1 4211 Yonge Street Suite 500 Toronto Ontario M2P 2A f smithandandersen.com ELECTRICAL DESIGN BRIEF FOR 128 HAZLETON AVENUE RESIDENTIAL CONDOMINIUM BUILDING TORONTO, ONTARIO OUR PROJECT NUMBER: E.001 DATE: (ISSUE FOR SPA) REV 0 Vancouver Kelowna Victoria Calgary Edmonton Winnipeg London Toronto Ottawa

2 E.001 Page 2 LIMITS OF LIABILITY ASSOCIATED WITH THIS DOCUMENT 1. THIRD PARTY USE 1.1. Any use that a third party makes of this document, or reliance on or decisions to be based on it, are the responsibility of such third party. Smith + Andersen accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based upon this document. 2. GENERAL LIMITS 2.1. This document has been prepared solely for the use of the CLIENT and its design team associated with the PROJECT. The material contained in this document reflects Smith + Andersen s best judgement in light of the information available at the time of preparation. There is no warranty expressed or implied. Professional judgement was exercised in gathering and assessing information. The recommendations presented are the product of professional care and competence and cannot be construed as an absolute guarantee Where equipment sizing is provided it should be considered order-of-magnitude only as the project details that may affect systems have not been established or finalized.

3 E.001 Page 3 1. INTRODUCTION 1.1. A proposed Group C and E construction located in Toronto, Ontario The facility is to be developed by Mizrahi Developments 1.3. Building is to be approximately 7,340 square meters, 9 stories tall with 3 stories belowgrade. It will be approximately 38 meters tall The building is considered a High Building by the definitions of the applicable building code (e.g. Ontario Building Code (OBC)). 2. DESIGN STANDARDS 2.1. The Electrical systems will be designed in accordance with the current edition of the following Codes and Standards: Ontario Building Code Ontario Electrical Safety Code National Fire Protection Authority (NFPA) Ontario Fire Code Local Ordinances and Authorities Institute of Electrical and Electronic Engineers (IEEE) standards LEED Illumination Engineering Society (IES) Standards ASHRAE 90.1 Energy Efficient Design of New Buildings The National Energy Code For Buildings (NECB) CAN/CSA-B72; Installation Code for Lightning Protection Systems Making a Sustainable City Happen the Toronto Green Development Standard Toronto Hydro Requirements for the Design and Construction of Customer- Owned High Voltage Substations Toronto Hydro-Electric System Metering Requirements 750 Volts or Less 3. NORMAL POWER DISTRIBUTION 3.1. The local distribution authority is Toronto Hydro A new incoming service will be provided at 13.8kV, 3 phase, 4 wire The primary utility feeders will come below ground in a concrete duct-bank off Davenport Road The utility feeders will terminate in a dual radial connection The primary high-voltage switchgear will be located in the P1 Main Electrical Room. The high voltage switchboard will contain a single fused disconnect branch feeder for the main transformer Lightning arresters to be provided on the line side of the main transformer.

4 E.001 Page A main customer owned 13.9kV:120/208V transformer will be installed inside the building in the main electrical room Utility metering to be done on the secondary side of the main transformer Our design will be based on power density calculations as required by the Ontario Electrical Safety Code (OESC) rule for residential occupancies and rule for other types of occupancies and OBC for lighting power densities Main electrical rooms will be located in the following location: P1 Main Electrical Room kV Customer Owned Switchgear kV:120/208V Main Transformer.3 120/208V Main Switchboard.4 120/208V Common Distribution Board and Panels.5 120/208V Suite Distribution Board P2 Generator Room.1 120/208V Generator.2 120/208V Generator Panel.3 120/208V Life-Safety and Non-Life-Safety Automatic Transfer Switches.4 120/208V Emergency Distribution Board and Panels Penthouse Mechanical Room.1 120/208V Common Distribution Board and Panels.2 120/208V Suite Distribution Board.3 120/208V Emergency Distribution Board and Panels Electrical riser closets will be located on each floor. Each closet will contain the suite power, communication, and fire alarm risers The primary distribution voltage, throughout the facility will be 120/208V Main electrical rooms, the generator room and any room housing an automatic transfer switch will have a 2-hour fire rating. All riser closets are to have a minimum 2-hour fire rating. All sub-electrical rooms are to have a minimum 1-hour fire rating All electrical equipment is to be sprinkler proof All electrical conductors rated at 120A (#1/0 AWG AL) or greater are to be aluminium: NUAL or similar. The remaining conductors are to be copper. All equipment to be aluminum bus. 4. EMERGENCY POWER DISTRIBUTION 4.1. Emergency power will be provided by a natural gas generator with a main breaker on the generator supplying a main distribution panel, which will supply individual feeds to the life safety system, non-life safety system and the fire pump system.

5 E.001 Page The life safety automatic transfer switch and distribution system will supply the following systems: Life safety lighting systems required by Building Code Exit Lighting Fire Alarm network panels Stair pressurization fans and elevator shaft Active Smoke control fans Active and passive smoke control dampers All elevators serving floors above grade with capacity on generator for fire fighter elevator and 1 other elevator The non-life safety automatic transfer switch and distribution system will supply the following systems: Sanitary pumps Storm water pumps Sump pumps Car lifts Garage door(s) Security System Telephone system Enterphone/Intercom system 4.4. Fire pumps will be supplied through a separate transfer switch and controller for each fire pump. The fire pump automatic transfer switch and controller are supplied by the sprinkler contractor Emergency power will meet the minimum operation requirements for a period of no less than 2 hours All emergency wiring is to be rated for a minimum of one hour with all wiring not installed in slab to be two-hour fire rated cable The generator will be 250kW standby rated The generator will be housed indoors within a 2 hour rated designated room in basement The generators will be specified to meet Tier II emission standards The emergency transfer switch will be 3 phase, 3-pole, molded case breaker style, with electronic controller, single sided bypass-isolation, generator start signal, load-dump relays and elevator pre-transfer inhibit signal The fire pump and controller will be fed via dedicated emergency and normal power distribution services. The fire pump controller will have a combination of main disconnect and transfer switch for each fire pump to comply with NFPA requirements Conductors supplying life safety systems and the fire pump shall be rated in conformance with the respective Building Code.

6 E.001 Page 6 5. FIRE ALARM 5.1. The building will be provided with an addressable two stage fire alarm system with battery charger and standby batteries The main fire alarm control panel will be located in CACF room off the main residential lobby All fire alarm detection and addressable loop wiring will be class A. All output device wiring will be Class B Speakers and Speaker-strobes will be provided throughout the building A voice paging system will be provided with a separate zone for each floor. For condo, corridor will be a separated zone from suite, to allow for silencing Visual strobes will be installed in all public and residential corridors and in floor areas where public may congregate in Group A occupancy Visual strobes will also be utilized in areas of high ambient noise including all mechanical rooms and as required by code Visual strobes will be provided in the living area of all residential suites Primary means of detection will be via manual pull stations and the sprinkler system. Smoke and heat detectors will be provided where required by Ontario Building Code Smoke alarms with integral strobes will be provided in all suite bedrooms, with separate carbon monoxide alarms where required by code and local bylaws The fire alarm will monitor the following systems: Standby emergency generators (Trouble/running) The fire pump (Trouble/running/loss of power/loss of phase/phase reversal/connected to alt. source) Jockey Pump Loss of Power Dry Sprinkler Compressor Loss of Power Natural Gas Genset PRV Valve (if applicable) Spare modules will be provided for future tenant tie-ins All magnetic locks will be release upon activation of the evacuation signal on the fire alarm Duct-type smoke detectors will be supplied in air handling systems that serve more than one floor/suite fire separation. Air handling equipment will be designed to shut down upon activation of its dedicated duct detector or the fire alarm system The sprinkler system will be electrically supervised via flow switches and supervised valves An elevator recall system is being provided. Smoke detectors will be provided in all elevator lobbies.

7 E.001 Page The complete fire alarm system will be tested and verified as per the requirements of the Ontario Building Code. 6. LIGHTING 6.1. High efficiency luminaires will be provided as per the recommendations of the IES Lighting will be designed to OBC requirements and IESNA recommendations Primary interior lighting will be provided by LED luminaires, such that the total lighting power density for the building will be 15% lower than ASHRAE Lighting in suites and public areas will be designed in conjunction with the Interior Designer Parking levels will be illuminated by fluorescent strip or LED luminaires to provide at least 50 lux average with 100 lux in the drive aisles The Lobby and public circulation area luminaires will suit architectural elements and provide average illumination levels of 100 to 200 lux Washrooms will be finished and contain recessed/surface mounted luminaires and decorative or architectural cove lighting appropriate for its environment, designed to 150 lux Shower area luminaires are to be LED downlights with lenses, suitable for wet environments Service rooms will be lit with chain hung, direct strip lights fluorescent luminaires with wire guards or LED luminaires Stairwells will be illuminated by diffuse LED luminaires Exterior lighting will be complete with shielding to ensure glare control and light trespass to passers-by and neighbouring properties. Full cut-off LED luminaires to ensure illumination with no spillage of light above the horizontal plane or onto adjacent properties Emergency lighting will be provided by emergency generator power throughout Emergency lighting will be provided to meet building code and will be provided in electrical and mechanical services rooms Battery units will provided in all electrical and mechanical rooms and in the generator room as supplementary lighting for emergency purpose Exit lights will be energy efficient LED type Lamps shall be TCLP compliant with a minimum CRI of 85 and from one manufacturer: GE, Philips or Osram Sylvania. Ballasts and drivers shall be electronic and manufactured by General Electric, Advance, Magnatek or Osram Sylvania.

8 E.001 Page 8 7. LIGHTING AND RECEPTACLE CONTROL 7.1. Washrooms, storage rooms, office areas and any other areas with transient occupancy will be provided with ceiling or wall mounted occupancy sensors Exterior lighting shall be automatically controlled capable of turning off exterior lighting when sufficient daylight is available or when the lighting is not required during night time hours Ceiling mount motion sensors shall control all non-emergency parking garage light fixtures Ceiling mount motion sensors shall control all non-emergency corridor light fixtures Motion sensor to be PIR, Ultrasonic or a combination sensor with a capability to add slaves. These will be optional wall mounted in small rooms and ceiling mounted in all other areas In areas with natural lighting, luminaires will be controlled by daylight sensors to make maximum use of natural light. Daylight sensors to switch or dim fixtures Mechanical and electrical room lighting shall be controlled by standard wall switches All-off switches will be provided in each suite by the exit so that all lighting and nonessential electrical equipment can be shut down at a single location. 8. METERING 8.1. A networked digital based electric metering system with embedded webpage will be provided. A detailed power meter with demand metering will be provided on the main incoming service with additional metering being provided in the building to allow for proper monitoring of mechanical equipment, emergency system, outdoor lighting, indoor lighting and any food services. The power metering system will all be one manufacturer, either Square D Powerlogic, Eaton Power Xpert or Siemens Sentron. All the power meters will be networked together on an independent wiring loop with Ethernet gateways provided to read the data remotely A digital tenant Revenue Canada approved metering system will be provided to meter [suites][retail tenants] in the building. The system will include all required conduit and rough-ins to interconnect all the tenant meters throughout the building. The system will be provided with an Ethernet gateway to allow for a remote access and bill processing. 9. GROUNDING SYSTEM 9.1. An AC grounding system with new main ground electrode that will consist of a minimum of four 3m ground rods spaced 3m apart and connected to the main electrical ground bus located in the main electrical room with two separate #3/0AWG ground connections. The grounding system for the building will be provided connecting each typical electrical room to the main grounding system in the main electrical room in a radial connection. A ground bar will be provided in each electrical room. All transformer neutrals will be

9 E.001 Page 9 connected to the grounding bar and a common cable connected back to the system ground Grounding will be provided following IEEE 1100 and Electrical Code Section 10 standards Separate #2/0AWG telecommunication ground riser will be provided off of the main building ground bus and the telecommunication ground riser will be connected in a radial pattern with ground bars in each telecommunication room Dedicated ground cables will be run from the electrical ground riser to all elevator shafts and elevator machine rooms to ground all elevators and equipment in the elevator pits. 10. EMI CONSIDERATIONS All wiring will be in conduit. All major normal power feeds will be in totally enclosed metal bus duct Routing of power cables and bus duct will be selected to minimize the effect of magnetic fields on other equipment Single conductor Teck or armoured cable will be avoided. 11. COMMUNICATIONS Communications riser rooms for suite telephone/internet/catv will be provided on every floor of the building or as checked by the owner or communication consultant. 101mm conduit sleeves will run between floors and one wall of the room will have a 20mm thick fire rated plywood back board From each typical riser room two conduits will run in the concrete slab to the first outlet of each suite for communication connection and from this point the conduit will daisy chain between the remaining outlets within the suite. Each outlet will be capable of providing cabling for telephone and CATV. 12. SECURITY SYSTEM Rough in conduit and junction box system will be provided for the security system by the Electrical Contractor. All electronic devices and installation will be provided by others All security devices will be connected as per the security consultant s drawings. Infrastructures will be installed by electrical contractor to support this Doors contacts, electric strikes, magnetic locks, and security cameras will be roughed in by the electrical division as directed by the Owner. 13. CO-ORDINATION OF MECHANICAL AND ELECTRICAL AND OTHERS

10 E.001 Page All starters, fire alarm shutdown, pressurization control, smoke evacuate control, motor control centres, and power wiring shall be by the electrical division except for units with starters as part of a package or for VFDs All power wiring shall be by the Electrical contractor including power wiring from variable speed drives to motors. VFDs to be mounted on or near the equipment and VFD cable will be run from the VFD drive to the motor with no disconnect between them All control wiring and controls shall be by Mechanical contractor. The Electrical contractor will provide 15A, 120V, 1 phase circuits at designated panels and they will be terminated in a junction box near the respective electrical panels. The Mechanical/Controls contractor is required to extend the 120V circuits to all of their respective equipment All fire alarm wiring shall be by Electrical contractor. 14. LIGHTNING PROTECTION Lightning protection will be designed and installed in accordance to CAN/CSA-B72; Installation Code for Lightning Protection Systems Intercepting conductor shall be installed on the entire roof perimeter at the highest part of the roof and as close to the edge as possible but never more than 0.5m from the edge of the roof Air terminals to be located within 0.5m of the outside corner of the roof spaced on intervals not exceeding 8m around the perimeter An intercepting conductor connected at both ends and at least every 50m shall be installed within the perimeter so that no point on the roof is more than 5m away from a conductor Every stack, and other objects located on the roof susceptible to strikes will have air terminals Conductor cables will interconnect air terminals and offer a multiple path to ground. Down lead conductors will be placed every 30m around the perimeter of the building (but never less than two), run down exterior columns, and terminate in a ground rod system in the lowest level of the building. Metal objects within 6 feet of conductor cable will be grounded Perimeter ground loop with 3m ground rods every 30m will be installed around the foundation of the building. The lightning ground grid will be connected to the main building electrical ground grid at a minimum of 2 locations.

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

Page 1 of General

Page 1 of General Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

UBC Technical Guidelines Section Edition Interior Building Lighting Page 1 of 5

UBC Technical Guidelines Section Edition Interior Building Lighting Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 27 05 05 Communication Rooms Design Guidelines 2.13 1.2 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations Electrical

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.07 ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.07 It is expected that the electrical design professional will conform to accepted good engineering design practices.

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

Technical II Report Electrical Systems

Technical II Report Electrical Systems Technical II Report Electrical Systems Kelly Chan Consultant: Prof T. Dannerth, P.E. Part A Drawings Drawings needed for single-line diagram EE1.01 title sheet (electrical drawings) EE2.09 penthouse/roof

More information

Related Sections: TBD. Effective Date: January 1, 2016

Related Sections: TBD. Effective Date: January 1, 2016 Description: The purpose of the section is to highlight the current applicable UMCP Design Standards for the design, selection and, installation of lighting fixtures within buildings. Related Sections:

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

13. ELECTRICAL - TECHNICAL

13. ELECTRICAL - TECHNICAL 13. ELECTRICAL - TECHNICAL 13.1 GENERAL REQUIREMENTS 1. Base the electrical design on providing the following features at the most economical cost, considering both investment and operating expenditures:

More information

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager. B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1 Page 1 TABLE OF CONTENTS 1 ELECTRICAL 2 Summary Sustainability Electrical Distribution Lighting Detection and Alarm Communication Systems Lightning Protection Clock Systems Access Control Housekeeping

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth Corbin Building Technical Assignment 2 Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth 10/26/2011 Technical Report II 1 Executive Summary The following report is an overview

More information

Fire Protection Coffee Break Training May 2016

Fire Protection Coffee Break Training May 2016 Fire Protection Coffee Break Training May 2016 Introduction High-Rise Requirements Questions and Answers Agenda Overview Site Fire Access Aerial Access Power/Back-up Power Elevators and Access Sprinklers

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

Technical Report Two

Technical Report Two Technical Report Two Yale Sculpture Building Advisors: Ted Dannerth Richard Mistrick Date: October 31, 2006 Electrical Systems Existing Conditions and Building Load Summary Report Executive Summary: This

More information

Port of Portland Conveying Equipment Guidelines

Port of Portland Conveying Equipment Guidelines Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10 Belleville, Ontario Page 1 of 10 1 GENERAL 1.1 GENERAL REQUIREMENTS.1 The General Conditions of CCDC2-2008, and the General requirements of Division 1, form part of this Section and must read in conjunction

More information

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018 Construction Management at Risk Services New North East Branch Library Project ADDENDUM 01 August 3, 2018 1. The attendance sheets (4 pages) from the Pre-Bid Conference are attached. 2. The proposals may

More information

SECTION INTERIOR LIGHTING

SECTION INTERIOR LIGHTING SECTION 26 51 00 INTERIOR LIGHTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

GENERAL AREAS OF INSPECTION

GENERAL AREAS OF INSPECTION This information is intended to assist you in preparation for the annual high-rise inspection. This is not a complete list and the Inspector may identify other conditions or issues in the building that

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. 2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. Exception: Manual fire alarm boxes are not required where the building is

More information

1. Division 26 Section Electrical General Requirements. 2. Division 26 Section "Wiring Devices" for wall-box dimmers and manual light switches.

1. Division 26 Section Electrical General Requirements. 2. Division 26 Section Wiring Devices for wall-box dimmers and manual light switches. PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 REFERENCES... 2 1.4 DEFINITIONS... 2 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 3 1.7 COORDINATION... 3 1.8 DELIVERY, STORAGE, AND

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST FIRE AND LIFE SAFETY SYSTEMS FOR STRUCTURES FIVE OR MORE STORIES IN HEIGHT AND LESS THAN 75 FEET IN HEIGHT FROM THE POINT

More information

ENERGY EFFICIENCY AFTER DECEMBER 31, 2016

ENERGY EFFICIENCY AFTER DECEMBER 31, 2016 MODULE 2 Energy Efficiency INTRODUCTION In this module the requirements for energy efficiency in buildings is examined with particular attention to the Supplementary Standard to the OBC, SB-10, Energy

More information

Residential-based Care Facility R-4 Guideline

Residential-based Care Facility R-4 Guideline Moreno Valley Fire Department Fire Prevention Bureau Residential-based Care Facility R-4 Guideline Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: April 7, 2017 Residential-based Care

More information

SECTION INTERIOR AND EXTERIOR LIGHTING FIXTURES

SECTION INTERIOR AND EXTERIOR LIGHTING FIXTURES SECTION 26 50 00 INTERIOR AND EXTERIOR LIGHTING FIXTURES PART 1: GENERAL 1.1 WORK INCLUDED: A. Interior lighting fixtures and accessories B. Exterior lighting fixtures and accessories C. Emergency battery

More information

IN2 Lighting Control Devices

IN2 Lighting Control Devices Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Lighting Control Devices Illinois Mathematics and Science Academy Follow this and additional works at: http://digitalcommons.imsa.edu/facility_in2_manuals

More information

SECTION 907 FIRE ALARM AND DETECTION SYSTEMS

SECTION 907 FIRE ALARM AND DETECTION SYSTEMS SECTION 907 FIRE ALARM AND DETECTION SYSTEMS 907.1 General. This section covers the application, installation, performance and maintenance of fire alarm systems and their components in new and existing

More information

HIGH-RISE RETROFIT ORDINANCES - NO and NO

HIGH-RISE RETROFIT ORDINANCES - NO and NO INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 91.8604 Effective: 9-06-90 DOCUMENT NO. P/BC 2002-054 Revised: 4-15-03 Previously Issued As: MGD 88 HIGH-RISE RETROFIT ORDINANCES - NO.

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and

More information

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

More information

A. This Section includes the following lighting control devices:

A. This Section includes the following lighting control devices: Attachment G LIGHTING CONTROL SPECIFICATIONS (Download Document separately) LIGHTING CONTROL SPECIFICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including

More information

Dates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000

Dates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000 Executive Summary The Milton S. Hershey Medical Center Academic Support Building is located on The Pennsylvania State University's campus in Hershey, PA. The building is owned by The Pennsylvania State

More information

Lord Stirling Community School Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004

Lord Stirling Community School Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004 Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004 Table of Content: Page 1 ~ Single Line Diagram 1 2 ~ Electrical System Narrative 2-3 3 ~ Lamp

More information

Product Specifications Dialog Room Controller* (*patent pending)

Product Specifications Dialog Room Controller* (*patent pending) 1 Product Specifications Dialog Room Controller* (*patent pending) 1. GENERAL 1.1. OVERVIEW 1.1.1. Provide a complete stand-alone, decentralized, low voltage, digital lighting control system for classrooms,

More information

FOR LEASE ROCKWOOD OFFICE PARK

FOR LEASE ROCKWOOD OFFICE PARK WILMINGTON, DE 19809 www.cbre.us/rockwood 11 PROPERTY HIGHLIGHTS Owner: Asset Manager: Address: Rockwood Office Park Associates, L.P. AIG Global Real Estate Investment Group 501, 503 & 505 Carr Road Site:

More information

Renovate MCRC Facilities Great Lakes, IL

Renovate MCRC Facilities Great Lakes, IL 6. ENGINEERING SYSTEMS REQUIREMENTS D50 ELECTRICAL SYSTEM DESCRIPTION The electrical repair work includes the design and construction of the electrical distribution system for the B3200 Marine Corps Reserve

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

Electrical System (N) PANELBOARD "L1" VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING

Electrical System (N) PANELBOARD L1 VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING Electrical System After re-designing the lighting system for the children s computer, circulation and storytelling areas, the electrical system had to be redesigned as well. These are the new panel board

More information

CFAA Technical Seminar Ontario Building Code Updates to 2015

CFAA Technical Seminar Ontario Building Code Updates to 2015 CFAA Technical Seminar Ontario Building Code Updates to 2015 October 28, 2015 2015 Fire Alarm Updates Ontario Building Code Glenn Somerton P.Eng. Senior Code Specialist Morrison Hershfield Limited gsomerton@morrisonhershfield.com

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 135 - QUEENS, 207-11 89TH AVENUE, New York, 11427 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-03-20

More information

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD LIGHTING FIXTURES AND CIRCUITRY & SWITCHING SECONDARY SCHOOLS 1. GENERAL 1.1.1. Consultants MUST prepare a Summary of Fixtures which will include catalogue

More information

Apartment Fire & Safety Inspection. City of Guadalupe

Apartment Fire & Safety Inspection. City of Guadalupe Apartment Fire & Safety Inspection City of Guadalupe Intent Provide information and the most common violation. It is NOT the intent to Identify all hazards a building may experience. It is NOT intended

More information

S AGE E NGINEERING A SSOCIATES, LLP

S AGE E NGINEERING A SSOCIATES, LLP S AGE E NGINEERING A SSOCIATES, LLP 1211 Western Avenue Albany, NY (518) 453 6091 F (518) 453 6092 Kingston Library Mechanical and Electrical Systems Field Report Date of Visits: Mechanical - September

More information

600 Watt Dimmer Install Guide

600 Watt Dimmer Install Guide 600 Watt Dimmer Install Guide ER6CD This guide covers all models of the ER6CD lighting controller. The box contents includes the controller with lock nut and installation guide. Overview The ER6CD controller

More information

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Fire Alarm Systems Plan Review Checklist Date: Permit Number: Business Name: Address: Fire Alarm System Submittal

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Smoke Detector Activation of any smoke detector shall start the alarm verification mode.

Smoke Detector Activation of any smoke detector shall start the alarm verification mode. Description: The purpose of the section is to provide the UMCP Design Standards for the design and implementation of Fire Alarm Systems at the UMCP campus. Related Sections: TBD Effective Date: July 10,

More information

ENGINE GENERATORS AND ACCESSORIES

ENGINE GENERATORS AND ACCESSORIES ENGINE GENERATORS AND ACCESSORIES GENERAL INFORMATION 1.1 This section applies to engine generators and accessories. DESIGN REQUIREMENTS 2.1 The Engineer of Record will consult with the University s Engineering

More information

DIVISION 26 ELECTRICAL SECTION FIRE ALARM SYSTEM

DIVISION 26 ELECTRICAL SECTION FIRE ALARM SYSTEM DIVISION 26 ELECTRICAL SECTION 26 81 11 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install all equipment and accessories for a complete local, analog addressable, manually and automatically actuated,

More information

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW 12/23/16 Rev 9 UltraLITE Model ELU General Specification 4.2 KW to 5 KW UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW 1.0 General General Specification This specification describes

More information

Catalog Number. Notes

Catalog Number. Notes Catalog Number FEATURES & SPECIFICATIONS INTENDED USE Built on the compact, low-profile Z strip channel, this LED strip offers long maintenance-free life, several color s, lumen outputs and lengths. Ideal

More information

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016)

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016) Cheboygan County Department of Building Safety 870 South Main Street P.O. Box 70 Cheboygan, Michigan 49721 TX: (231) 627-8813 FX: (231) 627-8454 www.cheboygancounty.net Service Entrance ONE- AND TWO-FAMILY

More information

3. Provide revised typed circuit directory in panelboards that have circuits removed.

3. Provide revised typed circuit directory in panelboards that have circuits removed. DIVISION 26 - ELECTRICAL 26 0501 MINOR ELECTRICAL DEMOLITION A. Coordinate utility service outages with the UND Electrical Department. B. Verify the abandoned wiring and equipment serve only abandoned

More information

Electrical Inspection Service & Distribution

Electrical Inspection Service & Distribution 0911 Distribution Panels & Switchgear Equipment, conduit, feeders, and grounding 480 Volt Switchboard: This switchboard contains the utility meter and two main, service, circuit breakers. One circuit breaker

More information

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5 Construction Standards Page 1 of 5.1 General Description.1 The University requires that all new fire alarm system control panel, components, and devices, as required for the project, be Secutron 2900 Series

More information

HIGH BAY APPLICATIONS

HIGH BAY APPLICATIONS STAIRWELLS The IIS Inverter can operate multiple fixtures in a building s stairwell and can be wired to bypass dimmers or occupancy sensors...keeping your egress corridors lit without sacrificing your

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:... 2 2. EMERGENCY POWER... 3 B. LIGHTING...4 1. GENERAL... 4 2. AVERAGE MAINTAINED

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 314 - BROOKLYN, 330 59 STREET, New York, 11220 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-23

More information

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE Effective Date: 11/01/02 Purpose: MECKLENBURG COUNTY To establish a set of guidelines for performance testing of all newly installed or upgraded fire alarm systems in order to ensure that all devices and

More information

Mechanical System Description

Mechanical System Description 1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure

More information

Town of Cicero Local Code Amendments

Town of Cicero Local Code Amendments Town of Cicero Local Code Amendments 2009 International Residential Code Local Amendments: DELETE Table R302.1 (Exterior Walls), see Attachment A. DELETE Exception for Subsection R313.2 (One and Two-Family

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

Full Service Central Station Fire Alarm Listing Evaluation

Full Service Central Station Fire Alarm Listing Evaluation Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm

More information

PART 4 ELECTRICAL STANDARDS

PART 4 ELECTRICAL STANDARDS PART 4 ELECTRICAL STANDARDS 1.0 INTRODUCTION AND SCOPE: These standards reflect the general requirements and recommendations of elevator contractors, with respect to the power distribution system to achieve

More information

Building Electrical System Overview

Building Electrical System Overview Philip Mackey L/E Dr. Mistrick Holy Cross Hospital North Addition Silver Spring, MD 0/3/05 Building Electrical System Overview Executive Summary: The following report describes the existing emergency power

More information

Residential Care Facilities Requirements

Residential Care Facilities Requirements Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 Residential Care Facilities Requirements SUBMITTAL REQUIREMENTS: Note: These requirements are in addition

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical

More information

Functional Performance Test

Functional Performance Test Fire Alarm Control Panel & Fire Alarm Annunciator Panel Notify all building occupants that testing will be conducted. Fire alarm contractor shall have personnel with 2-way radios at the fire alarm control

More information

Air Flow Diagram. Orange County Sanitation District SP-194 Section 05 Conceptual Design

Air Flow Diagram. Orange County Sanitation District SP-194 Section 05 Conceptual Design Orange County Sanitation District SP-194 Section 05 Conceptual Design Air Flow Diagram Two options are being analyzed for air distribution and temperature control within the building: Conditioned air shall

More information

Following are the systems proposed as per NBC & Local Fire Authority:

Following are the systems proposed as per NBC & Local Fire Authority: 1. OBJECTIVES AND STRATEGIES OF THE FIRE PROTECTION DESIGN This report describes the design parameters, system requirements of fire protection system for mixed occupancy (Assembly + Business) building

More information

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 1. A 2 PVC conduit was installed in the ground prior to setting a factory manufactured home on the foundation. The required service

More information

SECTION : FIRE ALARM & DETECTION SYSTEMS

SECTION : FIRE ALARM & DETECTION SYSTEMS SECTION 28 31 10: FIRE ALARM & DETECTION SYSTEMS 1. GENERAL A. This section applies to fire detection/alarm system and carbon monoxide system components and equipment installed during new construction

More information

DIVISION 16 - ELECTRICAL

DIVISION 16 - ELECTRICAL DIVISION 16 - ELECTRICAL I. GENERAL A. This division contains the following elements: 1. Electrical Distribution System. 2. Power System. 3. Lighting System. 4. Emergency Power System. 5. Fire Alarm Detection

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 86 - BROOKLYN, 220 IRVING AVENUE, New York, 11237 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-11-14

More information

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD PART 1 - GENERAL PURPOSE This Standard is intended to assure that fire detection/alarm systems at The University of Texas at Austin provide the highest level of fire safety possible. SCOPE This standard

More information

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 310 - BRONX, 260 WEST KINGSBRIDGE RD, New York, 10463 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-12-07

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: NEW SCH FOR ARTS AND SCIENCE - X, 965 LONGWOOD AVENUE, New York, 10459 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-12-01 8:13 AM 2017-12-01

More information

Catalog Number. Notes. Type. FST Snap on frosted, diffuse L/LENS No diffuser

Catalog Number. Notes. Type. FST Snap on frosted, diffuse L/LENS No diffuser Catalog Number FEATURES & SPECIFICATIONS INTENDED USE Built on the compact, low-profile Z strip channel, this LED strip offers long maintenance-free life, several color s, lumen outputs and lengths. Ideal

More information

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline Moreno Valley Fire Department Guideline Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 8, 2017 Alarm & Signaling Systems PURPOSE Fire alarm and signaling systems are designed to

More information

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2 Lindsay Frederick Lighting + Electrical Ron Dodson Faculty Advisor Native American Cultural Center Arizona Technical Report 2 Native American Cultural Center Technical Report 2 p. 2 Executive Summary The

More information

Photovoltaic (Solar) Array Installation Guide

Photovoltaic (Solar) Array Installation Guide Building & Safety Division Community Development Department 7351 Rosanna Street, Gilroy, CA 95020 Phone: 408 846-0451 Fax: 408 846-0429 Visit us: www.cityofgilroy.org Photovoltaic (Solar) Array Installation

More information

INTEGRATED LIFE SAFETY COMPLIANCE TESTING AND ITS PROCEDURES

INTEGRATED LIFE SAFETY COMPLIANCE TESTING AND ITS PROCEDURES INTEGRATED LIFE SAFETY COMPLIANCE TESTING AND ITS PROCEDURES By: Mehrdad Ghods Integrated Engineering Student Sept. 06, 2002 University of British Columbia Vancouver, BC i PREFACE: The purpose of this

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

DISTRIBUTION PANEL BOARDS; NEW CONSTRUCTION. Subpart 1. Circuit index. All circuits in light and power

DISTRIBUTION PANEL BOARDS; NEW CONSTRUCTION. Subpart 1. Circuit index. All circuits in light and power 4658.4600 DISTRIBUTION PANEL BOARDS; NEW CONSTRUCTION. Subpart 1. Circuit index. All circuits in light and power panels must be identified with a typewritten index. Doors on electrical panel boards accessible

More information