USED ELECTIONS. 1. Lighting network

Size: px
Start display at page:

Download "USED ELECTIONS. 1. Lighting network"

Transcription

1 TECHNI CALREPORT

2 USED ELECTIONS 1. Lighting network In the premises of the building will be installed cold light with type LED floodlighters. The lighting system is designed to be made with FROR conductor with 1.5mm2 section, partially paved in TPF-20mm2 tubes. The undercut conveying part will be lined in 200x75mm metal channel. In the part of the technical room, the lighting system will be made out of the wall with 20mm2 straight tubes clamped to the ceiling and side walls. The lighting lines will be three conductors with a 3x1.5mm section, all devices, distribution boxes, cell-outlet boxes, lighting fixtures etc. will be selected according to the CEI IP-44 system. The command will be made according to the solutions that are defined in the respective drawings. Emergency lighting is in accordance with EN1838. Emergency lights are installed on the surface, min. 1x8W, with internal batteries (autonomy 2 hours) and electronic devices. Exit and emergency exit lights are always on 2. Power Network The electric roof panels will be supplied with electricity from the 3-phase network with five conductors. The power lines across the floor will be a FROR conductor with 2.5mm2 section and 4mm2 metal channel piping. The number of plugs in each office is planned to be set according to the furnishing of each room. For the part of the office power equipment, a universal prize will be set, while for the audio-visual apparatus, etc., the universal bivalent socket. 3. Command network The telephone signal is envisaged to be extended to any environment and at any office of the faculty. In the cellar, in the server room, it will be the telephone switchboard where all the phone outlets will be connected. Here is the signal from the operator covering the telephone signal in this area. The TV signal will be central, with a satellite antenna installed on the object's tarraacen. Based on that will be realized the connection cable of the TV signal, which will be installed in any environment of the building. The internet signal will be connected to every office workplace, reading room, lecture halls and seminars, labs. A server room will be built. The room will be built in the basement of the building and will cover with electronic signal basement, ground floor, first floor and second floor. The server framework will have a line with meals of tension. Also in this room will be installed a UPS with autonomy 8 hours, creating alternative conditions that there will be no power disconnection in any seconds. The alarm system, fire protection, camera surveillance system and other signaling will be realized according to the requirements of the investor and according to the requirements of the technical conditions for these services at the assembly phase.

3 A fire alarm signaling unit with 9 coverage zones will be installed for signaling against fire. In all premises of the facility will be installed smoke detectors and heat, ionic and thermal optics. The camera monitoring system will be made according to the respective schemes. All cameras will be connected to the observation room, which will be in the basement floor. Camera observation and other signaling systems will be implemented in all indoor corridors. In this way it is possible to observe the object and the students in the interior of the university. 4. Electrical panels It is intended to be installed on the ground floor. The TU panel will be with magneto-electric automation. The lines of the technical facilities, and the chillers will have electricity supply only from the grid, while the cadres of the floors will have supply from the generator. Other services such as cameras, alarms etc. will have uninterrupted supplies QUALITY OF MATERIALS All selected materials and appliances to be used in this object will be in accordance with CEI norms. It is recommended that all equipment that will be used to be CE manufactured to meet the requirements set out in European technical norms. It is recommended to use GEWISS or BTICINO brand materials, VIMAR. Protective tubes and distribution boxes In all cases, the conductors and cables used must be protected in the future in metal conduit. The channel section will depend on the number of future conductors in them and the conductor section. In special cases, as in the case of crossings in the walls, the pedals protect the pipes with flexible pipes of heavy series. When installing the lighting it is recommended that the tubes are set to diameter 16mm2 or 20mm2 for one-phase lines 20mm2 and 25mm2 for the three-phase lines 25,32,40mm2. In all cases, the diameter of the pipe must be at least 1.3 times the diameter of the conveyor bush or the cables inserted therein. For TV, TP, Date cases, this coefficient will be 1.5. The distribution boxes are chosen to allow pipes, conductor connection and secure closure of the box. The dimensions of the dispensing boxes are chosen such that they allow the heat distribution to be produced inside them. A box with a minimum size is selected with sizes 150x150 that will be used as intermediate for lighting installation. It is determined that the pipes will pass the pipes according to their function, so the color of the tube will be the same for the lighting network, the other for the network of plugs etc..

4 Electrical cables For the installation of the power grid, the following tips of cables and cables are selected N07V-K conducts a polar. This conductor is installed in the future in plastic tubes FROR 450/700 flexible polar cable used in the installation of service equipment, motor power, power poles etc. FG7R 06/1 kv conductive one-pole rubber zipper with G7 quality PVC sheath. Used as power converter. - - Cable insulation is selected first in order to fit the ground voltage and nominal voltage (Uo / U) 450/700 V. The cables to be used for the signaling and command system will have 350/450 V. - - The color of the cables to be used in the installation of the electrical plant will be unified with the CEI and CEI norms. So for neutral conductor will be used blue color, for yellowgreen color convection and for phase conductor black, gray, brown, red colors. - The conductor and cable section will be selected in order to meet the permitted heat requirement of a voltage loss of up to 4% from the feed source to the last installed frame. It is well received that the power column should meet the requirement that the voltage loss at all its length be not greater than 3%. Nominal sections will be o mm2 for signaling control circuits o 1.5mm2 for lighting circuits o 2.5mm2 for circuits with power up to 2.5 kw o 4mm2 for circuits with power up to 4 kw - The neutrals section in the power circuit will in all cases be equal to the phase section. The defense section (PE) will also be equal to the phase section - Protection of lines. As a rule, in all cases that the frame of the facility will be provided, there will be five pipelines. In the floor power panels, the protection system will be equipped with a differential device that will be straightforward, while every line will be protected with a magneto-thermal automaton. For lines with section 1.5mm2 the protection automaton will be of type C and nominal current 10A. For lines with 2.5mm2 section the protection automaton will be of type C and rated current 16A For lines with 4mm2 section the protection automaton will be of type C and rated current 20A.

5 The floor supply lines will be in section 16, 25, 35mm2. Object line automates will be selected on the basis of the above criteria, while the main panel automats will be heavyweight automata. - The power of the cars will be from 4.5 to 35KA with Id = 0.3Ma EARTH SYSTEM AND PLANNING SYSTEM FROM ATMOSPHERIC DEMOLITION. The plant will be realized with electrode, galvanized tube with D = 35mm2 and L = 1.5m. this plant will also be connected with the energy meter box as well as with the main electric frame with CU-35m2 bare cable. The number of electrodes will be as low as 4 ohm resistance. Earth system will be equitable. All equipment or metal materials installed in the object will be connected to this plant. This should be applied correctly according to the solution in the respective drawing. The system of protection against atmospheric discharges is foreseen to be with system networks, with S <20mm2 as shown in the drawing perates. Aluminum alloy rods with a diameter of 22 mm and a length of 1mL will be placed at the top of the object, which will be attached to the conveyor belt with the connecting devices. The subtractive trajectory will be a 30x3 mm zig-zag tape, which will pass under the plaster of the facade of the object. It relates to the plant of the plantation. ING. LINDITA GJEKA

6

Bethlehem University 2008 Projects Summary

Bethlehem University 2008 Projects Summary 2008 Projects Summary 2008 Projects Summary In Addition to following up daily engineering related issues and supervising the Maintenance and Security Departments the University Engineer is involved in

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA Tel: TENDER NO: TTU/T/01A/

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA   Tel: TENDER NO: TTU/T/01A/ TAITA TAVETA UNIVERSITY P.O.BOX 635-80300, VOI, KENYA EMAIL: procurement@ttu.ac.ke; Tel: 020 8150257 TENDER NO: TTU/T/01A/2017-2018 CONSTRUCTION OF PROPOSED ADMINISTRATION BLOCK- TAITA TAVETA UNIVERSITY

More information

APARTMENTS CRIKVENICA DRAMALJ, VUKOVARSKA 105

APARTMENTS CRIKVENICA DRAMALJ, VUKOVARSKA 105 APARTMENTS CRIKVENICA DRAMALJ, VUKOVARSKA 105 Investor: Franjo i Zdenka Židov, Samobor +385 (0) 91 2220 250 mariozidov@gmail.com Page 1 Investor: Franjo i Zdenka Židov, Samobor +385 (0) 91 2220 250 mariozidov@gmail.com

More information

UEE30811 Q-Tracker Work Tasks

UEE30811 Q-Tracker Work Tasks UEE30811 Q-Tracker Work Tasks UEENEEC020B Participate in electrical work and competency development activities Q-Tracker requirements: 40 hours of practical training. 1. Comply with electrical industry/enterprise

More information

Electrical Inspection Special Electrical

Electrical Inspection Special Electrical 0941 Fire Alarm System Devices, panels, wiring, conduit, etc. The present fire alarm system manufactured by Gamewell was installed with the 1982 renovation. It is a non addressable, zoned system. It includes

More information

MY HOME LaYOut Of the building 22

MY HOME LaYOut Of the building 22 22 MY HOME Layout of the building LAYOUT OF THE BUILDING SECTION CONTENTS General rules for installation 24 Type of wiring 28 Devices in flush-mounting boxes 30 Devices in surface-mounting boxes 32 Rules

More information

Operating Instructions

Operating Instructions CS101 CarSense Vehicle Motion Detector Operating Instructions CAUTIONS AND WARNINGS Never use the CS101 as a safety reversing or presence detection system. The CS101 requires that a vehicle be moving for

More information

A measured step forward

A measured step forward A measured step forward Operations & Maintenance Manual TM JESCO UV 405-412-440-450-480-550-80 2 LCD LCD PLUS Contents 1. Introduction...3 2. General Principles and Safety Instructions...4 3. Instructions

More information

2009 ELECTRICAL CODE REQUIREMENTS

2009 ELECTRICAL CODE REQUIREMENTS 2009 ELECTRICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Inspection Request Line (231) 533-3510 Electrical requirements

More information

HEAT MONITORING AND CONTROL INSTRUMENTS FOR TRANSFORMERS MB 103 TEMPERATURE CONTROL UNIT PT 100 TEMPERATURE SENSOR

HEAT MONITORING AND CONTROL INSTRUMENTS FOR TRANSFORMERS MB 103 TEMPERATURE CONTROL UNIT PT 100 TEMPERATURE SENSOR HEAT MONITORING AND CONTROL INSTRUMENTS FOR TRANSFORMERS MB 103 TEMPERATURE CONTROL UNIT PT 100 TEMPERATURE SENSOR 2 MB 103 TRANSFORMER TEMPERATURE CONTROL UNIT WITH CONTROL SIGNAL Recent approval of new

More information

Electricity Unit Notes. Agriculture Mechanics I

Electricity Unit Notes. Agriculture Mechanics I Electricity Unit Notes Agriculture Mechanics I Principles of Electricity Electricity is a form of energy that can produce light, heat, magnetism, chemical changes Resistance: tendency of a material to

More information

EUROBOX SERIES TYPES CM... SM... MM...

EUROBOX SERIES TYPES CM... SM... MM... EUROBOX SERIES TYPES CM... SM... MM... AUTOMATIC GAS BURNER CONTROL SYSTEMS FOR GAS BURNERS AND GAS BURNING APPLIANCES WITH OR WITHOUT FAN Application This range of electronic gas burner control systems

More information

Annexure - 1. Detectors: Fire Alarm Control Panel :

Annexure - 1. Detectors: Fire Alarm Control Panel : Item 1. Supply Part This Specification includes Supply, Warranty, Installation, Testing and Commissioning and integration of the Fire Alarm System mainly consisting of the Fire Alarm Control Panel (FACP),

More information

Cables and cabling solutions for residential buildings: safety, comfort and environmental-friendliness

Cables and cabling solutions for residential buildings: safety, comfort and environmental-friendliness Cables and cabling solutions for residential buildings: safety, comfort and environmental-friendliness Turning a domicile into a super home While offering you a wide range of for residences of all kinds

More information

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior

More information

Section 8 Electrical.

Section 8 Electrical. Design Guidelines Section 8 Electrical. www.canterbury.ac.nz/learningresources Standards in the Design Guidelines Suite Design Standard Guidelines Index: 01 General 02 Architecture 03 Audio Visual 04 Civil

More information

Requirements for Electrical Installations

Requirements for Electrical Installations BRITISH STANDARD BS 7671:2018 Corrigendum (December 2018) Requirements for Electrical Installations IET Wiring Regulations Eighteenth Edition The Institution of Engineering and Technology and BSI NO COPYING

More information

Installation and operation manual ZK171-ZK172-ZK174

Installation and operation manual ZK171-ZK172-ZK174 Installation and operation manual ZK7-ZK7-ZK74 DESCRIPTION: KIT color video door phone system built on IP technology already configured. consisting of: audio/video entrance panel made of stainless steel,

More information

IEC PROJETOS EM VOTAÇÃO SETEMBRO E OUTUBRO. IEC Ed.1: Railway applications - Energy mesurement on board trains - Part 2: Energy measuring

IEC PROJETOS EM VOTAÇÃO SETEMBRO E OUTUBRO. IEC Ed.1: Railway applications - Energy mesurement on board trains - Part 2: Energy measuring IEC PROJETOS EM VOTAÇÃO SETEMBRO E OUTUBRO IEC/TC 9 - Electrical equipment and systems for railways IEC 62888-2 Ed.1: Railway applications - Energy mesurement on board trains - Part 2: Energy measuring

More information

SECTION (16140) - WIRING DEVICES

SECTION (16140) - WIRING DEVICES SECTION 26 27 26 (16140) - WIRING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Receptacles, Connectors, Switches, and Finish Plates. B. Related Sections: 1. Section 00 31 13.43 (00370) -

More information

HIGH EFFICIENCY POOL DEHUMIDIFIER AND CONDITIONER WITH HIGH HEAT RECOVERY RATES. Air treatment unit. Swimming pool waste air 28 C-65%

HIGH EFFICIENCY POOL DEHUMIDIFIER AND CONDITIONER WITH HIGH HEAT RECOVERY RATES. Air treatment unit. Swimming pool waste air 28 C-65% Dry HIGH EFFICIENCY POOL DEHUMIDIFIER AND CONDITIONER WITH HIGH HEAT RECOVERY RATES Calculation of savings (for illustrative purposes) Operating scheme Note: power rates refer to 10,000 m 3 /h of air and

More information

Technical documentation DTR

Technical documentation DTR Technical documentation DTR ENG TECHNICAL DOCUMENTATION Table of contents. INTRODUCTION. PRECAUTIONS. TRANSPORT. PACKAGE CONTENT. USE AND PRINCIPLE OF OPERATION. DEVICE CONSTRUCTION, DIMENSIONS, TECHNICAL

More information

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51 TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

PARVIS Safe and tranquil thanks to Parvis

PARVIS Safe and tranquil thanks to Parvis PARVIS Safe and tranquil thanks to Parvis PARVIS MES 9000S PARVIS DUAL PARVIS WS PARVIS SMA A safety system for outdoors, for civil and industrial environments, nts, that integrates e with the garden lighting

More information

SECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35

SECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35 SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1 Overview of Low-Voltage and Power-Limited Systems...3 Chapter 4 Equipment for General Use...3 Chapter 5 Special Occupancies...3 Chapter 6 Special Equipment...4

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2 Lindsay Frederick Lighting + Electrical Ron Dodson Faculty Advisor Native American Cultural Center Arizona Technical Report 2 Native American Cultural Center Technical Report 2 p. 2 Executive Summary The

More information

The extent of liability of the signatory/signatories is limited to the work described above as the subject of this certificate.

The extent of liability of the signatory/signatories is limited to the work described above as the subject of this certificate. This safety certificate is an important and valuable document which should be retained for future reference DETAILS OF THE CLIENT Client / DETAILS OF THE INSTALLATION Extent of the installation covered

More information

HOME AUTOMATION GUIDE TO THE HOME AUTOMATION SYSTEM

HOME AUTOMATION GUIDE TO THE HOME AUTOMATION SYSTEM HOME AUTOMATION GUIDE TO THE HOME AUTOMATION SYSTEM Quick Guide Rules for installing the By-me system Introduction This guide groups ten basic rules for creating a home automation system with the By-me

More information

Chapter 1 General... 5

Chapter 1 General... 5 About This Textbook...xi About the National Electrical Code...xv About the Authors and Illustrator...xix About the Team...xxi Article 90 Introduction to the National Electrical Code... 1 90.1 Purpose of

More information

FirePro control MANUAL

FirePro control MANUAL control MANUAL Door control for FailSafe (FS) motors HW version 1.3 SW version 1.4 English Table of Contents 1 Description of the Control...2 2 Safety Instructions...3 3 Mounting...4 4 Connecting...5 5

More information

CAESAREA SUBSTATION BATTERY ENERGY STORAGE SYSTEM PREFABRICATED EQUIPMENT CONTAINER SPECIFICATION ATTACHMENT TO ANNEXURE "B"

CAESAREA SUBSTATION BATTERY ENERGY STORAGE SYSTEM PREFABRICATED EQUIPMENT CONTAINER SPECIFICATION ATTACHMENT TO ANNEXURE B CAESAREA SUBSTATION BATTERY ENERGY STORAGE SYSTEM PREFABRICATED EQUIPMENT CONTAINER SPECIFICATION ATTACHMENT TO ANNEXURE "B" DATE DRAWER DESIGNER APPROVER This document shall be revised in its entirety

More information

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION Yunusco (BD) Ltd(Formerly Shore To Shore Textiles Ltd.) Plot# 224-233, Adamjee EPZ, Shiddirgonj, Narayangonj Siddirgonj The Alliance for Bangladesh Worker

More information

CONTROL DEVICE SLIDETRONIC HD

CONTROL DEVICE SLIDETRONIC HD CONTROL DEVICE SLIDETRONIC HD to control gravity self-closing fire gates Producer: Somati system s.r.o. Jihlavská 510/2c 664 41 Troubsko, okr.brno - venkov Tel.: 547 427 011 Fax: 547 427 013 E-mail: export@somati-system.cz

More information

Chang Liu Lighting + Electrical M.A.E./B.A.E. Integrated Degree. Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson

Chang Liu Lighting + Electrical M.A.E./B.A.E. Integrated Degree. Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson M.A.E./B.A.E. Integrated Degree Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson Renzo Museum of American Art Executive Summary This report provides an analysis of the electrical

More information

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

More information

GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS University of Iowa FSG - Design & Construction Services Design Reference Manual 2 Design Standards 2.02 Classroom Design Standards Classroom Design Standards GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

More information

PERSONAL PROFILE WORK EXPERIENCES. August 2005 to Present Astaldi Arabia Ltd. Construction Engineer/Supervisor E & I

PERSONAL PROFILE WORK EXPERIENCES. August 2005 to Present Astaldi Arabia Ltd. Construction Engineer/Supervisor E & I PERSONAL PROFILE Date of Birth : August 30, 1974 Place of Birth : Tanjay City, Negros Oriental, Philippines Age : 37 Gender : Male Status : Married Height : 5 8 Weight : 74 kg. Citizenship : Filipino Religion

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

SECURITY LIGHT MODEL NO: CL6PIR OPERATION INSTRUCTIONS PART NO: GC0215

SECURITY LIGHT MODEL NO: CL6PIR OPERATION INSTRUCTIONS PART NO: GC0215 SECURITY LIGHT MODEL NO: CL6PIR PART NO: 4003535 OPERATION INSTRUCTIONS GC0215 INTRODUCTION Thank you for purchasing this CLARKE Security Light with motion sensor. The motion sensor is a small electronic

More information

Full Service Central Station Fire Alarm Listing Evaluation

Full Service Central Station Fire Alarm Listing Evaluation Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm

More information

DTS SECURITY P.O.BOX 3399 Base plate-mounting EDENVALE instructions 1610 TELEPHONE

DTS SECURITY P.O.BOX 3399 Base plate-mounting EDENVALE instructions 1610 TELEPHONE DTS Megashock 5 Energizer 5J (Indoor installation) INSTALLATION MANUAL Comply to: SANS IEC 60 335-2-76 NRCS Ref. no. 7357 10 14 DTS SECURITY P.O.BOX 3399 Base plate-mounting EDENVALE instructions 1610

More information

Technical data LA 60TU

Technical data LA 60TU Technical data LA 6TU Device information LA 6TU Design - Heat source Outside air - Model Universal design - Regulation - Thermal energy metering Integrated - Installation location Outdoors - Performance

More information

Heat Sensor Cable Alarm Units DT650L / DT950L

Heat Sensor Cable Alarm Units DT650L / DT950L Heat Sensor Cable Alarm Units DT650L / DT950L For conventional and 950 series analogue addressable systems Installation and Commissioning Manual Version 2.1 / May 2004 http://www.geindustrial.com/ge-interlogix/emea

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No.

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No. BILL 1 GROUND FLOOR Supply, Deliver, Install, Set to Work and Commission the Following: 1.01 Lighting point completely wired in 3x1.5mm² single core PVC insulated copper cables drawn in 20mm diameter HG

More information

TOM BURNS, PLANNING DIRECTOR

TOM BURNS, PLANNING DIRECTOR ~~ 0 173 COUNTY OF SANTA CRUZ August 4,2005 PLANNING DEPARTMENT 701 OCEAN STREET, qth FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 TOM BURNS, PLANNING DIRECTOR Agenda:

More information

Project Development: Residential Building

Project Development: Residential Building Project Development: Residential Building Municipality Moscow, RUSSIA Contractor INDEX 1.0 FORWARD... 1.1 Description... 2.0 INSTALLATIONS SUPPLIED... 3.0 DESCRIPTION OF THE ELECTRICAL SYSTEM... 4.0 GENERAL

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Updated section on Manufacturers 3 1. 6/15/16 Updated division section from 16120 to 26 05 00, - mgl44

More information

EXNBG CLARIFICATION/DECISION SHEETS NOTED BY THE ATEX STANDING COMMITTEE STATUS ON DECEMBER 2009

EXNBG CLARIFICATION/DECISION SHEETS NOTED BY THE ATEX STANDING COMMITTEE STATUS ON DECEMBER 2009 EXNBG CLARIFICATION/DECISION SHEETS NOTED BY THE ATEX STANDING COMMITTEE STATUS ON DECEMBER 2009 Number ExNB/CS/ DS (1) Edition Subject / Keywords 98/06/001 1.0 Certification of a torch according to EN

More information

FireSystems PROTECTOWIRE. Installing Protectowire Linear Heat Detector

FireSystems PROTECTOWIRE. Installing Protectowire Linear Heat Detector PROTECTOWIRE FireSystems Installing 1. Purpose The purpose of this guide is to ensure coverage of the area to be protected in accordance with accepted fire protection principles and to assure uniform installations.

More information

Steel, Civil, MEP & Telecommunication Infrastructure Service Providers MEP Profile

Steel, Civil, MEP & Telecommunication Infrastructure Service Providers MEP Profile Steel, Civil, MEP & Telecommunication Infrastructure Service Providers MEP Profile 1 Gulf Turrets Presence BAHRAIN QATAR U.A.E. - Dubai U.A.E. - Abu Dhabi OMAN ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007

More information

Electrical Safety Requirements

Electrical Safety Requirements Electrical Safety Requirements Purpose This document defines the minimum required control measures to reduce the risk of injury or illness related to electricity. Scope Applicable to all Coca-Cola system

More information

IR FLAME DETECTOR RIV-601/F

IR FLAME DETECTOR RIV-601/F IR FLAME DETECTOR EN 54-10 class 2 VdS approval G 205044 application manual CONTROL LOGIC rev. 4 DEC07 MAFE DEC07 IR FLAME DETECTORS SUMMARY Page general notions...3 description...4. Electrical and general

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

(Notices) EUROPEAN COMMISSION

(Notices) EUROPEAN COMMISSION 14.8.2012 Official Journal of the European Union C 245/1 IV (Notices) NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION Commission communication in the framework

More information

ELECTRICAL SERVICE TECHNICIAN EXAMINATION 12 September 2015 QUESTION AND ANSWER BOOKLET

ELECTRICAL SERVICE TECHNICIAN EXAMINATION 12 September 2015 QUESTION AND ANSWER BOOKLET EST 2066 Candidate Code No. For Board Use Only Result Date Int Result Date Int ELECTRICAL SERVICE TECHNICIAN EXAMINATION 12 September 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Two Hours INSTRUCTIONS

More information

Model 17A00 Expansion Enclosure

Model 17A00 Expansion Enclosure HOME AUTOMATION, INC. Model 17A00 Expansion Enclosure Installation Manual Document Number 17I00-1 Rev A March, 2002 Home Automation, Inc. Model 17A00 Expansion Enclosure Installation Manual Document Number

More information

AUTOMATIC SLICING MACHINE

AUTOMATIC SLICING MACHINE AUTOMATIC SLICING MACHINE Instruction for use and maintenance Noaw s.r.l. Via Colombera, 27 21048 Solbiate Arno (VA) Tel. +39 0331 219 723 - fax. +39 0331 216 197 e-mail: noaw@noaw.it http://www.noaw.it

More information

FEC400 Series. Installation Manual

FEC400 Series. Installation Manual FEC400 Series Conventional microprocessor controlled fire detection and alarm panels with extinguishing control Installation Manual Version 2.3 / August 2004 Aritech is a GE Interlogix brand. http://www.geindustrial.com/ge-interlogix/emea

More information

Technical Report 2: Electrical Systems Criteria and Existing Conditions

Technical Report 2: Electrical Systems Criteria and Existing Conditions Technical Report 2: Electrical Systems Criteria and Existing Conditions Princeton Theological Seminary Library Princeton, NJ Stephanie Deckard Lighting Electrical Faculty Advisor Dr. Kevin Houser 10/12/2012

More information

CORFLEX TYPE MC-HL POWER, CONTROL & INSTRUMENTATION CABLES

CORFLEX TYPE MC-HL POWER, CONTROL & INSTRUMENTATION CABLES CORFLEX TYPE MC-HL POWER, CONTROL & INSTRUMENTATION CABLES CORFLEX TYPE MC-HL POWER, CONTROL & INSTRUMENTATION CABLES INDEX Corflex MC-HL Instrumentation - Pairs and Triads (0V*)... 1 - CORFLEX Cables

More information

Instruction manual for downdraft hood

Instruction manual for downdraft hood Instruction manual for downdraft hood Model code: BODY / DD600BK - BODY / DD900BK BODY / DD600SS - BODY / DD900SS Contact Caple on 0844 800 3830 or for spare parts www.4caple.co.uk The symbol on the product

More information

Bilingual Residential Wiring ELPT 1029

Bilingual Residential Wiring ELPT 1029 HOUSTON COMMUNITY COLLEGE SOUTHWEST Bilingual Residential Wiring ELPT 1029 Date and Time of class: Class CRN: Instructor s Name: School Site: Phone number: HOUSTON COMMUNITY COLLEGE SOUTHWESTCOURSE SYLLABUS

More information

LED NEW FB-SERIES LED NEW-SF FIXTURE LED NEW-SD FLOODLIGHT LED NEW-SD STREET. LED Explosion-proof Platform Light. LED Tri-proof Light

LED NEW FB-SERIES LED NEW-SF FIXTURE LED NEW-SD FLOODLIGHT LED NEW-SD STREET. LED Explosion-proof Platform Light. LED Tri-proof Light LED NEW FB-SERIES LED NEW-SF FIXTURE LED Explosion-proof Platform Light LED Tri-proof Light LED Explosion-proof Highbay Light LED NEW-CF FIXTURE LED Highbay Light LED Explosion-proof Light LED Explosion-proof

More information

Senior Thesis Presentation

Senior Thesis Presentation Senior Thesis Presentation 5th Year Architectural Engineering Lighting/ Electrical Option Advisors: Dr. Mistrick & Prof. Dannerth Building Overview Size: 104, 000 square feet on 4 levels (3 stories above

More information

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL This Appendix (2000 IRC Appendix-L) is produced, copyrighted, and maintained by the National Fire Protection Association Association, all rights reserved. Use of this Appendix is pursuant to license with

More information

CORFLEX. TYPE MC-HL & MV-105 or MC-HL OIL & GAS CABLES

CORFLEX. TYPE MC-HL & MV-105 or MC-HL OIL & GAS CABLES CORFLEX TYPE MC-HL & MV-105 or MC-HL OIL & GAS CABLES INDEX Instrumentation Cables - Pairs and Triads (0V*)... 2 - The Original MC-HL Technology In 1958 Canada Wire and Cable, which s now part of Nexans,

More information

Technical data LA 60TUR+

Technical data LA 60TUR+ Technical data LA 6TUR+ Device information LA 6TUR+ Design - Heat source Outside air - Model Universal design reversible - Regulation - Thermal energy metering Integrated - Installation location Outdoors

More information

BS Outcomes 6

BS Outcomes 6 BS7671 2015 Outcomes 6 Inspection and testing 6.1 Identify the general requirements for inspection and testing of installations 6.2 State the need for diagrams, charts or tables to be available e prior

More information

MP920 SALT CHLORINATOR

MP920 SALT CHLORINATOR MP920 SALT CHLORINATOR Index 1 Safety Instructions... 3 1.1 Warnings... 3 2 EC Conformity... 3 3 System Contents... 3 4 Installation... 4 4.1 Hydraulic Installation... 4 4.1.1 Electrolysis Cell... 4 4.2

More information

TECHNICAL CERTIFICATE USER MANUAL THERMOSTAT TP years warranty

TECHNICAL CERTIFICATE USER MANUAL THERMOSTAT TP years warranty TECHNICAL CERTIFICATE USER MANUAL THERMOSTAT TP510 3 years warranty TABLE OF CONTENT Application 4 Controls and indication 4 Adjustment and operation 5 Switch on / switch off the thermostat 5 Adjustment

More information

A. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod

A. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod Journeyman and Master Common Exam 2 1 The grounding terminal of a grounding-type receptacle installed in a metal box shall be? A. Connected to the equipment ground B. Bonded to the box C. Connected to

More information

USER MANUAL FOR EXPLOSION PROTECTED FLUORESCENT LIGHT FITTING type PSF 236

USER MANUAL FOR EXPLOSION PROTECTED FLUORESCENT LIGHT FITTING type PSF 236 CONTENT 1. Manufacturer 1 2. General safety informations 1 3. Purpose 2 4. Product compliance 2 5. Degree of protection and technical data 2 6. Type 3 7. Mounting and installation 3 8. Dimensions 6 9.

More information

THE NEXT SMART HOME GENERATION

THE NEXT SMART HOME GENERATION THE NEXT SMART HOME GENERATION She just finished installing her smart home system. Simply installed. Simply expanded. Simply secure. Homematic IP is the next generation of the Homematic technology by eq-3,

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

ELECTRICAL SAFETY IN HEALTHCARE FACITILIES

ELECTRICAL SAFETY IN HEALTHCARE FACITILIES ELECTRICAL SAFETY IN HEALTHCARE FACITILIES BY ENGR. S.M. NASEERUDDIN Dar Al-Majd Consulting Engineers Riyadh, Saudi Arabia ABSTRACT The increasing use of electrical diagnostic and treatment equipment in

More information

SECTION STREET LIGHTING AND TRAFFIC SIGNALS Replace this section with the following:

SECTION STREET LIGHTING AND TRAFFIC SIGNALS Replace this section with the following: Working Together to Serve SECTION 307 - STREET LIGHTING AND TRAFFIC SIGNALS Replace this section with the following: 307-1 GENERAL. The Work under this Section consists of furnishing and installing all

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Assessor: Karardi, Shibpur, Narsingdi Narsingdi Dhaka Bangladesh Emkay Enterprises The Alliance for Bangladesh Worker Safety Page 1/15 10 Apr 2016 Introduction

More information

Technical data LA 9S-TU

Technical data LA 9S-TU Technical data LA 9S-TU Device information LA 9S-TU Design - Heat source Outside air - Model Universal design - Regulation - Thermal energy metering Integrated - Installation location Outdoors - Performance

More information

Fire precautions in dwellings

Fire precautions in dwellings NORWICH City Council Fire precautions in dwellings Private sector housing Providing homes building communities Version 2 Published by Norwich City Council June 2010 Contents Page Introduction 1 2 Types

More information

OPERATING MANUAL MODEL NO MODEL NO AND MODEL NO MODEL NO

OPERATING MANUAL MODEL NO MODEL NO AND MODEL NO MODEL NO OPERATING MANUAL LIQUI-SENSE CONTROLLERS MODEL NO. 77096-00 MODEL NO. 77096-05 AND LIQUI-SENSE DETECTORS MODEL NO. 77095-00 MODEL NO. 77095-01 Cole-Parmer Instrument Co. 625 East Bunker Court Vernon Hills,

More information

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016)

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016) Cheboygan County Department of Building Safety 870 South Main Street P.O. Box 70 Cheboygan, Michigan 49721 TX: (231) 627-8813 FX: (231) 627-8454 www.cheboygancounty.net Service Entrance ONE- AND TWO-FAMILY

More information

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i.

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i. Additional Operating Instructions SITRANS F Vortex flowmeters Ex-i Edition 09/2018 CONTENTS 1 Safety instructions 3 1.1 General notes... 3 1.2 EU conformity... 3 1.3 Approval according to the IECEx scheme...

More information

Ç O K E S E N E L E K T R O N İ K LTD.

Ç O K E S E N E L E K T R O N İ K LTD. Ç O K E S E N E L E K T R O N İ K LTD. Electricity - Security System Experiment sets Electrical Transmission Lines Trainer Set The Experiment Set is designed to perform sample applications related to energy

More information

Inspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc

Inspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc Inspection Report 1 Inspection Way Orlando, FL 32825 Prepared for: Wanda Figueroa Prepared by: Page 1 of 25 Needs Service Summary This summary is not the entire report. The complete report may include

More information

DCP3/ DETAILS OF THE CLIENT ADDRESS OF THE INSTALLATION

DCP3/ DETAILS OF THE CLIENT ADDRESS OF THE INSTALLATION Issued in accordance with British Standard 7671 - Requirements for Electrical Installationsby a Domestic Installer enrolled with NICEIC, Warwick House, Houghton Hall Park, Houghton Regis, Dunstable LU5

More information

SPACE DETECTOR SP Presentation

SPACE DETECTOR SP Presentation SPACE DETECTOR SP2-114 Presentation 1 CONTENTS 2 ULTRASOUND DETECTION 4 2.1 PRINCIPLE 4 2.2 FOR A PERFECT WORKING ORDER 4 3 DETECTOR PLACEMENT 5 3.1 PLACEMENT SITUATION 6 3.2 ZONE OF DETECTION 6 3.3 CITY

More information

1 NORMS AND REGULATIONS Guarantee norms: Environmental notes: Identification:... 15

1 NORMS AND REGULATIONS Guarantee norms: Environmental notes: Identification:... 15 Index 1 NORMS AND REGULATIONS... 15 1.1 Guarantee norms:... 15 1.2 Environmental notes:... 15 1.3 Identification:... 15 2 INSTALLATION... 16 2.1 Lifting and Movement:... 16 2.2 Positioning:... 16 2.3 Environmental

More information

TRADING DIVISION COMPANY PROFILE. An ISO 9001 : 2008 Certified Company

TRADING DIVISION COMPANY PROFILE. An ISO 9001 : 2008 Certified Company TRADING DIVISION COMPANY PROFILE An ISO 9001 : 2008 Certified Company Contents Introduction 04 Company Summary 05 Structured Cabling 06 Server Cabinets 10 Cable Management System 11 Oil Field Supplies

More information

Table-1: Clarifications and modification in tender specifications based on Pre-bid meeting discussion

Table-1: Clarifications and modification in tender specifications based on Pre-bid meeting discussion Table-1: Clarifications and modification in tender s based on Pre-bid meeting discussion Sr. Ref Page. 1 4 Clause Site Preparation and Partitions walls 2 11 SLD 3 18 Batteries 4 18 Batteries 5 32 to 34

More information

Equipment Information

Equipment Information 2050D Equipment Information INDEX: DESCRIPTION AND KEY FEATURES LAYOUT NOMINAL TECHNICAL DATA CONFIGURATION www.sealedair-emea.com Reg. U.S. Pat. & TM Off. Sealed Air Corporation 2009. All rights reserved.

More information

Pluggit iconvent Decentralized residential ventilation with heat recovery Operating and installation instructions

Pluggit iconvent Decentralized residential ventilation with heat recovery Operating and installation instructions git iconvent Decentralized residential ventilation with heat recovery Operating and installation instructions www.pluggit.com The technology makes the difference. Innovations of git with an added value

More information

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager. B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.

More information

Network Speed Dome Installation Manual

Network Speed Dome Installation Manual Network Speed Dome Installation Manual Version 1.0.0 Table of Contents 1 INSTALLATION PREPARATION... 1 1.1 Basic Requirement... 1 1.2 Installation Check... 1 1.3 Cable Preparation... 1 1.3.1 The Min Specification

More information