1 Welcome to the Public Information Centre for the Sewage Infrastructure Master Plan for the City of Kingston Urban Area Please sign in and take a Comment Sheet Utilities Kingston staff and their consultants from CH2M HILL and XCG are on hand to answer your questions. May 20, 2009

2 Purpose of the Project Utilities Kingston has initiated a Class Environmental Assessment (EA) study to develop a Sewer Infrastructure Master Plan for the City of Kingston Urban Area. A cohesive Master Plan is required to guide the Utilities' efforts to: Advance the goal of Why Virtual elimination? Due to variations in rainfall, it is nearly impossible to design for complete elimination. containment/virtual elimination of combined sewer overflows (CSOs) Maximize the effectiveness of the existing sewer system Provide adequate system capacity to meet growthbased demand to the year 2026 as per the City s Official Plan Prioritize large scale capital improvements to the sewer system Provide information to stakeholders on issues and challenges associated with Kingston s unique sewer system The study will provide a strategic plan and financing strategy, allowing for the long term growth and sustainability of the sewer system.

3 Class Environmental Assessment Master Plan Process Master Plans are long range plans which examine the current and future requirements of a given infrastructure system using environmental assessment planning principles. Master Plans, at a minimum, must address Phases 1 and 2 of the Class Environmental Assessment (EA) process.

4 Typical Sewer Systems Typical modern sewer systems consist of 2 distinct and usually parallel sewers for the collection and conveyance of sanitary sewage and storm runoff. However, in the past, combined sewers were often used. As a historic city, Kingston has a number of remaining areas that are serviced by combined sewers. What is a Combined Sewer? Combined sewers are designed to collect rainwater, domestic sewage, and industrial wastewater in the same pipe. Most of the time, combined sewer systems transport all of their wastewater to a sewage treatment plant where it is treated and then discharged to a water body. What is a Combined Sewer Overflow (CSO)? During periods of heavy rainfall or snowmelt, the capacity of the combined sewer system can be exceeded and excess wastewater overflows from the system to nearby water bodies.

5 Like other Canadian Municipalities, the City of Kingston has sewers dating back to the late 1800s and early 1900s. Much of the original city area was serviced by a combined sewer system, although much of the originally combined area has now been separated. Generally, the combined sewer area is located in the central area and downtown, bordered by Sir John A. Macdonald Boulevard to the west, Third Avenue to the North and Lake Ontario to the south and Great Cataraqui River to the east. Within the combined sewer area, the City of Kingston collects the storm water runoff and sanitary wastewater and transfers it to the Ravensview Water Pollution Control Plant for treatment. In areas with separated sewers, sanitary sewage is collected and conveyed to a treatment plant, while stormwater is collected and either treated in separate facilities (in newer construction) or conveyed directly to creeks / rivers or Lake Ontario. Due to current physical constraints on the combined sanitary sewer system, during periods of heavy rainfall and snowmelt, varying quantities of combined sewage are bypassed to the Great Cataraqui River and Lake Ontario. These bypasses are required in order to avoid sewer backups into homes and businesses. Kingston has been working actively over the past 15 years to reduce CSOs through sewer separation projects, construction of storage tanks, sewer sealing, and upgrades to pumping stations.

6 1800s City is established and all wastewater and storm water is discharged directly to the lake and river. 1950s Due to regulatory changes, interceptors are installed to direct all flow to the sewage treatment plant and sewers are separated into sanitary and storm were planned for all new developments. 1990s The Pollution Control Plan (PCP) is completed and several identified capital works projects are initiated based on report recommendations to present The PCP is updated in 2000, several capital works projects are completed and several more projects are initiated

7 Process and Features Selection This Master Plan Study builds on the recommendations of various previous studies: 1992 Pollution Control Plan (1992) - A multi-year public works implementation plan that addressed the issues of pollution control and servicing for community growth 2000 Pollution Control Plan Update (2000) - Reviewed the City s implementation of the Pollution Control Plan (1992) to confirm that future works would adequately address water pollution issues cost-effectively 2004 City of Kingston Urban Growth Strategy (2004) - Provided an integrated approach to coordinated growth management of the City to the year Examined various growth alternatives and assessed the sewer infrastructure needs to adequately accommodate new contributions to the system 2006 Kingston Combined Sewer Critical Evaluation (2006) - Developed a guiding policy for the replacement of combined sewer serviced areas with separated sewers and provided a preferred strategy for road reconstruction works in those areas 2008 City of Kingston Draft Official Plan (2008) - Delineated future areas of development within the City of Kingston that will require service connections to the existing sewer network Water and Wastewater Facility Condition and Capacity Assessment (2008) - Provided a more definitive asset management plan based on full-assessment of condition and capacity of sewage pumping 2009 stations Sewer Infrastructure Master Plan for City of Kingston Urban Area CURRENT PROJECT

8 City of Kingston Sewage Infrastructure The City of Kingston sewage infrastructure includes areas served by combined sewers as well as pumping stations, CSO storage facilities, wastewater treatment plants and the sewer network. Lakeshore Perth Ravensview WWTP Dawson Point ) Sewersheds Areas Serviced By Combined Sewers CSO Tanks Pumping Stations ) Wastewater Treatment Plant Main Trunk Sewer Forcemains Pipes Freeway Major Roads ± Kilometres Bur Brook Utilities Kingston Sewer Infrastructure 38 Battersea Kingston Mills Middle Master Plan Sewer System Major Infrastructure Westbrook Westbrook Princess Taylor-Kidd Woodbine Creekford Collins Bay Mona Hudson Lancaster Woodside Old Colony Midland Centennial Gardiners Sydenham Sunnyside John Counter Portsmouth Sir John A. Macdonald Glengarry Sir John A. Macdonald John Counter North End PS Leroy Grant Dalton Elliott Kirkpatrick Division Weller Railway Mcadoos Montreal Great Cataraqui River 401 Gore 401 Butternut Creek PS 15 Bath Collins Bay Lincoln Mona Drive PS Roosevelt Henderson Bayridge Welborne Front Road PS Chelsea Development Henderson Days Crerar Front Days Road PS Centennial Cataraqui Creek Queen Mary King Johnson Van Order Portsmouth PS Mowat Concession Union Willingdon Collingwood Victoria Beverley Kingscourt Earl Alfred Stephen O'Kill PS O'Kill Brock Barrie Patrick Raglan Earl Bay Queen West Rideau Ontario River Street PS B-64 PS B-40 PS Emma Martin Park Earl Gore Lower Union Clarence William 2 ) West WWTP Lake Ontario 95 96

9 City of Kingston Sewage Infrastructure Victoria CHATHAM ST Montreal Utilities Kingston Sewer Infrastructure Master Plan Combined Sewer Area Outfall [Ú Pumping Stations Combined Sewer Overflow (CSO) CSO Tanks CSO with Monitor Roads Combined Sewers Forcemains Sanitary Sewers Storm Sewers Areas Serviced By Combined Sewers ± Kilometres The following is a map of the area served by combined sewers including the sewer conveyance system, pumping stations, outfalls, CSO tanks and CSO locations: YONGE ST PRINCESS ST SIR JOHN A. MACDONALD BLVD MACPHERSON AVE Van Order Norman Rogers STADIUM LANE KENNEDY ST GARDINER ST [Ú VAN ORDER DR CLIFF CRES WRIGHT CRES 43 BATH RD 35 Union Princess BATH RD Portsmouth PS PALACE RD UNION ST Sir John A. Macdonald Sir John A. Macdonald 34 COM_COKL09 COM_COKL10 King HELEN ST COLLEGE ST COM_CCOL07 COM_COKL08 Concession Willingdon COM_COKL07 42 PARK ST NAPIER ST 41 MACK ST COM_COKL04 39 COM_COKL05 MACDONNELL ST COM_CCOL06 Beverley 38 COM_CNEO02B COM_CNEO02A 49 COM_CCOL05 COM_CCOL04 Kingscourt Earl COM_COKL O'Kill PS [Ú Collingwood CSO Tank Alfred VICTORIA ST NELSON ST W CAMPUS LANE FRANKLIN PL WESTDALE AVE ALAMEIN DR OAKRIDGE AVE ALBERT ST GIBSON AVE CARRUTHERS AVE REGENT ST WILLINGDON AVE HILL ST CENTRE ST TORONTO ST THIRD AVE COLLINGWOOD ST FIRST AVE KING ST W ALFRED ST FRONTENAC ST PEMBROKE ST CONCESSION ST LIVINGSTON AVE SCOTT ST COLBORNE ST UNIVERSITY AVE ELM ST RUSSELL ST DIVISION ST COM_CHRB03 COM_COKL01 ADELAIDE ST MAIN ST Division BROCK ST EARL ST 53 STUART ST PINE ST RAGLAN RD Stephen ARCH ST TRAYMOOR ST ELLERBECK ST LEROY GRANT DR WESTDALE AVE ALWINGTON PL CHURCHILL CRES DRAYTON AVE DUNLOP ST DAVIDSON ST GRAHAM ST TOWER ST DUNDAS ST MORTON ST SMITH LANE CONNAUGHT ST S BARTLETT ST SMITH ST N BARTLETT ST DURHAM ST VANDALAY CRES KENSINGTON AVE VICTORIA ST NELSON ST KINGSCOURT AVE BIRCH AVE FERGUS ST DUNKIRK AVE GREY ST YORK ST JENKINS ST FRONTENAC ST Collingwood CSO tank 2,400m 3 CARLETON ST GUY ST LANSDOWNE ST STANLEY ST HAMILTON ST CREIGHTON ST BADER LANE LINTON ST GARRETT ST ABERDEEN ST QUEBEC ST CHERRY ST MEDICAL WAY O'Kill CSO tank 6,000m 3 ANN ST ELLICE ST CHAPMAN ST COM_CNEO02C THOMAS ST COWDY ST WILLIAM ST CLERGY ST W FOUNDERS ROW PLUM ST CARLISLE ST BARRIE ST YORK ST Barrie ST. CATHERINE ST Johnson COM_CHRB19 COM_CHRB20 O'Kill CSO Tank STEPHEN ST CLERGY ST E Patrick PRIMROSE WAY PATRICK ST COM_CHBT03 JOHNSON ST WEST ST KENT ST ALMA ST COM_CHRB22 COM_CHRB23 MONTREAL ST JAMES ST Raglan Balaclava SYDENHAM ST COM_CHRB03 COM_CHRB16 Earl JOHN ST MARKLAND ST REDAN ST SYDENHAM ST BAY ST QUEEN ST COM_CHRB17 MAITLAND ST 01 [Ú 15 COM_CHBT02 COM_CHRB11 18 COM_CHRB12 COM_CHRB COM_CHRB COM_CHRB14 COM_CHRB18 LOWER UNION ST SIMCOE ST CATARAQUI ST JOHN ST BAGOT ST JAMES ST Emma Martin Park CSO Tank COM_CHRB01 COM_CHRB05 Bay Bagot CHARLES ST COM_CHBT01 16 Brock ONTARIO ST WELLINGTON ST DUFFERIN ST NORTH ST WILLIAM ST Rideau CORRIGAN ST MILLERS LANE EARL ST ORDNANCE ST RIDEAU ST GORE ST 52 Queen RIVER ST RIDEAU TERR 06 KING ST E MARKET ST CLARENCE ST Ontario River Street PS PLACE D'ARMES BARRACK ST Local CSO 100m 100m 100m 3 tanks of on West, Union on on West, on West, 100m Lower Lower 3 each, Union Union on West, Earl and St Earl Earl Earl Lower and and and William William Union, St St Gore, St Earl and William Streets Emma Martin Park CSO tank 12,000m 3 2 HWY Clarence Street CSO tank 390m 3 2

10 Schedule and Deliverables 2009 Model Data Collection and Review Completed Calibration and Validation Completed Master Plan Growth Scenarios and Guiding Principles - Completed Evaluation of Alternatives and PCP Plan Update Implementation Plan Public Information Centre #2 Master Plan Report and Notice of Master Plan Completion MARCH

11 Next Steps Next Steps: Review of comments received from Public Information Center #1 Further development and evaluation of alternatives Identification of recommended strategy Second Public Information Centre (Fall 2009) Confirmation of recommended strategy Preparation of Master Plan Ongoing communication with: - Kingston Community - Regulatory Agencies As the Study continues, the City will continue to seek input from the public and a second PIC will be held in October If you are interested in being kept informed about this project, please add your name to our mailing list. If you have any questions or comments, please contact: Ryan Matthews, P.Eng. Senior Project Manager CH2M HILL Canada Limited 1101 Prince of Wales Drive, Suite 330 Ottawa, Ontario K2C 3W7 Tel: ext Cameron Smith, P.Eng. Public Consultation Manager XCG Consultants Ltd. 6 Cataraqui Street Woolen Mill, West Wing, Suite 105 Kingston, ON K7K 1Z7 Tel: Michael Fischer, P.Eng. Utilities Engineer Utilities Kingston 1211 John Counter Blvd. Kingston, ON K7L 4X7 Tel: ext Project Address: SewageMasterPlan@UtilitiesKingston.com

K+P TRAIL EXTENSION FEASIBILITY STUDY PRELIMINARY SITE ANALYSIS PLAN PREPARED FOR THE CITY OF KINGSTON NOT FOR CONSTRUCTION

K+P TRAIL EXTENSION FEASIBILITY STUDY PRELIMINARY SITE ANALYSIS PLAN PREPARED FOR THE CITY OF KINGSTON NOT FOR CONSTRUCTION YY/MM/DD V:\2015\1415605-000 - Kingston K+P Trail Extension Feasibility\Drawings\K+P - Sheet Layout.dwg TITLEBLOCK: 790mm x 534mm OTTAWA LA 2014 PRELIMINARY SITE ANALYSIS PLAN PREPARED FOR THE NOT FOR

More information

OFFERS INVITED PREMIER DEVELOPMENT LAND. 40 Sir John A. Macdonald Blvd., Kingston, ON. Click to View Aerial Video. Providing Solutions

OFFERS INVITED PREMIER DEVELOPMENT LAND. 40 Sir John A. Macdonald Blvd., Kingston, ON. Click to View Aerial Video. Providing Solutions OFFERS INVITED PREMIER DEVELOPMENT LAND 40 Sir John A. Macdonald Blvd., Kingston, ON Click to View Aerial Video *outline is approximate Site Area: Frontages: Zoning: PIN#: Municipal Services: 8.1 Acres

More information

38 Queen s University Campus Master Plan Part 1

38 Queen s University Campus Master Plan Part 1 38 Queen s University Campus Master Plan Part 1 46 The Campus at the City Scale Chapter 4 The Campus at the City Scale 39 Queen s is an urban University centrally located in Kingston. Decisions made by

More information

Preliminary Market Analysis

Preliminary Market Analysis Preliminary Market Analysis The preliminary market analysis is used to inform the Vision and opportunities to be explored in the next phase of the secondary plan. It will continue to guide strategies to

More information

2

2 2 3 4 5 IBI GROUP RESUME Demetrius Yannoulopoulos P. ENG. Associate Representative Experience IBI Group Manager, Associate Responsible for land development projects within the Ottawa region. Responsible

More information

Transportation Master Plan Schedule B Projects Road Name From To Description of Works Southcote Road Garner Road Twenty Road Extension

Transportation Master Plan Schedule B Projects Road Name From To Description of Works Southcote Road Garner Road Twenty Road Extension NOTICE OF STUDY COMPLETION CLASS ENVIRONMENTAL ASSESSMENT STUDY Municipal Class Environmental Assessment for Hamilton Airport Employment Growth District Background The Airport Employment Growth District

More information

BOARD OF ADVISORS Biographies

BOARD OF ADVISORS Biographies BOARD OF ADVISORS Biographies Sheila Boudreau, Senior Landscape Architect, Special Projects and Design Services, Toronto and Region Conservation Authority Sheila Boudreau is a registered landscape architect

More information

Report on the Environmental Benefits and Costs of Green Roof Technology for the City of Toronto

Report on the Environmental Benefits and Costs of Green Roof Technology for the City of Toronto Report on the Environmental Benefits and Costs of Green Roof Technology for the City of Toronto 1.0 About the study 1.1 Study objectives This study is part of a project undertaken by Ryerson University

More information

PUBLIC NOTIFICATION PLAN

PUBLIC NOTIFICATION PLAN VILLAGE OF LA GRANGE, ILLINOIS NPDES PERMIT NO. ILM580009 COMBINED SEWER OVERFLOW PUBLIC NOTIFICATION PLAN NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PROGRAM ILLINOIS ENVIRONMENTAL PROTECTION AGENCY

More information

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street

More information

LIMITED ENVIRONMENTAL REVIEW

LIMITED ENVIRONMENTAL REVIEW LIMITED ENVIRONMENTAL REVIEW A. Project Identification Project Name: Montpelier CSO Phase V WPCLF# CS390624-0006 Address: Kevin Brooks, Village Administrator 211 North Jonesville St. P.O. Box 148 Montpelier,

More information

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network. Better Cycling Dedicated bike facilities will be constructed along BRT corridors where space is available. Nearby bike routes will also be upgraded to ensure a complete network is available for cyclists.

More information

Purpose of Open House #3

Purpose of Open House #3 Public Meeting #3 May 9, 2009 MVVA Team Purpose of Open House #3 The main purpose of this Open House is to present and seek input on the: Evaluation of transportation and infrastructure design alternatives

More information

Public Meeting #3 May 9, 2009 MVVA Team

Public Meeting #3 May 9, 2009 MVVA Team Public Meeting #3 May 9, 2009 MVVA Team Welcome to the third Public Meeting for the Lower Don Lands Municipal Class Environmental Assessment (EA) Infrastructure Master Plan and Keating Channel Precinct

More information

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017 WILLIAM STREET STORM SEWER OUTFALL Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE March 23, 2017 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer Service Regulation

More information

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study Public Drop-in Event 1 Thursday, October 12, 2017 6:00 p.m. to 8:00 p.m. Humbercrest United Church Welcome Welcome to

More information

A 25-YEAR PLAN FOR DOWNTOWN

A 25-YEAR PLAN FOR DOWNTOWN A 25-YEAR PLAN FOR DOWNTOWN The Downtown Secondary Plan will provide policy direction to shape future growth and link that growth to the provision of infrastructure for liveability 1. BALANCING GROWTH

More information

Municipal Action Teams

Municipal Action Teams Municipal Action Teams Debbie Mans NY/NJ Baykeeper (e) debbie@nynjbaykeeper.org Rosana Da Silva Rutgers Cooperative Extension Water Resources Program (e) rdasilva@envsc.rutgers.edu February 26, 2016 NY/NJ

More information

DOWNTOWN PARKS & PUBLIC REALM PLAN

DOWNTOWN PARKS & PUBLIC REALM PLAN DOWNTOWN PARKS & PUBLIC REALM PLAN CHALLENGES The Parks and Public Realm Strategy addresses challenges associated with a growing Downtown, including: GOALS 3.3 New buildings will fit within their existing

More information

¾À 401 TOWN OF AJAX TOWN OF WHITBY. Lake Ontario. Background Urban Planning Studies forwest West Whitby

¾À 401 TOWN OF AJAX TOWN OF WHITBY. Lake Ontario. Background Urban Planning Studies forwest West Whitby Thickson Rd Conlin Rd Country Ln Taunton Rd E Garrard Road Reservoir Expansion 2013-2021 (2016-2025) ") #* Canadian Pacific Rail Pressure Zone 2 Pressure Zone 1 Anderson St Rossland Rd E AJAX Zone 1 Feedmain

More information

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT PUBLIC INFORMATION CENTRE Vaughan Metropolitan Centre (VMC) Black Creek Renewal Wednesday, May 10, 2017 6:00 p.m. to 8:00 p.m. Add photo Project Management, Environmental Assessment, Stormwater Management

More information

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process 1 Introduction Public Information Package Baseline Road Extension between Lambs Road and Bennett Road, Bowmanville Schedule B Municipal Class Environmental Assessment November 6, 2017 Overview The purpose

More information

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD. CITY OF VAUGHAN June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS GHK SUSTAINABILITY INTERNATIONAL + LIVABILITY (CANADA) LTD. = COMMUNITY VALUE DILLON CONSULTING LTD. Public Open House Tonight s Meeting WELCOME

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

City of Kitchener Integrated Stormwater Management Master Plan (ISWM-MP) Public Open House No. 2 April 28, 2016

City of Kitchener Integrated Stormwater Management Master Plan (ISWM-MP) Public Open House No. 2 April 28, 2016 City of Kitchener Integrated Stormwater Management Master Plan (ISWM-MP) Public Open House No. 2 April 28, 2016 Open House Format 20-30 min presentation Facilitated questions and answer session following

More information

OVERVIEW NEW PARK AT 318 QUEENS QUAY WEST

OVERVIEW NEW PARK AT 318 QUEENS QUAY WEST OVERVIEW NEW PARK AT 318 QUEENS QUAY WEST A new 9,600m 2 (0.96 Ha) waterfront park is being designed at 318 Queens Quay West on Toronto's Central Waterfront. The site is bordered by Queens Quay Blvd to

More information

THE WINGHAM RAIN BARREL STUDY

THE WINGHAM RAIN BARREL STUDY THE WINGHAM RAIN BARREL STUDY A JOINT PROJECT BETWEEN INSURANCE BUREAU OF CANADA AND THE TOWNSHIP OF NORTH HURON, ONTARIO 2009 2011 June 2011 CONTENTS PAGE 1. EXECUTIVE SUMMARY 3 2. BACKGROUND 4 Previous

More information

Ashbridges Bay Erosion and Sediment Control Project

Ashbridges Bay Erosion and Sediment Control Project Ashbridges Bay Erosion and Sediment Control Project Project Brief Overview Toronto and Region Conservation Authority, in partnership with the City of Toronto, intends to carry out remedial erosion control

More information

Authorization to Study Potential Heritage Conservation Districts (HCD) under Part V of the Ontario Heritage Act

Authorization to Study Potential Heritage Conservation Districts (HCD) under Part V of the Ontario Heritage Act STAFF REPORT ACTION REQUIRED Authorization to Study Potential Heritage Conservation Districts (HCD) under Part V of the Ontario Heritage Act Date: August 16, 2012 To: From: Toronto and East York Community

More information

Dundas Place Flexible Street Public Information Centre

Dundas Place Flexible Street Public Information Centre WELCOME TO THE DUNDAS PLACE DESIGN REVEAL Dundas Place Flexible Street Public Information Centre November 8, 2017 This project is funded by the City of London with support from the Government of Canada

More information

Village of Forest Park. July 27, Sewer Separation Evaluation

Village of Forest Park. July 27, Sewer Separation Evaluation Village of Forest Park July 27, 2015 Sewer Separation Evaluation Presentation Overview Study Background Historic Nature of Forest Park Drainage Scale of Flooding Problem Forest Park Sewer System Background

More information

Green Infrastructure for Stormwater Management in Syracuse, New York. Atlantic States Legal Foundation, Inc.

Green Infrastructure for Stormwater Management in Syracuse, New York. Atlantic States Legal Foundation, Inc. Green Infrastructure for Stormwater Management in Syracuse, New York Atlantic States Legal Foundation, Inc. SECTION I Green Infrastructure Technologies What is Green Infrastructure? Green Infrastructure

More information

Portage Parkway Environmental Assessment Public Information Centre No. 1

Portage Parkway Environmental Assessment Public Information Centre No. 1 City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces

More information

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017 King-Spadina Secondary Plan Community Consultation Meeting Michelle Knieriem, City Planner October 11, 2017 Agenda 6:30 Welcome 6:35 Presentation 7:15 Question and Answer Session 8:15 Closing Remarks HOW

More information

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment November 26, 2014 Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment Study Area & Drainage System Legend Coronation Project Park

More information

CITY OF VALPARAISO STORMWATER MASTER PLAN

CITY OF VALPARAISO STORMWATER MASTER PLAN CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August

More information

WITNESS STATEMENT OF ROBERT WINGATE

WITNESS STATEMENT OF ROBERT WINGATE File: 3433-LD-01 OMB File Nos. 0040162, R040191 and SO50014 1.0 Qualifications WITNESS STATEMENT OF ROBERT WINGATE CUMMING COCKBURN LIMITED, A DIVISIONOF IBI GROUP 1770 WOODWARD DRIVE K2C 0P8 Tel: (613)

More information

CATARAQUI RIVER THIRD CROSSING EA Landscape Analysis Background Report. October 23, Corush Sunderland Wright Limited

CATARAQUI RIVER THIRD CROSSING EA Landscape Analysis Background Report. October 23, Corush Sunderland Wright Limited October 23, 2009 Corush Sunderland Wright Limited INTRODUCTION The City of Kingston has initiated an Environmental Assessment (EA) to assess the need for, and the feasibility of, implementing additional

More information

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment Bostwick Road Municipal Class Environmental Assessment October 13, 2016 Welcome! Welcome to the first Public Information Centre for the Bostwick Road Municipal Class Environmental Assessment. Representatives

More information

PIPELINE ROAD DESIGN PROJECT COMMUNITY INFORMATION SESSION

PIPELINE ROAD DESIGN PROJECT COMMUNITY INFORMATION SESSION Dunkirk Avenue COMPLETING THE STREET Coquitlam is initiating the design to complete Pipeline Road between Guildford Way and David Avenue. This arterial road serves the Town Centre and Northeast Coquitlam.

More information

Thank you for coming to the Rail Corridor Land Use Study Public Meeting.

Thank you for coming to the Rail Corridor Land Use Study Public Meeting. 01 Welcome! Thank you for coming to the Rail Corridor Land Use Study Public Meeting. Tonight is an opportunity to learn about the Land Use Study for the Rail Corridor Site. In Fall 2016, Toronto City Council

More information

EXECUTIVE SUMMARY Greater Milwaukee Watersheds Stormwater Report. Background and Significance

EXECUTIVE SUMMARY Greater Milwaukee Watersheds Stormwater Report. Background and Significance EXECUTIVE SUMMARY 2008-2012 Greater Milwaukee Watersheds Stormwater Report Background and Significance The overall goal of this project was comprehensive sampling and data analysis to determine the contribution

More information

MWRA COMPLETED CSO PROJECTS Updated November 2, 2011

MWRA COMPLETED CSO PROJECTS Updated November 2, 2011 MWRA COMPLETED CSO PROJECTS Updated November 2, 2011 www.mwra.com 1. SOMERVILLE BAFFLE MANHOLE SEPARATION Alewife Brook, Upper Mystic River 1996 $400,000 Separated common manholes connecting local sewer

More information

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on The time is right to find funding solutions that address our aging infrastructure. We can enable

More information

Humber Bay Shores Precinct Plan Final Report

Humber Bay Shores Precinct Plan Final Report STAFF REPORT ACTION REQUIRED Humber Bay Shores Precinct Plan Final Report Date: May 21, 2010 To: From: Wards: Reference Number: Etobicoke York Community Council Director, Community Planning, Etobicoke

More information

Ref. Proposed Change Advantages/Disadvantages Other Implications Status/Recommendation Adelaide Street West, Toronto, M5H 1T1

Ref. Proposed Change Advantages/Disadvantages Other Implications Status/Recommendation Adelaide Street West, Toronto, M5H 1T1 memo To Cc From David Mack Date 01 March 2011 Updated 18 March 2011 Project Hamilton Rapid Transit B-Line Project 22249801 Subject Post Consultation Alignment Changes This note sets out a number of possible

More information

Fort Wellington National Historic Site

Fort Wellington National Historic Site Fort Wellington National Historic Site DECEMBER 2015 PUBLIC CONSULTATION DOCUMENT Invitation to participate Fort Wellington National Historic Site has begun the process of reviewing its management plan.

More information

West London Dyke, April 1947 Flood. Forks of the Thames, July 2000 Flood. Source: UTRCA

West London Dyke, April 1947 Flood. Forks of the Thames, July 2000 Flood. Source: UTRCA This Public Information Centre is the 1 st of 2. Its purpose is to inform the public and to receive input with regards to the West London Dyke Master Repair Plan. The following panels describe the history,

More information

Improvements Municipal Class Environmental Assessment. Public Information Centre #1 June 11, 2015

Improvements Municipal Class Environmental Assessment. Public Information Centre #1 June 11, 2015 Western Road & Sarnia Road/Philip Aziz Avenue Improvements Municipal Class Environmental Assessment Public Information Centre #1 June 11, 2015 1. Welcome We re hosting this Public Information Centre (PIC)

More information

6 Growth Management Challenges and Opportunities

6 Growth Management Challenges and Opportunities 6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s

More information

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building LA.09.TOR (Toronto) DATE: TO: FROM: SUBJECT: Chairman and Members of the Planning and Development Committee Thomas S. Mokrzycki, Commissioner of Planning and Building Central Waterfront Secondary Plan

More information

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land. BYLAW NO. 3549/2015 Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land. 1 WHEREAS pursuant to provisions of Section 648 of the Municipal

More information

Chapter 14: Community Services and Public Utilities

Chapter 14: Community Services and Public Utilities Chapter 14: Community Services and Public Utilities Goal: Cost-effective community services related to the needs of the community. Background The City of Dundas provides a variety of services to community

More information

Report on the Environmental Benefits and Costs of Green Roof Technology for the City of Toronto

Report on the Environmental Benefits and Costs of Green Roof Technology for the City of Toronto Report on the Environmental Benefits and Costs of Green Roof Technology for the City of Toronto Prepared For City of Toronto and Ontario Centres of Excellence Earth and Environmental Technologies (OCE-ETech)

More information

168 & 170 BRADFORD STREET

168 & 170 BRADFORD STREET 168 & 170 BRADFORD STREET City of Barrie prepared by: C.C. Tatham & Associates Ltd. 41 King Street, Unit 4 Barrie, Ontario L4N 6B5 Tel: (705) 733-9037 Fax: (705) 733-1520 info@cctatham.com prepared for:

More information

GUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES

GUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES Development in the Exhibition Place lands will be consistent with the following urban design guidelines. They provide a framework for new development of the lands and are to be read in conjunction with

More information

City of Jersey City. Department of Administration Division of Engineering Traffic and Transportation

City of Jersey City. Department of Administration Division of Engineering Traffic and Transportation Division of Engineering Traffic and Transportation : Duncan Avenue Road Program Bergen Avenue Road Program PSE&G Gas System Modernization Program NJDOT Municipal Aid FY2015 Road Program Ogden Dog Park

More information

4. UTILITIES ELEMENT.

4. UTILITIES ELEMENT. 4. UTILITIES ELEMENT. The purpose of this element is to provide for necessary public facilities and services correlated to future land use projections and population demand. Utilities Sub-Elements (A)

More information

Route Planning and Environmental Assessment Study Highway 17 Four-Laning from Sudbury to Markstay GWP

Route Planning and Environmental Assessment Study Highway 17 Four-Laning from Sudbury to Markstay GWP Route Planning and Environmental Assessment Study Highway 17 Four-Laning from Sudbury to Markstay GWP 5031-09-00 Presentation to City of Greater Sudbury Council: January 26, 2011 1 Roch Pilon, P.Eng. Head,

More information

Case Study Presentation of the Downtown Brampton Flood Protection Class EA

Case Study Presentation of the Downtown Brampton Flood Protection Class EA Case Study Presentation of the Downtown Brampton Flood Protection Class EA Presented by: Kenneth M. Dion, Project Director Port Lands Integration, Waterfront Toronto (formerly Senior Manager, TRCA) At:

More information

Engineering & Development Services Completed Projects, (Excluding Development Projects)

Engineering & Development Services Completed Projects, (Excluding Development Projects) Engineering & Development Services Completed Projects, 2006 2009 (Excluding Development Projects) 2009- up to end of June The reconstruction of Centre St. and McFarland Ave. was completed. The Bell Blvd.

More information

District of Muskoka Transportation Study

District of Muskoka Transportation Study District of Muskoka Transportation Study January 18, 2017 EPW Committee Presentation Study Purpose 2 1 Road Rationalization Review 2 Road Classification Review 3 Road Standards Review 4 Transportation

More information

Are Trees Green Infrastructure? Municipal policy and green infrastructure definitions

Are Trees Green Infrastructure? Municipal policy and green infrastructure definitions Are Trees Green Infrastructure? Municipal policy and green infrastructure definitions TENLEY CONWAY UNIVERSITY OF TORONTO MISSISSAUGA AAG 2018 Green Infrastructure and Urban Residents Project A green infrastructure

More information

KINGSTON S WATERFRONT MASTER PLAN

KINGSTON S WATERFRONT MASTER PLAN KINGSTON S WATERFRONT MASTER PLAN Connections Access Enhancements Presented to the City of Kingston by thinc design Mehak, Kelly & Associates Inc. MacIntosh Perry Consulting Engineers Ltd. Shoreplan Engineering

More information

BIBLIOGRAPHY DOCUMENT 8

BIBLIOGRAPHY DOCUMENT 8 BIBLIOGRAPHY DOCUMENT 8 Bibliography: Reports, Studies, Monitoring Completed since May 2003 (date of adoption of the first Official Plan by the amalgamated City of Ottawa) 1.0 GENERAL DATA REPORTS 1.1

More information

King-Spadina HCD Study

King-Spadina HCD Study King-Spadina HCD Study Community Meeting #2 March 18, 2014 City of Toronto Taylor Hazell Architects Ltd. Urban Strategies ASI Welcome Thank you for attending the second community meeting for the King-Spadina

More information

Relief Line Project Assessment

Relief Line Project Assessment 6/9/2015 Relief Line Project Assessment Stakeholder Advisory Meeting #2 June 9, 2015 Meeting Purpose Report on the Evaluation Results for Potential Station Locations Seek your Input on Potential Corridors

More information

This Review Is Divided Into Two Phases:

This Review Is Divided Into Two Phases: Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South

More information

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project Project Overview... 2 Thalia Creek (Windsor Woods) Tide Gate... 6 Club House Road Drainage Project... 9 Updated

More information

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London Bostwick Road Municipal Class Environmental Assessment Public Information Centre #2 June 14, 2017 Welcome! Welcome to the 2 nd Public Information Centre for the. Representatives from the and the consulting

More information

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT 7 August 13, 2009 TO: FROM: Mayor and Council City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT The Director of Public Works and his fine staff prepared and submitted to you a good overview

More information

Commissioners Road West Realignment Environmental Assessment

Commissioners Road West Realignment Environmental Assessment City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 2 November 29, 2017 Welcome to the Public Information Centre This 2 nd Public Information Centre

More information

Draft ROPA 43 - HPBATS/GTA West Corridor Protection

Draft ROPA 43 - HPBATS/GTA West Corridor Protection Draft ROPA 4 - HPBATS/GTA West Corridor Protection Overview Purpose The purpose of Regional Official Plan Amendment (ROPA) No. 4 is to: Implement a corridor protection area to protect for the planned corridor

More information

WELCOME DOWNTOWN BRAMPTON FLOOD PROTECTION. Environmental Assessment Project DOWNTOWN BRAMPTON FLOOD PROTEC TION - ENVIRONMENTAL ASSESSMENT

WELCOME DOWNTOWN BRAMPTON FLOOD PROTECTION. Environmental Assessment Project DOWNTOWN BRAMPTON FLOOD PROTEC TION - ENVIRONMENTAL ASSESSMENT WELCOME DOWNTOWN BRAMPTON FLOOD PROTECTION Environmental Assessment Project PUBLIC INFORMATION CENTRE #1 WHY ARE WE HERE? 1. Introduce the Downtown Brampton Flood Protection Project led by the TRCA and

More information

Bloor Street East Potential Ravine Portal Overlook and Access Passage to the Rosedale Valley and Don River Valley Ravine, Toronto, Canada

Bloor Street East Potential Ravine Portal Overlook and Access Passage to the Rosedale Valley and Don River Valley Ravine, Toronto, Canada TRANSFORMATIVE IDEA 2. GREAT STREETS Bloor Street Christie Pits Park Bloor St Spadina Ave Bathurst St Shaw St 1 Recognize the significant public realm improvements along Bloor Street and extend and enhance

More information

Master Plan Class Environmental Assessment for Downtown Mississauga Road Improvements

Master Plan Class Environmental Assessment for Downtown Mississauga Road Improvements Master Plan Class Environmental Assessment for Downtown Mississauga Road Improvements Public Information Centre # 1 Wednesday June 25, 2014 5:30 p.m. to 8:00 p.m. Mississauga Civic Centre Great Hall Welcome

More information

WELCOME TO OPEN HOUSE # 3

WELCOME TO OPEN HOUSE # 3 Bayview Avenue Class Environmental Assessment Study Steeles Avenue to Elgin Mills Road WELCOME TO OPEN HOUSE # 3 Please sign in and join our mailing list Why Are We Here Tonight? Study Process and Purpose

More information

7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT

7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT 7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations contained

More information

Master Environmental Servicing Plan & Secondary Plan

Master Environmental Servicing Plan & Secondary Plan East Side Lands Stage 2 1 Master Environmental Servicing Plan & Secondary Plan Public Information Centre #1 June 16, 2016 Welcome! Today s Agenda Please sign in at the front desk. 5:30 pm 6:30 pm: Open

More information

SUBDIVISON & ZONING BY-LAW AMENDMENT

SUBDIVISON & ZONING BY-LAW AMENDMENT RICHMOND WEST SUBDIVISON & ZONING BY-LAW AMENDMENT FEBRUARY 2013 APPLICATION INFORMATION Applications: Proposed Plan of Subdivision and Zoning By Law Amendment. Site Address: 6335 and 6350 Perth Street.

More information

2019 Capital Improvement Plan 2018 Adopted vs 2019 Request Agency Request CIP 2018 Adopted CIP

2019 Capital Improvement Plan 2018 Adopted vs 2019 Request Agency Request CIP 2018 Adopted CIP Stormwater Utility Capital Improvement Plan Project Summary Agency Priority # Citywide Flood Mitigation 5 900,000 2,800,000 525,000 530,000 675,000 650,000 # Starkweather Coagulant Treatment 2 2,700,000

More information

Kingston Waterfront Master Plan

Kingston Waterfront Master Plan Comprehensive Kingston Waterfront Master Plan Public Meeting #1 June 25th, 2014 City of Kingston intro to: a vision for Kingston s waterfront agenda Introductions (5 min) Overview of study (45 min.) Post

More information

Save the Rain Program Overview

Save the Rain Program Overview Save the Rain Program Overview Joanne M. Mahoney, County Executive Onondaga Lake Amended Consent Judgment (ACJ) Compliance Program, January 2011 Agenda 2 1. Fourth Stipulation to the ACJ 2009-2018: Save

More information

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA Welcome Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA May 3, 2012 Study Area Cherry Beach neighbourhood is located in lower Stoney Creek on Lake Ontario, east of Millen

More information

THAT Site Development Application DA (Villa Charities Inc./Villa Colombo DiPoce Campus) BE APPROVED, subject to the following conditions:

THAT Site Development Application DA (Villa Charities Inc./Villa Colombo DiPoce Campus) BE APPROVED, subject to the following conditions: COMMITTEE OF THE WHOLE JUNE 16, 2003 SITE DEVELOPMENT FILE DA.02.058 VILLA CHARITIES INC./VILLA COLOMBO DIPOCE CAMPUS Recommendation The Commissioner of Planning recommends: THAT Site Development Application

More information

APPENDIX G SEWERS G-101.

APPENDIX G SEWERS G-101. SEWERS G-101 APPENDIX G SEWERS G-101. Sewers. G-101. Sewers. 1-56 1/13/1956 Submitting a plan from the Municipal Authority for the construction of a sanitary sewage system and sewage treatment plant. 2-56

More information

West Chester Borough Stream Protection Fee (SPF) Overview

West Chester Borough Stream Protection Fee (SPF) Overview West Chester Borough Stream Protection Fee (SPF) Overview Chester County Engineers Fall Conference November 2016 Outline Stormwater Runoff Why is it a problem in West Chester? How are we going to address

More information

Red Hill Valley Project More Than A Road October 16, 2006

Red Hill Valley Project More Than A Road October 16, 2006 Red Hill Valley Project Presented By: More Than A Road October 16, 2006 September, 2007 Gerry Davis, C.M.A., Senior Director, Capital Planning and Implementation Division Public Works Department City of

More information

GREEN STREETS TO. Complete Streets Forum October 1, Sheila Boudreau, Urban Design Patrick Cheung, Toronto Water

GREEN STREETS TO. Complete Streets Forum October 1, Sheila Boudreau, Urban Design Patrick Cheung, Toronto Water GREEN STREETS TO Complete Streets Forum October 1, 2015 Sheila Boudreau, Urban Design Patrick Cheung, Toronto Water Green Streets Status Key Objective: Moving green infrastructure from special projects

More information

Building the transportation network we need for the future

Building the transportation network we need for the future Building the transportation network we need for the future WHO IS METROLINX? Metrolinx was created in 2006 by the Province of Ontario with a mandate to create greater connection between the communities

More information

Physical Approaches to Flood Mitigation

Physical Approaches to Flood Mitigation Physical Approaches to Flood Mitigation ational Academy of Sciences /19/2017 Chicago Area Before Development Widespread Flooding Waterways and Marshes Absorbent Ground Early settlers came to this location

More information

Chief Planner and Executive Director, City Planning Division

Chief Planner and Executive Director, City Planning Division STAFF REPORT ACTION REQUIRED Date: January 23, 2008 To: From: Wards: Reference Number: Executive Committee Chief Planner and Executive Director, City Planning Division All Wards ec080003 SUMMARY This report

More information

Flooding Hearing: Long and Short Term Strategies

Flooding Hearing: Long and Short Term Strategies Services of the San Francisco Public Utilities Commission Flooding Hearing: Long and Short Term Strategies Presentation to San Francisco Board of Supervisors Public Safety and Neighborhood Services Subcommittee

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016 Item 5, Report No. 26, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the City of Vaughan on June 7, 2016. 5 MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

More information

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville

More information

Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate"

Managing Stormwater Runoff with Green Infrastructure Enhancing Community Resiliency to the Changing Climate Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate" Presented at Stormwater Management on the Whale Pond Brook Watershed Meeting Christopher C.

More information

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

Heritage Markham Committee Meeting City of Markham

Heritage Markham Committee Meeting City of Markham Heritage Markham Committee Meeting City of Markham Council Chamber, Markham Civic Centre Members Councillor Colin Campbell Judith Dawson Graham Dewar Anthony Farr Councillor Don Hamilton David Johnston

More information

Toronto Complete Streets Guidelines

Toronto Complete Streets Guidelines Toronto Complete Streets Guidelines 108 110 7.1 Green Infrastructure Design Principles 112 7.2 Context-Sensitive Green Streets 114 7.3 Key Green Street Elements Green infrastructure refers to natural and

More information

DEPARTMENT OF CITIZENSHIP AND IMMIGRATION SERVICES CHRISTIAN ISLAND IN GEORGIAN BAY

DEPARTMENT OF CITIZENSHIP AND IMMIGRATION SERVICES CHRISTIAN ISLAND IN GEORGIAN BAY INDIAN AFFAIRS BRANCH DEPARTMENT OF CITIZENSHIP AND IMMIGRATION PROPOSAL FOR PLANNING AND ENGINEERING SERVICES FEASIBILITY STUDY CAUSEWAY AND RELATED ACCESS ROADS TO CHRISTIAN ISLAND IN GEORGIAN BAY Rassurées

More information