1 Stormwater Project Meeting City of South Burlington Presentation by: David P. Wheeler and Emmalee T. Cherington, Assistant Stormwater Superintendents Tom DiPietro, Deputy Director of Public Works City of South Burlington Public Works

2 Stormwater Project Meeting Agenda 6:00 Kennedy Drive Pond 2 6:20 Kennedy Drive Pond 7 6:40 Bartlett Bay Stormwater Treatment System Expansion 7:00 Deane Street / Woodcrest Drive Stormwater Project 7:20 Lindenwood Stormwater Project

3 Kennedy Drive Pond 2 Retrofit Original Construction in 2006

4 Location Map

5 Kennedy Drive Pond 2

6 Kennedy Drive Pond 2 Existing System Undersized Design Drainage Area: 0.76 Acres (0.71 Impervious) Actual Drainage Area: 3.53 Acres (2.23 Impervious) Only 0.15% Channel Protection Volume (CPv) Proposed Retrofit Expand system to meet CPv requirement Convert from Detention Pond into Gravel Wetland for increased phosphorous removal

7 Drainage Area Map

8 Draft Plans

9 Project Schedule & Funding 11/13/18 Public Meeting 1/15/19 12/15/19 - Project Engineering 1/15/20 Anticipated Bid Date 6/15/20 11/15/20 Construction Funding City received $253,616 VTrans Grant City obligation 20% match ($63,404)

10 Project Contact Dave Wheeler, Assistant Stormwater Superintendent x6113

11 Questions & Comments

12 Kennedy Drive Pond 7 Retrofit

13 Kennedy Drive Pond 7- Location Existing Location of Pond 7 Current Drainage Area

14 Kennedy Drive Pond 7- Brief Description of the Work Expand the existing Drainage Area of Pond 7 Located within impaired watershed-potash Brook Additional acres added to treatment Accommodate the 1-year storm Manage full Channel Protection Volume (CPv) Funding Received $300,000 Vtrans Grant City obligation 20% match ($75,000)

15 Draft Project Concept Connect to drainage area located north of Williston Rd. Proposing to modify existing pond into a gravel wetland. Potential wetland impacts will need to be determined. Enlarging existing pond is an alternate. Increases the acreage treated by 623%.

16 Project Schedule 11/13/18 - Public Meeting Thru Dec Project Engineering January Anticipated Bid Date 6 months- Anticipated Construction 12/2020- Anticipated Completion

17 Project Contact Emmalee Cherington, Assistant Stormwater Superintendent x 6115 echerington@sburl.com

18 Questions & Comments

19 Bartlett Bay Stormwater Treatment System Expansion (BBSTS)

20 BBSTS Location Map Existing Drainage Area Existing Stormwater Treatment

21 BBSTS Brief Description of Work Expand the existing Drainage Area of BBSTS Located within impaired watershed- Bartlett Brook Additional 9.34 acres of impervious area Accommodate the 1-year storm 15% flow reduction target for Bartlett Brook TMDL Funding Received $375,720 Vtrans Grant City obligation 20% match ($93,930)

22 Draft Project Concept Connect to drainage area at Harborview Drive and US Route 7. Proposing to expand existing treatment wetland. Additional 800 FT of culvert. Reposition existing access road Not impacting Class II wetland Additional Drainage Area

23 Draft Plans

24 Draft Plans

25 Draft Plans

26 Draft Plans

27 Project Schedule 11/13/18 - Public Meeting Thru Dec Project Engineering January Anticipated Bid Date 8 months- Anticipated Construction 12/2020- Anticipated Completion

28 Project Contact Emmalee Cherington, Assistant Stormwater Superintendent x6115

29 Questions & Comments

30 Deane Street / Woodcrest Drive Stormwater Project West End of Deane Street

31 Project Location

32 Project Location

33 Deane Street/Woodcrest Drive Existing Conditions Drainage Area: 7.46 Acres (2.38 Impervious) Collection system discharges directly to Potash Brook Proposed Project Infiltration chambers in Right of Way (ROW) sized to meet Water Quality Volume (WQv) and Channel Protection Volume (CPv) requirements

34 Drainage Area Map

35 Draft Plans

36

37 Project Schedule & Funding 11/13/18 Public Meeting 8/30/17 8/15/19 - Project Engineering 3/15/19 Anticipated Bid Date 6/15/19 11/15/19 Construction Funding City received $242,000 VTrans Grant City obligation 20% match ($60,500)

38 Project Contact Emmalee Cherington, Assistant Stormwater Superintendent x6115

39 Questions & Comments

40 Lindenwood Stormwater Project Path at End of Lindenwood Drive

41 Project Location

42 Project Location

43 Existing Conditions Lindenwood Drive Drainage Area: 10.6 Acres (2.2 Impervious) Collection system along Brewer Parkway discharges directly to Potash Brook. Proposed Project Install collection system along Lindenwood Dr. Construct Infiltration Basin on City owned parcel to meet WQv and CPv requirements

44 Drainage Area Map

45 Draft Plans

46

47 Project Schedule & Funding 11/13/18 Public Meeting 8/30/17 12/15/19 - Project Engineering 1/15/20 Anticipated Bid Date 6/15/20 9/15/21 Construction Funding City received $303,574 VTrans Grant City obligation 20% match ($76,000)

48 Project Contact Dave Wheeler, Assistant Stormwater Superintendent x6113

49 Questions & Comments

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located Outlet Retrofit Hitzel Terrace The town owned parcel along Hitzel Terrace is a natural wetland area which currently provides some level of stormwater detention and peak-flow attenuation. The proposed project

More information

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection Stormwater Retrofitting: The Art of Opportunity Presented by the Center for Watershed Protection What Are Stormwater Retrofits? Retrofits are stormwater management measures inserted in an urban or ultra-urban

More information

LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL

LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL B Y : M A R T Y W A N I E L I S T A A N D E R I C L I V I N G S T O N August, 2016 ACKNOWLEDGEMENTS The Low

More information

City of Columbia BMP Manual. Volume Calculation Tool and Examples

City of Columbia BMP Manual. Volume Calculation Tool and Examples City of Columbia BMP Manual Volume Calculation Tool and Examples July 24, 2013 Today s Agenda 1. Welcome 2. Review City s Design Aid Tools Example Project 3. Revisit City s BMP Maintenance Agreement Procedure

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

The Flow. Green Infrastructure Taking Root in Cities 3/23/2015. Green Infrastructure Evolution City Plans/Projects Measureable and Holistic Benefits

The Flow. Green Infrastructure Taking Root in Cities 3/23/2015. Green Infrastructure Evolution City Plans/Projects Measureable and Holistic Benefits Green Infrastructure Taking Root in Cities Robert Hopper, P.E. CDM Smith The Flow Green Infrastructure Evolution City Plans/Projects Measureable and Holistic Benefits 2 1 Parts, Systems, Whole The first

More information

MDOT Stormwater BMPs: The Challenge of Design. Janeen McDermott, PE Dan DeVaun, PE

MDOT Stormwater BMPs: The Challenge of Design. Janeen McDermott, PE Dan DeVaun, PE MDOT Stormwater BMPs: The Challenge of Design Janeen McDermott, PE Dan DeVaun, PE June 25, 2018 Outline Water Quality Treatment Water Quality Treatment Volume Guidelines Example Project BMP Design Challenges

More information

Swan Creek Urban BMP Inventory and Assessment. Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners

Swan Creek Urban BMP Inventory and Assessment. Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners Swan Creek Urban BMP Inventory and Assessment Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners Presentation Outline Project Background Methods Inventory Desktop

More information

NYC Green Infrastructure Program

NYC Green Infrastructure Program NYC Green Infrastructure Program Parks Without Borders May 24, 2016 NYC Water Quality Improvement Program $10B investment since the early 2000s has yielded the highest water quality observed in the NYC

More information

Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate"

Managing Stormwater Runoff with Green Infrastructure Enhancing Community Resiliency to the Changing Climate Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate" Presented at Stormwater Management on the Whale Pond Brook Watershed Meeting Christopher C.

More information

STORMWATER STRATEGY PROJECTS IN ACTION

STORMWATER STRATEGY PROJECTS IN ACTION STORMWATER STRATEGY PROJECTS IN ACTION NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION 2018 WATER QUALITY RESTORATION GRANTS FOR NONPOINT SOURCE POLLUTION PUBLIC INFORMATION SESSION JUNE 2018 319(H)

More information

Town of Vershire Road Erosion Inventory Report

Town of Vershire Road Erosion Inventory Report Town of Vershire Road Erosion Inventory Report Taylor Valley Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation

More information

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT VILLAGE OF SCARSDALE WESTCHESTER COUNTY, NEW YORK COMPREHENSIVE STORM WATER MANAGEMENT SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT In association with WESTCHESTER COUNTY FLOOD MITIGATION PROGRAM Rob

More information

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices Coastal Resilience through Community Engagement Webinar Series Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices 1:00 2:30pm CT 8 Today s Moderator Chad Berginnis, CFM

More information

Low Impact Development in Coastal South Carolina: A Planning and Design Guide

Low Impact Development in Coastal South Carolina: A Planning and Design Guide Low Impact Development in Coastal South Carolina: A Planning and Design Guide ACE Basin & North Inlet-Winyah Bay National Estuarine Research Reserves Network of 28 Reserves NOAA Program Research, Stewardship,

More information

GENERAL INFORMATION What is Stormwater? What is a stormwater utility? What is an impervious surface?

GENERAL INFORMATION What is Stormwater? What is a stormwater utility? What is an impervious surface? GENERAL INFORMATION What is Stormwater? Stormwater is rain or snowmelt that falls on streets, parking areas, rooftops, and other developed land and either flows directly into nearby streams or travels

More information

GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE

GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE Jennifer K. Lachmayr, PE, BCEE Kathryn B. Edwards, PE November 2015 Agenda Background Little River Flood Study Little River Pilot Program Vision for Implementation

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct

More information

Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain

Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain 2017 Florida Stormwater Association June 14-17, 2017 Eban Z. Bean, PhD, PE Assistant Professor & Extension Specialist Agricultural and Biological

More information

MALLETTS BAY INITIATIVE

MALLETTS BAY INITIATIVE MALLETTS BAY INITIATIVE Stormwater Management & Transportation Scoping Study January 19, 2017 Project Team Bryan Osborne Director of Public Works Sarah Hadd Director of Planning & Zoning Marshall Distel

More information

Action Plan for Retrofitting Structural BMPs

Action Plan for Retrofitting Structural BMPs Action Plan for Retrofitting Structural BMPs Hawaii State Department of Transportation Highways Division, Oahu District Storm Water Management Program NPDES Permit No. HI S000001 August 2014 Action Plan

More information

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK A. Authority As set forth in the Overland Park Municipal Code (OPMC), Chapter 16.210, the Director of Planning and Development

More information

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM DATE REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL Community Development PUD Concept & Development Stage Plan Preliminary Plat & Final Plat PREVIOUS

More information

Town of Corinth Road Erosion Inventory Report

Town of Corinth Road Erosion Inventory Report Town of Corinth Road Erosion Inventory Report Grist Mill Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation

More information

San Mateo County Storm Water Resource Plan

San Mateo County Storm Water Resource Plan San Mateo County Storm Water Resource Plan Matthew Fabry, P.E. CASQA Effectiveness Assessment Sub-Committee November 16, 2016 SWRP RAA GI Plan Characterization of watersheds Stormwater Capture Model Web-based

More information

ENVIRONMENTAL STEWARDSHIP, COMMITMENTS, AND COMPLIANCE

ENVIRONMENTAL STEWARDSHIP, COMMITMENTS, AND COMPLIANCE ENVIRONMENTAL STEWARDSHIP, COMMITMENTS, AND COMPLIANCE Russ Yurek, Maryland SHA July 20, 2015 AASHTO SOC Des Moines, IA Traditional Roadside Stewardship SHA Integrated Roadside Vegetation Management (IRVM)

More information

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project Presenter: Stacy Luell, Geosyntec Consultants Co-Authors: R. Batchelder, W. Tam, M. Hanna, M. Sadeghi

More information

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School 930 Gallison Hill Rd, East Montpelier, VT Filter Berm, Sand Filter, Cistern / Rain Barrel, Gravel Wetland, Check

More information

From and

From   and GREEN INFRASTRUCTURE IN PROVIDENCE, RI The Box Office From http://web.uri.edu/riss/the-box-office/ and http://www.morrisbeacon.com/media/portfolioprojects/implementation/box-office/box%20office.pdf: At

More information

4. Contractor (and subcontractors if applicable) certification statement(s)

4. Contractor (and subcontractors if applicable) certification statement(s) CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of

More information

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013 Planning the BMP Region 2000 Planning District Commission Lynchburg, VA December 13, 20013 PLANNING THE BMP AGENDA BMP Selection BMP Design SWM Plan Preparation 2 BMP SELECTION Types of BMPs Structural

More information

Tigard. City TIGARD STORMWATER. ofn MASTER PLAN. Respect and Care Do the Right Thing Get it Done. Tualatin River Watershed Council

Tigard. City TIGARD STORMWATER. ofn MASTER PLAN. Respect and Care Do the Right Thing Get it Done. Tualatin River Watershed Council City ofn Tigard Respect and Care Do the Right Thing Get it Done TIGARD STORMWATER MASTER PLAN Tualatin River Watershed Council January 4, 2017 Tigard Stormwater Master Plan Why It s Needed Long Overdue:

More information

Anne Arundel County s Severn River Watershed Implementation Strategy. Severn River Association

Anne Arundel County s Severn River Watershed Implementation Strategy. Severn River Association Anne Arundel County s Severn River Watershed Implementation Strategy Severn River Association Watershed Protection and Restoration Program Anne Arundel County Department of Public Works August 18, 2014

More information

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee? 1. There are no storm sewers on or near my property. Why should I pay a fee? All properties produce stormwater runoff that must be managed by the Township. Even if your property has never flooded and there

More information

Impervious Cover Project for Climate Resilience in New Jersey

Impervious Cover Project for Climate Resilience in New Jersey Impervious Cover Project for Climate Resilience in New Jersey Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu www.water.rutgers.edu February 26, 2016 Rutgers Cooperative Extension Rutgers

More information

Post Construction BMPs

Post Construction BMPs Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases

More information

CAPE ELIZABETH, MAINE TOWN CENTER STORMWATER MANAGEMENT PLAN UPDATE

CAPE ELIZABETH, MAINE TOWN CENTER STORMWATER MANAGEMENT PLAN UPDATE CAPE ELIZABETH, MAINE TOWN CENTER STORMWATER MANAGEMENT PLAN UPDATE September 2015 This report was prepared by The Town of Cape Elizabeth under award CZM NA14NOS4190066 to the Maine Coastal Program from

More information

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES Greenville County Technical Specification for: WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES 1.0 Mountainous and Steep Slope Sites 1.1 Description The geographic locations of portions of Greenville County are

More information

CROWN POINT SUBDIVISION

CROWN POINT SUBDIVISION CROWN POINT SUBDIVISION A COMPARISON OF CONVENTIONAL VERSUS CONSERVATION SUBDIVISION DESIGN DEVELOPER: PAUL LUCIANO BUILDERS LAND PLANNING & DESIGN: DAVID LAIRD ASSOCIATES FUNDING PROVIDED BY: PA SEA GRANT

More information

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. Numerous ecosystem-based functional stormwater quantity and quality design alternatives are possible within the street ROW. Several

More information

STORMWATER UTILITY PRESENTATION November 18, 2014

STORMWATER UTILITY PRESENTATION November 18, 2014 STORMWATER UTILITY PRESENTATION November 18, 2014 AGENDA 1. Introduction 2. What is Stormwater 3. What is the problem with polluted runoff? 4. Local Environmental Initiatives 5. Current status to fund,

More information

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks 2019 NEORSD GIG Eligibility and Technical Requirements Project must be located in the Sewer District s combined sewer area Location Applicant

More information

Community LID Workgroup Issue Paper #6

Community LID Workgroup Issue Paper #6 Community LID Workgroup Issue Paper #6 Topic: Hard and Impervious Surface Coverage Limits Objective: Minimize the amount of hard and impervious surfaces in developments to allow more stormwater to infiltrate

More information

NYC Green Infrastructure Program

NYC Green Infrastructure Program NYC Green Infrastructure Program 2013 Green Infrastructure Annual Report Kevin Dahms, Assistant Director, NYC DEP Office of Green Infrastructure Pre-Release Briefing for DEC ENGS 44 Sustainable Design

More information

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School West Little Pimmit Storm Sewer & John Marshall Green Street Projects July 7, 2015 Nottingham Elementary School Project Timeline February 2015: Archeological study of island, including historic spring location,

More information

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices JCCC CAMPUS SUSTAINABILITY o Student self-imposed green fee for campus wide sustainability

More information

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time. AGENDA ITEM H-7 continued from 4/18 Public Works STAFF REPORT City Council Meeting Date: 4/18/2017 Staff Report Number: 17-081-CC Informational Item: Update on the Bayfront Canal Bypass Project Recommendation

More information

Bioretention cell schematic key

Bioretention cell schematic key Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout

More information

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility Costs of Stormwater Management and How to Structure a Stormwater Utility Richard Claytor, P.E. Horsley Witten Group, Inc How to Fund Your Municipal Stormwater Program April 30, 2009 Peabody Institute Library

More information

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1 The ABC s of BMP s Aux Sable Watershed Plan St. Charles, IL Why are BMP s Important Best Management Practices (BMPs) developed as a set of practices which help to achieve goals of the Clean Water Act and

More information

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection Arlington County Watershed Retrofits Greg Hoffmann Center for Watershed Protection March 18, 2010 About the Center for Watershed Protection Non-profit 501(c)3, non-advocacy organization Work with watershed

More information

A G E N D A Council Update Training Room September 26, :45 p.m.

A G E N D A Council Update Training Room September 26, :45 p.m. CITY OF THORNTON CITY MANAGER S OFFICE A G E N D A Council Update Training Room September 26, 2017 5:45 p.m. A. Boards and Committees Reports (Estimated 20 Minutes) 1. Rangeview Library District Meeting

More information

Cost Effective Low Impact Development

Cost Effective Low Impact Development Cost Effective Low Impact Development An Introductory Guide to Conserve Land, Restore Resources, Protect Water, and Save Money in Massachusetts Stefanie Covino Shaping the Future of Your Community Program

More information

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region Sarah U Ren Program Director The Watershed Center of Grand Traverse Bay 231-935-1514, suren@gtbay.org Our Mission: The

More information

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Turgay Dabak, Joni Calmbacher, Sara DeGroot, Andrea Ryon Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Presentation Outline Project Background Project Overview BMPs Evaluated

More information

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith Urban Stormwater Management Rebecca Leonardson Rui Teles Brooke Ray Smith Introduction Stormwater in Portugal Why urban stormwater is currently a problem What is green stormwater management? Why it is

More information

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012 Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012 Jeff Herr, P.E., D.WRE National Stormwater Leader jherr@brwncald.com Acknowledgements

More information

DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs

DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs DCBP Appendix FINAL US Army Garrison, Hawaii October 2015 DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs Storm Water Management Plan DCBP Appendix B ACTION PLAN FOR RETROFITTING STRUCTURAL

More information

The use of low head weirs to. perennial streams with their floodplains:

The use of low head weirs to. perennial streams with their floodplains: The use of low head weirs to reconnect severely entrenched perennial streams with their floodplains: An Anne Arundel County TMDL Watershed Implementation Plan Strategy presented by Hala Flores, P.E Mid

More information

Watershed Planning Workshop

Watershed Planning Workshop Watershed Planning Workshop Upper Four Mile Run, Gulf Branch and Donaldson Run March 18, 2010 Langston Brown Community Center Outline Overview of Arlington s s Watersheds Watershed Management in Arlington

More information

Chapter 4 - Preparation of Stormwater Site Plans

Chapter 4 - Preparation of Stormwater Site Plans Chapter 4 - Preparation of Stormwater Site Plans The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for the City to evaluate a proposed

More information

Williamsburg Boulevard Green Streets Project. April 27, 2011 Williamsburg Middle School

Williamsburg Boulevard Green Streets Project. April 27, 2011 Williamsburg Middle School Williamsburg Boulevard Green Streets Project April 27, 2011 Williamsburg Middle School What is a Green Street? A green street incorporates facilities that reduce the impact of polluted runoff on our streams

More information

Stormwater Management Design Manual

Stormwater Management Design Manual New York State Stormwater Management Design Manual October 2001 Prepared by Center for Watershed Protection 8391 Main Street Ellicott City, MD 21043 For: New York State Department of Environmental Conservation

More information

South Bismarck Watershed Model Update and Stormwater Improvement Project

South Bismarck Watershed Model Update and Stormwater Improvement Project Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046 1.0 Executive Summary The focus of

More information

What is YOUR biggest challenge in stormwater control measure accounting/planning?

What is YOUR biggest challenge in stormwater control measure accounting/planning? Introduction Name Affiliation What is YOUR biggest challenge in stormwater control measure accounting/planning? 1 Opti-Tool Outreach Workshop Part 1 Research Based Stormwater System Accounting November,

More information

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT The Adapting to Rising Tides (ART) project evaluated the current condition of shoreline and community assets, and the

More information

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010 MOBILE CITY PLANNING COMMISSION LETTER OF DECISION Archbishop of Mobile 400 Government St. Mobile, AL 36602 Re: Case #SUB2010-00075 (Subdivision) 3650 Springhill Avenue (Northwest corner of Springhill

More information

RIVERSIDE, Newton MA June 9, 2011

RIVERSIDE, Newton MA June 9, 2011 June 9, 2011 TONIGHT S AGENDA: 1.Project Update (5 min.) 2.Master Plan Update (10 min.) 3.Environmental Update (5 min.) 4.Traffic Plan Update (25 min.) Questions PROJECT STATUS UPDATE Responding / Clarifying

More information

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS Chapter 6: Stormwater Management 6.1. INTRODUCTION This Chapter describes the current drainage patterns on the Project Site, the stormwater management system that is proposed as part of the Proposed Project,

More information

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE Presentation Highlights Background of Grant Award What are the County s grant requirements? Maryland Stormwater

More information

Detroit Stormwater Rules and Drainage Fee Updates

Detroit Stormwater Rules and Drainage Fee Updates 2016 Regional Stormwater Summit Detroit Stormwater Rules and Drainage Fee Updates Dan Christian, PE, D.WRE Tetra Tech INTRODUCTION 10/7/2016 DRAFT - For Discussion Purposes Only 2 Historically No formal

More information

Pasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed

Pasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed Pasco County Watershed Meeting for Flood Impacted Areas March 15, 2017 Regency Park Library, 9701 Little Road, New Port Richey, Pasco County The following is a summary of the meeting held on March 15,

More information

Pollutant Removal Benefits

Pollutant Removal Benefits Bioswales Bioswales Similar to biocells, but have a slight, but positive grade toward an outlet Designed to convey the WQv event at very low velocities Promote filtration through native vegetation, infiltration

More information

Objective: To provide practitioners and reviewers with information and design guidelines related to innovations in urban stormwater management.

Objective: To provide practitioners and reviewers with information and design guidelines related to innovations in urban stormwater management. West Virginia Stormwater Manual Training Workshop A Chesapeake Bay Stormwater Training Partnership Workshop December 5, 2012 9:00 AM 4:30 PM Robert C. Byrd Health Sciences Center Eastern 2500 Foundation

More information

Types and Basic Design of Post-Construction BMPs

Types and Basic Design of Post-Construction BMPs Types and Basic Design of Post-Construction BMPs F O R R E S I D E N T I A L L A N D S C A P E R S D A N B O G O E V S K I O H I O E P A N O R T H E A S T D I S T R I C T O F F I C E J U L Y 9, 2 0 1 3

More information

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination I-494 Rehabilitation Project SP 2785-330 (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination State Project Number 2785-330 Federal Project No. NHPP-I494 (002) Trunk Highway:

More information

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) For: (Insert Project Name) (Site Address or Tract/Lot Number) Prepared for: (Insert Owner/Developer Name) (Insert Address) (Insert City, State, ZIP) (Insert

More information

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management Introduction to Low Impact Development Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management http://hawaii.gov/dbedt/czm/resource/publication.php A Comprehensive

More information

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey This Presentation Ohio EPA Post-Construction Criteria/Guidance Runoff Reduction Accounting Green

More information

Low Impact Development and Green Infrastructure 101. The new paradigm for stormwater management

Low Impact Development and Green Infrastructure 101. The new paradigm for stormwater management Low Impact Development and Green Infrastructure 101 The new paradigm for stormwater management Wayne Petersen Urban Conservationist 515-281-5833 Wayne.Petersen@iowaagriculture.gov IDALS s Urban Conservation

More information

TOWN OF BURLINGTON Conservation Commission

TOWN OF BURLINGTON Conservation Commission TOWN OF BURLINGTON Conservation Commission MINUTES OF Approved October 13, 2016 Members Present: Members Absent: Also Present: Chair L. Cohen, Vice-Chair W. Boivin, K. Melanson, A. McNamara J. Lynch, G.

More information

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue 5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER Avenue 1. APPLICANT: Hoefer Wysocki Architects, L.L.C., is the applicant for this request. 2. REQUESTED ACTION: The applicant is requesting final

More information

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER CEQA scoping Meeting March 19 th, 2014 Winters City Council Chambers - 6:30 pm AGENDA FOR THE MEETING 6:30 Welcome (John Donlevy) 6:40 Overview

More information

COUNCIL OF THE TOWN OF LA PLATA. Ordinance No Amended

COUNCIL OF THE TOWN OF LA PLATA. Ordinance No Amended COUNCIL OF THE TOWN OF LA PLATA Ordinance No. 10-3 Amended Introduced By: Mayor Roy G. Hale Date Introduced: March 16, 2010 Planning Commission Hearing: April 6, 2010 Town Council Hearing: April 27, 2010

More information

West Virginia Stormwater Management Manual: Methods.

West Virginia Stormwater Management Manual: Methods. West Virginia Stormwater Management Manual: Methods Created to deliver targeted training on new tools and practices to improve the quality of stormwater runoff. www.cbstp.org www.chesapeakestormwater.net

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580

More information

The Benefits and Challenges Associated with Green Infrastructure Practices

The Benefits and Challenges Associated with Green Infrastructure Practices The Benefits and Challenges Associated with Green Infrastructure Practices Thomas M. Evans ASLA, LEED AP Regional Green Infrastructure Design Services Director OWEA Technical Conference, June 20, 2013

More information

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012 Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012 Overview Brief History: Getting Started to Now GSI Program: What s Working? GSI Program: What needs Improvement?

More information

6.5 Lakewood Gulch. Basin Snapshot

6.5 Lakewood Gulch. Basin Snapshot 6.5 Lakewood Gulch The Lakewood Gulch Map Unit is comprised of both Lakewood Gulch and Dry Gulch (4800-01 and 4801-01) from the Denver Storm Drainage Master Plan (SDMP) and has a total drainage area of

More information

Baltimore, MD Lt. Gov. Boyd Rutherford

Baltimore, MD Lt. Gov. Boyd Rutherford MODEL STANDARD PLAN FOR POULTRY HOUSE SITE DEVELOPMENT ON MARYLAND S EASTERN SHORE MARCH 2011 1800 Washington Boulevard 410-537-3000 Gov. Larry Hogan Baltimore, MD 21230-1718 800-633-6101 Lt. Gov. Boyd

More information

City of Sun Prairie Wetland Buffer Reduction Request

City of Sun Prairie Wetland Buffer Reduction Request City of Sun Prairie Wetland Buffer Reduction Request Westside Development Area January 9, 2017 Prepared by: City of Sun Prairie 300 E. Main Street Sun Prairie, WI 53590 BACKGROUND The City of Sun Prairie

More information

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS In 2007, the City Council adopted Ordinance No. 1155 establishing a storm water utility in the City. No fee structure was adopted at that time. The idea of

More information

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me

More information

Amy Bouska Urban Conservationist IDALS-Division of Soil Conservation

Amy Bouska Urban Conservationist IDALS-Division of Soil Conservation Amy Bouska Urban Conservationist IDALS-Division of Soil Conservation Wayne Petersen Wallace Building, Des Moines 515-281-5833 Wayne.petersen@iowaagriculture.gov Derek Namanny Spirit Lake FO 712-336-3782

More information

Update on Homeowner BMPs

Update on Homeowner BMPs Update on Homeowner BMPs Homeowner BMP Crediting UNM Plan for 9200 Bradford Pear Lane: 0.5 acres 1 Get Expert Lawn Advice 2 Maintain Dense Cover on Turf 3 Choose NOT to fertilize 4 Recycle Lawn Clippings

More information

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016 Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016 1 Agenda DRAFT ACTION PLAN REVIEW Public Consultation Time 6:00 6:05 6:05 6:20 6:20

More information

AGENDA 2015 Community Stormwater Event

AGENDA 2015 Community Stormwater Event AGENDA 2015 Community Stormwater Event Sponsors: 2015 Community Stormwater Event AGENDA 2015 Community Stormwater Event Welcome 6:00 1 st prize drawing 6:15 Stormwater Video final destination Stormwater

More information

Interpreting and Using the RI Site Specific Soil Mapping Standards and Procedures

Interpreting and Using the RI Site Specific Soil Mapping Standards and Procedures Interpreting and Using the RI Site Specific Soil Mapping Standards and Procedures Using the New Rhode Island Site Specific Soil Mapping Guide URI Coastal Institute, Kingston November 15, 2007 Lorraine

More information

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division Putting a LID on Stormwater Pollution Michele Loudenback, RPES Stormwater Enforcement Water Quality Division Outline Brief Regulatory History Conventional vs. Green Practices LID/GI Controls in Use Clean

More information