1 Attachment 4 Part 3 Town of Gawler EVANSTON GARDENS TRANSPORT INFRASTRUCTURE REVIEW AND STRUCTURE PLAN TRAFFIC ASSESSMENT Job No. WAD Rev B March WALLBRIDGE & GILBERT Client Name and Submission Type

2 CONTENTS 1 INTRODUCTION BACKGROUND PURPOSE OF THE ASSESSMENT PREVIOUS STUDIES PROPOSED DEVELOPMENT EXISTING ROADWAY AND TRAFFIC CONDITIONS EXISTING CONDITIONS HILLIER ROAD ANGLE VALE ROAD JACK COOPER DRIVE KEY INTERSECTIONS PLANNED ROADWAY IMPROVEMENTS EXISTING PEDESTRIAN AND CYCLIST INFRASTRUCTURE EXISTING PUBLIC TRANSPORT INFRASTRUCTURE TRAFFIC GENERATION AND DISTRIBUTION DEVELOPMENT AREA TRIP GENERATION SPATIAL DISTRIBUTION OF TRIPS TRIP ORIGIN / DESTINATION INFRASTRUCTURE UPGRADES INTERSECTION UPGRADE RECOMMENDATIONS HILLIER ROAD / HILLIER PARK RESIDENTIAL VILLAGE / AREA 8 ACCESS ROAD HILLIER ROAD BETWEEN AREA 8 ACCESS AND JACK COOPER DRIVE JACK COOPER DRIVE / HILLIER ROAD / MURRAY HILLIER COURT AREA 8 ACCESS ROAD / ANGLE VALE ROAD ANGLE VALE ROAD / JACK COOPER DRIVE ANGLE VALE ROAD / COVENTRY ROAD ANGLE VALE ROAD / NEW DISTRIBUTOR ROAD CLIFFORD ROAD / AREA 9 EMERGENCY ACCESS PEDESTRIAN AND CYCLIST INFRASTRUCTURE SUMMARY AND CONCLUSIONS APPENDIX A ASSESSED DEVELOPMENT AREAS APPENDIX B ANTICIPATED TRAFFIC GENERATION APPENDIX C RECOMMENDED INFRASTRUCTURE UPGRADES INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 2 of 27

3 INTRODUCTION BAKEWELL BRIDGE UNDERPASS, SA WALLBRIDGE & GILBERT INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 3 of 27

4 1 INTRODUCTION 1.1 BACKGROUND Wallbridge & Gilbert (W&G) have been engaged by the Town of Gawler (Council) to complete a review of the proposed Evanston Gardens Development Plan Amendment, and prepare a structure plan for the broader Evanston Gardens Area. The site, which covers approximately 100 ha, is located 5 km south west of the Gawler town centre, and approximately 40 km from the Adelaide CBD. The study area is bordered by Hillier Road / Gawler River to the north, Coventry Road to the south, Jack Cooper Drive to the east, and bya number of property boundaries to the west. The study area currently comprises existing residential allotments and rural land, as well as a local reserve and primary school. The area is also bordered by several other large land subdivisions, including Orleana Waters and Aspire. The majority of the land within the study area is currently zoned as Deferred Urban land, and has been identified for future residential development in The 30 Year Plan for Greater Adelaide. A proposal has been submitted to Council to amend the Development Plan and re-zone several allotments from Deferred Urban to Residential / Residential Park to allow for development of the land. A locality plan of the study area is illustrated in the following figure: Study Area Figure 1 - Proposed Land Division, Locality Plan 4 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 4 of 27

5 1.2 PURPOSE OF THE ASSESSMENT The purpose of this study is to identify the impact that the development of land within the study area will have on the existing transport infrastructure. The study will also identify any options/upgrades that may be required to ensure that the network can cope with any increase in traffic volumes. 1.3 PREVIOUS STUDIES The study will assess road infrastructure, as well as pedestrian and cyclist provision, and links to public transport. The following will be utilised while completing this study: Draft Gawler Transport and Traffic Management Plan, prepared by Mott MacDonald [July 2014] Draft Infrastructure Master Plan, New Southern Urban Areas (Evanston South, Evanston Gardens, Hillier), prepared by the Town of Gawler [August 2006] Standards and Requirements for Land Development/Land Division, prepared by the Town of Gawler [July 2012] Town of Gawler Development Plan, prepared by the Town of Gawler [April 2015] Gawler Community Plan , prepared by the Town of Gawler [September 2013] Strategic Directions Report , prepared by the Town of Gawler [July 2013] The methodology used in this analysis has been based on the Town of Gawler Development Plan, relevant Australian Standards and Austroads guidelines. 5 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 5 of 27

6 DETAILED REPORT GOODWOOD JUNCTION GRADE SEPARATION, SA WALLBRIDGE & GILBERT 6 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 6 of 27

7 2 PROPOSED DEVELOPMENT The land forming the subject of the Development Plan Amendment application occupies two areas of land, to the north and south of Hillier Road. Additional areas included as part of this review include three areas to the east of Jack Cooper Drive, three to the north and one to the south of Angle Vale Road, and an extension of the Karbeethan Reserve. The following table summarises the development areas included in this analysis, their size and projected land use. A plan illustrating the subject areasis included in Appendix A. Table 1 - Assessed Development Areas Development Area Size (ha) Projected Use Comments Area Residential Projected Use Area Recreational Karbeethan Reserve Area Recreational Proposed Karbeethan Reserve Extension Area Residential Projected Use Area Residential Projected Use Area Educational Existing Evanston Gardens Primary School Area Commercial Proposed Neighbourhood Centre Area Residential Subject of DPA application Area Retirement Living Subject of DPA application Area Residential Projected Use Area Residential Projected Use Area Residential Projected Use 7 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 7 of 27

8 3 EXISTING 3.1 EXISTING CONDITIONS ROADWAY AND TRAFFIC CONDITIONS Currently the subject areas are typically undeveloped, with some existing residential properties and outbuildings. Roads that will be primarily impacted by development include: Hillier Road Angle Vale Road Jack Cooper Drive These roads will provide access to the major development areas and will experience increases in traffic volumes as a result of development. Key features of the roadways are discussed below HILLIER ROAD Hillier Road in the study area is a two-way, two lane local collector roadunder the care and control of Council. The road typically has unsealed shoulders along the length of the study area. Daily traffic volumes are estimated to be in the order of 1,000vehicles per day (vpd). The posted speed limit is 60 kph ANGLE VALE ROAD Angle Vale Road in the study area is a two-way, two lane arterialroadunder the care and control of thedepartment of Planning, Transport and Infrastructure (DPTI).The road typically has unsealed shoulders along the length of the study area. Average Annual Daily Traffic (AADT) volumes are in the order of 3,100 vehicles per day (vpd), with approximately 6% heavy vehicle traffic. The posted speed limit is 60 kph JACK COOPER DRIVE Jack Cooper Drive in the study area is a two-way, two lane arterial roadunder the care and control of DPTI.The road typically has sealed shoulders along the length of the study area. Average Annual Daily Traffic (AADT) volumes are in the order of 5,400 vehicles per day (vpd), with approximately 3.5% heavy vehicle traffic. The posted speed limit is 80 kph, reducing to 60kph south of the Hillier Road junction. 8 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 8 of 27

9 3.1.4 KEY INTERSECTIONS The key intersections within the study area are: Jack Cooper Drive / Hillier Roadpriority-controlled T-junction Angle Vale Road / Jack Cooper Drivepriority-controlled T-junction Angle Vale Road / Coventry Road priority-controlled T-junction 3.2 PLANNED ROADWAY IMPROVEMENTS It is understood that a new distributor road is under consideration to link Angle Vale Road and Coventry Road to Main North Road. It is anticipated that this roadway would be a key transit route for traffic generated within the study area, providing a more direct link to Adelaide and supplementing the existing major travel routes. 3.3 EXISTING PEDESTRIAN AND CYCLIST INFRASTRUCTURE Minimal footpaths or bicycle lanes are provided in the vicinity of the site on any of the key roadways within the study area. The exception is a short section of footpath on Angle vale Road, east of the Jack Cooper Drive junction. 3.4 EXISTING PUBLIC TRANSPORT INFRASTRUCTURE Bus stops are located on jack Cooper Drive, close to the Hillier Road and Angle Vale Road junctions. Services operate to and from Gawler. Tambelin Railway Station, on the Gawler line, is located approximately 1.5km from Hillier Road. Services operate to Adelaide city and Gawler. 9 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 9 of 27

10 4 TRAFFIC GENERATION AND DISTRIBUTION 4.1 DEVELOPMENT AREA TRIP GENERATION Traffic generation rates for the proposed development areas have focussed on the weekdaypm peak periods, as this is considered to be the critical period for residential developments. While developments within the study area will be constructed in stages, the analysis has focussed on the fully-completed scenario. RESIDENTIAL The specific breakdown of each development has not yet been finalised, so for the purposes of the analysis the following assumptions were applied: 12.5% of land area designated as green space 12.5% of land area designated as road reserve A rate of 25 allotments per hectare adopted, based on similar residential developments in the vicinity Residential traffic generation rates have been calculated based on thedraft Gawler Transport and Traffic Management Plan and the NSW Roads and Maritime Services(previously Road and Traffic Authority) Guide to Traffic Generating Developments, TheTransport and Traffic Management Plan specifies a traffic generation rate of 6.5 trips per unit per day. The Guide to Traffic Generating Developmentsspecifies a 10% peak hour factor for residential developments, which has been applied to the daily rate. Daily Trips 6.5 per dwelling PM Weekday Trips 0.65 per dwelling The calculated residential trip generation can also be separated into incoming and outgoing trips during peak periods. Based on the Institute of Transport Engineers Guide to Trip Generation 7 th Edition, the following ratios have been adopted: PM Peak Period 65% incoming and 35% outgoing NEIGHBOURHOOD CENTRE While it is anticipated that the neighbourhood centre will accommodate a variety of land uses, for the purposes of the analysis it has been assumed that the neighbourhood centre will primarily be retail. The following assumptions have been applied to the analysis: 10,000m 2 of the centre will be occupied by retail 35% (3,500m 2 ) of the retail area will be floor area. This proportion is based on typical standalone retail developments A supermarket land use was assumed, based on the ITE rate of 11.3 trips per 100m 2 GFA 10 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 10 of 27

11 KARBEETHAN RESERVE The reserve is not anticipated to be a large generator of trips during the PM peak. It would likely be a higher generator on weekends, when people would use the recreational facilities. EVANSTON GARDENS PRIMARY SCHOOL The primary school is an existing development and would not therefore generate any additional trips. 120 students are enrolled in the school. The trip rate of 0.28 per student has been adopted from the ITE Guide. Based on the above assumptions, the following table outlines the anticipated trip generation for the land division for the PM peak hour. While the school is an existing generator, it has been included due to its central location within the study area. Table 2: Proposed Development Area Peak Hour Traffic Generation Development Area Units Trip Rate Incoming Trips Outgoing Trips Total Trips Area Allotments 0.65 per unit Area Hectares 0.02 per hectare Area Hectares 0.02 per hectare Area Allotments 0.65 per unit Area Allotments 0.65 per unit Area Students 0.28 per student Area 7 3,500m per 100m Area Allotments 0.65 per unit Area Allotments 0.2 per unit Area Allotments 0.65 per unit Area Allotments 0.65 per unit Area Allotments 0.65 per unit Total New Trips ,065 Total Study Area Trips , WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 11 of 27

12 The use of the term Trip represents a one-way vehicular movement from one point to another but excluding the return journey. Therefore, a vehicle entering and leaving the development corresponds to two trips. The additional development-generated trips will be used to assess the performance of key site accesses and added to the road network to determine the impact of the proposed development on the local road network. A plan illustrating the anticipated traffic generation of each development area is included in Appendix B. 4.2 SPATIAL DISTRIBUTION OF TRIPS The distribution of trips throughout the local road network is influenced by the locations of the access points and the origins / destinations of trips on the external road network. Distribution will also be influenced by the new distributor road linking to Angle Vale Road, with a greater proportion of traffic travelling via the new road to Adelaide following its completion. In order to minimise the impact on the road network and improve safety, it is recommended that where possible access points are located away from arterial roads. It is also recommended that developments have one access point only, with traffic routed to the access via the internal development road network. The following table outlines the recommended locations for the development area access points: Table 3: Recommended Development Area Access Location Development Area Area 1 Area 2 Area 3 Area 4 Area 5 Area 6 Area 7 Area 8 Area 9 Area 10 Access Location Hillier Road Hillier Road & Angle Vale Road Hillier Road Angle Vale Road Angle Vale Road Hillier Road & Angle Vale Road Angle Vale Road Hillier Road & Angle Vale Road Hillier Road Murray Hillier Court Comments Existing road link through reserve. Potential to form an approach to new distributor road roundabout. Existing access points. Primary access via Angle Vale Road. Roundabout access recommended on Hillier Road, linking with existing retirement village / Area 9 access. T-junction access initially recommended on Angle Vale Road, to be upgraded to roundabout operation following realignment of Coventry Road Access via retirement village. Recommended roundabout link with Area 8 access. Murray Hillier Court junction with Jack Cooper Drive recommended for upgrade. 12 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 12 of 27

13 Development Area Area 11 Area 12 Access Location Murray Hillier Court Ross Davis Avenue Comments Murray Hillier Court junction with Jack Cooper Drive recommended for upgrade. Based on the proposed development area access locations, it is anticipated that the Jack Cooper Drive / Hillier Road junction (and Murray Hillier Court, should the junction be upgraded) will experience a significant increase in traffic volumes, with up to five residential development areas travelling via the junction. 4.3 TRIP ORIGIN / DESTINATION It is anticipated that Adelaide will be the primary destination for trips generated by the new development areas. Existing primary routes between the study area and Adelaide are: Via Jack Cooper Drive and Main North Road. 42km, estimated travel time 42 minutes Via Angle Vale Road and Northern Expressway. 43km, estimated travel time 39 minutes While travel via thenorthern Expressway is typically a faster route to Adelaide, it is anticipated that travel via Main North Road will experience a higher proportion of trips, as this route provides access to the northern suburbs. The route is also the primary route to Gawler. Should the proposed new distributor road progress, this will form an additional primary route: Via Angle Vale Road, the potential future distributor road and Main North Road. Estimated 37km,estimated travel time 40 minutes This route would draw traffic from both existing routes, with travel via Jack Cooper Drive anticipated to experience the highest decrease, as the new link will also connect to Main North Road. 13 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 13 of 27

14 5 INFRASTRUCTURE UPGRADES 5.1 INTERSECTION UPGRADE RECOMMENDATIONS As a consequence of the proposed development, it is recommended that a number of key affected intersections within the study area are upgraded. Upgrading the intersections will improve capacity, ensuring that the network can accommodate the projected increase in traffic volumes resulting from the proposed development. The upgrades will also aim to improve safety. The upgrading of junctions will be a staged process, with those immediately impacted by development upgraded first, with those experiencing a lesser impact being upgraded as required to accommodate projected demand. IMMEDIATE UPGRADE Hillier Road / Hillier Park Residential Village / Area 8 Access Road Hillier Road between Area 8 Access and Jack Cooper Drive Jack Cooper Drive / Hillier Road / Murray Hillier Court Area 8 Access Road / Angle Vale Road FUTURE UPGRADE Angle Vale Road / Jack Cooper Drive Angle Vale Road / Coventry Road Angle Vale Road / New Distributor Road Clifford Road / Area 9 Emergency Access A plan illustrating the recommended infrastructure upgrades is included in Appendix C. 5.2 HILLIER ROAD / HILLIER PARK RESIDENTIAL VILLAGE / AREA 8 ACCESS ROAD Access to Area 8 will be required during construction and once the first residential units are completed. Consequently it is recommended that the upgrades are implemented once construction commences on Area 8. It is recommended that the Area 8 access road is combined with the existing Hillier Park Residential Village access to form a new four-way intersection on Hillier Road. A roundabout treatment is recommended based on the following: Area 8 will be a major traffic generator, accounting for 50% of traffic at the intersection. A roundabout would provide greater capacity than a priority-controlled junction. It would minimise the number of access points on Hillier Road, benefitting safety. It would accommodate trips generated by Area 9, an expansion of the Residential Village. 14 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 14 of 27

15 COST OPINION Pre-Construction $70,000 Construction $410,000 Contingency 20% $120,000 Total $600, % of cost to be borne by developer as access is required to service Area 8 and Area HILLIER ROAD BETWEEN AREA 8 ACCESS AND JACK COOPER DRIVE Hillier Road between the new Area 8 access and the Jack Cooper Drive junction will experience a significant increase in traffic volumes due to the development of Area 8 and Area 9. It is recommended that this section of Hillier Road is upgraded to accommodate the increased volumes and to improve safety. COST OPINION Pre-Construction $30,000 Construction $170,000 Contingency 20% $50,000 Total $250, % of cost to be borne by developer due to increased volumes generated by Area 8 and Area JACK COOPER DRIVE / HILLIER ROAD / MURRAY HILLIER COURT The Jack Cooper Drive / Hillier Road junction is anticipated to be the junction most impacted by the proposed development. The majority of development-generated trips are anticipated to travel via this junction to Adelaide and Gawler. It is recommended that this junction is upgraded once work commences on the first of the development areas to accommodate the increase in traffic volumes and improve safety. It is recommended that the junction is upgraded to roundabout operation, with Murray Hillier Court rerouted to form a four-way intersection. This arrangementis recommended based on the following: The rerouting of Murray Hillier Court would reduce the number of junctions on Jack Cooper Drive, improving safety. The junction is anticipated to accommodate traffic from all development areas. A large number of right turn movements are anticipated between Jack Cooper Drive and Hillier Road, with the potential for queues and delays for right turning traffic. A roundabout would result in greater capacity and improved traffic operation and safety. COST OPINION Pre-Construction $120,000 Construction $680,000 Contingency 20% $200,000 Total $1,000,000 50% of cost to be borne by developer and 50% by others. Distribution is based on the projected traffic volumes generated by Area 8 and Area 9 compared to the existing and anticipated future traffic volumes utilising Murray Hillier Court. 15 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 15 of 27

16 5.5 AREA 8 ACCESS ROAD / ANGLE VALE ROAD In order to reduce the impact of Area 8 on Hillier Road and to provide greater connectivity to the south, it is recommended to include a secondary access to the south, linking to Angle Vale Road. As this would function as a secondary access, with lower volumes than the Hillier Road access, a priority-controlled T-junction is recommended. In the future, following the upgrade and realignment of the Angle Vale Road / Coventry Road junction, this junction will be upgraded to a four-arm roundabout. It will be necessary to maintain sufficient vacant area within Area 8 to allow for the future roundabout upgrade. COST OPINION Pre-Construction $40,000 Construction $200,000 Contingency 20% $60,000 Total $300, % of cost to be borne by developer as access is required to service Area ANGLE VALE ROAD / JACK COOPER DRIVE A significant proportion of traffic from development areas with access roads on Angle Vale Road are anticipated to travel via the Angle Vale Road / Jack Cooper Drive junction. Additionally, a number of trips generated by the neighbourhood centre would travel via this junction. Upgrade to a roundabout is recommended to improve traffic operation at the junction. The existing alignment means that Angle Vale Road east is a major arm, despite being a small trip generator. Vehicles approaching on Jack Cooper Drive, a major trip generator, are consequently required to give way. A roundabout would improve traffic flow at the junction. COST OPINION Pre-Construction $140,000 Construction $820,000 Contingency 20% $240,000 Total $1,200,000 Upgrade subject to approval from DPTI. 5.7 ANGLE VALE ROAD / COVENTRY ROAD The anticipated increase in traffic volumes on Angle Vale Road, may lead to increased queuing and delays at the Angle Vale Road / Coventry Road junction for vehicles approaching on Coventry Road and right turning vehicles on Angle Vale Road. Upgrade to a roundabout would improve traffic operation at the junction, improving capacity and safety. It is recommended that the junction is realigned to the west, to provide greater separation to the Angle Vale Road / Jack Cooper Drive junction and to improve observation angles for traffic approaching on Coventry Road. The new roundabout would link to the Area 8 access, with the proposed T-junction upgraded to connect to the roundabout. As discussed above, it will be necessary to maintain sufficient vacant area within Area 8 to allow for the future roundabout upgrade. 16 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 16 of 27

17 COST OPINION Pre-Construction $140,000 Construction $820,000 Contingency 20% $240,000 Total $1,200, % of cost to be borne by others. 5.8 ANGLE VALE ROAD / NEW DISTRIBUTOR ROAD Should development of the new distributor road proceed, it is recommended that a roundabout is installed at the new junction with Angle Vale Road. As all approaches are anticipated to accommodate high traffic volumes, a roundabout would offer superior operation and safety to a priority-controlled T-junction. COST OPINION Pre-Construction $140,000 Construction $820,000 Contingency 20% $240,000 Total $1,200, % of cost to be borne by others. 5.9 CLIFFORD ROAD / AREA 9 EMERGENCY ACCESS It is noted that the existinghillier Park Residential Village access has been designed to encourage low speeds. It is recommended that an assessment is undertaken on the existing access to determine whether the arrangement is sufficient to accommodate the expanded retirement living development. If it is determined that the existing access does not have sufficient capacity to accommodate the additional trips, it is recommended that an emergency egress-only link is provided to Clifford Road PEDESTRIAN AND CYCLIST INFRASTRUCTURE As discussed previously, there is minimal existing pedestrian or cyclist infrastructure within the study area. It is recommended that a shared path network is constructed, linking key developments such as the school and neighbourhood centre to public transport services and large residential developments. 17 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 17 of 27

18 6 SUMMARY AND CONCLUSIONS Within the nominated study area in Evanston Gardens, up to 10 existing undeveloped areas may potentially be developed. Residential development is anticipated to account for the majority of land uses, with commercial and recreational land uses also possible. The new developments will result in additional trip generation, with the total generation for all development areas anticipated to be in the region of 10,000 trips per day and 1,000 trips during the weekday peak hours. The additional traffic generation will place increased demand on junctions withinthe study area. A number of upgrades are recommended to accommodate anticipated demand. Some upgrades are recommended for immediate implementation, while others are suitable for development in the future as more development areas are constructed. Junctions recommended for upgrade are: IMMEDIATE UPGRADE Hillier Road / Hillier Park Residential Village / Area 8 Access Road Roundabout operation Hillier Road between Area 8 Access and Jack Cooper Drive Midblock upgrade Jack Cooper Drive / Hillier Road / Murray Hillier Court Roundabout operation Area 8 Access Road / Angle Vale Road Priority-controlled T-junction FUTURE UPGRADE Angle Vale Road / Jack Cooper Drive Roundabout operation Angle Vale Road / Coventry Road Roundabout operation Angle Vale Road / New Distributor Road Roundabout operation Clifford Road / Area 9 Emergency Access (subject to assessment) It is considered that the future development areas can be satisfactorily accommodated subject to the upgrade of the above junctions. It is recommended that a shared path network is implemented to improve pedestrian and cyclist amenity and improve connectivity to the local public transport network. 18 WALLBRIDGE & GILBERTEvanston Gardens Transport Infrastructure Review WAD / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 18 of 27

19 APPENDIX A ASSESSED DEVELOPMENT AREAS PANALATINGA ROAD, SA WALLBRIDGE & GILBERT 20 WALLBRIDGE & GILBERTAldi Southgate Plaza rp001 - Rev B - Traffic Assessment / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 19 of 27

20 Area 9 Area 10 Area 11 Area 12 Area 6 Area 8 Area 3 Area 2 Area 1 Area 5 K:\JOBS\2015\ \ Evanston Gardens DPA Review Gawler Council\07 Photos\Imagery\WAD SK01.dwg, A, 2/10/2015 9:58 AM, dkretschmer 0 Area 7 Area 4 LEGEND: Proposed Development Plan Amendment Area Evanston Gardens Primary School Karbeethan Reserve Proposed Karbeethan Reserve Extension Proposed Neighbourhood Centre Infill Development Study Area REV. DATE DESCRIPTION DRAFT ENG. CHKD EVANSTONE GARDENS DPA STRUCTURE PLAN C When sheet printed full size, the scale bar is 100mm. 50 INFRASTRUCTURE & ENVIRONMENTAL SERVICES DRAWING NUMBER A0 100mm Page 20 of 27 Job Number Sheet No. ATTACHMENTS UNDER SEPARATE COVER - PART WAD SK018 DSK DSK Design Drawn Rev.

21 APPENDIX B ANTICIPATED TRAFFIC GENERATION T2T WALLBRIDGE & GILBERT 21 WALLBRIDGE & GILBERTAldi Southgate Plaza rp001 - Rev B - Traffic Assessment / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 21 of 27

22 NOT FOR CONSTRUCTION I:\2015\ \ Evanston Gardens DPA Review Gawler Council\WAD SK02.dwg, C, 16/3/ :12 AM, rfry 0 When sheet printed full size, the scale bar is 100mm mm INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 22 of 27

23 APPENDIX C RECOMMENDED INFRASTRUCTURE UPGRADES GLENELG TRAM OVERPASS, SA WALLBRIDGE & GILBERT 22 WALLBRIDGE & GILBERTAldi Southgate Plaza rp001 - Rev B - Traffic Assessment / Rev B INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 23 of 27

24 NOT FOR CONSTRUCTION I:\2015\ \ Evanston Gardens DPA Review Gawler Council\WAD SK03.dwg, D, 16/3/ :04 AM, rfry 0 When sheet printed full size, the scale bar is 100mm mm INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 24 of 27

25 KATE VUGTS Civil Engineer Telephone: ADELAIDE 60 Wyatt Street Adelaide SA 5000 Telephone: (W&G) Telephone: (Aztec) Facsimile: DARWIN Suite 7,9 Keith Lane Fannie Bay NT 0820 Telephone: (08) Facsimile: (08) TECHNICAL EXCELLENCE INNOVATION PROFESSIONALISM MELBOURNE 20 Market Street Southbank VIC 3006 Telephone: (W&G) Telephone: (Aztec) Facsimile: PERTH 634 Murray Street West Perth, WA 6005 Telephone: (08) WHYALLA Level 1,15 Darling Terrace Whyalla SA 5600 Telephone: Facsimile: WALLBRIDGE & GILBERT INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 25 of 27 AZTEC ANALYSIS ATTACHMENTS UNDER SEPARATE COVER - PART 8

26 URPS Evanston Gardens Developer Funded DPA 1 Attachment 5 Item Description Infrastructure Contribution Indicative Cost Road, Transport and Pedestrian Infrastructure Developer Council DPTI Infrastructure 1 Construction of new roundabout at Hillier Road to facilitate access to Area 8 and Area 9 including but not limited to all design, civil, infrastructure and landscape works 100% 0% N/A $600,000 2 Road reconstruction and upgrade of Hillier Road to minor collector standard for width of developers land as defined by Area 8 including but not limited design, civil, infrastructure and landscape works. 3 Undergrounding of the existing overhead power lines that run along the northern side of Hillier Road only for the extent of developers land as defined by Area 8, including all reinstatement. 4 Construction of new roundabout at Jack Cooper Drive including but not limited to all design, civil, infrastructure and landscape works. 5 Realignment and road construction of Murray Hillier Court to form new Jack Cooper Drive roundabout. Murray Hiller Court to be upgraded to minor collector standard including but not limited to all design, civil, infrastructure and landscape works. 6 Demolition of two existing bus stops on Jack Cooper Drive and construction of two new bus stops on Jack Cooper Drive based on new roundabout layout including but not limited to all design, civil, infrastructure and landscape works. 7 Construction of pedestrian footbridge over the Clifford Rd drain for pedestrian access to relocated bus stops from Area 9 including but not limited to all design, civil, infrastructure and landscape works. 8 Construction of a priority controlled T-intersection between Angle Vale Rd and Area 8 including but not limited to all design, civil, infrastructure and landscape works. Land to be provided by developers for future road widening purposes at this T-intersection for long term roundabout layout. 9 Financial Contribution to future roundabout at the intersection of Jack Cooper Drive and Angle Vale Road. A portion of the developers land may also need to be set aside to facilitate the final road alignments and layout of this roundabout. 10 Construction of 3m wide asphalt Shared Paths to facilitate linkages to surrounding communities including but not limited to all design, civil, infrastructure and landscape works. These Shared Paths are to be provided in accordance with the developer funded locations 100% 0% N/A $250, % 0% N/A $1,400,000 TBC 0% TBC $1,000,000 TBC 0% TBC $60,000 TBC 0% TBC $20,000 TBC 0% TBC $60,000 TBC 0% TBC $300,000 TBC 0% TBC $1,200, % 0% N/A $110,000 INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 26 of 27

27 URPS Evanston Gardens Developer Funded DPA 2 specified on the Wallbridge and Gilbert drawing WAD SK03-C. 11 Construction of all Pram ramps and pedestrian refuges associated with the construction of all 3m wide Shared Use Paths to provide linkages to surrounding community facilities and areas. 100% 0% N/A $60,000 SUB TOTAL $5,060,000 Stormwater Drainage and Water Harvesting Infrastructure Developer Council DPTI 12 Construction of Clifford Road underground reinforced concrete drainage pipe from stormwater basin in Area 9 to Gawler River including but not limited to all design, civil, infrastructure and landscape works. 75% 25% N/A $90, Underground drainage pipe from Area 8 to existing Angle Vale Road underground drainage pipe including but not limited to all design, civil, infrastructure and landscape works. 14 Construction of underground reinforced concrete drainage pipe along Hillier Road to replace the existing open channel for full length of road reconstruction on Hillier Rd. 15 Construction of underground pressure main pipe reticulation for the extent of the developers land as defined along Angle Vale Rd from the boundary of Area 7 to pumping infrastructure in Item 17 including but not limited to all design, civil, infrastructure and landscape works. 100% 0% N/A $15, % 0% N/A $80, % 0% N/A $30,000 SUB TOTAL $215,000 TOTAL $5,275,000 Notes 1. Areas 7, 8 and 9 are defined in the Evanston Gardens Development Plan Amendment Review (Wallbridge & Gilbert, 2016) 2. N/A Not Applicable, TBC To Be Confirmed 3. Works internal to the development sites will be undertaken by the developer and assessed by Council under the development application process. Only works external to the site will form part of a future Infrastructure Agreement. INFRASTRUCTURE & ENVIRONMENTAL SERVICES Page 27 of 27

RE: AMENDMENT C375 GEELONG PLANNING SCHEME 1900 BARWON HEADS ROAD, BARWON HEADS

RE: AMENDMENT C375 GEELONG PLANNING SCHEME 1900 BARWON HEADS ROAD, BARWON HEADS Reference: #V157080 14 August 2018 Barwon Heads Lifestyle Group Pty Ltd C/- Best Hooper Lawyers Level 9, 451 Little Bourke Street MELBOURNE VIC 3000 Attention: Mr. Edward Mahony (Lawyer) Dear Edward RE:

More information

OP Council Resolution June 16, Planning and Development Services

OP Council Resolution June 16, Planning and Development Services OP-08-01 Council Resolution June 16, 2008 Planning and Development Services Kingsgate Landing Outline Plan Table of Contents 1.0 Introduction 1 1.1 Purpose of Plan 1 1.2 Plan Area Location 1 1.3 Ownership

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department City of Grande Prairie Development Services Department ROYAL OAKS NORTH OUTLINE PLAN OP-07-03 NW 35-71-6 W6M May 7, 2007 Royal Oaks North Outline Plan TABLE OF CONTENTS 1.0 INTRODUCTION........ 3 1.1 Purpose

More information

Proposed Amendment to the

Proposed Amendment to the Proposed Amendment to the Carrigaline Electoral Area Local Area Plan Amendment No 1: Carrigaline (T-02, O-02 & U-02) August 2012 Proposed Amendment to the Carriagline Electoral Area Local Area Plan 2011

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

Executive Summary. NY 7 / NY 2 Corridor

Executive Summary. NY 7 / NY 2 Corridor Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions

More information

I609. Penihana North Precinct

I609. Penihana North Precinct I609. Penihana North Precinct I609.1. Precinct description The Penihana North Precinct is located south of the Swanson Railway Station, adjacent to the Rural Urban Boundary (RUB) and Waitakere Ranges Heritage

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON Report to: From: Chair & Members of the Administration & Planning Standing Committee W.F. Mann, Director of Planning and Development Date: April 16, 2012 PD 022-12 (Z19/11) Subject: Technical Report Proposed

More information

1. Welcome. Background

1. Welcome. Background 1. Welcome The purpose of this exhibition is to provide you with an update on progress on the Kilnwood Vale Scheme. In order to improve the scheme and deliver key facilities earlier in the development,

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED 9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

Subdivision Design Criteria. Penihana North GUIDELINES TO THE RULES

Subdivision Design Criteria. Penihana North GUIDELINES TO THE RULES Created September 2013 Penihana North Subdivision Design Criteria GUIDELINES TO THE RULES This part of the Plan sets out the design criteria for subdivision in Penihana North. The criteria will be considered

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

6 Growth Management Challenges and Opportunities

6 Growth Management Challenges and Opportunities 6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s

More information

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

TOWN OF WHITBY REPORT RECOMMENDATION REPORT TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Council REPORT NO: PL 95-09 DATE OF MEETING: October 13, 2009 PREPARED BY: Planning/Public Works Joint Report FILE NO(S): N/A LOCATION: N/A REPORT

More information

Amendment C147 Melton Planning Scheme Expert Evidence Statement Traffic & Transport , Taylors Road, Plumpton

Amendment C147 Melton Planning Scheme Expert Evidence Statement Traffic & Transport , Taylors Road, Plumpton 905 959, 961 1025 Taylors Road, Plumpton 16520REP001B-F 22 November 2016 onemilegrid.com.au 1/59 Keele Street, Collingwood, VIC 3066 (03) 9939 8250 onemilegrid ABN: 79 168 115 679 (03) 9939 8250 1/59 Keele

More information

AGINCOURT SECONDARY PLAN

AGINCOURT SECONDARY PLAN 1 AGINCOURT SECONDARY PLAN 1. AGINCOURT SECONDARY PLAN The following policies and principles apply to the area herein referred to as Agincourt, as outlined on Map 1-1. 1. GENERAL POLICIES 1.1 This Secondary

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

1071 King Street West Zoning Amendment Application - Preliminary Report

1071 King Street West Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1071 King Street West Zoning Amendment Application - Preliminary Report Date: August 9, 2012 To: From: Wards: Reference Number: Toronto and East York Community Council Director,

More information

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Proposed Land Use: Total Site Area (Ha): Housing 1.85 Ha Description: It is understood that the owner has no plans to dispose of the site

More information

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018 Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road

More information

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement (blank page) WestConnex New M5 5-42 (blank page) WestConnex New M5 5-44 5.5 Tunnels 5.5.1 Main alignment tunnels The main alignment tunnels would be about nine kilometres long, with the western tunnel

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Amendment C146 Melton Planning Scheme Expert Evidence Statement Traffic & Transport Beattys Road, Plumpton

Amendment C146 Melton Planning Scheme Expert Evidence Statement Traffic & Transport Beattys Road, Plumpton 235 311 Beattys Road, Plumpton 16585REP001C-F 21 November 2016 onemilegrid.com.au 1/59 Keele Street, Collingwood, VIC 3066 (03) 9939 8250 onemilegrid ABN: 79 168 115 679 (03) 9939 8250 1/59 Keele Street

More information

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT DATE: April 29, 2013 STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT 1100 Patricia Boulevard, Prince George, B.C., V2L 3V9 TO: FROM: SUBJECT: MAYOR AND COUNCIL JESSE DILL, PLANNER Development Variance

More information

Wingecarribee Shire Council

Wingecarribee Shire Council Connell Wagner Pty Ltd ABN 54 005 139 873 2 Palmer Street North Parramatta New South Wales 2151 Australia Telephone: +61 2 8896 4100 Facsimile: +61 2 9890 3558 Email: cwpar@conwag.com www.conwag.com Moss

More information

MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013

MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013 MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013 TABLE OF CONTENTS 1.0 ADMINISTRATION... 5 1.1 Preliminary... 5 1.2 Location and Description... 6 1.3 Zoning Map Description...

More information

SUBDIVISON & ZONING BY-LAW AMENDMENT

SUBDIVISON & ZONING BY-LAW AMENDMENT RICHMOND WEST SUBDIVISON & ZONING BY-LAW AMENDMENT FEBRUARY 2013 APPLICATION INFORMATION Applications: Proposed Plan of Subdivision and Zoning By Law Amendment. Site Address: 6335 and 6350 Perth Street.

More information

Local Growth Planning in North Central Green Line Communities

Local Growth Planning in North Central Green Line Communities 2018 April 30 Page 1 of 6 EXECUTIVE SUMMARY This report outlines a high-level scope for local growth planning for north central Green Line communities. The catalyst for this review is the significant investments

More information

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London Chapter 7 Route window W20 Dover Road and Leigh Road bridges Transport for London ROUTE WINDOW W20 7 Route window W20 Dover Road and Leigh Road bridges Transport for London 7.6 7.7 7.8 Baseline conditions

More information

38 Queen s University Campus Master Plan Part 1

38 Queen s University Campus Master Plan Part 1 38 Queen s University Campus Master Plan Part 1 46 The Campus at the City Scale Chapter 4 The Campus at the City Scale 39 Queen s is an urban University centrally located in Kingston. Decisions made by

More information

4 RESIDENTIAL ZONE. 4.1 Background

4 RESIDENTIAL ZONE. 4.1 Background 4 RESIDENTIAL ZONE 4.1 Background The residential areas within the City are characterised by mainly lowrise dwellings sited on individual allotments. Past architectural styles, settlement patterns and

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained

More information

Chapter 9 Route window W18 Slough station. Transport for London

Chapter 9 Route window W18 Slough station. Transport for London Chapter 9 Route window W18 Slough station Transport SLOUGH STATION 9 Route window W18 Slough station 9.6 Wexham Road bridge worksite north; and Wexham Road bridge worksite south. Uxbridge Road bridge

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1296 Kennedy Road - Zoning Amendment Application - Preliminary Report Date: January 15, 2016 To: From: Wards: Reference Number: Scarborough Community Council Acting Director,

More information

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose UAA School of Engineering Parking Garage Master Plan Amendment 1. Purpose Since the UAA campus master plan was drafted in 2003, adopted in 2004, and amended in 2009 a number of significant changes regarding

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PAVEMENT DESIGN D2 DESIGN GUIDELINES CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES D2 ISSUE: NO:3 September 2014 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...

More information

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014 [PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue May 23, 2014 Contents 1.0 Introduction... 2 2.0 Site Context... 2 2.1 Adjacent Uses... 2 Figure 1: Site

More information

Northern Territory Compact Urban Growth Policy

Northern Territory Compact Urban Growth Policy Northern Territory Compact Urban Growth Policy A Reference Policy Document to clause 2.7 (Reference to Policy) of the NT Planning Scheme May 2015 Table of Contents 1 Policy Setting... 3 1.1 Context for

More information

HOROWHENUA DEVELOPMENT PLAN June create a safe crossing for children moving to and from the school and other areas. 7.8 Ohau

HOROWHENUA DEVELOPMENT PLAN June create a safe crossing for children moving to and from the school and other areas. 7.8 Ohau 7.8 Ohau create a safe crossing for children moving to and from the school and other areas. Ohau has a traditional village form with a collective of school, church and reserve at the main road intersection.

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

South Davis County COMMUNITY SPOTLIGHT

South Davis County COMMUNITY SPOTLIGHT South Davis County COMMUNITY SPOTLIGHT Davis/SLC Community Connector Bus Rapid Transit line connecting SLC & Davis County RTP Phase 1 Project Generate 3,100 average weekday riders Relieve congestion on

More information

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved. COMMITTEE OF THE WHOLE AUGUST 18, 2003 THORNHILL CENTRE STREET STUDY PLANNING FILE: 15.92 Recommendation The Commissioner of Planning recommends: THAT the attached Terms of Reference for the Thornhill

More information

Blandford Forum Town Council, Blandford St Mary Parish Council and Bryanston Parish Council

Blandford Forum Town Council, Blandford St Mary Parish Council and Bryanston Parish Council Blandford Forum Town Council, Blandford St Mary Parish Council and Bryanston Parish Council Blandford + Neighbourhood Plan 2 Pre-Submission Plan Consultation (November 2018) Representations submitted on

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

M E M O R A N D U M. Chair and Members of North West Planning Advisory Committee

M E M O R A N D U M. Chair and Members of North West Planning Advisory Committee Item 9.1.1 PO Box 1749 Halifax, Nova Scotia B3J 3A5 Canada M E M O R A N D U M TO: FROM: Chair and Members of North West Planning Advisory Committee Stephanie Salloum, Planner II DATE: June 26, 2017 SUBJECT:

More information

BEFORE THE AUCKLAND UNITARY PLAN INDEPENDENT HEARINGS PANEL STATEMENT OF EVIDENCE OF MARTIN PEAKE ON BEHALF OF AUCKLAND COUNCIL

BEFORE THE AUCKLAND UNITARY PLAN INDEPENDENT HEARINGS PANEL STATEMENT OF EVIDENCE OF MARTIN PEAKE ON BEHALF OF AUCKLAND COUNCIL BEFORE THE AUCKLAND UNITARY PLAN INDEPENDENT HEARINGS PANEL IN THE MATTER of the Resource Management Act 1991 and the Local Government (Auckland Transitional Provisions) Act 2010 AND IN THE MATTER of Topic

More information

Employment and Commercial Review Analysis of Policy Directions

Employment and Commercial Review Analysis of Policy Directions Employment and Commercial Review Analysis of Policy Directions Appendix A The following analysis is town staff s response to the policy directions provided by the consultants who prepared the Employment

More information

Issues Requiring Future Study

Issues Requiring Future Study Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS SCHEME EVOLUTION STARBUCKS The proposed Starbucks Drive Thru alongside the proposed food store provides an appropriate mix of uses, suitable for this location. The proposed store is bespoke, designed specifically

More information

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting Page 1 of Report PB-76-17 SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO TO: FROM: Planning and Development Committee - Public Meeting Planning and Building

More information

20 & 50 Ashtonbee Road, 1920 & 1940 Eglinton Avenue East, and 880, 890 & 900 Warden Avenue Zoning Amendment Application Final Report

20 & 50 Ashtonbee Road, 1920 & 1940 Eglinton Avenue East, and 880, 890 & 900 Warden Avenue Zoning Amendment Application Final Report STAFF REPORT ACTION REQUIRED 20 & 50 Ashtonbee Road, 1920 & 1940 Eglinton Avenue East, and 880, 890 & 900 Warden Avenue Zoning Amendment Application Final Report Date: August 16, 2012 To: From: Wards:

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

St. Clair Avenue West Area Transportation Master Plan

St. Clair Avenue West Area Transportation Master Plan 1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present

More information

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016 FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for

More information

CITY OF FREMANTLE LOCAL PLANNING SCHEME NO. 4 AMENDMENT NO. 68 SCHEME AMENDMENT REPORT

CITY OF FREMANTLE LOCAL PLANNING SCHEME NO. 4 AMENDMENT NO. 68 SCHEME AMENDMENT REPORT CITY OF FREMANTLE LOCAL PLANNING SCHEME NO. 4 AMENDMENT NO. 68 SCHEME AMENDMENT REPORT CITY OF FREMANTLE PLANNING AND DEVELOPMENT SERVICES 8 WILLIAM STREET FREMANTLE WA 6160 PLANNING AND DEVELOPMENT ACT

More information

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3 1 Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Study Process and Purpose of PIC 3 2 Study Commencement February 2016 Phase 1: Problem and Opportunity Identify problems and opportunities

More information

Appendix 3 Horningsea Greenway Review

Appendix 3 Horningsea Greenway Review Appendix 3 Horningsea Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Sharon Ebert, Director Community Development Date: April 10, 2017 Agenda: City Council Work Session April

More information

Shift Rapid Transit Public Participation Meeting May 3, 2017

Shift Rapid Transit Public Participation Meeting May 3, 2017 Shift Rapid Transit Public Participation Meeting May 3, 2017 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public

More information

Welcome to our public exhibition

Welcome to our public exhibition About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the

More information

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc.

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc. Commercial Development Proposal 2168 Tenth Line Road Report September 2015 Prepared for Minto Developments Inc. Paquette Planning Associates Ltd. 56 Hutchison Avenue Ottawa, Ontario K1Y 4A3 PH: 613-722-7217

More information

PHASE III: Reserved Matters Submission

PHASE III: Reserved Matters Submission Statement of Compliance with the outline approval for the proposed residential development of land at: BURGES LANE, WIVELISCOMBE PHASE III: Reserved Matters Submission Foreword Contents: This Statement

More information

Next Steps / Development Process. Structure Plan. June submitted to City of Fremantle. Structure Plan. July supported for advertising

Next Steps / Development Process. Structure Plan. June submitted to City of Fremantle. Structure Plan. July supported for advertising overview What is today about? In July 0, the City of Fremantle resolved that the be advertised for public comment. Today is about: Understanding the history and context of the site Having your say on the

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

This Review Is Divided Into Two Phases:

This Review Is Divided Into Two Phases: Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South

More information

Central and East Neighbourhoods - Hermitage Outline Plan

Central and East Neighbourhoods - Hermitage Outline Plan Central and East Neighbourhoods - Hermitage Outline Plan Office Consolidation September 2013 Prepared by: Planning and Policy Services Branch Planning and Development Department City of Edmonton The Central

More information

EAST VILLAGE STRATEGIC SITE NOVEMBER 2017

EAST VILLAGE STRATEGIC SITE NOVEMBER 2017 EAST VILLAGE STRATEGIC SITE NOVEMBER 2017 East Village will be a sustainable, mixeduse precinct with a focus on innovative employment and education opportunities. Enhanced by green spaces and places for

More information

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference Scarborough Subway Extension Final Terms of Reference 1 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from

More information

9 th Street Sub Area Plan

9 th Street Sub Area Plan 9 th Street Sub Area Plan In the 1990 s, when the Township prepared the last Master Plan, the 9 th Street corridor was studied as part of a larger 9 th Street Focus Area that included the West Main Street

More information

THE CITY OF WINNIPEG BY-LAW NO. 4/2013. A By-law of THE CITY OF WINNIPEG to adopt a Secondary Plan for the Waverley West Southwest Neighbourhood.

THE CITY OF WINNIPEG BY-LAW NO. 4/2013. A By-law of THE CITY OF WINNIPEG to adopt a Secondary Plan for the Waverley West Southwest Neighbourhood. THE CITY OF WINNIPEG BY-LAW NO. 4/2013 A By-law of THE CITY OF WINNIPEG to adopt a Secondary Plan for the Waverley West Southwest Neighbourhood. THE CITY OF WINNIPEG, in Council assembled, enacts as follows:

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Public Information Centre #1

Public Information Centre #1 and Highway 401 Interchange Improvements WELCOME Public Information Centre #1 Veterans Memorial Parkway Extension and Highway 401 Interchange Improvements Study May 23, 2012 4 p.m. to 7 p.m. Brief Overview

More information

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows:

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows: Appendix A Stakeholder presentation + powerpoint slides Planning Context and Emerging Proposals presentation Nick Tyrrell, Alder King, Planning Consultants Alder King began by setting the site context

More information

DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y

DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y Gateway Intra-District Business Inter-District 44 CELEBRATING THE RIVER: A PLAN FOR DOWNTOWN JACKSONVILLE The Transportation Network This

More information

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report STAFF REPORT ACTION REQUIRED 393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report Date: March 29, 2010 To: From: Wards: Reference

More information

Emery Village Road 2A Municipal Class Environmental Assessment Study

Emery Village Road 2A Municipal Class Environmental Assessment Study PW12.11 STAFF REPORT ACTION REQUIRED Emery Village Road 2A Municipal Class Environmental Assessment Study Date: March 30, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Bylaw C-1262 Adopted February 6, Planning and Development Department

Bylaw C-1262 Adopted February 6, Planning and Development Department Bylaw C-1262 Adopted February 6, 2012 Planning and Development Department CITY OF GRANDE PRAIRIE BYLAW C-1262 A Bylaw to adopt the Brookfield Neighbourhood Outline Plan THE MUNICIPAL COUNCIL OF THE CITY

More information

Lambeth Main Street Streetscape Improvements

Lambeth Main Street Streetscape Improvements Lambeth Main Street Streetscape Improvements Open House October 5th, 2017 Agenda 1. Introduction 2. Project Background 3. Context 4. Project Objectives 5. Design Principles & Approach 6. Streetscape Design

More information

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Background and Process Monroe Expressway will be open by the end of 2018 Union County and Indian Trail identified a need to revisit

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

Sustainable Development Call for Projects Western Infrastructure Project Submissions

Sustainable Development Call for Projects Western Infrastructure Project Submissions 2009-2010 Sustainable Development Call for Projects Western Infrastructure Project Submissions January 20, 2010 2009-2010 SDCFP Summary of Infrastructure Funding Infrastructure Projects Number of Projects

More information

Mill Woods Town Centre Proposed Rezoning LDA

Mill Woods Town Centre Proposed Rezoning LDA Mill Woods Town Centre Proposed Rezoning LDA15 0649 The City of Edmonton has received an application for rezoning and an amendment to the Mill Woods Station Area Redevelopment Plan (ARP) for the Mill Woods

More information

411 Victoria Park Redevelopment Community Consultation Meeting

411 Victoria Park Redevelopment Community Consultation Meeting Click to edit Master title style 411 Victoria Park Redevelopment Community Consultation Meeting Official Plan Amendment and Zoning By law Amendment May 13, 2013 Click Presentation to edit Master Outline

More information

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report Date: March 11, 2014 To: From: Wards: Reference Number:

More information

K. SMART ASSOCIATES LIMITED

K. SMART ASSOCIATES LIMITED Planning Justification Report Zoning By-Law Amendment 185 King Street North Waterloo, Ontario April 7th, 2017 Project Reference Number 16-245 K. SMART ASSOCIATES LIMITED CONSULTING ENGINEERS AND PLANNERS

More information

Planning Proposal Toronto Road, Booragul. Amendment to Lake Macquarie Local Environmental Plan (LMLEP) 2014

Planning Proposal Toronto Road, Booragul. Amendment to Lake Macquarie Local Environmental Plan (LMLEP) 2014 Planning Proposal Toronto Road, Booragul Amendment to Lake Macquarie Local Environmental Plan (LMLEP) 2014 Local Government Area: Name of Draft LEP: Subject Land: Land Owner: Applicant: Folder Number:

More information

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN OKEFORD FITZPAINE NEIGHBOURHOOD PLAN Dear Parishioner, The Neighbourhood Plan Project Team have prepared this leaflet to summarise the full Neighbourhood Plan document. It provides a summary of the Vision,

More information

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information