1 June 26, :30am 11:30am There are three primary items for the focus today: 1. Are there any specific plans for your organization that we need to be aware of? 2. Are there any specific issues or concerns that we can address? 3. Where do the opportunities exist in this area of focus? Attendees Craig Hebebrand ODOT District John Motl ODOT District Mark Alan Carpenter ODOT District Natalie Conley ODOT District Jay Schach Hilton Garden Inn Bill Beckenbach Quadrangle, Inc Scott Carpenter Fire Museum Jim Folk Cleveland Indians Thomas Starinsky Historic Gateway Peter MacEwan Tri-C Skip Smallridge CSS Jeff Broadwater Baker Amilyn Cedergreen Baker Doug Blank Baker Meeting Discussion Jay Schach (Hilton Garden Inn) confirmed that the East 9 th Street entrance to the hotel and conference center is ingress only. Jim Folk mentioned that the Cleveland Indians have no future plans for expansion, but their concerns revolve primarily around maintaining all access points. He also wanted to emphasize access during construction. Scott Carpenter (Fire Museum) will be hoping to use the parking lot under the main viaduct for special event parking in the next year or so. 1

2 Jim Folk - The lot is owned by Norfolk Southern and is leased to Gateway. Fencing has been installed to permit parking of vehicles. The dirt/gravel area to the south may be used for parking, but can also accommodate storage of circus vehicles and other large items for future events in the Gateway area. A general assumption has been that the soil under this parking lot is so contaminated that selling the parcel to a developer would be unlikely. Scott Carpenter - The Fire Museum has developed a plan integrating one potential parking option with some potential streetscape improvements in the Fire Station region (Figure 1). The Fire Museum is proposing the integrating the Central Viaduct Historic Way with the Fire Memorial Park. The Fire Museum generally plans events around Indians games and other major events. The Museum generally notifies Gateway and generally has no issues with using portions of the lot. The museum would like to see the area greened-up to minimize the concrete, and uncover the trolley tracks to some degree, as well. Figure 1: Proposed layout plan for Fire Museum/fire Station (Provided by Scott Carpenter) Scott Carpenter the Fire Museum access will be right in/right out and prefers to think of this access as more of a driveway rather than a road. The museum would prefer that access be provided from downtown, as well. Jim Folk - Cleveland Indians would be agreeable to vehicular access to their lot along the old East 9 th Street alignment. The plan will need to be sure to identify the route to get to the parking lots. 2

3 Doug Blank - Pedestrian access would be maintained along the existing Commercial Road alignment. An option for continuing to allow left turns from downtown into the parking. Before the next meeting, Baker will develop potential access options to the major portion of the lot to be used for Gateway employees. Currently there are bike lanes on the Lorain-Carnegie bridge, but they are not striped elsewhere. Further coordination will be done. Jim Folk - clarified that the Fire Museum has no formal rights to this lot. Jeff Broadwater - Baker needs to investigate the R/W disposition of the East 9 th Street bridge of the RTA. Three points will be examined: (1) Access from Carnegie side of Commercial, (2) Access from new Commercial cul-de-sac, (3) Access from New Commercial/Broadway intersection. Tom Starinsky - requests that some sort of pedestrian access be provided with the target location the northeast corner of Carnegie and Ontario (Progressive Field). Baker needs to investigate ownership of the parcel on the Ontario hillside. Tom Starinsky suggests that Marty Cader should be added to the subcommittee. Tom S. / S. Carpenter - Safety under the two bridges is a concern. Lighting should be a strong consideration. This group should look into the preferred pedestrian paths and options to make the Ontario/Carnegie intersection more pedestrian friendly. Doug Blank- A pedestrian refuge island could be considered between the two N/S movements. Tom Starinsky also brought up the possibility of enhancement improvements at East 9 th St. Peter MacEwan - Tri-C mentioned that a noise analysis has been done in the past and wanted to know the results on impacts to the administration building. Craig Hebebrand - ODOT responded that the noise nor the vibration is an issue to Tri-C per ODOT standards. Peter MacEwan- Tri-C requested that the retaining wall near their property be given aesthetic considerations. Tri-C is considering building a parking deck to replace the parking they are losing in order to maintain greenspace and avoid challenges associated with grade differences. Tri-C asked if the Retaining wall could potentially be used for the foundation of the parking structure. Tri-C has Robert M. and Greg Peckham on their Art Council who could potentially help on the enhancements. 3

4 ODOT would probably not permit shared use of the retaining wall to support the parking structure due to R/W issues. ODOT would usually have the R/W to access/inspect the wall. Tom Starinsky - The lanterns as used on Huron behind Tower City could be considered for use along the Carnegie corridor. There are old lanterns that used to be on the Lorain-Carnegie bridge that could be brought back. Jay Schach - The Hilton Garden Inn had lighting improvements made during construction. Craig Hebebrand - Opportunities exist for enhancements between the Lorain Carnegie bridge and East 9 th Street along Carnegie, but no further east than East 9 th. Skip Smallridge - The improvements made in this corridor are key in that they could set the tone for future improvements. Unification is important to consider, moving forward. Discussion occurred regarding walled fill versus structure in the downtown areas. The preference of this group is that the parking area should be left open, and close as many other areas as possible with filled walls. This would help from the safety perspective. Land use and support locations will be limited by R/W ownership. If there are any areas that need to be prohibited from pier placement, it must be stated up front. Craig Hebebrand - Design build firm will be under contract by the end of Temporary right of way necessary for construction will be provided for the D/B contractor. Jay Schach - Webster Street behind the Hilton Garden Inn has been vacated. Concern exists regarding the large brick sewer along the Webster alignment. A cave-in of this sewer occurred previously. This is a concern moving forward. There was a collective interest to treat this as an area, tie-ing these area together through lighting and pedestrian experience. It was suggested to look at using the East 14 th St. bridge to be the entrance to Gateway as a boulevard idea. There should be a cohesive nature with all of these areas at this Gateway end. Action items: Baker will develop potential access options to the major portion of the lot to be used for Gateway employees. o Access from Carnegie side of Commercial o Access from new Commercial cul-de-sac o Access from New Commercial/Broadway intersection Baker /CSS to determine parking lot layout for Fire Museum/Station and Progressive Field Baker/CSS to create elevations to see vertical clearance in/around Fire Museum/Station 4

5 Baker to talk to Dan Dougherty about o NS yard and lease with Gateway o Old E. 9 th Bridge over GCRTA (ownership) Baker to get John Binns preliminary lighting plans for Skip ODOT to add Marty Cader to Subcommittee for Bike/Ped input ODOT to check with B&N to determine if sidewalks are provided on E. 9 th and Ontario under mainline. Next Meeting The next Gateway Focus meeting will be Friday July 24 at 9:30 at Progressive Field. 5

Urban Design & Global Aesthetics in Bridge Type Selection Workshop & Bridge Tour Meeting Minutes

Urban Design & Global Aesthetics in Bridge Type Selection Workshop & Bridge Tour Meeting Minutes CLEVELAND INNERBELT CONSTRUCTION CONTRACT GROUP 1 CUY-90-14.92, PID No. 77332 Meeting Minutes Project: Central Viaduct Date: June 28, 2006 Subject: Innerbelt Bridge Subcommittee Time: 8:00am - 4:00pm By:

More information

Innerbelt Bridge Subcommittee Meeting 3 - Meeting Minutes

Innerbelt Bridge Subcommittee Meeting 3 - Meeting Minutes CLEVELAND INNERBELT CONSTRUCTION CONTRACT GROUP 1 CUY-90-14.92, PID No. 77332 3 - Meeting Minutes Project: Central Viaduct Date: Subject: Innerbelt Bridge Subcommittee Time: 9:00am - 11:00am By: AMC/DJB/DAB

More information

Innerbelt Bridge Subcommittee Meeting 5 - Meeting Minutes

Innerbelt Bridge Subcommittee Meeting 5 - Meeting Minutes CLEVELAND INNERBELT CONSTRUCTION CONTRACT GROUP 1 CUY-90-14.92, PID No. 77332 5 - Meeting Minutes Project: Central Viaduct Date: Subject: Innerbelt Bridge Subcommittee Time: 9:00am - 12:00pm By: DJB Place:

More information

INNERBELT BRIDGE PUBLIC MEETING #2

INNERBELT BRIDGE PUBLIC MEETING #2 Welcome to the INNERBELT BRIDGE PUBLIC MEETING #2 Today s Discussion Welcome and Introductions (Bob Brown, City of Cleveland) Innerbelt Project Status (Craig Hebebrand, ODOT) Bridge Type Selection Update

More information

Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009

Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009 Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009 Process for Aesthetics Subcommittee June 25, 2009 Kick off Meeting June 26, 2009 Gateway and Tremont Focus Groups

More information

Cleveland Innerbelt Bridge / Central Viaduct Cleveland City Planning Commission October 2, 2009

Cleveland Innerbelt Bridge / Central Viaduct Cleveland City Planning Commission October 2, 2009 Cleveland Innerbelt Bridge / Central Viaduct Cleveland City Planning Commission October 2, 2009 New Westbound Bridge Schedule December 1, 2009 Contract Documents/Plan Package March 1, 2010 Request for

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

I-70/71 Innerbelt Project

I-70/71 Innerbelt Project I-70/71 Innerbelt Project Project Progress Meeting and Design Enhancement Update November 9, 2009 Ohio Department of Transportation MS Consultants MSI Design Overview of Presentation 1. Recap Recent Project

More information

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan Department of Community Planning & Economic Development 50 South 4th Street, Room 300 Minneapolis, MN 5545-385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,

More information

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment Urban Design Brief Proposed Official Plan & Zoning By-Law Amendment 3244, 3263 and 3274 Wonderland Road South Southside Group December 23, 2015 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND

More information

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1] nhancements [1] STATUS OF PROJECT: The project has recently moved from the Preliminary Design Phase to the Final Design Phase following the most recent Public Involvement Meeting held on January 9, 2019

More information

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities A. Background 1 A Main Street Master Plan Study was performed and completed in October of 2007. The study was initiated to review current land uses and development patterns along Main Street, from Parrish

More information

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

4. INDUSTRIAL 53 CASTLE ROCK DESIGN 4. INDUSTRIAL 53 CASTLE ROCK DESIGN CASTLE ROCK DESIGN 54 4. INDUSTRIAL Overview Well-designed and attractive industrial centers are the product of blending economic realities with both functional and

More information

Goals for Tonight s Meeting

Goals for Tonight s Meeting South Anthony Boulevard Railroad Grade Separation Study Report to Community November 30, 2011 Andorfer Commons Theatre Indiana Tech University Goals for Tonight s Meeting Recap of the meeting from last

More information

COMMUNITY PARTNERING TEAM

COMMUNITY PARTNERING TEAM ROUTE 18 TRANSPORTATION IMPROVEMENTS COMMUNITY PARTNERING TEAM CITY OF NEW BRUNSWICK Meeting Date: August 28, 2002 9 AM-Noon CORRIDOR AESTHETICS GROUP MEETING NO. 7 REPORT Location: Middlesex Cty. Planning

More information

TRANSPORTATION COMMITTEE

TRANSPORTATION COMMITTEE TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island

More information

MINUTES FROM THE SEVENTH MEETING OF THE MAIN STREET MARKHAM COMMITTEE IN City of Markham Canada Room - Civic Centre. September 17, 2014

MINUTES FROM THE SEVENTH MEETING OF THE MAIN STREET MARKHAM COMMITTEE IN City of Markham Canada Room - Civic Centre. September 17, 2014 MINUTES FROM THE SEVENTH MEETING OF THE MAIN STREET MARKHAM COMMITTEE IN 2014 City of Markham Canada Room - Civic Centre Members Councillor Campbell Councillor Moretti Phil Howes Jonathon Mingay Dianne

More information

9IMPLEMENTATION AND PHASING

9IMPLEMENTATION AND PHASING 9IMPLEMENTATION AND PHASING Purpose A key objective of the Railyard Master Plan is the integration of the public and private realm to provide a network of places that connect to and complement Commercial

More information

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor CHAPTER 5 Figure 5.23 The Road Corridor Road will develop as a mixed-use corridor, emphasizing regional retail, west of the river and mixed-use development east of the river. KEY RECOMMENDATIONS 1. High

More information

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project OHIO DEPARTMENT OF TRANSPORTATION DISTRICT 6 400 EAST WILLIAM STREET DELAWARE, OHIO 43015 800.372.7714 Columbus City Council City Hall 90 West Broad Street Columbus, OH 43215-9015 RE: I-70/71 Columbus

More information

Gas Stations ottawa.ca

Gas Stations ottawa.ca Urban Design Guidelines for Gas Stations ottawa.ca Ce document est disponible en français sur ottawa.ca. This document is available in French on ottawa.ca. Approved by City Council May 24, 2006 City of

More information

Victoria Bridge Municipal Class EA Civic Works Committee

Victoria Bridge Municipal Class EA Civic Works Committee Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction

More information

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006 Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and

More information

Century Highfield Sub Area Plan

Century Highfield Sub Area Plan Century Highfield Sub Area Plan The Century Highfield Sub Area Plan provides an opportunity to re evaluate the vision that was set forth for this area when the Township conducted a similar planning exercise

More information

Public Meeting & Workshop 1 April 26,2016

Public Meeting & Workshop 1 April 26,2016 Public Meeting & Workshop 1 April 26,2016 Northeast Ohio Areawide Coordinating Agency City of Cleveland ODOT Bike Cleveland Downtown Cleveland Alliance Ohio City Incorporated Warehouse District Agenda

More information

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies Vision, Objectives & Strategies The is the public framework and guide for future development of the Grand Traverse Commons. The establishes public polices for infrastructure, the preservation of natural

More information

City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21,

City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21, City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21, 2016 2016 2017 Activity Date March April May June July August September October November December

More information

Community Design Plan

Community Design Plan Gardena General Plan 2006 Authority While the is not a required element of a General Plan, it is included because improving the community appearance and image is paramount to the overall quality of life

More information

section five BEAUTIFICATION PLAN

section five BEAUTIFICATION PLAN section five BEAUTIFICATION PLAN BEAUTIFICATION PLAN Section Five Beautification Plan The goal of the Beautification Plan is to improve the Route 8-Sunnyland Corridor in terms of aesthetics and to create

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

URBAN DESIGN BRIEF REPORT

URBAN DESIGN BRIEF REPORT URBAN DESIGN BRIEF REPORT PREPARED FOR 2568401 ONTARIO INC NEW GASBAR, CONVENIENCE STORE & CARWASH DEVELOPMENT @ 1509 FANSHAWE PARK ROAD WEST LONDON, ONTARIO GAMA ENGINEERING INC. PROJECT NUMBER 1669 PREPARED

More information

East Corridor Final Environmental Impact Statement

East Corridor Final Environmental Impact Statement East Corridor Final Environmental Impact Statement Alternatives Considered Operating Plan The requirements for opening day operations versus year 2030 are based on ridership and operations. Opening day

More information

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208) MEMORANDUM Archuleta County Development Services Planning Department 1122 HWY 84 P. O. Box 1507 Pagosa Springs, Colorado 81147 970-264-1390 Fax 970-264-3338 TO: Archuleta County Planning Commission FROM:

More information

Carlsbad Village Redevelopment Concept Summary of Features

Carlsbad Village Redevelopment Concept Summary of Features Carlsbad Village Redevelopment Concept Summary of Features Calthorpe Associates November 5, 2003 The Redevelopment Concept illustrates a vision for the future of Carlsbad Village. The overall vision of

More information

Design Guidelines and Development Standards for Southwood Ranch. Prepared February, 2016 by

Design Guidelines and Development Standards for Southwood Ranch. Prepared February, 2016 by Design Guidelines and Development Standards for Southwood Ranch D e s i g n D i s t r i c t Prepared February, 2016 by Table of Contents Introduction 2 District Overlay Map. 3 Development Standards. 4

More information

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the

More information

EXHIBIT A. Chapter 2.7 SPECIAL PLANNED DISTRICTS. Article XVIII 15th Street School Master Planned Development

EXHIBIT A. Chapter 2.7 SPECIAL PLANNED DISTRICTS. Article XVIII 15th Street School Master Planned Development EXHIBIT A Chapter 2.7 SPECIAL PLANNED DISTRICTS Article XVIII 15th Street School Master Planned Development Sections: 2.7.3600 15 th Street School Master Planned Development 2.7.3610 Purpose 2.7.3620 Definitions

More information

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018 January 25, 2018 The Rome Waterfront Village project is intended to foster the revitalization of the area between South James Street and Erie Boulevard north of the Erie Canal as well as improve public

More information

A. INTRODUCTION B. PROJECT LOCATION

A. INTRODUCTION B. PROJECT LOCATION Chapter 1: Project Description A. INTRODUCTION The Lower Manhattan Development Corporation (LMDC), a subsidiary of the New York State Urban Development Corporation, doing business as the Empire State Development

More information

Design and Sustainability for Winter Operations

Design and Sustainability for Winter Operations Design and Sustainability for Rational: For Operations staff to be more involved in the Design of our road infrastructure. What gets designed and built by others, Becomes our maintenance legacy The Regional

More information

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling Proposed for Vic West Neighbourhood Plan Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling Design Guidelines for Intensive Residential Development - Townhouse and

More information

Appendix A COMMUNITY IMPROVEMENT PLAN DESIGN GUIDELINES

Appendix A COMMUNITY IMPROVEMENT PLAN DESIGN GUIDELINES Appendix A COMMUNITY IMPROVEMENT PLAN DESIGN GUIDELINES INTRODUCTION The continuous and desirable improvement of Arnprior requires a clear understanding of what is envisioned for the Town. These Design

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

5.2 LAND USE AND ZONING

5.2 LAND USE AND ZONING 5.2 LAND USE AND ZONING This section describes the land use and zoning of the project site and surrounding area, followed by an analysis of the potential for incompatibility or adverse impact on prevailing

More information

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session Chain Bridge Road Sidewalk Improvements Citizen Council Work Session May 10, 2016 Project Location 2 Project Objectives Provide a continuous pedestrian facility (sidewalk) connection from Downtown City

More information

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B

More information

THE NEIGHBORHOOD TODAY

THE NEIGHBORHOOD TODAY THE NEIGHBORHOOD TODAY CORE AREA VISION How are we Good Urbanism A Site s DNA thinking about Elements of great Unique elements urban communities embedded in a place the site and design? ELEMENTS LIKE:

More information

5.4.6 Cumulative Operational Impacts

5.4.6 Cumulative Operational Impacts 5.4.5.2 Visual Character Impacts The proposed project is located in greater downtown Los Angeles, which is a dynamic environment where new projects are constructed on an ongoing basis. Additional development

More information

appendix and street interface guidelines

appendix and street interface guidelines appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher

More information

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER') TO: FROM: Honorable Mayor and City Council Planning & Community Development Department SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

More information

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5 VISION STATEMENT 3 UTILIZATION OF THE GUIDELINES 3 IMPLEMENTATION 3 PROCEDURES FOR DESIGN REVIEW 3 LAND USE AND ZONING 4 LAND USE 4 ELEMENTS:... 4 ZONING 4 ELEMENTS:... 4 BUILDING SCALE AND SETBACKS 5

More information

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA 1 SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA Downtown Bozeman should be the location of buildings of greatest height and intensity in the community. The following guidelines apply

More information

Maplewood Avenue Downtown Complete Street Project

Maplewood Avenue Downtown Complete Street Project Maplewood Avenue Downtown Complete Street Project Second Public Meeting January 24, 2018 Welcome and Introduction of Project Team City Planning and Public Works Staff City of Portsmouth Juliet Walker Planning

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

Historic Ottawa Beach Waterfront Walkway Park Township

Historic Ottawa Beach Waterfront Walkway Park Township Historic Ottawa Beach Waterfront Walkway Park Township Project Description: Public access improvements to the shoreline of Lake Macatawa are the final steps in completing the park master plan for the Historic

More information

East Bayshore Road Neighbourhood

East Bayshore Road Neighbourhood East Bayshore Road Neighbourhood Northridge Property Management Urban Design Brief 3195 East Bayshore Road City of Owen Sound January 2016 East Bayshore Road Neighbourhood Northridge Property Management

More information

11 May 11, 2011 Public Hearing APPLICANT: SUKHWINDER SHINDA BHARIJ

11 May 11, 2011 Public Hearing APPLICANT: SUKHWINDER SHINDA BHARIJ 11 May 11, 2011 Public Hearing APPLICANT: SUKHWINDER SHINDA BHARIJ PROPERTY OWNER: S & J TRUCK TERMINAL, INC. REQUEST: Conditional Use Permit for mini-warehouse STAFF PLANNER: Leslie Bonilla ADDRESS /

More information

Questions for Carlsbad City Council Members and Candidates (July 1, 2016)

Questions for Carlsbad City Council Members and Candidates (July 1, 2016) Ponto is Carlsbad s Southern Coastal Gateway Questions for Carlsbad City Council Members and Candidates (July 1, 2016) 1. Are you aware of the 3 proposed developments in Ponto? What are your most important

More information

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES 4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES The following sections discuss the impacts associated with environmental resources for the tunneling method Alternatives A and B. The construction

More information

Speers Road Corridor Study. Livable Oakville (Official Plan) Council Sub Committee March 20, 2017

Speers Road Corridor Study. Livable Oakville (Official Plan) Council Sub Committee March 20, 2017 Speers Road Corridor Study Livable Oakville (Official Plan) Council Sub Committee March 20, 2017 Overview 1) Study Purpose & Background 2) Study Area 3) Policy Context and Plan Review 4) Speers Road Corridor

More information

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report City of Edmonton Final Report Walterdale Bridge Replacement and Approach Roads Evaluation April, 2011 Walterdale Bridge Replacement and Approach Roads Evaluation Final Report April 2011 Acknowledgement

More information

Steve, Following are our notes from the first two meetings with Montgomery County Planning Group:

Steve, Following are our notes from the first two meetings with Montgomery County Planning Group: To Steve Hatch Fax No. Telephone No. From Mike Stanley Date 10/16/17 Subject Minutes from Montgomery County Meetings File Distribution This is page 1 of 5 Memorandum/Discussion/Observations Steve, Following

More information

Re: Thorncreek Commons Commercial Response to Pre-Application Meeting held September 24, 2014 Comments

Re: Thorncreek Commons Commercial Response to Pre-Application Meeting held September 24, 2014 Comments 8/20/2015 Jay Ruchti Senior Planner City Development Department City of Thornton 9500 Civic Center Drive Thornton, CO Re: Thorncreek Commons Commercial Response to Pre-Application Meeting held September

More information

Building & Site Design Standards Application

Building & Site Design Standards Application FOR OFFICE USE ONLY Design standards plan review fee Building & Site Design Standards Application Phone: 208-468-5406 Fax: 208-468-5439 411 3rd Street South Nampa, Idaho 83651 5,000

More information

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES

More information

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION 7:00 P.M. TO 8:30 P.M. NOVEMBER 21 st, 2017 PENETANGUISHENE MEMORIAL COMMUNITY CENTRE BRIAN ORSER HALL (61 Maria Street) 1.

More information

The Anaheim Resort Public Realm Landscape Program. City of Anaheim. Adopted September 1994 (94R-239)

The Anaheim Resort Public Realm Landscape Program. City of Anaheim. Adopted September 1994 (94R-239) Public Realm Landscape Program City of Anaheim Adopted September 1994 (94R-239) Amendment No. 1 October 1996 (96R-178) Amendment No. 2 June 1999 (99R-137) Amendment No. 3 February 2001 (2002R-56) Amendment

More information

124 Subarea Visions. Vision Plan. A. Nelessen Associates, INC I Visioning I Planning I Urban Design

124 Subarea Visions. Vision Plan. A. Nelessen Associates, INC I Visioning I Planning I Urban Design Subareas 124 Subarea Visions The next seven sections describe specific recommendations tailored to each subarea. Each subarea is discussed separately except for certain aspects of 95th Street and Antioch

More information

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement Durham-Orange Light Rail Transit Project October 2016 1. Introduction The Combined FEIS/ROD summarizes the effects of the D-O LRT

More information

WELCOME AND APPROVAL OF MINUTES

WELCOME AND APPROVAL OF MINUTES Crescent Springs Small Area Study Task Force Meeting Minutes Location: NKAPC Commission Chambers Tuesday, January 27, 2010, 6:00 7:30 P.M. ATTENDANCE: Bobbie Baker Crescent Springs Resident Residing within

More information

Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation

Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation ote Guiding Principles included in this document are taken from the latest working draft of the Guiding Principles dated. The illustrations included

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar

More information

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership Workshop 3 City of Burlington Waterfront Hotel Planning Study September 14, 2017 The Planning Partnership The Waterfront Hotel Planning Study 01 The Brant & Lakeshore Planning Study will establish a Strategic

More information

Bylaw No. B-03/2011 Adopted by Airdrie City Council February 21, 2012

Bylaw No. B-03/2011 Adopted by Airdrie City Council February 21, 2012 COOPER S CROSSING STAGE 4 Neighbourhood Structure Plan City of Airdrie WESTMARK HOLDINGS LTD. Bylaw No. B-03/2011 Adopted by Airdrie City Council February 21, 2012 CONSULTANTS: LAND USE PLANNING: Southwell

More information

5.1 Commercial and Industrial Development. (Effective April 1, 2006)

5.1 Commercial and Industrial Development. (Effective April 1, 2006) 5.1 Commercial and Industrial Development. (Effective April 1, 2006) A. Applicability: The requirements of this section (5.10) shall apply to all uses within the LB Local Business; HB Highway Business;

More information

COMMERCIAL DESIGN REVIEW APPLICATION

COMMERCIAL DESIGN REVIEW APPLICATION CITY OF LACEY Community Development Department 420 College Street Lacey, WA 98503 (360) 491-5642 COMMERCIAL DESIGN REVIEW APPLICATION OFFICIAL USE ONLY Case Number: Date Received: By: Related Case Numbers:

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

Rights-of-Way Preservation Guidelines

Rights-of-Way Preservation Guidelines Rights-of-Way Preservation Guidelines Summary of Policy The purpose of the Rights-of-Way Preservation Guidelines is to help staff make decisions about preserving rights-ofway for future transportation

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

Urban Design & Placemaking

Urban Design & Placemaking Urban Design & Placemaking What is Urban Design? Urban Design is the discipline of creating equitable, vibrant, and sustainable places with distinct identities. The profession pulls from other built environment

More information

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS 56TH STREET AND 17TH AVENUE IMPROVEMENTS FUNDING: Bonded ESTIMATED COST: $3,885,000 COMPLETION DATE: Fall 2018 SCOPE OF PROJECT: Widening of 56th Street from 6th Avenue to 19th Avenue, and widening 17th

More information

Olde Towne Vision Plan

Olde Towne Vision Plan Olde Towne Vision Plan Introduction In 2016, the City of Bellevue will complete its move of City offices from Olde Towne Bellevue to its new municipal complex on Wall Street. The City intends to sell its

More information

BUSINESS DISTRICT DESIGN GUIDELINES

BUSINESS DISTRICT DESIGN GUIDELINES Des Plaines, Illinois Prepared for the City of Des Plaines by: The Lakota Group Laurie Marston, AICP March 2005 Section 5: Streetscape Elements Business District Design Guidelines STREETSCAPE ELEMENTS

More information

New Berlin City Center Plan Commission Review PDQ Food Stores, Inc

New Berlin City Center Plan Commission Review PDQ Food Stores, Inc March 2, 2017 City of New Berlin Planning Commission 3805 S Casper Dr New Berlin, WI 53151 RE: New Berlin City Center Plan Commission Review PDQ Food Stores, Inc Dear Plan Commission Members, On behalf

More information

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM DATE REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL Community Development PUD Concept & Development Stage Plan Preliminary Plat & Final Plat PREVIOUS

More information

Small Area Plan. South Gateway

Small Area Plan. South Gateway Small Area Plan Adopted May 12, 2008 South Gateway Purpose. The South Gateway Small Area Plan defines the City s expectations for the future of the southern entrance to the City at Interstate 85 and Highway

More information

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary New York Avenue Streetscape and Trail Project Public Meeting #1 Summary I. King Jordan Student Academic Center (SAC) Gallaudet University, Washington, DC February 23, 2017 Table of Contents 1.0 Introduction...

More information

PROJECT SHOWING MINUTES

PROJECT SHOWING MINUTES PROJECT SHOWING MINUTES North Lynn Street Esplanade Improvements Project No. 0029-000-859, C501, B605 UPC No. 109813 November 1, 2017 10:00 a.m. 1911 North Ft. Myer Drive, LL-10, Arlington, VA Overview

More information

Citizen Advisory Group Meeting 5: Land Use April 14, 2011

Citizen Advisory Group Meeting 5: Land Use April 14, 2011 Citizen Advisory Group Meeting 5: Land Use April 14, 2011 Meeting Agenda 1. Background Review 2. Transportation Follow-up 3. PED Overlay Approach 4. Land Use Mapping 5. Group Exercise 6. Wrap-up and Next

More information

Development Services Staff Report for Design Review Committee

Development Services Staff Report for Design Review Committee Development Services Staff Report for Design Review Committee To: Design Review Committee From: DS Staff: Erika Akin Subject: Proposed Addition to J s Car Wash File: DSRFY2016-1 Date: January 19, 2016

More information

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,

More information

JOB CREATION PROJECTS

JOB CREATION PROJECTS SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each

More information

Route 29 Project Delivery Advisory Panel September 11, 2014 Meeting Minutes

Route 29 Project Delivery Advisory Panel September 11, 2014 Meeting Minutes Route 29 Project Delivery Advisory Panel Meeting Minutes Meeting 5 of the Route 29 Project Delivery Advisory Panel (PDAP) was held at the Virginia Center for Transportation Innovation and Research in Charlottesville,

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

3.4.5 Roadway System and Infrastructure Phase I (Project) Roadway System Components E Street Extension (Phase I).

3.4.5 Roadway System and Infrastructure Phase I (Project) Roadway System Components E Street Extension (Phase I). 3.4.5 Roadway System and Infrastructure Roadway demolition, road improvements, roadway realignments, and construction of new roads, as well as utility infrastructure improvements, transit, as well as pedestrian

More information

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC REQUEST: Conditional Use Permit (car wash) 2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC PROPERTY OWNER: MESSER 1060 INDEPENDENCE BOULEVARD STAFF PLANNER: Carolyn A.K. Smith ADDRESS

More information

Creating Complete Roadway Corridors:

Creating Complete Roadway Corridors: Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

Rezoning Petition Pre-Hearing Staff Analysis October 15, 2018

Rezoning Petition Pre-Hearing Staff Analysis October 15, 2018 Rezoning Petition 2017-137 Pre-Hearing Staff Analysis October 15, 2018 REQUEST Current Zoning: R-3 (single family residential) Proposed Zoning: B-2(CD) (general business, conditional) LOCATION Approximately

More information

BEST PRACTICES: PARKING MANAGEMENT & DESIGN

BEST PRACTICES: PARKING MANAGEMENT & DESIGN BEST PRACTICES: PARKING MANAGEMENT & DESIGN Planning for Parking December 2015 The provision of parking is an essential part of planning and site design. However, parking is often associated with negative

More information