Interior Remodeling CAACSM Head Start ADDENDUM NO. #3 p. #1. TDF # January 21, 2019

Size: px
Start display at page:

Download "Interior Remodeling CAACSM Head Start ADDENDUM NO. #3 p. #1. TDF # January 21, 2019"

Transcription

1 Interior Remodeling CAACSM Head Start ADDENDUM NO. #3 p. #1 Community Action of Hastings The Design Forum Inc. TDF # January 21, 2019 NOTICE: The bid documents are amended, in certain particulars, as stated here-in which adds to, and/or supersedes, conflicting information in the Project Manual or Drawings. Work covered by this Addendum shall be subject to the Instructions to Bidders, General Conditions, Supplementary Conditions, General Requirements and Specifications. Acknowledge this Addendum on the Bid Form and include the cost of the work herein specified in the Bid. ATTACHMENTS INCLUDED: Debarment Form DRAWINGS INCLUDED: C1.1, A0.1, A1.1, A1.2, A8.1 SKETCHES INCLUDED: None 3.1 GENERAL ITEMS 1. Refer to attached debarment form furnished by Community Action for use in your bid submittals. 2. Refer to attached sign-in sheet for attendance at the meeting. 3. Per discussion at the pre-bid meeting, the roofing work will be a part of the scope of the project and the contractor that the Owner originally identified to do the work will not be available. Contractors are to secure quotes from a roofer that is authorized to work on a Dur-o-last roof for all work on this project. 4. Per discussion at the prebid meeting and in accordance with the specifications, no labor or materials bond will be required, and no bid security is required. 5. The Instructions to bidders make reference to a bid supplement. There is no bid supplement required. 3.2 SPECIFICATION CHANGES 1. Refer to Specification Index. Make the following revisions: a. Delete Abbreviations and Symbols b. Delete Quality Control c. Delete reference to Division 22, 23, 26, 27 and 28. The table of contents for those sections is published at the beginning of each section. d. Delete Section Play Surfacing e. Delete Section Chain Link Fencing 2. Refer to Drawing Index. Make the following revisions: a. Add ME1.1 b. Add SS1.1 c. Add SS Refer to Section Replace paragraph D with the following D. Acceptable core construction: Rigid insulation for "U" value of.36 or better. 4. Refer to Section Replace paragraph c with the following

2 Interior Remodeling CAACSM Head Start ADDENDUM NO. #3 p. #2 Community Action of Hastings The Design Forum Inc. TDF # January 21, 2019 C. Glazing beads shall be minimum 20 gauge steel with mitered corners. Labeled frames shall have UL or FM approved glazing beads. Interior frames receive ¼ thick glass, Exterior frames receive 1 thick glass. 5. Refer to Section A. In the third sentence, delete the phrase Only domestic manufacturers are acceptable. Also in the hardware schedule, delete the Set AL Refer to Section Window Covering, paragraph : Add the following sentence to the end of the paragraph, Shades are required in all exterior windows. 7. Refer to Division 26 Electrical. Add Section Fire Alarm System, attached herewith. 8. Refer to Division 27 FCCS. This Division of work will be performed by the Owner under separate contract. It will not be part of the bid process for this project. 3.3 DRAWING CHANGES 1. Refer to Sheet C1.1, dated 1/21/19, reissued with this addendum. Note the revisions at the remodeled walk in cooler structure and the detailed information on the dumpster enclosure. 2. Refer to Sheet A0.1, dated 1/21/19, reissued as part of this addendum. The existing exterior enclosure of the walk in cooler is to remain and has been incorporated into the plan. 3. Refer to Sheet A1.1, dated 1/21/19 reissued with this addendum. In room 114, the new exterior door should be labeled as 114B. Also in this same room the detail call out at the door frame should be 3 and 4 on sheet A2.1 in lieu of 6 on A2.1. In addition, delete note 6 from the room finish schedule notes. 4. Refer to Sheet A1.2, dated 1/21/19, reissued with this addendum. The drawing has been updated with information on the remodeling of the walk in cooler area. 5. Refer to sheet A2.1, dated 1/7/19, not reissued. In detail A/A2.1 the countertop should be PLAM in lieu of solid surface and there will be no alternate Also in the door schedule, revise doors 111A and 113A from 7-0 tall to 4-0 tall. The hollow metal frame should be capped on the top. In the door schedule add door 109A. Door will be 3-0 x 7-0, type 1, with stained finish, hollow metal frame type a, and hardware set 15. Also add hardware set 19 as follows 1-1/2 Pair Butts Plated steel ball bearing, heavy weight doors, average frequency, full mortise. 1 Lockset Classroom Function, lever. 1 Kick Plate Stainless Steel 1 Wall Stop/Hold Rockwood 494.

3 Interior Remodeling CAACSM Head Start ADDENDUM NO. #3 p. #3 Community Action of Hastings The Design Forum Inc. TDF # January 21, Refer to Sheet A8.1, dated 1/21/19 reissued with this addendum. Additional ceiling work is shown in the remodeled area of the old walk in cooler. 7. Refer to Sheet P1.1, dated 1/7/19, not reissued. Refer to the Demolition Notes: Add Note # 5 as follows Where required by the new floor plan, remove all existing floor drains and prep surface for installation of new flooring. Cap existing piping to remain in accordance with code requirements. 8. Refer to Sheet P2.1, dated 1/7/19, not reissued. In Mangers Office 127, add a Keyed Note # 12. At the list of Keyed Notes, add # 12 Move the existing water softening equipment into the adjacent existing mechanical/electrical room, coordinate location with other trades. 9. Refer to Sheet M1.1, dated 1/7/19, not reissued. Refer to the Mechanical Equipment List, add supply air grille S-3, 16x6, double deflection, steel, offwhite. 10. Refer to Sheet M2.1, dated 1/21/19, reissued with this addendum. Add return air ductwork and grilles serving RTU-123, as shown on the revised plan. Adjust the ductwork layout in MP Room 122 as shown. 11. Refer to Sheet E1.1, dated 1/7/19, not reissued. Refer to the light fixture schedule and add the following fixtures: X1, Lithonia LHQM, without heads, green letters, surface mounted with arrows as appropriate to location. X2, same fixture with exterior remote head, surface mounted with arrows as appropriate to location. 12. Refer to Sheet E2.1, dated 1/7/19, reissued with this addendum. a. In Storage 107 change Keyed Note 10 to Keyed Note 9. b. Add a Keyed Note 10 in the vicinity of Staff Toilet 108 c. Refer to the list of Keyed Notes for this sheet and add Keyed Note #10 as follows: Remove existing under floor wiring, including above floor wiring and conduit in this vicinity, prep floor to receive new flooring material. d. Refer to the Demolition Notes, Clarification: It is intended that where existing walls are removed to make way for the revised floor plan layout, all existing electrical devices and wiring that may exist in those walls be removed as well. It is also intended that where existing walls remain, but now become a part of a newly finished area, all existing devices and wiring be removed as well. e. to specification section issued with this bulletin. f. Refer to the revised architectural plan at MP Room 122, move the receptacle on south side of the room to the new south wall location g. Keyed Note 3 has been added to classrooms and corridors, coordinate final location requirements for child safe receptacles with inspector h. Delete the General Data Notes from this sheet. All data and communication type wiring and systems will be provided by the Owner under separate contract. Where the data symbol is shown on this sheet provide the empty back box and conduit to accessible location. Coordinate location of each data location with Owner before rough-in

4 Interior Remodeling CAACSM Head Start ADDENDUM NO. #3 p. #4 Community Action of Hastings The Design Forum Inc. TDF # January 21, Refer to Sheet E3.1, dated 1/7/19, not reissued. Adjust classroom exit lights to align with exit door locations. Add (3) C fixtures in the new area of MP Room 122, see updated architectural plan. Connect new light fixtures to the lights already shown in that room. Refer to the Mechanical plans for the location of exhaust fans, wire each to run with the room lights as noted on the mechanical schedule. 14. Refer to Sheet SS2.1, dated 1/7/19, reissued with this addendum. The Contractor shall provide, as part of his work for this project, conduit and boxes as necessary to support the installation of the security devices shown on this plan. The installation of the device, and the required wiring for the device, will be provided by the Owners Security System Contractor separate from the work of this project. In addition, provide, as a part of this work for this project, a complete code compliant Fire Alarm System as shown on the plan and as described in the attached specification. END OF ADDENDUM 3

5 MEETING ATTENDANCE SHEET 1. Kelly Bockheim, Mugen Const., 2. Jeff Bays, Cook-Jackson, 3. Jim Cary, 4. Everett Benedict, GLB Const., 5. Tom Rosencrants, GLB Const., 6. Jeremy Raymond, Trumble Group, 7. Larry Erhardt, Skye Construct., 8. Aaron Snyder, Copper Rock Const., 9. Isaac Burkwalt, MS Electric, 10. Scott Hardy, Hardy Electric, 11. Stan Schultz, Current Electric, 12. Jeff Dykema, Martech, 13. Todd Delamar, Circuit Elect., 14. Jordan Brinks, Architectural Openings and Access, 15. Paul Kluiosza, TL Hart, 16. Tom Taylor, MidState Security, 17. Karl Gelarowski, D & K Plumbing, Greg, Riverview Service, greg@riverviewservice.org 19. Jack Potter, D & B Commercial Flooring, dandbcommercialflooring@gmail.com 20. Greg Vaccaro, Associated Construction, greg@associatedconstructionbc.com 21. Jamie Seeber, Seeber s Flooring, jseeber50@gmail.com 22. Dave Mawe, Superior Glass, dm@supglass.com 23. Jim Hayden, R & B Elec. Inc., jimhayden@rocketmail.com 24. Trevor, Triangle Window Fashions, trevors@trianglewindowfashions.com 25. Rob Miedema, Heyboer and Bolt, rob@h-binc.com 26. Dave DeYoung, Visser Brothers, daved@visserbrothers.com 27. Steven Pitsch, Pitsch Companies, stevenpitsch@aol.com 28. Ryon Pitswch, X-treme Demolition, Chris Ockert, Abatement and Demolition Services, abatementdemoservices.chris@gmail.com

6

7 INTERIOR REMODELING HEAD START COMMUNITY ACTION OF HASTINGS TDF # SECTION FIRE ALARM SYSTEM The Design Forum, Inc. Morgan Landon, PE, LLC PART 1 GENERAL 1.01 SCOPE A. This Section requires a complete Design Build approach to the Fire Alarm system for this project. Components shown on the plans are for reference only. It is the Contractor s responsibility to design, provide and install a complete, code complying, properly operating Fire Alarm System SECTION INCLUDES A. Manual fire alarm stations. B. Fire alarm signaling appliances. C. Auxiliary fire alarm equipment REFERENCES A. NFPA 70 - National Electrical Code. B. NFPA 72 - Installation, Maintenance, and Use of Protective Signaling Systems. C. NFPA 72E - Automatic Fire Detectors. D. NFPA 72G - Notification Appliances for Protective Signaling Systems. E. NFPA Life Safety Code SUBMITTALS A. Submit in accordance with the requirements of Division 1, Section , and this section. B. Shop Drawings: Provide control panel layout and system wiring diagram adjustments showing each device and wiring connection required; approved by The Authority Having Jurisdiction (AHJ). C. Product Data: Provide electrical characteristics and connection requirements. D. Test Reports: Indicate satisfactory completion of required tests and inspections. E. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by Product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of products Fire Alarm System

8 INTERIOR REMODELING HEAD START The Design Forum, Inc. COMMUNITY ACTION OF HASTINGS Morgan Landon, PE, LLC TDF # F. Record actual locations of initiating devices, signaling appliances, and end-of-line devices OPERATION AND MAINTENANCE DATA A. Submit under provisions of Division 1. B. Operation Data: Operating instructions. C. Maintenance Data: Maintenance and repair procedures REGULATORY REQUIREMENTS A. Conform to requirements of NFPA 70 and NFPA 101. B. Furnish products listed and classified by UL as suitable for purpose specified and indicated MAINTENANCE SERVICE A. Furnish service and maintenance of new fire alarm system additions for one year from Date of Substantial Completion. Provide comprehensive one-year warranty covering travel time, mileage, parts, labor, supervision, overhead & profit SPECIFIC REQUIREMENTS A. Completed installation shall comply with all applicable codes. B. Arrange for additional power supply and system monitoring from emergency generator as required by system design. PART 2 PRODUCTS 2.01 FIRE ALARM A. Furnish new Fire Alarm Control Panel, and sub-panels, as necessary to properly operate the new system. B. Power supply: Ensure supply is adequate to serve control panel modules, remote detectors, remote annunciators, and alarm signaling devices. Include battery-operated emergency power supply with capacity for operating system in standby mode for 24 hours followed by alarm mode for 5 minutes. C. System Supervision: Component or power supply failure places system in trouble mode. D. Initiating Device Circuits: Supervised zone module with alarm and trouble indication; occurrence of single ground or open condition places circuit in trouble mode but does not disable that circuit from initiating an alarm Fire Alarm System

9 INTERIOR REMODELING HEAD START The Design Forum, Inc. COMMUNITY ACTION OF HASTINGS Morgan Landon, PE, LLC TDF # E. Indicating Appliance Circuits: Supervised signal module, sufficient for signal devices connected to system; occurrence of single ground or open condition places circuit in trouble mode but does not disable that circuit from signaling an alarm. F. Auxiliary Relays: Provide sufficient SPDT auxiliary relay contacts for each detection zone to provide accessory functions (e.g. RTU/AHU Stop) specified. G. Provide TROUBLE ACKNOWLEDGE, DRILL, and ALARM SILENCE switch. H. Trouble Sequence of Operation: System or circuit trouble places system in trouble mode, which causes the following system operations: 1. Visual and audible trouble alarm indicated by zone at new fire alarm panel. 2. Manual acknowledgement function at fire alarm control panel silences audible trouble alarm; visual alarm is displayed until initiating failure or circuit trouble is cleared. I. Alarm Sequence of Operation: Actuation of initiating device places circuit in alarm mode, which causes the following system operations: 1. Indicate location of alarm zone on new fire alarm control panel and remote annunciator. J. Lamp Test: Manual lamp test function causes alarm indication at each zone at fire alarm control panel. K. Drill Sequence of Operation: Manual drill function causes alarm mode operation as described above. L. Zoning for new systems: Each Initiating Device INITIATING DEVICES A. Manual Station: Semi-Flush mounted, non-coded type, single action manual station. Provide manufacturer's standard backbox. Replace existing manual stations in building area included in this project scope SIGNALING APPLIANCES A. Provide horn/strobes having white plastic housing, a sound level of 97 dba average and synchronized xenon flash output of 15/75 cd, 30 cd, 60 cd or 110 cd as required by building layout. The horn strobe shall mount to a 1-gang, 2-1/2 deep electrical box. The strobe shall have lens markings for wall mounting. B. Provide all alarm and trouble signals at the main Fire Alarm System Panel FIRE ALARM WIRE AND CABLE A. Fire Alarm Power Branch Circuits: Building wire, cable or signal wire, installed per Section B. Initiating Device and Indicating Appliance Circuits: Cable or signal wire installed per Section Fire Alarm System

10 INTERIOR REMODELING HEAD START COMMUNITY ACTION OF HASTINGS TDF # PART 3 EXECUTION The Design Forum, Inc. Morgan Landon, PE, LLC 3.01 INSTALLATION A. Install products in accordance with manufacturer's instructions. B. Install manual stations with operating handle 48 above floor. Install audible and visual signal devices 80" above floor. C. Use 16 AWG minimum size conductors for fire alarm detection and signal circuit conductors. Install wiring in conduit or cable (plenum rated) in trays, hoops or slings. D. Mount end-of-line device in control panel. E. Automatic Detector Installation: Conform to NFPA 72E FIELD QUALITY CONTROL A. Field testing will be performed under provisions of Division 01. B. Test in accordance with NFPA 72H MANUFACTURER'S FIELD SERVICES A. Prepare and start systems under provisions of Division 01. B. Include services of certified technician to supervise installation, adjustments, final connections, system testing, and approval by the City of Pontiac Fire Authority DEMONSTRATION A. Provide 8 hours of systems demonstration under provisions of Division 01. B. Demonstrate normal and abnormal modes of operation, and required responses to each. END OF SECTION Fire Alarm System

SECTION INTRUSION DETECTION

SECTION INTRUSION DETECTION (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) SECTION 28 16 00 INTRUSION

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

The following information shall become and form part of the contract documents.

The following information shall become and form part of the contract documents. October 4, 206 To: Attention: Re: All Bidders All Bidders JCBE Gymnasium HVAC Upgrades BC#: 206433 Edmonds Project No.: BHM6090 All bidders, The following information shall become and form part of the

More information

DIVISION 26 ELECTRICAL SECTION FIRE ALARM SYSTEM

DIVISION 26 ELECTRICAL SECTION FIRE ALARM SYSTEM DIVISION 26 ELECTRICAL SECTION 26 81 11 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install all equipment and accessories for a complete local, analog addressable, manually and automatically actuated,

More information

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A. System: UL listed B. Conform to requirements of NFPA 101

More information

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R Region Project Page 1 PART 1 - GENERAL 1.1 REFERENCES.1 CAN/ULC-S524-2006, Standard for the Installation of Fire Alarm Systems..2 CAN/ULC-S525-2007, Audible Signal Device for Fire Alarm Systems..3 CAN/ULC-S526-2007,

More information

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION FIRE ALARM SYSTEM

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION FIRE ALARM SYSTEM OSU PROJECT NO. 30-04-15 PAGE 1 PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, and equipment required to provide a complete and operating system of manual and automatic detection devices,

More information

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 28 31 00 FIRE ALARM AND SMOKE DETECTION SYSTEMS A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A.

More information

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Fike Micromist Water Mist Fire Suppression System with automatic detection and control. The work described in

More information

FIRE & LIFE SAFTEY STANDARD

FIRE & LIFE SAFTEY STANDARD Title: Effective Date: 01/01/14 Revised Date: 1/1/14 Code References: Title 16, Chapter 16.16 of the Roseville Municipal Code, NFPA 72 Note: This standard is a summary of Fire Department clarifications

More information

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10 Belleville, Ontario Page 1 of 10 1 GENERAL 1.1 GENERAL REQUIREMENTS.1 The General Conditions of CCDC2-2008, and the General requirements of Division 1, form part of this Section and must read in conjunction

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

Hinesville First United Methodist Church SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Hinesville First United Methodist Church SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 28 3111 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Fire-alarm control unit. 2. Manual fire-alarm boxes. 3. System smoke detectors. 4. Heat detectors.

More information

SECTION ISOLATED POWER SYSTEMS

SECTION ISOLATED POWER SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER PROJECT NO. CWA 2013-04 SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER BIDS RECEIVED: CITY HALL, CITY OF BESSEMER TIME: 2:00pm DATE: October 2, 2014 City of Bessemer --------------------------------------------------------------------------------------------------------------------------------------------

More information

SECTION FIRE ALARM SYSTEMS

SECTION FIRE ALARM SYSTEMS SECTION 16721 FIRE ALARM SYSTEMS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work

More information

SPECIFICATION FOR A TOTAL FLOOD ECARO-25 TM CLEAN AGENT FIRE SUPPRESSION SYSTEM FOR USE WITH THE SHP PRO CONTROL PANEL SYSTEM

SPECIFICATION FOR A TOTAL FLOOD ECARO-25 TM CLEAN AGENT FIRE SUPPRESSION SYSTEM FOR USE WITH THE SHP PRO CONTROL PANEL SYSTEM SECTION 1 - GENERAL CONDITIONS SPECIFICATION FOR A TOTAL FLOOD I. SCOPE: This specification outlines the requirements for a Total Flood ECARO-25 TM clean agent fire suppression system utilizing HFC-125

More information

SPECIFICATION FOR A TOTAL FLOOD ECARO-25 TM CLEAN AGENT FIRE SUPPRESSION SYSTEM FOR USE WITH THE CHEETAH Xi 50 CONTROL PANEL SYSTEM

SPECIFICATION FOR A TOTAL FLOOD ECARO-25 TM CLEAN AGENT FIRE SUPPRESSION SYSTEM FOR USE WITH THE CHEETAH Xi 50 CONTROL PANEL SYSTEM SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Total Flood ECARO-25 TM clean agent fire suppression system utilizing HFC-125 as the fire extinguishing agent

More information

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline Moreno Valley Fire Department Guideline Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 8, 2017 Alarm & Signaling Systems PURPOSE Fire alarm and signaling systems are designed to

More information

SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH IMPULSE VALVE, FK AGENT & CHEETAH Xi CONTROL PANEL

SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH IMPULSE VALVE, FK AGENT & CHEETAH Xi CONTROL PANEL SECTION 1 GENERAL CONDITIONS I. SCOPE: SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM This specification outlines the requirements for a Total Flood Clean Agent Fire Suppression System utilizing

More information

DONALD H. BERG, ARCHITECT

DONALD H. BERG, ARCHITECT DONALD H. BERG, ARCHITECT DVA PROJECT 632-CSI-402 PET/CT ROOM #A0-10 RENOVATION BASEMENT LEVEL, BUILDING 200 ARCHITECT S PROJECT No. 0917-02 ADDENDUM NO. 1 JUNE 25, 2018 Page 1 of 1 ARCHITECTURAL 1. Specifications:

More information

SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH IMPUSLE VALVE, Fike FK AGENT & SHP PRO CONTROL PANEL

SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH IMPUSLE VALVE, Fike FK AGENT & SHP PRO CONTROL PANEL SECTION 1 GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Total Flood Clean Agent Fire Suppression System utilizing FK-5-1-12 as the fire extinguishing agent and with a

More information

SECTION FIRE ALARM

SECTION FIRE ALARM SECTION 16740 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

TrueAlert Notification Appliances

TrueAlert Notification Appliances TrueAlert Notification Appliances UL Listed; FM, CSFM and MEA (NYC) Approved* Non-Addressable Audible/Visible Notification Appliances with SmartSync Operation of Strobes and Horns Features Wall mount audible/visible

More information

1.3 REFERENCE STANDARDS

1.3 REFERENCE STANDARDS SECTION 28 4600 FIRE DETECTION AND ALARM PART 1 -GENERAL 1.1 SECTION INCLUDES A. Fire alarm system design and installation, including all components, wiring, and conduit. B. Circuits from protected premises

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH IMPULSE VALVE, FK AGENT & CHEETAH Xi 50 CONTROL PANEL

SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH IMPULSE VALVE, FK AGENT & CHEETAH Xi 50 CONTROL PANEL SECTION 1 GENERAL CONDITIONS I. SCOPE: SPECIFICATION FIKE CLEAN AGENT FIRE SUPPRESSION SYSTEM WITH This specification outlines the requirements for a Total Flood Clean Agent Fire Suppression System utilizing

More information

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS HVAC Upgrades Phase 2 Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Section Includes:.1 Materials and installation for fire alarm systems upgrades..2 Audible signal devices..3 End-of-line devices..4 Sustainable

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-21 21 03.00 10 February 2009) ---------------------------------- Preparing Activity: USACE Superseding UFGS-21 21 03.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Fire alarm system specification for multiple tenant retail buildings

Fire alarm system specification for multiple tenant retail buildings Date: June 20, 2011 Project name: Baederwood Shopping Center Multiple Tenant Buildings B & C City/ State: Abington, PA Landlord s Vendor Contact: Dan Morrin Jr., NECCO Security Phone: (215)638-7999 Email:

More information

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used. PART 1 GENERAL 1.01 Scope of Standard A. This Standard is intended to assure that fire alarm and signaling systems at Sam Houston State University provide the highest level of life safety possible. This

More information

CITY OF PORTSMOUTH Department of Public Works MUNICIPAL COMPLEX FIRE ALARM. Bid # Addendum #1

CITY OF PORTSMOUTH Department of Public Works MUNICIPAL COMPLEX FIRE ALARM. Bid # Addendum #1 CITY OF PORTSMOUTH Department of Public Works MUNICIPAL COMPLEX FIRE ALARM Bid #56-09 Addendum #1 This Addendum forms part of the original document marked Bid #56-09 MUNICIPAL COMPLEX FIRE ALARM. Device

More information

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Fike Micromist Water Mist Fire Suppression System with a Cheetah Xi 50 addressable detection and control system.

More information

SENTRY PRODUCTS, INC. 01/98 SCAN - STAND-ALONE - Sample Specification

SENTRY PRODUCTS, INC. 01/98 SCAN - STAND-ALONE - Sample Specification This sample specification is for a duress only stand-alone SCAN system using SR series receivers with zone-within-a-zone and graphic display. SECTION 17 DURESS SYSTEM PART 1.00 - GENERAL 1.01 DESCRIPTION

More information

SECTION FIRE ALARM SYSTEMS

SECTION FIRE ALARM SYSTEMS SECTION 28 3100 PART 1 -GENERAL 1.01 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening.

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening. DIVISION 8 OPENINGS SECTION 08 33 23 PART 1 GENERAL 1.1 SECTION INCLUDES A. Overhead coiling counter fire doors. 1.2 RELATED SECTIONS A. Section 05500 - Metal Fabrications: Support framing and framed opening.

More information

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR SECTION 08734 COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL 1.1 SECTION INCLUDES A. Overhead

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition

More information

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401 Henry L. Chauvin, Architect, LLC 9429 Highway 941 Gonzales, Louisiana 70737 (225) 612-0707 Fax: (224) 612-4565 Email: henry.chauvin@outlook.com Additions & Alterations to Ascension Parish Library Galvez

More information

Gas Station & C Store SECTION CWM Job No

Gas Station & C Store SECTION CWM Job No SECTION 21 1300 - PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract

More information

DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM

DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION INTRUSION DETECTION SYSTEM

SECTION INTRUSION DETECTION SYSTEM SECTION 13845 INTRUSION DETECTION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete, operable, tested intrusion detection system, bearing Underwriters Laboratories (UL) mercantile listing

More information

IN2 Digital, Addressable Fire-alarm System

IN2 Digital, Addressable Fire-alarm System Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Digital, Addressable Fire-alarm System Illinois Mathematics and Science Academy Follow this and additional works at: http://digitalcommons.imsa.edu/facility_in2_manuals

More information

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website. 4.e STATE OF MISSOURI County of Franklin ss. COMMISSION ORDER Commission Order No. 2016-316 Third Quarter Term 2016 Tuesday,August,09,2016 Bid Notice IN THE MATTER OF ADVERTISING FOR SEALED BIDS FOR SMOKE

More information

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Fire Alarm Systems Plan Review Checklist Date: Permit Number: Business Name: Address: Fire Alarm System Submittal

More information

Bold items are particular to the City of Euless

Bold items are particular to the City of Euless EULESS FIRE DEPARTMENT FIRE MARSHAL S OFFICE INFORMATION LINE: Revised 8/2004 Fire Chief Lee Koontz Fire Marshal Paul Smith EFD-FMO 3-1 2003 International Fire & Building Code as Amended NFPA Standards

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

MANUAL OF DESIGN CRITERIA AND SPECIFICATIONS FOR FIRE DETECTION AND ALARM SYSTEMS PUBLIC SCHOOLS IN NEW MEXICO

MANUAL OF DESIGN CRITERIA AND SPECIFICATIONS FOR FIRE DETECTION AND ALARM SYSTEMS PUBLIC SCHOOLS IN NEW MEXICO MANUAL OF DESIGN CRITERIA AND SPECIFICATIONS FOR FIRE DETECTION AND ALARM SYSTEMS PUBLIC SCHOOLS IN NEW MEXICO Prepared For: Public Schools Facilities Authority State of New Mexico 2019 Galisteo, Suite

More information

SECTION DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM SECTION 283111 DIGITAL, ADDRESSABLE FIRE ALARM PART 1 - GENERAL 1.1 GENERAL A. This Section includes the following: 1. Fire-alarm control panel. 2. Manual fire-alarm boxes. 3. Smoke detectors. 4. Heat

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 2400CA - CLEAN AGENT CHEMICAL SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS GENERAL 1.1 SUMMARY General 1. Work under this contract shall meet the requirements of Division 01, General Requirements, Conditions of Contract,

More information

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan.

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan. ADDENDUM NO. 1 for MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140 Marquette, Michigan December 12, 2016 TO: ALL BIDDERS OF RECORD This addendum forms a part of

More information

Smoke Detector Activation of any smoke detector shall start the alarm verification mode.

Smoke Detector Activation of any smoke detector shall start the alarm verification mode. Description: The purpose of the section is to provide the UMCP Design Standards for the design and implementation of Fire Alarm Systems at the UMCP campus. Related Sections: TBD Effective Date: July 10,

More information

Lake County / Multi-Department Storage Facility / Project / December 12, 2016 SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Lake County / Multi-Department Storage Facility / Project / December 12, 2016 SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 283111 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS VALOUR COMMUNITY CENTRE FIRE ALARM SYSTEM Section 28 00 00 GYMNASIUM ADDITION & RENOVATION Page 1 of 3 28 00 00 FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS 1.2 SCOPE 1. The specification covering the General

More information

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE Effective Date: 11/01/02 Purpose: MECKLENBURG COUNTY To establish a set of guidelines for performance testing of all newly installed or upgraded fire alarm systems in order to ensure that all devices and

More information

A. Provide addressable fire alarm system throughout the facility and supervise wet and preaction fire sprinkler system.

A. Provide addressable fire alarm system throughout the facility and supervise wet and preaction fire sprinkler system. SECTION 283111 - PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

FIRE SUPPRESSION SPRINKLER SYSTEM

FIRE SUPPRESSION SPRINKLER SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this

More information

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics. A28.1 Standard of Practice - Fire Alarm Systems NOTE: Significant revisions or additions to the previous standards are highlighted in italics. OBJECTIVE OF STANDARD To provide compliant smart addressable

More information

Full Service Central Station Fire Alarm Listing Evaluation

Full Service Central Station Fire Alarm Listing Evaluation Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm

More information

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21 Division 21: FIRE SUPRESSION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM Table of Contents 1 Division 21 SECTION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A.

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for fire-extinguishing systems other than water-based fire suppression systems.

More information

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD PART 1 - GENERAL PURPOSE This Standard is intended to assure that fire detection/alarm systems at The University of Texas at Austin provide the highest level of fire safety possible. SCOPE This standard

More information

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 2 Wicomico County Circuit Court Second Floor

More information

SECTION AUTOMATIC VERTICAL CONVEYOR SYSTEM CLOSURE FIRE BARRIER

SECTION AUTOMATIC VERTICAL CONVEYOR SYSTEM CLOSURE FIRE BARRIER SECTION 08 3493 AUTOMATIC VERTICAL CONVEYOR SYSTEM CLOSURE FIRE BARRIER PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Smoke detector-activated, vertical closing fire barrier conveyor system closure.

More information

SECTION FIRE ALARM SYSTEM PART 1 GENERAL

SECTION FIRE ALARM SYSTEM PART 1 GENERAL SECTION 16720 - FIRE ALARM SYSTEM PART 1 GENERAL 1.1 SCOPE & RELATED DOCUMENTS A. The work covered by this section of the specifications includes the furnishing of all labor, equipment, materials, and

More information

ARCHITECT S PRE-BID ADDENDUM

ARCHITECT S PRE-BID ADDENDUM ARCHITECT S PRE-BID ADDENDUM 14203 487 Main Street Suite 500 Buffalo, New York Addendum No: 001 Date Issued: Feb. 8, 2019 Project: The West End (CWM Project No. 18.122) Location: 240-260 Lakefront Blvd.

More information

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax) FIRE DEPARTMENT SANTA CLARA COUNTY 14700 Winchester Blvd., Los Gatos, CA. 95032-1818 (408) 378-4010 (408) 378-9342 (fax) www.sccfd.org STANDARD DETAILS & SPECIFICATIONS Spec No C-4 Rev. Date 03/10/10 SUBJECT:

More information

SECTION ADDRESSABLE FIRE ALARM SYSTEM

SECTION ADDRESSABLE FIRE ALARM SYSTEM SECTION 16723 ADDRESSABLE FIRE ALARM SYSTEM 1 PART 1 GENERAL 1.1 DESCRIPTION A. This section outlines the requirements for the installation, programming and configuration of Addressable Fire Alarm System

More information

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan ADDENDUM NO. 2 RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan TO: All Bidders Gentlemen: You are hereby directed to make the following changes in the Project Manual and/or

More information

SECTION OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS

SECTION OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS SECTION 08331 OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft

More information

New Auburn University Veterinary Facility Gulf Shores, AL

New Auburn University Veterinary Facility Gulf Shores, AL SECTION 220405 - PLUMBING IDENTIFICATION PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following plumbing identification materials and their installation: 1. Pipe markers. 2. Stencils. 3. Valve

More information

LEA COUNTY NEW MEXICO Page 1 of 8 JUDICIAL COMPLEX RFP NO.: 03-(16-17)

LEA COUNTY NEW MEXICO Page 1 of 8 JUDICIAL COMPLEX RFP NO.: 03-(16-17) LEA COUNTY NEW MEXICO Page 1 of 8 JUDICIAL COMPLEX RFP NO.: 03-(16-17) ADDENDUM #3 This addendum forms part of the Contract Documents and modifies the original Contract Documents. All other parts of the

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

SECTION DOOR HARDWARE

SECTION DOOR HARDWARE PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 08 7100 DOOR HARDWARE A. Hardware for wood, aluminum, and hollow metal doors. B. Hardware for fire-rated doors. C. Electrically operated and controlled hardware.

More information

SECTION CLEAN AGENT FIRE SUPPRESSION SYSTEMS

SECTION CLEAN AGENT FIRE SUPPRESSION SYSTEMS SECTION 21 22 00 CLEAN AGENT FIRE SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTE: Delete between // --- // if not applicable to the project. Also delete any other item or paragraph

More information

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus ADDENDUM FORM INVITATION TO TENDER: 2016-067 ADDENDUM NO: 1 DATE ISSUED: June 23, 2016 ISSUED BY: Monty Thibeault DESCRIPTION: Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

More information

Fire Alarm System Fundamentals

Fire Alarm System Fundamentals Fire Alarm System Fundamentals Mircom is the largest and oldest privately owned fire alarm and life safety manufacturer in North America and 5th largest overall with 50 years of industry experience. Mircom

More information

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5 Construction Standards Page 1 of 5.1 General Description.1 The University requires that all new fire alarm system control panel, components, and devices, as required for the project, be Secutron 2900 Series

More information

BULLETIN. Permitting Tips (11/10)

BULLETIN. Permitting Tips (11/10) BULLETIN Permitting Tips (11/10) This bulletin is to make you aware of issues that have been identified by the City or other retailers and suggests Tenant s architect and engineer pursue further as it

More information

Concerns: Affects: Dated: June 12, SECTION 1: GENERAL Scope Work Included... 3

Concerns: Affects: Dated: June 12, SECTION 1: GENERAL Scope Work Included... 3 Technical Service Note Detection Systems, Inc. Fairport, New York 14450-9199 Technical Service (800) 374-7454 Sales: (800) 289-0096 and (585) 223-4060 Fax: (585) 223-9180 Concerns: Affects: Dated: June

More information

SECTION GENERATOR PARALLELING CONTROLS

SECTION GENERATOR PARALLELING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Michigan State University Construction Standards FIRE DETECTION AND ALARM PAGE

Michigan State University Construction Standards FIRE DETECTION AND ALARM PAGE PAGE 283100-1 SECTION 283100 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories. SECTION 238113 - PACKAGED TERMINAL AIR CONDITIONERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III SECTION 28 3111 - DIGITAL ADDRESSABLE FIRE ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Port of St Helens SIA Aircraft Hanger Scappoose, OR

Port of St Helens SIA Aircraft Hanger Scappoose, OR Port of St Helens SIA Aircraft Hanger Scappoose, OR AUTOMATIC FIRE SPRINKLER SYSTEM REVISION 2 MARCH 12, 2018 Scope: Furnish and install foam and water fire protection system including underground entrance

More information

C. All control equipment must have transient protection devices to comply with UL864 requirements.

C. All control equipment must have transient protection devices to comply with UL864 requirements. SECTION 28 31 11 - PART 1 - GENERAL 1.1 SCOPE & RELATED DOCUMENTS A. The work covered by this section of the specifications includes the furnishing of all labor, equipment, materials, and performance of

More information

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951) Riverside County Fire Department Office of the Fire Marshal 2300 Market St., Ste. 150, Riverside, CA 92501 Ph. (951) 955-4777 Fax (951) 955-4886 Guideline Title: Residentially Based Care Facilities Group

More information

Verdugo Woodlands Elementary School 2016 Interim Housing. Subject: Specifications and Drawings, dated December 10, 2015

Verdugo Woodlands Elementary School 2016 Interim Housing. Subject: Specifications and Drawings, dated December 10, 2015 Addendum No. 2 To: All Bidders Date: April 6, 2016 Project: Verdugo Woodlands Elementary School 2016 Interim Housing Subject: Specifications and Drawings, dated December 10, 2015 Page 1 of 5 THIS ADDENDUM

More information

Arlington Public Schools Purchasing Office

Arlington Public Schools Purchasing Office Arlington Public Schools Purchasing Office NOTICE OF ADDENDUM NO. 1 Issued on March 30, 2018 TITLE: ITB NO.: YORKTOWN HIGH SCHOOL INTERIOR MODIFICATIONS PROJECT 57FY18 ITB CLOSING DATE PRIOR TO 2:00 P.

More information

Linear Floor Heaters

Linear Floor Heaters Linear Floor Heaters The Price Linear Floor Heater family provides ultimate flexibility in terms of style, performance, and ease of installation. Using room-side heat virtually eliminates the requirement

More information

Changes to this Division since the last issuance are indicated with yellow highlighted text.

Changes to this Division since the last issuance are indicated with yellow highlighted text. Table of Contents 28 10 00 ELECTRONIC ACCESS CONTROL AND INTRUSION DETECTION... 2 A. GENERAL... 2 B. DESIGN REQUIREMENTS... 2 C. CONSTRUCTION REQUIREMENTS... 3 28 20 00 ELECTRONIC SURVEILLANCE... 4 A.

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016 Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting Prepared Especially for : OSFM TEC 2016 Acceptance Testing 11-2008 Agenda Before you begin Completing the

More information

BULLETIN. Temperature Controls (10/2013)

BULLETIN. Temperature Controls (10/2013) BULLETIN Temperature Controls (10/2013) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. This applies to Phase I & II only. Tenant Responsibility:

More information

SECTION FIRE DETECTION AND ALARM

SECTION FIRE DETECTION AND ALARM PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 46 00 SPEC WRITER NOTES: 1. The A/E must obtain a copy of the VA ENGINEERING GUIDE FOR FIRE PROTECTION DESIGN which provides fire alarm system criteria that

More information