1 FLOODPLAIN TECHNICAL MEMORANDUM FOR RTD SOUTHWEST CORRIDOR EXTENSION PROJECT January 2010 Prepared By Soutwest Corridor Extension Project Team In some cases, information in tis Environmental Tecnical Report may ave been refined or updated as preparation of te Draft EE advanced. In suc cases, te information and conclusions presented in te Draft EE supersede all previous background material included in tis Tecnical Report. 1

2 TABLE OF CONTENTS 1.0 INTRODUCTION Regulatory Environment AFFECTED ENVIRONMENT IMPACT EVALUATION AND MITIGATION METHODOLOGY Direct Impacts Indirect Impacts Construction Impacts Cumulative Impacts MITIGATION REFERENCES LIST OF FIGURES Table 1 Existing Bridges Witin te Study Area... 3 Table 2 Jurisdictional Requirements for On-site Detention... 6 LIST OF FIGURES Figure 1 Project Location Map... 2 Figure 2 Floodplain Map... i

3 1.0 INTRODUCTION Tis Tecnical Memorandum focuses on information regarding potential effects to floodplains tat would occur as a result of te Soutwest Corridor Ligt Rail Extension project. Te Soutwest Corridor Extension project will extend ligt rail service in te Soutwest Corridor along te C (Union Station to Mineral) and D (30t and Downing to Mineral) lines by 2.5 miles (Figure 1). Te project passes troug te City of Littleton and Arapaoe County, between te Mineral Avenue end-of-line station and County Line Road, were it crosses into Douglas County and Higlands Ranc. Between Mineral Avenue and County Line Road, te ligt rail alignment will run adjacent to Santa Fe Drive, crossing Dad Clark Gulc along te existing UPRR alignment. A new structure is added at Dad Clark Gulc to accommodate a double-tracked ligt rail crossing. Furter sout te alignment crosses County Line Road, bot freigt rail lines and C-470 on a fly-over bridge. Te tracks will follow CDOT s rigt-of-way sout of C-470, crosses Hig Line Canal over an extended box culvert, and continues east to Lucent Boulevard. 1.1 REGULATORY ENVIRONMENT Floodplains for tis analysis are te lands on eiter side of a water way tat are inundated wen te capacity of te stream cannel is exceeded during a 100-year precipitation event. Canges in te floodplain, suc as adding fill material, constructing buildings or bridges, or in any way limiting te natural conveyance of floodwaters, can cause a rise in te 100-year water surface and can subsequently impact properties not previously affected by a 100-year storm event. Areas of specific interest are te floodplains defined by te Federal Emergency Management Agency (FEMA) as special flood azard areas tat are inundated by a 100-year flood. FEMA floodplains are labeled by flood zones. Eac flood zone represents a type of flooding and level of detail used to create te floodplain boundary. Te following regulatory requirements apply to te floodplains located witin te study area. Executive Order (EO) 11988, Floodplain Management (1997), was autorized to direct federal agencies to provide leadersip and take action to reduce te risk of flood loss, to minimize te impacts of floods on uman safety, ealt and welfare, and to restore and preserve te natural and beneficial values served by floodplains. Tis EO was autorized to support te National Environmental Policy Act (NEPA), te National Flood Insurance Act of 1968 (amended), and te Flood Disaster Protection Act of Code of Federal Regulations (CFR), Title 44 Emergency Management and Assistance, Capter 1 FEMA contains te basic policies and procedures of FEMA to regulate floodplain management and to analyze, identify, and map floodplains for flood insurance purposes. Flood Management and Protection (FHPM and 23 CFR 650) - applicable to any federally-assisted construction project in an area identified as aving special flood azards. It requires te design to be consistent wit FEMA protocols, and construction to be completed in a manner to avoid FEMA identified flood azard areas. 1

4 Soutbridge e Sout P la tt k Jac MINERAL ass H ill Rd Ave Ja G e Lin ck as s g Hi Mine ra l u Soutpark W Fe Dr Can al Ci ty Ditc lc Soutbridge Park n Lo g nt a Sout Platte Park LITTLETON Jackass Hill Park pa RTD rk n-r id Ri v e er C D Aspen Grove Sopping Center Sa r Ci lc Writers Vista Park Wolurst Sou tp a rk Cir u rk G d C la Low er D a 85 McLellan Reservoir County Line Rd Eri ck so n B lv d ARAPAHO E CO DOUGLAS CO Cit y of Little to n c Lu en t vd Bl INTERMEDIATE STATION Line Can al Pl az a Dr C-470/ LUCENT Rd Hig SF Wind Crest BN U PR R (Not part of FasTracks Plan) Vista Higlands Ranc Golf Club ,000 bo ns rou g Dr Wa y ee Gr Creeksi de Mill HIGH LANDS RAN CH 2,000 Feet Source: Soutwest Corridor Extension Project Team, 2009 Stations Existing Soutwest Ligt Rail Line County Boundary Soutwest Ligt Rail Extension City Boundary Freigt Railroad Proposed Future Figure 1 Soutwest Corridor Extension

5 2.0 AFFECTED ENVIRONMENT Te study area for te Soutwest Corridor Extension consists of te track alignment wit a 300- foot buffer on eiter side of te ligt rail rigt-of-way (ROW) or ligt rail station property lines. Te Soutwest Corridor Extension is a 2.5-mile project from te existing Mineral Station to Lucent Boulevard (Figure 1). Te Corridor will ave at least one ligt rail station, te Colorado State Higway C-470 (C-470) and Lucent Boulevard Station. An intermediate station, located on te sout side of C-470 east of Santa Fe Drive, is also being assessed as part of te Environmental Evaluation, but is not funded as part of FasTracks. Te Soutwest Corridor Extension alignment (Alignment) begins just sout of te existing Mineral Ligt Rail Station at te intersection of West Mineral Avenue and Santa Fe Drive (United States Route 85) and will continue sout virtually parallel to Santa Fe Drive and te existing BNSF Railway Company (BNSF) alignment. Approximately 0.5 mile nort of C-470, te alignment transitions to te east of te BNSF alignment. Once on te sout side of C-470, te Alignment continues east, running parallel to C-470, to Lucent Boulevard. Te alignment ends approximately 0.3 mile from te start of te C-470 off-ramp to Lucent Boulevard (Figure 1). Tere are several waterways tat are located witin te study area, including Jackass Gulc, Dad Clark Gulc, City Ditc, te Higline Canal, and an unnamed tributary to McClellan Reservoir. Te Sout Platte River is located approximately 0.4 mile to te west of te Alignment. Te 100-year floodplain only traverses troug te study area in two locations, at Jackass Gulc and Dad Clark Gulc (Figure 2). Te 100-year floodplain witin te study area creates an envelope tat varies between 80 and 800 feet. Tere are 5 bridges tat cross te floodplain witin te study area (Table 1). TABLE 1: EXISTING BRIDGES WITHIN THE STUDY AREA Name Location of Bridge in Study Area Bridge Use BNSF/Union Pacific Railroad Company (UPRR) Rail Bridge Regional Transportation District (RTD) Ligt Rail Bridge BNSF Rail Bridge UPRR Rail Bridge Santa Fe Drive Nort & Sout Bound Bridge Source: Soutwest Corridor Team, 2008 Continuation of Railroad Tracks over West Mineral Avenue Continuation of RTD Ligt Rail Tracks over West Mineral Avenue Continuation of BNSF Railroad Tracks over Dad Clark Gulc Continuation of UPRR Railroad Tracks over Dad Clark Gulc Continuation of Santa Fe Drive over Dad Clark Gulc 2 Track Railroad Bridge 1 Track Ligt Rail Bridge 1 Track Railroad Bridge 1 Track Railroad Bridge 4 Lane veicle travel way wit median and soulders Piers in 100- year Floodplain

6 C D Aspen Grove Sopping Center Soutbridge Sout P la tt e Ri v SD 57' UN Q 5 LG er H LITTLETON -DFNDVV +LOO 3DUN 0,1(5$/ k Jac ass H ill Rd Well Locations Domestic u Soutpark W Fe Dr Monitoring Can al 6RXWK 3ODWWH 3DUN G lc Ci ty ck as s Unknown e Lin Di tc Ja Ave g Hi Mine ra l 6RXWKEULGJH 3DUN Permit Number n Lo Sa r Ci nt a g rk G d C la Low er D a u lc :ULWHUV 9LVWD 3DUN Wolurst Sou tp a rk Cir 85 McLellan Reservoir County Line Rd Eri ck so n B lv d $5$3$+2 ( &2 '28*/$6 &2 &LW \ RI /LWWOH WR Q c Lu en $ t 1RW SDUW RI )DV7UDFNV 3ODQ Line Can al Pl az a Dr & /8&(17 Rd Hig 6) Wind Crest % vd Bl,17(50(',$7( 67$7,21 Mill Vista Creeksi de +LJKODQGV 5DQFK *ROI &OXE sb en g Dr Wa y e Gr ou or HIGH LANDS RAN CH )HHW Source: Urban Drainage & Flood Control District, 2009; Soutwest Corridor Extension Project Team, 2009 Stations Existing Proposed Soutwest Ligt Rail Line 100-Year Floodplain Soutwest Ligt Rail Extension Study Area Freigt Railroad County Boundary City Boundary Future )LJXUH 6WUHDPV )ORRGSODLQV DQG :HOO /RFDWLRQV

7 Hig water mark and flood istory data is not readily available for tese locations due, to te fact tat bot te Jackass Gulc and Dad Clark Gulc are minor tributaries to te Sout Platte River. Te largest flood along te Sout Platte River occurred on June 16, 1965, wen a stream gauge in downtown Denver recorded te Sout Platte River wit a flowrate of 40,300 cubic feet per second (cfs) and a peak flood stage of 15.0 feet (Perry, 2005). A flood stage is defined as te eigt of water outside te existing stream banks. Tis flood was te one of te most devastating floods in te Denver metropolitan area and spurred legislature to build more dams along te Sout Platte River to elp control te flooding. Te 1965 flood was caused by tree days of intense rains, wit some areas receiving upwards of 14 inces of rain (Sprengelmeyer, 1999). Following tat event te Catfield dam was constructed upstream of te project area to mitigate future flood events. Te most recent notable ig water mark occurred on te Sout Platte River on June 4, A flowrate on te Sout Platte was measured to be 9,710 cfs wit a peak flood stage of 7.2 feet at te United States Geological Survey (USGS) Stream Gauge Station on te Sout Platte River at Union Avenue (Perry, 2005). A variety of land uses are located witin te study area, including agricultural, residential, industrial and commercial. Tere are a few existing buildings located witin te floodplain in te study area; owever, West Mineral Avenue would become inundated by te 100-year flood. On te west side of Santa Fe Boulevard to te Sout Platte River, te land is mostly vacant, and is eiter agricultural or low lying floodplain open space. Te Alignment will cross te 100-year floodplain in two separate areas were it runs parallel to Santa Fe Drive. Te first location is at te intersection of West Mineral Avenue and Santa Fe Drive. Te existing Mineral Ligt Rail Platform was built outside of te floodplain to matc te existing grade of te BNSF and Union Pacific Rail Road (UPRR) tracks tat run nort/sout. Te existing railroad and ligt rail tracks cross over Mineral Avenue via a bridge. Te build-up of tis portion allows te existing railroad to be above te 100-year floodplain. Te floodplain in tis portion of te proposed alignment is caused by a localized low area along West Mineral Avenue tat transitions to Jackass Gulc and extends approximately 1.3 miles to te east. Jackass Gulc continues eastward to te intersection between West Mineral Avenue and West Long Avenue, and eventually across te Higline Canal. At te location of te intersection between West Mineral Avenue and West Long Avenue, Jackass Gulc receives stormwater discarge from an existing 54-inc reinforced concrete pipe (RCP) equipped wit an energy dissipater, connected to te West Mineral Avenue storm sewer. As te ditc proceeds downstream to te Sout Platte River, te ultimate outfall of Jackass Gulc, te ditc crosses troug multiple parcels witin te Freewood Subdivision in Littleton, and is ten piped underneat te BNSF-UPRR tracks and Santa Fe Drive via a 60-inc RCP along West Mineral Avenue. At te proposed Alignment crossing, te 100-year floodplain is approximately 5,382.5 feet above mean sea level (msl), wic is approximately 16 feet below te existing single track ligt rail bridge. At a minimum, wen a second ligt rail track is added to te crossing over West Mineral Avenue, it will mimic te existing ligt rail bridge. Te flowrate in Jackass Gulc, during te 100-year event in te area of te existing ligt rail bridge over West Mineral Avenue, is 1,240 cfs. Te approximate drainage area of Jackass Gulc is 500 acres (Centennial, 1990). Te drainage area associated wit te proposed Alignment ligt rail bridge structure would be sligtly less tan 500 acres, due to te Alignment bridge structure lying 0.4 mile upstream from were Jackass Gulc outfalls into te Sout Platte River. 5

8 Te proposed alignment would also cross te 100-year floodplain wen it passes over Lower Dad Clark Gulc. Tis portion of Dad Clark Gulc is located at te outfall point of McClellan Reservoir. Once water is discarged from te reservoir back into Lower Dad Gulc Clark, it passes underneat te existing UPRR, BNSF and Santa Fe Drive bridges. Dad Clark Gulc ultimately outfalls to te Sout Platte River, wic is located approximately 1.3 miles downstream from McClellan Reservoir. Dad Clark Gulc proceeds underneat te City Ditc, wic travels nort-sout on te western side of Santa Fe Drive. To avoid an intersection of waters, te City Ditc is conveyed via an aqueduct structure across te existing stream banks of Lower Dad Clark Gulc. It sould be noted tat tis portion of Lower Dad Clark Gulc is different from te portion of Upper Dad Clark Gulc tat feeds te McClellan Reservoir, wic crosses C-470. Te existing UPRR bridge would be removed and replaced wit a ligt rail bridge. Te UPRR bridge and railroad tracks would be moved approximately 75 feet to te west of te existing BNSF railroad bridge. At a minimum, te proposed ligt rail bridge and te proposed new UPRR bridge would mimic te existing UPRR bridge. Te 100-year floodplain elevation is 5,378.6 feet above msl at te proposed alignment crossing. Te water level of te 100-year flood level is approximately 12 feet below te existing UPRR bridge. Te flowrate in tis portion of Dad Clark Gulc during te 100-year event, in te area of te proposed alignment bridge, would be approximately 1,780 cfs. At te location of te proposed re-alignment of te UPRR bridge, te 100-year floodplain elevation is approximately 5,380.5 feet above msl. Te flowrate at tis point is approximately 1,780 cfs. Te existing BNSF bridge tat will lie approximately 70 feet to te east of te proposed UPRR bridge is approximately 19 feet above te 100-year flood waters (Centennial, 1990). Te above information does not take into account McClellan Reservoir flood storage capacity, and can terefore be looked at as a worst-case scenario. Flood storage can be defined as te water olding or containing capabilities of a reservoir. By not including te flood storage in te calculations, te flowrate and te 100-year floodplain elevation are increased. Te total drainage area to te McClellan Reservoir is approximately 7.5 square miles via te Upper Dad Clark Gulc Tributary (Raub, 1981). Tis would most closely resemble te total drainage area to te proposed Alignment bridge structure; owever, te total drainage area of Lower Dad Clark Gulc, witout taking into account te total drainage area to te McClellan Reservoir (primarily te Upper Dad Clark Gulc tributary), is approximately 290 acres (approximately 0.5 square mile) in size were it outfalls to te Sout Platte River (Centennial, 1990). Te C-470/Lucent Boulevard and Intermediate stations would not be located witin 300 feet of te 100-year floodplain. It sould be noted tat te C-470/Lucent Boulevard Station would be developed along an unnamed tributary to McClellan Reservoir. Te existing open area allows cannel flow from tis portion to te RCP culvert underneat C-470. As te proposed Alignment proceeds sout, and crosses to te sout side of C-470, te Alignment would not be located witin 300 feet of te 100-year floodplain. Te proposed Alignment passes over te Higline Canal as well as an unnamed tributary to McClellan Reservoir; owever, neiter of tese features is surrounded by te 100-year floodplain. Te unnamed tributary to McClellan is connected to te storm-sewer underneat C-470 were te proposed Alignment crosses it. Encroacment of any of te floodplains along te Alignment study area would be subject to te requirements of local jurisdictions. During construction activities, Best Management Practices 6

9 (BMPs) for erosion and runoff control would be implemented. Detention systems would allow for te storage and control of stormwater runoff. Requirements for onsite detention facilities are provided in Table 2, by jurisdiction. TABLE 2: JURISDICTIONAL REQUIREMENTS FOR ON-SITE DETENTION Jurisdiction Minor Flood Levels Major Freeboard Requirements Detention Sizing Metods Underground Detention Above Ground Detention Urban Drainage and Flood Control District (UDFCD) Arapaoe County Douglas County 5- and 10-year plus water quality capture volume (WQCV) WQCV and Excess Urban Runoff Volume (EURV) WQCV and Excess Urban Runoff Volume (EURV) 100-year plus no less tan one-alf WQCV 100-year plus te WQCV 100-year plus te WQCV 1 foot above te water surface elevation wen te emergency spillway is conveying te maximum design or emergency flow Sources: UDFCD, 2007; Arapaoe County, 2007; and Douglas County, 2008b. Simplified metod based on empirical equations in storage capter of District Manual Only in ultraurban setting were no onsurface metods are practicable Proibited Preferred 7

10 3.0 IMPACT EVALUATION AND MITIGATION 3.1 METHODOLOGY Several streams are located witin te Soutwest Corridor Extension study area. A baseline map of te floodplains associated wit tese water features was developed from FEMA Flood Insurance Rate Maps (FIRMs). Drainage Master Plans and Flood Hazard Area Delineations (FHADs) were obtained from te UDFCD, wen available, and incorporated into te floodplain maps for te Soutwest Corridor Extension study area, and te 100-year floodplain event was mapped. Floodplain impacts ave been categorized as direct, indirect, temporary construction, and cumulative impacts. Direct impacts are defined as tose effects caused by te action and occurring at te same time and place (40 CFR ). Tese impacts would alter or eliminate te original floodplain and can include acquisition of a floodplain for development. Te study area for direct impacts is defined by te limits of te construction footprint and te limits of te permanent ROW required for te project witin te 100-year floodplain.. Te No Action Alternative would not result in any direct, indirect, construction-related, or cumulative impacts to floodplains and drainage/ydrology. Te direct, indirect, construction-related, and cumulative impacts of te Build Alternative are described below. 3.2 IMPACTS Direct Impacts Only two FEMA- and Urban Drainage and Flood Control District (UDFCD)-designated 100-year floodplains are located witin te study area: Jackass Gulc and Lower Dad Clark Gulc. Te Build Alternative would cross bot of tem. Te Lucent/C-470 Station and te Intermediate Station and associated park-n-rides are not located witin tese floodplains; owever tese facilities would introduce new impervious surfaces. Portions of te track/guideway and traction power substations would also introduce small amounts of impervious surface. Historic drainage patterns will be maintained across te tracks. Impacts to 100-year floodplains include: Jackass Gulc: Tree new piers would be placed in te 100-year floodplain. No effects to te 100-year water surface elevation due to teir minimal cross section and because te Gulc already flows troug a 60-inc RCP in tis area. Lower Dad Clark Gulc: Six new piers (tree for eac bridge) would be placed in te 100-year floodplain. Given teir minimal cross-section, tey would ave a negligible impediment on te 100-year floodplain. Te Build Alternative would also affect existing and proposed detention ponds along Santa Fe and C-470. Impacts to tese ponds and te need for additional ponds will be determined in 8

11 more detail as te engineering design is completed. Possible modifications could include resaping, enlarging, and relocation Indirect Impacts Indirect effects to floodplains would result from additional impervious surfaces introduced by transitoriented development around stations. Impacts due to suc development would be avoided troug aderence to local development requirements Construction Impacts Te development of te Build Alternative witin te study area would cause some temporary construction impacts witin te 100-year floodplain; owever te use of temporary construction BMPs would minimize water quality impacts Cumulative Impacts Only minor cumulative impacts are anticipated for tis resource. 3.3 MITIGATION Mitigation measures include adering to all UDFCD and local jurisdiction requirements. Some requirements include completing detention and water quality treatment in accordance wit tese requirements, and to continuously implement BMPs. RTD will coordinate floodplain management wit UDFCD and local jurisdictions, and any new development will also be subject to te requirements of te local jurisdictions. RTD will coordinate wit Denver Water for construction activity restrictions in proximity to te Hig Line Canal wen water flows between April and November. RTD as adopted a sustainability policy tat includes objectives for environmental sustainability, one of wic is to enance water quality and lower water use. Accomplisment of tis objective is recommended troug developing and adopting best practices for sustainable design, construction, operations, and maintenance. Specifically, RTD encourages evaluating te incorporation of LEED practices and urban drainage and flood control district BMPs in transit centers, park-n-rides, selters, and corridor projects. Improving stormwater quantity and quality sould be accomplised using locally accepted/encouraged BMPs for protection of water quality (RTD, 2007). 9

12 4.0 REFERENCES Arapaoe, Arapaoe County Stormwater Management Manual. Arapaoe County Public Works and Development, Centennial, Colorado, adopted January 30, Centennial, Flood Hazard Area Delineation, Lower Dad Clark Gulc and DFA Prepared for Urban Drainage and Flood Control District, Centennial Engineering Inc., Centennial, Colorado, November Douglas, Douglas County Storm Drainage Design and Tecnical Criteria Manual. Douglas County Department of Public Works Engineering Division, Castle Rock, Colorado, adopted January 1986, amended July Perry, 2005, Summary of Significant Floods in te United States and Puerto Rico, 1994 troug 1998 water year. United States Geological Survey Scientific Investigation Report , Prepared for te United States Geological Survey, C.A. Perry, Reston, Virginia, Raub, 1981, Flood Hazard Area Delineation, Dad Clark Gulc. Prepared for Urban Drainage and Flood Control District, Jack G. Raub Company, Englewood, Colorado, May Sprengelmeyer, 1999, 1965 Flood left Deep Scars along Sout Platte article in Rocky Mountain News, M.E. Sprengelmeyer, December 14, UDFCD, Urban Storm Drainage Criteria Manual Volume 2. Urban Drainage and Flood Control District, Denver, Colorado, January [June Revision]. 10

Floodplain Technical Memorandum

Floodplain Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 SOUTHWEST CORRIDOR EXTENSION Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 AGENDA I. Welcome/Introductions II. Project Review and Status III. Environmental

More information

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHECKLIST FOR PHASE II DRAINAGE REPORT I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION

More information

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

Right-of-Way Acquisitions and Relocations Technical Memorandum

Right-of-Way Acquisitions and Relocations Technical Memorandum Right-of-Way Acquisitions and Relocations Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional

More information

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Table of Contents G.1.a Water Resources - Surface Water - Drainage Table of Contents G.1.a Water Resources - Surface Water - Drainage 1. INTRODUCTION... 1335 2. ENVIRONMENTAL SETTING... 1335 a. Regional Hydrology... 1335 b. Local Hydrology... 1337 c. On-site Hydrology...

More information

Existing Conditions and Environmental Consequences Floodplains

Existing Conditions and Environmental Consequences Floodplains 3.9 Environmental Consequences 3.8 3.8.1 WHAT ARE FLOODPLAINS? are low-lying areas adjacent to rivers, streams, and other waterbodies that are susceptible to inundation (flooding) during rain events. These

More information

A. Regional Detention Requirements

A. Regional Detention Requirements I. GENERAL DESIGN GUIDELINES A. Full-spectrum detention is provided for all new development, redevelopment or expansion of a site to provide for water quality and flood control detention. B. Detention

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct

More information

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE 1.0 INTRODUCTION 1.1 OBJECTIVE This report, prepared for submittal to TxDOT, analyzes existing and proposed detention facilities draining into the TxDOT US90A storm sewer system. The results of the detailed

More information

8.5 FLOODING. Environmental Setting

8.5 FLOODING. Environmental Setting 8.5 FLOODING This section evaluates flooding impacts associated with the proposed General Plan, including whether implementing the plan will: (1) permit the construction of housing within a 100-year Flood

More information

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL

More information

PHASE III DRAINAGE REPORT

PHASE III DRAINAGE REPORT PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village

More information

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS 4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations

More information

6.5 Lakewood Gulch. Basin Snapshot

6.5 Lakewood Gulch. Basin Snapshot 6.5 Lakewood Gulch The Lakewood Gulch Map Unit is comprised of both Lakewood Gulch and Dry Gulch (4800-01 and 4801-01) from the Denver Storm Drainage Master Plan (SDMP) and has a total drainage area of

More information

Emergency Lighting Design Guide

Emergency Lighting Design Guide Emergency Ligting Design Guide Step 1 Identify mandatory Points of Empasis for te positioning of luminaires, eamples as follows: FINAL EXIT EXIT SIGNS DIRECTION CHANGE INTERSECTIONS At eac eit door At

More information

Appendix E Preliminary Location Hydraulic Study

Appendix E Preliminary Location Hydraulic Study Appendix E Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 February 2014 This page intentionally

More information

Northern Branch Corridor DEIS December 2011

Northern Branch Corridor DEIS December 2011 16 Floodplains 161 Chapter Overview 1611 Introduction The flowing chapter identifies floodplains found within the Northern Branch Corridor in accordance with Executive Order 11988, Floodplain Management

More information

South Bismarck Watershed Model Update and Stormwater Improvement Project

South Bismarck Watershed Model Update and Stormwater Improvement Project Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046 1.0 Executive Summary The focus of

More information

East Corridor Final Environmental Impact Statement

East Corridor Final Environmental Impact Statement East Corridor Final Environmental Impact Statement Alternatives Considered Operating Plan The requirements for opening day operations versus year 2030 are based on ridership and operations. Opening day

More information

Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018

Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018 Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018 Public Involvement Summary: The planning process includes opportunities

More information

SEMSWA s Role in the Land Development Process

SEMSWA s Role in the Land Development Process SEMSWA s Role in the Land Development Process One of SEMSWA s responsibilities is to ensure that any new development or redevelopment within its service area is designed and constructed in compliance with

More information

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK MAY 19, 2014 Prepared By: Timothy M. Lavocat, P.E., CFM

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

HAZARD MITIGATION GOALS AND OBJECTIVES

HAZARD MITIGATION GOALS AND OBJECTIVES SEWRPC Community Assistance Planning Report No. 282, 2nd Edition CITY OF MILWAUKEE ALL HAZARDS MITIGATION PLAN UPDATE Chapter IV HAZARD MITIGATION GOALS AND OBJECTIVES [NOTE: Throughout this plan update

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

Venice Pumping Plant Dual Force Main Project Draft EIR

Venice Pumping Plant Dual Force Main Project Draft EIR City of Los Angeles 5.9 LAND USE PLANS 5.9.1 Environmental Setting Venice Pumping Plant Dual Force Main Project Draft EIR The Project lies within the bounds of Los Angeles County and the City of Los Angeles.

More information

Level 1 Downstream Analysis

Level 1 Downstream Analysis Level 1 Downstream Analysis Newcastle Way Apartments Newcastle, Washington King County April 14, 2014 Revised July 10, 2014 Prepared by: Dean A. Furr, P.E. Reviewed by: Donald Scarberry, P.E. Coffman Engineering,

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations & Considerations Morse Study Area Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations Development Considerations Floodplain

More information

Village of Forest Park. July 27, Sewer Separation Evaluation

Village of Forest Park. July 27, Sewer Separation Evaluation Village of Forest Park July 27, 2015 Sewer Separation Evaluation Presentation Overview Study Background Historic Nature of Forest Park Drainage Scale of Flooding Problem Forest Park Sewer System Background

More information

Northern Branch Corridor SDEIS March 2017

Northern Branch Corridor SDEIS March 2017 14. Water Quality 14.1. Chapter Overview 14.1.1. Introduction This section discusses changes to the potential for activities associated with the development and operation of the Preferred Alternative to

More information

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water C. WATER 1. Surface Water Runoff See Section C.3, Flood Hazard/Mudflow Hazard, page 67. 2. Ground Water Determined not significant by the October 1984 and January 1999 Initial Studies conducted by the

More information

Figure 1 Cypress Street Study Area Location Map

Figure 1 Cypress Street Study Area Location Map July 20, 2016 TO: FROM: Jim Massarelli Director of Engineering Jeff Julkowski, PE Michael Burke, PE SUBJECT: Cypress Street Study Area Stormwater Analysis (CBBEL Project No. 16-0058) At the request of

More information

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014 City of Elmhurst City of Elmhurst Comprehensive Flood Plan City Council Meeting September 15, 2014 City of Elmhurst Presentation Overview Study Background Study Methodology Analysis of Three Additional

More information

VALUE OF URBAN DRAINAGE PLANNING AND FLOOD HAZARD REDUCTION PROJECTS IN THE 2013 FLOOD

VALUE OF URBAN DRAINAGE PLANNING AND FLOOD HAZARD REDUCTION PROJECTS IN THE 2013 FLOOD VALUE OF URBAN DRAINAGE PLANNING AND FLOOD HAZARD REDUCTION PROJECTS IN THE 2013 FLOOD ANDREW EARLES, PH.D., P.E. WRIGHT WATER ENGINEERS, INC. & KEN MACKENZIE, P.E., CFM UDFCD October 11, 2013 Water Resources

More information

1.0 PROJECT PURPOSE AND NEED

1.0 PROJECT PURPOSE AND NEED 1.0 PROJECT PURPOSE AND NEED The FasTracks Plan includes the extension of the Central Corridor from its current terminus at 30th/Downing to a connection to the East Corridor commuter rail service planned

More information

A G E N D A Council Update Training Room September 26, :45 p.m.

A G E N D A Council Update Training Room September 26, :45 p.m. CITY OF THORNTON CITY MANAGER S OFFICE A G E N D A Council Update Training Room September 26, 2017 5:45 p.m. A. Boards and Committees Reports (Estimated 20 Minutes) 1. Rangeview Library District Meeting

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON LONG RANGE PLANNING DIVISION North Bethany Subarea Stream Corridors: Existing Regulations In Oregon, there is a distinct difference between the land use rules that apply in rural

More information

Regional Transportation District

Regional Transportation District NORTHEAST AREA TRANSIT EVALUATION FINAL REPORT Prepared for: Regional Transportation District Prepared by: David Evans and Associates, Inc. URS, Corporation November 2007 LIST OF FIGURES Figure 1: Northeast

More information

NAPA COUNTY PUBLIC WORKS Standards & Specifications

NAPA COUNTY PUBLIC WORKS Standards & Specifications Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6

More information

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1 1.0 Introduction The Town of Castle Rock is situated between the metropolitan areas of Denver and Colorado Springs, amidst a unique terrain of rolling hills, mesas, ravines, and waterways. Like many Front

More information

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011 Santa Cruz River Master Plan Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011 Introduction Who is FICO? 2 Project Team Kimley-Horn and Associates, Inc. River

More information

NATIONAL WESTERN CENTER

NATIONAL WESTERN CENTER NATIONAL WESTERN CENTER Infrastructure Master Plan January 2015 TableofContents Section 1: Executive Summary... 1 Transportation... 2 Water Distribution System... 3 Wastewater Collection System... 3 Drainage...

More information

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me

More information

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013 Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site

More information

3.5. Visual and Aesthetic Qualities

3.5. Visual and Aesthetic Qualities 3.5 Visual and Aesthetic Qualities 3.5 Visual and Aesthetic Qualities 3.5.1 Introduction to Analysis 3.5.1.1 Summary of Results Implementation of the Preferred Alternative would involve the installation

More information

THE LAUREL STREET GRADE SEPARATION PROJECT IN COLTON, CA: DRAINAGE CHALLENGES AND SOLUTIONS

THE LAUREL STREET GRADE SEPARATION PROJECT IN COLTON, CA: DRAINAGE CHALLENGES AND SOLUTIONS ABSTRACT THE LAUREL STREET GRADE SEPARATION PROJECT IN COLTON, CA: DRAINAGE CHALLENGES AND SOLUTIONS Joseph Sawtelle, PE Project Engineer TranSystems 6 Hutton Centre, Suite 1250 Santa Ana, CA 92707 714-708-6881

More information

COLVER ROAD INDUSTRIAL CONCEPT PLAN

COLVER ROAD INDUSTRIAL CONCEPT PLAN COLVER ROAD INDUSTRIAL CONCEPT PLAN A CONCEPTUAL LAND USE AND TRANSPORTATION PLAN FOR TA-4 AN URBAN RESERVE AREA OF THE CITY TALENT City of Talent Adopted by City Council Resolution No., June, 2015 PART

More information

Southwest Transitway Extension Baseline Road to Norice Street. Environmental Assessment Minor Modification Report

Southwest Transitway Extension Baseline Road to Norice Street. Environmental Assessment Minor Modification Report Southwest Transitway Extension Baseline Road to Norice Street Environmental Assessment Minor Modification Report September 2009 Environmental Assessment Minor Modification Report Southwest Transitway

More information

3.5 VISUAL AND AESTHETIC QUALITIES

3.5 VISUAL AND AESTHETIC QUALITIES 3.5 VISUAL AND AESTHETIC QUALITIES 3.5.1 Introduction to Analysis A commuter rail transit project is a major investment in a community s future. How it impacts the visual qualities of the natural and cultural

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary Executive Summary Background As congestion continues to affect mobility in the region, the Ozarks Transportation Organization (OTO) is particularly concerned with traffic movement. The North-South Corridor

More information

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT PRELIMINARY STORM DRAIN CALCULATIONS ASSOCIATED WITH BRISBANE BAYLANDS REDEVELOPMENT BRISBANE, CALIFORNIA Prepared by BKF Engineers

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Problem: Stormwater collected from the neighborhood upstream is released at 9 Muirfield Lane and flows west toward

More information

ARTICLE III COMBINED SEWERS

ARTICLE III COMBINED SEWERS I ' j I' ARTICLE III COMBINED SEWERS COM'RS MIN.. VOL.281 JAN 2 2001 IMAGE Section 301 Construction; Extension of Sewers The construction of and/or extension to combined sewers are hereby prohibited, unless

More information

5.6 Valverde. Basin Snapshot. Valverde Land Uses

5.6 Valverde. Basin Snapshot. Valverde Land Uses 5.6 Valverde The Valverde water quality map unit is located in west Denver and generally overlaps with Basin 0064-02 (Valverde) in the City and County of Denver Storm Drain Master Plan (SDMP). The basin

More information

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010 City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area

More information

17.1 INTRODUCTION CONTEXT CONCLUSIONS

17.1 INTRODUCTION CONTEXT CONCLUSIONS CHAPTER 17. FLOODPLAIN 17.1 INTRODUCTION 17.1.1 CONTEXT A floodplain is part of an extensive drainage and filtration system and water cycle that serves to contain flood waters from storms. Floodplain areas

More information

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting 1. Call To Order 2. Roll Call of Members 3. Chairman's Comments PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Joint Planning and Zoning Meeting January 11, 2017 6:00 PM Courthouse

More information

POCKET COMMUNITY PLAN

POCKET COMMUNITY PLAN POCKET COMMUNITY PLAN Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS CONTENTS Community Location... 3-P-3 Community Vision... 3-P-4 Community Profile... 3-P-4 Community Issues... 3-P-6 Land

More information

BROADWAY STATION Infrastructure Master Plan May 2016

BROADWAY STATION Infrastructure Master Plan May 2016 BROADWAY STATION Infrastructure Master Plan May 2016 Contents Section 1: Executive Summary... 1 Section 1.1: Amendments and Minor Deviations... 2 Exhibit 1.0A: Broadway Station Development Gross Area...

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. June 18, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

Tucson Koi & Water Gardens

Tucson Koi & Water Gardens OV113-031 Tucson Koi & Water Gardens CONDITIONAL USE PERMIT SITE ANALYSIS 05.22.2014 Property Owners Walter & Jane Wong Family Investments, LLP 5437 East 3rd Street Tucson, Arizona 85711 Tucson Koi and

More information

MEMORANDUM. September 10, 2018

MEMORANDUM. September 10, 2018 September 10, 2018 MEMORANDUM TO: Chad Bird, City of Decorah FROM: Larry Weber and Dan Gilles, Iowa Flood Center, IIHR Hydroscience & Engineering COPY TO: Dana Werner, St. Paul District Corps of Engineers,

More information

Technical Memorandum 5

Technical Memorandum 5 Technical Memorandum 5 Environmental Resources August 2015 PREPARED BY AECOM Table of Contents Introduction... 3 Natural Features... 6 Watersheds... 6 Rivers, Lakes, Creeks... 6 Wetlands... 8 Floodplains...

More information

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation Department of Community Development Michael J. Penrose, Acting Director Divisions Building Permits & Inspection Code Enforcement County Engineering Economic Development & Marketing Planning & Environmental

More information

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris. South Platte River Meeting Comments & s #1 I am a huge fan of river areas and would love the Platte and surrounding waterways to improve to allow habitat for wildlife and recreation opportunities for citizens.

More information

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL Agenda Design Concept Report Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Questions Design Concept Report

More information

1. Project Description

1. Project Description To: By: Checked By: Jimmy Vilce, E.I. (FOT istrict 1 Project Manager) Jennifer Nunn, P.E. (The Balmoral Group) Lori Stanfill, P.E. (The Balmoral Group) Memorandum ate: July 10, 2018 Subject: In May of

More information

SECTION 4(f) DE MINIMIS DOCUMENTATION

SECTION 4(f) DE MINIMIS DOCUMENTATION SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project of an Environmental Impact Report and Scoping Meeting for the As the Lead Agency, the County of San Mateo (County) will prepare an Environmental Impact Report (EIR) for the (project), and would like your

More information

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM Reclamation plans for the Wilson Mine Lecroy area were approved by the Arkansas Department of Environmental Quality with a passive barrier

More information

EXCERPTS. Sep City and County of Denver (CCD) Storm Drainage Master Plan

EXCERPTS. Sep City and County of Denver (CCD) Storm Drainage Master Plan EXCERPTS Acronyms in Document: CCD- City and County of Denver (the City, the Mayor and his Administration) CDOT- Colorado Department of Transportation CPGC- City Park Golf Course (Detention, part of P2PH)

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 Problem: Anecdotal evidence suggests a natural spring exists in the backyard

More information

DRAINAGE CALCULATIONS

DRAINAGE CALCULATIONS DRAINAGE CALCULATIONS For the Carroll Single Family Residence At Santa Clara County Saratoga, California APN: 517-26-010 December 18, 2015 Prepared For: John and Peggy Carroll Prepared By: RI Engineering,

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. December 21, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

Section 11 Grading and Drainage Standards

Section 11 Grading and Drainage Standards Section 11 Grading and Drainage Standards 11.1 INTRODUCTION The proper grading, conveyance, storage and release of storm water is critical to maintain the integrity of the Property. Drainage facilities,

More information

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX G - Stormwater Study Findings & Stormwater Solutions LSU: MP Narrative July 2017 3.5 Open Space Existing Conditions The

More information

COLLIER BOULEVARD (CR 951) CORRIDOR

COLLIER BOULEVARD (CR 951) CORRIDOR Project(s) Goals Improve Traffic Circulation, Capacity & Safety Focus on Safety During Design & Construction Address Public Concerns Design an Aesthetically Pleasing Project Limit Environmental Impacts

More information

The use of low head weirs to. perennial streams with their floodplains:

The use of low head weirs to. perennial streams with their floodplains: The use of low head weirs to reconnect severely entrenched perennial streams with their floodplains: An Anne Arundel County TMDL Watershed Implementation Plan Strategy presented by Hala Flores, P.E Mid

More information

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204 DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making

More information

Project Narrative For Fruita RV Resort Conditional Use Permit

Project Narrative For Fruita RV Resort Conditional Use Permit Project Narrative For Fruita RV Resort Conditional Use Permit Date: November 18, 2016 Prepared by: Robert W. Jones, II, P.E. Vortex Engineering & Architecture, Inc. 2394 Patterson Rd., Ste. 201 Grand Junction,

More information

Downtown Denver Morrison. Located 30 minutes from downtown Denver behind the hogback

Downtown Denver Morrison. Located 30 minutes from downtown Denver behind the hogback Downtown Denver Morrison Located 30 minutes from downtown Denver behind the hogback Founded in 1874 as a passageway gold mines to the west. Morrison is the gateway to the Bear Creek Canyon. Surrounded

More information

INTRODUCTION PLANNING HISTORY

INTRODUCTION PLANNING HISTORY INTRODUCTION The Upper Rock Creek Master Plan Area lies in the east central part of Montgomery County. The Master Plan Area is adjacent to the City of Rockville to the south, the Olney Planning Area to

More information

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009 CSAH 101 Reconstruction Project Wayzata Task Force Meeting September 3, 2009 Agenda 700 7:00 Re-Introductions ti 7:05 2008 Activity Recap / 2009 Activities-to-date 7:10 Discussion of Layout Revisions (per

More information

Pollutant Removal Benefits

Pollutant Removal Benefits Bioswales Bioswales Similar to biocells, but have a slight, but positive grade toward an outlet Designed to convey the WQv event at very low velocities Promote filtration through native vegetation, infiltration

More information

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement DOWNTOWN REDMOND LINK EXTENSION 2018 SEPA Addendum to the East Link Project Final Environmental Impact Statement AUGUST 2018 Downtown Redmond Link Extension SEPA Addendum to the 2011 East Link Project

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

3.5 VISUAL AND AESTHETIC QUALITIES

3.5 VISUAL AND AESTHETIC QUALITIES 3.5 VISUAL AND AESTHETIC QUALITIES 3.5.1 Introduction to Analysis 3.5.1.1 Summary of Results The Preferred Alternative would represent a minimal change to the visual character of the existing rail corridor.

More information

Mississippi Skyway Preliminary Engineering Report

Mississippi Skyway Preliminary Engineering Report EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge

More information

C ity of Grande Prairie Development Services Department

C ity of Grande Prairie Development Services Department C ity of Grande Prairie Development Services Department FAIRWAY DEVELOPMENT OUTLINE PLAN OP 08 09 Approved April 6, 2009 Prepared by: Focus Corporation Table of Contents 1.0. Introduction 2 3 1.1. Plan

More information

Staff Report and Recommendation

Staff Report and Recommendation Community Planning and Development Planning Services 201 W. Colfax Ave., Dept. 205 Denver, CO 80202 p: 720.865.2915 f: 720.865.3052 www.denvergov.org/cpd TO: City Council Neighborhoods and Planning Committee

More information

EAST SACRAMENTO COMMUNITY PLAN

EAST SACRAMENTO COMMUNITY PLAN EAST SACRAMENTO COMMUNITY PLAN Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS CONTENTS Community Location...3-ES-3 Community Vision...3-ES-4 Community Profile...3-ES-4 Community Issues...3-ES-5

More information

5-Year Street Reconstruction Plan ( )

5-Year Street Reconstruction Plan ( ) 5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek

More information

Nob Hill Pipeline Improvements Project EIR

Nob Hill Pipeline Improvements Project EIR Section 3.1 Aesthetics This section addresses the visual aspects that may affect the views experienced by the public, including the potential to impact the existing character of each area that comprises

More information