Index Above Ground Drainage brackets, cast iron 228 pipes, PVC-U 211 ABS pipe & Solvent Weld Fittings 270 AC Static Inverter System, AC power supply t

Size: px
Start display at page:

Download "Index Above Ground Drainage brackets, cast iron 228 pipes, PVC-U 211 ABS pipe & Solvent Weld Fittings 270 AC Static Inverter System, AC power supply t"

Transcription

1 Index Above Ground Drainage brackets, cast iron 228 pipes, PVC-U 211 ABS pipe & Solvent Weld Fittings 270 AC Static Inverter System, AC power supply to luminaires 706 Access control alarm contact flush 723 emergency break glass double pole 723 exit button 723 exit PIR 723 magnetic swipe reader 723 proximity reader 723 Access Control Equipment, all-in-rates 107 Access Door, PVC-U, spill & waste 221 Acoustic Housings (for generators) 598 Prefabricated Acoustic Housing 598 Adaptable Boxes square pattern 606 steel 620 Adaptor, copper pipes 244 AHU s 579 Air Circuit Breakers (ACBs) ACB 65 ka fault rated 670 ACB 100 ka fault rated 669 Air Cooled Condensers 446 Air Curtain Unit Commercial Grade 588 Industrial Grade 591 Air Handling Units, all-in-rates 106 Airport terminal, elemental cost 128 All-In-Rates 105 above ground drainage 105 access control 107 air handling units 106 CCTV 107 chilled water 105 chilled water/lthw 105 data cabling 107 ductwork 106 electrical connection with mech services 113 external lighting 114 extract fans 106 fire alarms 113 generators 111 heat rejection 105 heat source 105 hose reels/dry risers 107 hot & cold water 108 HV switchgear 111 lifts and escalators 115 lighting 113 LV switchgear 111 pipes 108 pumps 105 ring main units 111 small power 112 sprinklers 106 substation (packaged) 111 transformers 111 UPS 111 water installations 105 Allowances annual holiday allowances 752 daily travel allowance 746 lodging allowance 747, 752 mileage allowance 747 subsistence allowance 747 weekend lodging allowances 752 Analogue Addressable Panels 727 Ancillaries 291 low temp hot water 375 regulators 291 Angle, Flat Cover, PVC trunking 613 Angle, Internal/External Cover, PVC trunking 613 Approximate Estimating 87 stage C elemental rates 97 Aprons, PVC-U, fittings 224 Armoured Cable clipped direct to background 623 laid in trench 621 SWA & AWA XLPE PVC clipped 623 in trench 621 Attenuators, DW144 galvanized, rectangular 553 Automatic Air Admittance, valves 223 Automatic Air Vents, valves 386 Automatic Power Factor Correction, floor standing steel enclosure 672 Automatic Transfer Switches enclosed Type, 3 or 4 pole 673 with dual by-pass 674 with single by-pass 674 panel Mounting Type, 3 or 4 pole 673

2 872 Index Balcony Outlets, PVC-U 193 Basket, tray, epoxy coated 668 Basket Tray, mild steel cable basket epoxy coated 668 zinc plated 667 Battery Chargers, HV switchgear 603 Bell mouth, gully drains 232 Bend, PVC-U 221 Bend, Flat/Internal/External, PVC miniature trunking 615 Bend, Internal/External, PVC bench trunking 615 Bends 90 double compartment, galvanized steel 609 single compartment, galvanized steel 609 triple compartment, galvanized steel 609 Biomass Energy 27 Black Enamelled, heavy gauge, screwed drawn steel 605 Black steel pipes, low temp hot water pipe 344 Boards and Panels 674 Body Coupler, 3 and 4 compartment, galvanized steel 611 Boilers all-in-rates 105 atmospheric, cast iron 331 condensing 332 domestic 326 forced draft cast iron sectional 327 steel shell 327 Borehole System 15 Bosses, PVC-U, adaptor 222 Brackets 228 fixed to background 194 for copper Pipes 241 Brackets and Supports, ductile iron, mild steel 233 Breakers/Fuses 674 Building Information Modelling (BIM) 3 Building Management Installations, elemental cost 175 Building Management System, controls 735 Busbar chambers 680 underfloor 655 Business Parks, elemental cost 141 Cabinets floor standing 716 wall mounted 716 Cable 600/1000 Volt grade, 2 core, galvanized steel wire armour 621, 624, 628, /1000 Volt grade, 3 core, galvanized steel wire armour 622, 624, 629, /1000 Volt grade, 4 core, galvanized steel wire armour 622, 624, 629, /1000 Volt grade, 7 core, galvanized steel wire armour 623, 625, 630, /1000 Volt grade, 12 core, galvanized steel wire armour 623, 625, 630, /1000 Volt grade, 19 core, galvanized steel wire armour 623, 625, 630, /1000 Volt grade, 27 core, galvanized steel wire armour 623, 625, 630, /1000 Volt grade, 37 core, galvanized steel wire armour 623, 625, 630, /1000 Volt grade, single core, aluminium wire armour 621, 623, 628, 630 earth, 450/750 Volt grade, Single core 636 fire-rated 639 firetuff fire-resistant 2 core core core 656 flexible 637 heavy duty fire-rated cable, 750 volt grade, LSF sheathed 641 light duty fire-rated cable 500 volt grade, bare volt grade, LSF sheathed volt Grade, bare 640 modular 647 XLPE insulation, LSOH clipped 630 laid in trench 628 Cable Basket 667 Cable Clip, high voltage 600 Cable Terminations brass weatherproof gland 626, 633 compound joint, glanding off 601 heavy duty, 750 Volt grade 642 light duty, 500 Volt grade 642 Cable Tray heavy duty galvanized steel, BS light duty galvanized steel, BS medium duty galvanized steel, BS Cable, FP /750 Volt grade, single core 643 Cable, FP /500 Volt grade, 2 core 644 Cable, FP /500 Volt grade, 3 core 644 Cable, FP /500 Volt grade, 4 core 644 Cable, FP /1000 Volt grade, 2 core 645 Cable, FP /1000 Volt grade, 3 core 645 Cable, FP /1000 Volt grade, 4 core 645 Cable, LSF Insulated, 450/750 Volt grade, single core, non-sheathed copper 635 Cable, Twin & Earth 300/500 Volt grade, LSF/LSF /500 Volt grade, PVC/PVC 636 Cable, XLPE Insulated, 300/500 Volt grade, single core, PVC sheathed 635 Cables armoured 621 fibre optic 720

3 Index 873 HV, XLPE 600 lighting controls 689 low voltage 621 telecommunications, laid on tray/basket 709 Cables and Wiring, armoured Cable 621 Cables Ties 600 Calorifiers non storage steam 439 non storage water 395 storage 303 Carbon Trading 55 Cast Resin Transformer, ventilated steel enclosure air natural 604 temperature controlled fans 604 Cat A Fit-out, elemental cost, office 140 CCTV Systems, all-in-rates 107 Ceiling Recessed Asymmetric Compact, fluorescent downlighter 683 Ceiling Roses batten holder, white moulded plastic, fixed to conduit 689 BC lampholder, white moulded plastic, flush fixed 689 white moulded plastic, flush fixed 689 Central battery system 705 Channel Sections, fabricated brackets 281 Check Valves, DRZ copper alloy and bronze 295 Chilled Beams 455 Chilled Water Pipes, pipes 451 Chillers absorption 444 air cooled 441 all-in-rates 105 dry air cooled 445 water cooled 443 CHP Combined Heat & Power 598 Circuit Breaker, high voltage 602 Circuit Breakers (ACBs) ACB 65 ka fault rated 670 ACB 100 ka fault rated 669 Circular, pipes, PVC-U 189 Cistern, overflow 219 Class C, Pipes, PVC-U 273 Class E, Pipes, PVC-U 273 Cleaning & Chemical Treatment duplex configuration 300 electromagnetic water conditioner 299 simplex configuration 300 triplex configuration 300 ultraviolet water sterilising unit 299 Clock Timing Systems digital clock 715 internal wall mounted electric clock 714 matching clock 714 quartz battery movement 714 quartz master clock 714 radio receiver 714 wall clocks for impulse systems 714 Closed Loop System 16 Combined Heat & Power (CHP) 598 Conduit, flexible 605 Conduit and Cable Trunking, containment 605 Connection Unit galvanized steel box 695 galvanized 695 moulded plastic box, standard fused 695 Connector Unit to immersion heater, moulded white plastic cover 696 Connectors copper pipes 244 roof Vent 237 Consumer Units 678 Containment basket 667 cable tray GRP 666 conduit 605 ladder rack 655 tray 659 Contractor Relays, pressed steel enclosure 680 Control Components FCU DDC control pack 587 immersion thermostats 405 surface thermostats 405 thermostatic radiator valves 405 Controllers damper actuators 735 frequency inverters 735 plant 735 zone 735 Cooker Control Units 45 Amp, metal coverplate Amp, plastic box and coverplate 696 Cooling Tower, all-in-rates 105 Cooling Towers closed circuit type 449 open circuit type 448 Cooling Units, VRF, room units 459 Copper Data Cabling, unshielded twisted pair, solid copper conductor 717 Copper Patch Leads, straight through booted 720 Copper Pipes bronze blank flanges 256 bronze screwed flanges 257 cold water brazed (silver) fittings 253 brazed (silver) flanges 256 bronze screw 255 compression fittings 251 high duty capillary 249 press fit mechanical joints 259 table x, cold Water 240

4 874 Index Cost indices 90 Couplers, PVC-U 190 Coupling EPDM 234 PVC bench trunking 615 PVC miniature trunking 615 Crossovers double compartment, galvanized steel 610 PVC trunking 612 single compartment, galvanized steel 610 triple compartment, galvanized steel 610 Cylinders copper; indirect 303 storage 303 Dado Modular Trunking, PVC skirting 619 Daily Travelling Allowance, hourly Rate 743 Dampers fire 533 smoke 534 volume control 532 Data Centre, elemental cost 172 Data Transmission Equipment/Cabling, all-in-rates 107 Day Care Units, RIBA Stage A Feasibility Cost 93 Daywork calculation of yearly rate 759 Electrical 761 formula for the calculation of yearly rate 762 Heating and Ventilating Industry 757 hourly rate of labour table, different grades 759 Mechanical 755 Dearators 389 Department Stores, RIBA Stage A Feasibility Cost 95 Detection/Alarm Equipment 724 Detectors, smoke/fire 726 Diagram access control diagram 74 BMS control diagram 77 CCTV diagram 76 chilled beam diagram 82 chilled ceiling diagram 81 data transmission diagram 70 displacement diagram 80 fan grille unit (FGU) diagram 85 FCU diagram 79 fire detection diagram 73 heat pump diagram 86 intruder detection diagram 75 lighting control system diagram 71 standby power diagram 72 structured cabling diagram 69 typical simple 11 K network connection diagram 67 UPS system diagram 68 VAV diagram 83 VRV diagram 84 Diffusers ceiling mounted, circular and rectangular 541 floor swirl 543 perforated 543 plastic air system 544 slot, aluminium 542 Dimmer, electrical accessories 688 Dirt Separators 388 Distribution Boards 674 LV switchgear 669 Distribution Cables armoured 647 unarmoured 649 Distribution Centres, elemental cost 170 Division Strip, PVC trunking, 1.8 m long 614 Domed Outlets, PVC-U 193 Double Compartment Trunking, jointed with standard connectors, galvanized steel 607 Drains, floor, cast iron 238 Dry Air Cooler, all-in-rates 105 Dry Risers, all-in-rates 107 Duct Bend, PVC underfloor trunking horizontal 616 vertical 616 Duct Connector, PVC underfloor trunking 616 Ductwork access doors 505 all-in-rates 106 circular ductwork, class B 461 circular polypropylene 471 circular PVC ductwork 471 dampers fire 533 smoke 534 volume control 532 dura duct LT, fire-rated 571 fire-rated ductwork duct, 2 hr protection 557 duct, 4 hr protection 571 slab, mineral wool 557 flat oval ductwork 465 flexible ductwork 470 rectangular class B, galvanized sheet metal DW rectangular ductwork, class C 506 Dura duct, fire-rated ductwork 571 DW144, ductwork 461 DW154, ductwork 471 DX Split Units, split type 459 Earth Cable, 450/750 Volt grade, Single core 636 Earthing & Bonding, earth bar, polymer insulators 729 Edge Elbow mains busbar 651 rising mains busbar 653

5 Index 875 Edge Tee mains busbar 652 rising mains busbar 653 Edge Z Unit, mains busbar 651 Electrical Accessories dimmer switch, push on/off action 688 dimmer switch, rotary action 688 metal clad 689 Electrical Gang Rates 595 Electrical Installations 593 Electrical Rates of Wages 749 Electrical Supply 597 Elemental Cost airport terminal 128 building management installations 175 business parks 141 data centre 172 distribution centres 170 fit-out Cat A 140 hospitals 154 hotels 149 office building 137 performing arts 145 residential affordable 161 residential private 164 school 158 shell and core 161 shopping Malls 132 sports hall 147 stadium 151 supermarkets 167 Elemental Rates 92, 97 Emergency Central Battery System, supply to luminaires 704 Emergency Lighting 110 Volt fluorescent luminaire 703 LED charging light European sign, polycarbonate base & diffuser 703 Enclosed Switch Disconnectors, enclosure minimum IP55 rating 680 End Cap, rising mains busbar 653 End Cover, mains busbar 651 End Feed Unit, rising mains busbar 653 Energy Meters electromagnetic 457 ultrasonic 457 Enhanced Capital Allowance (ECA) 33 Entertainment and Recreation, RIBA Stage A Feasibility Cost 94 EPDM, pipes, cast iron 233 Escalators, all-in-rates 127 Expansion Joints angular movement, stainless steel 376 axial movement, stainless steel 375 Extender Cables armoured 648 unarmoured 649 Extender Whip Ended Cables, armoured 648, 650 External Coupling, PVC trunking 613 External Lighting 685 all-in-rates 114 bulkhead, polycarbonate/aluminium body 685 ceiling mounted 685 circular bollard, polycarbonate visor 685 floodlight 685 ground mounted 685 Fabricated Hangers and Brackets, galvanized steel 243 Facade System 45 cost model 49 energy performance 46 impact on M47 Factories 92 Fan Coil Units 583 Ceiling Void Mounted 583 Low Level Perimeter 585 Fans all-in-rates 106 axial flow fans 547 bifurcated 548 centrifugal 549 in-line centrifugal 548 roof fans 549 toilet fans domestic 550 twin extract 548 Feasibility Cost 92 Feed-In Tariffs (FITs) 51 Fibre Optic Cable, tight buffered, LSOH sheathed 720 Fibre Optic Connectors, single & multimode 721 Fibre Patch Leads 722 Filtered Socket Outlet, 13 Amp, separate clean earth terminal, galvanized steel box 693 Filters, air bag 550 carbon, grease 552 Duct Mounted 550 panel 551 Fire Control Panels 726 Fire Dampers 533 Fire Detection and Alarm Equipment, all-in-rates 113 Fire Extinguishers, CO 2, ABC 324 Fire Hose Reels, automatic; rubber, manual; rubber 315 Fire Hydrants 325 Fire Protection Control Panels 727

6 876 Index Fire-Rated Cable 639 Fit-out Cat A, elemental cost, office 140 Fittings ABS, water 270 cast iron, EPDM 234 copper pipes 243 gutter, cast iron 195 moulded, cast iron 195 polypropylene Waste, push fit 216 Flange Connections, galvanized steel 281 Flanged Coupling, PVC trunking 613 Flanges, copper 255 Flat Elbow mains busbar 651 rising mains busbar 653 Flat Tee, rising mains busbar 653 Flat Z Unit, mains busbar 652 Flexible Cable 300 Volt grade, 2 core Volt grade, 3 core /500 Volt grade, 2 core 637 use in high temperature /500 Volt grade, 3 core 637 use in high temperature /500 Volt grade, 4 core 637 rubber insulated 300/500 Volt grade, 2 core /500 Volt grade, 3 core /500 Volt grade, 4 core /750 Volt grade, 2 core /750 Volt grade, 3 core /750 Volt grade, 4 core 639 Flexible Conduits metallic, PVC covered conduit, not exceeding 1 m long 606 PVC conduit, not exceeding 1 m long 606 Flexible Ductwork 470 Floor Drains, cast iron 238 Floor Outlet Box single 13 Amp Unswitched socket outlet, single compartment 694 twin 13 Amp switched socket outlet 1 blank plate, 3 compartment blank plate, 4 compartment 694 Floor Service Grommet, circular 694 Floor Trunking 611 Flue Supports 337 Flue System Fittings 335 Flue Systems domestic 333 domestic/small commercial 340 flashings & terminals 338 Fluorescent Luminaires batten type, surface mounted 682 surface mounted, opal diffuser 682 Flush Floor Trunking four compartment, galvanized steel 611 triple compartment, galvanized steel 611 Flush Floor Trunking Fittings 611 Frames, floor standing, vertical cable management 716 Fuel Cells System 21 benefits, types 22 cost comparison 25 markets, cost comparison 23 typical current project cost 24 Fused Switches Heavy Duty 679 Galvanized, heavy gauge, screwed drawn steel 605 Galvanized Steel Trunking 607 Gang rates ductwork 184 electrical 595 mechanical 183 Gas Booster Sets 311 Gas Fire Engine 598 Gauges, temperature and pressure 387 Generating Sets, standby diesel 111 Generators, standby 597 Getting Connection competition 42 costs 42 design 41 network reinforcement 42 planning 41 Grey Water Recycling 11 Grilles air diffusion, plastic 540 exhaust, aluminium 539 floor 538 supply, rectangular 536 Ground Water Cooling 15 GRP Cable Tray 666 GRP Tanks 298 Gutter Fittings, adaptors, angles, stop end, outlets 185 Gutters, cast iron 194 Hangers and Brackets fabricated 317 galvanized steel 452 Heads, rainwater 190 flat 209 Heat Emitters fan convectors 399 perimeter heaters 395 radiant strip heaters 396 radiators flat panel 398 pressed steel 396

7 Index 877 trench heating 401 under floor heating 402 unit heaters 440 Heat Exchangers CHW 453 LTHW 394 Heat Pumps 16 Heat Rejection 445 air cooled condensers 446 all-in-rates 105 cooling towers 448 dry air liquid coolers 445 Heater Batteries, local heating units 440 Heaters for Hot Water 305 Heavy Duty Fuse Switches, with HRC fuses 679 Heavy Fittings, galvanized steel 283 Heavy Flexible Cable 450/750 Volt grade, 2 core /750 Volt grade, 3 core /750 Volt grade, 4 core 639 High Impact PVC Heavy Gauge, standard pattern boxes & fittings 605 High Impact PVC Light gauge, standard pattern boxes & fittings 605 High/Low Bay Luminaires compact discharge, aluminium reflector 684 corrosion resistant GRP body, acrylic diffuser 684 flame proof, aluminium body 685 sealed discharge, aluminium reflector 684 Hoists, plant hire 767 Horizontal Bend double compartment, zinc coated underfloor ducting 617 triple compartment, zinc coated underfloor ducting 617 Hose Reels all-in-rates 107 automatic; rubber, manual; rubber 315 Hospitals elemental cost 154 RIBA Stage A Feasibility Cost 93 Hotels elemental cost 149 RIBA Stage A Feasibility Cost 96 RIBA Stage C Feasibility Cost 100 HRC Fused Distribution Boards, IP4X external protection enclosure 677 HV Cables, high voltage 600 HV Circuit Breaker, 3 Phase, 11kV 602 Industrial Angled Sockets splash proof, Amp, surface mounted 698 splash proof, Amp, surface mounted 699 water tight, Amp, surface mounted 699 water tight, Amp 700 Industrial Connectors splash proof, Amp 697 splash proof, Amp 699 water tight, Amp 698 water tight, Amp 700 Industrial Plugs splash proof, Amp 697 splash proof, Amp 699 water tight, Amp 698 water tight, Amp 700 Inlet Boxes, steel dry riser 316 Insulations ductwork all types/finishes 556 mineral fibre for pipes, concealed 407 pipes closed cell 301 Internal Coupling, PVC trunking 613 Inverter, AC static to luminaires 706 IP54 Protection, mains busbar 651 Isolating Switches 679 IT / Data, all-in-rates 107 JIB (Joint Industry board) 595 JIB Apprentice Training Scheme Rate of Wages London rate, rates with transport provided 750 national standard rate, rates with transport provided 750 JIB Rates of Wages London rate, rates with transport provided 750 national standard rate, rates with transport provided 750 Jointing Sleeve, PVC underfloor trunking 616 Junction Box four compartment, galvanized steel 611 triple compartment, galvanized steel 611 Junction Box Plates, double/triple compartment, zinc coated underfloor ducting 618 Junction Box/ Cross double compartment, zinc coated underfloor ducting 618 triple compartment, zinc coated underfloor ducting 618 Junction Box/ Tee double compartment, zinc coated underfloor ducting 618 triple compartment, zinc coated underfloor ducting 618 Junction Box/ Through or Angle double compartment, zinc coated underfloor ducting 618 triple compartment, zinc coated underfloor ducting 618 Junction/Terminal Box double compartment, zinc coated underfloor ducting 617 triple compartment, zinc coated underfloor ducting 617

8 878 Index Labour Rates ductwork 182 electrical 595 mechanical 181 Ladder Racks extra heavy duty galvanized steel 658 heavy duty galvanized steel 656 light duty galvanized steel 655 Lamp, T8 682 Leak Detection 456 LED Lighting 37 Leisure Centres, RIBA Stage A Feasibility Cost 94 Lifts all-in-rates 115 good lifts 122 machine room above 115 machine room less 119 Lighting, all-in-rates 113 Lighting Busbar, pre-wired busbar, plug in trunking for lighting 654 Lighting Controls cable, aluminium sheathed 689 lighting control modules 690 presence detectors 691 scene switch plate 691 Lighting Switches 686 Lighting Track single circuit, 25 A 2 P686 three circuit, 25 A 2 P686 Lightning Protection air rods 731 air terminals 731 bonds and clamps 731 conductor tape 730 earth pits 732 earth rods 733 surge Protection 734 Location Factors 91 Lock Equipment 723 Lodging Allowances, nightly rate 744 Louvres acoustic 544 weather 546 Low Impedance Busbar Trunking, straight copper busbar 651 Low Temp Hot Water Pipes extra for black malleable fittings 351 extra over black steel pipes 348 mech grooved steel pipe, fittings 369 plastic (polypropylene) pipe 370 fittings 370 press fit carbon steel pipe 367 fittings 367 screwed BS 1387 steel pipe 344 fittings 345 flanges 348 welded BS 1387 steel pipe 357 fittings 360 flanges 358 welded carbon steel 364 fittings 369 flanges 366 Low Velocity Air Conditioning, air handling Units supply 579 supply and extract 580 Luminaires batten 682 bulkhead, 60 watt 685 ceiling recessed asymmetric 683 downlighters 684 emergency 703 external 685 high/low bay 684 surface fluorescent 682 suspended fluorescent 684 wall mounted fluorescent 684 LV Switchboard Busbar, copper busbar 672 LV Switchgear all-in-rates 111 distribution boards 669 Machine room above (MRA) Lift 115 Mains Busbar 651 Major Projects Agreement, employee categories, hourly rate comparisons 746 Malleable Iron Fittings, galvanized steel 285 Manifold Connector, cast iron 235 Manual Call Points 726 Master Distribution Box 6 port, steel port, steel 647 Materials Rates, gang rates, electrical 593 MCB Distribution Boards, IP3X external protection enclosure 676 MCCB Panel Boards 674 MCCB Panelboards feeder MCCBs 675 panelboards 674 Mechanical Installations, material cost 181 Mechanical Rates of Wages 741 Medium Density Polyethylene MDPE (Blue) 266 compression fittings 269 electro fusion fittings 266 MDPE (Yellow), gas 308 compression fittings 309 electro fusion fittings 308 Metal Clad Cable BSEN data cable 647

9 Index 879 Meters Energy CHW 457 LTHW, ultrasonic 404 Midel Transformer, gasket-sealed steel tank 603 Miniature Circuit Breakers, For distribution boards 676 Modular Recessed, T8 lamp 682 Modular Recessed Compact Fluorescent, TCL lamp 683 Modular Recessed, Linear Fluorescent, high frequency control gear 683 Modular Wiring 647 Moulded Case Circuit Breakers MCCB 36 ka fault rated 671 MCCB 45 ka fault rated 671 MCCB 70 ka fault rated 671 MCCB 150 ka fault rated 670 MRL (Machine Room less) Lift, all-in-rates 119 Nipple, capillary fittings 248 Non-Standard Socket Outlet, 13 Amp, separate clean earth terminal, galvanized steel box 693 Office building, elemental cost 137 Offices 92 RIBA Stage C Feasibility Cost 97 Offset, mains busbar 651 Ogee Gutters, PVC-U 189 Open Loop System 15 Outlet Boxes, steel dry riser 316 Outlets rainwater 185 roof 186 small power 692 Overflow, bath 219 P-traps 232 Packaged Steam Boilers, gas/oil fired 343 Passenger lifts, all-in-rates 115 Patch Panels 19 wide, finished in black 718 voice 19 wide, finished in black 710 Performing Arts, elemental cost 145 Performing Arts Centre, RIBA Stage A Feasibility Cost 94 Pipe Clips copper pipes (CHW) 452 galvanized steel, plastic coated steel 219 metal fixing 211 Pipe Freezing, carbon steel, copper 403 Pipe in Pipe (Gas) 309 Pipeline Fittings, steel pipes 317 Pipes ABS waste 214 water 270 all-in-rates 108 black steel 344 screwed chilled water 451 screwed LTHW 344 welded LTHW 357 black steel screwed, gas 309 carbon steel 364 cast iron 205 soil EPDM rubber joints 228 copper, cold water 240 copper (plastic coated) 311 galvanized steel 278 galvanized steel, heavy 278 galvanized steel, medium 278 low temp hot water extra for black malleable fittings 351 extra over black steel pipes 344 mech grooved steel pipe 369 plastic (polypropylene) pipe 370 press fit carbon steel pipe 367 screwed BS 1387 steel pipe 344 welded BS 1387 steel pipe 357 welded carbon steel 364 MDPE blue 266 yellow 308 MDPE (Yellow), gas compression fittings 309 electro fusion fittings 308 mechanical grooved 369 MuPVC, plastic 211 polypropylene for LTHW 370 thermally fused joints 370 prefabricated black steel 317 press fit 367 carbon steel 367 stainless steel 264 PVC-C for cold water 276 PVC-U dry push fit joints 189 solvent welded joints 192 sprinkler, victaulic 319 stainless Steel 261 steel welded 310 Pipes Black Steel, Sprinkler Pipes & fittings, welded 317 PIR, access control 723 Plant Charges 763 Plant Hire Costs compaction equipment 770 concrete equipment 771 construction vehicles 768 excavators & loaders 769 hoists 767 lifting appliances and conveyors 765

10 880 Index pumps 764 scaffolding, shoring & fencing 764 site accommodation 772 site equipment 773 small tools 773 testing equipment 771 Plastic Ductwork, circular 471 Plug for Weatherproof socket outlet, protected to IP Plumbers Welding Supplement 747 Polypropylene, pipes, push fit joints 216 Power Factor Correction 672 Power Pole, aluminium painted 694 Power Post, aluminium painted, UPVC 694 Pressure Reducing Valves (PRV), steam 438 Pressurization Units CHW 455 LTHW 388 Pumps accelerator 394 all-in-rates 107 belt drive CHW & LTHW 390 circulator 393 close coupled 391 glandless domestic 393 pressurization cold water 295 sump 296 twin head belt drive 391 variable speed 391 Push Button Stations, heavy gauge pressed steel, polycarbonate cover 681 PVC Bench Trunking, white/grey finish 615 PVC Fittings, PVC-u (cold water) 274 PVC Miniature Trunking compartmented, white finish 614 single compartment, white finish 614 PVC Miniature Trunking Fittings 615 PVC Underfloor Trunking, single compartment 616 PVC-C, PVC-u (cold water) 276 Radio Frequency Cable, PVC sheathed, laid loose 712 Rain Water Harvesting 11 Rates and Wages, hourly rates of wages, electrical 749 Rates of wages hourly rates of wages, heating, ventilation 741 hourly rates of wages, main grades, plumbing, mechanical 745 mechanical 739 plumbing 745 trainee hourly rates of pay 742 RCD Protected Socket Outlet, 13 Amp, galvanized steel box 693 Recessed Downlighter, reflector with white/chrome bezel 684 Regional Variations 91 Renewable Energy 7 Renewable Energy Options biomass boilers 9 borehole cooling 9 building integrated photovoltaic (BIPV) 8 combined heat and power (CHP) 9 ground source heat pumps 8 investment yield table 10 solar water heating 9 wind generators 8 Renewable Obligations Certificates 59 Residential affordable, elemental cost 161 Residential Buildings, RIBA Stage C Feasibility Cost 102 Residential Private, elemental cost 164 Residual Current Circuit Breakers, For distribution boards 676 Responsibility Allowance hourly rates of wages, Craftsmen 742 hourly rates of wages, Senior Craftsmen 742 weekly rates of credit 753 Retail, RIBA Stage A Feasibility Cost 94 RIBA Stage A Feasibility Cost 92 commercial research 96 day care unit 93 distribution centres 92 factories 92 health and welfare facilities 93 hospitals 93 hotels 96 office buildings 92 recreation buildings 94 retail buildings 94 schools 95 supermarkets 95 warehouses 92 RIBA Stage C Feasibility Cost hotels 100 offices 97 residential 102 Ring Main Unit, 3 Phase, 11kV, 630 amp 602 Rising Bend double compartment, zinc coated underfloor ducting 617 four compartment, galvanized steel 611 triple compartment galvanized steel 611 zinc coated underfloor ducting 617 Rising Mains Busbar, straight aluminium bar 652 Roof Outlets, PVC-U 186 Roof Vent Connector 237 Roses, ceiling 689

11 Index 881 Scaffolding, plant hire 764 Schematic access control system (ACS) 74 alternative all air system (FGU) 85 BMS chilled water 78 BMS controls (LPHW) 77 chilled beam system 82 chilled ceiling system 81 data transmission 70 digital CCTV 76 displacement system 80 fan coil unit system 79 fire detection and alarm schematic 73 HV Intakes 1000 Kva to 6000 Kva 68 intruder detection system (IDS) 75 LV Intakes up to 1000 Kva 67 networked lighting control system 71 reverse cycle heat pump 86 standby power system 72 static UPS System 69 variable air volume (VAV) 83 variable refrigerant volume (VRV) 84 School, elemental cost 158 Scientific Buildings, RIBA Stage A Feasibility Cost 95 Semi Recessed Linear Fluorescent, T5 lamp 684 Service Outlet Box/Flat Lid double compartment 618 triple compartment 619 Service Outlet Module 3 compartment compartment 612 Shaver Sockets 250 voltage supply, white moulded plastic 696 dual voltage supply, white moulded plastic 696 Sheet Steel Adaptable Boxes black rectangular pattern 620 black square pattern 620 galvanized square pattern 620 Shell and Core, elemental cost 161 Shopping Malls elemental cost 132 RIBA Stage A Feasibility Cost 95 Single Compartment PVC Trunking, grey finish, clip on lid 612 Single Compartment PVC Trunking Fittings 612 Single Compartment Trunking, jointed with standard connectors, galvanized steel 607 Small Power, all-in-rates 112 Socket Outlet switched, 13 Amp metal clad, 1 & 2 gang 692 unswitched, 13 Amp metal clad, 1 & 2 gang 692 Socket Plate, PVC bench trunking 616 Socket Reducer, PVC underfloor trunking 616 Sockets, outlets, waste, solvent joints 192 Soil and Waste Pipes cast iron Pipes, rubber gasket joints 228 PVC-U 224 Sounders 726 Split Systems, for heating & cooling 459 Splitters, 5 Wire 649 Sports Hall elemental cost 147 RIBA Stage A Feasibility Cost 94 Sprinkler Alarms/Gongs 321 Sprinkler Fixings 317 Sprinkler Heads 320 Sprinkler Systems, all-in-rates 106 Sprinkler Tanks 322 Sprinkler Valves 321 Stadium, elemental cost 151 Stage A RIBA 92 Stage C RIBA 97 Stainless Steel Pipes 261 capillary fittings 261 compression fittings 261 press fit fittings 261 Standby Generators 597 Steam Strainers 436 Steam Traps cast iron 436 stainless steel 436 Stop End double compartment, zinc coated underfloor ducting 617 four compartment, galvanized steel 611 galvanized steel 608 PVC bench trunking 615 PVC miniature trunking 615 PVC trunking 612 triple compartment galvanized steel 611 zinc coated underfloor ducting 617 Stopcocks, copper 294 Storage Calorifiers, Copper 303 Strainers 383 steam 436 Supermarkets elemental cost 167 RIBA Stage A Feasibility Cost 95 Support, cast iron, pipe spacer 205 Supports and Brackets, ductile iron, mild steel 233 Surface Mounted, Linear Fluorescent, T8 lamp 683 Surveillance Equipment 724 all-in-rates 107 Suspended Linear Fluorescent, T5 lamp 684 Switch Disconnectors moulded Plastic Enclosure 697 steel sheet case 679 Switched Modules, armoured cable 649

12 882 Index Switches 6 Amp modular type switch 686 galvanized steel box, 1 way 687 galvanized steel box, 2 way Amp, watertight switch Amp, splash proof moulded switch Amp, watertight switch 688 architrave plate switch, 6 Amp, white plastic 687 ceiling switch, white moulded plastic 688 plate switch, 6 Amp flush mounted, white plastic 687 plate switch, 10 Amp flush mounted, white plastic 687 Switches/ Sensors, pressure devices 735 Switches/Sensors, temperature devices 735 Switchgear, HV 602 Synchronization Panels (for generators) 598 T Connectors, snap Fix 649 Tanks, overflow 219 Tanks and Cisterns cold water storage tanks sectional GRP 298 sectional steel 297 fuel oil storage tanks; steel, fuel storage tanks; plastic 313 moulded glass fibre cisterns 297 polypropylene cisterns 297 sprinkler tanks sectional GRP 322 sectional steel 322 Tap Off, mains busbar 652 Tap-Off Units lighting busbar 654 rising mains busbar 654 Tee, Flat Cover, PVC trunking 614 Tee, Internal/External Cover, PVC trunking 614 Tees double compartment, galvanized steel 610 PVC miniature trunking 615 single compartment, galvanized steel 609 triple compartment, galvanized steel 610 Telecommunications Cables, multipair internal telephone cable Installed in conduit/trunking 709 laid on tray/basket 709 Telephone Outlet bronze or satin chromeplate and box 710 moulded plastic plate and box 710 Television Aerial Cable, coaxial, PVC Sheathed 712 Terminal Strips, 20 Amp high density polythene 606 Terminations 600/1000 Volt grade, 2 core, galvanized steel wire armour 626, /1000 Volt grade, 3 core, galvanized steel wire armour 627, /1000 Volt grade, 4 core, galvanized steel wire armour 627, /1000 Volt grade, 7 core, galvanized steel wire armour 627, /1000 Volt grade, 12 core, galvanized steel wire armour 627, /1000 Volt grade, 19 core, galvanized steel wire armour 628, /1000 Volt grade, 27 core, galvanized steel wire armour 628, /1000 Volt grade, 37 core, galvanized steel wire armour 628, /1000 Volt grade, single core, aluminium wire armour 626, 633 glanding off 2 core core core 644 high voltage 600 Terminations, Glanding off 2 core core core 656 The Energy Technology List (ETL) 33 The Water Technology List (WTL) 33 Thermal Insulation ductwork 556 extra over concealed insulation fittings 407 extra over external insulation fittings 414 mineral fibre for pipes external 414 plant room 407 pipes closed cell 301 plant room insulation fittings 414 Thermostat, room thermostats 404 Thermostats 404 Top Feeder Unit, rising mains busbar 653 Trace Heating System 454 Transfer Switches 673 Transformer HV 602 oil filled, free breathing tank 603 Transformers, step down 603 Traps, polypropylene 217 Travelling & Time Allowances London rate, daily travelling allowance 751 national standard rate, daily travelling allowance 751 Tray, GRP 666 Trench heating, natural convection type 401 Triple Compartment Trunking, jointed with standard connectors, galvanized steel 607 Tripping Batteries, battery chargers, valve regulated lead acid battery 603

13 Index 883 Trunking 607 black enamelled, heavy gauge, 607 dado/skirting 619 double compartment, jointed with standard connectors 607 Flanged connector, galvanized steel 608 flexible conduits, metallic, PVC covered conduit 606 flush floor, triple compartment 611 galvanized, heavy gauge, 607 galvanized Steel 607 high Impact PVC heavy Gauge, standard pattern boxes & fittings 607 high Impact PVC light gauge, standard pattern boxes & fittings 607 PVC 612 stop end, galvanized steel 608 triple compartment, jointed with standard connectors 607 underfloor 617 Tubular Fittings, galvanized steel 282 TV Socket Outlet, moulded plastic box, flush/surface mounted 713 Typical Engineering Details 63 cost information 64 cost information w/ reinforcement 65 cost information w/ substation reinforcement 66 urban network underground 64 urban network underground w/ reinforcement 65 urban network underground w/ substation reinforcement 66 Un-Armoured Cable 635 Underfloor Busbar, pre-wired busbar, plug in trunking for power 655 Underfloor Ducting double compartment, zinc coated underfloor ducting 617 fittings, zinc coated underfloor ducting 617 triple Compartment, zinc coated underfloor ducting 617 Underfloor heating 402 Uninterruptible Power Supply integral diesel rotary, 3 phase 702 large size static, 3 phase, 10 year battery 702 medium size static, 1 phase, 10 year battery 701 medium size static, 3 phase, 10 year battery 701 single phase, 5 year battery, standard 13 Amp socket outlet 701 UPS 701 Valve ancillaries, steam heating system 436 Valves automatic air vent 386 ball float valves 292 ball valves 378 bronze/gunmetal inlet 316 check valves 380 check valves DZR 293 cocks 293, 385 commissioning valves 381 control valves 384 gate valve DZR 294 gates 292 globe valves 379 isolating 376 pressure reducing 438 radiator valves 386 regulators 384 safety and relief valves 385, 438 stopcocks 293, 386 strainers 436 VAV Variable Air Vol System, terminal Units 582 Vertical Access Box, 2 Compartment, PVC underfloor trunking 616 Vertical Multi Compartment Pillar, UPVC 695 Vertical Transport, all-in-rates 115 Video Cable, PVC flame retardant sheathed, laid loose 713 VRF Units, refrigerant 459 Wages, hourly rates of wages 741 Wall Mounted Compact Fluorescent, TCL lamp 684 Wall Spacer, cast iron 233 Warehouses 92 Water Heater (Electric) 305 Water Heater Switch, switched with neon indicator 696 Water Installations, all-in-rates 105 Water Treatment 299 Weatherproof Junction Boxes glassfibre reinforced polycarbonate 681 sheet steel with zinc spray finish 681 Weekly Holiday Credit & Welfare Contribution employee grades of entitlement 743 rates 743 Weekly Holiday Credit Contributions 747 Work Station, data outlet 718

670 Index Automatic Air Vents, valves 304 Automatic Power Factor Correction, floor standing steel enclosure 556 Automatic Transfer Switches enclosed t

670 Index Automatic Air Vents, valves 304 Automatic Power Factor Correction, floor standing steel enclosure 556 Automatic Transfer Switches enclosed t Index Above Ground Drainage brackets, cast iron 170 pipes, PVC-U 155 ABS pipe & Solvent Weld Fittings 207 AC Static Inverter System, AC power supply to luminaires 584 Access control alarm contact flush

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

MEP Syllabus CAREER DEVELOPMENT CENTRE SHRISTI MEP. Trichy-26

MEP Syllabus CAREER DEVELOPMENT CENTRE SHRISTI MEP. Trichy-26 SHRISTI MEP CAREER DEVELOPMENT CENTRE Trichy-26 MEP Syllabus Contact : dhinesh.shristimep@gmail.com / sangeetha.shristimep@gmail.com +91-80984 49847, 97158 67493 ELECTRICAL DESIGNING AND DRAUGHTING FUNDAMENTALS

More information

Assessment Schedule - TS.6

Assessment Schedule - TS.6 The Assessor shall determine the business s commitment and support to good and safe working practices; also that it has a positive culture in all aspects of its work. In particular, the assessor shall

More information

Operating Performance

Operating Performance INFORMATION SHEET 1 Jackson Engineering Advisers are specialist Building Services Engineers. This information sheet is offered as an aid to Building Owners and Managers as a guide to plant life expectancies.

More information

ADVANCE ELECTRICAL MEP CONTRACTING TRADING SERVICES

ADVANCE ELECTRICAL MEP CONTRACTING TRADING SERVICES ADVANCE ELECTRICAL MEP CONTRACTING TRADING SERVICES ABOUT US Quality products, exceptional service and quick delivery of a diverse product line are the foundation of our company. By leveraging the portfolio

More information

DIVISION 15 MECHANICAL

DIVISION 15 MECHANICAL DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with

More information

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option.

If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option. Air handling units Aesthetic Not to add significantly to the existing ambient noise levels. Functional requirements If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

HOME INSPECTION CHECKLIST

HOME INSPECTION CHECKLIST HOME INSPECTION CHECKLIST Date: Page 1 of 9 Client Name: Address: Tel No: Surname: Email: A WATER METER 1 Is the water meter visible YES NO 2 Water meter registers when water is drawn YES NO 3 Water meter

More information

(Notices) EUROPEAN COMMISSION

(Notices) EUROPEAN COMMISSION 14.8.2012 Official Journal of the European Union C 245/1 IV (Notices) NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION Commission communication in the framework

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Product Test Centre 15 Progress Road Eastwood Leigh-on-Sea Essex SS9 5JA Contact: Mr S Bailey Tel: +44 (0)1702 425738 E-Mail: stuart.bailey@honeywell.com

More information

Port of Portland Conveying Equipment Guidelines

Port of Portland Conveying Equipment Guidelines Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate

More information

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes). Guide Specifications PART 1 GENERAL 1.01 SYSTEM DESCRIPTION Microprocessor controlled, air-cooled liquid chiller utilizing scroll compressors, low sound fans, hydronic pump system and optional fluid storage

More information

Centeral Station Air Handling Unit

Centeral Station Air Handling Unit Centeral Station Air Handling Unit CA Series www.windind.com www.windind.com The product range includes double skinned Air Handling Units, double skinned Fan Coil Units, and custom designed packaged roof

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to define the general installation and minimum product

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

SCHEDULE OF RATES SHEET PRELIMINARIES

SCHEDULE OF RATES SHEET PRELIMINARIES Page : 1 PRELIMINARIES 1 CONTAINER BUDGET ALLOWANCE 1,100.00 1,100.00 1 SUPERVISION 3,900.00 3,900.00 1 ACCOMMODATION 5,390.00 5,390.00 1 TRAVEL ALLOWANCE 7,800.00 7,800.00 Sub- 18,190.00 18,190.00 Page

More information

EXPRESSION OF INTEREST (EOI) FOR. Fire Fighting System (FFS)

EXPRESSION OF INTEREST (EOI) FOR. Fire Fighting System (FFS) EXPRESSION OF INTEREST (EOI) FOR Fire Fighting System (FFS) KWtE-03-PR-EO-ACC-0 Rev01 11 Version: Date: Prepared by: Approved: 01 7/11/18 VMC AMN Page 1 OF 5 1 Project overview ACCIONA s Engineering, Procuring

More information

Special Provision No. 683S28 December 2017

Special Provision No. 683S28 December 2017 FIBRE OPTIC COMMUNICATION CABLES, AERIAL ON MESSENGER CABLE - Item No. FIBRE OPTIC COMMUNICATION CABLES, AERIAL ON MESSENGER CABLE (TEMPORARY) - Item No. Special Provision No. 683S28 December 2017 1. SCOPE

More information

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer Technical Development Program PRESENTED BY: COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Ray Chow Sales Engineer TDP Updates Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University. 15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.

More information

TRIMAX ASIA ENGINEERING & CONSTRUCTION (PG U )

TRIMAX ASIA ENGINEERING & CONSTRUCTION (PG U ) TRIMAX ASIA ENGINEERING & CONSTRUCTION (PG0176866-U ) FIRE PROTECTION EQUIPMENTS PARTS CATALOGUE TRIMAX ASIA ENGINEERING & CONSTRUCTION No. 24, Jalan Pantai, 12000 Butterworth, Penang, Malaysia. Fax: +6

More information

Oakdale Primary School Expansion Project Appendix C Elec Equipment Schedule

Oakdale Primary School Expansion Project Appendix C Elec Equipment Schedule Oakdale Primary School Expansion Project Appendix C Elec Equipment Schedule HBS-SH-MEP-803 May 2017 For Peterborough City Council ver. author date checked comment P1 DH 19-05-17 TJC TENDER ISSUE 1 Ref

More information

1 WATERMARK CERTIFICATION SCHEME SCHEDULE OF PRODUCTS This document was adopted 1 August 2017 and replaced the WaterMark Schedule of Specifications

1 WATERMARK CERTIFICATION SCHEME SCHEDULE OF PRODUCTS This document was adopted 1 August 2017 and replaced the WaterMark Schedule of Specifications 1 WATERMARK CERTIFICATION SCHEME SCHEDULE OF PRODUCTS This document was adopted 1 August 2017 and replaced the WaterMark Schedule of Specifications Product type Application Specification Appliances Bedpan

More information

CONTROLLED GOODS AND THE APPLICABLE SAFETY STANDARDS PART I DOMESTIC OR HOUSEHOLD APPLIANCES AND SIMILAR ELECTRICAL APPLIANCES

CONTROLLED GOODS AND THE APPLICABLE SAFETY STANDARDS PART I DOMESTIC OR HOUSEHOLD APPLIANCES AND SIMILAR ELECTRICAL APPLIANCES CONTROLLED GOODS AND THE APPLICABLE SAFETY STANDARDS PART I DOMESTIC OR HOUSEHOLD APPLIANCES AND SIMILAR ELECTRICAL APPLIANCES 1 Hair Dryers 8516.31 MS IEC 60335-2-23 Household and similar electrical appliances-

More information

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

NES. What s New June Contents: Detailed Technical guidance. Work section updates. (key points)

NES. What s New June Contents: Detailed Technical guidance. Work section updates. (key points) Contents: Section 1. Section 2. Section 3. Section 4 SUMMARY DETAIL OF WORK SECTION UPDATES & AUDITS SCHEDULES DETAIL CHANGES TO REFERENCE DOCUMENTS A full record of the content revisions can be obtained

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

SECTION 1.02 DETAILED SCOPE OF WORK

SECTION 1.02 DETAILED SCOPE OF WORK SECTION 1.02 DETAILED SCOPE OF WORK 1.02.1 General 1.02.1.1 Introduction... 3 1.02.1.2 General description of the works... 4 1.02.1.3 Design criteria... 5 1.02.2 Public Health Services 1.02.2.1 Mains cold

More information

Manual / Handbuch Spare parts list / Ersatzteilliste

Manual / Handbuch Spare parts list / Ersatzteilliste Manual / Handbuch Spare parts list / Ersatzteilliste Equipment Imp.-Exp. GmbH Zitterpappelweg 9 D - 22391 Hamburg Tel.: + 49 40 60009468-0 Fax: + 49 40 536 75 01 E - M a i l : i n f o @ w e s c o - n a

More information

TECHNICAL AND USER REQUIREMENTS FOR FIRE-FIGHTING PRESSURE HOSES FOR FIRE-FIGHTING PUMPS

TECHNICAL AND USER REQUIREMENTS FOR FIRE-FIGHTING PRESSURE HOSES FOR FIRE-FIGHTING PUMPS Centrum Naukowo Badawcze Ochrony PrzeciwpoŜarowej (Scientific and Research Centre for Fire Protection) Nadwiślańska 213, 05-420 Józefów, Poland Telephone (+48) 22 789 11 11 Fax.: (+48) 22 769 33 45 e-mail:

More information

CADDY CORPORATION. Utility Distribution Systems

CADDY CORPORATION. Utility Distribution Systems Food Service Equipment Air Systems Utility Distribution Systems page 1 of 2 Equipment Specifications General Specifications Caddy Corporation of America Energy Distribution and Management System, which

More information

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes WARM WATER UNDERFLOOR HEATING SYSTEMS Guidance Notes 02 WARM WATER UNDERFLOOR HEATING SYSTEMS Introduction Underfloor heating systems consist of a series of pipes which are integrated into the floor structure

More information

SECTION HYDRONIC PIPING AND SPECIALTIES

SECTION HYDRONIC PIPING AND SPECIALTIES SECTION 15511 HYDRONIC PIPING AND SPECIALTIES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Pipe Materials. 2. Fittings. 3. Specialty Items. 4. Glycol Antifreeze Protection. 5. Process Cooling B.

More information

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No.

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No. BILL 1 GROUND FLOOR Supply, Deliver, Install, Set to Work and Commission the Following: 1.01 Lighting point completely wired in 3x1.5mm² single core PVC insulated copper cables drawn in 20mm diameter HG

More information

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department SOUTH DUBLIN COUNTY COUNCIL Roads (Traffic and Transportation) Department TECHNICAL SPECIFICATION 4 SDCC-TS-04 SIGNAL INSTALLATION REQUIREMENTS REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF TRAFFIC CONTROL

More information

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager. B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.

More information

Design Standards Manual

Design Standards Manual Design Standards Manual Table of Contents: Part III (Divisions 1-32) Section No. Title Revision DIVISION 1: GENERAL REQUIREMENTS 01524 Construction Waste Management 05/07 01815 HVAC Commissioning Requirements

More information

SECTION DUCTWORK

SECTION DUCTWORK PART 1 GENERAL 1.1 REFERENCES SECTION 23 31 00 DUCTWORK A. ASHRAE - Handbook, Duct Design B. ASHRAE - Handbook, Duct Construction C. ASTM A90/A90M - Standard Test Method for Weight (Mass) of Coating on

More information

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD.

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. (A Wholly Owned Subsidiary of SBI) CIRCLE OFFICE: 4TH FLOOR, SBI LOCAL HEAD OFFICE III/1-PANDIT J N MARG, KHARAVELA NAGAR BHUBANESWAR, ODISHA-751001 Part-II PRICE

More information

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI Hydraulic Institute Standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Paragon. Induced Draft, Counter Flow Optional Accessories

Paragon. Induced Draft, Counter Flow Optional Accessories ANTIFREEZE PACKAGE / RESISTANCE HEATING OPTION The antifreeze package is supplied to provide protection against freezing of standing water in the cooling tower sump due to shutdown during winter operation.

More information

LABOUR RATES FOR PLUMBING CONTRACTORS. A guide to the labour costs of plumbing works LABOUR RATES FOR PLUMBING CONTRACTORS

LABOUR RATES FOR PLUMBING CONTRACTORS. A guide to the labour costs of plumbing works LABOUR RATES FOR PLUMBING CONTRACTORS LABOUR RATES FOR PLUMBING CONTRACTORS A guide to the labour costs of plumbing works MORE MONEY IN YOUR POCKET September 06-1 - Increasers Labour Time Required In Hours DURAVENT STYLE INCREASER 75-100MM

More information

RESEARCH AND TECHNOLOGY BUILDING RENOVATION 05/18/09 SECTION REFRIGERANT PIPING AND SPECIALITIES

RESEARCH AND TECHNOLOGY BUILDING RENOVATION 05/18/09 SECTION REFRIGERANT PIPING AND SPECIALITIES SECTION 23 23 00 REFRIGERANT PIPING AND SPECIALITIES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Refrigerant piping. 2. Unions, flanges, and couplings. 3. Pipe hangers and supports. 4. Refrigerant

More information

Telecity. Table of Contents. Page. Section 3.2

Telecity. Table of Contents. Page. Section 3.2 1 3.2 System Descriptions Table of Contents 3.2 SYSTEM DESCRIPTIONS... 3 3.2.1 General Notes... 3 3.3 Power Distribution MV... 4 3.3.1 Incoming Supply... 4 3.3.2 MV Switch room... 4 3.4 Power Distribution

More information

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA Tel: TENDER NO: TTU/T/01A/

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA   Tel: TENDER NO: TTU/T/01A/ TAITA TAVETA UNIVERSITY P.O.BOX 635-80300, VOI, KENYA EMAIL: procurement@ttu.ac.ke; Tel: 020 8150257 TENDER NO: TTU/T/01A/2017-2018 CONSTRUCTION OF PROPOSED ADMINISTRATION BLOCK- TAITA TAVETA UNIVERSITY

More information

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior

More information

PARTS MANUAL. American Dish Service ADS CONVEYOR DISHWASHER MODELS: ADC-44 L-R/R-L EFFECTIVE: SEPTEMBER 1, 2001

PARTS MANUAL. American Dish Service ADS CONVEYOR DISHWASHER MODELS: ADC-44 L-R/R-L EFFECTIVE: SEPTEMBER 1, 2001 EFFECTIVE: SEPTEMBER 1, 2001 ADS CONVEYOR DISHWASHER MODELS: ADC-44 L-R/R-L PARTS MANUAL 900 Blake Street Edwardsville, Kansas 66111 (913)422-3700 211-0044L-R / 212-0044R-L ADC-44 Conveyor Dishwasher 2

More information

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements. FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment

More information

EDS SUBSTATION ELECTRICAL SERVICES

EDS SUBSTATION ELECTRICAL SERVICES Document Number: EDS 07-1119 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 07-1119 SUBSTATION ELECTRICAL SERVICES EPN, LPN, SPN This standard specifies the electrical services requirements including

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

PROPOSED NEW BUILDING

PROPOSED NEW BUILDING HYDRAULIC DRAWINGS MATERIALS SERVICES TO BE CONSTRUCTED FROM MATERIAL AS LISTED BELOW UNLESS NOTED OTHER WISE SHOWN ON DRAWINGS. SERVICE MATERIAL REMARKS SEWER DRAINAGE upvc SOLVENT WELDED JOINTS SEWER

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 22 23 STEAM CONDENSATE PUMPS SPEC WRITER NOTES: 1. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

ESSAY: This will be a written paper of 6 essay questions. Candidates are to answer 5 questions in 2 hours for 60 marks.

ESSAY: This will be a written paper of 6 essay questions. Candidates are to answer 5 questions in 2 hours for 60 marks. 260 PLUMBING AND PIPE FITTING Examination Structure The examination for this syllabus will cover three major areas of groupings with 193 Building Engineering and 191 General Metal Work as trade-related

More information

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model BWXP OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER Electric Heater Company Base Model "BWXP" HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203)

More information

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500 Unvented Calorifier Range. Operating and Maintenance Manual. For Models 125 300 & 500 Telephone 08456 448802 Fax 08456 448803 Emial info@mhgheating.co.uk Web www.mhgheating.co.uk TABLE OF CONTENTS. Section

More information

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International

More information

Powerstock Storage Tank

Powerstock Storage Tank Powerstock Storage Tank Models ST300, ST500, ST750 & ST1000 INSTALLATION, COMMISSIONING AND SERVICING INSTRUCTIONS THE POWERSTOCK STORAGE TANK IS INTENDED FOR USE AS A COMMERCIAL APPLIANCE. PUBLICATION

More information

SECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM

SECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM PART 1 GENERAL 1.01 SUMMARY SECTION 15371 KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM A. Section Includes: A complete wet chemical automatic fire suppression system for the exhaust hood, including necessary

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013 SECTION 15800 - AIR HANDLING EQUIPMENT 1.1 GENERAL A. All air handlers installed shall conform to the University of Rochester specification Guideline for Semi-Custom and Pre-Engineered Air Handling Units.

More information

TECHNICAL. Series 18. Pump Packages

TECHNICAL. Series 18. Pump Packages TECHNICAL S Y S T E M S Series 18 Pump Packages Series 18 Pump Packages Standard Features Close-coupled, end-suction, centrifugal pumps Mounted and wired pump starters Hand-Off-Auto switch for each pump

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD INSTALLATION OF COMMERCIAL FIRE SPRINKLER SYSTEMS STANDARD #C-001 EFFECTIVE 03-25-2009 PURPOSE: To ensure that sprinkler plans submitted for review contain

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

Direct Fired Heater Model AD Specification

Direct Fired Heater Model AD Specification Direct Fired Heater Model AD Specification Description A Direct-fired gas heating and ventilating unit(s), as indicated on the drawings shall be furnished. Unit(s) shall be tested in accordance with ANSI

More information

PRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM

PRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM ANNEXUREIII D: FIRE PROTECTION SYSTEM SECTION ADDRESSABLE FIRE DETECTION AND ALARM SYSTEM Supply, Installation, testing and commissioning of Analogue Addressable Fire Alarm Control panel with battery backup

More information

Fill Point, Level Gauges, and Control Range

Fill Point, Level Gauges, and Control Range Fill Point, Level Gauges, and Control Range Page 1 Contents Fill Points, Level Gauges, and Control Equipment... 3 Fill Point Cabinets... 4 Single Tank Cabinet... 5 Twin Tank Cabinet... 6 Three Tank Cabinet...

More information

VSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation.

VSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation. Brochure# 228E 122011 TYPE VSA SEWAGE PUMP Capacities to 100 gpm, Heads to 120, Horsepower range 3/ thru 0, 3 thru discharge, 1750 and 1150 operation. HIGHLIGHTS Wet-Pit Installations Pumps Suspend From

More information

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup.

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup. SECTION 23 70 00- CENTRAL HVAC EQUIPMENT PART 1: GENERAL 1.1 PURPOSE: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

RV Products Division INSTALLATION INSTRUCTIONS FOR SERIES PACKAGE AIR CONDITIONER

RV Products Division INSTALLATION INSTRUCTIONS FOR SERIES PACKAGE AIR CONDITIONER RV Products Division INSTALLATION INSTRUCTIONS FOR 46413 SERIES PACKAGE AIR CONDITIONER 1. WARNINGS IMPORTANT NOTICE These instructions are for the use of qualified individuals specially trained and experienced

More information

FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS - Item No. FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS (TEMPORARY) - Item No.

FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS - Item No. FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS (TEMPORARY) - Item No. FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS - Item No. FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS (TEMPORARY) - Item No. Special Provision No. 683S01 December 2017 1. SCOPE This Special Provision covers

More information

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 Building Services Piping. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

COMPACT 3020 HE COMBI BOILERS

COMPACT 3020 HE COMBI BOILERS Alde UK Price List NB: Parts shown in catalogue but not listed below are special order only. RETAIL PRODUCTS 4070 120 8 RETAIL PRE MIXED G13 SPEC ANTIFREEZE 1 L BOTTLE (324 PACK) 2,673.00 3207.60 4070

More information

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS 230500 HVAC BASIC MATERIAL AND METHODS PART 1 GENERAL 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS A. Section 230000 Basic HVAC Requirements B. Section 230523 Valves C. Section 230510 Chilled

More information

Appendix B. Symbols for Drawings. Table B.1. Air moving devices and ductwork symbols. Air Movement. Fans. Axial flow fan.

Appendix B. Symbols for Drawings. Table B.1. Air moving devices and ductwork symbols. Air Movement. Fans. Axial flow fan. Appendix B Symbols for Drawings Table B.1 Air moving devices and ductwork symbols Air Movement Fans Axial flow fan Centrifugal fan Propeller fan Intake roof ventilator (supply) Exhaust roof ventilator

More information

Fan-and-filter units 4.3. Features. Fast assembly. Application diversity and functions

Fan-and-filter units 4.3. Features. Fast assembly. Application diversity and functions Fan-and-filter units Features Fan-and-filter units are ideal for dissipating heat loads costeffectively. The pre-requisite is that the ambient air must be relatively clean and with a temperature below

More information

INSTALLATION INSTRUCTIONS FOR 6532 SERIES PACKAGE HEAT PUMP

INSTALLATION INSTRUCTIONS FOR 6532 SERIES PACKAGE HEAT PUMP INSTALLATION INSTRUCTIONS FOR 6532 SERIES PACKAGE HEAT PUMP RV Products A Division of Airxcel, Inc. P.O. Box 4020 Wichita, KS 67204 1976-360 (1-02) PP TABLE OF CONTENTS 1. Warnings......................................................

More information

PLEASE READ ALL SECTIONS OF THIS GUIDE BEFORE COMMENCING YOUR INSTALLATION AND IN CONJUNCTION WITH YOUR DRAWINGS.

PLEASE READ ALL SECTIONS OF THIS GUIDE BEFORE COMMENCING YOUR INSTALLATION AND IN CONJUNCTION WITH YOUR DRAWINGS. Installation Guide This information is provided as a guide and may differ from project to project. It is assumed that the property is a two storey dwelling. Obviously a bungalow represents a simpler task,

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings. SECTION 15481 COMPRESSED AIR SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe and pipe fittings, including valves, unions and couplings. B. Air compressor. C. After cooler. D. Refrigerated air dryer.

More information

Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT

Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT DESIGN ASSOCIATES INC MECH/ELEC DESIGN & CONSULTING 422 Highland Ave, Cheshire, CT. 06410 (203) 271-3787, fax (203) 271-2886 Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE

More information

ECONOBOOST EB II & EB III Compact Water Booster

ECONOBOOST EB II & EB III Compact Water Booster ECONOBOOST EB II & EB III Compact Water Booster The Stokvis EB II twin pump & EB III triple pump cold water booster units meet today s need for compact, reliable, high performance equipment with modest

More information

TM Series. Induced Draft, Counter Flow Optional Accessories

TM Series. Induced Draft, Counter Flow Optional Accessories ANTIFREEZE PACKAGE / RESISTANCE HEATING OPTION The antifreeze package is supplied to provide protection against freezing of standing water in the cooling tower sump due to shutdown during winter operation.

More information

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. 23 00 00 HEATING, VENTILATING & AIR-CONDITIONING The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. PART 1 GENERAL 1.1 CODES A. All work installed under

More information

CABINET PARTS For Model: KSSS48QJX00 (Stainless Steel)

CABINET PARTS For Model: KSSS48QJX00 (Stainless Steel) CABINET PARTS 48" BUILT IN REFRIGERATOR 10 02 Litho In U.S.A. (mek) 1 Part No. 1 LITERATURE PARTS LIT2209249 Use & Care Guide LIT2006651 Energy Label LIT2006748 Service & Wiring Sheet LIT628370 Modular

More information

ThermoCable Linear Heat Detection System

ThermoCable Linear Heat Detection System ThermoCable Linear Heat Detection System Estimating Guide 1. INTRODUCTION 1.1 Linear Heat Detection ThermoCable digital linear heat detection wire is a combination of advanced polymer and digital technologies

More information

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

Internal ridged board 1 x 1.5 foil face installation shall be installed on roof, walls and base of casing. A-D WITH MPU SPECIFICATION WRITTEN SPECIFICATION Description A Modular Packaged Heating, Cooling and ventilating unit(s), as indicated on the drawings shall be furnished. Direct Fired Gas Unit(s) shall

More information

User Information Sheet 008 : 2010

User Information Sheet 008 : 2010 User Information Sheet 008 : 2010 Formerly UIS008, July 2009 ELECTRICAL INSTALLATIONS ASSOCIATED WITH BULK LPG INSTALLATIONS 1. Introduction This Information Sheet describes some of the principles and

More information

AIR COOLED PACKAGED CHILLER

AIR COOLED PACKAGED CHILLER AIR COOLED PACKAGED CHILLER UNIC sal is equipped to produce a wide range of COOLER Air conditioning and Refrigeration units, conforming to the international standards and works continually to improve its

More information

THE TINY LIGHTWEIGHT

THE TINY LIGHTWEIGHT Specification for AMS Decontamination Units THE TINY LIGHTWEIGHT DIMENSIONS & WEIGHTS: BODY LENGTH: LENGTH INC. A FRAME AND COUPLING: WIDTH: HEIGHT (INTERNAL): OVERALL HEIGHT FROM FLOOR: GROSS LADEN WEIGHT:

More information

Electrical Equipment & Systems

Electrical Equipment & Systems ELECTRA has been associated with world renowned electrical equipment and systems manufacturers since 1965. Our international manufacturers and suppliers are known for their quality, creativity, unique

More information

breeze easytm model # F100-1W

breeze easytm model # F100-1W DewStop breeze easytm model # F100-1W Installation Guide Read and Save These Instructions LISTED Questions, Problems, Missing Parts? Please Call 1-360-876-2974 or E-Mail info@dewstop.com please retain

More information

BOILER HOUSE PRODUCTS GMS

BOILER HOUSE PRODUCTS GMS GMS BOILER HOUSE PRODUCTS Contents Page 2 Introduction 3 Condensate Pumpsets 6 Blowdown Vessels 8 Boiler Feed Tanks Page 10 Chemical Dosing Pots 11 Vent Heads 11 De-Aerator Heads Introduction to Boiler

More information