USED ELECTIONS. 1. Lighting network
|
|
- Albert Harrington
- 5 years ago
- Views:
Transcription
1 TECHNI CALREPORT
2 USED ELECTIONS 1. Lighting network In the premises of the building will be installed cold light with type LED floodlighters. The lighting system is designed to be made with FROR conductor with 1.5mm2 section, partially paved in TPF-20mm2 tubes. The undercut conveying part will be lined in 200x75mm metal channel. In the part of the technical room, the lighting system will be made out of the wall with 20mm2 straight tubes clamped to the ceiling and side walls. The lighting lines will be three conductors with a 3x1.5mm section, all devices, distribution boxes, cell-outlet boxes, lighting fixtures etc. will be selected according to the CEI IP-44 system. The command will be made according to the solutions that are defined in the respective drawings. Emergency lighting is in accordance with EN1838. Emergency lights are installed on the surface, min. 1x8W, with internal batteries (autonomy 2 hours) and electronic devices. Exit and emergency exit lights are always on 2. Power Network The electric roof panels will be supplied with electricity from the 3-phase network with five conductors. The power lines across the floor will be a FROR conductor with 2.5mm2 section and 4mm2 metal channel piping. The number of plugs in each office is planned to be set according to the furnishing of each room. For the part of the office power equipment, a universal prize will be set, while for the audio-visual apparatus, etc., the universal bivalent socket. 3. Command network The telephone signal is envisaged to be extended to any environment and at any office of the faculty. In the cellar, in the server room, it will be the telephone switchboard where all the phone outlets will be connected. Here is the signal from the operator covering the telephone signal in this area. The TV signal will be central, with a satellite antenna installed on the object's tarraacen. Based on that will be realized the connection cable of the TV signal, which will be installed in any environment of the building. The internet signal will be connected to every office workplace, reading room, lecture halls and seminars, labs. A server room will be built. The room will be built in the basement of the building and will cover with electronic signal basement, ground floor, first floor and second floor. The server framework will have a line with meals of tension. Also in this room will be installed a UPS with autonomy 8 hours, creating alternative conditions that there will be no power disconnection in any seconds. The alarm system, fire protection, camera surveillance system and other signaling will be realized according to the requirements of the investor and according to the requirements of the technical conditions for these services at the assembly phase.
3 A fire alarm signaling unit with 9 coverage zones will be installed for signaling against fire. In all premises of the facility will be installed smoke detectors and heat, ionic and thermal optics. The camera monitoring system will be made according to the respective schemes. All cameras will be connected to the observation room, which will be in the basement floor. Camera observation and other signaling systems will be implemented in all indoor corridors. In this way it is possible to observe the object and the students in the interior of the university. 4. Electrical panels It is intended to be installed on the ground floor. The TU panel will be with magneto-electric automation. The lines of the technical facilities, and the chillers will have electricity supply only from the grid, while the cadres of the floors will have supply from the generator. Other services such as cameras, alarms etc. will have uninterrupted supplies QUALITY OF MATERIALS All selected materials and appliances to be used in this object will be in accordance with CEI norms. It is recommended that all equipment that will be used to be CE manufactured to meet the requirements set out in European technical norms. It is recommended to use GEWISS or BTICINO brand materials, VIMAR. Protective tubes and distribution boxes In all cases, the conductors and cables used must be protected in the future in metal conduit. The channel section will depend on the number of future conductors in them and the conductor section. In special cases, as in the case of crossings in the walls, the pedals protect the pipes with flexible pipes of heavy series. When installing the lighting it is recommended that the tubes are set to diameter 16mm2 or 20mm2 for one-phase lines 20mm2 and 25mm2 for the three-phase lines 25,32,40mm2. In all cases, the diameter of the pipe must be at least 1.3 times the diameter of the conveyor bush or the cables inserted therein. For TV, TP, Date cases, this coefficient will be 1.5. The distribution boxes are chosen to allow pipes, conductor connection and secure closure of the box. The dimensions of the dispensing boxes are chosen such that they allow the heat distribution to be produced inside them. A box with a minimum size is selected with sizes 150x150 that will be used as intermediate for lighting installation. It is determined that the pipes will pass the pipes according to their function, so the color of the tube will be the same for the lighting network, the other for the network of plugs etc..
4 Electrical cables For the installation of the power grid, the following tips of cables and cables are selected N07V-K conducts a polar. This conductor is installed in the future in plastic tubes FROR 450/700 flexible polar cable used in the installation of service equipment, motor power, power poles etc. FG7R 06/1 kv conductive one-pole rubber zipper with G7 quality PVC sheath. Used as power converter. - - Cable insulation is selected first in order to fit the ground voltage and nominal voltage (Uo / U) 450/700 V. The cables to be used for the signaling and command system will have 350/450 V. - - The color of the cables to be used in the installation of the electrical plant will be unified with the CEI and CEI norms. So for neutral conductor will be used blue color, for yellowgreen color convection and for phase conductor black, gray, brown, red colors. - The conductor and cable section will be selected in order to meet the permitted heat requirement of a voltage loss of up to 4% from the feed source to the last installed frame. It is well received that the power column should meet the requirement that the voltage loss at all its length be not greater than 3%. Nominal sections will be o mm2 for signaling control circuits o 1.5mm2 for lighting circuits o 2.5mm2 for circuits with power up to 2.5 kw o 4mm2 for circuits with power up to 4 kw - The neutrals section in the power circuit will in all cases be equal to the phase section. The defense section (PE) will also be equal to the phase section - Protection of lines. As a rule, in all cases that the frame of the facility will be provided, there will be five pipelines. In the floor power panels, the protection system will be equipped with a differential device that will be straightforward, while every line will be protected with a magneto-thermal automaton. For lines with section 1.5mm2 the protection automaton will be of type C and nominal current 10A. For lines with 2.5mm2 section the protection automaton will be of type C and rated current 16A For lines with 4mm2 section the protection automaton will be of type C and rated current 20A.
5 The floor supply lines will be in section 16, 25, 35mm2. Object line automates will be selected on the basis of the above criteria, while the main panel automats will be heavyweight automata. - The power of the cars will be from 4.5 to 35KA with Id = 0.3Ma EARTH SYSTEM AND PLANNING SYSTEM FROM ATMOSPHERIC DEMOLITION. The plant will be realized with electrode, galvanized tube with D = 35mm2 and L = 1.5m. this plant will also be connected with the energy meter box as well as with the main electric frame with CU-35m2 bare cable. The number of electrodes will be as low as 4 ohm resistance. Earth system will be equitable. All equipment or metal materials installed in the object will be connected to this plant. This should be applied correctly according to the solution in the respective drawing. The system of protection against atmospheric discharges is foreseen to be with system networks, with S <20mm2 as shown in the drawing perates. Aluminum alloy rods with a diameter of 22 mm and a length of 1mL will be placed at the top of the object, which will be attached to the conveyor belt with the connecting devices. The subtractive trajectory will be a 30x3 mm zig-zag tape, which will pass under the plaster of the facade of the object. It relates to the plant of the plantation. ING. LINDITA GJEKA
6
Bethlehem University 2008 Projects Summary
2008 Projects Summary 2008 Projects Summary In Addition to following up daily engineering related issues and supervising the Maintenance and Security Departments the University Engineer is involved in
More informationSCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL
SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm
More informationCOMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods
1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,
More informationBuilding Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as
More informationTAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA Tel: TENDER NO: TTU/T/01A/
TAITA TAVETA UNIVERSITY P.O.BOX 635-80300, VOI, KENYA EMAIL: procurement@ttu.ac.ke; Tel: 020 8150257 TENDER NO: TTU/T/01A/2017-2018 CONSTRUCTION OF PROPOSED ADMINISTRATION BLOCK- TAITA TAVETA UNIVERSITY
More informationAPARTMENTS CRIKVENICA DRAMALJ, VUKOVARSKA 105
APARTMENTS CRIKVENICA DRAMALJ, VUKOVARSKA 105 Investor: Franjo i Zdenka Židov, Samobor +385 (0) 91 2220 250 mariozidov@gmail.com Page 1 Investor: Franjo i Zdenka Židov, Samobor +385 (0) 91 2220 250 mariozidov@gmail.com
More informationUEE30811 Q-Tracker Work Tasks
UEE30811 Q-Tracker Work Tasks UEENEEC020B Participate in electrical work and competency development activities Q-Tracker requirements: 40 hours of practical training. 1. Comply with electrical industry/enterprise
More informationElectrical Inspection Special Electrical
0941 Fire Alarm System Devices, panels, wiring, conduit, etc. The present fire alarm system manufactured by Gamewell was installed with the 1982 renovation. It is a non addressable, zoned system. It includes
More informationMY HOME LaYOut Of the building 22
22 MY HOME Layout of the building LAYOUT OF THE BUILDING SECTION CONTENTS General rules for installation 24 Type of wiring 28 Devices in flush-mounting boxes 30 Devices in surface-mounting boxes 32 Rules
More informationOperating Instructions
CS101 CarSense Vehicle Motion Detector Operating Instructions CAUTIONS AND WARNINGS Never use the CS101 as a safety reversing or presence detection system. The CS101 requires that a vehicle be moving for
More informationA measured step forward
A measured step forward Operations & Maintenance Manual TM JESCO UV 405-412-440-450-480-550-80 2 LCD LCD PLUS Contents 1. Introduction...3 2. General Principles and Safety Instructions...4 3. Instructions
More information2009 ELECTRICAL CODE REQUIREMENTS
2009 ELECTRICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Inspection Request Line (231) 533-3510 Electrical requirements
More informationHEAT MONITORING AND CONTROL INSTRUMENTS FOR TRANSFORMERS MB 103 TEMPERATURE CONTROL UNIT PT 100 TEMPERATURE SENSOR
HEAT MONITORING AND CONTROL INSTRUMENTS FOR TRANSFORMERS MB 103 TEMPERATURE CONTROL UNIT PT 100 TEMPERATURE SENSOR 2 MB 103 TRANSFORMER TEMPERATURE CONTROL UNIT WITH CONTROL SIGNAL Recent approval of new
More informationElectricity Unit Notes. Agriculture Mechanics I
Electricity Unit Notes Agriculture Mechanics I Principles of Electricity Electricity is a form of energy that can produce light, heat, magnetism, chemical changes Resistance: tendency of a material to
More informationEUROBOX SERIES TYPES CM... SM... MM...
EUROBOX SERIES TYPES CM... SM... MM... AUTOMATIC GAS BURNER CONTROL SYSTEMS FOR GAS BURNERS AND GAS BURNING APPLIANCES WITH OR WITHOUT FAN Application This range of electronic gas burner control systems
More informationAnnexure - 1. Detectors: Fire Alarm Control Panel :
Item 1. Supply Part This Specification includes Supply, Warranty, Installation, Testing and Commissioning and integration of the Fire Alarm System mainly consisting of the Fire Alarm Control Panel (FACP),
More informationCables and cabling solutions for residential buildings: safety, comfort and environmental-friendliness
Cables and cabling solutions for residential buildings: safety, comfort and environmental-friendliness Turning a domicile into a super home While offering you a wide range of for residences of all kinds
More informationPlease refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing
The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior
More informationSection 8 Electrical.
Design Guidelines Section 8 Electrical. www.canterbury.ac.nz/learningresources Standards in the Design Guidelines Suite Design Standard Guidelines Index: 01 General 02 Architecture 03 Audio Visual 04 Civil
More informationRequirements for Electrical Installations
BRITISH STANDARD BS 7671:2018 Corrigendum (December 2018) Requirements for Electrical Installations IET Wiring Regulations Eighteenth Edition The Institution of Engineering and Technology and BSI NO COPYING
More informationInstallation and operation manual ZK171-ZK172-ZK174
Installation and operation manual ZK7-ZK7-ZK74 DESCRIPTION: KIT color video door phone system built on IP technology already configured. consisting of: audio/video entrance panel made of stainless steel,
More informationIEC PROJETOS EM VOTAÇÃO SETEMBRO E OUTUBRO. IEC Ed.1: Railway applications - Energy mesurement on board trains - Part 2: Energy measuring
IEC PROJETOS EM VOTAÇÃO SETEMBRO E OUTUBRO IEC/TC 9 - Electrical equipment and systems for railways IEC 62888-2 Ed.1: Railway applications - Energy mesurement on board trains - Part 2: Energy measuring
More informationSECTION (16140) - WIRING DEVICES
SECTION 26 27 26 (16140) - WIRING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Receptacles, Connectors, Switches, and Finish Plates. B. Related Sections: 1. Section 00 31 13.43 (00370) -
More informationHIGH EFFICIENCY POOL DEHUMIDIFIER AND CONDITIONER WITH HIGH HEAT RECOVERY RATES. Air treatment unit. Swimming pool waste air 28 C-65%
Dry HIGH EFFICIENCY POOL DEHUMIDIFIER AND CONDITIONER WITH HIGH HEAT RECOVERY RATES Calculation of savings (for illustrative purposes) Operating scheme Note: power rates refer to 10,000 m 3 /h of air and
More informationTechnical documentation DTR
Technical documentation DTR ENG TECHNICAL DOCUMENTATION Table of contents. INTRODUCTION. PRECAUTIONS. TRANSPORT. PACKAGE CONTENT. USE AND PRINCIPLE OF OPERATION. DEVICE CONSTRUCTION, DIMENSIONS, TECHNICAL
More informationTABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51
TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...
More informationPARVIS Safe and tranquil thanks to Parvis
PARVIS Safe and tranquil thanks to Parvis PARVIS MES 9000S PARVIS DUAL PARVIS WS PARVIS SMA A safety system for outdoors, for civil and industrial environments, nts, that integrates e with the garden lighting
More informationSECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35
SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1 Overview of Low-Voltage and Power-Limited Systems...3 Chapter 4 Equipment for General Use...3 Chapter 5 Special Occupancies...3 Chapter 6 Special Equipment...4
More informationSCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003
SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on
More informationLindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2
Lindsay Frederick Lighting + Electrical Ron Dodson Faculty Advisor Native American Cultural Center Arizona Technical Report 2 Native American Cultural Center Technical Report 2 p. 2 Executive Summary The
More informationThe extent of liability of the signatory/signatories is limited to the work described above as the subject of this certificate.
This safety certificate is an important and valuable document which should be retained for future reference DETAILS OF THE CLIENT Client / DETAILS OF THE INSTALLATION Extent of the installation covered
More informationHOME AUTOMATION GUIDE TO THE HOME AUTOMATION SYSTEM
HOME AUTOMATION GUIDE TO THE HOME AUTOMATION SYSTEM Quick Guide Rules for installing the By-me system Introduction This guide groups ten basic rules for creating a home automation system with the By-me
More informationChapter 1 General... 5
About This Textbook...xi About the National Electrical Code...xv About the Authors and Illustrator...xix About the Team...xxi Article 90 Introduction to the National Electrical Code... 1 90.1 Purpose of
More informationFirePro control MANUAL
control MANUAL Door control for FailSafe (FS) motors HW version 1.3 SW version 1.4 English Table of Contents 1 Description of the Control...2 2 Safety Instructions...3 3 Mounting...4 4 Connecting...5 5
More informationCAESAREA SUBSTATION BATTERY ENERGY STORAGE SYSTEM PREFABRICATED EQUIPMENT CONTAINER SPECIFICATION ATTACHMENT TO ANNEXURE "B"
CAESAREA SUBSTATION BATTERY ENERGY STORAGE SYSTEM PREFABRICATED EQUIPMENT CONTAINER SPECIFICATION ATTACHMENT TO ANNEXURE "B" DATE DRAWER DESIGNER APPROVER This document shall be revised in its entirety
More informationINITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION
INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION Yunusco (BD) Ltd(Formerly Shore To Shore Textiles Ltd.) Plot# 224-233, Adamjee EPZ, Shiddirgonj, Narayangonj Siddirgonj The Alliance for Bangladesh Worker
More informationCONTROL DEVICE SLIDETRONIC HD
CONTROL DEVICE SLIDETRONIC HD to control gravity self-closing fire gates Producer: Somati system s.r.o. Jihlavská 510/2c 664 41 Troubsko, okr.brno - venkov Tel.: 547 427 011 Fax: 547 427 013 E-mail: export@somati-system.cz
More informationChang Liu Lighting + Electrical M.A.E./B.A.E. Integrated Degree. Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson
M.A.E./B.A.E. Integrated Degree Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson Renzo Museum of American Art Executive Summary This report provides an analysis of the electrical
More informationELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED
SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED
More informationGENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS
University of Iowa FSG - Design & Construction Services Design Reference Manual 2 Design Standards 2.02 Classroom Design Standards Classroom Design Standards GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS
More informationPERSONAL PROFILE WORK EXPERIENCES. August 2005 to Present Astaldi Arabia Ltd. Construction Engineer/Supervisor E & I
PERSONAL PROFILE Date of Birth : August 30, 1974 Place of Birth : Tanjay City, Negros Oriental, Philippines Age : 37 Gender : Male Status : Married Height : 5 8 Weight : 74 kg. Citizenship : Filipino Religion
More informationElectrical Design Guidelines Table of Contents
C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6
More informationSECURITY LIGHT MODEL NO: CL6PIR OPERATION INSTRUCTIONS PART NO: GC0215
SECURITY LIGHT MODEL NO: CL6PIR PART NO: 4003535 OPERATION INSTRUCTIONS GC0215 INTRODUCTION Thank you for purchasing this CLARKE Security Light with motion sensor. The motion sensor is a small electronic
More informationFull Service Central Station Fire Alarm Listing Evaluation
Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm
More informationDTS SECURITY P.O.BOX 3399 Base plate-mounting EDENVALE instructions 1610 TELEPHONE
DTS Megashock 5 Energizer 5J (Indoor installation) INSTALLATION MANUAL Comply to: SANS IEC 60 335-2-76 NRCS Ref. no. 7357 10 14 DTS SECURITY P.O.BOX 3399 Base plate-mounting EDENVALE instructions 1610
More informationTechnical data LA 60TU
Technical data LA 6TU Device information LA 6TU Design - Heat source Outside air - Model Universal design - Regulation - Thermal energy metering Integrated - Installation location Outdoors - Performance
More informationHeat Sensor Cable Alarm Units DT650L / DT950L
Heat Sensor Cable Alarm Units DT650L / DT950L For conventional and 950 series analogue addressable systems Installation and Commissioning Manual Version 2.1 / May 2004 http://www.geindustrial.com/ge-interlogix/emea
More informationHOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District
HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the
More informationProposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No.
BILL 1 GROUND FLOOR Supply, Deliver, Install, Set to Work and Commission the Following: 1.01 Lighting point completely wired in 3x1.5mm² single core PVC insulated copper cables drawn in 20mm diameter HG
More informationTOM BURNS, PLANNING DIRECTOR
~~ 0 173 COUNTY OF SANTA CRUZ August 4,2005 PLANNING DEPARTMENT 701 OCEAN STREET, qth FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 TOM BURNS, PLANNING DIRECTOR Agenda:
More informationProject Development: Residential Building
Project Development: Residential Building Municipality Moscow, RUSSIA Contractor INDEX 1.0 FORWARD... 1.1 Description... 2.0 INSTALLATIONS SUPPLIED... 3.0 DESCRIPTION OF THE ELECTRICAL SYSTEM... 4.0 GENERAL
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Updated section on Manufacturers 3 1. 6/15/16 Updated division section from 16120 to 26 05 00, - mgl44
More informationEXNBG CLARIFICATION/DECISION SHEETS NOTED BY THE ATEX STANDING COMMITTEE STATUS ON DECEMBER 2009
EXNBG CLARIFICATION/DECISION SHEETS NOTED BY THE ATEX STANDING COMMITTEE STATUS ON DECEMBER 2009 Number ExNB/CS/ DS (1) Edition Subject / Keywords 98/06/001 1.0 Certification of a torch according to EN
More informationFireSystems PROTECTOWIRE. Installing Protectowire Linear Heat Detector
PROTECTOWIRE FireSystems Installing 1. Purpose The purpose of this guide is to ensure coverage of the area to be protected in accordance with accepted fire protection principles and to assure uniform installations.
More informationSteel, Civil, MEP & Telecommunication Infrastructure Service Providers MEP Profile
Steel, Civil, MEP & Telecommunication Infrastructure Service Providers MEP Profile 1 Gulf Turrets Presence BAHRAIN QATAR U.A.E. - Dubai U.A.E. - Abu Dhabi OMAN ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007
More informationElectrical Safety Requirements
Electrical Safety Requirements Purpose This document defines the minimum required control measures to reduce the risk of injury or illness related to electricity. Scope Applicable to all Coca-Cola system
More informationIR FLAME DETECTOR RIV-601/F
IR FLAME DETECTOR EN 54-10 class 2 VdS approval G 205044 application manual CONTROL LOGIC rev. 4 DEC07 MAFE DEC07 IR FLAME DETECTORS SUMMARY Page general notions...3 description...4. Electrical and general
More informationELECTRICAL SYSTEMS ASSESSMENT Hanover High School
ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,
More information(Notices) EUROPEAN COMMISSION
14.8.2012 Official Journal of the European Union C 245/1 IV (Notices) NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION Commission communication in the framework
More informationELECTRICAL SERVICE TECHNICIAN EXAMINATION 12 September 2015 QUESTION AND ANSWER BOOKLET
EST 2066 Candidate Code No. For Board Use Only Result Date Int Result Date Int ELECTRICAL SERVICE TECHNICIAN EXAMINATION 12 September 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Two Hours INSTRUCTIONS
More informationModel 17A00 Expansion Enclosure
HOME AUTOMATION, INC. Model 17A00 Expansion Enclosure Installation Manual Document Number 17I00-1 Rev A March, 2002 Home Automation, Inc. Model 17A00 Expansion Enclosure Installation Manual Document Number
More informationAUTOMATIC SLICING MACHINE
AUTOMATIC SLICING MACHINE Instruction for use and maintenance Noaw s.r.l. Via Colombera, 27 21048 Solbiate Arno (VA) Tel. +39 0331 219 723 - fax. +39 0331 216 197 e-mail: noaw@noaw.it http://www.noaw.it
More informationFEC400 Series. Installation Manual
FEC400 Series Conventional microprocessor controlled fire detection and alarm panels with extinguishing control Installation Manual Version 2.3 / August 2004 Aritech is a GE Interlogix brand. http://www.geindustrial.com/ge-interlogix/emea
More informationTechnical Report 2: Electrical Systems Criteria and Existing Conditions
Technical Report 2: Electrical Systems Criteria and Existing Conditions Princeton Theological Seminary Library Princeton, NJ Stephanie Deckard Lighting Electrical Faculty Advisor Dr. Kevin Houser 10/12/2012
More informationCORFLEX TYPE MC-HL POWER, CONTROL & INSTRUMENTATION CABLES
CORFLEX TYPE MC-HL POWER, CONTROL & INSTRUMENTATION CABLES CORFLEX TYPE MC-HL POWER, CONTROL & INSTRUMENTATION CABLES INDEX Corflex MC-HL Instrumentation - Pairs and Triads (0V*)... 1 - CORFLEX Cables
More informationInstruction manual for downdraft hood
Instruction manual for downdraft hood Model code: BODY / DD600BK - BODY / DD900BK BODY / DD600SS - BODY / DD900SS Contact Caple on 0844 800 3830 or for spare parts www.4caple.co.uk The symbol on the product
More informationBilingual Residential Wiring ELPT 1029
HOUSTON COMMUNITY COLLEGE SOUTHWEST Bilingual Residential Wiring ELPT 1029 Date and Time of class: Class CRN: Instructor s Name: School Site: Phone number: HOUSTON COMMUNITY COLLEGE SOUTHWESTCOURSE SYLLABUS
More informationLED NEW FB-SERIES LED NEW-SF FIXTURE LED NEW-SD FLOODLIGHT LED NEW-SD STREET. LED Explosion-proof Platform Light. LED Tri-proof Light
LED NEW FB-SERIES LED NEW-SF FIXTURE LED Explosion-proof Platform Light LED Tri-proof Light LED Explosion-proof Highbay Light LED NEW-CF FIXTURE LED Highbay Light LED Explosion-proof Light LED Explosion-proof
More informationSenior Thesis Presentation
Senior Thesis Presentation 5th Year Architectural Engineering Lighting/ Electrical Option Advisors: Dr. Mistrick & Prof. Dannerth Building Overview Size: 104, 000 square feet on 4 levels (3 stories above
More informationAPPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL
This Appendix (2000 IRC Appendix-L) is produced, copyrighted, and maintained by the National Fire Protection Association Association, all rights reserved. Use of this Appendix is pursuant to license with
More informationCORFLEX. TYPE MC-HL & MV-105 or MC-HL OIL & GAS CABLES
CORFLEX TYPE MC-HL & MV-105 or MC-HL OIL & GAS CABLES INDEX Instrumentation Cables - Pairs and Triads (0V*)... 2 - The Original MC-HL Technology In 1958 Canada Wire and Cable, which s now part of Nexans,
More informationTechnical data LA 60TUR+
Technical data LA 6TUR+ Device information LA 6TUR+ Design - Heat source Outside air - Model Universal design reversible - Regulation - Thermal energy metering Integrated - Installation location Outdoors
More informationBS Outcomes 6
BS7671 2015 Outcomes 6 Inspection and testing 6.1 Identify the general requirements for inspection and testing of installations 6.2 State the need for diagrams, charts or tables to be available e prior
More informationMP920 SALT CHLORINATOR
MP920 SALT CHLORINATOR Index 1 Safety Instructions... 3 1.1 Warnings... 3 2 EC Conformity... 3 3 System Contents... 3 4 Installation... 4 4.1 Hydraulic Installation... 4 4.1.1 Electrolysis Cell... 4 4.2
More informationTECHNICAL CERTIFICATE USER MANUAL THERMOSTAT TP years warranty
TECHNICAL CERTIFICATE USER MANUAL THERMOSTAT TP510 3 years warranty TABLE OF CONTENT Application 4 Controls and indication 4 Adjustment and operation 5 Switch on / switch off the thermostat 5 Adjustment
More informationA. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod
Journeyman and Master Common Exam 2 1 The grounding terminal of a grounding-type receptacle installed in a metal box shall be? A. Connected to the equipment ground B. Bonded to the box C. Connected to
More informationUSER MANUAL FOR EXPLOSION PROTECTED FLUORESCENT LIGHT FITTING type PSF 236
CONTENT 1. Manufacturer 1 2. General safety informations 1 3. Purpose 2 4. Product compliance 2 5. Degree of protection and technical data 2 6. Type 3 7. Mounting and installation 3 8. Dimensions 6 9.
More informationTHE NEXT SMART HOME GENERATION
THE NEXT SMART HOME GENERATION She just finished installing her smart home system. Simply installed. Simply expanded. Simply secure. Homematic IP is the next generation of the Homematic technology by eq-3,
More informationBrown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA
PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities
More informationM001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings
1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL
More informationELECTRICAL SAFETY IN HEALTHCARE FACITILIES
ELECTRICAL SAFETY IN HEALTHCARE FACITILIES BY ENGR. S.M. NASEERUDDIN Dar Al-Majd Consulting Engineers Riyadh, Saudi Arabia ABSTRACT The increasing use of electrical diagnostic and treatment equipment in
More informationSECTION STREET LIGHTING AND TRAFFIC SIGNALS Replace this section with the following:
Working Together to Serve SECTION 307 - STREET LIGHTING AND TRAFFIC SIGNALS Replace this section with the following: 307-1 GENERAL. The Work under this Section consists of furnishing and installing all
More informationINITIAL ELECTRICAL ASSESSMENT REPORT (EAR)
INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Assessor: Karardi, Shibpur, Narsingdi Narsingdi Dhaka Bangladesh Emkay Enterprises The Alliance for Bangladesh Worker Safety Page 1/15 10 Apr 2016 Introduction
More informationTechnical data LA 9S-TU
Technical data LA 9S-TU Device information LA 9S-TU Design - Heat source Outside air - Model Universal design - Regulation - Thermal energy metering Integrated - Installation location Outdoors - Performance
More informationFire precautions in dwellings
NORWICH City Council Fire precautions in dwellings Private sector housing Providing homes building communities Version 2 Published by Norwich City Council June 2010 Contents Page Introduction 1 2 Types
More informationOPERATING MANUAL MODEL NO MODEL NO AND MODEL NO MODEL NO
OPERATING MANUAL LIQUI-SENSE CONTROLLERS MODEL NO. 77096-00 MODEL NO. 77096-05 AND LIQUI-SENSE DETECTORS MODEL NO. 77095-00 MODEL NO. 77095-01 Cole-Parmer Instrument Co. 625 East Bunker Court Vernon Hills,
More informationONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016)
Cheboygan County Department of Building Safety 870 South Main Street P.O. Box 70 Cheboygan, Michigan 49721 TX: (231) 627-8813 FX: (231) 627-8454 www.cheboygancounty.net Service Entrance ONE- AND TWO-FAMILY
More informationAdditional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i.
Additional Operating Instructions SITRANS F Vortex flowmeters Ex-i Edition 09/2018 CONTENTS 1 Safety instructions 3 1.1 General notes... 3 1.2 EU conformity... 3 1.3 Approval according to the IECEx scheme...
More informationÇ O K E S E N E L E K T R O N İ K LTD.
Ç O K E S E N E L E K T R O N İ K LTD. Electricity - Security System Experiment sets Electrical Transmission Lines Trainer Set The Experiment Set is designed to perform sample applications related to energy
More informationInspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc
Inspection Report 1 Inspection Way Orlando, FL 32825 Prepared for: Wanda Figueroa Prepared by: Page 1 of 25 Needs Service Summary This summary is not the entire report. The complete report may include
More informationDCP3/ DETAILS OF THE CLIENT ADDRESS OF THE INSTALLATION
Issued in accordance with British Standard 7671 - Requirements for Electrical Installationsby a Domestic Installer enrolled with NICEIC, Warwick House, Houghton Hall Park, Houghton Regis, Dunstable LU5
More informationSPACE DETECTOR SP Presentation
SPACE DETECTOR SP2-114 Presentation 1 CONTENTS 2 ULTRASOUND DETECTION 4 2.1 PRINCIPLE 4 2.2 FOR A PERFECT WORKING ORDER 4 3 DETECTOR PLACEMENT 5 3.1 PLACEMENT SITUATION 6 3.2 ZONE OF DETECTION 6 3.3 CITY
More information1 NORMS AND REGULATIONS Guarantee norms: Environmental notes: Identification:... 15
Index 1 NORMS AND REGULATIONS... 15 1.1 Guarantee norms:... 15 1.2 Environmental notes:... 15 1.3 Identification:... 15 2 INSTALLATION... 16 2.1 Lifting and Movement:... 16 2.2 Positioning:... 16 2.3 Environmental
More informationTRADING DIVISION COMPANY PROFILE. An ISO 9001 : 2008 Certified Company
TRADING DIVISION COMPANY PROFILE An ISO 9001 : 2008 Certified Company Contents Introduction 04 Company Summary 05 Structured Cabling 06 Server Cabinets 10 Cable Management System 11 Oil Field Supplies
More informationTable-1: Clarifications and modification in tender specifications based on Pre-bid meeting discussion
Table-1: Clarifications and modification in tender s based on Pre-bid meeting discussion Sr. Ref Page. 1 4 Clause Site Preparation and Partitions walls 2 11 SLD 3 18 Batteries 4 18 Batteries 5 32 to 34
More informationEquipment Information
2050D Equipment Information INDEX: DESCRIPTION AND KEY FEATURES LAYOUT NOMINAL TECHNICAL DATA CONFIGURATION www.sealedair-emea.com Reg. U.S. Pat. & TM Off. Sealed Air Corporation 2009. All rights reserved.
More informationPluggit iconvent Decentralized residential ventilation with heat recovery Operating and installation instructions
git iconvent Decentralized residential ventilation with heat recovery Operating and installation instructions www.pluggit.com The technology makes the difference. Innovations of git with an added value
More informationELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.
B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.
More informationNetwork Speed Dome Installation Manual
Network Speed Dome Installation Manual Version 1.0.0 Table of Contents 1 INSTALLATION PREPARATION... 1 1.1 Basic Requirement... 1 1.2 Installation Check... 1 1.3 Cable Preparation... 1 1.3.1 The Min Specification
More information