1 Sustainable Shorelines Comparative Cost Analysis Review Jon K. Miller, Ph.D. Andrew Rella Center for Maritime Systems Stevens Institute of Technology Scope 9 (or 10) Shoreline Stabilization es o Wood and Steel Bulkheads, Crib Walls, Live Crib Walls, Revetments, Rip-Rap, Joint Planting, Bio Wall, Sill, Vegetative Geogrid 3 sites o Poughkeepsie, Henry Hudson Park (Albany), Bowline Point Park (Haverstraw) 2 Sea Level Rise Scenarios o Current Rate (2.77mm/yr), Rapid Ice Melt (48 by 2080) 1

2 An engineering analysis for nine (10) shoreline approaches Traditional Bulkhead Timber Cribbing Revetment Rip-Rap Alternative Live Stakes/Joint Planting Live Crib Wall Green(Bio) Wall Sill Vegetated Geogrid Bulkhead Figure 4: Timber pile/wale bulkhead (NC DCM, 2008). Figure 5: Steel sheet pile bulkhead (photo credit: Emilie Hauser). 2

3 Revetment Figure 9: Rock revetment (NC DCM, 2008). Figure 8: Typical revetment cross-section (USACE, St. Paul District). Rip Rap Figure 15: Constructed rip-rap shore protection project (USDA, 1996). Figure 14: Typical rip-rap slope cross-section (NYS DEC, 2005). 3

4 Timber Cribbing Figure 20: Typical Timber Cribbing Cross-Section and Plan View National Engineering Handbook, August, 2007). Live Crib Wall Figure 22: Live crib wall installation (NYS SWCC, 2005). Figure 21: Typical live crib wall cross-section (NYS DEC, 2005). 4

5 Vegetated Geogrid Figure 27: Typical vegetated geogrid (Iowa DNR, 2006). Figure 25: Typical geotextile roll slope protection ( Live Stakes Figure 27: Figure 28: Typical joint planting (NYS DEC, 2005). 5

6 Sills Figure 49: Sill and marsh shore protection project. (Jefferson Paterson Park & Museum). Figure 48: Typical sill/perched beach cross-section (Jefferson Paterson Park & Museum). Green (Bio) Walls Figure 18: Laboratory study of wave run-up along a green wall (Herrington, et al., 2005). Figure 19: Laboratory study of circulation adjacent to a green wall (Herrington, et al., 2005). 6

7 For 3 different sites Bowline Point Henry Hudson Park Poughkeepsie Listed from lowest energy to highest energy Bowline Point Park, Upper Haverstraw Bay, Rockland County Site Characteristics Extremely Mild Slope (1:20) Shallow (~10 ft) Wide (15,000 ft) 7

8 Poughkeepsie, near Kaal Rock, Dutchess County Site Characteristics Extremely Steep Slope (1:1.5) Deep (~50 ft) Henry Hudson Park, Bethlehem, Albany County Site Characteristics Mild-Moderate Slope Shallow (~20 ft) Narrow (1,000 ft) 8

9 Cost analysis includes: Initial Costs (IC) o Material and labor costs to construct the stabilization measure Maintenance and Repair Costs (M&R) o Costs associated with routine maintenance and repairs (i.e. not associated with any given storm) Damage Costs (DC) o Costs associated with restoring a structure to its original function after a specific storm causes damage Replacement Costs (RC) o Costs of replacing a structure once it reaches the end of its serviceable life. (Typically associated with material decay/degredation) Designs based on: Data as originally presented in the Alden & ASA (2006) report. Additional information on wind wave climate. Main features considered so that reasonably accurate quantities could be developed. Wakes & Ice considered crudely through application of rules of thumb as detailed information for each site was not available. 9

10 Initial Costs Based on material & labor costs &/or bulk costs Every attempt was made to be consistent within and across methods Cost information was obtained from a combination of research studies and actual recent construction bids o Significant variability Consideration of Sea Level Rise: M&R costs increased for vegetated (+10%) and wood (+5%) structures Number of storms likely to be encountered and the damage costs resulting from them increase with SLR. Since the rate of SLR increases under the rapid sea level rise scenario, the 70-yr period is discretized into two 25-yr periods and a 20-yr period 10

11 s = n/t r 11

12 Present Day Dollars Inflated according to US Army Corps of Engineers, Civil Works Index System guide (1.7%). Discount rate 0f 4.0% (Federal guidance) Methodology follows US EPA s A Guide to Developing and Documenting Cost Estimates During the Feasibility Study 12

13 Conclusions Generally, a number of alternatives exist at each site for which the costs are relatively similar. Under the rapid ice melt scenario, all 3 sites will be underwater within 70 years Ecologically enhanced alternatives can be cost competitive with traditional approaches o Consistent with NOAA s Weighing Your Options report. Wake Analysis 13

14 Sites Out of 60 possible locations, nearly 40 acceptable locations were determined. Wakes were observed at a final number of 32 sites over the course of 4 days. Experimental Set-up 14

15 Sample Video 15

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI Project supported via financial assistance provided by the Coastal Zone Management Act of 1972, as amended, administered by the Office of the Ocean

More information

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines Proactive By Design. Our Company Commitment Jesse Baldwin Coastal Geologist Project Manager GZA GeoEnvironmental,

More information

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary March 20, 2009 Low-Impact Shoreline Stabilization Cumulative

More information

A comparison of Traditional and Prefabricated Encapsulated Soil Lifts

A comparison of Traditional and Prefabricated Encapsulated Soil Lifts A comparison of Traditional and Prefabricated Encapsulated Soil Lifts Jane Herbert, Senior Extension Educator 2014 Wisconsin Lakes Convention Background on shoreline erosion control in MI KBS Shoreline

More information

North Carolina Coastal Federation

North Carolina Coastal Federation North Carolina Coastal Federation Erosion Control: Non-Structural Alternatives A Shorefront Property Owner s Guide Shoreline erosion and landward migration of marshes are natural processes, and are important

More information

Brooklyn Bridge Park: Storm Resilience through Design

Brooklyn Bridge Park: Storm Resilience through Design Brooklyn Bridge Park: Storm Resilience through Design During the early stages of the Brooklyn Bridge Park design process, careful thought was given to shoreline conditions and site location. Due to BBP

More information

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach Edward Alkiewicz 1, Stephen Schoenwiesner 1, Jeff Gerlach 1, Morris Perot 2, Scott Ault 2, Mark

More information

State of the State New Jersey. Steve Jacobus NJDEP 06/10/15

State of the State New Jersey. Steve Jacobus NJDEP 06/10/15 State of the State New Jersey Steve Jacobus NJDEP 06/10/15 1980s Living shorelines term coined in MD 2003 North Carolina passes Living Shoreline Law (HB 1028) early 2000s Delaware puts no bulkhead policy

More information

Supporting Hudson Riverfront Communities as Climate-Adaptive Leaders. Libby Zemaitis November 17, 2017 NYS DEC Hudson River Estuary Program

Supporting Hudson Riverfront Communities as Climate-Adaptive Leaders. Libby Zemaitis November 17, 2017 NYS DEC Hudson River Estuary Program 1 Supporting Hudson Riverfront Communities as Climate-Adaptive Leaders Libby Zemaitis November 17, 2017 NYS DEC Hudson River Estuary Program The Hudson River Estuary Program 2 Working to achieve 6 key

More information

NJ Department of Environmental Protection

NJ Department of Environmental Protection NJ Department of Environmental Protection COASTAL AND LAND USE PLANNING New Jersey Coastal Management Program Covers NJ coastal waters to limit of tidal influence including 239 municipalities in 19 counties,

More information

Russ J. Joffrion, P.E. Whitney Thompson, P.E.

Russ J. Joffrion, P.E. Whitney Thompson, P.E. A Case Study and Logistics Review on the Design and Construction of the Bayou Dupont Mississippi River Sediment Marsh Creation Project Jefferson and Plaquemines Parishes, LA Russ J. Joffrion, P.E. Whitney

More information

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle. Agenda Item D-2 City of Tacoma Planning and Development Services To: Planning Commission From: Stephen Atkinson, Planning Services Division Subject: Open Space Corridors Project Meeting Date: March 1,

More information

Libby Zemaitis October 18, 2017 Climate Outreach Specialist, NYS DEC Hudson River Estuary Program

Libby Zemaitis October 18, 2017 Climate Outreach Specialist, NYS DEC Hudson River Estuary Program 1 Supporting Hudson Riverfront communities as Climate-Adaptive Leaders Libby Zemaitis October 18, 2017 Climate Outreach Specialist, NYS DEC Hudson River Estuary Program The Hudson River Estuary Program

More information

Biotechnical streambank stabilization

Biotechnical streambank stabilization Traditional streambank stabilization Biotechnical streambank stabilization Channelization alters: shape pattern slope bed morphology cover Ecological effects: loss of riparian habitat loss of fish habitat

More information

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS TO: FROM: APPLICANT: AGENT: Shore Protection Committee: Commissioner Mark Williams, Chairman Mr. Richard Gardner Mr. Henry Morgan Mr. Zach Harris

More information

Living Shoreline Professionals Advanced Training. August 24 & 31, 2017 Hosted by Virginia Institute of Marine Science College of William & Mary

Living Shoreline Professionals Advanced Training. August 24 & 31, 2017 Hosted by Virginia Institute of Marine Science College of William & Mary Living Shoreline Professionals Advanced Training August 24 & 31, 2017 Hosted by Virginia Institute of Marine Science College of William & Mary LIVING SHORELINE PROFESSIONALS ADVANCED TRAINING AUGUST 2017

More information

EEA Capital Investment in Green Infrastructure

EEA Capital Investment in Green Infrastructure EEA Capital Investment in Green Infrastructure Goal: Advance local efforts to implement measures to increase natural storm damage protection, flood control, and community resilience State capital funding

More information

Preparing New Hampshire for Projected Storm Surge, Sea-Level Rise, and Extreme Precipitation

Preparing New Hampshire for Projected Storm Surge, Sea-Level Rise, and Extreme Precipitation NEW HAMPSHIRE COASTAL RISK AND HAZARDS COMMISSION Preparing New Hampshire for Projected Storm Surge, Sea-Level Rise, and Extreme Precipitation July 14, 2017 The Beaches Conference Wells High School Wells,

More information

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations 2 Executive Summary The City of Ramsey contracted the Anoka Conservation District to complete an inventory of riverbank condition along the entire 5.8 miles of City that border the Mississippi River. The

More information

Virginia s Tidal Wetlands: Managing for Resilience. Pam Mason

Virginia s Tidal Wetlands: Managing for Resilience. Pam Mason Virginia s Tidal Wetlands: Managing for Resilience Pam Mason Image: Skip Stiles, Wetlands Watch PAST: City of Norfolk shallow water and wetlands Fill. Maersk Nauticus Chrysler Museum Mc Arthur Mall Opera

More information

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY Mobile Bay National Estuary Program 4172 Commanders Drive Mobile, AL 36615 Phone: 251-431-6409 Fax: 251-431-6450 Contact: Tom Herder, Watershed Protection Coordinator Email: therder@mobilebaynep.com July

More information

ROCKLAND P.L.U.S. PLANNING LAND USE WITH STUDENTS

ROCKLAND P.L.U.S. PLANNING LAND USE WITH STUDENTS ROCKLAND P.L.U.S. PLANNING LAND USE WITH STUDENTS PLUS Program Goals: High School Students from throughout Rockland County understand: The power of land use planning in shaping a community Their role as

More information

Managing Shorelines: Control Erosion and Protect Water Quality. Ben Powell Clemson Extension

Managing Shorelines: Control Erosion and Protect Water Quality. Ben Powell Clemson Extension Managing Shorelines: Control Erosion and Protect Water Quality Ben Powell Clemson Extension Importance of Stabile Shoreline Erosion = loss of real estate Erosion unsightly = reduced property value

More information

Improvement of the Atlantic Coast of New York City,

Improvement of the Atlantic Coast of New York City, Improvement of the Atlantic Coast of New York City, Rockaway Inlet to Norton Point Project at Sea Gate Meeting Purpose The U.S. Army Corps of Engineers, the New York State Department of Environmental Conservation,

More information

Funding, Designing, and (eventually) Building Miles of Shoreline and Acres of Wetlands and Oyster Reefs on an Urbanized River!

Funding, Designing, and (eventually) Building Miles of Shoreline and Acres of Wetlands and Oyster Reefs on an Urbanized River! CW Gaskill City of Norfolk Funding, Designing, and (eventually) Building Miles of Shoreline and Acres of Wetlands and Oyster Reefs on an Urbanized River! Don Cole Brown and Caldwell C. W. Gaskill City

More information

DITCH BANK STABILIZATION TECHNIQUES

DITCH BANK STABILIZATION TECHNIQUES onstructed Ditch Drainage anagement Guide - No. 0 in series Order No. 5.0- December 00 DITH BANK STABILIZATION TEHNIQUES It is important to maintain ditches using practices that ensure ditch banks remain

More information

Sconset Geotextile Tube Update Sconset Bluff, Nantucket. Maria Hartnett, Associate

Sconset Geotextile Tube Update Sconset Bluff, Nantucket. Maria Hartnett, Associate Sconset Geotextile Tube Update Sconset Bluff, Nantucket Maria Hartnett, Associate www.epsilonassociates.com Presentation Outline Project Setting & Need for Erosion Control Project Components Geotubes Sand

More information

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project USACE Workshop November 21 st, 2013 By: Jenna Phillips Emphasis on Green or Nature-Based Engineering

More information

Rhode Island Shoreline Change Special Area Management Plan

Rhode Island Shoreline Change Special Area Management Plan Rhode Island Shoreline Change Special Area Management Plan Draft Document Outline REVISED 10/12/2017 VOLUME 1 Executive Summary & How to Use this Document (Draft by Dec 2017) 1. Introduction (Revised draft

More information

Land Management Program Erosion Control Techniques and Permitting Processes

Land Management Program Erosion Control Techniques and Permitting Processes Land Management Program Erosion Control Techniques and Permitting Processes Prepared by: Public Utility District No. 1 of Chelan County Wenatchee, Washington Erosion Control Techniques and Permitting

More information

Monitoring and Maintenance Permit Process

Monitoring and Maintenance Permit Process Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary April 9, 2010 Living Shorelines for Contractors and Project

More information

Assessment of Landscape, Visual and Natural Character Effects

Assessment of Landscape, Visual and Natural Character Effects Assessment of Landscape, Visual and Natural Character Effects Consent Footprint Amendments Mangamaunu Half Moon Bay Okiwi Bay South Report prepared for: New Zealand Transport Agency and KiwiRail Holdings

More information

HUDSON RIVER WATERFRONT. Hudson River Waterfront Walkway

HUDSON RIVER WATERFRONT. Hudson River Waterfront Walkway HUDSON RIVER WATERFRONT Hudson River Waterfront Walkway The Hudson River Waterfront Bayonne Bridge to the George Washington Bridge 40 miles of waterfront land Hudson River Waterfront Conservancy 1988 Stakeholder

More information

WEATHER IT TOGETHER Building Resilience. The Annapolis Model for Cultural Resource Hazard Mitigation Planning

WEATHER IT TOGETHER Building Resilience. The Annapolis Model for Cultural Resource Hazard Mitigation Planning WEATHER IT TOGETHER Building Resilience The Annapolis Model for Cultural Resource Hazard Mitigation Planning Weather It Together A Public / Private Partnership Weather It Together is the Annapolis model

More information

Rain Gardens at Vassar College: A Water Quality Assessment

Rain Gardens at Vassar College: A Water Quality Assessment Rain Gardens at Vassar College: A Water Quality Assessment Emily Vail Collins Research Fellow Vassar College Environmental Research Institute Community Educator Environment Program Cornell Cooperative

More information

PUBLIC SPACE/AMENITY PROJECTS

PUBLIC SPACE/AMENITY PROJECTS BUFFALO S LWRP 49 A1. Black Rock Canal Park Improvements Erie County Parks Black Rock Canal Park, Ontario and Niagara Street intersection PROJECT DESCRIPTION: Erie County s Black Rock Canal Park is 4.25

More information

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office Coastal Planning in Texas Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office e The Texas General Land Office (GLO) and the Texas Coast Since 1836: Manager of

More information

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013 City of Norfolk Coastal Flood Mitigation Program March 13, 2013 Topics Brief overview of Norfolk s Coastal Flood Program Data-driven analysis and decision making City-wide vulnerability, project concepts,

More information

HOW TO CONTROL STREAMBANK EROSION

HOW TO CONTROL STREAMBANK EROSION 6 HOW TO CONTROL STREAMBANK EROSION Prepared by the Iowa Department of Natural Resources In cooperation with the Natural Resources Conservation Service, U.S. DEPARTMENT OF AGRICULTURE 2006 The 1984 printing

More information

Restoring Water Ecosystems in NYC Parks

Restoring Water Ecosystems in NYC Parks Restoring Water Ecosystems in NYC Parks Hooked on our Waters Con October 19, 2013 - CUNY Graduate Center Marit Larson NYC Parks Landscape and ecosystem focus Watershed Streams Freshwater wetlands Tidal

More information

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series Presented by Jason Williams, PLA, NCI February 19, 2017 Introduction Lakes (impoundments)

More information

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.3 STATIC SLOPE STABILITY ANALYSES

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.3 STATIC SLOPE STABILITY ANALYSES DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.3 STATIC SLOPE STABILITY ANALYSES Parsons P:\Honeywell -SYR\444576 2008 Capping\09 Reports\9.3 December 2009_Capping and

More information

Date of Advertisement: January 14, 2019 Deadline for Receipt of Qualification Statements and Priced Proposal: February 12, :00 pm.

Date of Advertisement: January 14, 2019 Deadline for Receipt of Qualification Statements and Priced Proposal: February 12, :00 pm. MARYLAND COASTAL BAYS PROGRAM REQUEST FOR PROPOSALS TO PROVIDE PROFESSIONAL ENGINEERING AND TECHNICAL SERVICES FOR TIZZARD ISLAND COASTAL RESILIENCY PLANNING AND DESIGN Date of Advertisement: January 14,

More information

COASTAL CITY PHILADELPHIA IS A. Michael W. Tantala, P.E. Tantala Associates, LLC, Engineers and Architects. (Karen M Closkey and Keith VanDerSys)

COASTAL CITY PHILADELPHIA IS A. Michael W. Tantala, P.E. Tantala Associates, LLC, Engineers and Architects. (Karen M Closkey and Keith VanDerSys) Waterfront Development in a Changing a Changing Climate Climate PHILADELPHIA IS A COASTAL CITY Michael W. Tantala, P.E. Tantala Associates, LLC, Engineers and Architects (Karen M Closkey and Keith VanDerSys)

More information

2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved.

2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved. 2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved. Uplift of a Wet Weather Stream: Satisfying Regulatory Requirements Agawela Drive Stream Project Chattanooga, TN 2014 HDR, Inc.,

More information

Introducing Green Infrastructure for Coastal Resilience

Introducing Green Infrastructure for Coastal Resilience Introducing Green Infrastructure for Coastal Resilience National Oceanic and Atmospheric Administration (NOAA) Office for Coastal Management Gloucester, MA Office of Travel Courtesy, Tim Grafft What Is

More information

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material

More information

CLIMATE CHANGE & THE CARIBBEAN 3 TAKE AWAY MESSAGES

CLIMATE CHANGE & THE CARIBBEAN 3 TAKE AWAY MESSAGES CLIMATE CHANGE & THE CARIBBEAN 3 TAKE AWAY MESSAGES Climate Change... Distinct changes in measures of climate (rainfall, temperature, wind speed, etc.) lasting for a long period of time due to human actions.

More information

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011) Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011) Description The Corps of Engineers, Rock Island District (District) and the Illinois

More information

NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council

NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council Engaging RI Local Governments in Hazard Mitigation and Coastal Resilience NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council Teresa A. Crean, AICP University of Rhode Island Coastal

More information

Offshore Wind Energy Foundations Geotextile Sand-Filled Containers as Effective Scour Protection System

Offshore Wind Energy Foundations Geotextile Sand-Filled Containers as Effective Scour Protection System Offshore Wind Energy Foundations Geotextile Sand-Filled Containers as Effective Scour Protection System Karsten Peters / IMS Ingenieurgesellschaft mbh Hamburg, Germany Katja Werth / BBG Bauberatung Geokunststoffe

More information

Basic Geosynthetics: A Guide to Best Practices in Forest Engineering

Basic Geosynthetics: A Guide to Best Practices in Forest Engineering Basic Geosynthetics: A Guide to Best Practices in Forest Engineering Jonathan Fannin Ph.D., P. Eng., Forest Resources Management and Civil Engineering, University of British Columbia, Canada. ABSTRACT

More information

BAY AREA PARKS & RECREATION

BAY AREA PARKS & RECREATION BAY AREA PARKS & RECREATION ALCATRAZ ISLAND CLIFF STABILIZATION Alcatraz Island San Francisco Bay California National Park Service Wiss Janney Elstner Associates Geologic Hazards Geotechnical Site/Civil

More information

A Cooperative Effort Between:

A Cooperative Effort Between: Lake Shamineau Shoreline Assessment August 2007 A Cooperative Effort Between: Morrison County Planning and Zoning Morrison Soil and Water Conservation District Minnesota Department of Natural Resources

More information

Hydrologic Assessment of using Low Impact Development to Mitigate the Impacts of Climate Change. Chris Jensen, AScT Master of Science Thesis

Hydrologic Assessment of using Low Impact Development to Mitigate the Impacts of Climate Change. Chris Jensen, AScT Master of Science Thesis Hydrologic Assessment of using Low Impact Development to Mitigate the Impacts of Climate Change Chris Jensen, AScT Master of Science Thesis Bowker Creek Initiative April 12, 2012 Outline 1. Future Impacts

More information

Montana Stream Permitting

Montana Stream Permitting Montana Stream Permitting A Guide for Conservation District Supervisors and Others Conservation Districts Bureau Montana Department of Natural Resources and Conservation June 2001 CONTRIBUTORS Committee

More information

Bioretention Cell Construction

Bioretention Cell Construction An ASABE Meeting Presentation Paper Number: 084439 Bioretention Cell Construction R.A. Chavez, Research Engineer Oklahoma State University, 111 Agricultural Hall, Stillwater, OK 74078 G.O. Brown, Professor,

More information

Alternate Green Stream Bank Stabilization Methods

Alternate Green Stream Bank Stabilization Methods U.S. Army Corps of Engineers Philadelphia/Baltimore Districts Alternate Green Stream Bank Stabilization Methods Wissahickon Creek, Tannery Run and Rose Valley Creek Bo-Rit Asbestos Site Ambler, Pennsylvania

More information

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060 May 12, 2016 TO: Wetlands Board Members FROM: Richard W. Scarper RE: May, 2016 Wetlands Board Applications Attached are the Planning Department's administrative comments for the following wetlands/dunes

More information

Living Shorelines in Virginia: What s Happened Since the 2006 Living Shorelines Summit?

Living Shorelines in Virginia: What s Happened Since the 2006 Living Shorelines Summit? Living Shorelines in Virginia: What s Happened Since the 2006 Living Shorelines Summit? Karen Duhring Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

Pontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1

Pontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1 Pontchartrain Coastal Lines of Defense Program Coastal Sustainability Program February 2006 The Pontchartrain Coastal Lines of Defense Program consists of ten priority project areas within the Pontchartrain

More information

SMSHE Southeastern Michigan Society for Healthcare Engineering

SMSHE Southeastern Michigan Society for Healthcare Engineering SMSHE Southeastern Michigan Society for Healthcare Engineering Presentation on: Pavement Management and Preservation: The Right Fix at the Right Time PRESENTATION OVERVIEW Asset Evaluation (Management)

More information

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management Empowering Local Action for Coastal Resilience in Massachusetts Bruce K. Carlisle MA Office of Coastal Zone Management Context Coastal communities continue to face both chronic and acute storm surge, erosion,

More information

Technical Supplement 14D. Geosynthetics in Stream Restoration. (210 VI NEH, August 2007)

Technical Supplement 14D. Geosynthetics in Stream Restoration. (210 VI NEH, August 2007) Technical Supplement 14D (210 VI NEH, August 2007) Issued August 2007 Cover photo: Inert or manmade materials can be used in restoration designs where immediate stability is required and can be used in

More information

jmt.com MARINE Part of a diversified family of solutions

jmt.com MARINE Part of a diversified family of solutions jmt.com MARINE Part of a diversified family of solutions Services Marine & Coastal Engineering Modeling Coastal Initiatives & Techniques Port, Harbor, & Marine Consultancy Small Craft Design Permitting

More information

Engineering of Dunes. Protection Benefits of Coastal Sand Dunes. FEMA Dune Standards

Engineering of Dunes. Protection Benefits of Coastal Sand Dunes. FEMA Dune Standards Engineering of Dunes Protection Benefits of Coastal Sand Dunes In addition to providing habitat for a variety of species, coastal sand dunes are an integral part of a wellplanned coastal defense system.

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL 1 EROSION & SEDIMENT CONTROL Effective Soil & Water Protection Whether you want to prevent soil erosion caused by rain, water and wind, or protect waterways from inevitable build

More information

2013 Summer Recap. Rockaway Beach

2013 Summer Recap. Rockaway Beach 2013 Summer Recap and Discussion on Rockaway Beach Reconstruction Tonight s Agenda Summer Beach Update Phase 2 Assumptions, Constraints and Regulations Rebuilding the Boardwalk Coastal Protection Rockaway

More information

City of Poughkeepsie Waterfront Redevelopment Strategy. Poughkeepsie Waterfront Redevelopment Strategy

City of Poughkeepsie Waterfront Redevelopment Strategy. Poughkeepsie Waterfront Redevelopment Strategy City of Poughkeepsie Waterfront Redevelopment Strategy Poughkeepsie Waterfront Redevelopment Strategy City of Poughkeepsie Prime Assets: Major Waterfront Advantages: - Central City of the Hudson River

More information

Misunderestimating Maintenance: An empirical approach to quantify maintenance expectations for BMPs

Misunderestimating Maintenance: An empirical approach to quantify maintenance expectations for BMPs Misunderestimating Maintenance: An empirical approach to quantify maintenance expectations for BMPs James Houle, CPSWQ, UNH Stormwater Center University of New Hampshire, Durham, NH Imagine the Ultimate

More information

Building Ecological Solutions to Coastal Community Hazards: Guidance and NJ Coastal Community Assistance

Building Ecological Solutions to Coastal Community Hazards: Guidance and NJ Coastal Community Assistance Building Ecological Solutions to Coastal Community Hazards: Guidance and NJ Coastal Community Assistance Stacy Small-Lorenz National Wildlife Federation Restore America s Estuaries Summit New Orleans,

More information

HURON WATERFRONT DEVELOPMENT AND AMPHITHEATER

HURON WATERFRONT DEVELOPMENT AND AMPHITHEATER AWARD WINNING PROJECT Location Huron, Ohio Architectural, Engineering, Site, Landscaping, Planning, Survey, Grant Administration, Construction Administration Cost $285,000 Amphitheater $300,000 Marina

More information

Vegetating Disturbed Road & Stream Banks. By Mike Fournier NRCS Resource Conservationist

Vegetating Disturbed Road & Stream Banks. By Mike Fournier NRCS Resource Conservationist Vegetating Disturbed Road & Stream Banks By Mike Fournier NRCS Resource Conservationist Clearly Identify The Problem Project Objectives Clearly Define Objectives Before Work Starts Determine Whether Project

More information

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Notice is hereby given that the City of Alameda, Lead Agency, will prepare an Environmental Impact Report

More information

Living Shoreline Fundamentals

Living Shoreline Fundamentals Living Shoreline Fundamentals Karen Duhring Virginia Institute of Marine Science College of William & Mary April 19, 2017 Kilmarnock, VA Living Shoreline Fundamentals Origins of Living Shoreline Initiative

More information

REVETMENT WORKS- MUSKERS BEACH

REVETMENT WORKS- MUSKERS BEACH REVETMENT WORKS- MUSKERS BEACH Presented by: Arvind Singh Coordinator Infrastructure Projects, Livingstone Shire Council Chris Lancaster Geofabrics Australasia Pty. Ltd. Presentation Topics 1. Background

More information

Virginia Pilot. Climate Change Vulnerability and Risk Assessments of Transportation Infrastructure Hampton Roads, Virginia Implementation Pilot

Virginia Pilot. Climate Change Vulnerability and Risk Assessments of Transportation Infrastructure Hampton Roads, Virginia Implementation Pilot Virginia Pilot Climate Change Vulnerability and Risk Assessments of Transportation Infrastructure Hampton Roads, Virginia Implementation Pilot Yao-Jan Wu Andres Clarens Tanveer Hayat Brian Smith Jose Gomez

More information

Attachment 5 -- PowerPoint. Item 6C- Attach 5- PPT Presentation Page 1 of 15

Attachment 5 -- PowerPoint. Item 6C- Attach 5- PPT Presentation Page 1 of 15 Attachment 5 -- PowerPoint Page 1 of 15 Sausalito Dunphy Park Status Update and Authorize Consulting Contract Amendments March 27, 2018 Page 2 of 15 Summary Current Status October 2017 bidders thanked,

More information

Usage of Woven Geo-Textiles in the Construction Subgrade in Flexible Pavements

Usage of Woven Geo-Textiles in the Construction Subgrade in Flexible Pavements Usage of Woven Geo-Textiles in the Construction Subgrade in Flexible Pavements Muntazir Ahmad Bhat 1, Dr. Rakesh Gupta 2 1 Dept of Civil Engineering 2 Professor, Dept of Civil Engineering 1, 2, SRMIET,

More information

The Art of Submitting a Successful WRAPP. A City of Madison Perspective. Jojo O Brien City of Madison Engineering Division

The Art of Submitting a Successful WRAPP. A City of Madison Perspective. Jojo O Brien City of Madison Engineering Division The Art of Submitting a Successful WRAPP A City of Madison Perspective Jojo O Brien City of Madison Engineering Division OUTLINE Our Typical NOIs Our Typical Chapter 30 Permits Our System for Managing

More information

Panther Pond Conservation Project Phase II

Panther Pond Conservation Project Phase II Panther Pond Conservation Project Phase II 2009-2012 Working to protect and improve the water quality of Panther Pond The Panther Pond Conservation Project Phase II was funded in part by the US Environmental

More information

Appendix C. Soil Amendments. Appendix C. C.1 General Description. C.2 Physical Feasibility & Design Applications

Appendix C. Soil Amendments. Appendix C. C.1 General Description. C.2 Physical Feasibility & Design Applications Soil Amendments C.1 General Description C.2 Physical Feasibility & Design Applications C.3 Design Criteria C.3.1 Soil Testing C.3.2 Determining Depth of Compost Incorporation C.3.3 Compost Specifications

More information

HARVARD PROJECT ON SOUTHWEST FLORIDA AND SEA LEVEL: THE CASE OF COLLIER COUNTY (INCLUDING NAPLES, MARCO ISLAND & EVERGLADES CITY)

HARVARD PROJECT ON SOUTHWEST FLORIDA AND SEA LEVEL: THE CASE OF COLLIER COUNTY (INCLUDING NAPLES, MARCO ISLAND & EVERGLADES CITY) HARVARD PROJECT ON SOUTHWEST FLORIDA AND SEA LEVEL: THE CASE OF COLLIER COUNTY (INCLUDING NAPLES, MARCO ISLAND & EVERGLADES CITY) PROPOSAL DATE: MAY 21, 2016 Professor Charles Waldheim, Principal Investigator

More information

Green Infrastructure Codes and Ordinances

Green Infrastructure Codes and Ordinances 1 Green Infrastructure Codes and Ordinances Emily Vail Hudson River Estuary Program NYS Department of Environmental Conservation New York State Water Resources Institute at Cornell University March 19,

More information

Natural Shoreline Landscapes on Michigan Inland Lakes. Introduction. Workshop for Property Owners. Photo by Jane Herbert

Natural Shoreline Landscapes on Michigan Inland Lakes. Introduction. Workshop for Property Owners. Photo by Jane Herbert Natural Shoreline Landscapes on Michigan Inland Lakes Workshop for Property Owners Introduction Photo by Jane Herbert MSU is an affirmative action, equalopportunity employer. Michigan State University

More information

EFFECT OF RELICT JOINTS IN RAIN INDUCED SLOPE FAILURES IN RESIDUAL SOIL

EFFECT OF RELICT JOINTS IN RAIN INDUCED SLOPE FAILURES IN RESIDUAL SOIL EFFECT OF RELICT JOINTS IN RAIN INDUCED SLOPE FAILURES IN RESIDUAL SOIL Neethimappiriya Tharmalingam, Student (Email: neethi_26@yahoo.com) N.W.H. Lakshamana, Student (Email: hansaka8888@yahoo.com) R.D.T.B.

More information

.MANAGED RETREAT. Need for managed retreat

.MANAGED RETREAT. Need for managed retreat 602 MANAGED RETREAT hazards. This strategy is based on a philosophy of moving out of harm's way, and is proactive in recognizing that the dynamics of the coastal zone should dictate the type of management

More information

Preliminary Sea Level Rise Case Study: Navarre Beach, FL

Preliminary Sea Level Rise Case Study: Navarre Beach, FL Preliminary Sea Level Rise Case Study: Navarre Beach, FL This publication was funded in part, through a grant agreement from the Florida Department of Environmental Protection, Florida Coastal Management

More information

City of Alameda California

City of Alameda California City of Alameda California Revised Notice of Preparation (NOP) of an Environmental Impact Report for the Alameda Marina Master Plan Notice is hereby given that the City of Alameda, Lead Agency, will prepare

More information

Geosynthetics for Erosion Control and Reinforcement

Geosynthetics for Erosion Control and Reinforcement Geosynthetics for Erosion Control and Reinforcement Stan Boyle, Ph.D., P.E. Shannon & Wilson, Inc. What are Geosynthetics? Geosynthetics are (generally) polymeric products used in civil engineering applications.

More information

Climate Change and Physical Development Threats, Challenges and Adaptation Responses in Coastal Communities: Grand Riviere, Trinidad

Climate Change and Physical Development Threats, Challenges and Adaptation Responses in Coastal Communities: Grand Riviere, Trinidad Climate Change and Physical Development Threats, Challenges and Adaptation Responses in Coastal Communities: Grand Riviere, Trinidad Michelle Mycoo Ph.D. and Michael Sutherland Ph.D. Geomatics Engineering

More information

Presenta/on Outline. Sea Level Rise Adapta/on Guidelines for Sea Dikes & Coastal Development 11/24/11

Presenta/on Outline. Sea Level Rise Adapta/on Guidelines for Sea Dikes & Coastal Development 11/24/11 Sea Level Rise Adapta/on Guidelines for Sea Dikes & Coastal Development 2011 UBCM Conven-on Rising Oceans & Raising Dikes: Rethinking Coastal Development in a Changing Climate September 27, 2011 Jesal

More information

Moses Lake Shoreline Landscape Design

Moses Lake Shoreline Landscape Design WASHINGTON STATE UNIVERSITY EXTENSION Moses Lake Shoreline Landscape Design WSU Master Gardeners: Mary Shinn, Barbara Guilland, Cynthia Calbick, Jean Anderson What you do in your yard does make a difference

More information

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm Welcome Tannery and Waterworks Parks Shoreline Improvements, Environmental Assessment Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment #1 6 pm to 8 pm Why We Are Here Tannery

More information

Coastal hazard assessments in Victoria

Coastal hazard assessments in Victoria Coastal hazard assessments in Victoria Viktor Brenners viktor.brenners@delwp.vic.gov.au Future Coasts program 4 year program established in 2007. Outputs included: Coastal Digital Elevation Models Victorian

More information

Welcome. to the Bull Shoals Lake Master Plan Revision Open House

Welcome. to the Bull Shoals Lake Master Plan Revision Open House Welcome to the Bull Shoals Lake Master Plan Revision Open House At the open house you can: Learn about the project Provide comments on the Draft Master Plan and Draft Environmental Assessment (EA) Watch

More information

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total HARLEM RIVER, EAST RIVER AND WESTERN LONG ISLAND SOUND PLANNING REGION Flushing Bay and Creek Ecosystem Restoration Source Feasibility Study Background Study Resolution (1994), Reconnaissance Report (1996),

More information

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015 Using the Updated RI Soil Erosion and Sediment Control Handbook The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015 URI Cooperative Extension NEMO URI Cooperative Extension NEMO White Oak,

More information

FRI B04 ASLA 2014 DENVER Dredge Landscapes Dredge Landscapes: Sediment Flows, Earth Moving, and Dredge as Designed Landscape

FRI B04 ASLA 2014 DENVER Dredge Landscapes Dredge Landscapes: Sediment Flows, Earth Moving, and Dredge as Designed Landscape Dredge Landscapes: Sediment Flows, Earth Moving, and Dredge as Designed Landscape From river control to erosion fences, a diverse array of human activities manipulates sediments and change landscapes.

More information