1 New Town Project of Seoul May 2006 Seoul Metropolitan Government (New Town Development Bureau)

2 CONTENTS 1 Background of New Town Development Project 2 Concept and Features of the project 3 Project Plans 4 Special Act for Urban Renewal Facilitation 5 New Town Project in Eunpyong

3 1 Background Seoul, the capital of the Republic of Korea seoul 01

4 1 Background Seoul Capital of the Chosun Dynasty years old capital dating back to the beginning of the Chosun dtnasty in Originally a walled city situated north of Han river 1960~1970 : Rapid Urbanization and Urban Growth - Rapid urbaniztion resulted in population concentration in Seoul - Launched development of southern part of the city (south of Han river) in Cheonggyecheon Stream in the CBD was covered with concrete 1980~mid 1990 : Urban Expansion and Sprwal - Hosted Asian Game in 1986, the Olympic Game in Completion of development of southern part and beginning of urban sprawl Mid 1990~2003 : Imbalance between regions - Northern part of Seoul is underdeveloped compared to southern part Need for a new policy agenda setting Changes in administrative districts of Seoul 02

5 1 Background Gangbuk, the old center of the city In the past Gangbuk(northern part of Seoul) was the center (CBD) of Seoul 03

6 1 Background Development of Gangnam In 1970s Gangnam(southern part of Seoul) was developed 04

7 1 Background Development of Gangnam The government implemented policies to facilitate Gangnam development Restriction of Gangbuk Development - Banned specific facilities in Gangbuk - Strengthened land use and building regulations - Facilities causing population concentration ( educational institutions, public institutions etc.) were relocated into Gangnam Incentives for Gangnam Development - Offered tax relief for real estate development, while imposing tax on vacant land - Encouraged construction of medium to large-sized buildings in strategic locations - Zoned certain areas exclusively for multi-family housing complex - Invested intensively in infrastructure 05

8 1 Background Gangbuk marginalized in development Shortened public investment, dependence on private sector for development Insufficient urban infrastructure (roads, parks), deterioration of living condition 06

9 1 Background Current Status of Seoul Non- Gangnam Region Land Area : km2 Administrative districts : 25 autonomous districts Population : 3,624,000 households 10,281,000 people Land Area : km2 Administrative districts : 22 autonomous districts Population : 3,060,000 households 8,727,000 people City Hall 한 강 Gangnam Region Land Area : km2 Administrative districts : 3 autonomous districts Population : 564,000 households 1,554,000 people 07

10 1 Background Comparison of living quality among districts stark contrast Housing Condition(Aged housing) Ratio of housing older than 30 years - Average : 4.5% - Max : 23.4% (Jongno) - Min : 0.1 % (Gangnam) Housing prices Price of apartment(condominium) unit - Average : 7.217m Won/3.3m2 - Max : 14.58m Won (Gangnam) - Min : 4.74m Won (Geumcheon) Residents Educational background Ratio of Residents with college education and above - Average : 23.4% - Max : 40.0% (Seocho) - Min: 15.0% (Geumcheon)` Local Public Finance Financial independence index - Average : Max : (Gangnam) - Min : 32.4 (Gangbuk) 08

11 1 Background Reasons of interregional imbalance Old downtown(gangbuk) Underdeveloped Poor urban infrastructure Financial deficit (lagged Investment) Less competitive for further development Decentralization of population Planning/Development Dependence on property tax Undeveloped land New downtown(gangnam) Development launched in 1970s High quality infrastructure Financially independent (continuous Investment) Sufficient Momentum/ Potential for development A mixture of reasons originating from policies, institutional system, and investment 09

12 2 Concepts and Features of New Town Project What s New Town Project? New Town In Town Not a mere redevelopment or reconstruction of old buildings, but a comprehensive renewal of built-up area (downtown and residential area) Building a community bringing people from all walks of life together Encouraging private sector to take on phased and consecutive development by block after setting up masterplan and guidelines in order to prevent disorderly development Creating high quality living environment focusing on education, culture and welfare 10

13 2 Concepts and Features of New Town Project Principles of development plan Environment friendliness and sustainability - Reflecting local conditions and characteristics - Ensuring consistency with upper level plans and relevant plans Advanced planning for large-scale area by public sector, followed by phased development by private sector - Urban design faithful to principles Creating multi-cores of urban activities, while giving design priority to pedestrian, bicycle and public transport - Minimizing traffic generating factors - Encouraging Mixed-used development - Ensuring concurrency between land use and inftrastructure Creating inclusionary living environment for low-income households - Diversifying public housing - Ensuring resettlement of existing residents after redevelopment 11

14 2 Concepts and Features of New Town Project Types of New Town Project Residential Area type Targeting residential areas packed with old housing that need improvement of living environment and basic infrastructure Urban Core type Targeting commercial or industrial areas around subway stations or along main roads to enhance efficiency of land use and rejuvenate urban functions 12

15 2 Concepts and Features of New Town Project Features of the Project Current state New Town Project Planning Standard Development Initiator Role of public sector Development Unit Minimun requirement Private sector Issuing necessary permissions and approvals Dispersed plots determined by profitability Comprehensive provision of infrastrucure Publi-Private Partnership Actively involved Community (Sub District) Development Method Housing redevelopment/ reconstruction method Adopting diverse methods 13

16 2 Concepts and Features of New Town Project Process of New Town Project Designation of target sub districts Preparing proposal for application Notice to district residents Finalization of development plan Appointing Master Planner Drawing up development plan Notice to target sub district residents Consulting with district council Submitting application to city government Screening and review and by city planning committee Notice of the final result (city government) Consultation with district planning committee Consultation with relevant organizations Consulting with district council Public hearing (target district) Request for approval of development plan (District City government) Consultation with relevant organizations Review by joint city committee of planning and architecture` Final Notice (City government) Consultation with district planning committee Project approval 14

17 2 Concepts and Features of New Town Project Decision-making system - Decision-making process of New Town project Relevant departments of city government consultation Working level support team consultation MP(Master Planner) -Executive MP(1) - Advisory MP(2) Advise on specialized areas Review of plans Committee for balanced regional development (Urban renewal committee) Practical comments Opinion exchange Engineers (Impact analyse etc.) consultation Engineers Land use and development plan consultation Architects (Master Plan) 15

18 2 Concepts and Features of New Town Project Features of New Town project The public takes the lead in establishing community development plans and designating target areas - With financial support for setting up project plans and providing infrastructure Accumulated financial support : 238.2b Won (= US$ XXX ) : 26.8b Won : 67.4b Won : 130.5b Won : 13.5b Won Additional support will be offered as detailed project plans are available 16

19 2 Concepts and Features of New Town Project Features of New Town project Improving quality of development plan by appointing relevant specialists as Master Planner Commissioning design work to private sector to improve design quality Minimizing dismantlement of old neighborhoods by adopting gradual and phased development scheme Strengthening public support system for the projects of public interest Task forces for New Town project are set up in both city and district governments and Project Support Centers in sub-district to provide technical advices and conciliate various conflict of interests. 17

20 2 Concepts and Features of New Town Project New Town Project Task Force New Town Development Bureau: 1 headquarters, 2 departments, 5 divisions 82 staffs Overall coordination of projects, sub-district designation, administrative/budget support, planning support and decision making 21 of 25 districts set up task forces and support centers Plan-making, conflict management, technical advices 102 Master Planners (34 Executive MPs, 68 Advisory MPs) General management of plan-making process, technical advices, control of contractors, concilation of interests Committee for balanced regional development : 25 members (municipal officials, city councilors and specialists) Revew and advice of development and project plans, technical advices, project area selection 18

21 3 Project Plans Project areas New Town Project Pilot scheme : 3 areas, 4,782,448 m2 (23 Oct. 02) - Eunpyong (3,495,248 m2 ), Gilem (950,000 m2 ), Wangsimni (337,200 m2 ) 2nd phase : 12 areas, 8,069,117 m2 (18 Nov. 03) 3rd phase : 11 areas, 10,318,829 m2 (15 Dec. 05) Location of New Town areas Location of 3rd New Town 19

22 3 Project Plans Expected impacts of New Town in Gangbuk Housing-to -houehold ratio(%) Gangbuk (+6.3) Housing older than 30 years(%) Gangbuk (+0.5) Southeast Seoul (+2.8) Southeast Seoul (+6.1) Road rate(%) Gangbuk (+3.3) Per capita park space ( m2 /person) Gangbuk (+1.5) Southeast Seoul (+1.9) Southeast Seoul (+0.5) 20

23 4 Special Act for Urban Renewal Facilitation Background - Complex legal system and administrative processes have prolonged project implementation - Diverse measures are needed to be systemized for project incentives and quality control - Flexible development methods are needed to be adopted to reflect housing market conditions Legislation Process - Special Act enacted : Task force for implementation launched : Proposal for Enforcement Decree submitted : Municipal Ordinance enacted : Special Act effectively implemented :

24 4 Special Act for Urban Renewal Facilitation Special Act for Urban Renewal Facilitation Target areas: residential areas(500,000 m2 ), urban cores (200,000 m2 ) Providing national, municipal or provincial budget support to cover whole or partial costs of infrastructure investment Deregulating conditions for target area designation, floor area and building coverage ratios, requirements for school, parking space, small-sized housing units etc. Simplyfing Administrative Processes by allowing legal mandate and fiction Introducing private finance initiatives for building core facilities e.g. cultural/welfare facilities built on plots prepared for infrastructure provision 22

25 4 Special Act for Urban Renewal Facilitation Special Act for Urban Renewal Facilitation Appointing General Project Manager for development management Appointing Master Planner to support plan-making and implementation Preparing measures to recapture capital gains of project Offering preferential treatment to induce private schools by exempting from local taxes and development charge and allowing special account in the case of lease/sale of municipal land Preparing anti-speculation measures by regulating land transactions and building permission with target area designation 23

26 5 Eunpyong New Town Eunpyong New Town Project 24

27 5 Eunpyong New Town Location & Site 고양시덕양구 은평구 site - 10km from downtown Gateway to northwest Seoul ( Surrounded by Bukhan mountain ) - Residents : 8,721households 25,100 people` ( No. of houses: 4,691 No. of tenants: 4,030 )` 2.5km 5.0km 7.5km 25

28 5 Eunpyong New Town Project outline Land Area : 3,495,248m2 Project Period : Oct 2002 ~ Dec 2008 Planned Population : 15,200 households, 42,560 people Housing by types : 365 detached houses (single-family housing), 14,835 apartment units (multi-family housing) - rental units : 4,783 Housing by size (A total of 14,835 units) (1pyeong=3.3m2) - Less than 27pyeong (Net area: 18pyeong) : 3,530 units - 34 pyeong(25.7) : 6,153 units - 41 (32) ~ 65( 54) pyeong : 5,152 units 26

29 5 Eunpyong New Town Project objectives Resort style, eco-friendly city - Country garden-type houses in downtown - Harmonizing with nature by creating green networks and water front Futuristic community - Providing various types of housing to encourage social mix - Creating futuristic housing types of flexiblity Improving qualty of living environment - Adopting housing types that reflect life style of the 21 century - Offering state-of-the-art ICT services 27

30

31 5 Eunpyong New Town Land Use Plan District 3-1 District 1 District 2 District 3-2 Total area : 3, m2 Residential use : 1,553,000 m2 (44.5%) Commercial use Public use : 95,000 m2 (2.75%) : 1,847,000 m2 (52.8%) 29

32 5 Eunpyong New Town Planning Concept for District 1 Moonseong Yetgol town A town where the top of the Bukhan Mt. could be overlooked Town with residential roads Patio houses Resort style town Country houses In downtown Jingwan valley Incorporating ordinary life and leisure 30

33 General view 31

34 Patio houses 32

35 Linear park 33

36 Motjari-gol (pond village) 34

37 Night view (from Changneung Stream) 35

38 Thank you!

39

40

41

42

43

44 3 Project Plans Areas for 3 rd Phase Project Area 1,000 m2 4 1 Changshin Emum Jangwi 1, rd Phase 4 Sanggye Susaek Bukahyun Siheung Shingil 1,469 9 Heuksuk Shinrim Gyoyeo 738 Go to the previous page 19-2

45 1. Background Changes in administrative districts of Seoul 1394~ ~ Go to the previous page 25 autonomous districts, km2 2-1

46 3 Project Plans Areas for pilot scheme/ 2 nd phase new town project Area 1,000 m2 1 5 Pilot scheme 1 Eunpyong 3,495 2 Gilem Wangsimni Gyonam Hannam 1, Jeonnong Joonghwa Mia nd phase 6 gajwa 1,073 7 Ahyun 1,088 8 Sinjung Banghwa Noryangjin youngdengpo 12 Cheonho Go to the previous page 19-1

Case Study of Integrated Housing and Railway Development (Kohoku New Town and Yokohama City Metro Development)

Case Study of Integrated Housing and Railway Development (Kohoku New Town and Yokohama City Metro Development) Case Study of Integrated Housing and Railway Development (Kohoku New Town and Yokohama City Metro Development) Project Division, Urban Development Bureau and Development Cooperation Division, International

More information

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1 Implementation 10 Implementation This chapter overviews how to use the comprehensive plan as a land use and programming tool for the Town of Bloomsburg and recommends annual review of the plan by the Town

More information

Outline of Presentation

Outline of Presentation LUSAKA CITY COUNCIL 2 nd Annual IGC Cities Conference Making Cities work for growth London School of Economics (LSE) United Kingdom. 28 th 29 th January 2016 Presenter: Alex Mwansa Town Clerk Lusaka City

More information

Making TOD Work in the Heart of Suburban Sprawl

Making TOD Work in the Heart of Suburban Sprawl Making TOD Work in the Heart of Suburban Sprawl Rocky Mountain Land Use Institute March 6, 2009 Speakers Ben Herman, FAICP, Principal Clarion Associates Darcie White, AICP, Principal Clarion Associates

More information

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference Scarborough Subway Extension Final Terms of Reference 1 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

City Planning based on Green Space Development in Major Asian Cities

City Planning based on Green Space Development in Major Asian Cities 2008 Conference: Blueprints for Sustainable Infrastructure Auckland, New Zealand December 9-12, 9 2008 City Planning based on Green Space Development in Major Asian Cities Dr. Kayoko YAMAMOTO National

More information

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion CDAC Update: Downtown Dartmouth Update: CDAC July 25 th Motion 2018-10-24 Downtown Dartmouth Plan Open House October 22, 2018 6:00 pm Open House 6:30 pm Presentation + Q&A 7:20 pm Open House 8:30 pm Close

More information

2018 Northampton Township Comprehensive Plan

2018 Northampton Township Comprehensive Plan 2018 BUCKS COUNTY, PENNSYLVANIA What is a? A comprehensive plan is a municipality s main policy document that details the collective vision for the future, the historic, environmental, and cultural facilities

More information

Strategies to Connect and Integrate Urban Planning and Environmental Planning Through Focusing On Sustainability : Case Study of Cheongju City, Korea.

Strategies to Connect and Integrate Urban Planning and Environmental Planning Through Focusing On Sustainability : Case Study of Cheongju City, Korea. Strategies to Connect and Integrate Urban Planning and Environmental Planning Through Focusing On Sustainability : Case Study of Cheongju City, Korea. Assistant Professor, Dept. of Urban Engineering, Chungbuk

More information

Noblesville Unified Development Ordinance Audit

Noblesville Unified Development Ordinance Audit Noblesville Unified Development Ordinance Audit December 4 th, 2012 Shane Burkhardt, AICP RW Armstrong Project Summary Started project in the beginning of June 2012 Conducted focus groups July 2012 Conducted

More information

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN 5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN The Planning and Economic Development Committee recommends the following: 1. The communication from Brendan O Callaghan,

More information

Planning Districts INTRODUCTION

Planning Districts INTRODUCTION INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is

More information

8implementation. strategies

8implementation. strategies PROGRAM STRATEGIES 8implementation strategies T he implementation actions of this chapter are designed to support and carry out the land use, economic development, transportation, urban design, and program

More information

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 EXHIBIT A Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 1 As amended by Resolution No. 2008-02-001(TR1R) of the Tax Increment Reinvestment Zone No.1, and approved to

More information

EXISTING COMPREHENSIVE PLAN

EXISTING COMPREHENSIVE PLAN EXISTING COMPREHENSIVE PLAN Town Center Land Use Element: V. LAND USE POLICIES Town Center Mercer Island's business district vision as described in "Your Mercer Island Citizen-Designed Downtown" was an

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

CHAPTER 12 IMPLEMENTATION

CHAPTER 12 IMPLEMENTATION CHAPTER 12 IMPLEMENTATION The 2010 Town of Denton Comprehensive Plan is intended to capture a vision of the future of Denton. As such, it provides a basis for a wide variety of public and private actions

More information

Laberge Group. Town of Coeymans. Draft Comprehensive Plan. Overview of Planning Process

Laberge Group. Town of Coeymans. Draft Comprehensive Plan. Overview of Planning Process Draft : Presentation of Goals & Strategies Laberge Group Benjamin H. Syden, A.I.C.P., E.D.P Director in Charge Nicole Allen, A.I.C.P. Senior Planner Anjali Malhotra Planner Presentation Outline Introductions

More information

1-17 Anndale Drive, Bales Avenue and Glendora Avenue Zoning Amendment Application Preliminary Report

1-17 Anndale Drive, Bales Avenue and Glendora Avenue Zoning Amendment Application Preliminary Report STAFF REPORT ACTION REQUIRED 1-17 Anndale Drive, 31-35 Bales Avenue and 22-70 Glendora Avenue Zoning Amendment Application Preliminary Report Date: August 20, 2007 To: From: Wards: Reference Number: North

More information

Planning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator

Planning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator Department Director of Manager of Policy Planner Planner II (2) Planner II/ Heritage Coordinator Technician/ Sustainability Coordinator Technician Administrative Clerk March 2017 Department 2018 Business

More information

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY MAIN STREET ECONOMIC DEVELOPMENT STRATEGY A PATHWAY TO A BETTER POUGHKEEPSIE DRAFT Working Paper #2: Planning Strategies Submitted December 1 st, 2015 to the City of Poughkeepsie LAND USE LAW CENTER PACE

More information

Matthew F. Craigie, Project Manager

Matthew F. Craigie, Project Manager Matthew F. Craigie, Project Manager Graduate Certificate in Real Estate Development, Portland State University M.A. Geography, Binghamton University, SUNY B.A. Economics, Earlham College Matt Craigie joined

More information

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

Town of Cobourg Heritage Master Plan. Statutory Public Meeting Town of Cobourg Heritage Master Plan Statutory Public Meeting April 25 th 2016 Presentation Overview 1. Introduction 2. Project background and schedule overview 3. Review of strategic direction content

More information

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy 2014 Professional Awards 1 ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy Janesville, WI Completed December 2014 Analysis & Planning Purpose of Project 2 The purpose of the Rock

More information

Fossumdumpa Stovner, Oslo

Fossumdumpa Stovner, Oslo Fossumdumpa Stovner, Oslo The site is part of a larger area of 25.000 sqm called Fossumdumpa, which is located in the center of Stovner district and situated in the Grorud Valley in the eastern part of

More information

Dyersville Downtown Plan. Open House October 24, 2017

Dyersville Downtown Plan. Open House October 24, 2017 Dyersville Downtown Plan Open House October 24, 2017 What is a Comprehensive Plan? - Vision - Guidance for decisions - Basis for regulations What is a Downtown Plan? - Understand priorities - Identify

More information

TOD 101 CREATING LIVABLE COMMUNITIES WITH TRANSIT

TOD 101 CREATING LIVABLE COMMUNITIES WITH TRANSIT 1 CREATING LIVABLE COMMUNITIES WITH TRANSIT What are transit Centered Communities? Benefits of Partnerships to Support and Implement What You Will Learn Portland s Pearl District Your Trainers Today Catherine

More information

Downtown Whitby Action Plan

Downtown Whitby Action Plan Downtown Whitby Action Plan Final Report October 2016 Table of Contents Introduction 1 Public Consultation 2 Walkability 3 Downtown Whitby Walkability Map 4 Vision 5 Goal & Objectives 6 Objective 1 7 Objective

More information

Stafford County Strategic Plans

Stafford County Strategic Plans Stafford County Strategic s Strategic Department Description Date Adopted Board of Supervisors Priorities Fiscal Responsibility Education Public Safety Infrastructure Economic Development Service Excellence

More information

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Streets for People, Place-Making and Prosperity.  #TOcompletestreets COMPLETE STREETS FOR TORONTO Streets for People, Place-Making and Prosperity COMPLETE STREETS: A NEW APPROACH A Complete Streets design approach considers the needs of all users people who walk, bicycle,

More information

Joint Meeting City Council and the Plan Commission. September 1st, 2015

Joint Meeting City Council and the Plan Commission. September 1st, 2015 Joint Meeting City Council and the Plan Commission September 1st, 2015 1 The City Plan Commission shall recommend a City Plan for the physical development of the City Article IX Section 2 of the City of

More information

Implementation Guide Comprehensive Plan City of Allen

Implementation Guide Comprehensive Plan City of Allen Implementation Guide 2030 Comprehensive Plan City of Allen DRAFT 2015 Implementation Guide Allen 2030 Comprehensive Plan INTRODUCTION The Comprehensive Plan serves as a guide for the growth and development

More information

Richard H. Bradley Board of Directors Meeting April 25, A 21st Century Sustainability Framework

Richard H. Bradley Board of Directors Meeting April 25, A 21st Century Sustainability Framework Richard H. Bradley Board of Directors Meeting April 25, 2011 A 21st Century Sustainability Framework October 18, 2011 What is the DowntownDC BID? BID History Established in 1998 as Washington DC came out

More information

THE POLICY FRAMEWORK FOR WALKABLE COMMUNITIES. Community Technical Assistance Program Building Active Communities Institute March 2016

THE POLICY FRAMEWORK FOR WALKABLE COMMUNITIES. Community Technical Assistance Program Building Active Communities Institute March 2016 THE POLICY FRAMEWORK FOR WALKABLE COMMUNITIES Community Technical Assistance Program Building Active Communities Institute March 2016 ACTIVE COMMUNITIES BACK THEN ACTIVE COMMUNITIES BACK THEN Lifestyle

More information

SUSTAINABLE URBAN DEVELOPMENT AND COHESION POLICY EUROPEAN COMMISSION. Urban Policy within the framework of EU Cohesion Policy

SUSTAINABLE URBAN DEVELOPMENT AND COHESION POLICY EUROPEAN COMMISSION. Urban Policy within the framework of EU Cohesion Policy Urban Policy within the framework of EU Cohesion Policy 2007-2013 16/09/2007 SUSTAINABLE URBAN DEVELOPMENT AND COHESION POLICY 2007-2013 Marco Orani European Commission Directorate General for 1 SUSTAINABLE

More information

Thailand s Eastern Seaboard Development

Thailand s Eastern Seaboard Development 1 Thailand s Eastern Seaboard Development Office of the National Economic and Social Development Board Outline : 2 1 Background 2 Selection of Location 3 Objectives 4 Target Areas 5 Roles of NESDB 6 Impacts

More information

Vietnam Scaling up Urban Upgrading Project (SUUP)

Vietnam Scaling up Urban Upgrading Project (SUUP) 1. Introduction Vietnam Scaling up Urban Upgrading Project (SUUP) Terms of Reference (TOR) Technical Advisory Services on Universally Accessible Infrastructure Design September 2018 The project is part

More information

Cambie Corridor Planning Program Phase Two Draft Plan. Standing Committee on City Services and Budgets May 5, 2011

Cambie Corridor Planning Program Phase Two Draft Plan. Standing Committee on City Services and Budgets May 5, 2011 Cambie Corridor Planning Program Phase Two Draft Plan Standing Committee on City Services and Budgets May 5, 2011 Cambie Corridor Program Terms of Reference approved July 2009 Land Use Transportation Energy

More information

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017 Page 1 of 10 EXECUTIVE SUMMARY This Land Use Amendment application seeks to redesignate a full downtown block (currently the YWCA site) from a Direct Control based on the CM-2 District (Land Use Bylaw

More information

2016 Comprehensive Plan

2016 Comprehensive Plan JOINT WORK SESSION SPECIAL MEETING OF PLANNING COMMISSION & TOWN COUNCIL 2016 Comprehensive Plan January 29, 2015 COMMUTER LOT VOTE I support a Commuter Lot that has the following: Heavy Landscape Buffer

More information

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Notes: This document is provided for information purposes

More information

Indonesia: Towards Habitat III and the New Urban Agenda

Indonesia: Towards Habitat III and the New Urban Agenda MINISTRY OF PUBLIC WORKS AND HOUSING REPUBLIC OF INDONESIA Indonesia: Towards Habitat III and the New Urban Agenda Bangkok, 27-28 January 2016 Habitat Indonesia National Secretariat Outline Towards Habitat

More information

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005 1 Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005 Purpose To update the Committee on the ForwardDallas! Plan, including: Status Anticipated Products Public

More information

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN Official Plan Amendment XX to the Official Plan for the City of Ottawa 1 INDEX THE STATEMENT OF COMPONENTS PART A THE PREAMBLE PAGE Purpose...

More information

TOWN COUNCIL / PLANNING COMMISSION

TOWN COUNCIL / PLANNING COMMISSION Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.

More information

City of Westbrook. 2 York Street Westbrook, Maine (207) Fax:

City of Westbrook. 2 York Street Westbrook, Maine (207) Fax: City of Westbrook DEPARTMENT OF PLANNING & CODE ENFORCEMENT 2 York Street Westbrook, Maine 04092 (207) 854-0638 Fax: 1-866-559-0642 WESTBROOK PLANNING BOARD TUESDAY, JANUARY 2, 2018, 7:00 P.M. WESTBROOK

More information

Mountain Resort Community Success Factors: Whistler, Canada Case Study

Mountain Resort Community Success Factors: Whistler, Canada Case Study Mountain Resort Community Success Factors: Whistler, Canada Case Study Dr. Peter Williams Centre For Tourism Policy and Research Simon Fraser University, Vancouver, Canada North American Mountain Resort

More information

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment Authority September 17, 2015 Discussion Points Overview of

More information

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT LOS ANGELES CITY PLANNING COMMISSION CASE NO: CPC 2006-9374 CRA CEQA: Exempt DATE: December 21, 2006 Location: Valley Plaza and Laurel Plaza TIME: after

More information

6 Strategic Vision and Vision Matrix

6 Strategic Vision and Vision Matrix PUBLIC HANDOUT: FEBRUARY 11, 2013 TOWN COUNCIL MEETING STRATEGIC VISION PLAN: VISIONING INTO ACTION 6 Strategic Vision and Vision Matrix 6.1 Strategic Vision The Strategic Vision builds on the vision of

More information

Welcome to the Oakridge Centre Open House

Welcome to the Oakridge Centre Open House Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive

More information

Governance Arrangements in Commercial City Districts. Some thoughts from the UK

Governance Arrangements in Commercial City Districts. Some thoughts from the UK Governance Arrangements in Commercial City Districts Some thoughts from the UK The UK Placemaking and Place Management Journey Street associations - Networking; social; lobbying - Objecting City centre

More information

HOUSING ELEMENT GOALS, OBJECTIVES, AND POLICIES

HOUSING ELEMENT GOALS, OBJECTIVES, AND POLICIES HOUSING ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 6 Maintain and enhance the supply of decent, safe, energy efficient and affordable housing and maximize viable options and opportunities for present

More information

Rio de Janeiro - Brazil. Urban Regeneration & Climate Change

Rio de Janeiro - Brazil. Urban Regeneration & Climate Change Rio de Janeiro - Brazil Urban Regeneration & Climate Change 2017 Rio de Janeiro - Brazil introduction slide 1 BRASIL 204.5 million inhabitants RIO DE JANEIRO STATE 16.5 million inhabitants RIO DE JANEIRO

More information

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project 1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA 1.1.1 Project Description The Trunk Highway (TH) 14 West Corridor is a two-lane roadway approximately 22 miles in length. Located in Nicollet County, the corridor

More information

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File # 0 'O DI Lan-171-14 1 - THE CORPORATION OF THE TOWN OF COBOURG..,. STAFF REPORT TO: FROM: Mayor and Members of Council Dean A. Hustwick, Director of Recreation and Culture DATE OF MEETING: Committee of

More information

Port Lavaca Future Land Use

Port Lavaca Future Land Use Port Lavaca Future Land Use Introduction The City of Port Lavaca is beginning to see sustained growth, after many years of relative stable population. New single family homes, apartments, and businesses

More information

Executive Summary. The Mebane CLP is not a regulatory document, but is intended to guide land development decisions. The plan includes:

Executive Summary. The Mebane CLP is not a regulatory document, but is intended to guide land development decisions. The plan includes: Executive Summary P URPOSE AND O RGANIZATION OF THE P LAN The City of Mebane, with input from citizens and an appointed CLP Advisory Committee, adopted Mebane by Design, a Comprehensive Land Development

More information

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE Shady Grove Metro Station Area Charrette Closing Presentation October 25-28, 2000 MONTGOMERY COUNTY, MD M-NCPPC Design Collective, Inc. Architects

More information

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE Adopted April 16, 2016 Amended July 19, 2016 Overview of Integrated Effort The overall goal of the Four Mile Run Valley (4MRV) initiative is to develop a comprehensive

More information

Roosevelt Corridor. R e i n v e s t m e n t P l a n. Public Meeting Gilbert Elementary School May 12, :00 pm

Roosevelt Corridor. R e i n v e s t m e n t P l a n. Public Meeting Gilbert Elementary School May 12, :00 pm Roosevelt Corridor R e i n v e s t m e n t P l a n Public Meeting Gilbert Elementary School May 12, 2009 6:00 pm Agenda 6:00 6:10 6:25 6:40 6:55 7:00 Opening Comments Councilwoman Jennifer V. Ramos District

More information

The Dreispitz in Basel / Switzerland: New economy on old sites

The Dreispitz in Basel / Switzerland: New economy on old sites The Dreispitz in Basel / Switzerland: New economy on old sites 1. Introduction At 50.000m 2 Dreispitz is currently the largest and most ambitious development project in Basel, the second biggest town in

More information

Recent UN and EU Sustainable Development Policies (Post 2015): What challenges for city planning and governance

Recent UN and EU Sustainable Development Policies (Post 2015): What challenges for city planning and governance Recent UN and EU Sustainable Development Policies (Post 2015): What challenges for city planning and governance Europe at a crossroads: the challenge for future sustainable development 20 July 2016 Roudaina

More information

Encouraging collaboration:

Encouraging collaboration: Encouraging collaboration: Applied research in the context of Dongtan eco-city in China Anne-Marie Gribnau, Arup Amsterdam European Construction Technological Platform, 20 November 2007 Contents Introduction

More information

NEW YORK AND CONNECTICUT SUSTAINABLE COMMUNITIES. Fair Housing & Equity Assessment & Regional Planning Enhancement

NEW YORK AND CONNECTICUT SUSTAINABLE COMMUNITIES. Fair Housing & Equity Assessment & Regional Planning Enhancement NEW YORK AND CONNECTICUT SUSTAINABLE COMMUNITIES Fair Housing & Equity Assessment & Regional Planning Enhancement November 12, 2013 Yonkers Public Library Federal grant to improve regional planning to

More information

Sorted citizen input comments in review of Blount County plans July, August, and September 2007

Sorted citizen input comments in review of Blount County plans July, August, and September 2007 Sorted citizen input comments in review of Blount County plans July, August, and September 2007 The following presents sorted citizen input comments from three sessions held in July, August and September

More information

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity Status Update (2006 vs. Now) Citizen s Advisory Committee February 2018 Plan for Prosperity 2000 2017 2000 2017 Gardnerville Population 6,000 5,760 5746 5,500 5,000 5,067 5,550 5,165 5,394 5,412 5,250

More information

Kinzie Industrial Corridor

Kinzie Industrial Corridor Mayor Emanuel s Industrial Corridor Modernization Kinzie Industrial Corridor Fulton Market Innovation District Plan Implementation October 10, 2017 Rahm Emanuel, Mayor David Reifman, Commissioner Dept.

More information

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018 Public Open House Overview of the Downtown Plan Official Plan Amendment April 23, 2018 1 A 25-Year Plan for Downtown To ensure growth contributes positively to Toronto s Downtown as a great place to live,

More information

Town of Peru Comprehensive Plan Executive Summary

Town of Peru Comprehensive Plan Executive Summary Town of Peru Comprehensive Plan Executive Communities that plan grow by choice, not by chance. A plan makes growth thoughtful, understandable, and predictable. A plan shows that a community is managing

More information

SUMMARY. An Attractive, Competitive and Sustainable GREATER MONTREAL. Draft Metropolitan Land Use and Development Plan. April 2011

SUMMARY. An Attractive, Competitive and Sustainable GREATER MONTREAL. Draft Metropolitan Land Use and Development Plan. April 2011 April 2011 Draft Metropolitan Land Use and Development Plan GREATER MONTREAL An Attractive, Competitive and Sustainable SUMMARY Message from the Chair I am pleased to introduce this draft of the Metropolitan

More information

Kensington Center. Public Meeting # Transit-Oriented Development, Town of Berlin, CT

Kensington Center. Public Meeting # Transit-Oriented Development, Town of Berlin, CT Kensington Center Public Meeting #1 10.27.16 Transit-Oriented Development, Town of Berlin, CT CivicMoxie 2016 What is Transit-Oriented Development Definition: Transit-Oriented Development (TOD) = is an

More information

City of Welland Commercial Policies. Public Information Centre March 25 th, 2009

City of Welland Commercial Policies. Public Information Centre March 25 th, 2009 City of Welland Commercial Policies Public Information Centre March 25 th, 2009 Presentation Outline Presentation will address the following four areas: Purpose of this Public Information Centre? Why does

More information

12 Intergovernmental Coordination

12 Intergovernmental Coordination Intergovernmental Coordination Supporting Data The purpose of the Intergovernmental Coordination Element is to identify and resolve incompatible goals, objectives, policies and development proposed in

More information

Vancouver. Title of the Initiative. Initiative Duration. Submitted by. Comments by the Jury

Vancouver. Title of the Initiative. Initiative Duration. Submitted by. Comments by the Jury 134 Vancouver Title of the Initiative Initiative Duration Submitted by Comments by the Jury Visionary Vancouver: Creating a Welcoming and Sustainable Place for All 2009-2020 Wendy Au, Deputy City Manager,

More information

20. Ballysadare Mini-Plan

20. Ballysadare Mini-Plan 20. Ballysadare Mini-Plan 20. Ballysadare Mini-Plan Community facilities Ballysadare has a wide range of community facilities: a primary school, St Mary s College (secondary school), a health centre, playing

More information

The Five Components of the McLoughlin Area Plan

The Five Components of the McLoughlin Area Plan The Five Components of the McLoughlin Area Plan This documents contains the complete language of the five components of the McLoughlin Area Plan: The Vision Statement The Values The Guiding Principles

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

City of St. Thomas New Official Plan

City of St. Thomas New Official Plan City of St. Thomas New Official Plan Sustainable & Healthy Community Workshop Ann Joyner and Paddy Kennedy Dillon Consulting Limited Work Shop Outline Introduction Presentation Exercise 1 (individual)

More information

THE TOWN OF WASAGA BEACH

THE TOWN OF WASAGA BEACH THE TOWN OF WASAGA BEACH Downtown Development Master Plan Committee of the Whole Presentation January 26 th 2017 Uses within this designation should reflect a dependence on tourism as opposed to the permanent

More information

A study on the regional landscape planning framework on the relationships between urban and rural areas: case study of Tokachi region, Hokkaido, Japan

A study on the regional landscape planning framework on the relationships between urban and rural areas: case study of Tokachi region, Hokkaido, Japan A study on the regional landscape planning framework on the relationships between urban and rural areas: case study of Tokachi region, Hokkaido, Japan K. Yamagishi & H. Kobayashi Laboratory of Urban Planning

More information

WAC #7 3/14/14. Coachella General Plan Update

WAC #7 3/14/14. Coachella General Plan Update WAC #7 3/14/14 Coachella General Plan Update Agenda 2 Introductions Public Draft General Plan Overview and Discussion of Next Steps Implementation and Evaluation Health Element Process Evaluation (discussion)

More information

Intergovermental Coordination

Intergovermental Coordination Intergovermental Coordination CITY OF WINTER PARK CHAPTER 8: INTERGOVERNMENTAL COORDINATION ELEMENT INTERGOVERNMENTAL COORDINATION ELEMENT GOAL 8-1: PROVIDE FOR IMPROVED INTERGOVERNMENTAL COORDINATION

More information

China. City and Regional Planning in. Absorbing 50 Years of ISOCARP. Statutory Planning System In China. Planning Legislation in China

China. City and Regional Planning in. Absorbing 50 Years of ISOCARP. Statutory Planning System In China. Planning Legislation in China Absorbing 50 Years of ISOCARP City and Regional Planning in Statutory Planning System In China China By Dr. SHI Nan, SG, UPSC; VP, ISOCARP Prof. Hongyang WANG, Nanjing University Planning Legislation in

More information

OFFICIAL CONTROLS IMPLEMENTATION LEGAL REQUIREMENTS

OFFICIAL CONTROLS IMPLEMENTATION LEGAL REQUIREMENTS IMPLEMENTATION The objective of the Implementation component of the Comprehensive Plan is to identify the changes that need to be made to the official controls in order to be consistent with the Comprehensive

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

Getting and Giving the Most

Getting and Giving the Most Getting and Giving the Most It s OUR meeting participate enthusiastically Focus on the future Terminology expertise is secondary There is such a thing as a bad idea! Respect (for each other and the process)

More information

Integrated Multi Modal Public Transit Hub

Integrated Multi Modal Public Transit Hub Leaders Programme in Urban Transport Planning and Management Integrated Multi Modal Public Transit Hub at Central Business District- Ahmedabad Neela Munshi (Senior Town Planner) Deepa Dave (AM Urban Planner)

More information

6 Sub-Sector Strategies

6 Sub-Sector Strategies 6 Sub-Sector Strategies 6.1 In accordance with the proposed goals and objectives for the Study Area until 2027, the sub-sector strategies have been itemized for fulfilling the requirements of the proposed

More information

Official Plan Review: Draft Built Form Policies

Official Plan Review: Draft Built Form Policies PG.30.1 REPORT FOR ACTION Official Plan Review: Draft Built Form Policies Date: May 15, 2018 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Division

More information

Lunch Talk by ACEHK. Leveraging Consultants Innovation to Enhance Quality of Urban Renewal

Lunch Talk by ACEHK. Leveraging Consultants Innovation to Enhance Quality of Urban Renewal Lunch Talk by ACEHK Leveraging Consultants Innovation to Enhance Quality of Urban Renewal Ir WAI Chi Sing GBS JP FHKEng Managing Director, Urban Renewal Authority 28 February 2017 1 Scope of Urban Renewal

More information

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK SMART CONSERVATION THROUGH SMART GROWTH NJ LAND CONSERVATION RALLY March 22, 2014 Laurette Kratina, PP, AICP, Supervising Planner Somerset County Planning

More information

Unprecedented CBD sustainably built upon Public-Private Partnerships

Unprecedented CBD sustainably built upon Public-Private Partnerships 100 Years of Sustainable Community Development in Central Tokyo: Unprecedented CBD sustainably built upon Public-Private Partnerships Tatsuo Nishimoto Deputy General Manager Urban Development Promotion

More information

Kinzie Industrial Corridor

Kinzie Industrial Corridor Mayor Emanuel s Industrial Corridor Modernization Kinzie Industrial Corridor Fulton Market Innovation District Plan Implementation October 19, Rahm Emanuel, Mayor David Reifman, Commissioner Dept. of Planning

More information

Fareham Right to Build Expo. Richard Bacon MP. Why support Custom and Self-Build Housing?

Fareham Right to Build Expo. Richard Bacon MP. Why support Custom and Self-Build Housing? Fareham Right to Build Expo Richard Bacon MP Why support Custom and Self-Build Housing? What is The Right to Build Self-build and Custom Housebuilding Act 2015 and Housing and Planning Act 2016 specifically,

More information

Department of Environment and Urban Planning - We develop Linköping!

Department of Environment and Urban Planning - We develop Linköping! Department of Environment and Urban Planning - We develop Linköping! Our task is to create an active and well functioning urban and rural community for the people of today and of the future. Our core values

More information

Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council

Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council and others in the public and private sectors, dedicated to planning

More information

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN 12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN The Planning and Economic Development Committee recommends the adoption of the recommendation contained in the following report August

More information

Sustainably Repositioning Greyfield Sites. Greyfield Sites Anywhere

Sustainably Repositioning Greyfield Sites. Greyfield Sites Anywhere Sustainably Repositioning Greyfield Sites Jim Constantine Looney Ricks Kiss Architects Todd Poole 4ward Planning Greyfield Sites Anywhere Pennsylvania Chapter American Planning Association Conference 2009

More information