Report to/rapport au : Transportation Committee Comité des transports. and Council / et au Conseil. October 24, octobre 2012

Size: px
Start display at page:

Download "Report to/rapport au : Transportation Committee Comité des transports. and Council / et au Conseil. October 24, octobre 2012"

Transcription

1 1 Report to/rapport au : Transportation Committee Comité des transports and Council / et au Conseil October 24, octobre 2012 Submitted by/soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale adjointe, Planning and Infrastructure/Urbanisme et Infrastructure Contact Person / Personne ressource: Vivi Chi, Manager/Gestionnaire, Transportation Planning/Planification des transports, Planning and Growth Management/Urbanisme et Gestion de la croissance (613) x 21877, Vivi.Chi@ottawa.ca Gloucester-South Nepean (22) Ref N : ACS2012-PAI-PGM-0249 SUBJECT: BARRHAVEN TO RIVERSIDE SOUTH RAPID TRANSIT PLANNING AND ENVIRONMENTAL ASSESSMENT STUDY RECOMMENDATIONS OBJET : RECOMMANDATIONS DE L ÉTUDE DE PLANIFICATION ET D ÉVALUATION ENVIRONNEMENTALE POUR LE TRANSPORT EN COMMUN RAPIDE ENTRE BARRHAVEN ET RIVERSIDE-SUD REPORT RECOMMENDATIONS That the Transportation Committee recommend Council approve initiating the Transit Project Assessment Process in accordance with Ontario Environmental Assessment Act (Regulation 231/08) for the Barrhaven to Riverside South Bus Rapid Transit facilities as described in this report and supporting documents, including the preparation and filing of an Environmental Project Report for formal public review and comment. RECOMMANDATIONS DU RAPPORT Que le Comité des transports recommande au Conseil d approuver le lancement du Processus d évaluation des projets du transport en commun conformément à la Loi sur les évaluations environnementales de l Ontario (Réglementation 231/08) concernant les installations du transport en commun rapide par autobus entre Barrhaven et Riverside-Sud, comme le décrivent le présent rapport et les documents d appui, et d approuver également la préparation et le dépôt d un

2 2 rapport de projet environnemental qui servira à l examen officiel et aux commentaires du public. Executive Summary Assumptions and Analysis The North-South Corridor LRT Project Environmental Assessment (N-S LRT EA) from Barrhaven Town Centre to the Rideau Centre was approved by the Minister of the Environment in June The EA report identified twin-track electric Light Rail Transit (LRT) as the recommended technology for the entire corridor. In 2008, Council approved an updated Transportation Master Plan (TMP) that identified the segment of the N-S corridor connecting Barrhaven Town Centre and Riverside South Town Centre as a bus rapid transit (BRT) facility terminating at an LRT/BRT transfer station and Park and Ride within Riverside South Town Centre. This change in technology requires a new EA approval which is the principal subject of this Planning and EA study. This study also addresses a City commitment made in response to the Ontario Municipal Board (OMB) appeal hearing for Official Plan Amendment (OPA) No. 76, in which the City agreed to identify: Property requirements for the BRT stations along the Transitway between Limebank Road and the Rideau River; Land requirements, both size and location, to accommodate the BRT-LRT transfer station to the west of Limebank Road, and as part of this work a review of the size and location of the Park and Ride facility proposed on the east and west sides of Limebank Road to serve this BRT-LRT station, and LRT station requirements, particularly north of Earl Armstrong Road with respect to drainage and station platform size as well as pedestrian circulation needs. Additionally, in response to Council direction, staff identified in a report presented to the 22 February 2012 Transit Commission meeting that it was technically feasible to extend the existing single-track diesel powered O-Train to either Leitrim or Bowesville Station and Park and Rides. That report concluded that a recommendation regarding possible future extension of the O-Train should be examined within the 2013 Transportation Master Plan Update. Accordingly, this BRT Planning and EA Study also identifies a Recommended Plan to extend BRT technology within the future LRT corridor between Riverside South Town Centre and a potential future O-Train transfer/terminus at either the Leitrim or Bowesville Station and Park and Ride facilities. To address imminent planned development along Chapman Mills Drive, this report also presents an interim implementation plan (Document 1) to defer the full cost of constructing the ultimate transit facility (Document 2), provide enhanced transit service reliability in the near term, and address existing operational issues in this corridor. Accordingly, this report presents the Recommended Plan that describes:

3 3 1. An ultimate BRT facility from Barrhaven Town Centre to Riverside South Town Centre; 2. An interim BRT Extension from Riverside South Town Centre to Bowesville or Leitrim Station and Park and Ride facilities; and 3. A near term implementation strategy on Chapman Mills Drive. This project is being planned in accordance with the Transit Project Assessment Process (TPAP) as described in Ontario s Transit Project Regulation (O. Reg. 231/08). Prior to initiating the formal approvals process, the TPAP requires proponents to have a clearly defined transit project which necessitates a considerable amount of planning work. In the context of this project, planning activities completed by the City have included corridor selection (as part of the N-S LRT EA), assessment and evaluation of design alternatives, identification of a strategy to guide project implementation and a comprehensive stakeholder engagement program including Agency, Stakeholder and Business Consultation Group Meetings and a Public Open House. Project Estimate The preliminary project cost estimate to design and construct the transitway facility is $225 M in 2012 dollars. This estimate will be refined after detailed design of the project and will include inflation in accordance with the Construction Price Index. The upcoming TMP review will include an update to the affordability model and the establishment of project priorities. This project will be part of that review. The recommended plan to extend BRT from Greenbank Road to a BRT/LRT transfer facility west of Street 4 in Riverside South Town Centre is estimated to cost $85 million. The potential interim extension of BRRT facility from Riverside South Town Centre to Bowesville Park and Ride is estimated to cost $95 million. The potential interim extension of this BRRT facility from Bowesville Park and Ride to Leitrim Park and Ride is estimated to cost $45 million. The near-term transit priority implementation plan for Chapman Mills Drive from Greenbank Road to Woodroffe Avenue is estimated to cost $12 million. The $6M for near-term transit priority measures for the section between Longfields and Woodroffe would come from existing capital authority. The remaining Greenbank to Longfields section would be funded from development charges and future capital authority for transit priorities and/or transit supplementary network projects. Public Consultation/Input Meetings with Agency, Business, and Public Consultation Groups were held three times between April and September Comments and feedback were incorporated during the development and evaluation of alternatives and preparation of the Recommended Plan. A Public Open House was held on 2 October 2012 at Steve MacLean School with 33 people signing the registry. There was a general support for the recommended plan and the concerns that were raised were design in nature and would be responded to in

4 4 the detail design plan (next phase of project) or were transit operational issues that would be managed by OCTranspo. Hypothèses et analyse L évaluation environnementale du couloir nord-sud du TLR du centre de Barrhaven au Centre Rideau a été approuvée par le ministre de l Environnement en juin Le rapport d ÉE désignait le train léger sur rail électrique à voies doubles comme la technologie recommandée pour la totalité du couloir. En 2008, le Conseil a approuvé le Plan directeur des transports mis à jour qui énonçait que le tronçon du couloir N-S reliant le centre ville de Barrhaven et le centre de Riverside Sud serait relié par transport en commun rapide par autobus (TCRA) se terminant à une station de correspondance TCRA/TLR et un parc-o-bus au centre de Riverside Sud. Ce changement de technologie exige qu une nouvelle ÉE soit réalisée et approuvée ce qui est le principal objectif de l étude de planification et d évaluation environnementale. Cette étude porte également sur l engagement pris par la Ville en réponse à l audition de l appel fait à la Commission des affaires municipales de l Ontario concernant la modification 76 du Plan officiel, dans laquelle la Ville a convenu de déterminer : Les exigences relatives aux propriétés pour les stations du TCRA le long du Transitway entre le chemin Limebank et la rivière Rideau; Les besoins en terrain, soit la taille et l emplacement, pour accommoder la station de correspondance TCRA/TLR à l ouest du chemin Limebank; et, dans le cadre de ces travaux, l évaluation de la taille et de l emplacement du parc-o-bus proposé sur les côtés est et ouest du chemin Limebank afin de servir la station du TCRA/TLR; et Les besoins pour la station de TLR, plus particulièrement au nord du chemin Earl Armstrong, relativement au drainage et à la taille des quais de la station ainsi que les besoins pour la circulation piétonnière. De plus, en réponse à une directive du Conseil, le personnel a indiqué dans un rapport présenté à la réunion du 22 février 2012 de la Commission du transport en commun que, du point de vue technique, il était techniquement possible de prolonger le couloir existant de l O-Train diesel à voie simple jusqu aux stations et parc-o-bus de Leitrim ou Bowesville. Ce rapport concluait qu il serait important de prendre en considération une recommandation concernant le prolongement possible futur du O-Train dans la mise à jour du Plan des transports de Par ailleurs, cette étude de planification et d évaluation environnementale pour le transport en commun rapide entre Barrhaven et Riverside-Sud mentionne également un plan recommandé visant à étendre la technologie du TCRA dans le couloir futur du TLR entre le centre de Riverside Sud et un terminus/station de correspondance possible futur de l O-Train aux stations et parcs-o-bus Leitrim ou Bowesville. En vue des projets d aménagement prévus le long de la promenade Chapman Mill, ce rapport présente un plan de mise en œuvre intermédiaire qui propose de reporter les

5 5 coûts totaux de la construction des installations de transport en commun définitives, de fournir dans l intérim un service fiable et amélioré de transport en commun et de régler les problèmes opérationnels dans ce couloir. En conséquence, le présent rapport présente le plan recommandé qui décrit : 1. Les installations de TCRA définitives du centre de Barrhaven au centre de Riverside Sud; 2. Le prolongement TCRA du centre de Riverside Sud aux installations de station et de parc-o-bus de Bowesville ou Leitrim; et 3. Une stratégie de mise en œuvre à court terme sur la promenade Chapman Mills. Ce projet est planifié conformément au processus d évaluation des projets de transport en commun, tel que décrit dans le règlement sur les projets de transport en commun (Règlement de l Ontario 231/08). Avant de lancer les processus d approbation officiels, le processus d évaluation des projets de transport en commun exige que les proposants présentent un projet de transport en commun clairement défini, ce qui se traduira par beaucoup de temps passé à la planification. Dans le contexte de ce projet, les activités de planification qu a réalisées la Ville ont porté sur la sélection du couloir (dans le cadre de l évaluation environnementale du couloir nord-sud du TLR), l évaluation des diverses solutions de concept, la mise au point d une stratégie pour guider la mise en œuvre et un programme complet pour s assurer de la participation des intervenants, dont des rencontres avec des groupes de consultation d organismes, d intervenants et d entreprises, ainsi qu une séance portes ouvertes. Estimations du projet L estimation préliminaire des coûts du projet visant la conception et la construction des installations du Transitway s élève à 225 millions de dollars, en dollars de Cette estimation sera affinée une fois que les détails de la conception du projet seront connus et que l inflation aura été ajoutée, conformément à l Indice des prix de la construction. Le prochain examen du PDT, dont il fera partie, contiendra une mise à jour au modèle d abordabilité et l établissement des priorités du projet. Le plan recommandé visant à élargir le tracé du transport en commun rapide par autobus (TCRA) reliant le chemin Greenbank à un terminus de correspondance proposé entre train et autobus situé immédiatement à l ouest de la rue 4, au centre-ville de Riverside-Sud, devrait coûter 85 millions de dollars, selon les estimations. La prolongation provisoire potentielle de l installation du transport en commun rapide (TCR) entre le centre-ville de Riverside-Sud et le parc-o-bus de Bowesville devrait coûter 95 millions de dollars. La prolongation provisoire potentielle de TCR entre les parcs-o-bus de Bowesville et de Leitrim devrait coûter 45 millions de dollars. Le plan de mise en œuvre du corridor prioritaire de transport en commun, à court terme, sur la promenade Chapman Mills, entre le chemin Greenbank et l avenue Woodroffe, devrait coûter 12 millions de dollars. Les 6 millions de dollars réservés au corridor prioritaire de transport

6 6 en commun à court terme, et en l occurrence, au tronçon entre la promenade Longfields et l avenue Woodroffe, proviendront de l autorisation d immobilisations en vigueur. Le tronçon entre le chemin Greenbank et la promenade Longfields sera financé à même les charges d aménagement et l autorisation d immobilisations ultérieures pour priorités aux transports en commun. Consultation/commentaires publics Trois rencontres ont eu lieu avec des groupes de consultation publique, de consultation d entreprises et de consultation d'organismes entre avril et septembre Les commentaires ont été intégrés pendant l élaboration et l évaluation de solutions de remplacement et la préparation du plan recommandé. Une séance portes ouvertes a eu lieu le 2 octobre 2012 à l école Steve MacLean, 33 personnes ont signé le registre. En général, ces personnes ont manifesté leur appui au plan recommandé. Quelques inquiétudes ont été énoncées au sujet de la conception et seront abordées dans le plan de conception détaillée (étape suivante du projet) ; ou encore portaient sur des questions opérationnelles qui seront gérées par OC Transpo. BACKGROUND The North-South Corridor LRT Project Environmental Assessment (N-S LRT EA) from Barrhaven Town Centre to the Rideau Centre was completed and approved by the Minister of the Environment on 19 June The EA report identified twin-track electrified Light Rail Transit (LRT) as the recommended technology for the entire corridor. The project was intended to be constructed and operational by fall 2009; therefore, interim implementation solutions were not identified. The project was terminated by City Council in December 2006 and the downtown portion of the Recommended Plan was subsequently replaced by the Downtown Ottawa Transit Tunnel (DOTT) EA. The current single-track diesel-powered O-Train continues to operate in the corridor between Bayview and Greenboro stations. In 2008, City Council approved an updated Transportation Master Plan (TMP) that identified the rapid transit corridor connecting Barrhaven Town Centre and Riverside South Town Centre as a bus rapid transit (BRT) facility. This represents a change to the approved N-S LRT EA, which had identified twin-track LRT along this section of the transit network. Furthermore, the 2008 TMP identified the twin-track LRT terminating at an LRT/BRT transfer station and Park and Ride within Riverside South Town Centre, just west of Limebank Road. As operational characteristics and right-of-way (ROW) requirements differ between BRT and LRT, on 07 December 2011, Transportation Committee approved the Statement of Work for a new Planning and Environmental Assessment (EA) Study to identify and reserve any additional property required to accommodate a BRT facility between Barrhaven Town Centre and Riverside South Town Centre. Study limits are illustrated in Figure 1.

7 7 Figure 1 Study Area This Planning and EA study also addresses a City commitment made in response to the OMB appeal hearing for OPA No. 76, in which the City agreed to identify: Property requirements for the BRT stations along the Transitway between Limebank Road and the Rideau River; Land requirements, both size and location, to accommodate the BRT-LRT transfer station to the west of Limebank Road, and as part of this work a review of the size and location of the Park and Ride facility proposed on the east and west sides of Limebank Road to serve this BRT-LRT station; and LRT station requirements, particularly north of Earl Armstrong Road with respect to drainage and station platform size as well as pedestrian circulation needs. At its meeting of 22 June 2011, Council approved work to increase the frequency of O-Train service from 15 minutes to eight minutes between Bayview Drive and Greenboro Crescent. This project is now underway and is expected to be completed in Furthermore, Transit Commission also directed staff to investigate and report back on the feasibility of extending the current O-Train service further south toward Leitrim and Riverside South. A report to the 22 February 2012 Transit Commission meeting identified that it was technically feasible to extend the O-Train to either Leitrim Park and

8 8 Ride or Bowesville Park and Ride. The report concluded that a recommendation regarding the future extension of the O-Train should be presented as part of the 2013 Transportation Master Plan Update. Therefore, this BRT Planning and EA Study also identifies a Recommended Plan to extend BRT technology within the future LRT corridor between Riverside South Town Centre and a potential future O-Train transfer/terminus at either the Leitrim or Bowesville Station and Park and Ride facilities (Figure 2). Figure 2 Possible O-Train Transfer Locations Finally, to address recent, ongoing and imminent planned development along Chapman Mills Drive, an interim implementation plan is proposed that will defer the full cost of constructing the ultimate transit facility, provide enhanced transit service reliability in the near term, and address existing operational issues in this corridor. This project is being planned in accordance with the Transit Project Assessment Process (TPAP) as described in Ontario s Transit Project Regulation (O. Reg. 231/08). The TPAP is based on the principles and best practices of Environmental Assessment planning and places a six month maximum timeframe on the approvals process. Prior to initiating the formal approvals process, the TPAP requires proponents to have a clearly defined transit project which necessitates a considerable amount of planning work. In the context of this project, planning activities completed by the City have included corridor selection (as part of the N-S LRT EA), assessment and evaluation of design alternatives, identification of a strategy to guide project implementation and a comprehensive stakeholder engagement program including Agency, Stakeholder and Business Consultation Group Meetings and a Public Open House. Together, the

9 9 findings from these planning activities constitute the Recommended Plan which is presented herein for Transportation Committee and Council approval. DISCUSSION Project Need To support the growth management objectives set out in the Official Plan, the City has established the strategic goal of increasing the peak-hour transit modal split from 23 per cent to 30 per cent by To help achieve this objective, the 2008 TMP identified a plan for a required network of inter-linked rapid transit corridors including a downtown tunnel and incremental extensions to growing urban centres outside of the Greenbelt. The Capital Works Plan contained in the 2008 TMP prioritized the implementation of future transportation infrastructure projects based on need. In the Capital Works Plan, the Barrhaven Riverside South Rapid Transit project was identified as a Phase 2 project. Within the south urban community, the City has planned and protected for transit supportive development through the South Nepean (Barrhaven) Town Centre Community Design Plan (2006) and the Riverside South Community Design Plan (2010). Both plans established a vision for these growing communities that emphasized compact, mixed-use, pedestrian scaled and transit supportive development. Specifically, the plan for both town centres includes a mixed-use main street that also incorporates an at-grade rapid transit corridor (Chapman Mills Drive in Barrhaven Town Centre and Transit Street in Riverside South Town Centre). The land use policies in the Barrhaven CDP support residents and jobs at full build-out. In Riverside South Town Centre, the CDP calls for jobs and residents at full-build out. By introducing rapid transit at the earliest stage in the development of these new urban communities, the Recommended Plan presented in this report will promote alternative modes of transportation and reduce overall autodependence. This study is being completed at this time to meet City commitments included an agreement with Urbandale Development Corporation and Riverside South Development Corporation (27 September 2011) that came as a result of an appeal to the OPA#76 Rapid Transit Schedule. Description of the Recommended Plan Ultimate BRT from Barrhaven Town Centre to Riverside South Town Centre In general, the Recommended Plan (Document 2) constitutes a two lane BRT facility that follows the general alignment of the approved N-S LRT corridor connecting Greenbank Road with a proposed LRT/BRT transfer terminus located immediately west of Street 4 in Riverside South Town Centre. With the exception of the Rideau River crossing (via the Strandherd-Armstrong Bridge), this facility will be exclusively for transit use, and will not be grade separated with crossing streets. This facility is projected to serve approximately passengers in the peak hour, peak direction; and will provide connections to the

10 10 Southwest Transitway (in the west) and the future N-S LRT corridor (in the east). Seven rapid transit stations are provided at key intersections along the corridor. Three stations incorporate Park and Ride facilities at Woodroffe Avenue (825 spaces), River Road (940 spaces) and Street 4 (1660 spaces). The proposed Park and Ride facilities have been designed to accommodate the projected 2031 demand. As illustrated in Figure 3, the Recommended Plan can be separated into three distinct areas. Legend Transit Station with Park and Ride Transit Station Figure 3 Recommended Plan-Distinct Areas (Barrhaven to Riverside South Town Centre) Area 1: Barrhaven Town Centre (from Greenbank Road to Chapman Mills Park and Ride) Within Barrhaven Town Centre the Recommended Plan includes a two-lane BRT facility operating within the median of Chapman Mills Drive. Each transit lane is 4.0 metre wide, and is separated from Chapman Mills Drive by a 4.5 metre grassed median on each side. Consistent with the N-S LRT EA, stations are proposed at the Southwest Transitway, Longfields Drive, and Beatrice Avenue. At each location the transit platforms are located on the far side of the intersection. While this Planning and EA study seeks approval for the transit component of this cross-section only, considerable work was also carried out to refine the City s vision for Chapman Mills Drive, which is intended to form the mixed-use, pedestrian scaled core of Barrhaven Town Centre. Specifically, through a review of the South Nepean Town Centre CDP and consultation with various City departments, the development community and the general public, a proposed typical cross-section for Chapman Mills Drive emerged that includes one 3.5 metre traffic lane, one 2.5 metre (all day) parking lane, a 2.0 metre segregated bicycle lane, and a 4.0 metre sidewalk in each direction. This results in a typical cross section width of 41.0 metre (Figure 4). This cross section widens to 43.0 metre in the vicinity of the intersection of Chapman Mills Drive and the Southwest Transitway to accommodate bus turning movements.

11 11 Figure 4 Typical Cross Section - Area 1 Area 2: Transit Priority Corridor (Chapman Mills Station to Riverview Station) This section of the Recommended Plan has already been approved and is currently under construction. Specifically, the transit service plan includes shoulder bus-only lanes on Strandherd Drive, with transit priority at the intersection of Strandherd Drive for westbound access into Chapman Mills Station. Over the Strandherd-Armstrong Bridge 4.0 metre bus-only lanes, 2.0 metre cycling lanes, and 3.0 metre sidewalks are being provided (Figure 5). Shoulder bus-only lanes on Earl Armstrong Road will provide access to Riverview Station. Local and rapid transit platforms are proposed at both Chapman Mills and Riverview Stations. Figure 5 Typical Cross Section Area 2

12 12 Area 3: Exclusive BRT Corridor (Riverview Station to Riverside South Town Centre) East of Riverview Station, the Transitway consists of two 3.75 metre bus lanes operating within a 40.0 metre wide, exclusive BRT corridor (Figure 6). Through this section, the Transitway runs adjacent to residential backyards, requiring 3.0 high noise barriers along its length (exact limits to be confirmed). In accordance with City policy a 3.5 metre multi-use pathway is provided on the south side of the corridor, connecting multi-use facilities on the Strandherd-Armstrong Bridge to those planned for Riverside South Town Centre. Figure 6 Typical Cross Section Area 3 Transit stations are proposed at Spratt Road West, Collector Road B and at the BRT/LRT transfer/terminus and Park and Ride facility located north of the Transitway, just west of Street 4 (which forms the western limit of the Town Centre). This facility has been sized to accommodate 1660 parking spaces and facilitate the transfer of passengers between local transit services, the proposed BRRT facility and the approved N-S LRT. Local access is provided from Street 4 (Figure 7).

13 13 Figure 7 Riverside South Town Centre Park and Ride Potential Interim Extension from Riverside South Town Centre to Bowesville or Leitrim Park and Ride As noted previously, the City has assessed the potential feasibility of extending the existing O-Train service to either Leitrim or Bowesville Station. A recommendation regarding this potential extension is expected to be presented as part of the forthcoming TMP update. Should the City elect to carry out the O-Train extension south of Greenboro Crescent, an interim extension of the BRT facility from Riverside South to either Leitrim or Bowesville Station would be required. This would also require an O-Train/BRT transfer facility incorporated into the station design at either Bowesville or Leitrim Station. Regardless of where the transfer is ultimately located, park and ride facilities at both Leitrim and Bowesville stations have been designed to accommodate the projected 2031 demand. This interim extension can be separated into two distinct areas (Figure 8).

14 14 Figure 8 Recommended Plan-Distinct Areas (Riverside South Town Centre Leitrim/Bowesville) Area 4: Riverside South Town Centre (Street 4 to Collector Road E) Similar to Barrhaven Town Centre, the Recommended Plan through Riverside South Town Centre consists of a two lane transit facility located in the median of Transit Street. Again, each transit lane is 4.0 metre wide, and is separated from adjacent traffic lanes by a 4.5 metre grassed median on each side. One Transitway station is proposed in the Town Centre east of Limebank Road. Consistent with the City s vision for Chapman Mills Drive, a proposed typical cross-section for Transit Street has been identified that includes one 3.5 metre traffic lane, one 2.5 metre (all day) parking lane and a 2.0 metre segregated bicycle lane in each direction. As specified in the Riverside South Town Centre CDP, 5.0 metre sidewalks are proposed in this area resulting in a typical cross section width of 43.0 metre (Figure 9).

15 15 Figure 9 Typical Cross Section Area 4 Area 5: Exclusive BRT Corridor (Collector Road E to Bowesville or Leitrim Station) East of the town centre, the Recommended Plan again provides two, 3.75 metre bus lanes and a 3.5 metre multi-use pathway within a typical 40.0 metre wide, exclusive BRT corridor (same typical cross-section as Area 3). Transit stations are provided at Spratt Road East, Bowesville Park and Ride, and Leitrim Park and Ride. To accommodate the transfer of passengers between local transit, rapid transit and a potential O-Train extension, conceptual transfer station configurations have been developed at both Leitrim and Bowesville Stations. Again, the recommendation regarding whether or not to extend the O-Train (and where it should terminate) will be presented as part of the 2013 TMP Update study. The location of the transfer station will impact the number of parking spaces that can be provided in the park and ride lot. Depending on where the transfer location is located, the combined capacity of the two park and ride facilities will range from approximately 3650 spaces (if transfer is located at Leitrim) to 3500 (if transfer is located at Bowesville). Near Term Implementation on Chapman Mills Drive Chapman Mills Drive has been constructed between Woodroffe Avenue and Longfields Drive. An extension to Greenbank Road is expected in the near term. To ensure compatibility of new construction with the BRT Recommended Plan, and to address existing operational issues within the constructed portion of the roadway, a near term implementation plan has been developed. Specifically, this plan recommends constructing the ultimate facility within the median of Chapman Mills Drive as the new roadway is extended to Greenbank Road, which requires modifications to existing intersections at Longfields Drive and Leamington Way. The near-term plan also recommends

16 16 modifications to the intersection of Beatrice Drive and Chapman Mills Drive to allow transit vehicles operating within mixed traffic to access transit only lanes through a newly signalized intersection. Buses will service transit platforms located within the median before rejoining general traffic on the far side of the intersection. In order to eliminate a potentially unsafe merge from the left, the parking lane on the far side of the intersection will be repurposed as a general traffic lane and vehicles will be required to merge from the right. The proposed near term implementation plan also recommends constructing the ultimate cross-section from Clearbrook Drive to Woodroffe Avenue (Document 1), including intersection modifications at Clearbrook Drive and Chapman Mills Drive. Consideration of Alternatives The general alignment of the rapid transit corridor was identified and approved through the N-S LRT Corridor EA study, Riverside South Town Centre CDP and South Nepean Town Centre (Barrhaven) CDP. In addition, between Woodroffe Avenue and River Road (across the Strandherd-Armstrong Bridge), the transit facility has been planned, approved and partially constructed. Finally, based on the Transitway Design Manual and refined through recent EA and functional design exercises, the City has developed a preferred configuration for a typical, rural Transitway cross-section within a 40.0 metre right-of-way that will be applied for the transit exclusive areas (Areas 3 and 5). The consideration of alternatives for this study, therefore, focused specifically on the assessment and evaluation of functional design alternatives for the Town Centres and for the location and configuration of the proposed BRT/LRT transfer facility in Riverside South. Town Centres As noted previously, the City s vision for both South Nepean (Barrhaven) and Riverside South Town Centres were identified and documented in Community Design Plans completed in 2006 and 2010 respectively. Both CDPs planned for mixed use development focused on a pedestrian oriented, transit supportive main street (Chapman Mills Drive in Barrhaven and Transit Street in Riverside South). The N-S LRT Corridor EA specified an electrified light rail transit (LRT) facility in the median of both Chapman Mills Drive and Transit Street. With the proposed change in technology from LRT to BRT, two Town Centre design alternatives were developed for evaluation: Dedicated Right Side Bus Lanes and Median BRT. Both alternatives were evaluated based on the following criteria: Urban Design and Community Building o Street Scale o Public Amenity Space o Consistency with Approved City Plans o Clear Delineation/Segregation of Modes o Provision of Parking and Loading Zones Transportation Performance o Pedestrian Crossing Distance and Delay o Cycling Conflicts with other Modes o Transit Service Reliability and Priority

17 17 o Intersection Level of Service (for general traffic) Cost and Constructability o Capital Cost o Maintenance Cost o Property Acquisition o Construction Duration o Ease of Construction Staging Median BRT: This configuration isolates transit service through the use of planted medians between mixed traffic and BRT lanes (Figure 10). While none exist in Ottawa today, median BRT facilities are a common arrangement for dedicated transit facilities in urban environments. Median BRT facilities are also planned for Greenbank Road from Chapman Mills to Cambrian Road. Figure 10 Median Bus Rapid Transit Dedicated Right Side Bus Lanes: This dedicated right side transit arrangement is commonly used in urban settings including on Albert and Slater Streets in downtown Ottawa. Transit vehicles operate in an exclusive lane between an all-day parking lane and a through traffic lane (Figure 11).

18 18 Figure 11 Dedicated Right Side Bus Lanes Evaluation Summary: From an urban design perspective, both alternatives provide opportunities to create an attractive pedestrian and cycling environment, with ample space for sidewalks, bicycle lanes and robust street plantings. However, the Median BRT alternative is slightly preferred as it provides a unique character that minimizes the scale of a wide transportation corridor, provides clear separation between different modes, and remaining consistent with the overall vision for median transit on Chapman Mills Drive and Transit Street that was identified through the CDP process. From a transportation perspective, the Median BRT alternative is preferred as it provides enhanced transit service reliability and adequately accommodates general traffic, pedestrians, and cyclists. Both alternatives include signal pre-emption for transit vehicles at crossing roadways resulting in comparable travel times through the corridor. However, as buses operating in the median do not interact with right turning vehicles and vehicles accessing parking and loading zones, the Median BRT is expected to provide enhanced transit service reliability. From the pedestrian perspective, the

19 19 Dedicated Right Side Bus Lane configuration results in a shorter overall crossing distance when compared to the Median alternative. However, the Dedicated Right Side Bus Lane configuration creates a potential conflict point as passengers must cross the cycling lane to access transit platforms. For general traffic, both configurations result in intersection levels of service of D or better, indicating that general traffic movements can be accommodated. There is no significant difference between alternatives from a capital and maintenance cost perspective. While the Median BRT carries higher construction and maintenance costs associated with drainage (additional drainage infrastructure required for the median lanes), the Dedicated Right Side Bus Lanes will require additional lighting in the median to illuminate the general traffic lane that will be located further from sidewalk light standards. In winter, both alternatives will require the same number of lanes to be maintained. Finally, there is no discernible difference between alternatives from a construction duration and constructability perspective. Overall, the Median BRT alternative is recommended as this option will provide enhanced transit service reliability, accommodate all modes, and create a unique streetscape that is consistent with the planned vision for both town centres. BRT/LRT Transfer Location Options (Riverside South Town Centre) The need for a new BRT/LRT transfer facility at the terminus of the NS LRT in Riverside South, including a park and ride facility, was identified in the 2008 TMP. The land use concept developed as part of the Riverside South Town Centre Community Design Plan located this transfer facility just west of Limebank Road, and identified a 1175 space park and ride facility south of Transit Street, occupying space on both sides of Limebank Road (Location 1-(Figure 12)).

20 20 Location 1 Location 2 Location 3 Location 4 Figure 12 Transfer Location Options (Riverside Town Centre) Through consultation additional location options were identified just west of Main Street (Location 2), just east of Street 4 (Location 3), and just west of Street 4 (Location 4). These conceptual designs were evaluated based on the following criteria: Land Use; Transit Operations; Passenger Transfers; and Access. Evaluation Summary: Based on the evaluation of alternatives and consultation with staff (including OC Transpo), the developer and local community, Location 4 is recommended. This locates the park and ride facility outside of the core town centre lands, creating the opportunity for higher density in Riverside South Town Centre than under all other options. This location also results in the least impact to mixed use Town Centre development frontage. Furthermore, the transfer itself provides the most compact design, permitting shared LRT/BRT platforms facilitating direct passenger transfers. Finally, this location does not require park and ride users to cross traffic lanes to access transit platforms.

21 21 Project Estimate The preliminary project cost estimate to design and construct the transitway facility is $225 M in 2012 dollars as follows: Construction and Property Acquisition $150 M Design, Project Management, Construction Administration $35 M Project Contingency $40 M Total $225 M This estimate will be refined after detailed design of the project and will include inflation in accordance with the Construction Price Index. The upcoming TMP review will include an update to the affordability model and the establishment of project priorities. This project will be part of that review. The recommended plan to extend BRT from Greenbank Road to a BRT/LRT transfer facility west of Street 4 in Riverside South Town Centre is estimated to cost $85 million. The potential interim extension of BRRT facility from Riverside South Town Centre to Bowesville Park and Ride is estimated to cost $95 million. The potential interim extension of this BRRT facility from Bowesville Park and Ride to Leitrim Park and Ride is estimated to cost $45 million. The near-term transit priority implementation plan for Chapman Mills Drive from Greenbank Road to Woodroffe Avenue is estimated to cost $12 million with $6 million coming from development charges and $6 million coming from existing capital budget authority. RURAL IMPLICATIONS This project is located within the urban area. However, improved transit service benefits residents across the city. Specifically, the provision of a rapid transit facility and adequate park and ride facilities will enhance access and improve mode choice for rural residents. CONSULTATION Recognizing the importance of public and stakeholder participation in the planning process, a comprehensive consultation process was undertaken to ensure that all concerns and issues were identified and given appropriate consideration early and throughout the study. This consultation program included meetings with an Agency Consultation Group (ACG), a Business Consultation Group (BCG), a Public Consultation Group (PCG), a Public Open House, and posting of project information on the City of Ottawa s website. Individual stakeholder meetings were also carried out as necessary during the course of the study. The ACG included staff from various City Departments as well as representatives from

22 22 the Rideau Valley Conservation Authority, Ministry of Natural Resources, Transport Canada, the Ottawa Macdonald-Cartier Airport Authority and the National Capital Commission. The PCG was comprised of representatives from local community associations, special interest group, and school boards. Invitations were also extended to a number of City of Ottawa Advisory Committees. The BCG was comprised of representatives from the Barrhaven BIA and land developers owning land within and surrounding the study area. The study team met with each consultation group three times throughout the process. The meeting format was a presentation followed by a discussion period. Public Open House There was one Public Open House (POH) held on 2 October 2012 at Steve MacLean Public School. The POH was organized as a drop-in style session with a set of graphic display boards, a formal PowerPoint presentation of the evaluation leading to the Recommended Plan, and a facilitated question and answer session. Councillor Desroches was in attendance and provided opening remarks. Thirty-three people signed the POH register. In general, the public and agencies have been supportive of this project and the Recommended Plan. Table 1 below summarizes the comments received through the consultation activities.

23 23 Table 1: Summary of Major Consultation Activities and Comments Received Milestone Comments ACG Meetings May 31, 2012 July 30, 2012 September 13, 2012 These meetings provided an opportunity for the study team to present the evaluation of alternatives, discuss the materials to be covered at the Open House, and receive comments from the Agency representatives on specific technical issues. Comments primarily were related to: Operational and maintenance impacts of the alternatives, Comparing how the modes of transportation would function (buses, vehicles, cycling, and pedestrian) between the alternatives and particularly at intersections, and PCG Meetings June 5, 2012 August 14, 2012 September 26, 2012 BCG Meetings June 22 and July 12 August 14 September14 Layout and location of the BRT/LRT transfer station. These meetings provided an opportunity for the study team to present the evaluation of alternatives, present materials to be covered at the Open House, and receive comments from representatives on specific community issues. Comments primarily were related to: How pedestrians would access transit platforms in the median bus transit option, Where would pedestrians wait at intersections in the town centres if they cannot cross on one light signal, If the segregated bike lanes should be at the same level of sidewalks or at street level and the impacts at intersections, Impact of on-street parking removal in the Chapman Mills near-term implementation strategy, If noise walls would be provided at sections where the Transitway backed onto residential backyards, and To ensure that proposed multi-use pathways connected to existing multi-use pathways. These meetings provided an opportunity for the study team to present the evaluation of alternatives, present materials to be covered at the Open House, and receive comments from the Barrhaven BIA and land developers with land holdings within the study area. Comments primarily were related to: The Recommended Plan should be in line with the community design plans (CDP) as marketing for new subdivisions and homes is based on the CDP s vision and guidelines, Potential conflicts between cyclists and pedestrians in the town centre design alternatives, Differences between existing protected right-of-way

24 24 Public Open House October 2, 2012 Steve MacLean Public School and proposed right-of-way in the Recommended Plan, and Alternative locations of the transfer station and park and ride in Riverside South Town Centre. The POH provided members of the general public with the opportunity to learn about the study process as well as to provide comments and feedback on any aspect of project, including environmental impacts, evaluation of alternatives, and on the recommended plan. Comments received included: Impact of the O-Train extension to existing transit services, particularly to route 99, Ensuring that proposed bikes lanes and multi-use pathways were to be connected to future multi-use pathways, Next steps if the project is approved by Council and the timing of project construction, If the bus lane design in the Recommended Plan is compatible for bus travel on the Strandherd- Armstrong Bridge, What was the anticipated build out of the study area in terms of number of residents and jobs, and General support for the recommended plan. COMMENTS BY THE WARD COUNCILLOR Councillor Desroches is aware of the report and would like to see the interim transportation solutions along the Chapman Mills Drive Corridor implemented as soon as possible. LEGAL IMPLICATIONS There are no legal impediments to implementing the recommendations in this report. RISK MANAGEMENT IMPLICATIONS There are no risk implications associated with the implementation of this report s recommendations. FINANCIAL IMPLICATIONS The financial implications associated with this project are outlined in the body of this report and will be included in the Transportation Master Plan update, which will determine future transit priorities. Once determined, these priorities will be included in future Long-Range Financial Plan reviews and the next Development Charge By-law update. Funding for construction of the ultimate project will be considered in future

25 25 years capital budgets. Funding for intersection improvement on Chapman Mills Drive will come from existing capital authority. ACCESSIBILITY IMPACTS There are no accessibility implications associated with this report. ENVIRONMENTAL IMPLICATIONS Environmental impacts associated with the general corridor and alignment were assessed during the N-S LRT Corridor EA study. As the change in technology from LRT to BRT requires a wider footprint, and to assess potential environmental condition changes since 2004/5 when initial field work was completed, additional aquatic and terrestrial field surveys were carried out as part of this study. Below provides a brief summary of potential impacts identified during this study, and proposed mitigation measures/commitments to future study. Mosquito Creek will be spanned with a new bridge structure with no in-water piers to avoid direct impacts to the watercourse. Minor direct impacts include additional shading and removal of a small amount of riparian vegetation. Direct and indirect impacts can be managed using appropriate mitigation and restoration measures including erosion and sediment control, and riparian landscape plantings. The BRT alignment will require a number of new culvert crossings of minor drainage features, and a tributary of Mosquito Creek will need to be realigned in several locations. Direct impacts include local removal of riparian vegetation and alteration of channel bed and banks. The aquatic habitat is not sensitive (agricultural drainage features) and therefore the direct impacts and indirect impacts can be managed using standard mitigation and restoration measure including adherence to in-water construction timing windows, and the reinstatement of aquatic habitat using natural channel design principles. It is anticipated that a permit from the Rideau Valley Conservation Authority under O. Reg. 174/06 will be required during detail design to address proposed watercourse alterations. Similar to the approved NS LRT alignment, the BRT alignment results in minor edge encroachment into adjacent vegetation. The vegetation communities that will be affected are not rare, but nonetheless do contribute to local forest cover and support regionally significant species. Where the alignment creates a new edge through a forested community, edge management techniques will be employed to better seal and protect the new forest edge. Habitat of four Species at Risk (SAR) has been identified in the general study area (east of the Rideau River). However, planned development in Riverside South is expected to precede construction of the Transitway project and will result in changes to species presence/ habitat conditions. Furthermore, SAR legislation is expected to change by the time this project is implemented (i.e. new species added to the list, new habitat protection requirements etc.). Therefore, through consultation with Ministry of Natural Resources, it was determined that detailed SAR surveys should be undertaken closer to

26 26 project implementation (detail design phase), and specific design measures to mitigate potential impacts to SAR habitat are most appropriately developed at that time. TECHNOLOGY IMPLICATIONS ITS will work closely with the Planning and Growth Management department to develop a detailed work plan and business cases for technology initiatives that may be required to support these proposals. This work plan and business cases where required, would be evaluated and approved through the City of Ottawa ITS intake process for all new technology requests. TERM OF COUNCIL PRIORITIES The recommendation contained herein aims to support the following Term of Council Priorities approved by Council in July 2011: TM1 Ensure sustainable transit services TM2 Maximize density in and around transit stations TM3 Provide infrastructure to support mobility choices TM4 Promote alternative mobility choices SUPPORTING DOCUMENTATION Document 1 Near Term Implementation on Chapman Mills Drive Document 2: Barrhaven to Riverside South Rapid Transitway DISPOSITION Following Committee and Council approval of the functional design, Planning and Growth Management will undertake the following: Initiate and complete the formal six month Transit EA Process using the functional design to define the undertaking and file the Environmental Project Report (EPR) with the Ministry of the Environment in accordance with Ontario EA Regulation 231/08 for transit project.

Report to/rapport au : Transportation Committee Comité des transports. November 26, novembre 2012

Report to/rapport au : Transportation Committee Comité des transports. November 26, novembre 2012 1 Report to/rapport au : Transportation Committee Comité des transports November 26, 2012 26 novembre 2012 Submitted by/soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale adjointe,

More information

PLANNING COMMITTEE REPORT JULY COMITÉ DE L URBANISME RAPPORT 34 LE 11 JUILLET ZONING 968 ST.

PLANNING COMMITTEE REPORT JULY COMITÉ DE L URBANISME RAPPORT 34 LE 11 JUILLET ZONING 968 ST. 86 COMITÉ DE L URBANISME 6. ZONING 968 ST. LAURENT BOULEVARD ZONAGE 968, BOULEVARD ST-LAURENT COMMITTEE RECOMMENDATION That Council approve an amendment to the Zoning By-law 2008-250 to change the zoning

More information

Report to Rapport au: Planning Committee / Comité de l'urbanisme November 10, 2015 / 10 novembre 2015

Report to Rapport au: Planning Committee / Comité de l'urbanisme November 10, 2015 / 10 novembre 2015 1 Report to Rapport au: Planning Committee / Comité de l'urbanisme November 10, 2015 / 10 novembre 2015 and Council / et au Conseil November 25, 2015 / 25 novembre 2015 Submitted on October 22, 2015 Soumis

More information

Riverside South. Rapid Transit Study. Riverside South. Value Planning Workshop

Riverside South. Rapid Transit Study. Riverside South. Value Planning Workshop Riverside South Rapid Transit Study Peter Steacy, P. Eng. Program Manager Transportation Environmental Assessments City of Ottawa Value Planning Workshop Christopher Gordon, P. Eng. Project Manager Transportation

More information

Local Growth Planning in North Central Green Line Communities

Local Growth Planning in North Central Green Line Communities 2018 April 30 Page 1 of 6 EXECUTIVE SUMMARY This report outlines a high-level scope for local growth planning for north central Green Line communities. The catalyst for this review is the significant investments

More information

2. RIDEAU RIVER MULTI-USE PATHWAY CROSSING ENVIRONMENTAL ASSESSMENT STUDY RECOMMENDATIONS

2. RIDEAU RIVER MULTI-USE PATHWAY CROSSING ENVIRONMENTAL ASSESSMENT STUDY RECOMMENDATIONS 24 2. RIDEAU RIVER MULTI-USE PATHWAY CROSSING ENVIRONMENTAL ASSESSMENT STUDY RECOMMENDATIONS RECOMMANDATIONS DE L'ÉTUDE D'ÉVALUATION ENVIRONNEMENTALE CONCERNANT UN SENTIER POLYVALENT TRAVERSANT LA RIVIÈRE

More information

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference Scarborough Subway Extension Final Terms of Reference 1 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from

More information

City of Toronto. Emery Village Transportation Master Plan

City of Toronto. Emery Village Transportation Master Plan City of Toronto Emery Village Transportation Master Plan May 2009 Emery Village Transportation Master Plan Toronto, ON May 2009 Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel:

More information

Report to Rapport au: Planning Committee / Comité de l'urbanisme February 23, 2016 / 23 février 2016

Report to Rapport au: Planning Committee / Comité de l'urbanisme February 23, 2016 / 23 février 2016 1 Report to Rapport au: Planning Committee / Comité de l'urbanisme February 23, 2016 / 23 février 2016 and Council / et au Conseil February 24, 2016 / 24 février 2016 Submitted on February 11, 2016 Soumis

More information

PLANNING COMMITTEE REPORT 33A 11 JULY COMITÉ DE L URBANISME RAPPORT 33A LE 11 JUILLET ZONING , 4479 AND 4487 INNES ROAD

PLANNING COMMITTEE REPORT 33A 11 JULY COMITÉ DE L URBANISME RAPPORT 33A LE 11 JUILLET ZONING , 4479 AND 4487 INNES ROAD 273 COMITÉ DE L URBANISME 12. ZONING - 4471, 4479 AND 4487 INNES ROAD ZONAGE - 4471, 4479 ET 4487 CHEMIN INNES COMMITTEE RECOMMENDATIONS That Council: 1. Approve an amendment to the Zoning By-law 2008-250

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016 Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest

More information

Kanata Light Rail Transit Planning and Environmental Assessment Study

Kanata Light Rail Transit Planning and Environmental Assessment Study Kanata Light Rail Transit Planning and Environmental Assessment Study Public Open House #2 Transportation Services Department December 7, 2017 Agenda Review study progress Confirm the Preferred Corridor

More information

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained

More information

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN Official Plan Amendment XX to the Official Plan for the City of Ottawa 1 INDEX THE STATEMENT OF COMPONENTS PART A THE PREAMBLE PAGE Purpose...

More information

9. LANSDOWNE Ŕ HERITAGE AND ALGONQUIN INTERPRETATION AND PUBLIC ART IMPLEMENTATION PLAN

9. LANSDOWNE Ŕ HERITAGE AND ALGONQUIN INTERPRETATION AND PUBLIC ART IMPLEMENTATION PLAN 137 COMITÉ DES FINANCES ET DU 9. LANSDOWNE Ŕ HERITAGE AND ALGONQUIN INTERPRETATION AND PUBLIC ART IMPLEMENTATION PLAN PLAN DE MISE EN ŒUVRE DE LA PORTION ART PUBLIC ET INTERPRÉTATION DU PATRIMOINE DU LANSDOWNE

More information

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment Bostwick Road Municipal Class Environmental Assessment October 13, 2016 Welcome! Welcome to the first Public Information Centre for the Bostwick Road Municipal Class Environmental Assessment. Representatives

More information

Port Credit Local Advisory Panel October 20 th Meeting

Port Credit Local Advisory Panel October 20 th Meeting Port Credit Local Advisory Panel October 20 th Meeting Focus Of This Evening s Meeting: 1. Hurontario Main Street Higher Order Transit Study 2. Port Credit Mobility Hub & GO Station Parking Structure Study

More information

Shift Rapid Transit Public Participation Meeting May 3, 2017

Shift Rapid Transit Public Participation Meeting May 3, 2017 Shift Rapid Transit Public Participation Meeting May 3, 2017 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public

More information

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved. COMMITTEE OF THE WHOLE AUGUST 18, 2003 THORNHILL CENTRE STREET STUDY PLANNING FILE: 15.92 Recommendation The Commissioner of Planning recommends: THAT the attached Terms of Reference for the Thornhill

More information

Planning, Property and Development Department Report. To the Riel Community Committee

Planning, Property and Development Department Report. To the Riel Community Committee Planning, Property and Development Department Report To the Riel Community Committee Date: October 30, 2006 File: SP 5/2006 Subject: Waverley West Northeast Neighbourhood Area Structure Plan Location:

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED 9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT CITY COUNCIL AGENDA REPORT Subject: COUNCIL MOTION LRT ALIGNMENT REMOVAL FROM THE TRANSPORTATION MASTER PLAN On February 10, 2016 Councillor Hughes provided notice in accordance with Section 23 of Procedure

More information

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA 1 1 Purpose of Public Information Centre #2 To provide interested and/or potentially affected stakeholders with an opportunity to participate in the planning and decision-making process for this Municipal

More information

Rapid Transit Implementation Working Group

Rapid Transit Implementation Working Group Rapid Transit Implementation Working Group October 12, 2017 1 Agenda 1. Consultation Update 2. Technical Work Update 3. LTC Rapid Transit Integration 4. Next Steps 2 Consultation Update 3 Consultation

More information

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

Rapid Transit Implementation Working Group September 14, 2017

Rapid Transit Implementation Working Group September 14, 2017 Rapid Transit Implementation Working Group September 14, 2017 BACKGROUND Council approved the Rapid Transit Master Plan and Updated Business Case on July 25, 2017. Approval of the RTMP confirmed the BRT

More information

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE 3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations

More information

Emery Village Road 2A Municipal Class Environmental Assessment Study

Emery Village Road 2A Municipal Class Environmental Assessment Study PW12.11 STAFF REPORT ACTION REQUIRED Emery Village Road 2A Municipal Class Environmental Assessment Study Date: March 30, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Burloak Drive Grade Separation

Burloak Drive Grade Separation Burloak Drive Grade Separation Transit Project Assessment Process Public Meeting #1 March 30, 2017 GO Lakeshore West Service Plan Weekday Rush Hour 15-minute, two-way service between Aldershot* and Union

More information

St. Clair Avenue West Area Transportation Master Plan

St. Clair Avenue West Area Transportation Master Plan 1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present

More information

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London Bostwick Road Municipal Class Environmental Assessment Public Information Centre #2 June 14, 2017 Welcome! Welcome to the 2 nd Public Information Centre for the. Representatives from the and the consulting

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

1. APPLICATION FOR NEW CONSTRUCTION AT 506 KENT STREET, A PROPERTY LOCATED IN THE CENTRETOWN HERITAGE CONSERVATION DISTRICT

1. APPLICATION FOR NEW CONSTRUCTION AT 506 KENT STREET, A PROPERTY LOCATED IN THE CENTRETOWN HERITAGE CONSERVATION DISTRICT 1 1. APPLICATION FOR NEW CONSTRUCTION AT 506 KENT STREET, A PROPERTY LOCATED IN THE CENTRETOWN HERITAGE CONSERVATION DISTRICT DEMANDE DE NOUVELLE CONSTRUCTION AU 506, RUE KENT, PROPRIÉTÉ SITUÉE DANS LE

More information

Report to Rapport au: Built Heritage Sub-Committee / Sous-comité du patrimoine bâti April 9, 2015 / 9 avril and / et

Report to Rapport au: Built Heritage Sub-Committee / Sous-comité du patrimoine bâti April 9, 2015 / 9 avril and / et 1 Report to Rapport au: Built Heritage Sub-Committee / Sous-comité du patrimoine bâti April 9, 2015 / 9 avril 2015 and / et Planning Committee / Comité de l'urbanisme April 28, 2015 / 28 avril 2015 and

More information

Report to/rapport au : Planning Committee Comité de l'urbanisme. and Council / et au Conseil. June 22, juin 2012

Report to/rapport au : Planning Committee Comité de l'urbanisme. and Council / et au Conseil. June 22, juin 2012 104 Report to/rapport au : Planning Committee Comité de l'urbanisme and Council / et au Conseil June 22, 2012 22 juin 2012 Submitted by/soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale

More information

Portage Parkway Environmental Assessment Public Information Centre No. 1

Portage Parkway Environmental Assessment Public Information Centre No. 1 City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

master plan of highways bus rapid transit amendment

master plan of highways bus rapid transit amendment Scope of Work master plan of highways bus rapid transit amendment September 2011 Montgomery County Planning Department M-NCPPC MontgomeryPlanning.org 1 Scope of Work master plan of highways bus rapid transit

More information

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1 ~!VAUGHAN NOV Z 5 2016 November 21, 2016 Mr. Denis Kelly, Regional Clerk The Regional Municipality of York 17250 Yonge Street Newmarket, ON L3Y 6Z1 Dear Mr. Kelly: RE: NEW KIRBY GO STATION IN BLOCK 27

More information

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016 FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for

More information

Southwest Transitway Extension Baseline Road to Norice Street. Environmental Assessment Minor Modification Report

Southwest Transitway Extension Baseline Road to Norice Street. Environmental Assessment Minor Modification Report Southwest Transitway Extension Baseline Road to Norice Street Environmental Assessment Minor Modification Report September 2009 Environmental Assessment Minor Modification Report Southwest Transitway

More information

Alta Vista Transportation Corridor Environmental Study Report November 2005

Alta Vista Transportation Corridor Environmental Study Report November 2005 Alta Vista Transportation Corridor Environmental Study Report November 2005 6.0 ALTERNATIVE DESIGNS The Preferred Solution to providing additional transportation system capacity through the AVTC study

More information

Report to/rapport au : Ottawa Built Heritage Advisory Committee Comité consultatif sur le patrimoine bâti d Ottawa

Report to/rapport au : Ottawa Built Heritage Advisory Committee Comité consultatif sur le patrimoine bâti d Ottawa 95 Report to/rapport au : Ottawa Built Heritage Advisory Committee Comité consultatif sur le patrimoine bâti d Ottawa and/et Planning Committee Comité de l'urbanisme and Council / et au Conseil May 18,

More information

Welcome to the Oakridge Centre Open House

Welcome to the Oakridge Centre Open House Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive

More information

Chapter 1.0 Introduction

Chapter 1.0 Introduction Chapter 1.0 Introduction 1.1 Background The North Metro commuter rail line is part of the RTD FasTracks regional transit system expansion program to build more than 100 miles of rail transit throughout

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street

More information

WELCOME TO OPEN HOUSE # 3

WELCOME TO OPEN HOUSE # 3 Bayview Avenue Class Environmental Assessment Study Steeles Avenue to Elgin Mills Road WELCOME TO OPEN HOUSE # 3 Please sign in and join our mailing list Why Are We Here Tonight? Study Process and Purpose

More information

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

TOWN OF WHITBY REPORT RECOMMENDATION REPORT TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Council REPORT NO: PL 95-09 DATE OF MEETING: October 13, 2009 PREPARED BY: Planning/Public Works Joint Report FILE NO(S): N/A LOCATION: N/A REPORT

More information

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening Midtown Corridor Alternatives Analysis Appendix A - Initially Considered Alternatives Screening Arterial BRT on Lake Street - Overall Rating: RATING Metropolitan Council recommendations stated in the Transportation

More information

Eglinton West LRT Update

Eglinton West LRT Update Eglinton West LRT Update Community Consultation Update May 16, 2016 Background Rapid transit along Eglinton Ave between Kennedy Station and Pearson Airport was included in the Metrolinx Regional Transportation

More information

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose: Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:

More information

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK Welcome! The purpose today is to: Present the Study Background; Describe Alignment Alternatives Analyzed; Present the Evaluation of

More information

Commissioners Road West Realignment Environmental Assessment

Commissioners Road West Realignment Environmental Assessment City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 1 March 30, 2017 Welcome to the Public Information Centre This first Public Information Centre

More information

Report to/rapport au : Planning Committee Comité de l'urbanisme. and Council / et au Conseil. June 11, juin 2012

Report to/rapport au : Planning Committee Comité de l'urbanisme. and Council / et au Conseil. June 11, juin 2012 162 Report to/rapport au : Planning Committee Comité de l'urbanisme and Council / et au Conseil June 11, 2012 11 juin 2012 Submitted by/soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale

More information

Executive Summary. NY 7 / NY 2 Corridor

Executive Summary. NY 7 / NY 2 Corridor Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN 12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN The Planning and Economic Development Committee recommends the adoption of the recommendation contained in the following report August

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016 Item 5, Report No. 26, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the City of Vaughan on June 7, 2016. 5 MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

More information

Stanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report

Stanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report STAFF REPORT ACTION REQUIRED Stanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report Date: December 16, 2011

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

Relief Line Project Assessment

Relief Line Project Assessment Relief Line Project Assessment Public Information Centre April 5, 2017 Tonight s Meeting PURPOSE To review the preferred alignment for the Local Segment. AGENDA 6:30 Open House 7:00 Presentation / Discussion

More information

South of Eastern Strategic Direction Status Update

South of Eastern Strategic Direction Status Update STAFF REPORT ACTION REQUIRED South of Eastern Strategic Direction Status Update Date: July 10, 2014 To: From: Planning and Growth Management Committee Chief Planner and Executive Director, City Planning

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY SEPTEMBER 2016 Introduction The Platteview Road Corridor Study was led by the Metropolitan Area Planning Agency (MAPA) with assistance from

More information

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013 APPENDIX 5 - Guiding Design Vision and Principles Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013 Vision Statement The redevelopment of the former

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

Director, Community Planning, Toronto and East York District

Director, Community Planning, Toronto and East York District Lower Yonge Precinct Plan Update STAFF REPORT ACTION REQUIRED Date: October 16, 2012 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning, Toronto and

More information

PART 1. Background to the Study. Avenue Study. The Danforth

PART 1. Background to the Study. Avenue Study. The Danforth The Danforth 1.1/ Study Purpose & Key Municipal Goals 1.2/ The Local Advisory Committee 1.3/ The Project Team 1.4/ Study Process/Summary of Method 1.5/ Summary of Consultation 1.1 Study Purpose and Key

More information

Figure 1- Site Plan Concept

Figure 1- Site Plan Concept Figure 1- Site Plan Concept Parking will be provided underground on three levels at rate of 1.0 space/ unit; this rate includes all visitors parking. MMM Group has prepared a parking assessment (April,

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016]

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016] [Amendment #166, January 12, 2016] The policies of this Secondary Plan are in effect, save and except for the property at 560 Rideau Street, for which there remains a site specific appeal to this Secondary

More information

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development Overview The Chicago Transit Authority (CTA), in partnership with the Chicago Department

More information

2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN

2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN 2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN Pursuant to Section 17(15) of the Planning Act, as amended, the Regional Planning

More information

Services Department F May 28, 2007

Services Department F May 28, 2007 Report To: Development Services Committee Item: Date of Report: From: DS-07-144 May 23, 2007 Commissioner, Development File: Date of Meeting: Services Department F-7000-0013 May 28, 2007 Subject: Gibb

More information

Implementation Guide Comprehensive Plan City of Allen

Implementation Guide Comprehensive Plan City of Allen Implementation Guide 2030 Comprehensive Plan City of Allen DRAFT 2015 Implementation Guide Allen 2030 Comprehensive Plan INTRODUCTION The Comprehensive Plan serves as a guide for the growth and development

More information

Design Brief and Planning Rationale. for Site Plan Control Application. Harmony Subdivision, Stage 1, Block 104

Design Brief and Planning Rationale. for Site Plan Control Application. Harmony Subdivision, Stage 1, Block 104 Design Brief and Planning Rationale for Site Plan Control Application Harmony Subdivision, Stage 1, Block 104 4025 Strandherd Drive, Minto Communities Inc. Prepared By: NOVATECH Suite 200, 240 Michael

More information

Public Information Centre #1

Public Information Centre #1 and Highway 401 Interchange Improvements WELCOME Public Information Centre #1 Veterans Memorial Parkway Extension and Highway 401 Interchange Improvements Study May 23, 2012 4 p.m. to 7 p.m. Brief Overview

More information

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018

More information

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT PUBLIC INFORMATION CENTRE Vaughan Metropolitan Centre (VMC) Black Creek Renewal Wednesday, May 10, 2017 6:00 p.m. to 8:00 p.m. Add photo Project Management, Environmental Assessment, Stormwater Management

More information

Lesson 6. Corridor Planning

Lesson 6. Corridor Planning Lesson 6 Corridor Planning 1 Learning Outcomes Identify land use strategies and solutions that can be incorporated into multimodal transportation corridor plans Identify land use stakeholders and describe

More information

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines THE GARDEN CITY PLAN City of St. Catharines Official Plan City of St. Catharines August 2010 APPROVAL INFORMATION This Official Plan of the City of St. Catharines Planning Area, known as the Garden City

More information

METRO Gold Line BRT CBAC Meeting. August 23, 2018

METRO Gold Line BRT CBAC Meeting. August 23, 2018 METRO Gold Line BRT CBAC Meeting August 23, 2018 1 Today s Topics Introductions Corridor Management Committee Update Public Engagement Update History of Alignment Project Scope Discussions Upcoming CBAC

More information

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting Page 1 of Report PB-76-17 SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO TO: FROM: Planning and Development Committee - Public Meeting Planning and Building

More information

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc.

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc. Commercial Development Proposal 2168 Tenth Line Road Report September 2015 Prepared for Minto Developments Inc. Paquette Planning Associates Ltd. 56 Hutchison Avenue Ottawa, Ontario K1Y 4A3 PH: 613-722-7217

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS 4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations

More information

East Corridor Final Environmental Impact Statement

East Corridor Final Environmental Impact Statement East Corridor Final Environmental Impact Statement Alternatives Considered Operating Plan The requirements for opening day operations versus year 2030 are based on ridership and operations. Opening day

More information

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas 111111 PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction The ION rapid transit system will link Waterloo, Kitchener and Cambridge through a central transit corridor (CTC). There are a number

More information

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Sharon Ebert, Director Community Development Date: April 10, 2017 Agenda: City Council Work Session April

More information

Mill Woods Town Centre Proposed Rezoning LDA

Mill Woods Town Centre Proposed Rezoning LDA Mill Woods Town Centre Proposed Rezoning LDA15 0649 The City of Edmonton has received an application for rezoning and an amendment to the Mill Woods Station Area Redevelopment Plan (ARP) for the Mill Woods

More information

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline Welcome Green Line LRT Beltline Alignment Options Stay engaged! Follow the Green Line story at calgary.ca/greenline Green Line LRT Why are we here? Our Challenge Determine the best alignment in the Beltline.

More information

Commissioners Road West Realignment Environmental Assessment

Commissioners Road West Realignment Environmental Assessment City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 2 November 29, 2017 Welcome to the Public Information Centre This 2 nd Public Information Centre

More information

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN 5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN The Planning and Economic Development Committee recommends the following: 1. The communication from Brendan O Callaghan,

More information

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Pubic Information Centre #1 Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Open House # 1 Tonight, we invite you to.

More information

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,

More information

Evaluation Criteria. Detailed Evaluation Criteria

Evaluation Criteria. Detailed Evaluation Criteria Evaluation Criteria Detailed Evaluation Criteria Community Well-being A safe and socially inclusive service that improves access to key community destinations and provides transportation choices for Calgarians.

More information