1 4.16 Historic and Archaeological Resources Introduction to Resources and Regulatory Requirements The National Historic Preservation Act of 1966 (NHPA) Section 106 states that any federal or federally assisted project or any project requiring federal licensing or permitting must consider the project s impacts on historic properties listed in or eligible for listing in the National Register of Historic Places (NRHP or National Register), in accordance with 36 CFR Part 800. Properties include historic and prehistoric archaeological sites, as well as districts, buildings, structures, objects, and landscapes, in addition to cultural or traditional places or resources that have value to a community, such as an Indian Tribal group (NHPA Section 101). To consider the potential concerns of Indian Tribes, Sound Transit also reviewed the following: American Indian Religious Freedom Act of 1978 Executive Order (EO) (access to and/or ceremonial use of sacred sites by Indian religious practitioners) Also, Section 4(f) of the Department of Transportation Act of 1966 (23 United State Code 138) prohibits the Federal Transit Administration (FTA) from approving a project or program that uses land from a significant public park, recreation area, wildlife or waterfowl refuge, or historic site, with the following exceptions: There is no feasible and prudent alternative to the use of the land. The project includes all possible planning to minimize harm to the property. A Section 4(f) evaluation is included in Appendix D of this Final EIS. The Cities of Seattle, Mercer Island, and Redmond regulate the impacts of projects on historic resources. The City of Bellevue has no applicable ordinances regarding historic resources. Local regulations that were reviewed during the assessment include the following: City of Seattle Landmarks Preservation Ordinance (SMC 25.12) requires that properties eligible for city landmark designation be at least 25 years old and meet at least one of six criteria of significance. City of Mercer Island Ordinance No. 05C-09 (amending Ordinance No ) contains provisions for historic designation of private and municipal properties 50 years of age or older within the city limits. City of Redmond Ordinance No contains provisions for historic preservation, including a Redmond Heritage Resource Register, administered by the Landmarks and Heritage Commission. Designation requires that a structure be at least 40 years of age and meet other criteria established by the Commission; archaeological sites also are eligible for designation. Project historians and archaeologists analyzed 439 buildings or structures and investigated two archaeological sites. Of this total, 12 historic resources have been found to be listed in or eligible for listing in the NRHP. The Federal Transit Administration (FTA), in consultation with the State Historic Preservation Office (SHPO), has made a determination of adverse effect for the project. This determination results from the preferred alternative s (B2M and C11A) potential impacts on the Winters House and potential Surrey Downs historic district. Other alternatives would also impact the potential Surrey Downs Historic District and Justice White House. A separately bounded Appendix H4, Historic and Archaeological Resources Technical Report, provides detail information on these historic resources Affected Environment The FTA and Sound Transit consulted with the Washington State Historic Preservation Officer (SHPO) in the Department of Archaeology and Historic Preservation (DAHP), Washington State Department of Transportation (WSDOT), local jurisdictions, and Indian Tribes during the investigations concerning historic and archaeological resources. In addition, Sound Transit coordinated with staff at the Cities of Seattle, Mercer Island, Bellevue, and Redmond. Sound Transit and FTA consulted with and received concurrence from DAHP on the Area of Potential Effects (APE) used for this project. The APE is the area within which the project may cause direct or indirect changes to the character of any historic properties. The APE for archaeological resources is limited to the portion of the project where ground-disturbing activities would be conducted, such as areas for demolition, construction, staging, equipment storage locations, and stormwater management facilities (36 CFR [d]). For the archaeological resource investigation, the vertical extent of the APE may vary according to construction practice deeper for excavation areas and shallower for at-grade East Link Project Final EIS Historic and Archaeological Resources

2 construction and depending on the subsurface limits of known human use or occupation where the project feature occurs. The APE for historical buildings and structures is one block (approximately 200 feet) on each side of the centerline of the project routes (i.e., a total corridor width of approximately 400 feet). The APE extends approximately 200 feet from the outer limits of station locations and maintenance facilities. The APE also includes the area one block from where tunnel alternatives could disturb the ground surface or potentially have other surface impacts, depending on terrain and local land use. Uniquely for bored or mined tunnel construction, the APE for noise, vibration, and settlement impacts is 100 feet on each side of the route centerline (i.e., a total corridor width of approximately 200 feet). The archaeological sensitive areas and those listed or determined to be eligible historic resources within the study area s APE are shown in Exhibit Detailed maps are available in the Historic and Archaeological Resources Technical Report (Appendix H4) Archaeological Resources Two archaeological sites have been recorded near the archaeological resource APE. Archaeological site 45KI8 was recorded in 1966 (Greengo, 1966) near the Redmond Way Alternative (E1). The site was described as consisting of scattered artifact finds along the east bank of the river for about one-half mile, including some finds in dredged material. The condition of the site in 1966 was reported as completely worked over on surface no midden [organic remains] visible (Greengo, 1966). Site 45KI 839 was recorded along lower Bear Creek, near the confluence of Bear Creek with the Sammamish River. The site is buried about 5 feet under the ground surface and consists of several stone tool fragments, stone flakes from tool-making, and fire-cracked rocks that appear to date to several thousand years old (Hodges et al., 2009). Mapping of landform criteria for archaeological sensitivity identified several portions of the alternatives as having high sensitivity for prehistoric archaeological sites, but did not identify areas with a high sensitivity of important historic-period archaeological sites. The project archaeologist developed maps of areas judged to have high prehistoric archaeological sensitivity for the project alternatives based on historic stream courses, ethnographic land use, and topography of the terrain. These maps were compared with an archaeological model prepared for the DAHP. Archaeological sensitivity and survey maps are provided in Appendix H4. Much of the Segment B and E alternatives have relatively high levels of archaeological sensitivity based on the presence of Mercer Slough in Segment B and the Sammamish River floodplain in Segment E. Also shown in Appendix H4 are the survey tracts with shovel test probe locations that were excavated during the archaeological survey. A field crew conducted an archaeological survey for the 2008 Draft EIS in February 2007 and for the Final EIS (Stage 1) in March, June, and July 2010 (Thompson and Gilpin, 2010). The work included 27 survey tracts placed primarily in archaeologically sensitive areas but also included low-sensitivity areas. The survey placed 12 tracts in the archaeologically sensitive portions of Segment B, 7 in Segment D which varied as both low and medium archaeologically sensitive, and 8 in the archaeologically sensitive portions of Segment E. Two survey tracts (in Segment D) were placed in areas considered to have low archaeological sensitivity to control for the bias inherent in focusing surveys on high-sensitivity areas. No tracts were placed in Segments A or C because heavy development and other characteristics provided relatively fewer areas of high archaeological sensitivity. One of the Draft EIS survey tracts and two of the Final EIS survey tracts were unable to be surveyed due to issues with entry and/or significant surface disturbances. A preconstruction archaeological survey will provide additional information and guidance for uncovering historic resources during construction. The archaeological survey of the Segment B tracts encountered areas of historical disturbance, heavy vegetation, water near or at the ground surface, and modern debris. Survey tracts in Segment D also showed considerable disturbance, while many of those in Segment E (particularly along the Sammamish River) encountered fill covering the native soils up to about 3 feet deep. The project archaeologist identified an additional survey tract to search for recorded archaeological site 45KI8 described above, but encountered no evidence of the site. It is difficult to tell whether the site still exists because the area has been eroded, dredged, rip-rapped, and filled Historic and Archaeological Resources East Link Project Final EIS

3 ¾À 908 Justice William White House R E D M O N D Bill Brown Saloon ÂΡ ÂΡ ÂΡ 405 ¾À 202 ¾À 520 ÂΡ Segment E Segment D B E L L E V U E Segment C Segment D ÂΡ ÂΡ Bellevue Fire Station Safeway Store Segment C Segment B Pilgrim Lutheran Church Segment B Winters House ÂΡ ÂΡ Potential Surrey Downs Historic District (no boundary delineation) Publix Hotel Segment A Jose Rizal 12th Avenue South Bridge Mt. Baker Ridge Tunnel and Eastern Portals I-90 Lake Washington Segment Immigrant Station and 90 Assay 405 Office 405 Will H. Thompson House S E A T T L E Lake Washington M E R C E R I S L A N D Lake Sammamish Segment A 90 Lake Washington Mile Source: Data from University of Washington (2006), Historical Research Associates (2007), Sound Transit (2004), King County (2006), and City of Redmond (2005). NHRP Listed/Eligible Site Preferred Alternative Other Alternatives At-Grade Route At-Grade Route Sensitivity Zone Elevated Route Elevated Route Exhibit ú Proposed Station Retained-Cut Route Retained-Cut or Cultural Resources New and/or Expanded Retained-Fill Route Retained-Fill Route Segments A, B, C, D, and E ÂΡ Park-and-Ride Lot East Link Project Tunnel Route Tunnel Route

4 None of the surveys located prehistoric archaeological remains. One historic-period archaeological site was recorded during the 2010 survey session. This site consisted of a scatter of domestic debris found in a survey tract along Segment B. The site is not eligible for listing in the NRHP because it did not retain many aspects of integrity nor did it meet any of the four criteria for listing. In summary, the survey located no NRHP-eligible prehistoric or historic-period archaeological remains at archaeological site 45KI8. These results are not conclusive because buried materials and sites could be found, particularly along the Segment B and Segment E alternatives. Although past development has likely damaged or destroyed archaeological sites, some important remains could exist Traditional Cultural Properties FTA and Sound Transit have conducted governmentto-government consultation with the Muckleshoot Indian Tribe, Snoqualmie Indian Tribe, Suquamish Tribe, Duwamish Tribe, Tulalip Tribes of Washington, and Yakama Nation, initially providing project information by mail. Meetings have been held with Snoqualmie and Muckleshoot Tribal representatives to discuss the project and its potential impacts on archaeological sites and traditional cultural properties (TCPs). Consultation with the Tribes has revealed no traditional cultural properties in the project vicinity Historic Buildings and Structures A historical records search was performed that identified several properties listed in the National Register, the Washington Heritage Register (WHR), or local registers. Appendix H4 lists the properties inventoried and shows the properties determined to meet the National Register and local ordinance criteria by Inventoried resources would be 50 years old by the baseline year Field surveys by project historians and preparation of inventory forms took place primarily from February through June 2007, September through October 2007, and February to April The field surveys inventoried 439 buildings and structures (including one potential historic district) in the APE, with 12 either listed in the National Register (and thus automatically listed in the WHR) or recommended to be eligible. Sound Transit also conducted field tours with DAHP staff to identify properties that appeared to meet National Register eligibility criteria. The DAHP reviews NRHP recommendations for concurrence, and the local jurisdictions review local landmark register recommendations. Letters from the DAHP and local jurisdictions concurring on the eligibility of the historic properties can be found in Appendix H4. Table summarizes the NRHP- or local-listed or eligible properties identified in the APE, Exhibits through and through are photographs of these properties, and the following subsections discuss these properties. In addition to resources discussed in the remainder of this section, one potential historic resource, the former BNSF Railway, was surveyed in the APE for multiple project segments. Portions of the former BNSF Railway are within the APE for Segments B, C, D, and E. The portions of the former BNSF Railway within the project s APE have been determined as not eligible for listing in the NRHP, although the railroad as a whole has been determined eligible from a previous archaeological investigation. These portions are nondescript and do not well represent the theme of the railroad as a whole. Significant intact properties representative of the former BNSF Railway's and the preceding owners contributions to railroad technology are not presented by portions of the former BNSF Railway in these segments of the project corridor. Segment A The five historic structures and buildings in Segment A are on the NRHP and have already been recorded at the Washington DAHP. They are the Publix Hotel, located within the Seattle Chinatown National Register Historic District and the International Special Review Historic District; the Immigrant Station and Assay Office Building (INS Building); the Jose Rizal 12th Avenue South Bridge; the Will H. Thompson House; and the Mount Baker Ridge Tunnels and Eastern Portals. In addition, WSDOT, on behalf of the Federal Highway Administration and DAHP, identified a segment of I-90 between I-5 and I-405, which includes the Mount Baker Ridge Tunnels and Eastern Portals, as eligible for the NRHP and therefore nominated these as one eligible resource. DAHP concurred with this determination in a letter dated November 23, The architecture of the INS Building features Neo-classical and Mediterranean elements, as shown in Exhibit The building is important for its role in history, particularly that of Asian immigration. The Publix Hotel in the Seattle Chinatown NRHP Historic 4.16 Historic and Archaeological Resources East Link Project Final EIS

5 TABLE List of Historic Properties in Area of Potential Effect Segment Field No. and Map ID Property Name/Type Address Register Status A, Interstate Publix Hotel (Seattle Chinatown NRHP/ International Special Review Historic District) 504 Fifth Avenue South Contributing element to NRHP and Seattle Special Review historic districts A, Interstate Immigrant Station and Assay Office 815 Airport Way South NRHP, WHR, esl A, Interstate Jose Rizal 12th Avenue South Bridge 12th Avenue South crossing of South Dearborn Street NRHP, WHR, esl A, Interstate Will H. Thompson House 3119 South Day Street NRHP, WHR, SL A, Interstate 90 I90 I-90 Lake Washington Highway Segment, milepost (includes Mount Baker Ridge Tunnel and Eastern Portals) I-90 Washington State Department of Transportation right-ofway between mileposts 3.4 to 8.9 and East end of I-90 tunnel A, Interstate Endresen Residence nd Avenue South A, Interstate Romaine Electric/Washington Iron Works Pattern Shop 1101 Airport Way South NRHP, WHR, SL a B, South Bellevue 16 The Winters House 2102 Bellevue Way SE NRHP, WHR B, South Bellevue 63 Pilgrim Lutheran Church SE 11th Street enrhp, ewhr C, Downtown Bellevue 1100 Safeway Store th Avenue NE enrhp, ewhr C, Downtown Bellevue various (see Exhibit ) Potential Surrey Downs Historic District 37 structures (see Exhibit ) D, Bel-Red/Overlake 104 Former Bellevue Fire Station NE Bellevue- Redmond Road E, Downtown Redmond 112 Justice William White House Leary Way NE and NE 76th Street E, Downtown Redmond 113 Redmond Trading Company 7805 Leary Way NE RHL esl esl Potential enrhp enrhp, ewhr enrhp, ewhr, RHL E, Downtown Redmond 114 Bill Brown Saloon Building 7824 Leary Way NE RHL, enrhp, ewhr E, Downtown Redmond 118 Dudley Carter/Haida House Sammamish Slough Park a The Mount Baker Ridge Tunnel and Eastern Tunnel Portals are also designated as Seattle Landmarks. RHL e NRHP SL RHL WHR determined eligible National Register of Historic Places Seattle Landmark Redmond Historic Landmark Washington Heritage Register District is significant for its association with Seattle history (Exhibit ). The 12th Avenue South Bridge, constructed in 1911, was listed in the NRHP based on its engineering design (Exhibit ). The Mount Baker Tunnels architects designed an impressive gateway to the City of Seattle by combining Art Deco elements and stylized Native American motifs, as shown in Exhibit Although the tunnels were an engineering feat, the National Register listing focuses on their striking ornamentation. The Lake Washington Segment of I-90 between Martin Luther King Jr. Way in Seattle and East Channel Bridge in Bellevue was determined eligible for the NRHP as a key piece of transportation history. It included extensive community involvement and design of the centerlanes for transit (Exhibit ). It is also significant for its innovative engineering and design that incorporated floating bridges, landscaped lids, and minimized community impacts. Although the facility is less than 50 years old, it qualified for listing in the NRHP under Criteria Consideration G, achieving significance because of its exceptional importance. The Will H. Thompson House is significant due to its architecture and high level of integrity (Exhibit ). East Link Project Final EIS Historic and Archaeological Resources

6 EXHIBIT United States Immigration Station and Assay Office Building EXHIBIT Mount Baker Ridge Tunnel EXHIBIT Publix Hotel EXHIBIT I-90 Lake Washington Highway Segment EXHIBIT Jose Rizal 12th Avenue South Bridge EXHIBIT Will H. Thompson House 4.16 Historic and Archaeological Resources East Link Project Final EIS

7 EXHIBIT Pilgrim Lutheran Church EXHIBIT Endresen Residence EXHIBIT Romaine Electric/Washington Iron Works Pattern Shop EXHIBIT Mithun & Nesland Design on 109th Avenue SE in Surrey Downs Subdivision EXHIBIT The Winters House EXHIBIT Safeway Store East Link Project Final EIS Historic and Archaeological Resources

8 EXHIBIT Former Bellevue Fire Station, NE Bellevue-Redmond Road EXHIBIT Bill Brown Saloon Building EXHIBIT Justice William White House In addition, City of Seattle has determined that the Endresen Residence at nd Avenue (Exhibit ) and the Romaine Electric/Washington Iron Works building at 1101 Airport Way (Exhibit ) may be eligible for City Landmark status. However, these buildings were determined not eligible for the NRHP. Segment B The Winters House was listed in the NRHP in 1992 based on its Spanish Eclectic architecture, as shown in Exhibit , and its association with the bulbgrowing and floriculture industry in King County and Washington. The Winters House is currently used by the Eastside Heritage Center as a heritage research center, exhibit space, archive storage, library, and public meeting space. Additionally, the Eastside Heritage Center provides public and educational programming at the Winters House. The Winters EXHIBIT Haida House House also contains office space for the City of Bellevue Parks and Community Service Department staff and can be used for public or private meeting event space. The Winters House is part of the Heritage Loop Trail in Mercer Slough Nature Park; the site includes historical interpretation and facilities for trail users. The Pilgrim Lutheran Church (Exhibit ), completed in 1965, is an outstanding example of Neo- Expressionist architectural style. The firm that designed the building Grant, Copeland, Chervenak and Associates won awards for several of their local projects. Segment C A portion of the Surrey Downs residential subdivision is potentially eligible for the NRHP as a historic district (see Exhibit ). According to discussions with DAHP, this residential area has not been 4.16 Historic and Archaeological Resources East Link Project Final EIS

9 determined eligible because many of the houses in the Surrey Downs neighborhood are outside the Area of Potential Effect and thus were not analyzed for historic significance. A district is a concentration of buildings or other properties that may or may not be individually eligible for the National Register, but are linked by one or more features that define their character. To be considered eligible as part of the potential Surrey Downs historic district, the houses need to be a consistent architectural style and not have been outwardly modified since their construction. The district is unique because the subdivision featured home designs that are of the post-world-war II called Northwest Modern Style of design created by Mithun & Nesland, a Seattle architectural firm. The DAHP determined 37 houses would be contributing elements to the potential historic district within the project APE. The historians did not establish boundaries for the district because it extends beyond the project APE. The house in Exhibit is representative of the Northwest Modern style of design (18 houses in the potential historic district), which includes one-story houses with carports and two-story houses with garages located beneath the living space. Other contributing houses include splitlevel (11 houses) and ranch (8 houses) styles. Exhibit shows the location of each of the contributing homes within the APE, and the properties are listed in Appendix H4. Facing Bellevue Way NE just north of NE 4th Street, the currently closed Safeway store built in 1962 is eligible for the NRHP based on its distinctive character of a large-scale commercial grocery store of the 1960s era (Exhibit ). Segment D One NRHP-eligible structure was identified in Segment D. The Former Bellevue Fire Station on Bel- Red Road, constructed in 1960, is a good example of Populuxe architecture, a style reminiscent of 1950s aerodynamic design (Exhibit ). Segment E The Justice William White House (Exhibit ) and the Bill Brown Saloon Building (Exhibit ) are designated as Redmond Heritage Landmarks and are also eligible for listing in the NRHP (and therefore also for the WHR). The Justice William White House is important because its owners, William and Emma McRedmond White, both played important roles in the history of Redmond and western Washington. They set aside a part of the house, which was built in 1900, as a hotel because it was conveniently located close to the railroad line and the passenger depot, giving guests easy access. The Redmond Trading Company building, currently occupied by Half Price Books, is a City of Redmond Heritage Landmark. This building was built in 1910 to house the trading company that was Redmond s largest business for decades. This building is not considered eligible for listing in the NRHP or the WHR since the display windows along the Leary Way side of the building is the only remaining characteristic from the original façade. The Bill Brown Saloon Building is important because of its association with the man who was mayor of Redmond from 1919 to Beginning about 1915, the building s second floor served as an unofficial Redmond City Hall (Hardy, 2001). The Dudley Carter/Haida House is a City of Redmond Heritage Landmark, and the City considers it to be eligible for listing in the National Register (Exhibit ). It was constructed by nationally known, Canadian-born artist Dudley Carter following methods of the Haida First Nation. Review conducted by DAHP, however, determined that because the building is less than 50 years old and not of exceptional significance, it does not qualify for the National Register Environmental Impacts Impact Evaluation Methods The Advisory Council on Historic Preservation s regulations implementing NHPA Section 106 create a process by which federally assisted projects are reviewed for their effects on properties listed in, or eligible for listing in, the NRHP. After the resource is identified and evaluated, the next step is applying the Criteria of Adverse Effect. These criteria are used to determine whether the undertaking could change the characteristics that qualify the property for NRHP inclusion. An adverse effect is found when an undertaking may alter, directly or indirectly, any of the characteristics of a historic property that qualify the property for inclusion in the National Register in a manner that would diminish the integrity of the property's location, design, setting, materials, workmanship, feeling, or association. Adverse effects include, but are not limited to, the following: Demolition or alteration of the property Alteration of the property s setting Introduction of visual, audible, or atmospheric elements that are out of character with the setting of the historic property East Link Project Final EIS Historic and Archaeological Resources

10 EXHIBIT Contributing Properties to the Potential Surrey Downs Historic District Physical encroachment upon an archaeological site. Pursuant to 36CFR Part 800.5(b), an agency may propose a finding of no adverse effect in consultation with the SHPO when the undertaking is modified or conditions are imposed to avoid adverse effects. FTA, in consultation with SHPO, has made a determination of adverse effect for the project. This determination results from the project s potential impacts on the Winters House by Preferred Alternative B2M and on the potential Surrey Downs Historic District by Preferred Alternative C11A, and Alternatives C4A, C2T and C3T. The Justice William White House would be potentially impacted by Alternative E4 because it would require relocation. Minimization and mitigation measures have been developed to resolve the potential impacts on these resources. The project would not adversely impact the other historic resources No Build Alternative The No Build Alternative would not affect any historic properties Impacts during Operation Although some potentially sensitive archaeological areas are identified, studies to date have identified no NRHP-eligible prehistoric or historic-period archaeological sites in the project APE. If one or more archaeological sites were identified in future studies, evaluation and treatment would be completed. The following subsections discuss the potential effects of project operation on historic buildings and structures. Segment A Operation of the light rail system with Preferred Interstate 90 Alternative (A1) is not anticipated to affect the eight historic properties identified in Table because of the position of Preferred Alternative A1 in the center of I Historic and Archaeological Resources East Link Project Final EIS

11 The Publix Hotel is across the street to the east from the International District Station entrance, and the project would not result in aboveground changes in the immediate vicinity. The INS Building is situated at the Fifth Avenue S/I-90 ramp, and the light rail facility would be under Airport Way and not visible near this building. Due to the location of the project alternative in the existing D2 Roadway right-of-way and the project s consistency with the transit function and appearance of this facility, operation of the project would similarly not adversely impact the Romaine Electric/Washington Iron Works Pattern Shop structure or setting. The operation of the project along I-90 at-grade beneath the 12th Avenue South Bridge would not adversely impact the setting of the bridge because the project is within the boundaries of the existing I-90 roadway. The Will H. Thompson House would not have vibration or impacts from this project. Due to the distance of Preferred Alternative A1 from the residence at nd Avenue South and the project s location in a tunnel within the existing I-90 right-of-way, operation of the project along I-90 at-grade would not adversely impact this historic property. Preferred Alternative A1 would be constructed within I-90 s existing center roadway and would not require widening of the facility (Exhibit ) within Segment A. The design, materials, and workmanship of the tunnels, portals, floating bridges, and lids would not substantially change. The structural integrity and intended use of the facility would be maintained. Preferred Alternative A1 is consistent with the historical aspects, features, and characteristics of this segment of I-90 and the bridge s long-term planning objectives and would not diminish the resource as a key piece of transportation history with innovative engineering and planning for future rail transit. Due to the context of I-90 as a transportation corridor, with early planning for rail transit, and the East Link project s location in the center roadway, the project would not change the character-defining features that qualify the resource to be included in the NRHP in a manner that would diminish the integrity of the property's location, design, setting, materials, workmanship, feeling, or association. In conclusion, none of the historic buildings and structures in Segment A would be impacted by the project during operations. Segment B Preferred 112th SE Modified Alternative (B2M) is proposed to be located within the 50-foot boundary established in the Winters House NRHP nomination form. Preferred Alternative B2M passes directly in front EXHIBIT I-90 Floating Bridges with Visual Simulation of Light Rail in Center Roadway EXHIBIT Winters House, Preferred Alternative B2M Birds Eye View of the Winters House in a lidded retained cut. The eastern edge of the Preferred Alternative B2M right-ofway measures approximately 10 feet from building foundation and 5 feet from the edge of the Winters House porch but is located in a lidded retained cut that is completely below grade. Exhibit depicts the Winters House with the proposed project (Preferred Alternative B2M), and Exhibit shows the existing cross-section as well as the cross-section for B2M. The perspective and cross-section views illustrate minimization approaches incorporated into the project design to maintain historic integrity during light rail operation. East Link Project Final EIS Historic and Archaeological Resources

12 EXHIBIT Cross Section of Preferred Alternative B2M Adjacent to Winters House 4.16 Historic and Archaeological Resources East Link Project Final EIS

13 These elements include placing the light rail in a 170-foot-long lidded retained cut that would extend the width of the house and the length of the 50-foot property boundary on each side of the house, as identified in the NRHP nomination. Landscaping sensitive to the historic nature of the building and setting would be installed. Additional impacts on the Winters House property include a required American with Disabilities Act (ADA)-accessible ramp to connect the building to the parking lot; the sidewalk (per the City of Bellevue s requirement), which encroaches onto the front lawn by 5 feet; and a load restriction over the lidded trench that prohibits vehicles from driving on the front lawn, thus requiring deliveries at the first level of the building. Adjacent parking, which is located outside of the 50 feet nomination boundary, would be replaced with a new parking structure. Whereas the Winters House would continue to fully convey its significance as outlined in its NRHP registration form, the 50-foot boundary around the house has been reduced by the widening of Bellevue Way SE, and the landscaping within this area no longer retain integrity because of several changes to the area over time. Although the presence of the larger land area surrounding the property on the north, south, and east sides has been a feature since it was constructed and is a character-defining feature, the setting of the residence as it relates to Bellevue Way SE is not a character-defining feature, given past widening and improvements to Bellevue Way SE. As a result, Preferred Alternative B2M would not affect a historic resource related to the existing landscape. Due to the proximity of the lidded retained cut and light rail guideway to the Winters House, the potential for vibration impacts during operation was analyzed and is described in more detail in Section 4.7, Noise and Vibration. No vibration impacts are projected. Using standard track work, the project would likely have groundborne noise impacts at the Winters House. As described in Section 4.7, Noise and Vibration, standard methods of vibration reduction, such as resilient fasteners or ballast mats, would be incorporated into the project and reduce the level of groundborne noise but may not eliminate the impact. The track design would incorporate a floating slab, if necessary, to eliminate the groundborne noise impact. Sound Transit applied the Criteria of Adverse Effect (36 CFR 800.5) in analyzing each aspect of Preferred Alternative B2M, considering the property s characterdefining features that convey its significance and qualify its listing in the NRHP. Operation of Preferred Alternative B2M would not diminish the property s location because the Winters House structure would not be moved. The roadway would be the same distance from the house, and the light rail facility would be in a lidded, retained cut below grade in front of the structure and within the 50-foot property boundary on either side established by the NRHP nomination. Removal of the existing driveway would similarly not diminish the setting of the landscaping because it lacks integrity. Similarly, B3-114th Extension Design Option would also avoid adverse impacts on the resource. Operation of Alternative B1 in the center of Bellevue Way SE is not anticipated to adversely impact the Pilgrim Lutheran Church, which is located just west of the street, although Bellevue Way SE would be realigned up to 10 feet into the property for a distance of roughly 250 feet (Exhibit ). EXHIBIT Proximity of Alternative B1 to Pilgrim Lutheran Church In addition, an underground stormwater detention vault would be constructed at the northeast corner of the property in the parking area, but operation of this facility would not adversely impact the Pilgrim Lutheran Church. No parking would be removed. The vault would not be visible after construction, and the only surface element to the vault would be one or two manholes necessary for maintenance. No parking spaces would be removed. Maintenance would consist of periodically parking a truck at the site and opening the manholes for cleaning and maintenance, and maintenance could be scheduled to avoid major events and regular services at the church. The parcel is large and the historic building is sufficiently distant from East Link Project Final EIS Historic and Archaeological Resources

14 the portion to be acquired so that the historic property would not be adversely impacted. The location already experiences the visual and noise impacts of heavy street traffic, and no additional impacts are expected to occur from operation of the project. Access from SE 11th Street to the church would not be disrupted. Vibration impacts would not be expected to reach the church. There are no impacts to historic properties in the Alternative B7 APE. In conclusion, none of the historic buildings in Segment B would be impacted by the project during operations. Segment C While Preferred 108th NE At-Grade Alternative (C11A) (Exhibit ) connecting to Preferred Alternative B2M would remove properties along 112th Avenue SE and Main Street, and both streets border the potential Surrey Downs historic district, no properties contributing to the potential historic district would be removed. When connecting to Preferred Alternative B2M, Preferred Alternative C11A would remove one row of noncontributing properties along 112th Avenue SE, a single row of noncontributing properties along Main Street, and one property along 111th Avenue SE. EXHIBIT Proximity of Preferred Alternative C11A to Potential Surrey Downs Historic District While Preferred Alternative C11A would remove properties along 112th Avenue SE and Main Street, it would not remove any of the properties contributing to the potential historic district. Along 112th Avenue SE, the first two rows of properties from the roadway are noncontributing, as are properties nearest the corner of 112th Avenue SE and Main Street and just south of Main Street. Due to the nature and orientation of the properties along the eastern and northern edges of the potential historic district, this impact would not be adverse. One row of noncontributing properties would remain between the contributing properties and the project along 112th Avenue SE and most of Main Street. The contributing properties would be the same distance from 112th Avenue SE and Main Street, and the transit changes to each roadway would not directly affect the district setting that would affect its potential for listing in the NRHP, or for its contributors to convey their significance and that of the district as a whole. The project would not adversely impact the historic setting within the Surrey Downs neighborhood. Preferred Alternative C11A includes the 108th Station on Main Street adjacent to contributing buildings. Contributing properties nearest the proposed project would be indirectly affected by Preferred Alternative C11A operation, and the noncontributing buildings in commercial use along Main Street would be removed. The potential historic district s setting would be affected by the removal of noncontributing properties along the major roadways of 112th Avenue SE and Main Street and the 108th Station. However, due to the surrounding dense, urban nature of the properties along the eastern and northern edges of the potential district, this impact would not be adverse. When connecting to Alternatives B3, B3-114th Extension Design Option, or B7, Preferred Alternative C11A would not remove any properties or change access along 112th Ave SE. One row of properties along Main Street would be permanently removed for the light rail guideway and 108th Station. Preferred Alternative C11A could have potential moderate noise impacts on three contributing properties in the northwest portion of the potential district, south of the proposed station; however, these noise impacts would be minimized and avoided with a permanent sound barrier included along the 112th Avenue SE and Main Street portions of the project. While Preferred Alternative C11A would introduce changes to the setting of the potential Surrey Downs historic district, the project would not affect any contributing properties and would minimize impacts on setting and context. During final design, Sound Transit would assess whether or not the existing large evergreen trees located next to the contributing properties near the 108th Station could be preserved. Sound Transit s intention is to preserve the established trees to the extent practicable. Project components such as station design, landscaping, and a landscaped berm would minimize project visual and noise impacts, create a buffer from the project, and could enhance the neighborhood boundary where noncontributing properties would be removed Historic and Archaeological Resources East Link Project Final EIS

15 Preferred 110th NE Tunnel Alternative (C9T) would not be adjacent to any contributing properties. It would remove one row of noncontributing properties along 112th Avenue SE and one to two rows of noncontributing properties at the northeast corner of the neighborhood where 112th Avenue SE meets Main Street when connecting to Preferred Alternative B2M (Exhibit ). Fewer noncontributing properties would be removed along Main Street as compared with Preferred Alternative C11A because Preferred Alternative C9T enters a tunnel on the south side of Main Street and turns north to tunnel under 110th Avenue NE. The visual change to the area surrounding the potential Surrey Downs historic district would be less than those of Preferred Alternative C11A because the properties along Main Street west of 110th Avenue NE would remain. If the East Main Station Design Option is selected, no additional properties would be removed. There is only one historic property in the Bellevue Way Tunnel Alternative (C1T) APE: the Safeway store. Alternative C1T would be in a tunnel profile in the Bellevue Way street right-of-way when passing by the Safeway property. Alternative C1T would have no visual, vibration, or noise impacts during operation and therefore would not adversely impact this property. Operation of the 108th NE Tunnel (C3T) and 106th NE Tunnel (C2T) Alternatives would have no visual impacts on properties that contribute to the potential Surrey Downs historic district within the APE (Exhibit ). Vibration and noise impacts also are not anticipated during East Link operation. Similar to Preferred Alternative C11A, construction would be directly adjacent to contributing properties and appropriate measures to minimize impacts would be implemented. EXHIBIT Proximity of Preferred Alternative C9T to Potential Surrey Downs Historic District When connecting to Alternatives B3, B3 114th Extension Design Option, or B7, Preferred Alternative C9T would not remove any properties or change access along 112th Ave SE. One row of noncontributing properties along Main Street between 112th Avenue SE and 110th Avenue would be permanently removed. While Preferred Alternative C9T would affect the setting of the potentially NRHP-eligible Surrey Downs historic district, the project would not affect any contributing properties and would minimize effects on setting and context. Project components such as landscaping create a buffer from the project and could enhance the neighborhood boundary where noncontributing properties would be removed. EXHIBIT Staging Area for Connections from B2E vs. B3 and B7 for Tunnel Alternatives C2T and C3T Operation of Couplet Alternative (C4A) along 112th Avenue SE would avoid adverse impacts on properties that contribute to the potential Surrey Downs historic district (Exhibit ). Almost all of the contributing properties would be screened by existing vegetation, fences, and other houses. Similar to Preferred Alternative C11A, construction would be directly adjacent to contributing properties and appropriate measures to minimize impacts would be implemented. The 112th NE Elevated (C7E) and 110th NE Elevated (C8E) Alternatives are not anticipated to affect properties that contribute to the potential Surrey Downs historic district within the APE because the alternatives are distant enough (at least 200 feet) to avoid visual, noise, and vibration impacts. East Link Project Final EIS Historic and Archaeological Resources

16 district because the alternative is distant enough to avoid visual change and noise impacts. Segment D There are no historic properties within the APE for Preferred NE 16th At-Grade Alternative (D2A), Alternative D2A - 120th Station and - NE 24th Design Options, the NE 16th Elevated (D2E), and SR 520 (D5) Alternatives. EXHIBIT Staging Area for Connections from B2A and B2E vs. B3 and B7 for Alternative C4A 110th NE At-Grade Alternative (C9A) would be elevated and on the east side of 112th Avenue SE, so there would be no acquisition of properties along the west side of 112th Avenue SE near the potential Surrey Downs historic district. Because this alternative would be elevated, with straddle bents, approximately 40 feet in this area, Alternative C9A would result in visual change. In addition, permanent sound walls would be constructed along the south side of Main Street adjacent to noncontributing structures. However, this change in visual quality would occur outside the Surrey Downs neighborhood and therefore not affect its potential eligibility for the NRHP. In addition, the two rows of noncontributing properties along 112th Avenue SE would remain between the potential Surrey Downs historic district and the project. Alternative C9A would travel at-grade on the south side of Main Street before turning north on 110th Avenue NE, and would require the removal of one row of structures along the south side of Main Street between 112th Avenue SE and 110th Avenue NE. None of the properties that would be removed contribute to the potential Surrey Downs historic district, and the project would not be adjacent to any contributing properties. The intersection of 110th Place SE would either be gated with right-in/right-out access only or closed. However, access to the north end of the neighborhood would remain. Alternative C9A would not alter or remove contributing resources or otherwise diminish character-defining features of the potential historic district. The 114th Avenue NE Elevated Alternative (C14E) would avoid adverse impacts on properties that contribute to the potential Surrey Downs historic For the NE 20th Alternative (D3), a narrow portion of the parcel that the former Bellevue Fire Station occupies would be incorporated into the project due to road reconstruction (Exhibit ). However, the building is located on the portion of the parcel outside of the APE, and the portion of the property that would be acquired is not a character-defining feature of the resource. Operation of the alternative would not result in visual, noise, vibration, or other impacts on the property. Widening of the road and introduction of the retained-cut light rail would not adversely impact the setting, which is characterized by major roadways: Bel-Red Road, 148th Avenue NE, and NE 20th Street. Although the building s parcel is situated inside the APE, the building itself is outside the APE. EXHIBIT Effects of Alternative D3 on former Bellevue Fire Station Segment E The Justice William White House, the Redmond Trading Company building, and the Bill Brown Saloon building (Exhibit ) are within the APE of Preferred Marymoor Alternative (E2) and Alternative E2 - Redmond Transit Center Station Design Option. The Justice William White House is approximately 65 feet from the route and separated by NE 76th Street. The Bill Brown Saloon is at least 100 feet from the route Historic and Archaeological Resources East Link Project Final EIS

17 alignment farther from the Bill Brown Saloon and the Redmond Trading Company building, but closer to the Justice William White House. This shift in the alignment would not affect any of the three properties because Preferred Alternative E2 would not encroach on the historic boundary, or alter the historic setting of the corridor as a railway in relation to the Justice William White House. The character-defining features of the Justice William White House and the Bill Brown Saloon that convey their significance and qualify the properties for listing in the NRHP would not be adversely impacted by this potential shift of the alignment. EXHIBIT Proximity of Preferred Alternative E2, and Alternatives E1 and E4 to Bill Brown Saloon Building and Justice William White House The Redmond Trading Company building is approximately 50 feet from the rail alignment and the Downtown Redmond Station. While Preferred Alternative E2, the Downtown Redmond Station, and E2 - Redmond Transit Center Design Option would introduce light rail into the setting of these resources, which are across the former BNSF Railway corridor from each other, including a station just west of Leary Way NE, the project would be at-grade within the existing railroad corridor and consistent with the character of the railroad setting. The operation of trains for passenger use in the right-of-way is consistent with the historic use of the corridor. The station would be designed in coordination with the City of Redmond and the community to complement the historic setting of Downtown Redmond. In addition, none of the remaining historic period buildings that contribute to the setting would be removed. Therefore, Preferred Alternative E2 and E2 - Redmond Transit Center Design Option would have no adverse impact on these resources. During final design, Sound Transit will work with the City of Redmond to adjust the design of Preferred Alternative E2 within the former BNSF Railway corridor and NE 76th Street right-of-way to accommodate the potential for future freight / commuter rail, the Central Connector utility line, the King County Trail, automobile traffic on NE 76th Street, as well as East Link light rail. Resulting changes may include shifting the Preferred Alternative E2 rail At the Justice William White House, Redmond Trading Company building, and the Bill Brown Saloon building, the Redmond Way Alternative (E1) route is the same as described above for Preferred Alternative E2, although it does not include the Downtown Redmond Station. This alternative would result in no impacts on historic properties. The Leary Way Alternative (E4) would require relocating the Justice William White House, which would result in an adverse impact. Sound Transit has consulted with the City of Redmond and DAHP about moving the building to a nearby location that preserves as much of its setting, feeling, and association with the former BNSF Railway as possible to resolve the adverse impacts from building relocation. Furthermore, relocation would occur in a manner that avoids damage to the building during transport and re-establishment. If Alternative E4 is selected, FTA and Sound Transit would continue to consult with the City, DAHP, and other interested parties to determine whether a suitable relocation site can be determined that is feasible within the project alternative. The roles and responsibilities for implementing mitigation measures would be established through a Memorandum of Agreement (MOA). In conclusion, the Justice William White House would be potentially impacted and the remaining historic resources in Segment E would not be impacted by the project during operations Impacts during Construction It is unlikely that project alternatives would affect NRHP-eligible archaeological sites because many portions of the project are located within areas not considered sensitive for the occurrence of archaeological sites or are located in high-sensitivity areas that have experienced previous disturbance. In addition, the archaeological investigation to date has encountered no NRHP-eligible archaeological sites, including historically recorded site 45KI8. Past fill and East Link Project Final EIS Historic and Archaeological Resources

4.16 Historic and Archaeological Resources

4.16 Historic and Archaeological Resources 4.16 Historic and Archaeological Resources 4.16.1 Introduction to Resources and Regulatory Requirements The National Historic Preservation Act of 1966 (NHPA) Section 106 states that any federal or federally

More information

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH 112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG060310124909PGH C ontents Introduction 1 Project Overview 1 Public Involvement and Technical Coordination 4 Description

More information

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental REVISED DRAFT ENVIRONMENTAL IMPACT REPORT/ Affected Environment, Environmental 2.1.8 Cultural Resources This section evaluates the potential for historical and archaeological resources within the proposed

More information

22a. Existing Condition. 22b. Simulation of NE 20th Street Alternative (D3)

22a. Existing Condition. 22b. Simulation of NE 20th Street Alternative (D3) Appendix F4.5 Visual Consistency and Key Observation Point Analyses EXHIBIT F4.5-22 Key Observation Point 22 (looking east along NE 20th Street) 22a. Existing Condition 22b. Simulation of NE 20th Street

More information

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018

More information

D.7 Segment B/C Least Harm Analysis

D.7 Segment B/C Least Harm Analysis Appendix D Section 4(f)/6(f) Supplemental Evaluation D.7 Segment B/C Least Harm Analysis D.7.1 Introduction to Least Harm Analysis As discussed in Section D.6.1.3, as there is no prudent and feasible alternative

More information

Appendix E Section 4(f) Evaluation

Appendix E Section 4(f) Evaluation Appendix E Section 4(f) Evaluation Appendix E Draft Section 4(f) Evaluation E.1 Introduction This appendix addresses a federal regulation known as Section 4(f), which protects parks, recreation areas,

More information

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement DOWNTOWN REDMOND LINK EXTENSION 2018 SEPA Addendum to the East Link Project Final Environmental Impact Statement AUGUST 2018 Downtown Redmond Link Extension SEPA Addendum to the 2011 East Link Project

More information

Draft Environmental Assessment Appendix A. SHPO Correspondence, January 19, 2017

Draft Environmental Assessment Appendix A. SHPO Correspondence, January 19, 2017 Draft Environmental Assessment Appendix A. SHPO Correspondence, January 19, 2017 Rosecrans/Marquardt Grade Separation Project April 2018 Federal Railroad Administration U.S. Department 1200 New Jersey

More information

7.0 DRAFT SECTION 4(f) EVALUATION

7.0 DRAFT SECTION 4(f) EVALUATION 7. DRAFT SECTION 4(f) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects on parks, recreation areas, wildlife and waterfowl

More information

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION Suite 900 - James K. Polk Building 505 Deaderick Street Nashville, Tennessee 37243-0334 MEMORANDUM TO: FROM: Files Joe W. Matlock,

More information

ENVIRONMENTAL REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS: SECTION 106 AND SECTION 4(F)

ENVIRONMENTAL REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS: SECTION 106 AND SECTION 4(F) ENVIRONMENTAL REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS: SECTION 106 AND SECTION 4(F) Oklahoma Association of County Engineers November 8, 2016 Law and Regulatory Requirements: Section 106 National Historic

More information

7.0 SECTION 4(F) EVALUATION

7.0 SECTION 4(F) EVALUATION Chapter 7 Section 4(f) Evaluation 7.0 SECTION 4(F) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects to parklands and

More information

Abstract. See the Fact Sheet for persons who may be contacted for additional information concerning this document

Abstract. See the Fact Sheet for persons who may be contacted for additional information concerning this document See the Fact Sheet for persons who may be contacted for additional information concerning this document Abstract The Central Puget Sound Regional Transit Authority (Sound Transit) proposes to construct

More information

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina 1.0 INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 U.S.C. 303, requires that prior to

More information

Historic and Cultural Resources

Historic and Cultural Resources Chapter 4: Historic and Cultural Resources 4.1 INTRODUCTION This chapter assesses the potential effects to historic structures and archaeological resources as a result of the construction and operation

More information

APPENDIX J SHPO COORDINATION

APPENDIX J SHPO COORDINATION Final Environmental Impact Statement/Final Environment Impact Report Appendix J SHPO Coordination APPENDIX J SHPO COORDINATION August 2011 CRENSHAW/LAX TRANSIT CORRIDOR PROJECT Final Environmental Impact

More information

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement Durham-Orange Light Rail Transit Project October 2016 1. Introduction The Combined FEIS/ROD summarizes the effects of the D-O LRT

More information

4.2 Land Use Introduction to Resources and Regulatory Requirements

4.2 Land Use Introduction to Resources and Regulatory Requirements 4.2 Land Use 4.2.1 Introduction to Resources and Regulatory Requirements This section provides information on the existing land uses and current zoning (future allowable land uses), describes changes in

More information

LITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013

LITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013 LITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013 Environmental Assessment (EA) Availability Completed in Compliance with the National Environmental Policy Act (NEPA)

More information

Appendix E Memorandum of Agreement between FHWA and the SHPO

Appendix E Memorandum of Agreement between FHWA and the SHPO Appendix E between FHWA and the SHPO MEMORANDUM OF AGREEMENT BETWEEN THE FEDERAL HIGHWAY ADMINISTRATION AND THE FLORIDA STATE HISTORIC PRESERVATION OFFICER PURSUANT TO 36 CFR PART 800 REGARDING THE WEKIVA

More information

Right-of-Way Acquisitions and Relocations Technical Memorandum

Right-of-Way Acquisitions and Relocations Technical Memorandum Right-of-Way Acquisitions and Relocations Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional

More information

7.5 Impacts on the Section 4(f) Properties

7.5 Impacts on the Section 4(f) Properties constructive use, such as noise, air quality and visual impacts were also assessed. It was determined that this project would not introduce changes of an external nature that would affect the recreational

More information

Mississippi Skyway Preliminary Engineering Report

Mississippi Skyway Preliminary Engineering Report EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge

More information

SECTION 4(f) DE MINIMIS DOCUMENTATION

SECTION 4(f) DE MINIMIS DOCUMENTATION SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)

More information

Visual and Aesthetic Resources

Visual and Aesthetic Resources Visual and Aesthetic Resources 7.1 INTRODUCTION This chapter evaluates the effects of the Modified Design on visual and aesthetic resources, in comparison to the effects of 2004 FEIS Design. The 2004 FEIS

More information

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014. Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014. Board 1: Welcome Welcome to the Wilson Transfer Station Project Public Hearing. The purpose

More information

4.1 LAND USE AND HOUSING

4.1 LAND USE AND HOUSING 4.1 This section provides a project-level analysis of potential impacts to land use, Shorelines of the State (shorelines), and housing. The study area for the land use and housing analysis in the Final

More information

East Corridor Final Environmental Impact Statement

East Corridor Final Environmental Impact Statement East Corridor Final Environmental Impact Statement Alternatives Considered Operating Plan The requirements for opening day operations versus year 2030 are based on ridership and operations. Opening day

More information

I 5 South Multimodal Corridor Study. Appendix F. I 5 South Multimodal Corridor Study Cultural Resources Constraints Analysis (February 8, 2010)

I 5 South Multimodal Corridor Study. Appendix F. I 5 South Multimodal Corridor Study Cultural Resources Constraints Analysis (February 8, 2010) I 5 South Multimodal Corridor Study Appendix F I 5 South Multimodal Corridor Study Cultural Resources Constraints Analysis (February 8, 2010) 847 Jamacha Road, El Cajon, California 92019-3206 tel: (619)

More information

RZC Public View Corridors and Gateways

RZC Public View Corridors and Gateways RZC 21.42 Public View Corridors and Gateways 21.42.010 Purpose 21.42.020 Scope and Authority 21.42.030 Administration 21.42.040 Gateways Design 21.42.050 Unidentified Public Views 21.42.060 Identification

More information

CEQA and Historic Preservation: A 360 Degree Review

CEQA and Historic Preservation: A 360 Degree Review CEQA and Historic Preservation: A 360 Degree Review California Preservation Foundation Workshop February 11, 2015 Presented by Chris McMorris Partner / Architectural Historian CEQA and Historic Preservation

More information

3.5 VISUAL AND AESTHETIC QUALITIES

3.5 VISUAL AND AESTHETIC QUALITIES 3.5 VISUAL AND AESTHETIC QUALITIES 3.5.1 Introduction to Analysis 3.5.1.1 Summary of Results The Preferred Alternative would represent a minimal change to the visual character of the existing rail corridor.

More information

4.5 Visual and Aesthetic Resources

4.5 Visual and Aesthetic Resources 4.5 Visual and Aesthetic Resources 4.5.1 Summary Table 4.5-1 shows how many homes would have reduced visual quality under each alternative. Measures like the ones suggested in Section 4.5.5, Potential

More information

Transportation. Strategies for Action

Transportation. Strategies for Action Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;

More information

Technical Memorandum 5

Technical Memorandum 5 Technical Memorandum 5 Environmental Resources August 2015 PREPARED BY AECOM Table of Contents Introduction... 3 Natural Features... 6 Watersheds... 6 Rivers, Lakes, Creeks... 6 Wetlands... 8 Floodplains...

More information

Project Description. Dear Ms. Roland-Nawi:

Project Description. Dear Ms. Roland-Nawi: U.S. Department of Transportation Federal Transit Administration REGION IX Arizona, California, Hawaii, Nevada, Guam American Samoa, Northern Mariana Islands 201 Mission Street Suite 1650 San Francisco,

More information

5.8 Visual Resources and Aesthetic Qualities

5.8 Visual Resources and Aesthetic Qualities I-70 East Supplemental Draft EIS 5.8 Visual Resources and Aesthetic Qualities 5.8 Visual Resources and Aesthetic Qualities This section discusses the visual resources and aesthetic qualities of the study

More information

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility. SUMMARY THE I-69 LOCATION STUDY The proposed I-69 Location Study from El Dorado to McGehee, Arkansas, represents one section (Section of Independent Utility No. 13) of the nationally designated I-69 Corridor

More information

7.0 FINAL SECTION 4(f) AND 6(f) EVALUATION

7.0 FINAL SECTION 4(f) AND 6(f) EVALUATION 7.0 FINAL SECTION 4(f) AND 6(f) EVALUATION 7.1 INTRODUCTION This chapter presents the existing conditions and potential effects to public parklands, recreational resources, and historic properties as they

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations. This section of the Draft EIR addresses the existing land uses on and adjacent to the project site and discusses the potential impacts of the proposed project on existing land uses. Key issues addressed

More information

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP. (10/27/14) PennDOT Section 106 Field Assessments and Finding Combined Early tification/finding? Yes Concurrence required or requested: Yes MPMS: 51507 ER# (if consultation with PHMC required) ): County:

More information

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2. Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General

More information

FINAL MITIGATION PLAN to address

FINAL MITIGATION PLAN to address CENTRAL CORRIDOR LRT STATE CAPITOL MALL HISTORIC FINAL MITIGATION PLAN February 2010 FINAL MITIGATION PLAN to address Adverse Effects of the Central Corridor LRT Project on the State Capitol Mall Historic

More information

Existing Conditions Summary (Draft for Review)

Existing Conditions Summary (Draft for Review) Existing Conditions Summary (Draft for Review) Prepared by March 16, 2015 Bird s-eye-view of Norwalk in 1899 (Cropped) Existing Conditions Summary (Draft for Review) March 16, 2015 Table of Contents 1.

More information

section five BEAUTIFICATION PLAN

section five BEAUTIFICATION PLAN section five BEAUTIFICATION PLAN BEAUTIFICATION PLAN Section Five Beautification Plan The goal of the Beautification Plan is to improve the Route 8-Sunnyland Corridor in terms of aesthetics and to create

More information

Planning Districts INTRODUCTION

Planning Districts INTRODUCTION INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is

More information

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements: Eligibility Requirements To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements: 1) Relate to surface transportation and 2) Be one of the 12 designated

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

Stakeholder Advisory Group Level 2 Recommendations Snapshot

Stakeholder Advisory Group Level 2 Recommendations Snapshot Stakeholder Advisory Group Level 2 Recommendations Snapshot The following recommendation tables were completed with the West Seattle and Ballard Link Extensions Stakeholder Advisory Group (SAG) during

More information

Staff Report CONDITIONAL USE

Staff Report CONDITIONAL USE Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission Daniel Echeverria, (801) 535-7165, daniel.echeverria@slcgov.com Date: May 21, 2015 Re: PLNPCM2015-00139

More information

Historic and Archaeological Resources

Historic and Archaeological Resources Historic and Archaeological Resources 8. INTRODUCTION This chapter assesses the potential effects to architectural (i.e., historic) and archaeological resources as a result of the construction and operation

More information

PUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region

PUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region National Capital Region DRAFT Environmental Impact Statement PUBLIC HEARING Matthews Memorial Baptist Church Washington, DC October 18, 2007 Introduction Welcome and team introduction Hearing procedures

More information

Bus Rapid Transit Environmental Assessment and Section 4(f) Evaluation Summary

Bus Rapid Transit Environmental Assessment and Section 4(f) Evaluation Summary Bus Rapid Transit Environmental Assessment and Section 4(f) Evaluation Summary S.0 SUMMARY August 25, 2000 As a grantee of the Federal Transit Administration (FTA), the Greater Cleveland Regional Transit

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

SECTION 106 DETERMINATION OF EFFECTS REPORT

SECTION 106 DETERMINATION OF EFFECTS REPORT SECTION 106 DETERMINATION OF EFFECTS REPORT Prepared for: Southeastern Pennsylvania Transportation Authority (SEPTA) Prepared by: AECOM January 2017 Determination of Effects Report King of Prussia Rail,

More information

5.4.6 Cumulative Operational Impacts

5.4.6 Cumulative Operational Impacts 5.4.5.2 Visual Character Impacts The proposed project is located in greater downtown Los Angeles, which is a dynamic environment where new projects are constructed on an ongoing basis. Additional development

More information

3.4 ARCHAEOLOGICAL, HISTORIC, AND PALEONTOLOGICAL RESOURCES

3.4 ARCHAEOLOGICAL, HISTORIC, AND PALEONTOLOGICAL RESOURCES 3. AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES Final Environmental Impact Statement and Section 4(f) Evaluation 3.4 ARCHAEOLOGICAL, HISTORIC, AND PALEONTOLOGICAL RESOURCES 3.4.1 Archaeological

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3 Table of Contents Programmatic Section 4(f) Evaluation for use of a Historic Bridge Replacement of Route 30/130 Bridge over the Cooper River Structure No. 0405-153 City of Camden, Borough of Collingswood,

More information

FUTURE LAND USE ELEMENT

FUTURE LAND USE ELEMENT FUTURE LAND USE ELEMENT GOAL I: To create and sustain a great place to live, play, and prosper Objective 1: The City of Ocala shall incorporate the principles and strategies of the Ocala 2035 Vision into

More information

CHAPTER 2: HISTORIC BACKGROUND

CHAPTER 2: HISTORIC BACKGROUND CHAPTER 2: HISTORIC BACKGROUND The historic town of Eastlake was created on June 22, 1911 when the Eastlake Subdivision was recorded at the Adams County Clerk and Recorder s Office. The Eastlake Investment

More information

3.11 HISTORIC AND CULTURAL RESOURCES Affected Environment. Background Information. Regulatory Overview

3.11 HISTORIC AND CULTURAL RESOURCES Affected Environment. Background Information. Regulatory Overview 3.11 HISTORIC AND CULTURAL RESOURCES This section characterizes existing historic and cultural resource conditions on the New Whatcom site and in the site vicinity, and identifies the potential for impacts

More information

5.6 Cumulative Impacts Evaluation

5.6 Cumulative Impacts Evaluation ceremonies. For the last several decades this property has been used as a surface parking lot. The Presidio Trust is now re-establishing the Main Parade Ground as a gathering place for park visitors, residents,

More information

CHAPTER 6 SECTION 4(f ) EVALUATION

CHAPTER 6 SECTION 4(f ) EVALUATION Final Environmental Impact Statement/Final Environment Impact Report CHAPTER 6 SECTION 4(f ) EVALUATION Final Environmental Impact Statement/Final Environmental Impact Report THIS PAGE INTENTIONALLY BLANK

More information

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Town Center. Block 5 Existing multifamily residential units are expected to remain. Area Guidelines Germantown s districts should be developed as distinct communities with unique features that are supported through the guidelines. The guidelines not only help distinguish these districts

More information

1.0 Circulation Element

1.0 Circulation Element 5/9/18 1.0 Circulation Element 1.1 Introduction As growth and development occur in Apache County, enhancements to its circulation system will be necessary. With time, more roads will be paved and air and

More information

ARTICLE VI: SITE PLAN REVIEW

ARTICLE VI: SITE PLAN REVIEW Section 6.01 - Site Plan Review (All Districts) ARTICLE VI: SITE PLAN REVIEW Site plans give the Planning commission an opportunity to review development proposals in a concise and consistent manner. The

More information

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM Identification Historic Name Nicollet Avenue Bridge Current Name Nicollet Avenue Bridge Field # Address Nicollet Avenue over Minnehaha Creek City/Twp Minneapolis SHPO Inventory Number Review and Compliance

More information

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES 4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES The following sections discuss the impacts associated with environmental resources for the tunneling method Alternatives A and B. The construction

More information

Floodplain Technical Memorandum

Floodplain Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

Northern Branch Corridor SDEIS March 2017

Northern Branch Corridor SDEIS March 2017 Northern Branch Corridor SDEIS March 2017 15. 15.1. Chapter Overview 15.1.1. Introduction This chapter discusses changes to the Preferred Alternative resulting in the potential for project improvements

More information

Corridor Management Committee. September 29, 2017

Corridor Management Committee. September 29, 2017 Corridor Management Committee September 29, 2017 1 Today s Topics Chair s Update Proposed Corridor Protection Wall Aesthetic Design Overview Public Outreach Environmental Review Civil Construction Update

More information

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA FINANCIAL PROJECT ID NUMBER 411189-2-22-01 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 4 Prepared

More information

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 SOUTHWEST CORRIDOR EXTENSION Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 AGENDA I. Welcome/Introductions II. Project Review and Status III. Environmental

More information

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES CHAPTER 1 GENERAL DESIGN GUIDELINES 1.0 INTRODUCTION This Publication has been developed to provide current, uniform procedures and guidelines for the application and design of safe, convenient, efficient

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent COMMUNITY DESIGN Intent An attractive, well-designed County will attract quality development, instill civic pride, improve the visual character of the community, and create a strong, positive image for

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

Hockessin Community Redevelopment Plan

Hockessin Community Redevelopment Plan Hockessin Community Redevelopment Plan 3.1 Introduction The Community Redevelopment Plan for the Village of Hockessin is the result of the people s vision for a distinct village center that serves as the

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

To: Planning Commission D.. June 3, 2009

To: Planning Commission D.. June 3, 2009 Agenda Item No. 9(a~ CITY OF WOODINVILLE, WA REPORT TO THE PLANNING COMMIS ION 17301 133 1'd Avenue NE, Woodinville, WA 98072 WWW.CI.WOODINVILLE.WA.US To: Planning Commission D.. June 3, 2009 From: Subject:

More information

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS 4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations

More information

APPENDIX F DRAFT SECTION 4(f) EVALUATION

APPENDIX F DRAFT SECTION 4(f) EVALUATION APPENDIX F DRAFT SECTION 4(f) EVALUATION APPENDIX F DRAFT SECTION 4(f) EVALUATION Section 4(f) of the Department of Transportation Act of 1966, as amended, (49 United States Code (USC) 303) states that

More information

City of Meriden Harbor Brook Flood Control Project Overview

City of Meriden Harbor Brook Flood Control Project Overview City of Meriden Harbor Brook Flood Control Project Overview Updated August 2013 OVERVIEW The center of Meriden, including the HUB site is the low point of the town which is ringed by basalt ridges. Running

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

Architectural Inventory Form

Architectural Inventory Form COLORADO CULTURAL RESOURCE SURVEY Page 1 of 8 Official Eligibility Determination (OAHP use only) Rev. 9/98 OAHP1403 Date Initials Determined Eligible National Register Determined Not Eligible National

More information

BOULEVARD AND PARKWAY STANDARDS

BOULEVARD AND PARKWAY STANDARDS 88-323 BOULEVARD AND PARKWAY STANDARDS 88-323-01 PURPOSE Considerable public and private investment exists and is expected to occur adjacent to boulevards and parkways within the city. The following standards

More information

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area. This Plan s urban design goals are to create an urban scale, walkable community with connections to transit, parks, and services and with amenities and facilities for residents and employees. The 1992

More information

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21 Table 2-4: North Segment Alignment Analysis 2-21 SCARBOROUGH RAPID TRANSIT Based on the above analysis (detailed analysis is contained in Appendix A-4), North Alignment 3 is preferred because it: Has the

More information

Appendix E Preliminary Location Hydraulic Study

Appendix E Preliminary Location Hydraulic Study Appendix E Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 February 2014 This page intentionally

More information

East Panorama Ridge Concept Plan Amendment

East Panorama Ridge Concept Plan Amendment Page 1 of 7 L003 : East Panorama Ridge Concept Plan Amendment Corporate NO: L003 Report COUNCIL DATE: March 4, 2002 REGULAR COUNCIL LAND USE TO: Mayor & Council DATE: February 27, 2002 FROM: General Manager,

More information

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church R E S O L U T I O N WHEREAS, the Prince George s County Planning Board is charged with the approval of Detailed Site Plans pursuant to Part 3, Division 9 of the Zoning Ordinance of the Prince George s

More information

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION M E M O R A N D U M 10-B PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION DATE: April 9, 2018 TO: FROM: SUBJECT: The Honorable Landmarks Commission Planning Staff 133

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

Pennsy Greenway Trail

Pennsy Greenway Trail Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad

More information

17.1 INTRODUCTION CONTEXT CONCLUSIONS

17.1 INTRODUCTION CONTEXT CONCLUSIONS CHAPTER 17. FLOODPLAIN 17.1 INTRODUCTION 17.1.1 CONTEXT A floodplain is part of an extensive drainage and filtration system and water cycle that serves to contain flood waters from storms. Floodplain areas

More information

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories: Lakeside Business District Lakeside Business District Land Use Categories: Campus Commercial Campus Commercial means a mixture of uses which includes corporate offices, office parks, hotels, commercial,

More information