670 Index Automatic Air Vents, valves 304 Automatic Power Factor Correction, floor standing steel enclosure 556 Automatic Transfer Switches enclosed t

Size: px
Start display at page:

Download "670 Index Automatic Air Vents, valves 304 Automatic Power Factor Correction, floor standing steel enclosure 556 Automatic Transfer Switches enclosed t"

Transcription

1 Index Above Ground Drainage brackets, cast iron 170 pipes, PVC-U 155 ABS pipe & Solvent Weld Fittings 207 AC Static Inverter System, AC power supply to luminaires 584 Access control alarm contact flush 598 emergency break glass double pole 598 exit button 598 exit PIR 598 magnetic swipe reader 598 proximity reader 598 Access Control Equipment, all-in-rates 87 access control system (ACS), schematic 43 Access Door, PVC-U, spill & waste 164 Acoustic Housings (for generators) 491 Adaptable Boxes square pattern 497 steel 509 Adaptor, copper pipes 183 AHU s 476 Air Circuit Breakers (ACBs) ACB 65 ka fault rated 554 ACB 100kA fault rated 553 Air Cooled Condensers 357 Air Curtain Unit 484 Air Handling Units 86 Airport terminal, elemental cost 101 All-In-Rates 85 above ground drainage 85 access control 87 air handling units 86 CCTV 87 chilled water 85 chilled water / LTHW 89 data cabling 88 ductwork 86 electrical connection with mech services 93 external lighting 94 extract fans 86 fire alarms 93 generators 91 heat rejection 85 heat source 85 hose reels/dry risers 87 HV switchgear 91 lifts and escalators 95 lighting 93 LV switchgear 91 pipes 89 pumps 86 ring main units 91 small power 92 sprinklers 87 substation (packaged) 91 transformers 91 UPS 91 water installations 85 Allowances annual holiday allowances 622 daily travel allowance 617 lodging allowance 617 lodging allowances 622 mileage allowance 617 subsistence allowance 617 weekend lodging allowances 622 alternative all air system (FGU), schematic 43 Analogue Addressable Panels 601 Ancillaries 224 low temp hot water 295 regulators 224 Angle, Flat Cover, PVC trunking 503 Angle, Internal/External Cover, PVC trunking 504 Approximate Estimating 67 cost indices 69 stage C elemental rates 78 Aprons, PVC-U, fittings 166 Armoured Cable clipped direct to background 513 laid in trench 511 SWA & AWA XLPE PVC clipped 513 in trench, 511 Attenuators, DW144 galvanised, rectangular 454 Automatic Air Admittance, valves 166

2 670 Index Automatic Air Vents, valves 304 Automatic Power Factor Correction, floor standing steel enclosure 556 Automatic Transfer Switches enclosed type, 3 or 4 pole 556 with dual by-pass 557 with single by-pass 557 panel mounting type, 3 or 4 pole 556 Balcony Outlets, PVC-U 142 Basket, tray epoxy coated 552 zinc plated 551 Basket Tray, mild steel cable basket, zinc plated 551 Battery Chargers, HV switchgear 494 Bellmouth, gully drains 173 Bend, PVC-U 164 Bend, Flat/Internal/External, PVC miniature trunking 505 Bend, Internal/External, PVC bench trunking 506 Bends 90 double compartment, galvanised steel 499 single compartment, galvanised steel 499 triple compartment, galvanised steel 499 Biomass Boilers 8 Biomass Energy 27 Black Enamelled, heavy gauge, screwed drawn steel 496 Black steel pipes, low temp hot water pipe 268 BMS chilled water, schematic 43 BMS controls (LPHW), schematic 43 Boards and Panels 557 Body Coupler, 3 and 4 compartment, galvanised steel 502 Boilers all-in-rates 85 atmospheric, cast iron 258 condensing 258 domestic 254 forced draft cast iron sectional 255 steel shell 257 Borehole Cooling 8 Borehole System 19 Bosses, PVC-U, adaptor 165 Brackets 173 fixed to background 142 for copper pipes 181 Brackets and Supports, ductile iron, mild steel 174 BREAAM 8 Breakers / Fuses 557 BSP, copper pipes 190 Building Management Installations, elemental cost 125 Building Management System, controls 608 Building Regulations 3, 7 Busbar chambers 562 edge elbow edge tee 539 end cap 538 end cover 536 end feed unit 538 flat elbow IP54 protection 536 lighting 539 main 536 offset 537 rising 538 top feeder unit 538 underfloor 540 Busbar Chambers, sheet steel case 562 Business Parks, elemental cost 107 Cabes Tiles 492 Cabinets floor standing 592 wall mounted 592 Cable 600/1000 volt grade, 2 core, galvanised steel wire armour 511, /1000 volt grade, 3 core, galvanised steel wire armour 511, /1000 volt grade, 4 core, galvanised steel wire armour 512, /1000 volt grade, 7 core, galvanised steel wire armour 512, /1000 volt grade, 12 core, galvanised steel wire armour 512, /1000 volt grade, 19 core, galvanised steel wire armour 512, /1000 volt grade, 27 core, galvanised steel wire armour 512, /1000 volt grade, 37 core, galvanised steel wire armour 513, /1000 volt grade, single core, aluminium wire armour 511, 513

3 Index 671 earth, 450/750 volt grade, Single core 524 fire rated 527 firetuff fire resistant 2 core core core 533 flexible 524 heavy duty fire rated cable, 750 volt grade, LSF sheathed 528 light duty fire rated cable 500 volt grade, bare volt grade, LSF sheathed volt grade, bare 527 modular 533 XLPE insulation, LSOH, laid in trench 517 Cable Basket 551 Cable Clip, high voltage 492 Cable Terminations brass weatherproof gland 515, 521 compound joint, glanding off 493 heavy duty, 750 volt grade 529 light duty, 500 volt grade 529 Cable Tray heavy duty galvanised steel, BS light duty galvanised steel, BS medium duty galvanised steel, BS Cable, FP100, 450/750 volt grade, single core 530 Cable, FP /500 volt grade, 2 core /500 volt grade, 3 core /500 volt grade, 4 core 531 Cable, FP /1000 volt grade, 2 core /1000 volt grade, 3 core /1000 volt grade, 4 core 532 Cable, LSF Insulated, 450/750 volt grade, single core, non-sheathed copper 523 Cable, Twin & Earth 300/500 volt grade, LSF/LSF /500 volt grade, PVC/PVC 523 Cable, XLPE Insulated, 300/500 volt grade, single core, PVC sheathed 523 Cables armoured 511 fibre optic 595 HV, XLPE 492 lighting controls 570 low voltage 511 telecommunications, laid on tray/basket 587 Cables and Wiring, armoured cable 511 Calorifiers non storage steam 351 non storage water 312 storage 235 Cast Resin Transformer, ventilated steel enclosure air natural 495 temperature controlled fans 495 Cat A Fit-out, elemental cost, office 106 CCTV Systems, all-in-rates 87 Ceiling Recessed Asymmetric Compact, fluorescent downlighter 565 Ceiling Roses batten holder, white moulded plastic, fixed to conduit 570 BC lampholder, white moulded plastic, flush fixed 570 white moulded plastic, flush fixed 570 Central battery system 583 Channel Sections, fabricated brackets 216 Check Valves, DRZ copper alloy and bronze 228 chilled beam system, schematic 43 Chilled Beams 365 chilled ceiling system, schematic 43 Chilled Water Pipes, pipes 361 Chillers absorption 355 air cooled 353 all-in-rates 85 dry air cooled 356 water cooled 354 CHP Combined Heat & Power 491 CHP Combined Heat and Power 8 Circuit Breaker, high voltage 494 Circuit Breakers (ACBs) ACB 65 ka fault rated 554 ACB 100kA fault rated 553 Circuit Breakers (MCCBs) MCCB 36 ka fault rated 555 MCCB 45 ka fault rated 555 MCCB 70 ka fault rated 555 MCCB 150 ka fault rated 554 Circular, pipes, PVC-U 141 Cistern, overflow 162 Class C, pipes, PVC-U 209 Class E, pipes, PVC-U 210 Cleaning & Chemical Treatment duplex configuration 232

4 672 Index electromagnetic water conditioner 231 simplex configuration 232 triplex configuration 233 ultraviolet water sterilising unit 232 Clock Timing Systems digital clock 591 internal wall mounted electric clock 591 matching clock 591 quartz battery movement 591 quartz master clock 591 radio receiver 591 wall clocks for impulse systems 591 Closed Loop System 16 Combined Heat & Power (CHP) 491 Conduit, flexible 496 Conduit and Cable Trunking, containment 496 Connection Unit galvanised steel box 574 moulded plastic box, standard fused 574 Connector Unit to immersion heater, moulded white plastic cover 575 Connectors copper pipes 184 roof Vent 177 Consumer Units 560 Containment basket 551 cable tray GRP 550 conduit 496 ladder rack 540 tray 544 Contractor Relays, pressed steel enclosure 562 Control Components FCU DDC control pack 483 immersion thermostats 347 surface thermostats 347 thermostatic radiator valves 347 Controllers damper actuators 609 frequency inverters 609 plant 608 zone 608 Cooker Control Units 45A, metal coverplate A, plastic box and coverplate 575 Cooling Tower, all-in-rates 85 Cooling Towers closed circuit type 359 open circuit type 358 Cooling Units, VRF, room units 367 Copper Data Cabling, unshielded twisted pair, solid copper conductor 592 Copper Patch Leads, straight through booted 595 Copper Pipes bronze blank flanges 194 bronze screwed flanges 195 cold water brazed (silver) fittings 190 brazed (silver) flanges 195 bronze screw 195 compression fittings 190 high duty capillary 188 press fit mechanical joints 180 table x, cold water 180 Cost indices 70 Cost Model, façade system 39 Couplers, PVC-U 139 Coupling EPDM 174 PVC bench trunking 505 PVC miniature trunking 505 Crossovers double compartment, galvanised steel 501 PVC trunking 502 single compartment, galvanised steel 500 triple compartment, galvanised steel 501 Cylinders copper; direct 237 copper; indirect 236 storage 235 Dado Modular Trunking, PVC skirting 508 Daily Travelling Allowance, hourly rate 613 Dampers fire 435 smoke 437 volume control 434 Data Centre, elemental cost 123 data transmission, schematic 43 Data Transmission Equipment/Cabling, all-inrates 88 Day Care Units, RIBA Stage A Feasibility Cost 74 Daywork calculation of yearly rate 629 electrical 630 formula for the calculation of yearly rate 632 heating and ventilating industry 626 hourly rate of labour table, different grades 629 mechanical 625

5 Index 673 Dearators 306 Department Stores, RIBA Stage A Feasibility Cost 75 Detection/Alarm Equipment 599 Detectors, smoke/fire 600 Diagram 47 access control diagram 54 BMS control diagram 57 CCTV diagram 56 chilled beam diagram 62 chilled ceiling diagram 61 data transmission diagram 50 displacement diagram 60 fan grille unit (FGU) diagram 65 FCU diagram 59 fire detection diagram 53 heat pump diagram 66 intruder detection diagram 55 lighting control system diagram 51 standby power diagram 52 structured cabling diagram 50 typical simple 11K network connection diagram 47 UPS system diagram 49 VAV diagram 63 VRV diagram 64 Diffusers ceiling mounted, circular and rectangular 443 floor swirl 446 perforated 445 plastic air system 446 slot, aluminium 444 digital CCTV, schematic 43 Dimmer, electrical accessories 569 Dirt Separators 306 displacement system, schematic 43 Distribution Boards 558 LV switchgear 553 Distribution Cables armoured 533 unarmoured 535 Distribution Centres, elemental cost 122 Division Strip, PVC trunking, 1.8m long 504 Domed Outlets, PVC-U 142 Door Curtain Unit 484 Double Compartment Trunking, jointed with standard connectors, galvanised steel 498 Drains, floor, cast iron 178 Dry Air Cooler, all-in-rates 85 Dry Risers, all-in-rates 87 Duct Bend, PVC underfloor trunking horizontal 506 vertical 506 Duct Connector, PVC underfloor trunking 506 Ductwork access doors 410 all-in-rates 86 circular ductwork, class B 369 circular polypropylene 380 circular PVC ductwork 378 dampers fire 435 smoke 437 volume control 434 dura duct LT, fire rated 469 fire rated ductwork duct, 2 hr protection 457 duct, 4 hr protection 469 slab, mineral wool 469 flat oval ductwork 373 flexible ductwork 377 rectangular class B, galvanised sheet metal DW rectangular ductwork, class C 411 Dura duct, fire rated ductwork 469 DW144, ductwork 369 DW154, ductwork 378 DX Split Units, split type 367 Earth Cable, 450/750 volt grade, single core 524 Earthing & Bonding, earth bar, polymer insulators 602 Edge Elbow mains busbar 537 rising mains busbar 538 Edge Tee mains busbar 537 rising mains busbar 539 Edge Z Unit, mains busbar 537 Electrical Accessories dimmer switch, push on/off action 570 dimmer switch, rotary action 569 metal clad 570 Electrical Connection 33 Electrical Gang Rates 487 Electrical Installations 487 material cost 127 Electrical Rates of Wages 619 Electrical Supply 490

6 674 Index Elemental Cost airport terminal 101 building management installations 125 business parks 105 data centre 123 distribution centres 122 fit out Cat A 105 hospitals 114 hotels 112 office building 105 performing arts 109 residential affordable 117 residential private 119 school 116 shell and core 117 shopping malls 103 sports hall 111 stadium 113 supermarkets 121 Elemental Rates 73, 78 Elevators, all-in-rates 95 Emergency Central Battery System, supply to luminaires 583 Emergency Lighting 110 volt fluorescent luminaire 582 LED charging light European sign, polycarbonate base & diffuser 582 Enclosed Switch Disconnectors, enclosure minimum IP55 rating 562 End Cap, rising mains busbar 538 End Cover, mains busbar 536 End Feed Unit, rising mains busbar 538 Energy Calculation 4 Energy Meters, ultrasonic, electromagnetic 366 Entertainment and Recreation, RIBA Stage A Feasibility Cost 75 EPC Energy Performance Certificate 8 EPDM, pipes, cast iron 173 Escalators, all-in-rates 100 Expansion Joints angular movement, stainless steel 296 axial movement, stainless steel 295 Extender Cables armoured 534 unarmoured 535 Extender Whip Ended Cables, armoured 534, 536 External Coupling, PVC trunking 503 External Lighting 566 all-in-rates 94 bulkhead, polycarbonate/aluminium body 566 ceiling mounted 566 circular bollard, polycarbonate visor 567 floodlight 567 ground mounted 566 Fabricated Hangers and Brackets, galvanised steel 183 Façade System 37 cost model 39 energy performance 37 impact on M38 Factories 73 fan coil unit system, schematic 43 Fan Coil Units 480 Fans all-in-rates 86 axial flow fans 449 bifurcated 449 centrifugal 451 in-line centrifugal 451 kitchen fans 451 roof fans 450 toilet fans domestic 451 twin extract 450 Feasibility Cost 73 Fibre Optic Cable, tight buffered, LSOH sheathed 595 Fibre Optic Connectors, single & multimode 596 Fibre Patch Leads 596 Filtered Socket Outlet, 13A, separate clean earth terminal, galvanised steel box 573 Filters, air bag 452 carbon, grease 453 panel 453 Fire Control Panels 600 Fire Dampers 434 Fire Detection and Alarm Equipment, all-in-rates 93 fire detection and alarm schematic, schematic 43 Fire Extinguishers, CO2, ABC 252 Fire Hose Reels, automatic; rubber, manual; rubber 244 Fire Hydrants 252 Fire Protection Control Panels 601 Fire Rated Cable 527 Fire Rated Ductwork dura duct LT, rectangular 469 rectangular 457

7 Index 675 Fit out Cat A, elemental cost, office 106 Fittings ABS, water 207 cast iron, EPDM 178 copper pipes 183 gutter, cast iron 142 moulded, cast iron 149 polypropylene waste, push fit 160 Flange Connections, galvanised steel 217 Flanged, connector, galvanised steel 499 Flanged Coupling, PVC trunking 503 Flanges, copper 193 Flat Elbow mains busbar 537 rising mains busbar 538 Flat Tee, rising mains busbar 539 Flat Z Unit, mains busbar 537 Flexible Cable 300 volt grade, 2 core volt grade, 3 core /500 volt grade, 2 core 525 use in high temperature /500 volt grade, 3 core 525 use in high temperature /500 volt grade, 4 core 525 rubber insulated 300/500 volt grade, 2 core /500 volt grade, 3 core /500 volt grade, 4 core /750 volt grade, 2 core /750 volt grade, 3 core /750 volt grade, 4 core 526 Flexible Conduits metallic, PVC covered conduit, not exceeding 1m long 496 PVC conduit, not exceeding 1m long 496 Flexible Ductwork 377 Floor Drains, cast iron 178 Floor Outlet Box single 13A unswitched socket outlet, single compartment 574 twin 13A switched socket outlet 1 blank plate, 3 compartment blank plate, 4 compartment 573 Floor Service Grommet, circular 574 Floor Trunking 497 Flue Supports 263 Flue System Fittings 261 Flue Systems domestic 259 domestic/small commercial 265 flashings & terminals 264 Fluorescent Luminaires batten type, surface mounted 564 surface mounted, opal diffuser 564 Flush Floor Trunking four compartment, galvanised steel 501 triple compartment, galvanised steel 501 Flush Floor Trunking Fittings 501 FP100, 450/750 volt grade, single core 530 FP /500 volt grade, 2 core /500 volt grade, 3 core /500 volt grade, 4 core 531 Frames, floor standing,, vertical cable management 592 Fuel Cells System 21 benefits, types 22 cost comparison 25 markets, cost comparison 23 typical current project cost 24 Fused Switches Heavy Duty 561 Galvanised, heavy gauge, screwed drawn steel 496 Galvanised Steel Trunking 498 Gang rates ductwork 133 electrical 487 mechanical 131 Gas Booster Sets 242 Gas Fire Engine 491 Gauges, temperature and pressure 305 Generating Sets, standby diesel 91 Generators, standby 490 Getting Connection competition 34 costs 35 design 33 network reinforcement 34 planning 33 Glanding off, terminations 531 Grey Water Recycling 11 Grilles air diffusion, plastic 443 exhaust, aluminium 441 floor 441 supply, rectangular 438 Ground Source Heat Pumps 8 Ground Water Cooling 15

8 676 Index GRP Cable Tray 550 GRP Tanks 231 Gutter Fittings, adaptors, angles, stop end, outlets 135 Gutters, cast iron 142 Hangers and Brackets fabricated 246 galvanised steel 362 Heads, rainwater 139 flat 154 Heat Emitters fan convectors 316 perimeter heaters 313 radiant strip heaters 313 radiators flat panel 315 pressed steel 313 trench heating 317 under floor heating 319 unit heaters 352 Heat Exchangers CHW 363 LTHW 312 Heat Pumps 16 Heat Rejection 356 air cooled condensers 357 all-in-rates 85 cooling towers 358 dry air liquid coolers 356 Heater Batteries, local heating units 352 Heaters for Hot Water 238 Heavy Duty Fuse Switches, with HRC fuses 561 Heavy Fittings, galvanised steel 219 Heavy Flexible Cable 450/750 volt grade, 2 core /750 volt grade, 3 core /750 volt grade, 4 core 526 High Impact PVC Heavy Gauge, standard pattern boxes & fittings 496 High Impact PVC Light gauge, standard pattern boxes & fittings 496 High/Low Bay Luminaires compact discharge, aluminium reflector 566 corrosion resistant GRP body, acrylic diffuser 566 flame proof, aluminium body 566 sealed discharge, aluminium reflector 566 Hoists, plant hire 636 Horizontal Bend double compartment, zinc coated underfloor ducting 507 triple compartment, zinc coated underfloor ducting 507 Hose Reels all-in-rates 87 automatic; rubber, manual; rubber 244 Hospitals elemental cost 114 RIBA Stage A Feasibility Cost 74 Hotels elemental cost 112 RIBA Stage A Feasibility Cost 77 RIBA Stage C Feasibility Cost 82 HRC Fused Distribution Boards, IP4X external protection enclosure 559 HV Cables, high voltage 492 HV Circuit Breaker, 3 phase, 11kV 494 HV Intakes 1000Kva to 6000Kva, schematic 43 Industrial Angled Sockets splash proof, A, surface mounted 577 splash proof, A, surface mounted 578 water tight, A, surface mounted 577 water tight, A 579 Industrial Connectors splash proof, A 576 splash proof, A 578 water tight, A 577 water tight, A 579 Industrial Plugs splash proof, A 576 splash proof, A 577 water tight, A 577 water tight, A 578 Inlet Boxes, steel dry riser 245 Insulations ductwork all types/finishes 456 mineral fibre for pipes, concealed 320 pipes closed cell 233 Internal Coupling, PVC trunking 503 intruder detection system (IDS), schematic 43 Inverter, AC static to luminaires 584 IP54 Protection, mains busbar 536 Isolating Switches 561 IT / Data, all-in-rates 87

9 Index 677 JIB (Joint Industry board) 489 JIB Apprentice Training Scheme Rate of Wages London rate, rates with transport provided 620 national standard rate, rates with transport provided 620 JIB Rates of Wages London rate, rates with transport provided 620 national standard rate, rates with transport provided 620 Jointing Sleeve, PVC underfloor trunking 506 Junction Box four compartment, galvanised steel 501 triple compartment, galvanised steel 501 Junction/Terminal Box double compartment, zinc coated underfloor ducting 507 triple compartment, zinc coated underfloor ducting 507 Labour Rates ductwork 131 electrical 487 mechanical 131 Ladder Racks extra heavy duty galvanised steel 542 heavy duty galvanised steel 541 light duty galvanised steel 540 Lamp, T8 564 Leak Detection 365 Leisure Centres, RIBA Stage A Feasibility Cost 75 Lifts all-in-rates 95 good lifts 98 machine room above 95 machine room less 97 Lighting, all-in-rates 93 Lighting Busbar, pre-wired busbar, plug in trunking for lighting 539 Lighting Controls cable, aluminium sheathed 570 lighting control modules 571 presence detectors 571 scene switch plate 571 Lighting Switches 568 Lighting Track single circuit, 25A 2 P567 three circuit, 25A 2 P567 Lightning Protection air rods 604 air terminals 605 bonds and clamps 605 conductor tape 604 earth pits 606 earth rods 606 surge protection 607 Local Planning and Building Regulations 7 Location Factors 71 Lock Equipment 598 Lodging Allowances, nightly rate 615 Louvres acoustic 447 weather 448 Low Impedance Busbar Trunking, straight copper busbar 536 Low Temp Hot Water Pipes extra for black malleable fittings 274 extra over black steel pipes 272 mech grooved steel pipe, fittings 289 plastic (polypropylene) pipe 290 fittings 290 press fit carbon steel pipe 288 fittings 288 screwed BS 1387 steel pipe 268 fittings 269 flanges 272 welded BS 1387 steel pipe 279 fittings 282 flanges 280 welded carbon steel 285 fittings 288 flanges 287 Low Velocity Air Cconditioning, air handling units, supply 476 Low Velocity Air Conditioning, air handling units, supply and extract 476 Luminaires batten 564 bulkhead, 60 watt 566 ceiling recessed asymmetric 564 downlighters 566 emergency 582 external 566 high/low bay 566 surface fluorescent 564 suspended fluorescent 564 wall mounted fluorescent 565 LV Intakes up to 1000Kva, schematic 43

10 678 Index LV Switchboard Busbar, copper busbar 555 LV Switchgear all-in-rates 91 distribution boards 553 Machine room above (MRA) Lift 95 Mains Busbar 536 Major Projects Agreement, employee categories, hourly rate comparisons 617 Malleable Iron Fittings, galvanised steel 220 Manifold Connector, cast iron 176 Manual Call Points 600 Master Distribution Box 6 port, steel port, steel 533 Materials Rates, gang rates, electrical 487 MCB Distribution Boards, IP3X external protection enclosure 558 MCCB Panel Boards 557 MCCB Panelboards feeder MCCBs 558 panelboards 557 Mechanical Installations, material cost 127 Mechanical Rates of Wages 612 Medium Density Polyethylene MDPE (Blue) 203 compression fittings 205 electro fusion fittings 204 MDPE (yellow), gas 239 compression fittings 239 electro fusion fittings 239 Metal Clad Cable BSEN data cable 533 Meters, energy, ultrasonic, electromagnetic 366 Meters Energy CHW 366 LTHW, ultrasonic 320 MIDEL Transformer, gasket-sealed steel tank 495 Miniature Circuit Breakers, For distribution boards 559 Modular Recessed, T8 lamp 565 Modular Recessed Compact Fluorescent, TCL lamp 565 Modular Recessed, Linear Fluorescent, high frequency control gear 564 Modular Wiring 533 Moulded Case Circuit Breakers MCCB 36 ka fault rated 555 MCCB 45 ka fault rated 555 MCCB 70 ka fault rated 555 MCCB 150 ka fault rated 554 MRL (Machine Room less) Lift, all-in-rates 95 networked lighting control system, schematic 43 Nipple, capillary fittings 187 Non-Standard Socket Outlet, 13A, separate clean earth terminal, galvanised steel box 573 Office building, elemental cost 105 Offices 73 RIBA Stage C Feasibility Cost 80 Offset, mains busbar 537 Ogee Gutters, PVC-U 138 Open Loop System 15 Outlet Boxes, steel dry riser 245 Outlets rainwater 137 roof 141 small power 572 Overflow, bath 162 P-traps 173 Packaged Steam Boilers, gas/oil fired 267 Part L Building Regulations 3 Passenger lifts, all-in-rates 95 Patch Panels 19 wide, finished in black 593 voice 19 wide, finished in black 588 Performing Arts, elemental cost 109 Performing Arts Centre, RIBA Stage A Feasibility Cost 75 Photovoltaic (PV) 8 Photovoltaic Building Integrated (BIPV) 8 Pipe Clips copper pipes (CHW) 362 galvanised steel, plastic coated steel 163 metal fixing 158 Pipe Freezing, carbon steel, copper 319 Pipe in Pipe (Gas) 240 Pipeline Fittings, steel pipes 246 Pipes ABS waste 158 water 207 all-in-rates 85 black steel 279 screwed chilled water 361

11 Index 679 screwed LTHW 268 welded chilled water 361 welded LTHW 279 black steel screwed, gas 240 carbon steel 285 cast iron 151 soil EPDM rubber joints 173 copper, cold water 181 copper (plastic coated) 241 capillary fittings 241 galvanised steel 213 galvanised steel, heavy 213 galvanised steel, medium 213 low temp hot water extra for black malleable fittings 274 extra over black steel pipes 272 mech grooved steel pipe 289 plastic (polypropylene) pipe 290 press fit carbon steel pipe 288 screwed BS 1387 steel pipe 268 welded BS 1387 steel pipe 279 welded carbon steel 285 MDPE blue 203 yellow 239 MDPE (yellow), gas compression fittings 239 electro fusion fittings 239 mechanical grooved 289 MuPVC, plastic 155 polypropylene for LTHW 290 thermally fused joints 290 prefabricated black steel 246 press fit 288 carbon steel 288 stainless steel 202 PVC-C for cold water 212 PVC-U dry push fit joints 138 solvent welded joints 141 sprinkler, victaulic 248 stainless Steel 198 steel welded 241 Pipes Black Steel, sprinkler pipes & fittings, welded 246 PIR, access control 598 Plant Charges 633 Plant Hire Costs compaction equipment 639 concrete equipment 639 construction vehicles 637 excavators & loaders 638 hoists 636 lifting appliances and conveyors 634 pumps 634 scaffolding, shoring & fencing 634 site accommodation 640 site equipment 641 small tools 643 testing equipment 639 Plastic Ductwork, circular 378 Plug for Weatherproof socket outlet, protected to IP Plumbers Welding Supplement 618 Polypropylene, pipes, push fit joints 160 Power Factor Correction 556 Power Pole, aluminium painted 574 Power Post, aluminium painted, UPVC 574 Pressure Reducing Valves (PRV), steam 351 Pressurisation Units CHW 364 LTHW 306 Pumps accelerator 311 all-in-rates 86 belt drive CHW & LTHW 307 circulator 311 close coupled 309 glandless domestic 310 pressurisation cold water 229 sump 229 twin head belt drive 308 variable speed 309 Push Button Stations, heavy gauge pressed steel, polycarbonate cover 562 PV Photovoltaic 8 PVC Bench Trunking, white / grey finish 505 PVC Fittings, PVC-u (cold water) 210 PVC Miniature Trunking compartmented, white finish 505 single compartment, white finish 505 PVC Miniature Trunking Fittings 505 PVC Underfloor Trunking, single compartment 506 PVC-C, PVC-u (cold water) 212 Radio Frequency Cable, PVC sheathed, laid loose 589 Rain Water Harvesting 11 Rates and Wages 619

12 680 Index Rates of wages hourly rates of wages, heating, ventilation 612 hourly rates of wages, main grades, plumbing, mechanical 616 mechanical 612 plumbing 617 trainee hourly rates of pay 613 RCD Protected Socket Outlet, 13A, galvanised steel box 573 Recessed Downlighter, reflector with white/ chrome bezel 566 Regional Variations 71 Renewable Energy 7 Renewable Energy Options biomass boilers 8 borehole cooling 8 building integrated photovoltaic (BIPV) 8 combined heat and power (CHP) 8 ground source heat pumps 8 investment yield table 8 solar water heating 8 wind generators 8 Residential affordable, elemental cost 117 Residential Buildings, RIBA Stage C Feasibility Cost 84 Residential Private, elemental cost 119 Residual Current Circuit Breakers, For distribution boards 559 Responsibility Allowance hourly rates of wages, Craftsmen 613 hourly rates of wages, senior craftsmen 613 weekly rates of credit 622 Retail, RIBA Stage A Feasibility Cost 75 reverse cycle heat pump, schematic 43 RIBA Stage A Feasibility Cost 73 commercial research 76 day care unit 74 distribution centres 73 factories 73 health and welfare facilities 74 hospitals 74 hotels 77 office buildings 73 recreation buildings 75 retail buildings 75 schools 76 supermarkets 76 warehouses 73 RIBA Stage C Feasibility Cost hotels 82 offices 78 residential 84 Ring Main Unit, 3 phase, 11kV, 630A 494 Rising Bend double compartment, zinc coated underfloor ducting 507 four compartment, galvanised steel 501 triple compartment galvanised steel 501 zinc coated underfloor ducting 507 Rising Mains Busbar, straight aluminium bar 538 Roof Outlets, PVC-U 141 Roof Vent Connector 177 Roses, ceiling 570 Scaffolding, plant hire 634 School, elemental cost 116 Scientific Buildings, RIBA Stage A Feasibility Cost 76 Semi Recessed Linear Fluorescent, T5 lamp 565 Service Outlet Module 3 compartment compartment 502 Shaver Sockets 250 voltage supply, white moulded plastic 575 dual voltage supply, white moulded plastic 575 Sheet Steel Adaptable Boxes black rectangular pattern 510 black square pattern 509 galvanised rectangular pattern 510 galvanised square pattern 510 Shell and Core, elemental cost 117 Shopping Malls elemental cost 103 RIBA Stage A Feasibility Cost 75 Single Compartment PVC Trunking, grey finish, clip on lid 502 Single Compartment PVC Trunking Fittings 502 Single Compartment Trunking, jointed with standard connectors, galvanised steel 497 Small Power, all-in-rates 92 Socket Outlet switched, 13A metal clad, 1 & 2 gang 572 unswitched, 13A metal clad, 1 & 2 gang 572 Socket Plate, PVC bench trunking 506

13 Index 681 Socket Reducer, PVC underfloor trunking 506 Soil and Waste Pipes cast iron pipes, rubber gasket joints 170 PVC-U 167 Solar Water Heating 8 Sounders 600 Split Systems, for heating & cooling 367 Splitters, 5 Wire 535 Sports Hall elemental cost 111 RIBA Stage A Feasibility Cost 75 Sprinkler Alarms/Gongs 249 Sprinkler Fixings 246 Sprinkler Heads 249 Sprinkler Systems, all-in-rates 87 Sprinkler Tanks 250 Sprinkler Valves 249 Stadium, elemental cost 113 Stage A RIBA 73 Stage C RIBA 78 Stainless Fittings, compression fittings 201 Stainless Steel Pipes 198 capillary fittings 199 press fit fittings 198 Standby Generators 490 standby power system, schematic 43 static UPS System, schematic 43 Steam Strainers 349 Steam Traps cast iron 349 stainless steel 349 Stop End double compartment, zinc coated underfloor ducting 507 four compartment, galvanised steel 501 galvanised steel 498 PVC bench trunking 505 PVC miniature trunking 505 PVC trunking 503 triple compartment galvanised steel 501 zinc coated underfloor ducting 507 Stopcocks, copper 227 Strainers 302 steam 349 Supermarkets elemental cost 121 RIBA Stage A Feasibility Cost 76 Support, cast iron, pipe spacer 151 Supports and Brackets, ductile iron, mild steel 174 Surface Mounted, Linear Fluorescent, T8 lamp 564 Surveillance Equipment 599 all-in-rates 87 Suspended Linear Fluorescent, T5 lamp 565 Sustainability Technology 7 Switch Disconnectors 562 moulded plastic enclosure 576 steel sheet case 561 Switched Modules, armoured cable 535 Switches 6A modular type switch 568 galvanised steel box, 1 way 568 galvanised steel box, 2 way, 568 6A, watertight switch A, splash proof moulded switch A, watertight switch 569 architrave plate switch, 6A, white plastic 569 ceiling switch, white moulded plastic 569 plate switch, 6A flush mounted, white plastic 569 plate switch, 10A flush mounted, white plastic 568 Switches/ Sensors, pressure devices 608 Switches/Sensors, temperature devices 608 Switchgear, HV 494 Synchronisation Panels (for generators) 490 T Connectors, snap fix 534 Tanks, overflow 162 Tanks and Cisterns cold water storage tanks sectional GRP 231 sectional steel 230 fuel oil storage tanks; steel, fuel storage tanks; plastic 243 moulded glass fibre cisterns 230 polypropylene cisterns 230 sprinkler tanks sectional GRP 250 sectional steel 250 Tap Off, mains busbar 537 Tap-Off Units lighting busbar 539 rising mains busbar 539 Tee, Flat Cover, PVC trunking 504 Tee, Internal/External Cover, PVC trunking 504 Tees double compartment, galvanised steel 500 PVC miniature trunking 505

14 682 Index single compartment, galvanised steel 500 triple compartment, galvanised steel 500 Telecommunications Cables, multipair internal telephone cable Installed in conduit/trunking 587 laid on tray/basket 587 Telephone Outlet bronze or satin chromeplate and box 588 moulded plastic plate and box 588 Television Aerial Cable, coaxial, PVC sheathed 589 Terminal Strips, 20A high density polythene 497 Terminations 600/1000 volt grade, 2 core, galvanised steel wire armour 515, /1000 volt grade, 3 core, galvanised steel wire armour 515, /1000 volt grade, 4 core, galvanised steel wire armour 516, /1000 volt grade, 7 core, galvanised steel wire armour 516, /1000 volt grade, 12 core, galvanised steel wire armour 516, /1000 volt grade, 19 core, galvanised steel wire armour 516, /1000 volt grade, 27 core, galvanised steel wire armour 517, /1000 volt grade, 37 core, galvanised steel wire armour 517, /1000 volt grade, single core, aluminium wire armour 515, 521 glanding off 2 core core core 531 high voltage 492 Terminations,, Glanding off 2 core core core 532 Thermal Insulation ductwork 457 extra over concealed insulation fittings 320 extra over external insulation fittings 337 mineral fibre for pipes external 337 plant room 326 pipes closed cell 233 plant room insulation fittings 326 Thermostat, room thermostats 346 Thermostats 346 Top Feeder Unit, rising mains busbar 538 Trace Heating System 363 Transfer Switches 556 Transformer HV 494 oil filled, free breathing tank 495 Transformers cast resin air natural 495 temperature controlled fans 495 gasket-sealed steel tank 495 MIDEL 495 step down 495 Traps, polypropylene 161 Travelling & Time Allowances London rate, daily travelling allowance 621 national standard rate, daily travelling allowance 621 Tray GRP 550 heavy duty galvanised steel, BS light duty galvanised steel, BS medium duty galvanised steel, BS mild steel cable basket, zinc plated 551 Trench heating, natural convection type 317 Triple Compartment Trunking, jointed with standard connectors, galvanised steel 498 Tripping Batteries, battery chargers, valve regulated lead acid battery 494 Trunking 497 bends 90 double compartment 499 single compartment 499 triple compartment 499 black enamelled, heavy gauge, 496 body coupler, 3 and 4 compartment, 502 crossovers double compartment 501 single compartment 500 triple compartment 501 dado/skirting 507 double compartment, jointed with standard connectors 497 flanged connector, galvanised steel 499 flexible conduits, metallic, PVC covered conduit 496 floor 501 flush floor, triple compartment 501 galvanised, heavy gauge, 496

15 Index 683 galvanised steel 498, 501 high Impact PVC heavy Gauge, standard pattern boxes & fittings 496 high Impact PVC light gauge, standard pattern boxes & fittings 496 junction box four compartment 501 triple compartment 501 PVC 502 rising bend four compartment 501 triple compartment 501 service outlet module 3 compartment compartment 502 stop end four compartment 501 galvanised steel 498 triple compartment 501 tees double compartment 500 single compartment 500 triple compartment 500 triple compartment, jointed with standard connectors 498 underfloor 506 Tubular Fittings, galvanised steel 218 TV Socket Outlet, moulded plastic box, flush/ surface mounted 590 Typical Engineering Details cost information 44 cost information w/ reinforcement 45 cost information w/ substation reinforcement 46 urban network underground 44 urban network underground w/ reinforcement 45 urban network underground w/ substation reinforcement 46 Typical Schematic, engineering details 43 Un-Armoured Cable 523 Underfloor Busbar, pre-wired busbar, plug in trunking for power 540 Underfloor Ducting double compartment 507 fittings 507 triple compartment 507 Underfloor heating 319 Uninterruptible Power Supply integral diesel rotary, 3 phase 581 large size static, 3 phase, 10 year battery 580 medium size static, 1 phase, 10 year battery 580 medium size static, 3 phase, 10 year battery 580 single phase, 5 year battery, standard 13A socket outlet 580 UPS 580 urban network Mainly Underground, schematic 43 urban network with reinforcement, schematic 43 urban network with substation reinforcement, schematic 43 Valve ancillaries, steam heating system 349 Valves automatic air vent 304 ball float valves 225 ball valves 297 bronze/gunmetal inlet 245 check valves 299 check valves DZR 228 cocks 226, 304 commissioning valves 300 control valves 303 gate valve DZR 227 gate valves DZR 296 gates 226 glove valves 298 isolating 296 pressure reducing 351 radiator valves 306 regulators 302 safety and relief valves 303, 351 stopcocks 226, 304 strainers 349 variable air volume (VAV), schematic 43 variable refrigerant volume (VRV), schematic 43 VAV Variable Air Vol System, terminal units 479 Vertical Access Box, 2 Compartment, PVC underfloor trunking 506 Vertical Multi Compartment Pillar, UPVC 574 Vertical Transport, all-in-rates 95 Video Cable, PVC flame retardant sheathed, laid loose 590 VRF Units, refrigerant 367

16 684 Index Wages, hourly rates of wages 612 Wall Mounted Compact Fluorescent, TCL lamp 565 Wall Spacer, cast iron 174 Warehouses 73 Water Heater (Electric) 238 Water Heater Switch, switched with neon indicator 575 Water Installations, all-in-rates 85 Water Treatment 232 Weatherproof Junction Boxes glassfibre reinforced polycarbonate 563 sheet steel with zinc spray finish 563 Weekly Holiday Credit & Welfare Contribution employee grades of entitlement 614 rates 614 Weekly Holiday Credit Contributions 618 Wind Generators 8 Work Station, data outlet 594

Index Above Ground Drainage brackets, cast iron 228 pipes, PVC-U 211 ABS pipe & Solvent Weld Fittings 270 AC Static Inverter System, AC power supply t

Index Above Ground Drainage brackets, cast iron 228 pipes, PVC-U 211 ABS pipe & Solvent Weld Fittings 270 AC Static Inverter System, AC power supply t Index Above Ground Drainage brackets, cast iron 228 pipes, PVC-U 211 ABS pipe & Solvent Weld Fittings 270 AC Static Inverter System, AC power supply to luminaires 706 Access control alarm contact flush

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

MEP Syllabus CAREER DEVELOPMENT CENTRE SHRISTI MEP. Trichy-26

MEP Syllabus CAREER DEVELOPMENT CENTRE SHRISTI MEP. Trichy-26 SHRISTI MEP CAREER DEVELOPMENT CENTRE Trichy-26 MEP Syllabus Contact : dhinesh.shristimep@gmail.com / sangeetha.shristimep@gmail.com +91-80984 49847, 97158 67493 ELECTRICAL DESIGNING AND DRAUGHTING FUNDAMENTALS

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

Operating Performance

Operating Performance INFORMATION SHEET 1 Jackson Engineering Advisers are specialist Building Services Engineers. This information sheet is offered as an aid to Building Owners and Managers as a guide to plant life expectancies.

More information

Assessment Schedule - TS.6

Assessment Schedule - TS.6 The Assessor shall determine the business s commitment and support to good and safe working practices; also that it has a positive culture in all aspects of its work. In particular, the assessor shall

More information

ADVANCE ELECTRICAL MEP CONTRACTING TRADING SERVICES

ADVANCE ELECTRICAL MEP CONTRACTING TRADING SERVICES ADVANCE ELECTRICAL MEP CONTRACTING TRADING SERVICES ABOUT US Quality products, exceptional service and quick delivery of a diverse product line are the foundation of our company. By leveraging the portfolio

More information

HOME INSPECTION CHECKLIST

HOME INSPECTION CHECKLIST HOME INSPECTION CHECKLIST Date: Page 1 of 9 Client Name: Address: Tel No: Surname: Email: A WATER METER 1 Is the water meter visible YES NO 2 Water meter registers when water is drawn YES NO 3 Water meter

More information

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

DIVISION 15 MECHANICAL

DIVISION 15 MECHANICAL DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with

More information

If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option.

If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option. Air handling units Aesthetic Not to add significantly to the existing ambient noise levels. Functional requirements If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally

More information

SCHEDULE OF RATES SHEET PRELIMINARIES

SCHEDULE OF RATES SHEET PRELIMINARIES Page : 1 PRELIMINARIES 1 CONTAINER BUDGET ALLOWANCE 1,100.00 1,100.00 1 SUPERVISION 3,900.00 3,900.00 1 ACCOMMODATION 5,390.00 5,390.00 1 TRAVEL ALLOWANCE 7,800.00 7,800.00 Sub- 18,190.00 18,190.00 Page

More information

SECTION 1.02 DETAILED SCOPE OF WORK

SECTION 1.02 DETAILED SCOPE OF WORK SECTION 1.02 DETAILED SCOPE OF WORK 1.02.1 General 1.02.1.1 Introduction... 3 1.02.1.2 General description of the works... 4 1.02.1.3 Design criteria... 5 1.02.2 Public Health Services 1.02.2.1 Mains cold

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

Port of Portland Conveying Equipment Guidelines

Port of Portland Conveying Equipment Guidelines Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate

More information

(Notices) EUROPEAN COMMISSION

(Notices) EUROPEAN COMMISSION 14.8.2012 Official Journal of the European Union C 245/1 IV (Notices) NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION Commission communication in the framework

More information

EXPRESSION OF INTEREST (EOI) FOR. Fire Fighting System (FFS)

EXPRESSION OF INTEREST (EOI) FOR. Fire Fighting System (FFS) EXPRESSION OF INTEREST (EOI) FOR Fire Fighting System (FFS) KWtE-03-PR-EO-ACC-0 Rev01 11 Version: Date: Prepared by: Approved: 01 7/11/18 VMC AMN Page 1 OF 5 1 Project overview ACCIONA s Engineering, Procuring

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to define the general installation and minimum product

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate

More information

NES. What s New June Contents: Detailed Technical guidance. Work section updates. (key points)

NES. What s New June Contents: Detailed Technical guidance. Work section updates. (key points) Contents: Section 1. Section 2. Section 3. Section 4 SUMMARY DETAIL OF WORK SECTION UPDATES & AUDITS SCHEDULES DETAIL CHANGES TO REFERENCE DOCUMENTS A full record of the content revisions can be obtained

More information

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer Technical Development Program PRESENTED BY: COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Ray Chow Sales Engineer TDP Updates Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section

More information

Oakdale Primary School Expansion Project Appendix C Elec Equipment Schedule

Oakdale Primary School Expansion Project Appendix C Elec Equipment Schedule Oakdale Primary School Expansion Project Appendix C Elec Equipment Schedule HBS-SH-MEP-803 May 2017 For Peterborough City Council ver. author date checked comment P1 DH 19-05-17 TJC TENDER ISSUE 1 Ref

More information

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International

More information

TRIMAX ASIA ENGINEERING & CONSTRUCTION (PG U )

TRIMAX ASIA ENGINEERING & CONSTRUCTION (PG U ) TRIMAX ASIA ENGINEERING & CONSTRUCTION (PG0176866-U ) FIRE PROTECTION EQUIPMENTS PARTS CATALOGUE TRIMAX ASIA ENGINEERING & CONSTRUCTION No. 24, Jalan Pantai, 12000 Butterworth, Penang, Malaysia. Fax: +6

More information

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes). Guide Specifications PART 1 GENERAL 1.01 SYSTEM DESCRIPTION Microprocessor controlled, air-cooled liquid chiller utilizing scroll compressors, low sound fans, hydronic pump system and optional fluid storage

More information

Centeral Station Air Handling Unit

Centeral Station Air Handling Unit Centeral Station Air Handling Unit CA Series www.windind.com www.windind.com The product range includes double skinned Air Handling Units, double skinned Fan Coil Units, and custom designed packaged roof

More information

PROPOSED NEW BUILDING

PROPOSED NEW BUILDING HYDRAULIC DRAWINGS MATERIALS SERVICES TO BE CONSTRUCTED FROM MATERIAL AS LISTED BELOW UNLESS NOTED OTHER WISE SHOWN ON DRAWINGS. SERVICE MATERIAL REMARKS SEWER DRAINAGE upvc SOLVENT WELDED JOINTS SEWER

More information

1 WATERMARK CERTIFICATION SCHEME SCHEDULE OF PRODUCTS This document was adopted 1 August 2017 and replaced the WaterMark Schedule of Specifications

1 WATERMARK CERTIFICATION SCHEME SCHEDULE OF PRODUCTS This document was adopted 1 August 2017 and replaced the WaterMark Schedule of Specifications 1 WATERMARK CERTIFICATION SCHEME SCHEDULE OF PRODUCTS This document was adopted 1 August 2017 and replaced the WaterMark Schedule of Specifications Product type Application Specification Appliances Bedpan

More information

LABOUR RATES FOR PLUMBING CONTRACTORS. A guide to the labour costs of plumbing works LABOUR RATES FOR PLUMBING CONTRACTORS

LABOUR RATES FOR PLUMBING CONTRACTORS. A guide to the labour costs of plumbing works LABOUR RATES FOR PLUMBING CONTRACTORS LABOUR RATES FOR PLUMBING CONTRACTORS A guide to the labour costs of plumbing works MORE MONEY IN YOUR POCKET September 06-1 - Increasers Labour Time Required In Hours DURAVENT STYLE INCREASER 75-100MM

More information

Design Standards Manual

Design Standards Manual Design Standards Manual Table of Contents: Part III (Divisions 1-32) Section No. Title Revision DIVISION 1: GENERAL REQUIREMENTS 01524 Construction Waste Management 05/07 01815 HVAC Commissioning Requirements

More information

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department SOUTH DUBLIN COUNTY COUNCIL Roads (Traffic and Transportation) Department TECHNICAL SPECIFICATION 4 SDCC-TS-04 SIGNAL INSTALLATION REQUIREMENTS REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF TRAFFIC CONTROL

More information

TECHNICAL AND USER REQUIREMENTS FOR FIRE-FIGHTING PRESSURE HOSES FOR FIRE-FIGHTING PUMPS

TECHNICAL AND USER REQUIREMENTS FOR FIRE-FIGHTING PRESSURE HOSES FOR FIRE-FIGHTING PUMPS Centrum Naukowo Badawcze Ochrony PrzeciwpoŜarowej (Scientific and Research Centre for Fire Protection) Nadwiślańska 213, 05-420 Józefów, Poland Telephone (+48) 22 789 11 11 Fax.: (+48) 22 769 33 45 e-mail:

More information

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Product Test Centre 15 Progress Road Eastwood Leigh-on-Sea Essex SS9 5JA Contact: Mr S Bailey Tel: +44 (0)1702 425738 E-Mail: stuart.bailey@honeywell.com

More information

Special Provision No. 683S28 December 2017

Special Provision No. 683S28 December 2017 FIBRE OPTIC COMMUNICATION CABLES, AERIAL ON MESSENGER CABLE - Item No. FIBRE OPTIC COMMUNICATION CABLES, AERIAL ON MESSENGER CABLE (TEMPORARY) - Item No. Special Provision No. 683S28 December 2017 1. SCOPE

More information

Manual / Handbuch Spare parts list / Ersatzteilliste

Manual / Handbuch Spare parts list / Ersatzteilliste Manual / Handbuch Spare parts list / Ersatzteilliste Equipment Imp.-Exp. GmbH Zitterpappelweg 9 D - 22391 Hamburg Tel.: + 49 40 60009468-0 Fax: + 49 40 536 75 01 E - M a i l : i n f o @ w e s c o - n a

More information

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes WARM WATER UNDERFLOOR HEATING SYSTEMS Guidance Notes 02 WARM WATER UNDERFLOOR HEATING SYSTEMS Introduction Underfloor heating systems consist of a series of pipes which are integrated into the floor structure

More information

Powerstock Storage Tank

Powerstock Storage Tank Powerstock Storage Tank Models ST300, ST500, ST750 & ST1000 INSTALLATION, COMMISSIONING AND SERVICING INSTRUCTIONS THE POWERSTOCK STORAGE TANK IS INTENDED FOR USE AS A COMMERCIAL APPLIANCE. PUBLICATION

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett

More information

ECONOBOOST EB II & EB III Compact Water Booster

ECONOBOOST EB II & EB III Compact Water Booster ECONOBOOST EB II & EB III Compact Water Booster The Stokvis EB II twin pump & EB III triple pump cold water booster units meet today s need for compact, reliable, high performance equipment with modest

More information

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University. 15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.

More information

EDS SUBSTATION ELECTRICAL SERVICES

EDS SUBSTATION ELECTRICAL SERVICES Document Number: EDS 07-1119 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 07-1119 SUBSTATION ELECTRICAL SERVICES EPN, LPN, SPN This standard specifies the electrical services requirements including

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No.

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No. BILL 1 GROUND FLOOR Supply, Deliver, Install, Set to Work and Commission the Following: 1.01 Lighting point completely wired in 3x1.5mm² single core PVC insulated copper cables drawn in 20mm diameter HG

More information

CONTROLLED GOODS AND THE APPLICABLE SAFETY STANDARDS PART I DOMESTIC OR HOUSEHOLD APPLIANCES AND SIMILAR ELECTRICAL APPLIANCES

CONTROLLED GOODS AND THE APPLICABLE SAFETY STANDARDS PART I DOMESTIC OR HOUSEHOLD APPLIANCES AND SIMILAR ELECTRICAL APPLIANCES CONTROLLED GOODS AND THE APPLICABLE SAFETY STANDARDS PART I DOMESTIC OR HOUSEHOLD APPLIANCES AND SIMILAR ELECTRICAL APPLIANCES 1 Hair Dryers 8516.31 MS IEC 60335-2-23 Household and similar electrical appliances-

More information

Fill Point, Level Gauges, and Control Range

Fill Point, Level Gauges, and Control Range Fill Point, Level Gauges, and Control Range Page 1 Contents Fill Points, Level Gauges, and Control Equipment... 3 Fill Point Cabinets... 4 Single Tank Cabinet... 5 Twin Tank Cabinet... 6 Three Tank Cabinet...

More information

CADDY CORPORATION. Utility Distribution Systems

CADDY CORPORATION. Utility Distribution Systems Food Service Equipment Air Systems Utility Distribution Systems page 1 of 2 Equipment Specifications General Specifications Caddy Corporation of America Energy Distribution and Management System, which

More information

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI Hydraulic Institute Standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION HYDRONIC PIPING AND SPECIALTIES

SECTION HYDRONIC PIPING AND SPECIALTIES SECTION 15511 HYDRONIC PIPING AND SPECIALTIES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Pipe Materials. 2. Fittings. 3. Specialty Items. 4. Glycol Antifreeze Protection. 5. Process Cooling B.

More information

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model BWXP OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER Electric Heater Company Base Model "BWXP" HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203)

More information

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager. B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

SECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM

SECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM PART 1 GENERAL 1.01 SUMMARY SECTION 15371 KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM A. Section Includes: A complete wet chemical automatic fire suppression system for the exhaust hood, including necessary

More information

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA Tel: TENDER NO: TTU/T/01A/

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA   Tel: TENDER NO: TTU/T/01A/ TAITA TAVETA UNIVERSITY P.O.BOX 635-80300, VOI, KENYA EMAIL: procurement@ttu.ac.ke; Tel: 020 8150257 TENDER NO: TTU/T/01A/2017-2018 CONSTRUCTION OF PROPOSED ADMINISTRATION BLOCK- TAITA TAVETA UNIVERSITY

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

SECTION DUCTWORK

SECTION DUCTWORK PART 1 GENERAL 1.1 REFERENCES SECTION 23 31 00 DUCTWORK A. ASHRAE - Handbook, Duct Design B. ASHRAE - Handbook, Duct Construction C. ASTM A90/A90M - Standard Test Method for Weight (Mass) of Coating on

More information

PARTS MANUAL. American Dish Service ADS CONVEYOR DISHWASHER MODELS: ADC-44 L-R/R-L EFFECTIVE: SEPTEMBER 1, 2001

PARTS MANUAL. American Dish Service ADS CONVEYOR DISHWASHER MODELS: ADC-44 L-R/R-L EFFECTIVE: SEPTEMBER 1, 2001 EFFECTIVE: SEPTEMBER 1, 2001 ADS CONVEYOR DISHWASHER MODELS: ADC-44 L-R/R-L PARTS MANUAL 900 Blake Street Edwardsville, Kansas 66111 (913)422-3700 211-0044L-R / 212-0044R-L ADC-44 Conveyor Dishwasher 2

More information

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior

More information

PLEASE READ ALL SECTIONS OF THIS GUIDE BEFORE COMMENCING YOUR INSTALLATION AND IN CONJUNCTION WITH YOUR DRAWINGS.

PLEASE READ ALL SECTIONS OF THIS GUIDE BEFORE COMMENCING YOUR INSTALLATION AND IN CONJUNCTION WITH YOUR DRAWINGS. Installation Guide This information is provided as a guide and may differ from project to project. It is assumed that the property is a two storey dwelling. Obviously a bungalow represents a simpler task,

More information

PRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM

PRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM ANNEXUREIII D: FIRE PROTECTION SYSTEM SECTION ADDRESSABLE FIRE DETECTION AND ALARM SYSTEM Supply, Installation, testing and commissioning of Analogue Addressable Fire Alarm Control panel with battery backup

More information

BOILER HOUSE PRODUCTS GMS

BOILER HOUSE PRODUCTS GMS GMS BOILER HOUSE PRODUCTS Contents Page 2 Introduction 3 Condensate Pumpsets 6 Blowdown Vessels 8 Boiler Feed Tanks Page 10 Chemical Dosing Pots 11 Vent Heads 11 De-Aerator Heads Introduction to Boiler

More information

RESEARCH AND TECHNOLOGY BUILDING RENOVATION 05/18/09 SECTION REFRIGERANT PIPING AND SPECIALITIES

RESEARCH AND TECHNOLOGY BUILDING RENOVATION 05/18/09 SECTION REFRIGERANT PIPING AND SPECIALITIES SECTION 23 23 00 REFRIGERANT PIPING AND SPECIALITIES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Refrigerant piping. 2. Unions, flanges, and couplings. 3. Pipe hangers and supports. 4. Refrigerant

More information

Centrifugal, tank pump designed to remove condensate water from air conditioners, refrigeration equipment, gas boilers and de-humidifiers. Engineered with contractor input and Little Giant quality, the

More information

COMPACT 3020 HE COMBI BOILERS

COMPACT 3020 HE COMBI BOILERS Alde UK Price List NB: Parts shown in catalogue but not listed below are special order only. RETAIL PRODUCTS 4070 120 8 RETAIL PRE MIXED G13 SPEC ANTIFREEZE 1 L BOTTLE (324 PACK) 2,673.00 3207.60 4070

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 22 23 STEAM CONDENSATE PUMPS SPEC WRITER NOTES: 1. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

User Information Sheet 008 : 2010

User Information Sheet 008 : 2010 User Information Sheet 008 : 2010 Formerly UIS008, July 2009 ELECTRICAL INSTALLATIONS ASSOCIATED WITH BULK LPG INSTALLATIONS 1. Introduction This Information Sheet describes some of the principles and

More information

TECHNICAL. Series 18. Pump Packages

TECHNICAL. Series 18. Pump Packages TECHNICAL S Y S T E M S Series 18 Pump Packages Series 18 Pump Packages Standard Features Close-coupled, end-suction, centrifugal pumps Mounted and wired pump starters Hand-Off-Auto switch for each pump

More information

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements. FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment

More information

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500 Unvented Calorifier Range. Operating and Maintenance Manual. For Models 125 300 & 500 Telephone 08456 448802 Fax 08456 448803 Emial info@mhgheating.co.uk Web www.mhgheating.co.uk TABLE OF CONTENTS. Section

More information

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 Building Services Piping. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013 SECTION 15800 - AIR HANDLING EQUIPMENT 1.1 GENERAL A. All air handlers installed shall conform to the University of Rochester specification Guideline for Semi-Custom and Pre-Engineered Air Handling Units.

More information

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD.

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. (A Wholly Owned Subsidiary of SBI) CIRCLE OFFICE: 4TH FLOOR, SBI LOCAL HEAD OFFICE III/1-PANDIT J N MARG, KHARAVELA NAGAR BHUBANESWAR, ODISHA-751001 Part-II PRICE

More information

Contents The IET Regulations, BS 7671, and this Guide 1.1 The need for this Electrician s Guide 1.2 The IET Regulations BS 7671

Contents The IET Regulations, BS 7671, and this Guide 1.1 The need for this Electrician s Guide 1.2 The IET Regulations BS 7671 Contents 1 The IET Regulations, BS 7671, and this Guide 1 1.1 The need for this Electrician s Guide 1 1.2 The IET Regulations BS 7671 2 1.2.1 International basis 2 1.2.2 The Seventeenth Edition 3 1.2.3

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings. SECTION 15481 COMPRESSED AIR SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe and pipe fittings, including valves, unions and couplings. B. Air compressor. C. After cooler. D. Refrigerated air dryer.

More information

Telecity. Table of Contents. Page. Section 3.2

Telecity. Table of Contents. Page. Section 3.2 1 3.2 System Descriptions Table of Contents 3.2 SYSTEM DESCRIPTIONS... 3 3.2.1 General Notes... 3 3.3 Power Distribution MV... 4 3.3.1 Incoming Supply... 4 3.3.2 MV Switch room... 4 3.4 Power Distribution

More information

Paragon. Induced Draft, Counter Flow Optional Accessories

Paragon. Induced Draft, Counter Flow Optional Accessories ANTIFREEZE PACKAGE / RESISTANCE HEATING OPTION The antifreeze package is supplied to provide protection against freezing of standing water in the cooling tower sump due to shutdown during winter operation.

More information

Fan-and-filter units 4.3. Features. Fast assembly. Application diversity and functions

Fan-and-filter units 4.3. Features. Fast assembly. Application diversity and functions Fan-and-filter units Features Fan-and-filter units are ideal for dissipating heat loads costeffectively. The pre-requisite is that the ambient air must be relatively clean and with a temperature below

More information

ESSAY: This will be a written paper of 6 essay questions. Candidates are to answer 5 questions in 2 hours for 60 marks.

ESSAY: This will be a written paper of 6 essay questions. Candidates are to answer 5 questions in 2 hours for 60 marks. 260 PLUMBING AND PIPE FITTING Examination Structure The examination for this syllabus will cover three major areas of groupings with 193 Building Engineering and 191 General Metal Work as trade-related

More information

CABINET PARTS For Model: KSSS48QJX00 (Stainless Steel)

CABINET PARTS For Model: KSSS48QJX00 (Stainless Steel) CABINET PARTS 48" BUILT IN REFRIGERATOR 10 02 Litho In U.S.A. (mek) 1 Part No. 1 LITERATURE PARTS LIT2209249 Use & Care Guide LIT2006651 Energy Label LIT2006748 Service & Wiring Sheet LIT628370 Modular

More information

(Publication of titles and references of harmonised standards under Union harmonisation legislation) (Text with EEA relevance) (2017/C 298/02)

(Publication of titles and references of harmonised standards under Union harmonisation legislation) (Text with EEA relevance) (2017/C 298/02) C 298/14 EN Official Journal of the European Union 8.9.2017 Commission communication in the framework of the implementation of Directive 2014/35/EU of the European Parliament and of the Council on the

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD INSTALLATION OF COMMERCIAL FIRE SPRINKLER SYSTEMS STANDARD #C-001 EFFECTIVE 03-25-2009 PURPOSE: To ensure that sprinkler plans submitted for review contain

More information

VSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation.

VSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation. Brochure# 228E 122011 TYPE VSA SEWAGE PUMP Capacities to 100 gpm, Heads to 120, Horsepower range 3/ thru 0, 3 thru discharge, 1750 and 1150 operation. HIGHLIGHTS Wet-Pit Installations Pumps Suspend From

More information

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup.

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup. SECTION 23 70 00- CENTRAL HVAC EQUIPMENT PART 1: GENERAL 1.1 PURPOSE: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

INSTALLATION INSTRUCTIONS OWNERS GUIDE & WARRANTY STATEMENT

INSTALLATION INSTRUCTIONS OWNERS GUIDE & WARRANTY STATEMENT 315050B APR 2018 INSTALLATION INSTRUCTIONS OWNERS GUIDE & WARRANTY STATEMENT RHEEM ELECTRIC DAIRY HOT WATER HEATER Congratulations for choosing a Rheem Water Heater It is important that you take a few

More information

CORRIGENDA. (Publication of titles and references of harmonised standards under Union harmonisation legislation)

CORRIGENDA. (Publication of titles and references of harmonised standards under Union harmonisation legislation) C 173/162 EN Official Journal of the European Union 13.5.2016 CORRIGENDA Corrigendum to Commission communication in the framework of the implementation of Directive 2006/95/EC of the European Parliament

More information

Global-Tek (Singapore) Pte Ltd

Global-Tek (Singapore) Pte Ltd Global-Tek (Singapore) Pte Ltd Door Type G-TEK G-TEK WWW.GLOBAL-TEK.COM.SG 1 P a g e Door Type, CONTENTS Wash and Rinse Arm Assembly....... 3-4 Booster Heater... 5-6 Wash Chamber.. 7-8 Door Lift Assembly...9-10

More information

Line Pressure ( w.c.) Gas Supply Min. Max. Pressure ( w.c.) Natural Gas Propane Gas

Line Pressure ( w.c.) Gas Supply Min. Max. Pressure ( w.c.) Natural Gas Propane Gas HVAC Guideline Specifications WHISPER-JET: SET SERIES Two Stage Positive Pressure Gas-Fired Infrared Radiant Tube Type Heater Commercial/Industrial Applications Technical Summary Input Range: 80,000/60,000

More information

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS 230500 HVAC BASIC MATERIAL AND METHODS PART 1 GENERAL 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS A. Section 230000 Basic HVAC Requirements B. Section 230523 Valves C. Section 230510 Chilled

More information

HVAC Equipment Access Equipment Location

HVAC Equipment Access Equipment Location City of Lancaster- Building Department 121 East Chestnut Street, Suite 102, Lancaster, Ohio 43130-3825 (740) 687-6649, Fax (740) 681-5030 Web site: www.ci.lancaster.oh.us/dept/building HVAC Heating, Ventilating,

More information

007100S01 - PROGRAM DESIGN CRITERIA

007100S01 - PROGRAM DESIGN CRITERIA Related Division Contents: 00 PROGRAM DESIGN 01 GENERAL INFORMATION 33 CENTRAL STEAM PIPING AND EQUIPMENT 21 FIRE PROTECTION PIPING AND EQUIPMENT 33 MAIN CAMPUS CENTRAL CHILLED WATER SYSTEM 07 ROOFING

More information

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

KSSS42QDW05, KSSS42QDX05

KSSS42QDW05, KSSS42QDX05 CABINET PARTS 42" BUILT IN REFRIGERATOR 4 97 Litho In U.S.A. (mek) 1 Part No. CABINET PARTS 1 Cabinet (Not A Serviceable Part) 3 2005004 Grommet, Tube Crossover 4 1112023 Roller, Front & Rear (4) 5 Support,

More information

Direct Fired Heater Model AD Specification

Direct Fired Heater Model AD Specification Direct Fired Heater Model AD Specification Description A Direct-fired gas heating and ventilating unit(s), as indicated on the drawings shall be furnished. Unit(s) shall be tested in accordance with ANSI

More information

CONTENT. 7 Dairy Shed Fittings. 1 Fittings: Low Density. 8 Hoses & Hose Fittings. 2 MDPE Fittings and Pipe. 3 Camlocks & Threaded Pipe Fittings

CONTENT. 7 Dairy Shed Fittings. 1 Fittings: Low Density. 8 Hoses & Hose Fittings. 2 MDPE Fittings and Pipe. 3 Camlocks & Threaded Pipe Fittings Section Product Section Product 1 Fittings: Low Density Anka Pipe Fittings Malco Stainless Steel Pipe Fittings 2 MDPE Fittings and Pipe SAB Blueline MDPE Pipe 3 Camlocks & Threaded Pipe Fittings RX Plastics

More information

Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT

Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT DESIGN ASSOCIATES INC MECH/ELEC DESIGN & CONSULTING 422 Highland Ave, Cheshire, CT. 06410 (203) 271-3787, fax (203) 271-2886 Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE

More information

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN DIVISION 21 - FIRE SUPPRESSION (REFER TO SECTION 23 05 00 FOR BASIC FIRE SUPPRESSION REQUIREMENTS) 21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems END OF SECTION FIRE

More information