncombustible separation and additional noncombustible separations should not be required. Related Public Comments for This Document Related Comment Public Comment No. 2-NFPA [Section No ] Related Item Relationship Public Input No. 1-NFPA [Section No [Excluding any Sub-Sections]] Submitter Information Verification Submitter Full Name: Brian Baughman Organization: Generac Power Systems Street Address: City: State: Zip: Submittal Date: Wed Mar 02 16:57:11 EST 2016

19 of 22 9/12/2016 2:51 PM Public Comment No. 2-NFPA [ Section No ] Engines Located Outdoors Engines, and their weatherproof housings, if provided, that are installed outdoors shall be located at least 1.5 m (5 ft) from openings in walls and at least 1.5 m (5 ft) from combustible structures except as provided in or A clearance less than 1.5 m (5 ft) shall be permitted where all portions of structures that are closer than 1.5 m (5 ft) from the engine enclosure have a fire resistance rating of at least 1 hour A clearance less than 1.5 m (5 ft) shall be permitted where it has been demonstrated by one of the following methods through testing by a Nationally Recognized Testing Laboratory acceptable to the authority having jurisdiction that a fire within the enclosure will not ignite structures: * Where a full-scale fire test has shown that the complete consumption of the combustibles within the enclosure will not ignite structures, the engine structure. Engines, and their weatherproof housings, if provided, shall be permitted to be placed at a distance no less than that specified during the fire test from a wall constructed of the same material. * Where calculations have shown that a fire within the engine enclosure will not ignite structures, the engine shall be permitted to be placed at a distance no less than that specified in the calculations. combustible materials. Statement of Problem and Substantiation for Public Comment The first draft language does not bring clarity to the code. SwRI, an OSHA NRTL, has performed full scale engine enclosure testing for generator manufacturers and has certified through listing and labeling which generator manufacturer enclosures are approved as meeting the requirement in Clause 1 of Clause 2 of does not state what approved calculations are acceptable and who is deemed qualified to perform these calculations. The States are required to participate in the OSHA safety programs or substitute their own safety programs. The State is the authority having jurisdiction and the State can approve their own recognized testing laboratory. Related Public Comments for This Document Related Comment Public Comment No. 1-NFPA [Section No ] Related Item First Revision No. 1-NFPA [Section No ] Relationship Submitter Information Verification Submitter Full Name: Brian Baughman Organization: Generac Power Systems Street Address: City: State: Zip: Submittal Date: Wed Mar 02 17:33:47 EST 2016

20 0 of 22 9/12/2016 2:51 PM Public Comment No. 13-NFPA [ Section No ] Engines, and their weatherproof housings, if provided, that are installed outdoors shall be located at least 1.5 m (5 ft) from openings in walls and at least 1.5 m (5 ft) from combustible structures except as provided in or A clearance less than 1.5 m (5 ft) shall be permitted where all portions of structures that are closer than 1.5 m (5 ft) from the engine enclosure have a fire resistance rating of at least 1 hour A clearance less than 1.5 m (5 ft) shall be permitted where it has been demonstrated by one of the following methods acceptable to the authority having jurisdiction that a fire within the enclosure will not ignite structures: (1)* Where a full-scale fire test has shown that the complete consumption of the combustibles within the enclosure will not ignite structures, the engine shall be permitted to be placed at a distance no less than that specified during the fire test from a wall of the same material. (2)* Where calculations have shown that a fire within the engine enclosure will not ignite structures, the engine shall be permitted to be placed at a distance no less than that specified in the calculations. Statement of Problem and Substantiation for Public Comment I fully support the proposed language. Related Item First Revision No. 1-NFPA [Section No ] Submitter Information Verification Submitter Full Name: Marcelo Hirschler Organization: GBH International Street Address: City: State: Zip: Submittal Date: Wed May 11 19:31:29 EDT 2016

21 1 of 22 9/12/2016 2:51 PM Public Comment No. 20-NFPA [ Section No ] A clearance less than 1.5 m (5 ft) shall be permitted where it has been demonstrated by one of the following methods acceptable to the authority having jurisdiction that a fire within the enclosure will not ignite structures: (1) * Where a full-scale fire test has shown that the complete consumption of the combustibles within the enclosure will not ignite structures, the engine shall be permitted to be placed at a distance no less than that specified during the fire test from a wall of the same material. (2) * Where calculations have shown that a fire within the engine enclosure will not ignite structures, the engine shall be permitted to be placed at a distance no less than that specified in the calculations. Statement of Problem and Substantiation for Public Comment Calculations to predict the results of a fire inside the enclosure of an engine generator are limited in scope. Limited in scope, to the effect of the combustible materials that are a part of the engine generator construction. However, the combustibles that are a part of the engine generator construction are not the only combustibles that can burn inside the enclosure once ignited. In particular, there is a fuel source attached to the engine generator that is routed into the enclosure as well. The most common types of fuel sources are propane (liquid or vapor), natural gas, or diesel fuel. If the fuel source is natural gas the supply is unlimited. Propane and diesel fuel as a fuel source are limited by the size of the supply tank but usually have an adequate supply to flow for many hours. Depending on whether the unit is running or not, the Automatic Safety Shutoff Valves (ASSVs) will be open (engine running) or closed (engine not running). If the engine is running, the ASSVs are open, when the fuel lines and other fuel containing parts are consumed the fuel will enter the compartment and be available to burn. The fuel burning will add a significant amount of energy to the enclosure and heat load that is to be contained within the enclosure. Normally the engine will stop when the fuel lines are consumed due to the lack of fuel to power the engine. The ASSVs will close if they can. The ability of the ASSVs to close is dependent on if the fire has damaged the internal sealing components. The ASSVs sealing components are usually made from rubber or a similar material and melt at a relatively low temperature. Regardless of whether the engine is running or not the fire inside the enclosure can potentially comprise the gas shutoff valve and allow the fuel supply to enter the enclosure and fuel the fire. It would be very difficult to calculate the effect of this additional fuel source, rate of burn, path of burn and the overall effect on the ability of the engine generator enclosure to contain the fire. This is why the calculations to predict the results of a fire inside the enclosure of an engine generator are limited in scope. Since this approach is limited in scope, section (2) should be eliminated from the 2018 version of NFPA 37. Related Item First Revision No. 1-NFPA [Section No ] Submitter Information Verification Submitter Full Name: Jeff Jonas Organization: Generac Power Systems Street Address: City: State: Zip: Submittal Date: Wed May 18 15:57:48 EDT 2016

22 2 of 22 9/12/2016 2:51 PM Public Comment No. 15-NFPA [ Section No. 4.3 ] 4.3* Hazardous Locations. In hazardous locations, engines that neither compress a flammable gas nor pump a flammable liquid shall meet the following three criteria: (1) They shall be installed in a an enclosure or room of fire-resistive construction. (2) They shall be ventilated from a nonhazardous outside area. (3) They shall have outside access only defined emergency egress path(s). Statement of Problem and Substantiation for Public Comment Larger gensets and turbines today are being provided with large, purpose designed free standing enclosures that are not an engine room as used in NFPA 37. Engine room as used in NFPA 37 implies a portion of a building that is walled off to provide a separate space in which an engine / turbine is placed; much like we wall off Office or Bathroom spaces in a building. The task group has provided an expanded discussion of enclosures at Annex section A that considers and distinguishes between the close fitting weather covers that are provided for small gensets and microturbines; and the large, purpose designed, free standing enclosures, purpose designed packages and containerized assemblies that are provided with larger genset and industrial turbine installations. Recognizing that the free standing purpose designed enclosures, packages and containers for gensets and turbines are being placed as an assembly within a larger building, it is usually not practical (nor is it being provided!) for personnel working within those structures to have a direct exit to outdoors; rather they exit to the larger building from which an exit path to the outdoors must be provided This change recognizes the evolution in installation configurations. Related Public Comments for This Document Related Comment Public Comment No. 16-NFPA [Section No ] Public Comment No. 17-NFPA [Section No ] Public Comment No. 18-NFPA [Section No. A.3.3.2] Related Item First Revision No. 20-NFPA [Section No. 4.3] Relationship Submitter Information Verification Submitter Full Name: Larry Danner Organization: GE Power & Water Street Address: City: State: Zip: Submittal Date: Mon May 16 08:08:58 EDT 2016

23 3 of 22 9/12/2016 2:51 PM Public Comment No. 16-NFPA [ Section No ] Electrical installations in rooms, or enclosures containing engines shall comply with NFPA 70. Statement of Problem and Substantiation for Public Comment enclosures added here for consistency with the changes made to 4.3 and the expanded discussion of enclosures provided in Annex A Related Public Comments for This Document Related Comment Public Comment No. 15-NFPA [Section No. 4.3] Related Item First Revision No. 20-NFPA [Section No. 4.3] Relationship Change for Consistency between clauses Submitter Information Verification Submitter Full Name: Larry Danner Organization: GE Power & Water Street Address: City: State: Zip: Submittal Date: Mon May 16 08:22:10 EDT 2016

24 4 of 22 9/12/2016 2:51 PM Public Comment No. 17-NFPA [ Section No ] Engine rooms, enclosures, or other locations shall not be classified as hazardous locations as defined in Article 500 of NFPA 70, solely by reason of the engine fuel, lubricating oil, or hydraulic fluid. Statement of Problem and Substantiation for Public Comment enclosures added here for consistency with the changes made to 4.3 and the expanded discussion of enclosures provided at Annex section A Related Public Comments for This Document Related Comment Relationship Public Comment No. 15-NFPA [Section No. 4.3] Provide consistency with Public Comment 15 Related Item First Revision No. 20-NFPA [Section No. 4.3] Submitter Information Verification Submitter Full Name: Larry Danner Organization: GE Power & Water Street Address: City: State: Zip: Submittal Date: Mon May 16 08:26:23 EDT 2016

25 5 of 22 9/12/2016 2:51 PM Public Comment No. 4-NFPA [ Section No. 5.1 ] 5.1* Gas Piping Gas Train Materials and Fittings and Gas Piping Systems Gas piping system from the point of delivery to the equipment isolation valve shall be installed in accordance with the following methods: (1) All fuel gas piping systems at service pressures equal to or less than a gauge pressure of 860 kpa (gauge pressure of 125 psi) shall be installed in accordance with NFPA 54. (2) All fuel gas p iping systems at service pressures in excess of a gauge pressure of 860 kpa (gauge pressure of 125 psi), other than LP-Gas systems, shall be installed in accordance with ANSI/ASME B31.3, Process Piping. (3) LP-Gas p iping systems, whether liquid or vapor phase, shall be installed in accordance with the provisions of NFPA * Plastic pipe on the gas train or within the gas piping system shall not be used to carry fuel within a room housing an engine(s) Approved metallic flexible connectors on a gas train or within the gas piping system shall be permitted for protection against damage caused by settlement, vibration, expansion, contraction, or corrosion Approved nonmetallic connectors on a gas train or within the gas piping system shall be permitted for protection against damage caused by settlement, vibration, expansion, contraction, or corrosion except for LP-Gas in the liquid phase * Connectors used on the gas train for vibration dampening shall be properly anchored and installed according to manufacturer's instructions. Statement of Problem and Substantiation for Public Comment The term fuel gas piping system in NFPA 54 is all piping upstream of the equipment isolation valve. NPFA 54 defines piping system as All pipe, tubing, valves, and fittings from the point of delivery to the outlets of the appliance shutoff valve (aka equipment isolation valve). All piping that is downstream of the equipment isolation valve is part of the fuel gas train, which is part of the engine and is not considered fuel gas piping. 2) The NFPA 54 reference is circuitous; NPFA 86 references a standard, whose scope does not cover and should not be applied to a fuel gas train of the oven. Thus, unintentional conflicts can occur. For example, NPFA 54 (2015), 5.6 Acceptable Piping Materials and Joining Methods required that non-ferrous flanged (i.e. aluminum flanged connections) comply with ANSI/ASME B16.24, Cast Copper Alloy Pipe Flanges and Flanged Fittings: Classes 150, 300, , 1500, and 2500 (see NFPA 54, paragraph ). This standard only permits flat face flanges. For design of gas trains, the use of Aluminum valves with raised face flanges has been standard since the 1930 s. Such valves are permitted in NPFA 86, NFPA 85, CDS-1, UJL 795, UL 2200, and a whole host of ANSI standards, and the intent of the NFPA 54 reference is not to prohibit the use of aluminum valves with raised face flanges. Related Item Committee Input No. 10-NFPA [Section No ] Submitter Information Verification Submitter Full Name: Kevin Carlisle Organization: Karl Dungs, Inc. Street Address: City: State:

26 6 of 22 9/12/2016 2:51 PM Zip: Submittal Date: Wed Mar 16 17:23:27 EDT 2016

27 7 of 22 9/12/2016 2:51 PM Public Comment No. 11-NFPA [ Section No. 5.6 ] 5.6 Overpressure Protection Overpressure protection shall be required for any fuel gas train subject to either of the following conditions : LP-Gas piping systems, whether liquid or vapor phase, in accordance with the provisions of NFPA 58. Fuel gas piping systems at service pressures in excess of a gauge pressure of 860 kpa ((gauge pressure of 125 psi), other than LP-Gas systems, in accordance with ANSI/ASME B31.3, Process Piping. Fuel gas piping systems and fuel gas trains, handling pressures equal to or less than a gauge pressure of 860 kpa (gauge pressure of 125 psi), when the supply pressure exceeds a gauge pressure of 14 kpa (gauge pressure of : (1) The inlet gas pressure exceeds both 14 kpa ( 2 psi) and the protected pressure already provided to the fuel gas train is greater than the maximum allowable operating pressure rating of any fuel gas train component When an overpressure protection device is required in 5.6.1(3), the overpressure protection device shall be set to provide a protected pressure so that the following pressures are not exceeded: (1) If the component s maximum allowable operating pressure rating is a gauge pressure less than 83 kpa (gauge pressure less than 12 psi), the allowable overpressure is 50 percent over the maximum allowable operating pressure rating of the component. (2) If the component s maximum allowable operating pressure rating is a gauge pressure equal to or greater than 83 kpa but less than 414 kpa (gauge pressure equal to or greater than 12 but less than 60 psi), the allowable overpressure is a gauge pressure of 41 kpa (gauge pressure of 6 psi) over the maximum allowable operating pressure rating of the component. (3) If the component s maximum allowable operating pressure rating is a gauge pressure equal to or greater than 414 kpa but less than or equal to 860 kpa (gauge pressure equal to or greater than 60 psi), but less than or equal to 125 psi), the allowable overpressure is 10 percent over the maximum allowable operating pressure rating of the component. (1) rated pressure of any downstream component (2) The failure of a single upstream line pressure regulator results in an inlet gas pressure exceeding the rated pressure of any downstream component

28 8 of 22 9/12/2016 2:51 PM The overpressure protection device required in (3) shall also comply with the following: (1) The overpressure protection device shall be any one device permitted in Section 5.9 of NFPA 54. The gas piping system or fuel gas train shall be designed and installed such that the (1) * There shall be an active or passive means by which the activation of the overpressure protection device is in a continuous pressure protection mode, and the overpressure condition is (2) detectable. Pressure relief valves, where (1) Where a pressure relief valve(s) is used as the overpressure protection device, the relief valve and all connected vent piping shall be sized to fully relieve the required volume of gas in order to provide a protected pressure in accordance with (2) accommodate the maximum anticipated flow due to the failure of the nearest upstream line pressure regulator. Add annex A under the following conditions: The upstream pressure regulator in the gas piping system has failed in the wide open position. The required relieving pressure of the relief valve is based on the protected pressure to the upstream pressure regulator in the gas piping system. The pressure limits in this section are consistent with 49 CFR Part , Required Capacity of Pressure Relieving and Limiting Stations A (2) An example of active means is an alarm or light notification. An example of passive means is a manual reset. Additional Proposed Changes File Name Description Approved NFPA_37_Section_5_6_-_Revisions_FINAL_TASK_GROUP.docx This is the work of the task group Statement of Problem and Substantiation for Public Comment New definitions needed in order to know how to apply the requirement, and this resulted in changes to the wording. Also, scope was limited to the gas train since NFPA 37 does not cover gas piping. Therefore, task group feels that failure of a service regulator need not be needed to drive the requirement of an OPD since the issue is really about failure of line regulator within the upstream gas piping system Related Item First Revision No. 11-NFPA [New Section after 5.5] Submitter Information Verification Submitter Full Name: Kevin Carlisle Organization: Karl Dungs, Inc. Street Address: City: State: Zip: Submittal Date: Fri May 06 15:42:38 EDT 2016

29 9 of 22 9/12/2016 2:51 PM Public Comment No. 18-NFPA [ Section No. A ] A Enclosure. An enclosure is not considered to be a room. An enclosure can be a simple weather protection cover (as typically provided for a small outdoor genset) that cannot be entered by a person, UL2200 is often applied for the design of these enclosures. An enclosure can also be a purpose designed structure provided with an engine or a room. turbine by the manufacturer, which may have provisions for personnel entry to facilitate inspection or maintenance. Some gensets and turbines are provided in a fully self-contained package that may be in the form of a purpose designed structure or a standard shipping container. Although purpose designed structures and packages may be placed within a building, they remain independent structures that are not an integral part of the building and, therefore, do not constitute an engine room as used in NFPA 37. These purpose designed structures / packages may provide any of, but are not limited to, the following functions: (1) Environmental protection (2) Noise containment (3) Fire protection (4) Heat rejection / ventilation (5) Human protection (6) Hazardous area classification Statement of Problem and Substantiation for Public Comment This expanded discussion for the term enclosure a) recognizes and details the current variety of installations for gensets and turbines, and b) provides clarity on the subject to users of NFPA 37. Related Public Comments for This Document Related Comment Public Comment No. 15-NFPA [Section No. 4.3] Public Comment No. 19-NFPA [Section No. B.1.2.9] Related Item First Revision No. 20-NFPA [Section No. 4.3] Relationship Provides an updated discussion of "enclosur" as used in Public Comment 15 Submitter Information Verification Submitter Full Name: Larry Danner Organization: GE Power & Water Street Address: City: State: Zip: Submittal Date: Mon May 16 08:31:28 EDT 2016

30 0 of 22 9/12/2016 2:51 PM Public Comment No. 12-NFPA [ Section No. A (2) ] A (2) The calculation procedure procedures in Chapter 10 of NFPA 555 is contain a procedure similar to the Radiant Ignition of a Near Fuel algorithm in NIST s Fire Protection Engineering Tools for Hazard Estimation (FPETool) for calculating ignition from a nearby fire. It is a sound, engineering-based method of predicting the risk radiative ignition of ignition from a fire a material not in direct contact with a flame. The values in and the reference to the NFPA 555 calculation method are the result of the calculations presented to the technical committee in The calculations treated an engine fire as a vertical cylinder. The values in changed somewhat in the 1998 edition of NFPA 37 based on those calculations. They are reasonably consistent with the requirements of the Building Officials and Code Administrators (BOCA) National Building Code, which was in effect at the time. The committee wanted to include a performance alternative in NFPA 37. The reference in this annex section to the NFPA 555 method provides guidance on how to evaluate proposed alternatives. Statement of Problem and Substantiation for Public Comment I fully support the concept in this annex note. The proposed change is basically editorial. Chapter 10 of NFPA 555 contains more than one procedure for evaluating radiative ignition. The procedures do not address risk but hazard, which is the potential for harm. The charging paragraph of Chapter 10 of NFPA 555 is shown below Methods/Tools. A set of analytical methods or tools is needed to provide a means for performing the evaluations embodied by the definitions in Section 8.3. In particular, methods are needed to predict the heating to ignition of materials contained within a fuel package as well as the radiative heat transfer to the material from other fuel packages or the hot gas layer. This chapter focuses on the radiative ignition of a material not in direct contact with a flame. Related Item First Revision No. 1-NFPA [Section No ] First Revision No. 23-NFPA [Section No. A.4.1.4(2)] Submitter Information Verification Submitter Full Name: Marcelo Hirschler Organization: GBH International Street Address: City: State: Zip: Submittal Date: Wed May 11 19:22:21 EDT 2016

31 1 of 22 9/12/2016 2:51 PM Public Comment No. 5-NFPA [ Section No. A.5.1 ] A.5.1 Gaseous-fueled engines are those engines in which the fuel supply is delivered to the engine in vapor form, including, but not limited to, the following: (1) Natural gas (2) Compressed natural gas (CNG) (3) Propane (4) LP-Gas (5) Mixed gas (6) Manufactured gas and syngas (7) Biogas (e.g., landfill and digester gas) (for biogas applications, see CSA B , Code for Digester Gas and Landfill Gas Installations for Piping Materials and Practices) Liquefied natural gas (LNG), for the purpose of Chapter 5, can be considered a gaseous fuel for engines. Piping systems supplying gaseous fuels should be designed to minimize piping failure. Several examples of methods for minimizing piping failure are as follows: (1) Welded pipe joints should be used where practical. Threaded couplings and bolted flanges should be assembled in accordance with the manufacturer's requirements. (2) If rigid metal piping is used, it should be designed to deflect with the engine in any direction. Properly designed flexible connectors are an alternative in high-vibration areas, such as between rigid pipe supply lines and manifolds or other points of connection to the engine. (3) Rigid piping connected directly to the engine should be supported so that failures will not occur due to the natural frequency of the piping coinciding with the rotational speed of the engine. Care should be taken in the design of pipe supports to avoid vibrations. For guidance on the evacuation/purging, charging, and commissioning of the combustible gas supply in the piping upstream of the equipment isolation valve, refer to NFPA 56. During commissioning, the gas train should be inspected for leaks. Typically, inspection and leak tests of a gas train is performed at a pressure not less than their normal operating pressure using the test method detailed in NFPA 54. Statement of Problem and Substantiation for Public Comment Leak testing of a gas piping system is detailed in NFPA 54. I suggest we have some recommendation in the Annex about using NFPA 54 as the method to test a gas train for external tightness. Related Item Public Input No. 23-NFPA [Section No ] Submitter Information Verification Submitter Full Name: Kevin Carlisle Organization: Karl Dungs, Inc. Street Address: City: State: Zip: Submittal Date: Fri Apr 08 16:56:22 EDT 2016

NFPA 37 Public Comment Responses Page 1 of 32

NFPA 37 Public Comment Responses Page 1 of 32 of 30 11/4/2016 3:05 PM Public Comment No. 6-NFPA 37-2016 [ New Section after 1.6 ] TITLE OF NEW CONTENT Type your content here... 1.7 Pressure Measurement. All pressures expressed in this document are

More information

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS I. Introduction. This is the Motions Committee Report on Standards in the Fall 2013 Revision Cycle. The report identifies Certified

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached) TECHNICAL COMMITTEE ON WATER-COOLING TOWERS NFPA 214 (F2015) Second Draft Meeting Agenda February 17, 2014 10:00 AM - 1:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Tuesday, March 10; All Day Wednesday, March 11; All Day DRURY PLAZA HOTEL San Antonio Riverwalk 0. Administrative. A. Meeting Schedule.

More information

First Revision No. 22-NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No. 22-NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 28 2/2/2016 9:39 AM First Revision No. 22-NFPA 37-2015 [ Global Input ] Add the following definitions to chapter 3: 3.3.x Service Regulator. A pressure regulator installed by the serving gas supplier

More information

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference Matthews, Diane Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference http://nfpa.adobeconnect.com/rpbmeet/

More information

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement 1 of 7 3/4/2016 12:02 PM Second Revision No. 5-NFPA 56-2016 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Storage and Warehousing of Containers and Portable Tanks R. P. Benedetti DATE: September 16, 2010 SUBJECT:

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

First Revision No. 20-NFPA [ Section No ]

First Revision No. 20-NFPA [ Section No ] of 25 7/15/2015 8:30 AM First Revision No. 20-NFPA 56-2015 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by NFPA

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ] 8 of 93 11/6/2015 7:41 AM Public Input No. 52-NFPA 30-2015 [ Section No. 21.2 [Excluding any Sub-Sections] ] For the purpose of this chapter, the term in this section shall have the definitions given.

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of

More information

TECHNICAL COMMITTEE ON SOLVENT EXTRACTION PLANTS

TECHNICAL COMMITTEE ON SOLVENT EXTRACTION PLANTS TECHNICAL COMMITTEE ON SOLVENT EXTRACTION PLANTS MEMORANDUM TO: FROM: Technical Committee on Solvent Extraction Plants R. P. Benedetti DATE: May 2, 2012 SUBJECT: Agenda for Conference Call ROC Meeting

More information

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333 Paul Cabot Administrator National Fuel Gas Ms. Gabriella Davis Recording Secretary, IAPMO Standards Council International Association of Plumbing and Mechanical Officials (IAPMO) IAPMO Group World Headquarters

More information

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 4-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1 * This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES 1.

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation.

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation. NFPA Technical Committee On Fire Hose NFPA 1961 Minutes Task Group Update Underwriters Laboratory November 15 th - 16 th 2016 Tuesday, November 15 th, 2016 Meeting called to order at 8:07 AM by Chairman

More information

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems San Antonio, TX October 12-14, 2016 The following are the meeting minutes from the third meeting of the Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems held in San Antonio,

More information

Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on

Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on Nonvoting Industrial and Medical Gases Michael W. St. Clair, Chair Ostrander, OH [U] Rep. NFPA Industrial Fire Protection Section

More information

REPORT* OF THE MOTIONS COMMITTEE 2017 NFPA TECHNICAL MEETING JUNE 7, 2017 BOSTON, MA

REPORT* OF THE MOTIONS COMMITTEE 2017 NFPA TECHNICAL MEETING JUNE 7, 2017 BOSTON, MA REPORT* OF THE MOTIONS COMMITTEE 2017 NFPA TECHNICAL MEETING JUNE 7, 2017 BOSTON, MA I. Introduction This is the Report* of the s Committee listing Certified Amending s that may be presented at the 2017

More information

NFPA 86 Commitee Inputs Page 1 of 45

NFPA 86 Commitee Inputs Page 1 of 45 of 44 1/26/2017 2:28 PM Committee Input No. 102-NFPA 86-2016 [ Global Input ] The Committee is considering language for pre-purge of the work chambers for Class A, Class B and Class C furnaces. This could

More information

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM 1 of 14 6/22/2016 3:15 PM Second Revision No. 1-NFPA 17A-2016 [ Section No. 4.3.3 ] 4.3.3 All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease vapors,

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON WATER-COOLING TOWERS First Draft Meeting Agenda February 7, 2014 10:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions and Update of

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

Page 1 of 19 Committee Input No. 14-NFPA 33-2013 [ Global Input ] Type your content here... Supplemental Information File Name IndoorDraftforCI.docx Description This committee input would be added to new

More information

Technical Committee on Incinerators and Waste Handling Systems

Technical Committee on Incinerators and Waste Handling Systems Technical Committee on Incinerators and Waste Handling Systems Date: April 27, 2017 To: From: Technical Committee on Incinerators and Waste Handling Systems Eric Nette, Staff Liaison/Engineer Re: Agenda

More information

First Revision No. 1-NFPA 30A-2015 [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

First Revision No. 1-NFPA 30A-2015 [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement of 35 1/21/2016 7:56 AM First Revision No. 1-NFPA 30A-2015 [ Section No. 1.1.3 ] 1.1.3* This code shall not apply to those motor fuel dispensing facilities where only liquefied petroleum gas (LP-Gas),

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] 1.3 Application. 1.3.1 This standard shall apply to all systems for the movement of environmental air in structures that serve the following, except

More information

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Emergency Power Supplies Kelly

More information

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 496-2014 [ Section No. 5.2.2 ] 5.2.2 Where When the enclosure has been opened or if the protective gas supply has failed to maintain the required positive pressure, the enclosure

More information

2018 National Fuel Gas Code Summary List of Revisions Updated: 7/27/17

2018 National Fuel Gas Code Summary List of Revisions Updated: 7/27/17 The following list contains a summary of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. 1.1.1.1 (B), (C), & (D)

More information

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification Public Comment No. 2-NFPA 73-2014 [ Section No. 4.1.3 ] 4.1.3 Unused Openings. 4.1.3.1 Unused openings, other than those intended for the operation of equipment, those intended for mounting purposes, or

More information

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call vember 20, 2012 2-4 PM EDT (1-3 PM CT; 12-2 PM MT; 11-1 PM PT) 1. Welcome-Glenn McGinley, Committee Chair

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

NFPA 550 ROP Meeting Minutes

NFPA 550 ROP Meeting Minutes NFPA 550 ROP Meeting Minutes NFPA Technical Committee on Fire Risk Assessment Methods (FIR-AAA) June 24, 2010 Microsoft Live Meeting 1. Call to order. The meeting was called to order at 1:00 PM on Monday,

More information

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169 7471 Phone: 617 770 3000 Fax: 617 770 0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Furnishings

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

This standard applies to new installations and to those portions of existing equipment and installations that are modified

This standard applies to new installations and to those portions of existing equipment and installations that are modified NFPA STANDARDS DEVELOPMENT SITE SECOND DRAFT REPORT Closing Date: July 19, 2013 NOTE: All Public Comment must be received by 5:00 pm EST/EDST on the published Closing Date. NFPA 37, Standard for the Installation

More information

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m.

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m. 1. Call to Order: NFPA Technical Committee on Building Systems NFPA 900 First Draft Teleconference/Web Meeting AGENDA Thursday, February 13, 2014 11:00 a.m. Noon EDT Online meeting link: http://nfpa.adobeconnect.com/r366m2eaxx6/

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Merchant Vessels

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

FACT SHEET 2018 National Fuel Gas Code Summary List of Revisions rev

FACT SHEET 2018 National Fuel Gas Code Summary List of Revisions rev This fact sheet provides an overview of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. These revisions are published

More information

2016 Annual Revision Cycle Consent Document NFPA 75

2016 Annual Revision Cycle Consent Document NFPA 75 2016 Annual Revision Cycle Consent Document NFPA 75 The Committee on Electronic Computer Systems produced a Technical Committee Report that received at least one Notice of Intent to Make a Motion (NITMAM)

More information

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Mercantile and Business Occupancies

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 105 1/21/2016 7:49 AM Public Input No. 2-NFPA 30A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI

More information

First Revision No. 106-NFPA [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 106-NFPA [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 106-NFPA 86-2012 [ Chapter NFPA ] 7.4.10.2* The number of safety shutoff valve cycles shall be determined by one of the following ways: (1) Counting of actual safety shutoff valve open-closed

More information

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX 1. Call to Order. The meeting of the Technical Committee on Fire Tests

More information

Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on

Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on This list represents the membership at the time the Committee was balloted on the text of this edition. Since that time, changes

More information

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Public Comment No. 7-NFPA 30A-2013 [ Section No ] Page 1 of 13 Public Comment No. 7-NFPA 30A-2013 [ Section No. 6.4.2 ] 6.4.2 Additional Proposed Changes Each pump shall have installed on the discharge side a listed leak detection device that will provide

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] First Revision No. 1-NFPA 499-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this recommended practice

More information

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018) M EM O RA N D UM TO: FROM: DATE: SUBJECT: Correlating Committee on Combustible Dusts Yiu Lee, Project Administrator January 27, 2017 NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Tank Storage and Piping Systems R. P. Benedetti DATE: November 23, 2009 SUBJECT: Agenda for December

More information

Fire Code Action Committee (F-CAC) Meeting Minutes June 19-20, 2012 Chicago IL. Summary of Actions and Regional Work Group (RWG) Assignments

Fire Code Action Committee (F-CAC) Meeting Minutes June 19-20, 2012 Chicago IL. Summary of Actions and Regional Work Group (RWG) Assignments Fire Code Action Committee (F-CAC) Meeting Minutes June 19-20, 2012 Chicago IL Fire-CAC Members in Attendance Anthony Apfelbeck (Vice-Chairman) Daniel Finnegan Howard Hopper, P.E. Andrew King Kelly Nicolello

More information

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Mr. Merton Bunker, Committee Chair, called the meeting to order at 8:05 on Wednesday September

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT

TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT MEMORANDUM TO: FROM: Technical Committee on Liquid Fuel Burning Equipment R. P. Benedetti DATE: May 15, 2014 SUBJECT: Agenda for May 28-29, 2014 NFPA

More information

NFPA s Standards Development Process

NFPA s Standards Development Process NFPA s Standards Development Process Revision Cycle 104 weeks or 141 weeks Guiding Principles Due process Openness Lack of dominance Seek society s balance between: Acceptable risk Commitment of resources

More information

FINAL* REPORT OF THE MOTIONS COMMITTEE

FINAL* REPORT OF THE MOTIONS COMMITTEE FINAL* REPORT OF THE MOTIONS COMMITTEE ON CERTIFIED AMENDING MOTIONS FOR PRESENTATION AT THE 2012 ASSOCIATION TECHNICAL MEETING JUNE 13-14, 2012 LAS VEGAS, NEVADA I. Introduction. This is the second and

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

Page 1 of 15 Second Revision No. 8-NFPA 82-2013 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 13, Standard for the Installation

More information

Mobile Food Units. A definition of mobile food unit added in OFC Rule 2 is as follows:

Mobile Food Units. A definition of mobile food unit added in OFC Rule 2 is as follows: Technical Bulletin #18-002 February 2018 / 2017 OFC Mobile Food Units Referenced Codes and Standards: OAC 1301:7-7-3(T); OFC 320 OAC 1301:7-7-2(B); OFC 202 OAC 1301:7-7-9(F); OFC 906 NFPA 58 (2014) NFPA

More information

TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT

TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT TECHNICAL COMMITTEE ON LIQUID FUEL BURNING EQUIPMENT MEMORANDUM TO: FROM: Technical Committee on Liquid Fuel Burning Equipment R. P. Benedetti DATE: March 10, 2015 SUBJECT: Agenda for March 25, 2015 NFPA

More information

NFPA Technical Meeting (Tech Session) June 24-25, 2015 Agenda*

NFPA Technical Meeting (Tech Session) June 24-25, 2015 Agenda* NFPA Technical Meeting (Tech Session) June 24-25, 2015 Agenda* NFPA Standards presented for Action Wednesday, June 24, 2015 starting @ 2:00pm: NFPA 33, Standard for Spray Application Using Flammable or

More information

First Revision No. 82-NFPA [ Detail ] Submitter Information Verification Submitter Full Name: Organization:

First Revision No. 82-NFPA [ Detail ] Submitter Information Verification Submitter Full Name: Organization: of 176 1/25/2016 3:32 PM First Revision No. 82-NFPA 54-2015 [ Detail ] Title of 7.1: Installation of Underground Piping. Underground Title of 7.2: Installation of Aboveground Piping. Submittal Date: Thu

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document of 79 1/27/2016 2:09 PM Public Input No. 1-NFPA 59-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/API and replace with API. (2) ANSI/UL

More information

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Industrial and Medical Gases

More information

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Code (FCC-AAA) Gregory

More information

GASEOUS HYDROGEN SYSTEMS

GASEOUS HYDROGEN SYSTEMS CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 GENERAL 701.1 Scope. The installation of gaseous hydrogen systems shall comply with this chapter and Chapters 30 and 35 of the Fire Compressed gases shall

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

SAF-BCF SECOND REVISIONS WITH STATEMENTS

SAF-BCF SECOND REVISIONS WITH STATEMENTS Page 196 of 331 32.2.1.3 ] Second Revision No. 153-NFPA 101-2013 [ New Section after 32.2.1.4 Multiple-Level Buildings. For purposes of applying requirements of this chapter that utilize the term level

More information

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016)

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016) 2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016) Reference: Documents referenced for this bulletin are as follows: San

More information

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 214-2013 [ Section No. 4.2 ] 4.2 * Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Portable Fire Extinguishers

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document National Fire Protection Association Report of 113 http://submittals.nfpa.org/terraviewweb/contentfetcher?commentpara... 2/9/2016 10:50 AM Public Input No. 1-NFPA 87-2015 [ Global Input ] Throughout standard

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Internal Combustion Engines

More information

Committee Input No. 60-NFPA [ Sections , ]

Committee Input No. 60-NFPA [ Sections , ] Page 1 of 15 Committee Input No. 60-NFPA 34-2013 [ Sections 3.3.7.1, 3.3.7.2 ] Sections 3.3.7.1, 3.3.7.2 3.3.7.1 Combustible Liquid. A Any liquid that has a closed-cup flash point at or above 100 F (37.8

More information

TECHNICAL COMMITTEE MEMBERS PRESENT

TECHNICAL COMMITTEE MEMBERS PRESENT National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0770 www.nfpa.org MINUTES NFPA Technical on Fire Doors and Windows NFPA 80 and NFPA 105

More information

Public Comment No. 3-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 3-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification Public Comment No. 3-NFPA 1408-2013 [ Global Input ] Type your content here... NFPA 1408, Standard for Training Fire Service Personnel in the Operation, Care, Use and Maintenance of Thermal Imagers Revise

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

Committee on NFPA 51A

Committee on NFPA 51A Committee on M E M O R A N D U M TO: FROM: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant DATE: May 6, 2010 SUBJECT: ROC Letter Ballot The ROC letter ballot

More information

Technical Committee on Record Protection (REA-AAA)

Technical Committee on Record Protection (REA-AAA) Technical Committee on Record Protection (REA-AAA) DATE: September 8, 2015 TO: FROM: M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Record Protection (REA-AAA) Audrey

More information

Standards and Safety Update

Standards and Safety Update Standards and Safety Update Presented By: Michael J. Johnston Executive Director Standards and Safety, NECA Update Objectives Update on NFPA 70E and NECA Safety products Update on NECA S National Electrical

More information

4. Approval of Second Draft Meeting Minutes from March 18 19, (Attachment B)

4. Approval of Second Draft Meeting Minutes from March 18 19, (Attachment B) TECHNICAL COMMITTEE ON Electric Generating Plants AGENDA Pre-First Draft Meeting for NFPA 850 & 853 October 12 th -13 th, 2016 1:00PM 5:00PM First Day 8:00AM-5:00PM Second Day 1. Call to Order Mark Boone,

More information

"Spray area" is the term that is used throughout the document. This change is for consistency.

Spray area is the term that is used throughout the document. This change is for consistency. of 78 5/30/2014 2:08 PM Public Comment No. 39-NFPA 33-2013 [ Global Input ] For Chapter 18, replace "spray paint area" with "spray area". "Spray area" is the term that is used throughout the document.

More information

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting March 14 15, 2012 San Diego, CA

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting March 14 15, 2012 San Diego, CA National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting March 14 15, 2012 San Diego, CA The NFPA 1521 Task Group and NFPA 1561 Task Group, established

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Second Revision No. 3-NFPA [ Section No. 2.3 ] Second Revision No. 3-NFPA 804-2014 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990. ASME Boiler

More information