1 FURTHER TO EXECUTIVE COMMITTEE #3/05 To be held Friday, May 6, 2005 Pages 7. SECTION I - ITEMS FOR AUTHORITY ACTION LISTED ON AGENDA AS REPORT TO FOLLOW 7.12 LAKE ONTARIO RESOURCES IMPROVEMENT OPPORTUNITY ASSESSMENT SECTION II - ITEMS FOR EXECUTIVE ACTION 8.1 ERRATA UPDATE SHEET WITHDRAWN THE REGIONAL MUNICIPALITY OF PEEL NEW PERMITS CITY OF PICKERING GAZAREK REALTY HOLDINGS LTD. To construct in a flood plain, place fill within a regulated area on Lot 18, Concession 1, (1800 Kingston Road), in the City of Pickering, Duffins Creek Watershed as located on the property owned by Gazarek Realty Holdings Ltd TOWN OF MARKHAM TOWN OF MARKHAM To construct in a flood plain, place fill within a regulated area (east of Kennedy Road, north of Highway 7 and south of Austin Drive), in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham ITEM NEW ITEM 8.6 TOP OF RIDGE AND TOWN OF CALEDON Ontario Municipal Board Hearing

2 TO: FROM: Chair and Members of the Executive Committee Meeting #3/05, May 6, 2005 Adele Freeman, Director, Watershed Management RE: LAKE ONTARIO RESOURCES IMPROVEMENT OPPORTUNITY ASSESSMENT KEY ISSUE Approval to enter into an agreement with the Natural Heritage Institute to participate in the Lake Ontario Resources Improvement Opportunity Assessment Project funded by the Great Lakes Protection Fund. RECOMMENDATION THAT the Toronto and Region Conservation Authority (TRCA) participate in the Lake Ontario Resources Improvement Opportunity Assessment project led by the Natural Heritage Institute; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute the agreement, including all necessary documentation required. BACKGROUND In the fall of 2004, TRCA staff was contacted by the Natural Heritage Institute (NHI) and requested to participate in a project to assist in the development of a template for identifying and implementing the most feasible and ecologically beneficial "improvement opportunities" within the Lake Ontario sub-basin. The approach involves the further development and application of a hydroecological planning tool developed by Cornell University, augmented by an interactive process for factoring into consideration the socio-economic constraints, for selecting readily implementable and efficacious improvement projects. This initiative was conceived in part as a response to the Great Lakes Charter Annex which envisions that ecosystem improvement actions will accompany future water uses, but goes further to identify improvement opportunities that can be required or implemented by a full range of stakeholders in the basin including permitting agencies at the national, state/provincial and local community level. The identification of opportunities would be of value to permit applicants needing to mitigate project impacts; and conservation organizations and local communities wishing to undertake ecological restoration activities. In the United States context, this approach may eventually provide a tool for mitigation bankers seeking to invest in projects that can satisfy permit or regulatory requirements. This project is designed to identify the best opportunities for such improvement projects in two ways: i) it will illuminate the projects most likely to yield the desired ecological outcomes; and, ii) it will provide a basis for determining which can be achieved most cost-effectively, in other words, those that will yield the most robust result per unit of expenditure - a shared objective of permitting agencies, permittees, conservation initiators and mitigation bankers alike. 109

3 This project will apply and build upon the Cornell Hydroecological Tool to identify hydrologic impairments and predict the benefits of alternative restoration actions in watersheds of Lake Ontario. The design and field testing phases of this project will involve the direct participation of potential customers. The project has been broken into a number of specific tasks: Task 1 - initial customer outreach, target watershed identification and inventory of initial restoration opportunities; Task 2 - enhancing and expanding Cornell's hydroecology and conservation mapping tool; Task 3 - identify most promising improvement opportunities within the selected watersheds and calibrate system; Task 4 - workshops to identify on-hydrologic factors impacting success; Task 5 - disseminated results; Task 6 - propagate results, methods and process to the entire Great Lakes Basin; Task 7 - project coordination, administration and reporting. Outcomes and Evaluation The principal outcomes of this work will result in a predictive tool and effective methodology that will enable relevant stakeholders to identify restoration opportunities in the target watersheds of the Lake Ontario Basin in a manner that takes into consideration not only the importance of the individual site, but also the potential comprehensive impact of various restoration activities. These restoration opportunities will be based on the input of relevant stakeholders and will represent both multi-organization prioritization opportunities and a refinement of those priorities across their breadth to focus attention on those restoration opportunities with the largest potential ecosystem impacts. Secondly, the inclusive and far reaching customer inclusion process implemented by the project will help establish ownership by the individual parties and will focus attention across these multiple organizations on the restoration opportunities with the largest potential impact. Project Team In addition to TRCA, the project team will be composed of: Natural Heritage Institute - Since NHI's founding in 1989, they have been a leader in crafting innovative solutions that are based on scientific investigation and economic and policy analysis. They apply a wide array of tools in pursuit of their mission; advocate before judicial, administrative and legislative bodies; serve as technical and policy advisors to the ultimate governmental decision makers; plan and implement new resource management programs; design and apply state-of-the-science decision support systems; and, represent conservation interests in complex, multi-party negotiations over the allocation of natural resources. Center for the Environment, Cornell - The Center for the Environment specializes in crafting interdisciplinary collaborations among scientists and professors drawn from throughout Cornell and collaborating institutions. The center also works to apply new knowledge to environmental problems, and to promote Cornell's new methods and information for environmental stewardship needs around the world. 110

4 The Nature Conservancy - Founded in 1951, The Nature Conservancy is an international science-based tax-exempt conservation organization committed to working in partnership with local communities to achieve conservation results. The conservancy's mission is to preserve plants, animals and natural communities that represent the diversity of life on Earth by protecting the lands and waters they need to survive. The conservancy has offices in all 50 states and operates in Canada, the Pacific, the Caribbean and Latin America. FINANCIAL DETAILS The total project cost funded by the Great Lakes Protection Fund is $543,619 US. TRCA has been allocated $117,116 US to carry out its part of the project which includes the identification of 4-5 target watersheds within the Province of Ontario, including at least 1 of TRCA's watersheds; provision of georeferenced information in a format for the modelling; outreach to stakeholders in the province including workshops facilitation; and, identification of the most promising improvements. DETAILS OF WORK TO BE DONE Staff will develop a work plan in conjunction with the other team members. Adele Freeman will attend the project initiation meeting in Chicago in May 24, Report prepared by: Adele Freeman, extension 5238 For Information contact: Adele Freeman, extension 5238 Date: May 3,

5 8.1 APPLICATION FOR PERMITS UNDER ONTARIO REGULATION 158 Fill, Construction and Alteration to Waterways Information has been received and reviewed by staff for the following Scheduled Errata items. The recommendations within the staff reports should be amended to include the following: ENBRIDGE GAS DISTRIBUTION INC. Enbridge Plan, Notes and Details, Drawing No , Sheet No. 2 of 9, prepared by S. Fitzpatrick, dated September 13, 2004, revised February 2, 2002, stamped received by TRCA staff on March 3, CITY OF MISSISSAUGA Letter of Undertaking to provide revisions to engineering, sediment/erosion control, restoration and planting plans to the satisfaction of TRCA; dated April 15, 2005; received April 25, 2005; prepared by the City of Mississauga ENBRIDGE GAS DISTRIBUTION INC. Enbridge Plan, Notes and Details, prepared by P. Garnier, Drawing No , Sheet No. 2 of 2, dated October 21, 2004, revised April 13, 2005, stamped received by TRCA staff on April 21, THE REGIONAL MUNICIPALITY OF PEEL WITHDRAWN CITY OF TORONTO Drawing No. 117-S486-10, Sheet 7, prepared by LEA Consulting Ltd., received on April 1, 2005, Red-lined revised by TRCA staff on May 5, 2005; Drawing No. 117-S486-11, Sheet 8; Drawing No.117-S486-12, Sheet 9; Drawing No. 117-S486-13, Sheet 10; Drawing No. 117-S486-14, Sheet 11; Drawing No. 117-S486-15, Sheet 12; Drawing No. 117-S486-16, Sheet 13; Drawing No. 117-S486-17, Sheet 14; Drawing No. 117-S486-18, Sheet 15, prepared by LEA Consulting Ltd., received on March 1, JAN BIRCH PROPERTIES INC. Drawing No. A1.1, Ground Floor/ Site Plan, revised July 27, 2004, received August 27, 2004, prepared by Roger du Toit Architects Ltd LEWIS STEINBERG Tree Inventory/Preservation Plan, Drawing No. L1, prepared by Janet Rosenberg & Associates Landscape Architects, revised April 18, 2005, received April 19, 2005; Layout and Planting Plan, Drawing No. L2, prepared by Janet Rosenberg & Associates Landscape Architects, revised April 18, 2005, received April 19, 2005; Grading Plan, Drawing No. L3, Janet Rosenberg & Associates Landscape Architects, revised April 18, 2005, received April 19, 2005; Landscape Details, Drawing No. L4, Janet Rosenberg & Associates Landscape Architects, revised April 18, 2005, received April 19, 2005; 112

6 Letter of Undertaking, commitment to address any requests for TRCA revisions to landscape plans, dated April 22, 2005, received April 28, PARVIZ YOUSEFZADFH Drawing No. A-1, Site Plan; Drawing No. A-3, Ground Floor Plan; Drawing A-4, Second Floor Plan; Drawing No. A-5, Front Elevation; Drawing No. A-6, Rear Elevation; Drawing No. A-7, Left Side Elevation; Drawing No. A-8, Right Side Elevation; Drawing No. A-10, Typical Section; Drawing No. A-11, Typical Details and Specifications, prepared by Samuel Barsketis, dated February 5, 2005, received March 21, 2005; Drawing No. A-2, Basement Plan, prepared by Samuel Barsketis, dated February 5, 2005, received March 21, 2005, red-lined revised to indicate glass block windows by TRCA staff on May 4, ONTARIO LTD. Red-Line Revised Servicing and Grading Plan, Drawing No. SP1, prepared by Soscia Engineering Ltd., dated April 5, 2005, received April 26, BLOCK 11 LANDOWNERS GROUP Letter of Undertaking, to address any outstanding TRCA issues with respect to Stormwater Ponds 1A & 1B, prepared by David Ashfield, Schaeffers Consulting Engineers, dated April 22, 2005, received April 26, BLOCK 11 LANDOWNERS GROUP Letter of Undertaking, to address any outstanding TRCA issues with respect to Stormwater Pond 4, prepared by David Ashfield, Schaeffers Consulting Engineers, dated April 22, 2005, received April 26, BLOCK 11 LANDOWNERS GROUP Letter of Undertaking, to address any outstanding TRCA issues with respect to Stormwater Pond 2, prepared by David Ashfield, Schaeffers Consulting Engineers, dated April 22, 2005, received April 26, BLOCK 11 LANDOWNERS GROUP Letter of Undertaking, to address any outstanding TRCA issues with respect to Crossing C, prepared by David Ashfield, Schaeffers Consulting Engineers, dated April 22, 2005, received April 26, BLOCK 11 LANDOWNERS GROUP Letter of Undertaking, to address any outstanding TRCA issues with respect to Crossing E, prepared by David Ashfield, Schaeffers Consulting Engineers, dated April 22, 2005, received April 26,

7 NEAMSBY INVESTMENTS INC. Enterprise Boulevard Drawing No. P4, Project No , Prepared by Masongsong Associates Engineering Limited, as received on March 14th, 2005; Enterprise Boulevard Drawing No. DE5, Project No , Prepared by Masongsong Associates Engineering Limited as received on March 14th, 2005; Letter of Undertaking confirming the extent of works being approved as part of Permit Drawings P4 and DE5 as prepared by Masongsong Associates Engineering Limited dated April 27th, REGIONAL MUNICIPALITY OF YORK Letter of Undertaking from York Region to provide engineering drawings to the satisfaction of TRCA staff, dated April 27, 2005; received April 28, ROBERT WHITE Proposed Addition to the White Residence, Drawing No.: SP-1, prepared by The Gregory Design Group, dated April 2005, revised May 3, 2005; Proposed Addition to the White Residence, Dwg. No. : A-1, Dwg. No.: A-2, Dwg. No. A-3, Dwg. No. A-4, prepared by The Gregory Design Group, dated April SANDRA PAGE Drawing number D-01-01, entitled, The Page Residence, date received April 15, 2005, prepared by Stojanovic Land Surveying Red-lined to include required silt fencing, April 25, 2005; Drawing number A-1, entitled, Proposed Renovations to the Page Residence 27 Billy Joel Crescent Town of Markham, date received April 19, 2005; Drawing number A-2, entitled, Proposed Renovations to the Page Residence, date received April 19, 2005; Drawing number A-3, entitled, Proposed Renovations to the Page Residence, date received April 19, 2005; Drawing number A-4, entitled, Proposed Renovations to the Page Residence, date received April 19, 2005; Drawing number A-5, entitled, Proposed Renovations to the Page Residence, date received April 19, 2005; Drawing number A-6, entitled, Proposed Renovations to the Page Residence 27 Billy Joel Crescent Town of Markham, date received April 19, 2005; Drawing number A-7, entitled, Proposed Renovations to the Page Residence, date received April 19, 2005; Drawing number A-8, entitled, The Page Residence, date received April 19, 2005; General Landscape Drawing, entitled, The Page Residence, date received May 4, 2005, prepared by The Gregory Design Group REGIONAL MUNICIPALITY OF YORK North Don Collector Sewer Rehabilitation and Bank Stabilization, Dwg No. AC-1, prepared by MacViro and York Region, dated October 2004, received March 2,

8 CITY OF PICKERING GAZAREK REALTY HOLDINGS LTD. To construct in a flood plain, place fill within a regulated area on Lot 18, Concession 1, (1800 Kingston Road), in the City of Pickering, Duffins Creek Watershed as located on the property owned by Gazarek Realty Holdings Ltd. The purpose is to construct in the Regional Storm Floodplain of Duffins Creek and excavate and place fill within a Fill Regulated Area in order to facilitate the construction of an addition to the existing car dealership within the Pickering Town Centre Special Policy Area. LOCATION MAP: 1800 Kingston Road The permit will be issued for the period of May 6, 2005 to May 5, 2007 in accordance with the following documents and plans which form part of this permit: Site Grading & Servicing Plan, Dwg. No. S-1, prepared by Landscape Planning Limited, dated April 14, 2004, revised March 8, 2005 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to construct in the Regional Storm Floodplain of Duffins Creek and excavate and place fill within a Fill Regulated Area in order to facilitate the construction of a service drive thru, a new car showroom, and a new service shop to the existing car dealership on the subject property. The subject property is located on the north side of Kingston Road, east of Brock Road, within the Pickering Town Centre Special Policy Area (SPA). The site is located entirely within the SPA and is separated from the watercourse by Finch Avenue to the north. 115

9 Control of Flooding: The subject property is located within the Regional Storm Floodplain of Duffins Creek, and the applicant has taken the necessary steps to ensure that the building will withstand the depths of flooding associated with a Regional Storm. Given that the building addition will match the existing structure, the applicant is proposing active floodproofing for this commercial space. TRCA water management staff are satisfied that there will be no impacts on the storage or conveyance of flood waters as a result of the proposed development. Pollution: Sediment and erosion control fencing will be erected around the work site in order to contain all construction-generated sediment. Conservation of Land: There are no geotechnical/slope stability or fisheries resources concerns related to this proposal. As the proposed addition is within an existing parking area, there are no natural heritage features on the site which may be negatively impacted by the proposed development. Plantings As no vegetation removals are required to accommodate the proposed development, no additional plantings are required. Policy Guidelines: This proposal is consistent with Section B) - Development Guidelines for Development/Redevelopment within Designated Two Zone Areas or Special Policy Areas - of the Authority's Valley and Stream Corridor Management Program. CFN: Application #: 087/05/PICK Report Prepared by: Carla Pierini, extension 5314 For information contact: Russel White, extension 5306 Date: March 14, 2005 TOWN OF MARKHAM TOWN OF MARKHAM To construct in a flood plain, place fill within a regulated area (east of Kennedy Road, north of Highway 7 and south of Austin Drive), in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to excavate and place fill within a Fill Regulated Area, and construct within the floodplain of the Rouge River in order to retrofit the existing outlet structure and channel for the Unionville Stormwater Management Pond B-3 located on the north side of Highway 7, east of Kennedy Road in the Town of Markham. 116

10 LOCATION MAP: east of Kennedy Road, north of Highway 7 and south of Austin Drive The permit will be issued for the period of May 6, 2005 to May 5, 2007 in accordance with the following documents and plans which form part of this permit: Letter of Undertaking, prepared by Gina Gammarano of the Town of Markham, dated May 4, 2005, to address any outstanding engineering comments prior to release of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to excavate and place fill within a Fill Regulated Area and construct within the Regional Storm Floodplain of the Rouge River in order to facilitate the retrofit an existing outfall from the Unionville Stormwater Management Pond B-3 located on the north side of Highway 7, east of Kennedy Road in the Town of Markham. In February 1999, the TRCA and the Town of Markham completed a Stormwater Retrofit Study, which has been used to support a long-term plan to improve stormwater quality and erosion controls within the Town. Based on this study, the Unionville SWM Pond B-3 was identified as requiring retrofitting. The proposed works include modifications to the existing outlet structure and channel. The outfall will not interfere with the low flow channel of the abutting watercourse. Control of Flooding: The proposed works are located within the Regional Storm Floodplain, but will not impact the storage or conveyance of flood waters. Pollution: A silt fence will be erected around the work site, and a temporary silt trap will be installed in order to contain all construction-generated sediment. 117

11 Conservation of Land: There are no geotechnical/slope stability issues or fisheries resources concerns related to this proposal. All disturbed areas are to be restored. Plantings All disturbed areas are to be restored to existing condition. Policy Guidelines: This proposal is consistent with Section Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: Application #: 068/05/MARK Report Prepared by: Carla Pierini, extension 5314 For information contact: Russel White, extension 5306 Date: March 3,

12 TO: FROM: Chair and Members of the Executive Committee Meeting #3/05, May 6, 2005 Carolyn Woodland, Director, Development Services RE: TOP OF RIDGE AND TOWN OF CALEDON Ontario Municipal Board Hearing KEY ISSUE Authorization for party status before the Ontario Municipal Board on referrals related to a zoning amendment and site plan application to permit the development of approximately thirty-two (32) townhouse dwellings on the subject property. RECOMMENDATION THAT authorization be given to Toronto and Region Conservation Authority (TRCA) staff to obtain party status before the Ontario Municipal Board (OMB) regarding proposed modifications to the current site plan previously approved by the OMB that are not in conformity with the Valley and Stream Corridor Management Program; THAT staff continue to work cooperatively with our municipal partners and appellants to ensure that the requirements of the Valley and Stream Corridor Management Program are met; THAT staff be authorized to retain legal counsel to pursue this appeal before the Ontario Municipal Board; AND FURTHER THAT the Ontario Municipal Board and all parties and participants to the hearing be so advised. BACKGROUND The subject property is approximately 4.1 hectares (10.2 acres) in size and is located adjacent to the southwest quadrant of the King Street/Queen Street intersection, more specifically southeast of the King Street/Station Road intersection (accessed by way of Rolling Hills Lane), in the Village of Bolton, Town of Caledon. The property is comprised of a significant valley feature (3.9 hectares) associated with the Main Branch of the Humber River and a tableland area (1.2 hectares). The valleylands are zoned Open Space and the tableland portion of the property is zoned townhouse residential. The majority of the property is located within the TRCA Fill Regulated Area. The OMB previously ordered the approval of a zoning by-law amendment (Zoning By-law No ) and site plan (SPA 93/06) for a townhouse development on the subject property in In this regard, TRCA supported the proposed development applications and subsequently issued a TRCA fill permit (C ). As such, the TRCA was not a party to the 1996 OMB hearing(s) referred to above. 119

13 The current Planning Act application for the subject property is to amend the OMB approved site plan (SPA 93/06) in order to facilitate the redesign of the proposed development (reorient the location of townhouse units and landscaping). The applicant is requesting a reduction to the structural setback from the valleylands from approximately 5 metres to approximately 2 metres to facilitate the proposed revision(s). No buffer lands beyond top of bank are being proposed. Although TRCA staff have no geotechnical, floodplain and/or fisheries related concerns with the proposed revisions, it has been determined that the potential impacts of the setback reduction will have short and long term negative influences on the existing (and/or proposed) vegetation located along the slopes. RATIONALE The OMB hearing is scheduled for June 28, No pre-hearing is scheduled for this application. Upon discussions with the Town of Caledon legal staff, TRCA staff has been advised that it is in the best interest of the Town of Caledon and the TRCA to obtain separate council to represent our respective interests in these matters. The Town of Caledon staff has not yet rendered a decision on the subject application, however, it is TRCA staff's understanding that the town may also object to the approval of the noted revisions based on similar concerns as well as additional municipal planning related issues (i.e. lack of amenity space, landscaping and other infrastructure related matters). In support of the initial zoning by-law amendment and site plan applications, TRCA staff had previously reviewed and approved all associated supporting technical studies as required (i.e. geotechnical and slope stability analyses, environmental impact assessment and stormwater management report). TRCA did not object to the approval of the original site plan and subsequently issued a TRCA fill permit for the proposed development. Through the original approval of these applications a minimum setback of approximately 5 metres from the valleylands was established. It was deemed that the approved setback referred to above adequately addressed all outstanding geotechnical and/or ecology related concerns. As described, the tableland portion of the subject property is well defined and the valley slopes are well vegetated. The vegetation on the slopes is characterized by an intermediate hardwood forest (northern and southern portions of the property) and a succeeding shrubland/grassland complex (eastern portion of property). Further to additional investigation, TRCA staff feels that the proposed 2 metre setback will not provide an adequate buffer between the proposed development and the valleylands. TRCA staff feels that the proposed development will have both short and long term negative effects on the valleylands in this area such as the removal of significant vegetation, the loss of edge habitat, the potential for surface erosion on the adjacent slope, and the need for future maintenance to manage the forested slope edge (i.e. remove invasive species, hazard trees and control slope erosion). In order to ensure that the TRCA s interests in this matter are adequately represented, TRCA staff is requesting approval to seek party status at the upcoming OMB hearing. 120

14 DETAILS OF WORK TO BE DONE Staff is requesting the authorization to retain legal counsel to ensure that TRCA interests are protected and addressed at the OMB hearing. TRCA staff will continue to work with all parties and participants to the hearing to try to resolve the outstanding issues noted above prior to the OMB hearing. Report prepared by: Quentin Hanchard, extension 5324 For Information contact: Quentin Hanchard, extension 5324 Date: May 04, 2005 Attachments:1 121

15

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013 FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013 FURTHER TO: Pages EX10. APPLICATION FOR PERMITS UNDER ONTARIO REGULATION 166/06 Development, Interference with Wetlands

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #5/06 To be held on Friday, July 7, ERRATA UPDATE SHEET

FURTHER TO EXECUTIVE COMMITTEE MEETING #5/06 To be held on Friday, July 7, ERRATA UPDATE SHEET FURTHER TO EXECUTIVE COMMITTEE MEETING #5/06 To be held on Friday, July 7, 2006 Pages FURTHER TO: 8. SECTION II - ITEMS FOR EXECUTIVE ACTION 8.1 ERRATA UPDATE SHEET 138-140 WITHDRAWN 8.1.36 CITY OF TORONTO

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #10/11 To be held on Friday, November 4, 2011

FURTHER TO EXECUTIVE COMMITTEE MEETING #10/11 To be held on Friday, November 4, 2011 FURTHER TO EXECUTIVE COMMITTEE MEETING #10/11 To be held on Friday, November 4, 2011 FURTHER TO: Pages EX4. DELEGATIONS NEW DELEGATION EX4.2 A delegation from Mr. Anton Kikas, P.Eng., O.L.S. with Anton

More information

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Executive Committee Meeting Addendum #7/15 July 3, 2015 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Maria Augimeri Michael Di Biase David Barrow Ronald Chopowick Vincent Crisanti Glenn

More information

3-2 Environmental Systems

3-2 Environmental Systems 3-2 Environmental Systems 3.0 ENVIRONMENTAL SYSTEMS CONTENTS 3.1 GREENWAY SYSTEM 3.1.1 General Policies 3.1.2 Natural Heritage Network 3.1.3 Natural Heritage Network Enhancement Lands 3.1.4 Rouge Watershed

More information

10.14 ERRATA UPDATE SHEET 3

10.14 ERRATA UPDATE SHEET 3 Executive Committee Meeting Addendum #13/15 January 15, 2016 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Maria Augimeri Michael Di Biase David Barrow Vincent Crisanti Glenn De Baeremaeker

More information

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM C H A P T E R 1 M O D E L P O L I C I E S F O R I M P L

More information

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED 9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following

More information

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN Page 1 1. INTRODUCTION AND BACKGROUND 1.1 THE PROJECT VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN TERMS OF REFERENCE The Town of Caledon (Town) is a large, predominantly rural municipality with

More information

FURTHER TO EXECUTIVE COMMITTEE #3/09 To be held Friday, May 8, 2009

FURTHER TO EXECUTIVE COMMITTEE #3/09 To be held Friday, May 8, 2009 FURTHER TO EXECUTIVE COMMITTEE #3/09 To be held Friday, May 8, 2009 Pages FURTHER TO: NEW DELEGATIONS 4. DELEGATIONS 4.1 A delegation by Ray Ristich, Ajax Resident, in regard to widening of Rossland Road

More information

10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report

10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report STAFF REPORT ACTION REQUIRED 10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report Date: March 9, 2012 To: From: Wards: Reference Number: Etobicoke York Community Council Director, Community

More information

Stream Corridor Management Plan

Stream Corridor Management Plan Stream Corridor Management Plan A unified and comprehensive approach to protecting, restoring and managing the Upper Delaware River Graydon Dutcher Delaware County Soil and Water Conservation District

More information

TRCA Roles and Responsibilities in Planning and Development

TRCA Roles and Responsibilities in Planning and Development TRCA Roles and Responsibilities in Planning and Development Regional Watershed Alliance November 14, 2018 Laurie Nelson, MCIP, RPP Associate Director, Planning and Policy Outline Roles and Legislation

More information

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation Staff Report To Service Area Committee of the Whole Infrastructure, Development and Enterprise Services Date Monday, March 6, 2017 Subject Natural Heritage Action Plan (NHAP) Project Initiation Report

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014 Item 6, Report No. 21, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on May

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #7/12 To be held on Friday, September 7, 2012

FURTHER TO EXECUTIVE COMMITTEE MEETING #7/12 To be held on Friday, September 7, 2012 FURTHER TO EXECUTIVE COMMITTEE MEETING #7/12 To be held on Friday, September 7, 2012 FURTHER TO: Pages EX10. APPLICATION FOR PERMITS UNDER ONTARIO REGULATION 166/06 Development, Interference with Wetlands

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK

TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK NOTICE OF PREPARATION OF AN ADDENDUM REPORT TO THE HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK ENVIRONMENTAL ASSESSMENT & RESPONSE TO

More information

Ashbridges Bay Erosion and Sediment Control Project

Ashbridges Bay Erosion and Sediment Control Project Ashbridges Bay Erosion and Sediment Control Project Project Brief Overview Toronto and Region Conservation Authority, in partnership with the City of Toronto, intends to carry out remedial erosion control

More information

Albion Hills Conservation Area Master Plan. Public Information Session

Albion Hills Conservation Area Master Plan. Public Information Session Albion Hills Conservation Area Master Plan Public Information Session 1 03.25.2014 Meeting Agenda 1. Project Introduction Property History Current Use Master Plan Process 2. Draft Vision Goals and Objectives

More information

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN 12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN The Planning and Economic Development Committee recommends the adoption of the recommendation contained in the following report August

More information

COLVER ROAD INDUSTRIAL CONCEPT PLAN

COLVER ROAD INDUSTRIAL CONCEPT PLAN COLVER ROAD INDUSTRIAL CONCEPT PLAN A CONCEPTUAL LAND USE AND TRANSPORTATION PLAN FOR TA-4 AN URBAN RESERVE AREA OF THE CITY TALENT City of Talent Adopted by City Council Resolution No., June, 2015 PART

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT CITY COUNCIL AGENDA REPORT Subject: DESIGNATED FLOOD LINE CARROT CREEK Recommendation(s) That Administration bring forward a Land Use Bylaw amendment in October 2014 establishing the Designated Flood Line

More information

TRCA Field Staking Protocol December 2016

TRCA Field Staking Protocol December 2016 Page 1 of 6 TRCA Field Staking Protocol December 2016 This Protocol describes TRCA staff s current practice for field staking the physical top of bank, the physical toe of slope, and the limit of existing

More information

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS Recommendation The Commissioner of Planning recommends: THAT

More information

Brampton. Secondary Plan. Review. Bram West. A New Direction in Planning & Public Consultation

Brampton. Secondary Plan. Review. Bram West. A New Direction in Planning & Public Consultation Brampton Bram West Secondary Plan Review A New Direction in Planning & Public Consultation Introduction The Bram West Secondary Plan Review offers an important opportunity for the community to define a

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016 Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest

More information

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #10/12 To be held on Friday, December 7, 2012

FURTHER TO EXECUTIVE COMMITTEE MEETING #10/12 To be held on Friday, December 7, 2012 FURTHER TO EXECUTIVE COMMITTEE MEETING #10/12 To be held on Friday, December 7, 2012 FURTHER TO: Pages EX8.7 NEW ITEM WWK RECREATION INC. (WILD WATER KINGDOM) Deferral of 2012 Rent 118 EX10. APPLICATION

More information

Town of Peru Comprehensive Plan Executive Summary

Town of Peru Comprehensive Plan Executive Summary Town of Peru Comprehensive Plan Executive Communities that plan grow by choice, not by chance. A plan makes growth thoughtful, understandable, and predictable. A plan shows that a community is managing

More information

Red Hill Valley Project More Than A Road October 16, 2006

Red Hill Valley Project More Than A Road October 16, 2006 Red Hill Valley Project Presented By: More Than A Road October 16, 2006 September, 2007 Gerry Davis, C.M.A., Senior Director, Capital Planning and Implementation Division Public Works Department City of

More information

Background Summary Report

Background Summary Report Background Summary Report May 2014 Submitted by Macaulay Shiomi Howson Ltd. In association with AMEC MMM Group Brook McIlroy Inc. Hemson Consulting Ltd. Table of Contents 1. Introduction... 1 2. Why is

More information

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON Subject: Boyne Survey Secondary Plan and Related Official Plan Amendments The following text and schedules constitute Amendment No. 30 to the

More information

Report to: Development Services Committee Report Date: April 24, 2017

Report to: Development Services Committee Report Date: April 24, 2017 SUBJECT: Cornell Rouge National Urban Park Gateway - Report on Design Charrette and Next Steps PREPARED BY: Lilli Duoba, MES, MCIP, RPP, Manager, Natural Heritage (ext. 7925) REVIEWED BY: Marg Wouters,

More information

APPENDIX F: EXTERNAL APPROVALS

APPENDIX F: EXTERNAL APPROVALS 1.0 RESPONSIBILITIES When the City is constructing the Park or Open Space Development lands (OPTION I), after the subdivision construction process is completed by the Developer, Open Space Development

More information

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT PUBLIC INFORMATION CENTRE Vaughan Metropolitan Centre (VMC) Black Creek Renewal Wednesday, May 10, 2017 6:00 p.m. to 8:00 p.m. Add photo Project Management, Environmental Assessment, Stormwater Management

More information

Feasibility Analysis for Expansion of the Provincial Greenbelt Plan Area into Mississauga

Feasibility Analysis for Expansion of the Provincial Greenbelt Plan Area into Mississauga Feasibility Analysis for Expansion of the Provincial Greenbelt Plan Area into Mississauga November 8, 2013 Natural Heritage and Urban Forest Strategy: Draft Discussion Paper #3: Table of Contents 1.0 Introduction...

More information

Stanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report

Stanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report STAFF REPORT ACTION REQUIRED Stanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report Date: December 16, 2011

More information

THAT Site Development Application DA (Villa Charities Inc./Villa Colombo DiPoce Campus) BE APPROVED, subject to the following conditions:

THAT Site Development Application DA (Villa Charities Inc./Villa Colombo DiPoce Campus) BE APPROVED, subject to the following conditions: COMMITTEE OF THE WHOLE JUNE 16, 2003 SITE DEVELOPMENT FILE DA.02.058 VILLA CHARITIES INC./VILLA COLOMBO DIPOCE CAMPUS Recommendation The Commissioner of Planning recommends: THAT Site Development Application

More information

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN 5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN The Planning and Economic Development Committee recommends the following: 1. The communication from Brendan O Callaghan,

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

Town of Newmarket 395 Mulock Drive P.O. Box 328, Newmarket, Ontario, L3Y 4X7. Website: newmarket.ca Phone:

Town of Newmarket 395 Mulock Drive P.O. Box 328, Newmarket, Ontario, L3Y 4X7.   Website: newmarket.ca Phone: Town of Newmarket 395 Mulock Drive P.O. Box 328, Newmarket, Ontario, L3Y 4X7 Email: info@newmarket.ca Website: newmarket.ca Phone: 905-895-5193 Natural Heritage System Boundary Refinement: Vacant Lot West

More information

NOTE: PLEASE REFER TO MISSISSAUGA PLAN FOR ADDITIONAL CITY-WIDE POLICIES WHICH APPLY TO THIS DISTRICT.

NOTE: PLEASE REFER TO MISSISSAUGA PLAN FOR ADDITIONAL CITY-WIDE POLICIES WHICH APPLY TO THIS DISTRICT. NOTE: THE POLICIES IN THIS DOCUMENT ARE SPECIFIC TO THE FAIRVIEW PLANNING DISTRICT OF, AND MUST BE READ IN CONJUNCTION WITH ALL THE POLICIES OF PLEASE REFER TO FOR ADDITIONAL CITY-WIDE POLICIES WHICH APPLY

More information

6 Growth Management Challenges and Opportunities

6 Growth Management Challenges and Opportunities 6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST St. Mary s Soil Conservation District 26737 Radio Station Way, Suite B Leonardtown, MD 20650 Phone: 301-475-8402 ext. 3 Fax: 301-475-8391 www.stmarysscd.com St. Mary s County Government Department of Public

More information

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

Goal 1 To establish and follow land use patterns for the long-range development of the campus. ELEMENT 4 FUTURE LAND USE Goal 1 To establish and follow land use patterns for the long-range development of the campus. Objective 1A Correct existing incompatible campus land uses. Policy 1A-1 Reduce

More information

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary TABLE OF CONTENTS Page Executive Summary 1.0 INTRODUCTION...1-1 1.1 Purpose of the Undertaking...1-1 1.2 Study Area Description...1-1 1.3 Description of the Undertaking...1-1 1.4 Rationale for the Undertaking...1-2

More information

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 7 To provide park facilities, recreation programs, and open space resources that are safe, adequate, and accessible to all City residents,

More information

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report Date: March 17, 2014 To: From: Wards: Reference Number: Planning and Growth Management

More information

APPENDIX I Presentations

APPENDIX I Presentations APPENDIX I Presentations Workshop Summary Report 11 Peel Region Official Plan Review May 5, 2010 Compatible Active Recreation Workshop July 29, 2010 Components of PROPR Sustainability Planning Tools/Updates

More information

11. BALLANTRAE-MUSSELMAN LAKE AND ENVIRONS SECONDARY PLAN

11. BALLANTRAE-MUSSELMAN LAKE AND ENVIRONS SECONDARY PLAN 11. BALLANTRAE-MUSSELMAN LAKE AND ENVIRONS SECONDARY PLAN 11.1 PURPOSE The Ballantrae-Musselman Lake and Environs Secondary Plan Area includes two small existing settlement areas, Ballantrae and Musselman

More information

11 APPEAL BY LEBOVIC ENTERPRISES INC. AND REVLIS LTD. TO OFFICIAL PLAN AMENDMENT D , TOWN OF AURORA

11 APPEAL BY LEBOVIC ENTERPRISES INC. AND REVLIS LTD. TO OFFICIAL PLAN AMENDMENT D , TOWN OF AURORA 11 APPEAL BY LEBOVIC ENTERPRISES INC. AND REVLIS LTD. TO OFFICIAL PLAN AMENDMENT D09-09-03, TOWN OF AURORA The Planning and Economic Development Committee recommends the following: 1. The deputation by

More information

IMPLEMENTATION STRATEGY: GOAL 1: TO SUSTAIN A HEALTHY NATIVE PRAIRIE GRAZING RESOURCE

IMPLEMENTATION STRATEGY: GOAL 1: TO SUSTAIN A HEALTHY NATIVE PRAIRIE GRAZING RESOURCE IMPLEMENTATION STRATEGY: GOAL 1: TO SUSTAIN A HEALTHY NATIVE PRAIRIE GRAZING RESOURCE Objectives Actions Timetable Lead and Supporting Agencies 1. Maintain or adopt sound rangeland practices that are reflective

More information

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN Official Plan Amendment XX to the Official Plan for the City of Ottawa 1 INDEX THE STATEMENT OF COMPONENTS PART A THE PREAMBLE PAGE Purpose...

More information

The lands identified as Residential Areas on Schedule A1, Urban Structure, represent the areas that provide for stable residential communities.

The lands identified as Residential Areas on Schedule A1, Urban Structure, represent the areas that provide for stable residential communities. Livable Oakville Part D: Land Use Designations and Policies 11. RESIDENTIAL 11.1 General The lands identified as Residential Areas on Schedule A1, Urban Structure, represent the areas that provide for

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #4/05. Friday, June 3, 2005

INDEX TO EXECUTIVE COMMITTEE MINUTES #4/05. Friday, June 3, 2005 INDEX TO EXECUTIVE COMMITTEE MINUTES #4/05 Friday, June 3, 2005 MINUTES Minutes of Meeting #3/05, held on May 6, 2005 265 ONTARIO REGULATION 158 555174 Ontario Ltd. 275 1380543 Ontario Limited 300 Bell

More information

SECTION 2 - GENERAL POLICIES

SECTION 2 - GENERAL POLICIES SECTION 2 - GENERAL POLICIES 2.1 General Development a) Goals i) To accommodate the population and development anticipated for the Town in the planning period. ii) To provide the necessary services and

More information

Chapter 1: General Program Information

Chapter 1: General Program Information Chapter 1: General Program Information 1.1 Introduction The Montgomery County Stormwater Management Resolution (#03-1-5) was adopted by the County Board of Commissioners on January 22, 2003. The purpose

More information

Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report

Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report STAFF REPORT ACTION REQUIRED 148-156 Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report Date: March 13, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #7/11 To be held on August 5, 2011

FURTHER TO EXECUTIVE COMMITTEE MEETING #7/11 To be held on August 5, 2011 FURTHER TO EXECUTIVE COMMITTEE MEETING #7/11 To be held on August 5, 2011 FURTHER TO: Pages EX8. SECTION II - ITEMS FOR EXECUTIVE ACTION EX8.2 - LISTED ON AGENDA AS REPORT TO FOLLOW EX8.2 51 DEER VALLEY

More information

CHAPTER 12 IMPLEMENTATION

CHAPTER 12 IMPLEMENTATION CHAPTER 12 IMPLEMENTATION The 2010 Town of Denton Comprehensive Plan is intended to capture a vision of the future of Denton. As such, it provides a basis for a wide variety of public and private actions

More information

AMENDMENT NO. 38 TO THE CITY OF BARRIE OFFICIAL PLAN SALEM SECONDARY PLAN. June 2014

AMENDMENT NO. 38 TO THE CITY OF BARRIE OFFICIAL PLAN SALEM SECONDARY PLAN. June 2014 AMENDMENT NO. 38 TO THE CITY OF BARRIE OFFICIAL PLAN SALEM SECONDARY PLAN June 2014 AMENDMENT NO. 38 TO THE OFFICIAL PLAN OF THE BARRIE PLANNING AREA TABLE OF CONTENTS Page Introduction 1 Part A - The

More information

3. ZONING BY-LAW AMENDMENT FILE Z P FERMA PROPERTIES LIMITED PRELIMINARY REPORT

3. ZONING BY-LAW AMENDMENT FILE Z P FERMA PROPERTIES LIMITED PRELIMINARY REPORT COMMITTEE OF THE WHOLE (PUBLIC HEARING) JUNE 20, 2005 3. ZONING BY-LAW AMENDMENT FILE Z.05.017 P.2005.41 FERMA PROPERTIES LIMITED PRELIMINARY REPORT Recommendation The Commissioner of Planning recommends:

More information

HAZARD MITIGATION GOALS AND OBJECTIVES

HAZARD MITIGATION GOALS AND OBJECTIVES SEWRPC Community Assistance Planning Report No. 282, 2nd Edition CITY OF MILWAUKEE ALL HAZARDS MITIGATION PLAN UPDATE Chapter IV HAZARD MITIGATION GOALS AND OBJECTIVES [NOTE: Throughout this plan update

More information

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies Vision Statement Queen Creek s interconnected network of parks, trails, open spaces and recreation opportunities provide safe and diverse activities and programs that sustain its unique, small town, equestrian

More information

Edward R. Sajecki Commissioner of Planning and Building. Land Use Review- Former Parkway Belt West Lands- Fieldgate Drive and Audubon Boulevard

Edward R. Sajecki Commissioner of Planning and Building. Land Use Review- Former Parkway Belt West Lands- Fieldgate Drive and Audubon Boulevard Corporate Report Clerk s Files Originator s Files CD.04.FOR DATE: November 15, 2011 TO: FROM: SUBJECT: Chair and Members of Planning and Development Committee Meeting Date: December 5, 2011 Edward R. Sajecki

More information

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge Meeting Agenda City of Guelph River Systems Advisory Committee September 19, 2018 City Hall, Meeting Room B From 4:00 to 6:00 p.m. Meeting Chair: Mariette Pushkar Agenda Items Welcome to all Item 1, 2

More information

PDS June 1, 2016 Page 1. Planning and Development Committee. MEETING DATE: Wednesday, June 01, 2016

PDS June 1, 2016 Page 1. Planning and Development Committee. MEETING DATE: Wednesday, June 01, 2016 Page 1 REPORT TO: Planning and Development Committee MEETING DATE: Wednesday, June 01, 2016 SUBJECT: ROPA 12: Project Initiation Report Regional Official Plan Amendment (ROPA # 12) Watercourse Policies

More information

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street

More information

Planning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator

Planning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator Department Director of Manager of Policy Planner Planner II (2) Planner II/ Heritage Coordinator Technician/ Sustainability Coordinator Technician Administrative Clerk March 2017 Department 2018 Business

More information

3 TOWN OF WHITCHURCH-STOUFFVILLE OFFICIAL PLAN AMENDMENT NOS. 116 & 117

3 TOWN OF WHITCHURCH-STOUFFVILLE OFFICIAL PLAN AMENDMENT NOS. 116 & 117 3 TOWN OF WHITCHURCH-STOUFFVILLE OFFICIAL PLAN AMENDMENT NOS. 116 & 117 The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following report,

More information

implementation r expression in landscape

implementation r expression in landscape 6 ubc okanagan implementation campus plan r expression in landscape 68 6 implementation campus plan sections The Campus Plan supports the academic mission, values and commitments of the University by providing

More information

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1 ~!VAUGHAN NOV Z 5 2016 November 21, 2016 Mr. Denis Kelly, Regional Clerk The Regional Municipality of York 17250 Yonge Street Newmarket, ON L3Y 6Z1 Dear Mr. Kelly: RE: NEW KIRBY GO STATION IN BLOCK 27

More information

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings Presented To: Planning Committee Request for Decision Application for rezoning in order to permit a place of worship on a vacant lot zoned for C1, Local Commercial uses, Cam Street, Sudbury Sitiri Investments

More information

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements COMPLETE APPLICATION CHECKLIST Jan 2016 STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS The following checklist has been compiled to assist the applicant in preparing their application for approval

More information

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

McKay Road Interchange and Salem / Lockhart Crossing

McKay Road Interchange and Salem / Lockhart Crossing McKay Road Interchange and Salem / Lockhart Crossing The McKay Road Interchange Class EA has two components: 1. A new MacKay Road Interchange at Highway 400; and 2. A new bridge crossing of Highway 400

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

Edward R. Sajecki Commissioner of Planning and Building

Edward R. Sajecki Commissioner of Planning and Building Corporate Report Clerk s Files Originator s Files CD.03.POR DATE: TO: FROM: SUBJECT: Chair and Members of Planning and Development Committee Meeting Date: February 27, 2012 Edward R. Sajecki Commissioner

More information

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department REPORT TO THE CITY OF WINDSOR PLANNING ADVISORY COMMITTEE DATE OF REPORT: August 19, 2010 SUBJECT: Official Plan

More information

City of Kitchener Integrated Stormwater Management Master Plan (ISWM-MP) Public Open House No. 2 April 28, 2016

City of Kitchener Integrated Stormwater Management Master Plan (ISWM-MP) Public Open House No. 2 April 28, 2016 City of Kitchener Integrated Stormwater Management Master Plan (ISWM-MP) Public Open House No. 2 April 28, 2016 Open House Format 20-30 min presentation Facilitated questions and answer session following

More information

APPENDIX L3. Table of Contents. SWP EA Information Sheets

APPENDIX L3. Table of Contents. SWP EA Information Sheets E N V I R O N M E N T A L A S S E S S M E N T APPENDIX L3 SWP EA Information Sheets Table of Contents EA Info Sheet 1... L3-1 EA Info Sheet 2... L3-3 EA Info Sheet 3... L3-5 EA Info Sheet 4... L3-7 SCARBOROUGH

More information

Report to: Development Services Committee Report Date: September 11, 2017

Report to: Development Services Committee Report Date: September 11, 2017 ~RKHAM Report to: Development Services Committee Report Date: September 11, 2017 SUBJECT: PREPARED BY: Conceptual Master Plan for the Future Urban Area - Community Structure Plan and Key Policy Direction

More information

South of Eastern Strategic Direction Status Update

South of Eastern Strategic Direction Status Update STAFF REPORT ACTION REQUIRED South of Eastern Strategic Direction Status Update Date: July 10, 2014 To: From: Planning and Growth Management Committee Chief Planner and Executive Director, City Planning

More information

2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN

2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN 2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN Pursuant to Section 17(15) of the Planning Act, as amended, the Regional Planning

More information

4. Contractor (and subcontractors if applicable) certification statement(s)

4. Contractor (and subcontractors if applicable) certification statement(s) CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of

More information

1.0 PLANNING MARKHAM S FUTURE CONTENTS

1.0 PLANNING MARKHAM S FUTURE CONTENTS 1-1 Planning Markham s Future 1.0 PLANNING MARKHAM S FUTURE CONTENTS 1.1 THE PURPOSE OF THE OFFICIAL PLAN 1.2 THE MARKHAM CONTEXT 1.3 THE REGULATORY CONTEXT 1.3.1 Province of Ontario 1.3.2 York Region

More information

By Only to

By  Only to Please refer to: Susan Rosenthal e-mail: susanr@dauieshowe.com direct line: 416.263.4518 File No. 701744 Lawyers The Fifth Floor 99 Spadina Ave Toronto, Ontario M5V 3P8 T 416.977.7088 F 416.977.8931 davieshowe.com

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON LONG RANGE PLANNING DIVISION North Bethany Subarea Stream Corridors: Existing Regulations In Oregon, there is a distinct difference between the land use rules that apply in rural

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #9/11 To be held on Friday, October 14, 2011

FURTHER TO EXECUTIVE COMMITTEE MEETING #9/11 To be held on Friday, October 14, 2011 FURTHER TO EXECUTIVE COMMITTEE MEETING #9/11 To be held on Friday, October 14, 2011 FURTHER TO: Pages EX4. DELEGATIONS EX4.1 A delegation from Mr. Luca Pasquali of 5 Attercliff Court, City of Toronto,

More information

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE Attachment 1 COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE Priorities and Key Initiatives Committee May 2013 Page E-1 How we grow Goal 2: To ensure sustainable development

More information

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District STAFF REPORT December 20, 2005 To: From: Subject: North York Community Council Director, Community Planning, North York District Preliminary Report Application to Amend the Official Plan and Zoning By-law

More information

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

and Richmond Street West - Official Plan Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 822-838 and 860-862 Richmond Street West - Official Plan Amendment Application - Preliminary Report Date: August 14, 2017 To: From: Wards: Reference Number: Toronto and East

More information

SCHEDULE 10 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ10. Truganina Precinct Structure Plan. 1.0 The Plan

SCHEDULE 10 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ10. Truganina Precinct Structure Plan. 1.0 The Plan SCHEDULE 10 TO THE URBAN GROWTH ZONE Shown on the planning scheme map as UGZ10 Truganina Precinct Structure Plan 1.0 The Plan Map 1 shows the future urban structure proposed in the Truganina Precinct Structure

More information

OFFICE CONSOLIDATION CHAPTER 47 HIGHWAY 427 INDUSTRIAL SECONDARY PLAN

OFFICE CONSOLIDATION CHAPTER 47 HIGHWAY 427 INDUSTRIAL SECONDARY PLAN OFFICE CONSOLIDATION CHAPTER 47 HIGHWAY 427 INDUSTRIAL SECONDARY PLAN NOTE: This Secondary Plan is partially in effect. Highlighted sections are under appeal. August 2017 1 EXPLANATORY NOTE Office Consolidation

More information

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

2900 Steeles Avenue East at Don Mills Road in the Town of Markham STAFF REPORT INFORMATION ONLY 2900 Steeles Avenue East at Don Mills Road in the Town of Markham Date: January 23, 2008 To: From: Wards: Reference Number: North York Community Council Director, Community

More information

Red Fox Commercial Outline Plan

Red Fox Commercial Outline Plan Red Fox Commercial Outline Plan City of Cold Lake, Alberta Prepared by Durrance Projects Ltd and Ross W. Sharp & Associates Ltd October 2014 Rupert 1 Table of Contents 1. PURPOSE...3 1.1. Location...4

More information

Ontario Municipal Board Commission des affaires municipales de l'ontario

Ontario Municipal Board Commission des affaires municipales de l'ontario PL150128 Ontario Municipal Board Commission des affaires municipales de l'ontario PROCEEDING COMMENCED UNDER subsection 34(11) of the Planning Act, R.S.O. 1990, c. P. 13, as amended Applicant and Appellant:

More information