1 Kings County Jail Expansion Phase 3 Rational Analysis of Smoke Control System

2 Kings County Jail Phase 3 Page 2 RATIONAL ANALYSIS OF SMOKE CONTROL SYSTEM PER 2013 CBC General Description: The project consists of a major addition to the existing Kings County Jail facility. The addition includes 1 new medical housing wing, new kitchen facility, new classrooms, and a non-detention warehouse facility. The new additions are all single story. The existing Jail is of Type 1 construction with unlimited area SF. The new addition will add 26,367 SF to the existing building. The new additions will be located on the north-east side of the existing facility. The new additions will be of the same construction type and fully fire sprinkled except for the warehouse facility. The warehouse facilities will be a pre-manufactured metal building. The new classroom additions and medical housing areas with lay-in ceilings and/or low structure height, will be equipped with an active Smoke Control System, SCS, based on the 2013 CBC Pressurization Method. The kitchen smoke zone areas with lay-in ceilings and/or low structure height will utilize a Purge method. All areas will be designed in accordance with 2013 CBC 909 and shall have complete automatic control via the smoke evacuation panels and/or the fire alarm panels. Design Considerations: The design intent is for the Smoke Control System to contain the smoke within a given smoke zone and provide a tenable environment for the interval of time required to safely evacuate or relocate all of the occupants within a given Smoke Zone. Per the evacuation plan provided by the County(see Appendix D), the time to safely evacuate the occupants from each smoke zone is less than ten minutes. The new addition will be divided into 3 separate smoke control zones (refer to drawing M1.00 for zone boundaries). Each zone will have its own smoke control system and operation (refer to drawing M1.01 for operation matrix and system schematics, operation matrix also included in Appendix C). Zones 1, 2 and 3 are separated from the existing jail facility by the secured circulation corridor and will be connected to the existing facility with new secured circulation corridors.

3 Kings County Jail Phase 3 Page 3 Pressurization Method Areas The classroom areas (smoke zone 1) and medical housing area (smoke zone 3) will utilize the pressurization method for smoke control per 2013 CBC A large volume smoke-rated exhaust fan will exhaust all air from the classrooms pulling 100% outdoor make-up air through an intake relief vent on the roof. Classrooms will each be exhausted at a negative pressure relative to the adjacent zone without exceeding the maximum door-opening force of 30 lbs per CBC The supply air and return air ductwork normally serving these spaces will be isolated from other zones by closing combination fire/smoke dampers. For the medical housing area, large volume smoke-rated exhaust fans will exhaust all air from the open, high ceiling corridor maintaining a negative pressure while the air handler provides 100% outdoor make-up air to the cells to positively pressurize the cells. Ceiling supply to the corridor area will be shut off by smoke dampers to prevent mixing of the corridor smoke layer. The Purge Method Areas The kitchen areas (smoke zone 2) with all low ceiling areas will utilize the purge method of smoke evacuation due to the low ceiling heights and difficulty maintaining a tenable space beyond 6-feet tall. The air handler serving these areas will operate in the 100% outside air mode with the supply fans running to provide make-up air for the smoke exhaust fans. The smoke exhaust fans will energize upon alarm to exhaust the space and maintain a tenable 6-foot zone. Design Fire (Heat Release Rate, HRR) The design fire (or design HRR) for each zone area will vary due to the function of the space and the anticipated fuel available to produce a fire. The HRR is estimated to be between 237 Btu/s and 265 Btu/s (refer to NFPA 92B-2012 Smoke Exhaust Calculations in Appendix B). The calculations are based on a steady state fire with fuel products such as paper, clothing and a common fuel source such as cooking oil. The combustible materials assumed for the classroom space is limited to paper products and minor clothing. The combustible materials assumed for the kitchen area is food packaging trash. Fires centered around the cooking appliances will be controlled by the fire suppression system included with the kitchen hoods. For the medical housing area, the combustible materials are limited to the personal belongings an inmate is allowed to keep in their cell. This is the equivalent of paper goods and clothing. Furniture in all of the spaces is comprised of steel furniture and CA Bulletin 133 tested flame retardant plastic chairs. Mattresses in the medical housing meet or exceed the flammability requirements of CA Bulletin 129, CA Bulletin 603 and 16 CFR Part Below is a list of the Smoke Zones and the corresponding fire size (HRR) for each space:

4 Kings County Jail Phase 3 Page 4 1. Smoke Zone #1 (Classrooms Area G) = 265 Btu/s a. Wastepaper basket (6 lbs) = 14.2 Btu/s b. Cotton Clothing (2 lbs) = Btu/s c. Fuel Source (oil) = 109 Btu/s 2. Smoke Zone #2 (Kitchen Area G) = 800 Btu/s a. Plastic trash bags with cellulosic trash (2 bags) = 551 Btu/s b. Large barrel with milk cartons = 140 Btu/s c. Fuel Source (oil) = 109 Btu/s 3. Smoke Zone #3 (Medical Housing Area H) = 350 Btu s a. Wastepaper basket (2 lbs) = 14.2 Btu/s b. Cotton Clothing (4 lbs) = 227 Btu/s c. Fuel Source (oil) = 109 Btu/s The HRR was derived based on the following assumptions: Wastepaper basket (2 lbs) = 15 kw (14.2 Btu/s) Plastic trash bag with cellulosic trash = 110 to 330 btu/s per NFPA 92B Appendix B. Large barrel with milk cartons = 140 btu/s per NFPA 92B Appendix B. Cotton Clothing (4 lbs) = 240 kw (227 Btu/s) Fuel Source (1-tablespoon oil) = 115 kw (109 Btu/s) Ceiling Heights The ceiling heights vary in each of the individual smoke zones from 10-0 to 15-0 (refer to Appendix B for the NFPA 92B-2012 Smoke Exhaust Calculations for ceiling heights in each zone). Climatic Design Conditions: 29 DegF winter outdoor design temperature, 105 DegF summer outdoor design temperature, 15 MPH wind speed, and 68 DegF 78 DegF inside design temperature range.

5 Kings County Jail Phase 3 Page 5 Special Considerations: Stack Effect: Since the building is only 18 tall to the top of the parapet and the thermal difference between the indoor and outdoor conditions is slight, there is little potential for adverse inference due to stack effect. Temperature Effect: The local indoor and outdoor design conditions are not so extreme to expect the smoke plume to act differently than the calculations would predict. Wind Effect: The building addition butts up against the northeast side of the existing Jail. The prevailing wind is from the northwesterly direction. With a design wind speed of only 15 MPH the wind is expected to have little impact on system performance. Climate: Our local conditions are such that it doesn t snow. The prospect of snow or ice blockage of make-up air inlets or exhaust outlets is very remote.

6 Kings County Jail Phase 3 Page 6 Smoke Control System and HVAC System: The HVAC Systems are 4-pipe rooftop VAV systems. The supply air is ducted to VAV Boxes and then distributed to actual zones through supply outlets. The return air system is a ducted return with return outlets ducted back to the rooftop unit. The Medical holding cells have dedicated exhaust systems to maintain constant ventilation airflow through the cells. For the remaining areas, there are localized exhaust fans which provide general exhaust for restrooms and various spaces and also maintain space pressurization. Smoke Zone 1 (Classrooms) Pressurization Method Description The Smoke Control System (SCS) for Smoke Zone 1 designed with the Pressurization Method per 2013 CBC will utilize a dedicated SCS exhaust fan during the smoke control operation with the general supply and return ventilation ductwork isolated by closed combination fire/smoke dampers. Make-up air for each classroom will be provided via large intake relief vents on the roof with motorized fail-open dampers opened by the SCS, drawing in 100% outside make-up air. Air will be drawn through the intake vents by the action of the exhaust fans. The static pressure resistance of the make-up air path will determine the negative pressure maintained in the individual classrooms. The exhaust fans are sized to handle the static pressure through the make-up air dampers and are UL listed Power Ventilators for Smoke-Control Systems, rated and certified for the increased temperature requirements of smoke control at 500 F/4 hrs and 1000 F/ 15 mins. The make-up air is provided directly to each classroom and all areas will be exhausted simultaneously once the system is activated at a rate of 20 air changes per hour (3 minute air change rate). Negative pressure in the classrooms relative to the adjacent smoke zones and secure corridor will contain the smoke to the classroom in which the fire occurs. Differential pressures will not exceed the maximum door-opening force of 30 lbs per 2013 CBC Evacuation procedure provided by the County is to evacuate the inmates from the space in which the smoke is contained to either an adjacent empty classroom or to the secure corridor and then to the designated safe area. The planned classroom loading is 18 inmates and one instructor. The estimated time required to relocate the occupants once the smoke detection system is activated is less than 10 minutes. Refer to Appendix D for evacuation procedures and timing provided by the County. Refer to the Smoke Control Zoning List in Appendix A, the Smoke Control Operation Matrix in Appendix C and on drawing M1.01, the SCS Schematics on drawing M1.01, and the Exhaust Fan Schedules on M0.02 for the specific fans and relief hoods serving each space. The Service row in the Exhaust Fan Schedule indicates which fans are dedicated smoke control fans. Dedicated smoke control fans only operate during SCS operation.

7 Kings County Jail Phase 3 Page 7 Smoke Zone 2 (Kitchen) Purge Method Description The Smoke Control System for smoke zone 2 designed with the Purge Method will utilize the dedicated SCS exhaust fans during the smoke control operation with the general exhaust fans in that zone de-energized. The kitchen area will utilize a dedicated SCS exhaust fan in addition to enabling the kitchen hood exhaust fans for the removal of the smoke. The exhaust fans are sized to handle the static pressure through the make-up air dampers and are UL listed Power Ventilators for Smoke- Control Systems, rated and certified for the increased temperature requirements of smoke control at 500 F/4 hrs and 1000 F/ 15 mins. Exhaust and make-up air for each zone will be drawn through the overhead ductwork of each VAV air handler. The air handler shall operate in the 100% outside air mode for the make-up air to the smoke exhaust fans. The air handler is specified with UL 555S listed return and outside air dampers and are rated and certified for the increased temperature requirements of smoke control. The air handler shall be provided with a dedicated UL listed smoke control panel to control the fan and damper operation within the air handler during smoke evacuation mode. The VAV boxes are specified with fail open damper actuators. The SCS will interrupt power to all VAV boxes in this zone allowing the VAV dampers to actuate to full open. Since the make-up air is provided through a duct system that is common to all areas within this zone, all areas served by the air handler will be exhausted simultaneously once the system is activated. Additional make-up air will be provided via large intake relief vents on the roof with UL555S listed motorized fail-open dampers with end switches opened by the SCS, drawing in 100% outdoor make-up air. Make-up air will be drawn in through the relief vents by the negative space pressure created by the exhaust system. Evacuation procedure provided by the County is to evacuate the occupants from the kitchen area to the secure Culinary Kitchen corridor and then to the designated safe area. The estimated time required to relocate the occupants once the smoke detection system is activated is less than 10 minutes. Refer to Appendix D for evacuation procedures and timing provided by the County. Refer to the Smoke Control Zoning List in Appendix A, the Smoke Control Operation Matrix in Appendix C and on drawing M1.01, the SCS Schematics on drawing M1.01, and the Exhaust Fan Schedules on M0.02 for the specific fans and air handlers serving each space. The Service row in the Exhaust Fan Schedule indicates which fans are dedicated smoke control fans. Dedicated smoke control fans only operate during SCS operation.

8 Kings County Jail Phase 3 Page 8 Smoke Zone 3 (Medical Housing) Pressurization Method Description The Smoke Control System (SCS) for Smoke Zone 3 designed with the Pressurization Method per 2013 CBC will utilize two dedicated SCS exhaust fans during the smoke control operation with make-up air provided through the main air handler serving this zone in addition to relief vents. All of the cells will be positively pressurized and the corridor will be negatively exhausted. Upon detection of smoke the SCS will enable the smoke exhaust fans to maintain a negative pressure and exhaust all air from the open high ceiling corridor area at a rate of 20 air changes per hour (3 minute air change rate). The exhaust fans are sized to handle the static pressure through the make-up air dampers and are UL listed Power Ventilators for Smoke-Control Systems, rated and certified for the increased temperature requirements of smoke control at 500 F/4 hrs and 1000 F/ 15 mins. All other exhaust fans normally serving the cells and restroom areas will be deactivated. The air handler shall operate in 100% outside air mode providing positive pressure and make-up air to the cells. The air handler is specified with UL 555S listed return and outside air dampers and are rated and certified for the increased temperature requirements of smoke control. The air handler shall be provided with a dedicated UL listed smoke control panel to control the fan and damper operation within the air handler during smoke evacuation mode. The VAV boxes are specified with fail open damper actuators. The SCS will interrupt power to all VAV boxes in this zone allowing the VAV dampers to actuate to full open. Supply air from the air handler will be shut off to the corridor by combination fire/smoke dampers to prevent mixing of the smoke layer in the corridor. Make-up air to the corridor will be provided by two relief openings down low in the wall from the Rec Yard at the east end of the corridor and two roof mounted relief vents ducted down to low wall vents on the west end of the corridor. UL555S listed motorized fail-open dampers with end switches opened by the SCS will be provided at all relief openings. Differential pressures will not exceed the maximum door-opening force of 30 lbs per 2013 CBC Evacuation procedure provided by the County is to evacuate the inmates from the space where the smoke is originating, through the corridor and out to either the adjacent secure corridor or the Rec Yard. All other inmates will remain in their cells positively pressurized with 100% outside make-up air. The estimated time required to relocate the occupants once the smoke detection system is activated is less than 10 minutes. Refer to Appendix D for evacuation procedures and timing provided by the County. Refer to the Smoke Control Zoning List in Appendix A, the Smoke Control Operation Matrix in Appendix C and on drawing M1.01, the SCS Schematics on drawing M1.01, and the Exhaust Fan Schedules on M0.02 for the specific fans and relief hoods serving each space. The Service row in the Exhaust Fan Schedule indicates which fans are dedicated smoke control fans. Dedicated smoke control fans only operate during SCS operation.

9 Kings County Jail Phase 3 Page 9 Detection Devices The Smoke Control System and Fire Alarm System are interlocked to work in conjunction with each other. A smoke detection system is provided throughout the expanded facility with heat detectors used in the Kitchen area. Detectors are located at the ceiling level throughout the facility. Fire alarm panel and control is provided at the main control room via the guard control consoles. The SCS will be activated automatically via the smoke or heat detectors or can be manually operated by the security guards via the central control panels. Refer to Fire Alarm drawings SE2.01 thru SE2.04 and Smoke Control Panel drawing SE4.01. Pressurization Method Smoke Control System Sequence of Control System shall be activated automatically upon detection of smoke by duct detector in the VAV air handler or any of the local smoke or heat detectors. System shall also be activated manually via the control panel or fire alarm system. Smoke or Heat detector shall signal Fire Alarm System and Smoke Control System. By action of Smoke Control System and Energy Management System o The VAV air handlers shall disengage from heating or cooling and fans shall shut down. o The general exhaust fans shall deactivate. By action of the Fire Alarm System and Smoke Control System o The VAV air handler Return Air Damper s shall close by override signal from Smoke Control System. o Power to VAV boxes will be interrupted by signal from Smoke Control System. VAV boxes will have fail-open damper actuators to open 100% upon loss of power. o The VAV air handler OSA Damper s shall open to 100% outside air position by override signal from Smoke Control System. o Relief Hood intake air dampers shall be driven to 100% open position by signal from Smoke Control System. o Smoke Exhaust Fan control dampers shall be driven to 100% open position by signal from Smoke Control System. o Smoke Exhaust Fan serving smoke zone shall energize and run by signal from Smoke Control System. System shall run in this fashion until the Smoke Control System is manually turned off and then reset to the automatic position. Refer to Operation Matrix on drawing M1.01 for specific operation of the HVAC system and associated exhaust fans within each smoke zone.

10 Kings County Jail Phase 3 Page 10 Purge Method Smoke Control System Sequence of Control System shall be activated automatically upon detection of smoke by duct detector in the VAV air handler or any of the local smoke or heat detectors. System shall also be activated manually via the control panel or fire alarm system. Smoke or heat detector shall signal Fire Alarm System and Smoke Control System. By action of Smoke Control System and Energy Management System o The VAV air handlers shall disengage from heating or cooling, the economizer shall be driven to 100% open and supply fans shall continue to operate. o The VAV air handler return fans shall deactivate. o The general exhaust fans shall deactivate. By action of the Fire Alarm System and Smoke Control System o The VAV air handler Return Air Damper s shall close by override signal from Smoke Control System. o The VAV air handler OSA Damper s shall open to 100% outside air position by override signal from Smoke Control System. o Power to VAV boxes will be interrupted by signal from Smoke Control System. VAV boxes will have fail-open damper actuators to open 100% upon loss of power. o Relief Hood intake air dampers shall be driven to 100% open position by signal from Smoke Control System. o Smoke Exhaust Fan control dampers shall be driven to 100% open position by signal from Smoke Control System. o Smoke Exhaust Fans located in each smoke zone shall energize and run by signal from Smoke Control System. o Kitchen Hood exhaust fans shall energize and be commanded to run at 100% by override contact relay signal from Smoke Control System. System shall run in this fashion until the Smoke Control System is manually turned off and then reset to the automatic position. Refer to Operation Matrix on drawing M1.01 for specific operation of the HVAC system and associated exhaust fans within each smoke zone.

11 Kings County Jail Phase 3 Page 11 Calculations: See Appendix B for NFPA 92B-2012 Smoke Exhaust Calculations and differential pressure calculations.

12 CLASSROOMS/KITCHEN SECTOR G APPENDIX A Smoke Control Zoning List Kings County Jail Phase 3 Page 12 Smoke Zone 1 Classrooms AH-19 o EF-52 Exhaust from Classrooms and Staff Programming Multipurpose Classroom G101 Multipurpose Classroom G102 Multipurpose Classroom G113 Multipurpose Classroom G114 Shared Staff Programs G103 Smoke Zone 2 Kitchen AH-19 o EF-51 Exhaust from open area Warewash G111 Tray Assy G108 Circ G110 Staff Dining G105 o EF-43, EF-44 Exhaust from Kitchen Hoods Food Prep G116 MEDICAL SECTOR H Smoke Zone 3 Medical Housing and Corridor AH-18 o EF-41A, EF-41B Shared Office H101 Male Cells H102-H110 Female Cells H113-H118 Jan H119 Storage H120 Multipurpose/Dayroom H121-H123 M/F Cells H124-H125 Safety Cells H126-H127 Staff Station H128 Staff Toilet H129 Shower H130-H131 Circ H132 Vid Visit H133-H134 Interview H135-H136 Circ H137

13 APPENDIX B Kings County Jail Phase 3 Page 13 NFPA 92B-2012 Smoke Exhaust Calculations

14 NFPA 92B-2012 Smoke Exhaust Calculations Project Name: Kings County Jail Phase III Job # Date 9/4/2015 Smoke Zone No. 1 - Classrooms Area G Kings County Jail Phase III Smoke Control System - Exhaust Calculations Space Geometry & Properties Design Fire Properties Calculated Variables Variables Value Units Description A = 2456 ft2 Floor area Hc = 10 ft height of ceiling H = 0 ft height of balcony β = 2.8 exhaust location factor, dimensionless for ceilings and 2 for walls or near walls Pelev = 249 ft project elevation To = 75 degf Ambient Temp Fd = 30 lbf Total door opening force, Max allowed to set in motion per 2013 CBC dp = 0.24 in. W.C. maximum allowable pressure differential from adjacent spaces (ASHRAE A53.7 (Eq9)) Al = 1.2 ft2 Effective leakage area (assuming 1/8" gap around doors, tight construction) Cd = 0.65 Discharge Coefficient, dimensionless (ASHRAE F16.13) cp = 0.24 btu/lb-degf specific heat of plume gases (NFPA 92B Eq. (17)) Q = 265 btu/s steady state heat release rate (refer to narrative for description) ρatm = lb/ft3 density of smoke/air at 68degF (NFPA A.3.11) Qc = btu/s Convective portion of heat release rate ( assumed 70%) z = 6 ft height of smoke layer above fire zl = 4.3 ft Limiting elevation d = 4 ft depth of smoke layer below lowest point of exhaust inlet Zb = 6 ft height of smoke layer above balcony Tp = 312 degf Plume Temp Ts = 312 degf Smoke Temp ρ = lb/ft3 Density of smoke m (z>zl) = 3.26 lb/s mass flow rate of smoke production (smoke layer higher than flame height) m (z<zl) = 2.87 lb/s mass flow rate of smoke production (smoke layer equal or lower than flame height) Vl = 1531 ft3/min volumetric infiltration leakage rate at design pressure difference V = 3816 ft3/min volumetric rate of smoke production. Exhaust CFM required Vmax = ft3/min maximum flow rate at an exhaust inlet Page 1

15 Equations Used zl = 0.533*Qc^(2/5) NFPA 92B Eq. (7) 4.3 ft Smoke Zone No. 1 - Classrooms - Area G (Cont.) Kings County Jail Phase III Smoke Control System - Exhaust Calculations m (z>zl) = 0.022*Qc^(1/3)*z^(5/3) *Qc NFPA 92B Eq. (8) 3.26 lb/s m (z<zl) = *Qc^(3/5)*z NFPA 92B Eq. (9) 2.87 lb/s V = 60*m/ρ NFPA 92B 3.11 Eq. (22) 3816 ft3/min Vmax = 0.537*β*d^(5/2)*((To )*(Ts-To))^(1/2) NFPA 92B 3.9 Eq. (20) ft3/min Tp = To+Qc/(m*Cp) NFPA 92B Eq. (17) 312 degf ρ = ρatm*(528/( tp)) NFPA 92B A lb/ft3 Vl = 776*Cd*A*(2*dP/ρatm)^(1/2) ASHRAE F16.13 (Eq.36) 1531 ft3/min Page 2

16 NFPA 92B-2012 Smoke Exhaust Calculations Project Name: Kings County Jail Phase III Job # Date 9/4/2015 Smoke Zone No. 2 - Kitchen Area G Kings County Jail Phase III Smoke Control System - Exhaust Calculations Space Geometry & Properties Design Fire Properties Calculated Variables Variables Value Units Description A = 5370 ft2 Floor area Hc = 10 ft height of ceiling H = 0 ft height of balcony β = 2.8 exhaust location factor, dimensionless for ceilings and 2 for walls or near walls Pelev = 249 ft project elevation To = 75 degf Ambient Temp Fd = 30 lbf Total door opening force, Max allowed to set in motion per 2013 CBC dp = 0.24 in. W.C. maximum allowable pressure differential from adjacent spaces (ASHRAE A53.7 (Eq9)) Al = 1.2 ft2 Effective leakage area (assuming 1/8" gap around doors, tight construction) Cd = 0.65 Discharge Coefficient, dimensionless (ASHRAE F16.13) cp = 0.24 btu/lb-degf specific heat of plume gases (NFPA 92B Eq. (17)) Q = 800 btu/s steady state heat release rate (refer to narrative for description) ρatm = lb/ft3 density of smoke/air at 68degF (NFPA A.3.11) Qc = 560 btu/s Convective portion of heat release rate ( assumed 70%) z = 6 ft height of smoke layer above fire zl = 6.7 ft Limiting elevation d = 4 ft depth of smoke layer below lowest point of exhaust inlet Zb = 6 ft height of smoke layer above balcony Tp = 468 degf Plume Temp Ts = 468 degf Smoke Temp ρ = lb/ft3 Density of smoke m (z>zl) = 5.94 lb/s mass flow rate of smoke production (smoke layer higher than flame height) m (z<zl) = 5.56 lb/s mass flow rate of smoke production (smoke layer equal or lower than flame height) Vl = 1531 ft3/min volumetric infiltration leakage rate at design pressure difference V = 8351 ft3/min volumetric rate of smoke production. Exhaust CFM required Vmax = ft3/min maximum flow rate at an exhaust inlet Page 3

17 Equations Used zl = 0.533*Qc^(2/5) NFPA 92B Eq. (7) 6.7 ft Smoke Zone No. 2 - Kitchen Area G (Cont.) Kings County Jail Phase III Smoke Control System - Exhaust Calculations m (z>zl) = 0.022*Qc^(1/3)*z^(5/3) *Qc NFPA 92B Eq. (8) 5.94 lb/s m (z<zl) = *Qc^(3/5)*z NFPA 92B Eq. (9) 5.56 lb/s V = 60*m/ρ NFPA 92B 3.11 Eq. (22) 8351 ft3/min Vmax = 0.537*β*d^(5/2)*((To )*(Ts-To))^(1/2) NFPA 92B 3.9 Eq. (20) ft3/min Tp = To+Qc/(m*Cp) NFPA 92B Eq. (17) 468 degf ρ = ρatm*(528/( tp)) NFPA 92B A lb/ft3 Vl = 776*Cd*A*(2*dP/ρatm)^(1/2) ASHRAE F16.13 (Eq.36) 1531 ft3/min Page 4

18 NFPA 92B-2012 Smoke Exhaust Calculations Project Name: Kings County Jail Phase III Job # Date 9/4/2015 Smoke Zone No. 3 - Medical Area H Kings County Jail Phase III Smoke Control System - Exhaust Calculations Space Geometry & Properties Design Fire Properties Calculated Variables Variables Value Units Description A = 5962 ft2 Floor area Hc = 15 ft height of ceiling H = 0 ft height of balcony β = 2.8 exhaust location factor, dimensionless for ceilings and 2 for walls or near walls Pelev = 249 ft project elevation To = 75 degf Ambient Temp Fd = 30 lbf Total door opening force, Max allowed to set in motion per 2013 CBC dp = 0.3 in. W.C. maximum allowable pressure differential from adjacent spaces (ASHRAE A53.7 (Eq9)) Al = 1.2 ft2 Effective leakage area (assuming 1/8" gap around doors, tight construction) Cd = 0.65 Discharge Coefficient, dimensionless (ASHRAE F16.13) cp = 0.24 btu/lb-degf specific heat of plume gases (NFPA 92B Eq. (17)) Q = btu/s steady state heat release rate (refer to narrative for description) ρatm = lb/ft3 density of smoke/air at 68degF (NFPA A.3.11) Qc = btu/s Convective portion of heat release rate ( assumed 70%) z = 6 ft height of smoke layer above fire zl = 4.8 ft Limiting elevation d = 9 ft depth of smoke layer below lowest point of exhaust inlet Zb = 6 ft height of smoke layer above balcony Tp = 347 degf Plume Temp Ts = 347 degf Smoke Temp ρ = lb/ft3 Density of smoke m (z>zl) = 3.76 lb/s mass flow rate of smoke production (smoke layer higher than flame height) m (z<zl) = 3.39 lb/s mass flow rate of smoke production (smoke layer equal or lower than flame height) Vl = 1712 ft3/min volumetric infiltration leakage rate at design pressure difference V = 4591 ft3/min volumetric rate of smoke production. Exhaust CFM required Vmax = ft3/min maximum flow rate at an exhaust inlet Page 5

19 Equations Used zl = 0.533*Qc^(2/5) NFPA 92B Eq. (7) 4.8 ft Smoke Zone No. 3 - Medical Area H (Cont.) Kings County Jail Phase III Smoke Control System - Exhaust Calculations m (z>zl) = 0.022*Qc^(1/3)*z^(5/3) *Qc NFPA 92B Eq. (8) 3.76 lb/s m (z<zl) = *Qc^(3/5)*z NFPA 92B Eq. (9) 3.39 lb/s V = 60*m/ρ NFPA 92B 3.11 Eq. (22) 4591 ft3/min Vmax = 0.537*β*d^(5/2)*((To )*(Ts-To))^(1/2) NFPA 92B 3.9 Eq. (20) ft3/min Tp = To+Qc/(m*Cp) NFPA 92B Eq. (17) 347 degf ρ = ρatm*(528/( tp)) NFPA 92B A lb/ft3 Vl = 776*Cd*A*(2*dP/ρatm)^(1/2) ASHRAE F16.13 (Eq.36) 1712 ft3/min Page 6

20 2013-CBC Maximum Design Pressure Calculations Project Name: Kings County Jail Phase III Job # Date 9/29/2015 Smoke Zone No. 1 - Classrooms Area G Kings County Jail Phase III Smoke Control System - Exhaust Calculations Door Geometry & Properties Variables Value Units Description A = ft2 Door Area d = 0.25 ft Distance from door handle to latch edge of door F = 30 lbf Total door opening force, Max allowed to set in motion per 2013 CBC Fdc 12 lbf Force required to overcome closing device K = 5.2 Coefficient 5.2 W = 3.83 ft Door Width Calculated Pressure dp = 0.24 in. W.C. Maximum Allowable Design pressure difference Equations Used dp = 2(W-d)(F-Fdc)/KWA 2013-CBC Eq. (9-1) Design Pressure Relief Hood = 0.02 Damper = Relief Duct = Relief Grille = in. W.C. Total Negative Design Pressure for Space Page 7

21 APPENDIX C Kings County Jail Phase III Smoke Control System - Control Matrix Appendix C SMOKE CONTROL OPERATION MATRIX SMOKE ZONE EQUIP. MARK SMOKE DETECTION IN ZONE 1 (G) OPERATION MODE EQUIPMENT STATUS SMOKE DETECTION IN ZONE 2 (G) OPERATION MODE EQUIPMENT STATUS SMOKE DETECTION IN ZONE 3 (H) OPERATION MODE EQUIPMENT STATUS AH-19 AH OFF SMOKE ZONE 1 (G) EF-51 EF OFF EF-52 EF ON RH-1 DAMPER OPEN RH-2 DAMPER OPEN RH-3 DAMPER OPEN RH-4 DAMPER OPEN RH-5 DAMPER OPEN NORMAL OPERATION NORMAL OPERATION AH-19 AH EF-42 EF OFF SMOKE ZONE 2 (G) EF-43 EF-44 MUA-1 MUA-2 EF-45 EF-51 VAV RH-10 NORMAL OPERATION EF ON EF ON AH OFF AH OFF EF OFF EF ON VAV OFF DAMPER OPEN NORMAL OPERATION RH-11 DAMPER OPEN AH-18 EF-37 AH EF OFF SMOKE ZONE 3 (H) EF-38 EF-39 EF-40 LOUVER H LOUVER H VAV NORMAL OPERATION NORMAL OPERATION EF OFF EF-41A EF ON EF OFF EF OFF EF-41B EF ON RH-8 DAMPER OPEN RH-9 DAMPER OPEN DAMPER OPEN DAMPER OPEN VAV OFF

22 APPENDIX C Kings County Jail Phase III Smoke Control System - Control Matrix Appendix C COMMENT EF ON EF OFF DAMPER OPEN SMOKE CONTROL MATRIX LEGEND DESCRIPTION ACTIVE OR SMOKE GENERATION IN THIS ZONE. EXHAUST FAN IS ACTUATED "ON". DAMPER IS ACTUATED "OPEN". EXHAUST FAN IS DEACTIVATED. SMOKE CONTROL RELIEF DAMPER IS ACTUATED "OPEN". AIR HANDLER SUPPLY AND RETURN/EXHAUST FANS ACTUATED "OFF". RETURN AIR AH OFF DAMPER ACTUATED "CLOSED". OUTSIDE AIR DAMPER ACTUATED "OPEN". HEATING AND COOLING ACTUATED "OFF". BMS OPERATES AIR HANDLER SUPPLY AND RETURN/EXHAUST FANS; OUTSIDE AIR, RETURN AIR, AND EXHAUST AIR DAMPERS; HEATING AND COOLING COILS, VAV NORMAL OPERATION BOXES ACCORDING TO NORMAL SEQUENCE OF OPERATION. SMOKE RELIEF DAMPERS ACTUATED CLOSED. SMOKE EXHAUST FANS OFF. CONTROL DAMPERS AT SMOKE EXHAUST FANS ACTUATED CLOSED. AIR HANDLER SUPPLY ACTUATED "ON". RETURN/EXHAUST FAN ACTUATED "OFF". AH RETURN AIR DAMPER ACTUATED "CLOSED". OUTSIDE AIR DAMPER ACTUATED "OPEN". HEATING AND COOLING ACTUATED "OFF". VAV OFF POWER TO VAV BOX IS INTERUPTED BY RELAY. VAV BOX ACTUATOR TO FAIL OPEN UPON LOSS OF POWER. SMOKE CONTROL NOTES: 1. BUILDING OPERATION UNDER NORMAL POWER A. UNDER NON-ALARM CONDITION, AIR HANDLERS OPERATE IN NORMAL MODE FOR HEATING AND COOLING. B. UNDER ALARM CONDITION, AIR HANDLERS OPERATE AS INDICATED IN SMOKE CONTROL MATRIX LEGEND. 2. BUILDING OPERATION UNDER POWER LOSS OR EMERGENCY POWER CONDITION A. UNDER NON-ALARM CONDITION, AIR HANDLERS OPERATE SUPPLY AND RETURN/EXHAUST FANS ONLY. OUTSIDE AIR DAMPER IS CLOSED. RETURN AIR DAMPER IS OPEN. HEATING AND COOLING ARE DEACTIVATED. B. UNDER ALARM CONDITION, AIR HANDLERS OPERATE AS INDICATED IN SMOKE CONTROL MATRIX LEGEND.

23 Kings County Jail Phase 3 APPENDIX D OFFICE OF SHERIFF COUNTY OF KINGS MEMORANDUM The Kings County Jail SB1022 Project includes the Culinary Kitchen and Mental Health Suite. The program staffing guidelines and evacuations exits will include the following: Culinary Kitchen There are four classrooms within the culinary kitchen, two that are adjoined on the northwest end of the kitchen and two that are adjoined on the southwest end. The program will include no more than eighteen (18) inmates and one instructor per classroom. Each classroom has two entry/exit doors which are electronically controlled by central control and would be utilized during an evacuation procedure. Available Facility staff would respond to assist in the evacuation of all classrooms which would exit to the Culinary Kitchen Corridor to the designated safe area which would take less then ten minutes. Mental Health Suite There are three Mental Health Multipurpose rooms on the west end of the Mental Health Suite with one being ADA compliant. The program will include no more than three (3) inmates and one staff per session. Each multipurpose room has one door on the southeast wall which will be used to enter and exit the rooms to and from the Mental Health Suite corridor. These doors are all electronically controlled by central control or may be keyed open by staff. This unit is also comprised of (17) seventeen cells with (7) seven being double occupancy for a total housing capacity of 24 inmates. There will be (2) Detention Deputies assigned to this unit 24 hours a day, seven days a week. In the evacuation process for the Mental Health Unit, the multipurpose rooms would be electronically released, the cells would be manually opened by unit assigned staff who would evacuate inmates to a designated safe area which would take less then ten minutes.

DACC Health Sciences Building Air Handler Assessment/Study

DACC Health Sciences Building Air Handler Assessment/Study DACC Health Sciences Building Air Handler Assessment/Study NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 June 14, 2016 Final Submittal 1065 S. Main St., Bldg. D, Ste.

More information

Ventilation for New Low-Rise Residential Buildings July 20, 2015

Ventilation for New Low-Rise Residential Buildings July 20, 2015 Ventilation for New Low-Rise Residential Buildings July 20, 2015 BSC Standard 01 2015 Building Science Corporation 3 Lan Drive, Suite 102 Westford, MA 01886 www.buildingscience.com Contents 1. PURPOSE...3

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

ICC CODE CORNER 2012 IFC Code & Commentary

ICC CODE CORNER 2012 IFC Code & Commentary SECTION 909 SMOKE CONTROL SYSTEMS 909.1 Scope and purpose. This section applies to mechanical or passive smoke control systems when they are required for new buildings or portions thereof by provisions

More information

Stairwell Pressurization Systems

Stairwell Pressurization Systems Course No: M05-022 Credit: 5 PDH A. Bhatia Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774 info@cedengineering.com Introduction

More information

Submittal Data Performance Data Electrical Data

Submittal Data Performance Data Electrical Data ERMS Series Submittal Data Submittal Data Unit Designation: Job name: Architect: Engineer: Contractor: Performance Data Revision: 07/01/11 Cooling Capacity: EER: Heating Capacity: COP: Ambient Air Temp:

More information

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this

More information

NFPA 101 Life Safety Code Culture change 2012

NFPA 101 Life Safety Code Culture change 2012 NFPA 101 Life Safety Code Culture change 2012 Produced by Kansas Fire Marshal April, 2012 On March 9, 2012 Centers for Medicare & Medicaid Services implements a policy where they have formally adopted

More information

Life Safety Damper Installation ASHRAE St Louis Chapter Feb. 9,2015. Peter McDonnell, PE, LEED AP BD+C McClure Engineering

Life Safety Damper Installation ASHRAE St Louis Chapter Feb. 9,2015. Peter McDonnell, PE, LEED AP BD+C McClure Engineering Life Safety Damper Installation ASHRAE St Louis Chapter Feb. 9,2015 Peter McDonnell, PE, LEED AP BD+C McClure Engineering UL DAMPER TEST STANDARDS UL 555 - FIRE DAMPERS UL555S SMOKE DAMPERS UL555C CEILING

More information

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION)

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION) GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION) February, 2017 Contents Clauses Page 1. Basic Concepts 1 2. Design Considerations 1 3. Car Parks Ventilation 2 4. Kitchen

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

Edward K. Budnick Hughes Associates, Inc. Wheaton, Maryland, U.S.A SUMMARY. that is entrained or otherwise mixed into the mass.

Edward K. Budnick Hughes Associates, Inc. Wheaton, Maryland, U.S.A SUMMARY. that is entrained or otherwise mixed into the mass. THE CAPABILITIES OF SMOKE CONTROL: FUNDAMENTALS AND ZONE SMOKE CONTROL John H. Klote Center for Fire Research National Institute of Standards and Technology Gaithersburg, Maryland, U.S.A. 20899 Edward

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Boiler Venting. Definitions, Theory and Applications. Presented by: Jason Geagan, National Sales Manager US Draft Co Fort Worth, TX

Boiler Venting. Definitions, Theory and Applications. Presented by: Jason Geagan, National Sales Manager US Draft Co Fort Worth, TX Boiler Venting Definitions, Theory and Applications Presented by: Jason Geagan, National Sales Manager US Draft Co Fort Worth, TX Gas Appliance Listings ANSI Z21 - Categorized Appliances Gas fired low

More information

WHITE PLAINS SMOKE CONTROL CODE PART 1. GENERAL REQUIREMENTS

WHITE PLAINS SMOKE CONTROL CODE PART 1. GENERAL REQUIREMENTS WHITE PLAINS SMOKE CONTROL CODE a. Application of Code. PART 1. GENERAL REQUIREMENTS The following uniform standards and procedures shall apply to the design, installation and testing of new smoke purge

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

Mold/Moisture Control Case Study

Mold/Moisture Control Case Study Mold/Moisture Control Case Study Presented by Boggarm S. Setty, P.E., FASHRAE Setty & Associates, Ltd. www.clima2005.ch Clima 2005 Lausanne Solothurnstrasse 13 CH-3322 Schönbühl Switzerland th 8 REHVA

More information

Gas-Fired Indoor and Outdoor Duct Furnaces

Gas-Fired Indoor and Outdoor Duct Furnaces July, 2008 Gas-Fired Indoor and Outdoor Duct Furnaces INDOOR GRAVITY VENTED DFG, DBG, DCG INDOOR SEPARATED COMBUSTION DFS, DBS, DCS OUTDOOR GRAVITY AND POWER EXHAUSTED H Series table of contents A complete

More information

R7DA Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. 6 and 7 ½ Ton DOAS Packaged Gas/Electric Units

R7DA Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. 6 and 7 ½ Ton DOAS Packaged Gas/Electric Units TECHNICAL SPECIFICATIONS R7DA Series 6 and 7 ½ Ton DOAS Packaged Gas/Electric Units 5.4 ISMRE Commercial System 81% Steady State Efficiency Standard Features Fits Pre-Existing Curbs High-Efficiency Low

More information

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Fire Alarm Systems Plan Review Checklist Date: Permit Number: Business Name: Address: Fire Alarm System Submittal

More information

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

Considerations in the Design of Smoke Management Systems for Atriums

Considerations in the Design of Smoke Management Systems for Atriums Construction Technology Update No. 48 Considerations in the Design of Smoke Management Systems for Atriums by G.D. Lougheed This Update discusses the use of an engineered approach to the design of smoke

More information

Prescriptive Requirement for Smoke Control

Prescriptive Requirement for Smoke Control HKIE CPD Training Course (II) 7July 2009 Organization by The Hong Kong Institution of Engineers Fire Division Co-organized by the Association of Registered Fire Services Installation contractors of Hong

More information

FEATURES AND BENEFITS

FEATURES AND BENEFITS FEATURES AND BENEFITS Product Features and Benefits Full Product Line Offering Feature All models are 80% thermally efficient Blower performance up to 3.0 W.C. DX or chilled water section with factory

More information

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon OSU Alumni Center Phase I Implementation Review Prepared for Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon 97331 October 31, 2011 Job No. 02.11.00113 Introduction: Glumac was engaged by

More information

Smoke Management in High-Rise Structures

Smoke Management in High-Rise Structures Smoke Management in High-Rise Structures Most modern building codes define a high-rise structure as a building greater than 75 feet in height from the lowest level of fire department vehicle access to

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

Model 8120 and 8126 Safety & Installation Instructions

Model 8120 and 8126 Safety & Installation Instructions Ventilation Controller Model 8120 and 8126 Safety & Installation Instructions FAMILIARIZE YOURSELF WITH THE INSTALLATION INSTRUCTIONS BEFORE STARTING DANGER ATTENTION INSTALLER: To prevent serious injury

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION CHAPTER 23.20 LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION SECTIONS 23.20.100 Local Amendments To The International Mechanical Code, 2000 Edition 23.20.202 Definitions 23.20.301.14

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST TENANT IMPROVEMENTS Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved w/comments;

More information

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members: SESSION 1-2015 Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE (90.1.2013) ASHRAE Detroit Members: AM Session is eligible for (X) Professional Development

More information

Digital Precise Air Control - DPAC

Digital Precise Air Control - DPAC Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

Installation Instructions

Installation Instructions FAVXXR6C2100-A01 Vent Damper and Control Installation Instructions FAMILIARIZE YOURSELF WITH THE INSTALLATION INSTRUCTIONS BEFORE STARTING ATTENTION INSTALLER: This product must be installed by a qualified

More information

2009 IECC Commercial Mechanical Requirements

2009 IECC Commercial Mechanical Requirements BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(

More information

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio Technical Report 3 Northfield Mental Healthcare Center Dr. Stephen Treado Ji Won Park Mechanical Option Fall 2012 TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare

More information

SPECIFIC APPLIANCES CHAPTER 6

SPECIFIC APPLIANCES CHAPTER 6 CHAPTER 6 SPECIFIC APPLIANCES SECTION FGC 601 GENERAL 601.1 Scope. This chapter shall govern the approval, design, installation, construction, maintenance, alteration and repair of the appliances and equipment

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

Basic Hood Considerations The design process for a successful kitchen ventilation system starts when the engineering design HVAC team receives

Basic Hood Considerations The design process for a successful kitchen ventilation system starts when the engineering design HVAC team receives Design Considerations for Commercial Kitchen Ventilation By John A. Clark, P.E., Member ASHRAE Commercial kitchen ventilation (CKV) design must consider everything needed to be coordinated to form a system

More information

Safety Tips for the Office

Safety Tips for the Office Safety Tips for the Office An office fire can be devastating - resulting in business interruption or permanent closure, loss of lives, jobs, property and information. Offices are loaded with combustible

More information

Smoke Control Design and Activation. CFAA NCA Technical Seminar 2015

Smoke Control Design and Activation. CFAA NCA Technical Seminar 2015 Smoke Control Design and Activation CFAA NCA Technical Seminar 2015 2 Overview Principles of smoke control Codes CACF controls Programming Commissioning Testing Goals To provide an introduction to smoke

More information

2006 Washington State Nonresidential Energy Code Compliance Form Washington State Nonresidential Energy Code Compliance Forms Revised July 2007

2006 Washington State Nonresidential Energy Code Compliance Form Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical Summary 2006 Washington State nresidential Energy Code Compliance Form MECH-SUM 2006 Washington State nresidential Energy Code Compliance Forms Revised July 2007 Project Info Project Address

More information

Simple Equations for Predicting Smoke Filling Time in Fire Rooms with Irregular Ceilings

Simple Equations for Predicting Smoke Filling Time in Fire Rooms with Irregular Ceilings Fire Science and Technorogy Vol.24 No.4(2005) 165-178 165 Simple Equations for Predicting Smoke Filling Time in Fire Rooms with Irregular Ceilings Jun-ichi Yamaguchi 1, Takeyoshi Tanaka 2 1 Technical Research

More information

VH Series B ENVIRO-STAC Vertical Hi-Rise Fan Coil Unit with Enhanced Humidity Control

VH Series B ENVIRO-STAC Vertical Hi-Rise Fan Coil Unit with Enhanced Humidity Control VH Series B ENVIRO-STAC Vertical Hi-Rise Fan Unit with Enhanced Humidity Control Motorized Bypass Damper Temperature and Humidity Controller Reheat Control Elastomeric Foam Insulation High Efficiency,

More information

2012 INTERNATIONAL FUEL GAS CODE VENTS

2012 INTERNATIONAL FUEL GAS CODE VENTS 2012 INTERNATIONAL FUEL GAS CODE SECTION 502 (IFGC) VENTS 502.1 General. All vents, except as provided in Section 503.7, shall be listed and labeled. Type B and BW vents shall be tested in accordance with

More information

Session: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island

Session: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island Session: HVAC 101 HVAC 101 Steve Sain Sain Engineering Associates, Inc. August 9, 2016 Rhode Island Convention Center Providence, Rhode Island Why? 2 Acknowledgements 3 Disclaimer I m gonna shoot down

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

Gil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee

Gil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee Gil Rossmiller In the construction industry for over 30 years ICC IRC Plumbing & Mechanical Code Development Committee ICC- IECC Commercial Energy Code Development Committee Building Official Parker, Colorado

More information

Air Change, Ventilation, and Dehumidification for Multi-family Buildings

Air Change, Ventilation, and Dehumidification for Multi-family Buildings Air Change, Ventilation, and Dehumidification for Multi-family Buildings Armin Rudd Corp www.buildingscience.com for Acknowledgments: USDOE Building America Joseph Lstiburek, Peter Baker, Kohta Ueno--BSC

More information

AUTOMATIC MAKE-UP AIR DAMPER WITH TRANSFORMER READ AND SAVE THESE INSTRUCTIONS

AUTOMATIC MAKE-UP AIR DAMPER WITH TRANSFORMER READ AND SAVE THESE INSTRUCTIONS AUTOMATIC MAKE-UP AIR DAMPER WITH READ AND SAVE THESE INSTRUCTIONS FOR RESIDENTIAL USE ONLY Page 1 WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS, OBSERVE THE FOLLOWING: 1. Installation

More information

Indiana WX Oil Furnace Inspection Guide

Indiana WX Oil Furnace Inspection Guide Indiana WX Oil Furnace Inspection Guide Client: Job # : Address: Phone: Client Interview: Oil Dealer: Date of last service: Comments/Billing information: Standard Inspection / Clean and Tune Follow-up:

More information

Mechanical System Description

Mechanical System Description 1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure

More information

DUCT SYSTEMS CHAPTER 6

DUCT SYSTEMS CHAPTER 6 SECTION 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this chapter except as otherwise

More information

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems 233100 AIR DISTRIBUTION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 230700 HVAC Insulation B. Section 237300 Air Handling C. Section 230900 Building Automation and Control System Guidelines D. Section

More information

Cleveland Clinic Design Standards MECHANICAL SYSTEMS DESIGN GUIDELINES HVAC AIR DISTRIBUTION PART I - GENERAL 1.1 SUMMARY

Cleveland Clinic Design Standards MECHANICAL SYSTEMS DESIGN GUIDELINES HVAC AIR DISTRIBUTION PART I - GENERAL 1.1 SUMMARY PART I - GENERAL 1.1 SUMMARY A. This section addresses the general requirements for air handling distribution systems, including air handlers, ductwork, ductwork accessories, terminal units, air devices,

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2006 EDITION

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2006 EDITION CHAPTER 23.20 LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2006 EDITION Sections 23.20.100 Local amendments to the International Mechanical Code, 2006 Edition... 2 23.20.101.2 Scope... 2 23.20.303.4

More information

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA CITY OF DANA POINT COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 33282 Golden Lantern, Suite 209 Dana Point, CA 92629 949 248 3594 www.danapoint.org INDOOR AIR QUALITY B011 AIR 2013 CALIFORNIA CODES CODE

More information

Terminal. Las Vegas, NV. Technical

Terminal. Las Vegas, NV. Technical McCarran International port Terminal 3 Technical Assignment 3 Mechanical System Existing Conditions Evaluation December 3, 2007 Prepared By: Faculty Advisor: Dr. William Bahnfleth, Ph.D., P..E. Table of

More information

INVESTIGATION FINDINGS III IMPACT OF INADEQUATE VENTILATION AND DISCHARGE SYSTEMS

INVESTIGATION FINDINGS III IMPACT OF INADEQUATE VENTILATION AND DISCHARGE SYSTEMS INVESTIGATION FINDINGS III IMPACT OF INADEQUATE VENTILATION AND DISCHARGE SYSTEMS SUMMARY Ammonia odours were reported in the community close to the time of the incident (Appendix D) and firefighters reported

More information

PENNSYLVANIA. Downloaded

PENNSYLVANIA. Downloaded Housekeeping/Laundry/Maintenance 205.26. Laundry. PENNSYLVANIA Downloaded 01.15.11 (a) A laundry room shall be provided in a facility where commercial laundry service is not used for the washing of soiled

More information

FAARM-Underground Facility. Conceptual Design Review. Mechanical Systems. Dunham Associates, Inc.

FAARM-Underground Facility. Conceptual Design Review. Mechanical Systems. Dunham Associates, Inc. FAARM-Underground Facility Conceptual Design Review Mechanical Systems Prepared by: Dunham Associates, Inc. April 17, 2012 Dunham Project Number: 0412145-000-00 Dunham Associates Inc. Page 1 of 8 Mechanical

More information

Technical Information

Technical Information How to design easily a smoke management system? Mechanical smoke extraction for enclosed car park Car park: specificity of the smoke extraction system Car parks are nowadays integrated directly inside

More information

SPECIFIC APPLIANCES CHAPTER 6

SPECIFIC APPLIANCES CHAPTER 6 CHAPTER 6 SPECIFIC APPLIANCES SECTION 601 GENERAL 601.1 Scope. This chapter shall govern the approval, design, installation, construction, maintenance, alteration and repair of the appliances and equipment

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Alarm System Plan Review 2009 International Fire Code and 2010 NFPA 72 Date of Review // BLD201 - Project Address: Project Name: _ Professional

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Chapter 43, Building Rehabilitation allows for degrees of compliance based on the work category such as the extent of work.

Chapter 43, Building Rehabilitation allows for degrees of compliance based on the work category such as the extent of work. 3610 COMMERCE DR SUITE 817 BALTIMORE MD 21227 P 410.737.8677 F 410.737.8688 www.haifire.com May 5, 2014 Review of Regulations 42 CFR Parts 403, 416, 418, 460, 482, 483 and 485 Medicare and Medicaid Programs;

More information

Site address. Ventilation Quantity (Determine quantity by using Table N or Equation 11-1) Continuous ventilation

Site address. Ventilation Quantity (Determine quantity by using Table N or Equation 11-1) Continuous ventilation City of Victoria Building Inspections Department 7951 Rose Street P. O. Box 36 Victoria, MN 55386 (952) 443-4210 Ventilation, Makeup and Combustion Air Calculations Instructions and Example These instructions

More information

HVAC Mandatory Provisions Part II, Page 1

HVAC Mandatory Provisions Part II, Page 1 HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency

More information

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1 L21366/101 090 00.00/Page 1 HVAC EXECUTIVE SUMMARY The North Middlesex Regional High School has received average maintenance of the HVAC systems over its occupied years. Even with adequate maintenance,

More information

Ventilation System Description. September 8, 2000 HETA

Ventilation System Description. September 8, 2000 HETA September 8, 2000 HETA 99-0250 Harry Enoch, Ph.D. Director, Environmental Health and Safety University of Kentucky 252 East Maxwell Street Lexington, KY 40506-0314 Dear Dr. Enoch: On June 7, 1999, the

More information

SPECIFIC APPLIANCES CHAPTER 6

SPECIFIC APPLIANCES CHAPTER 6 CHAPTER 6 SPECIFIC APPLIANCES SECTION 601 (IFGC) GENERAL 601.1 Scope. This chapter shall govern the approval, design, installation, construction, maintenance, alteration and repair of the appliances and

More information

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager.

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager. 10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager 2019 WHEA Webinar Johnson Controls Institute Overview Operation & Maintenance (O&M)

More information

DIVISION 15 MECHANICAL

DIVISION 15 MECHANICAL DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

CONNECTICUT. Downloaded

CONNECTICUT. Downloaded Housekeeping/Laundry/Maintenance J. Laundry. CONNECTICUT Downloaded 01.15.11 (1) This service, if provided, shall be used exclusively for laundry and shall be remote from resident and food service areas,

More information

Model 8191 & 8192 Ventilator with Dehumidification Installation and Operating Instructions

Model 8191 & 8192 Ventilator with Dehumidification Installation and Operating Instructions Model 8191 & 8192 Ventilator with Dehumidification Installation and Operating Instructions ON/OFF button used to turn the ventilator on and off Up/Down buttons used to change humidity or vent time setting

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

USEFUL RESOURCES: Applicability. Item o of section 150. Review-Definitions Section 101

USEFUL RESOURCES: Applicability. Item o of section 150. Review-Definitions Section 101 FUNDAMENTALS of ASHRAE 62.2 2007 VENTILATION AND ACCEPTABLE INDOOR AIR QUALITY IN LOW-RISE RESIDENTIAL BUILDINGS by Joe Kirkpatrick Deputy Building Official City of Irvine jkirkpatrick@ci.irvine.ca.us

More information

Home Performance Science

Home Performance Science Home Performance Science Symptoms of a Sick House Too hot/too cold rooms Respiratory problems Headaches/nausea Smoky fireplace Foggy windows Stuffy air and lingering odors Peeling paint Constant dust problems

More information

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. 2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. Exception: Manual fire alarm boxes are not required where the building is

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

Civil Engineering Building

Civil Engineering Building Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

NEW! Thermo Scientific 1300 Series B2 Class II, Type B2 Biological Safety Cabinet

NEW! Thermo Scientific 1300 Series B2 Class II, Type B2 Biological Safety Cabinet NEW! Thermo Scientific 1300 Series B2 Class II, Type B2 Biological Safety Cabinet Simplifying Your Safety Decisions Now it s easy to select the best biological safety cabinet for your work with gases and

More information

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for: Date: 05/21/2001 Time: 02:57:44 PM Job Name: EarthWise VAV Terminal Units Full Spec Location: AnyTown, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SINGLE & DUAL DUCT UNIT

More information

Ventilation, Makeup and Combustion Air Calculations Submittal Form New Dwellings

Ventilation, Makeup and Combustion Air Calculations Submittal Form New Dwellings Ventilation, Makeup and Combustion Air Calculations Submittal Form New Dwellings Site Address Contractor Contractor Email Contractor Phone Date SECTION A Square feet * Number of bedrooms Ventilation Quantity

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

Summary of BBS Proposed Ohio Mechanical Code Rule Changes October 2016

Summary of BBS Proposed Ohio Mechanical Code Rule Changes October 2016 Summary of BBS Proposed Ohio Mechanical Code Rule Changes October 2016 Ohio Administrative Code Rule Number OMC Section IMC origin Reason for proposed 4101:2-2-01 Air, Makeup 2015 Modified definition Air,

More information

Tunnel Fire Dynamics and Evacuation Simulations

Tunnel Fire Dynamics and Evacuation Simulations Tunnel Fire Dynamics and Evacuation Simulations James Priest, PhD & James Niehoff DGS-SEE Seminar on Fire Protection for Physics Research Facilities 7 & 8 October 2015 Introduction (Background) Presentation

More information

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems Volume 6, Issue 1 CARRIER edesign SUITE NEWS Modeling 100% OA Constant Volume Air Systems This article provides an overview of how to model a stand-alone constant air volume (CAV) 100% OA system in HAP.

More information

CHAPTER 4 VENTILATION AIR SUPPLY

CHAPTER 4 VENTILATION AIR SUPPLY CHAPTER 4 VENTILATION AIR SUPPLY 401.0 General. This chapter contains requirements for ventilation air supply and exhaust, evaporative cooling systems and makeup-air requirements for direct-gas-fired heaters,

More information

Building Automation System (BAS) Design Criteria

Building Automation System (BAS) Design Criteria 25 0520 Building Automation System (BAS) Design Criteria 1. Design Statement a. During the various design phases of this project, the Engineer will develop options and strategies for selection of the appropriate

More information

Scholar III Unit Ventilator

Scholar III Unit Ventilator Scholar III Unit Ventilator 800 to 2000 CFM Models SVI 1000-2000 General Description The Scholar III unit ventilator is designed to provide comfortable, quiet and efficient heating and cooling for school

More information