ELECTRICAL AND COMMUNICATION INSTALLATION DESIGN IN AN OFFICE COMPLEX

Size: px
Start display at page:

Download "ELECTRICAL AND COMMUNICATION INSTALLATION DESIGN IN AN OFFICE COMPLEX"

Transcription

1 ELECTRICAL AND COMMUNICATION INSTALLATION DESIGN IN AN OFFICE COMPLEX PROJECT INDEX: PRJ017 BY F17/1765/2006 MUTUMA WALTER MURIMI SUPERVISOR: PROF. E. MWANGI EXAMINER: DR. J. MBUTHIA DATE: 27 th MAY 2011

2 OBJECTIVES Lighting Design Power Points Design Fire alarm system Load Balancing Power Distribution Layout Cable Sizing Communication system design

3 Lighting Design Lumen method was adopted for this design. Daylight factor was estimated and included in lumen equation as per building services code. Lumen method equation Room index equation N = E x A Ф x M.F x U.F x D.F K = L x W H (L + W)

4 Sample Lighting Calculation For example, total illuminance required for biological science lab was 300 lux. Room Index K = 12 x 8 = 1.6 3(12+8) Utilization factor (U.F) = 0.47, daylight factor obtained = 1.75, maintenance factor taken as 0.9. Thorn T26 battens of 1200mm length, twin 36W fittings with 6700 lumens were used. Number of fittings: N = 300 x 12 x 8 = 5.81, approximately x 0.47 x 0.9 x 1.75

5 Lighting layout for the biological science lab

6 Fire alarm and security system design Fire alarm system installation fulfils the following functions: Indicate clearly the escape routes, Provide illumination on such routes for safe evacuation from the building, Ensure fire alarm call points and fire equipment provided along the escape routes can be easily located and used, Permit operations concerned with safety measures.

7 Fire alarm and security system in the building

8 Power points design Power points laid out in accordance to IEE recommendations on wiring of 13A final sockets. 30A MCB could support a load of 7200W. Taking a load of 500W per single socket, a ring could have 7 twins or 14 single outlets. Provision was given for TPN isolators in the machine workshop as well as double pole switches for handriers and fans in other areas.

9 Power points Layout for machines workshop

10 Sample calculation for ground floor load Lighting load = Tot. light fittings Worst case load diversity = = 16920W Power point load = 100% of 1 st ring circuit + 75% of remaining ring circuits = ( ) = 45000W Single phase isolator load = ( % % 21600) = 30720W. Three phase isolators load = ( % ) = 87334W Thus, total Ground floor load ( with diversity factor) = 179,974W

11 Load Balancing Done for every DB, floor and then the whole building. The lesser load on a DB was compensated on the next DB. Three phase loads were equally distributed through the 3 phases on ground floor. Phase with larger load on one floor deliberately given a lesser load on the next floor.

12 Summary of Ground floor Load Balancing Table 3.9 Load balancing on DB 3 Description Red phase Yellow phase Blue phase 30A 30A 30A 6A 6A 6A 6A Totals 42A 36A 36A Table 3.15 Load balancing on ground floor Description Red phase Yellow phase Blue phase DB 1 88A 88A 86A DB 2 18A 30A 30A DB 3 42A 36A 36A Totals 148A 154A 152A

13 DB Protection The consumer loads were allocated DBs after allowing for diversity. For instance for DB6, load after applying diversity was obtained as (50A + 75% of 50A + 90% 0f 18A) = 103.7A, therefore a 150A MCCB would be appropriate. Consumer ways were protected by MCBs of rating slightly higher than load on that way. The DB isolators had a rating of between 100A and 200A (MCCBs).

14 Sample way allocation on DB2

15 Distribution Layout Diagram

16 Cable Sizing Done to satisfy IEE regulations. Voltage drop from source to fixed equipment not to exceed 4% of the declared nominal voltage. Cables selected with reference to IEE tables. Voltage drop was calculated as per the formula: For example, for DB7, voltage drop (V) = (100A x 1.1mV/A/m 50/1000) =5.5V which was less than 4 per cent of 415V.

17 Protection system design Protection systems included: Earthing PME system. Lightning protection done using an air termination (lightning rod) together with several horizontal and vertical conductors positioned strategically on the building.

18 Communication system design This involved telephone circuitry, television connections and data cabling for computers. The data cabling was done through a 200mm 50mm metallic trunking. A private automatic branch exchange (PABX) with 20 extensions was also incorporated in the design for telephone switching.

19 Communication system layout showing the PABX

20 Conclusion and future recommendations The objectives of the project were met as complete installation design of electrical and communication systems were done. Fault currents are to be determined for the various protection devices used as well as the protection system.

21 THANK YOU

ES8. Candidate Code No. For Board Use Only. Result Date Int. Result Date Int

ES8. Candidate Code No. For Board Use Only. Result Date Int. Result Date Int ES8 Candidate Code No. For Board Use Only Result Date Int Result Date Int ELECTRICAL WORKERS REGISTRATION BOARD ELECTRONIC SECURITY THEORY/REGULATIONS EXAMINATION 9 September 2006 QUESTION AND ANSWER BOOKLET

More information

Electrisaver User and Installation Instructions

Electrisaver User and Installation Instructions Electrisaver User and Installation Instructions The Electrisaver push button boost timer can be used to control immersion elements and other electrical appliances up to 3kW or as an override/extension

More information

ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET

ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Candidate Code No. EASQ 3017 For Board Use Only Result Date Int Result Date Int ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ

More information

Guide to: 17 th Edition Consumer Units

Guide to: 17 th Edition Consumer Units Guide to: 17 th Edition Consumer Units Introduction For well over one hundred years the Wiring Regulations have provided the rules which must be followed to make sure that electrical installations are

More information

BUILDING ASSESSMENT REPORT ELECTRICAL SERVICES FOR 75 FOX STREET BUILDING

BUILDING ASSESSMENT REPORT ELECTRICAL SERVICES FOR 75 FOX STREET BUILDING GAUTENG DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT ELECTRICAL SERVICES FOR 75 FOX STREET BUILDING September 2014 Contents 1. INTRODUCTION... 3 1.1. Design Criteria and Specification...

More information

ELECTRICAL APPLIANCE SERVICEPERSON EXAMINATION 19 November 2016 QUESTION AND ANSWER BOOKLET

ELECTRICAL APPLIANCE SERVICEPERSON EXAMINATION 19 November 2016 QUESTION AND ANSWER BOOKLET Candidate Code No. EAS 1081 For Board Use Only Result Date Int Result Date Int ELECTRICAL APPLIANCE SERVICEPERSON EXAMINATION 19 November 2016 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time

More information

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No.

Proposed Development at Likoni Road, Nairobi for NTSA - Electrical Installations Bills of Quantities. DESCRIPTION QTY UNIT RATE AMOUNT KSh. 28 No. BILL 1 GROUND FLOOR Supply, Deliver, Install, Set to Work and Commission the Following: 1.01 Lighting point completely wired in 3x1.5mm² single core PVC insulated copper cables drawn in 20mm diameter HG

More information

Contents The IET Regulations, BS 7671, and this Guide 1.1 The need for this Electrician s Guide 1.2 The IET Regulations BS 7671

Contents The IET Regulations, BS 7671, and this Guide 1.1 The need for this Electrician s Guide 1.2 The IET Regulations BS 7671 Contents 1 The IET Regulations, BS 7671, and this Guide 1 1.1 The need for this Electrician s Guide 1 1.2 The IET Regulations BS 7671 2 1.2.1 International basis 2 1.2.2 The Seventeenth Edition 3 1.2.3

More information

ELECTRICAL INSTALLER THEORY EXAMINATION. 14 November 2015 QUESTION AND ANSWER BOOKLET

ELECTRICAL INSTALLER THEORY EXAMINATION. 14 November 2015 QUESTION AND ANSWER BOOKLET Candidate Code No. EIN 11 For Board Use Only Result Date Int Result Date Int ELECTRICAL INSTALLER THEORY EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS

More information

SmartRad Planning Manual

SmartRad Planning Manual SmartRad Planning Manual Issue 1 15 April 2010 Dimplex SmartRad Fan Convector Models SRX80, SRX120, SRX140 & SRX180 Applies to models with White Glass, Black Glass and Metal facias Contents 1 Introduction

More information

DCP3/ DETAILS OF THE CLIENT ADDRESS OF THE INSTALLATION

DCP3/ DETAILS OF THE CLIENT ADDRESS OF THE INSTALLATION Issued in accordance with British Standard 7671 - Requirements for Electrical Installationsby a Domestic Installer enrolled with NICEIC, Warwick House, Houghton Hall Park, Houghton Regis, Dunstable LU5

More information

ELECTRONIC SECURITY THEORY/REGULATIONS EXAMINATION 19 November 2011

ELECTRONIC SECURITY THEORY/REGULATIONS EXAMINATION 19 November 2011 Candidate Code No. ESAI 27 For Board Use Only Result Date Result Date Int ELECTRONIC SECURITY THEORY/REGULATIONS EXAMINATION 19 November 2011 QUESTION AND ANSWER BOOKLET Time Allowed: 3 Hours INSTRUCTIONS

More information

Electrical Protection and Transportation Installations for Non-domestic Buildings

Electrical Protection and Transportation Installations for Non-domestic Buildings Unit 53: Electrical Protection and Transportation Installations for Non-domestic Buildings Unit code: H/601/1392 QCF level: 5 Credit value: 15 Aim This unit provides learners with an opportunity to develop

More information

EMERGENCY LIGHTING COMPLETION CERTIFICATE For small installations and verification of existing installations

EMERGENCY LIGHTING COMPLETION CERTIFICATE For small installations and verification of existing installations A DETAILS OF THE CLIENT Client/ B DETAILS OF THE EMERGENCY LIGHTING INSTALLATION Extent of the installation covered by this certificate The Owner 19 Walker Grove, Hatfield, Hertfordshire 19 Walker Grove,

More information

User Information Sheet 008 : 2010

User Information Sheet 008 : 2010 User Information Sheet 008 : 2010 Formerly UIS008, July 2009 ELECTRICAL INSTALLATIONS ASSOCIATED WITH BULK LPG INSTALLATIONS 1. Introduction This Information Sheet describes some of the principles and

More information

VIESMANN. Installation and service instructions VITOTROL 300A. for contractors. Vitotrol 300A. Remote control, part no

VIESMANN. Installation and service instructions VITOTROL 300A. for contractors. Vitotrol 300A. Remote control, part no Installation and service instructions for contractors VIESMANN Vitotrol 300A Remote control, part no. 7438 364 VITOTROL 300A 3/2010 Please keep safe. Safety instructions Safety instructions Please follow

More information

ELECTRICAL SERVICE TECHNICIAN EXAMINATION 12 September 2015 QUESTION AND ANSWER BOOKLET

ELECTRICAL SERVICE TECHNICIAN EXAMINATION 12 September 2015 QUESTION AND ANSWER BOOKLET EST 2066 Candidate Code No. For Board Use Only Result Date Int Result Date Int ELECTRICAL SERVICE TECHNICIAN EXAMINATION 12 September 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Two Hours INSTRUCTIONS

More information

Solutions for airports and railway stations

Solutions for airports and railway stations Solutions for airports and railway stations Solutions for airports and railway stations Airports and railway stations aren t just places where countless people pass through every day. They also provide

More information

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA Tel: TENDER NO: TTU/T/01A/

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA   Tel: TENDER NO: TTU/T/01A/ TAITA TAVETA UNIVERSITY P.O.BOX 635-80300, VOI, KENYA EMAIL: procurement@ttu.ac.ke; Tel: 020 8150257 TENDER NO: TTU/T/01A/2017-2018 CONSTRUCTION OF PROPOSED ADMINISTRATION BLOCK- TAITA TAVETA UNIVERSITY

More information

Systems of inspecting the existing building and the procedures of auditing engineering plans. M. Mostafa

Systems of inspecting the existing building and the procedures of auditing engineering plans. M. Mostafa Systems of inspecting the existing building and the procedures of auditing engineering plans M. Mostafa 2 Agenda 1. Introduction 2. Why inspection? 3. Initial Verification 4. Periodic verification 5. Reference

More information

Syncro AS. Analogue Addressable Fire Control Panel. User Manual

Syncro AS. Analogue Addressable Fire Control Panel. User Manual Syncro AS Analogue Addressable Fire Control Panel User Manual Man-1100 Issue 02 Nov. 2008 Index Section Page 1. Introduction...3 2. Safety...3 3. Panel Controls...4 3.1 Access Level 1...4 3.2 Access Level

More information

Oakdale Primary School Expansion Project Appendix A - MEP Schedule of Works

Oakdale Primary School Expansion Project Appendix A - MEP Schedule of Works Oakdale Primary School Expansion Project Appendix A - MEP Schedule of Works HBS-SH-MEP-801 May 2017 For Peterborough City Council ver. author date checked comment P1 KA 19-05-17 TC TENDER ISSUE 1 1. Mechanical

More information

Handout Notes Major changes in BS : 2016

Handout Notes Major changes in BS : 2016 Handout Notes Major changes in BS 5266-1: 2016 The contents section now includes Introduction 1 Scope 2 Normative references 3 Terms and definitions 4 Consultation and records 5 Illumination for emergency

More information

Emergency Lighting User's Guide

Emergency Lighting User's Guide Emergency Lighting User's Guide Emergency Lighting System Emergency Lighting System Emergency lighting systems are the systems that become automatically active and provide adequate lighting when the main

More information

12W Round LED Wall/Ceiling Light with Microwave Sensor

12W Round LED Wall/Ceiling Light with Microwave Sensor 12W Round LED Wall/Ceiling Light with Microwave Sensor Model: LEDSR12WHMS Installation & Operating Instructions 1 1. General Information These instructions should be read carefully and retained for further

More information

Solutions for the health care sector

Solutions for the health care sector Solutions for the health care sector Solutions for the health care sector There are only a few places where a failure of the power supply can be as life threatening as in a hospital, where delicate instruments

More information

GI/GN7520. Guidance on Lighting of Railway Premises. Railway Group Guidance Note

GI/GN7520. Guidance on Lighting of Railway Premises. Railway Group Guidance Note GN Published by Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2007 Rail Safety and Standards Board Limited GI/GN7520 Issue 1 December 2007 Railway Group Guidance

More information

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -SQA- SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 4280130 -Session-1990-91 -Superclass- XJ -Title- GAS SERVICES:

More information

LAWSON FINAL DISTRIBUTION PRODUCTS RANGE

LAWSON FINAL DISTRIBUTION PRODUCTS RANGE FINAL DISTRIBUTION PRODUCTS RANGE ISO 14001:2004 Certified ISO 9001:2008 Certified FUSES INDIA LTD Lawson Fuses India Ltd is a wholly owned subsidiary of Lawson Fuses Ltd,a long established UK company

More information

GUARDIAN CX10 PRIORITY/EVACUATION INTERFACE USERS MANUAL

GUARDIAN CX10 PRIORITY/EVACUATION INTERFACE USERS MANUAL GUARDIAN CX10 PRIORITY/EVACUATION INTERFACE USERS MANUAL General information The CX10 provides a priority input into an audio system of up to 10 channels in a 19 1RU package. The CX10 may be used with

More information

Intelligent Security & Fire Ltd

Intelligent Security & Fire Ltd full installation, commissioning and operating manuals can be downloaded from www.haes-systems.co.uk combined addressable / conventional fire alarm control panel User Guide Approved Document No. MFBU-04

More information

360º Surface Mount Ceiling PIR Light Controller

360º Surface Mount Ceiling PIR Light Controller 360º Surface Mount Ceiling PIR Light Controller Model: PDRS1500 Installation & Operating Instructions 1 1. General Information These instructions should be read carefully and retained for further reference

More information

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Address: 687, Al-Haj Nurl Amin Sowdagar Lane CDA, R/A, Road No 20, South Agrabad Chittagong Chittagong Bangladesh 03 Apr 2014 The Alliance for Bangladesh

More information

Surface Mount Wall PIR Light Controller. Model: PDWM1500. Installation & Operating Instructions

Surface Mount Wall PIR Light Controller. Model: PDWM1500. Installation & Operating Instructions Surface Mount Wall PIR Light Controller Model: PDWM1500 Installation & Operating Instructions 1. Introduction The PDWM1500 utilises passive infrared technology to detect heat radiation of moving human

More information

18W Round LED Wall/Ceiling Light with Microwave Sensor

18W Round LED Wall/Ceiling Light with Microwave Sensor 18W Round LED Wall/Ceiling Light with Microwave Sensor Model: LEDMR18WHMS Installation & Operating Instructions 1 1. General Information These instructions should be read carefully and retained for further

More information

INSTANTANEOUS ELECTRIC SHOWER

INSTANTANEOUS ELECTRIC SHOWER GUARANTEE / SERVICE POLICY INSTANTANEOUS ELECTRIC SHOWER GUARANTEE Designa guarantee this DS3000 product for a period of two years, from date of purchase, against mechanical and electrical defects arising

More information

Guide to sollysta Wiring Accessories

Guide to sollysta Wiring Accessories Guide to sollysta Wiring Accessories Introduction This guide expands upon some of the requirements found in the 17 th Edition of the IEE Wiring Regulations and Building Regulations and how they affect

More information

Equipment Information

Equipment Information STA65 Equipment Information INDEX: DESCRIPTION AND KEY FEATURES LAYOUT NOMINAL TECHNICAL DATA CONFIGURATION www.sealedair-emea.com Reg. U.S. Pat. & TM Off. Sealed Air Corporation 2006. All rights reserved.

More information

Vented (fresh air is heated, passed through textiles and exhausted from the appliance) Washer dryers are excluded from the analysis.

Vented (fresh air is heated, passed through textiles and exhausted from the appliance) Washer dryers are excluded from the analysis. Functionality Mapping Document Country: Technology: Sub Category: Vented and condenser electric models Introduction The first stage in the Mapping and Benchmarking process is the definition of the products,

More information

ELECTRICAL APPLIANCE SERVICEPERSON EXAMINATION 7 May 2016 QUESTION AND ANSWER BOOKLET

ELECTRICAL APPLIANCE SERVICEPERSON EXAMINATION 7 May 2016 QUESTION AND ANSWER BOOKLET Candidate Code No. EAS 1078 For Board Use Only Result Date Int Result Date Int ELECTRICAL APPLIANCE SERVICEPERSON EXAMINATION 7 May 2016 QUESTION AND ANSWER BOOKLET Time Allowed: 2 Hours INSTRUCTIONS READ

More information

Guide to Condition Reports for Domestic Electrical Installations

Guide to Condition Reports for Domestic Electrical Installations Guide to Condition Reports for Domestic Electrical Installations Guide to condition reports for domestic electrical installations Courtesy of Greater Manchester Fire and Rescue Service What is an electrical

More information

Complete the table to show which size fuse, 3 A or 13 A, should be fitted to each of the appliances. Appliance Power Fuse

Complete the table to show which size fuse, 3 A or 13 A, should be fitted to each of the appliances. Appliance Power Fuse Q1. (a) Look at the electrical safety information poster. Complete the table to show which size fuse, 3 A or 13 A, should be fitted to each of the appliances. Appliance Power Fuse Kettle Hair straighteners

More information

Fire Safety Register

Fire Safety Register Fire Safety Register Introduction 1.1 Section 18(2) of the Fire Services Acts, 1981 and 2003 generally applies to all premises other than a dwelling house occupied as a single private dwelling. This section

More information

SECTION 1.02 DETAILED SCOPE OF WORK

SECTION 1.02 DETAILED SCOPE OF WORK SECTION 1.02 DETAILED SCOPE OF WORK 1.02.1 General 1.02.1.1 Introduction... 3 1.02.1.2 General description of the works... 4 1.02.1.3 Design criteria... 5 1.02.2 Public Health Services 1.02.2.1 Mains cold

More information

CHALLENGER 66 INDUSTRIAL

CHALLENGER 66 INDUSTRIAL CHALLENGER 66 INDUSTRIAL Features: Available in two lengths Single or twin LEDs Surface mounting IP66 (dust tight & strong water jet proof) IK10 (20 joule) shock resistance Corrosion resistant High performance

More information

LC1 & 2. Fire Alarm Panel 6\VWHPLQVWDOODWLRQRSHUDWLQJ PDLQWHQDQFH LQVWUXFWLRQV

LC1 & 2. Fire Alarm Panel 6\VWHPLQVWDOODWLRQRSHUDWLQJ PDLQWHQDQFH LQVWUXFWLRQV LC1 & 2 Fire Alarm Panel 6\VWHPLQVWDOODWLRQRSHUDWLQJ PDLQWHQDQFH LQVWUXFWLRQV ZIRCONLC1 One Zone Conventional Fire Panel ZIRCONLC2 Two Zone Conventional Fire Panel Compliant with EN54-2:1998 & EN54-4:1998

More information

Installation Guide. Disabled Persons Emergency Alarm Kit. Single Zone Call Control/Call answered unit c/w Sounder LED indicators and Braille lettering

Installation Guide. Disabled Persons Emergency Alarm Kit. Single Zone Call Control/Call answered unit c/w Sounder LED indicators and Braille lettering Installation Guide Disabled Persons Emergency Alarm Kit Contents: Single Zone Call Control/Call answered unit c/w Sounder LED indicators and Braille lettering Remote Reset Unit c/w Sounder & call Answered

More information

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500 Unvented Calorifier Range. Operating and Maintenance Manual. For Models 125 300 & 500 Telephone 08456 448802 Fax 08456 448803 Emial info@mhgheating.co.uk Web www.mhgheating.co.uk TABLE OF CONTENTS. Section

More information

Smart Series TAS-05-11, TAS-05-12

Smart Series TAS-05-11, TAS-05-12 Smart Series TAS-05-, TAS-05-2 Temperature Alarm & System Control Module User s Manual D-M-E Company ED-0063-OT-002-A D-M-E TAS User s Manual Page Copyright D-M-E Company 2000. All rights reserved. D-M-E

More information

SCHEDULE OF RATES SHEET PRELIMINARIES

SCHEDULE OF RATES SHEET PRELIMINARIES Page : 1 PRELIMINARIES 1 CONTAINER BUDGET ALLOWANCE 1,100.00 1,100.00 1 SUPERVISION 3,900.00 3,900.00 1 ACCOMMODATION 5,390.00 5,390.00 1 TRAVEL ALLOWANCE 7,800.00 7,800.00 Sub- 18,190.00 18,190.00 Page

More information

ENERGIZED NEUTRAL EFFECTS ON CORRUGATED GAS SUPPLY LINES

ENERGIZED NEUTRAL EFFECTS ON CORRUGATED GAS SUPPLY LINES ENERGIZED NEUTRAL EFFECTS ON CORRUGATED GAS SUPPLY LINES Kevin R. Davis, PE, CFEI, CVFI Goodson Engineering, Denton, TX and Michael Shuttlesworth, PE Goodson Engineering, Denton, TX ABSTRACT In the course

More information

EMERGENCY RESPONSE PLAN FOR

EMERGENCY RESPONSE PLAN FOR Department Name Department of Biomedical Engineering Address Engineering Block E4, #04-08, 4 Engineering Drive 3, S(117583) Tel / Fax 65161610 / 68723069 Date of Issue 02 January 2017 EMERGENCY RESPONSE

More information

TIME KNITWEAR (PVT) LTD.

TIME KNITWEAR (PVT) LTD. ELECTRICAL SAFETY INSPECTION REPORT TIME KNITWEAR (PVT) LTD. Baribogh, Enayetnagar, Fatullah, Narayangonj-1400, Bangladesh Factory List: 1. Time Knitwear (Pvt) Ltd. Inspected by: Dawa Report Generated

More information

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT Hatimara Road, Barenda, Kashimpur, Gazipur, Gazipur Dhaka The Alliance for Worker Safety Page 1/18 Introduction to the Report The following report contains

More information

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION Assessor: Nalzani, Chandana Joydebpur, Gazipur Joydebpur, Gazipur Dhaka Emkay Enterprises The Alliance for Worker Safety Page 1/13 Introduction to the Report

More information

Project Briefing Document. Section 3 Electrical Services design guide and specifications

Project Briefing Document. Section 3 Electrical Services design guide and specifications ESTATES SUPPORT SERVICE Project Briefing Document Section 3 Electrical Services design guide and specifications Issue 1.1 June 2014 Project Ref. Project Name Project Manager Date issued... Consultant/Contractor...

More information

Trade of Electrician. Fixed Appliance and Socket Circuits COURSE NOTES

Trade of Electrician. Fixed Appliance and Socket Circuits COURSE NOTES Trade of Electrician Standards Based Apprenticeship Fixed Appliance and Socket Circuits Phase 2 Module No. 2.2 Unit No. 2.2.5. COURSE NOTES Created by Chris Ludlow - Dundalk TC Revision 1 April 2000 By

More information

Vented (fresh air is heated, passed through textiles and exhausted from the appliance) Washer dryers are excluded from the analysis.

Vented (fresh air is heated, passed through textiles and exhausted from the appliance) Washer dryers are excluded from the analysis. Functionality Mapping Document Country: Technology: Sub Category: Vented and condenser electric models Introduction The first stage in the Mapping and Benchmarking process is the definition of the products,

More information

Work environment and personal protection measures: Our Company recognizes the importance of protective measures for the workplace and for - 1 -

Work environment and personal protection measures: Our Company recognizes the importance of protective measures for the workplace and for - 1 - Work environment and personal protection measures: Our Company recognizes the importance of protective measures for the workplace and for individual employees. Our key targets and implementations are as

More information

Figure 1. Explain how rubbing an acetate rod with a cloth causes the rod and cloth to become charged

Figure 1. Explain how rubbing an acetate rod with a cloth causes the rod and cloth to become charged Q1.A student rubs an acetate rod with a cloth. Figure 1 shows the charges on the acetate rod and cloth before and after rubbing. Figure 1 (a) Explain how rubbing an acetate rod with a cloth causes the

More information

Equipment Information

Equipment Information ST98-600 Equipment Information INDEX: DESCRIPTION AND KEY FEATURES LAYOUT NOMINAL TECHNICAL DATA CONFIGURATION Sealed Air GmbH Customer Systems Center D4 Park 4 CH-6039 Root-Längenbold Telephone: +41 (0)

More information

INSTALLATION AND USER INSTRUCTIONS COUNTERTOP AND FREE STANDING FRYERS

INSTALLATION AND USER INSTRUCTIONS COUNTERTOP AND FREE STANDING FRYERS INSTALLATION AND USER INSTRUCTIONS COUNTERTOP AND FREE STANDING FRYERS IMPORTANT PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THE EQUIPMENT. KEEP THEM IN A SAFE PLACE FOR FUTURE REFERENCE. WARNING:

More information

GRADESHIFT UDL INSTRUCTION MANUAL 3.1 PSTN CONNECTION

GRADESHIFT UDL INSTRUCTION MANUAL 3.1 PSTN CONNECTION GRADESHIFT UDL INSTRUCTION MANUAL 3.1 PSTN CONNECTION GradeShift UDL Instruction Manual 3.1 PSTN Connection Telephone Line Connection There are several different types of telephone line available from

More information

Fire Procedures. April 2016

Fire Procedures. April 2016 Estates Department Fire Procedures April 2016 Author Robert Hardman Estates Manager Last Policy Review Date 1/04/16 Next policy Review Date 1/04/17 Reviewed by The Laurus Trust School Fire Procedures Contents

More information

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department SOUTH DUBLIN COUNTY COUNCIL Roads (Traffic and Transportation) Department TECHNICAL SPECIFICATION 4 SDCC-TS-04 SIGNAL INSTALLATION REQUIREMENTS REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF TRAFFIC CONTROL

More information

Technical Data. General specifications Switching element function Rated operating distance s n 4 mm

Technical Data. General specifications Switching element function Rated operating distance s n 4 mm 0102 Model Number Features 4 mm non-flush Accessories BF 12 Mounting flange, 12 mm Technical Data specifications Switching element function NAMUR, NO Rated operating distance s n 4 mm Installation non-flush

More information

PANELBOARDS & BUILDING DISTRIBUTION

PANELBOARDS & BUILDING DISTRIBUTION 262416 PANELBOARDS & BUILDING DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Distribution panelboards 2. Power panelboards B. Related Sections: 1.02 POLICY 1. CU Standard 260500, Basic

More information

WILLASTON MEMORIAL HALL REGISTERED CHARITY NUMBER FIRE RISK ASSESSMENT

WILLASTON MEMORIAL HALL REGISTERED CHARITY NUMBER FIRE RISK ASSESSMENT WILLASTON MEMORIAL HALL REGISTERED CHARITY NUMBER 520090 FIRE RISK ASSESSMENT February 2017 Description of Premises Willaston Memorial Hall is a stone-built single-story community building situated on

More information

MW & EW 10 & 15 Litre Unvented Water Heaters HANDBOOK. IMPORTANT: This booklet should be given to the customer after installation and demonstration.

MW & EW 10 & 15 Litre Unvented Water Heaters HANDBOOK. IMPORTANT: This booklet should be given to the customer after installation and demonstration. MW & EW 10 & 15 Litre Unvented Water Heaters HANDBOOK IMPORTANT: This booklet should be given to the customer after installation and demonstration. Description of water heater 1) Hot water outlet 2) Temperature

More information

CW9000 Wireless Fire System. Installation Manual

CW9000 Wireless Fire System. Installation Manual CW9000 Wireless Fire System Installation Manual CONTENTS 1 PROJECT PROCESS...4 1.1 PLANNING...4 1.2 SITE SURVEY...4 1.3 EQUIPMENT INSTALLATION...4 1.4 COMMISSIONING / CONFIGURATION...4 2 SYSTEM INSTALLATION...5

More information

FIRE ALARM CONTROL EQUIPMENT. Addendum October 2006 Instructions for new style EN54-4 Power supply unit module

FIRE ALARM CONTROL EQUIPMENT. Addendum October 2006 Instructions for new style EN54-4 Power supply unit module FIRE ALARM CONTROL EQUIPMENT Addendum October 2006 Instructions for new style EN54-4 Power supply unit module MXLK-05 Issue 2.0 June 2007 INSTALLATION Safety Suppliers of articles for use at work are required

More information

Guide to condition reports for domestic electrical installations.

Guide to condition reports for domestic electrical installations. Guide to condition reports for domestic electrical Courtesy of Greater Manchester Fire and Rescue Service What is an electrical installation? An electrical installation is a fixed wiring system made up

More information

Fire safety management issues identified by fire risk assessments

Fire safety management issues identified by fire risk assessments Health and Safety Safety Team The University of Manchester Waterloo Place, 180 Oxford Road, Manchester Health and M13 Safety 9GP www.manchester.ac.uk To From Vice-Presidents/Deans, Heads of Schools and

More information

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD.

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. (A Wholly Owned Subsidiary of SBI) CIRCLE OFFICE: 4TH FLOOR, SBI LOCAL HEAD OFFICE III/1-PANDIT J N MARG, KHARAVELA NAGAR BHUBANESWAR, ODISHA-751001 Part-II PRICE

More information

360º FLUSH MOUNT CEILING PIR LIGHT CONTROLLER INSTALLATION & OPERATING. Cat No. SLFM360 INSTRUCTIONS

360º FLUSH MOUNT CEILING PIR LIGHT CONTROLLER INSTALLATION & OPERATING. Cat No. SLFM360 INSTRUCTIONS 360º FLUSH MOUNT CEILING PIR LIGHT CONTROLLER Cat No. SLFM360 INSTALLATION & OPERATING INSTRUCTIONS 1 Introduction The SLFM360 utilises passive infrared technology to detect heat radiation of moving human

More information

Emergency Assist Alarm Kit Single Zone

Emergency Assist Alarm Kit Single Zone Emergency Assist Alarm Kit Single Zone Model: EASZKN Installation & Operating Instructions 1 1. General Information These instructions should be read carefully and retained for further reference and maintenance.

More information

Refrigeration / Air Conditioning Systems Circuit Drawings. Student Resource Package No: NR 24

Refrigeration / Air Conditioning Systems Circuit Drawings. Student Resource Package No: NR 24 Refrigeration / Air Conditioning Systems Circuit Drawings Nominal Student Hours: Student Resource Package No: NR 24 24 Hours. Delivery: Recognition of Prior Learning: Package Purpose: Suggested Resources:

More information

Electrical Fires in Finland

Electrical Fires in Finland TUKES ELECTRICAL FIRES IN FINLAND Dr Veli-Pekka Nurmi Mr Antti Nenonen Mr Kai Sjöholm Electrical Fires in Finland Summary of the results of the follow-up study 2003 2004 The Safety Technology Authority

More information

THE SAFE USE OF ELECTRICITY

THE SAFE USE OF ELECTRICITY Reference: RCDS 015 THE SAFE USE OF ELECTRICITY Description of Activity Statutory requirements apply to all use and potential use of electricity. This Data Sheet applies to:- 1. All Mains voltage Portable

More information

Emergency Lighting Design

Emergency Lighting Design SECTION 3: 9: page 1 Section 9: Emergency Lighting Design SECTION 9: page 3 Introduction When the electricity supply fails and the lights go out, it is essential that emergency lighting is automatically

More information

AQUA PREMIER ELECTRONIC ELECTRIC SHOWER. Installation and User Guide

AQUA PREMIER ELECTRONIC ELECTRIC SHOWER. Installation and User Guide AQUA PREMIER ELECTRONIC ELECTRIC SHOWER Installation and User Guide IMPORTANT: This booklet should be left with the user after installation and demonstration CONTENTS Section Page Section Page Introduction.......................

More information

LED Sensor Floodlight AZPOSE XL-S

LED Sensor Floodlight AZPOSE XL-S LED Sensor Floodlight AZPOSE XL-S XL-25S-765/830/840 XL-10S-765/830/840 Installation Guide Contents Product Information...p.1 Specifications...p.1 Specifications summary...p.2 Detection Range...p.2 Outline

More information

Tech Report. September 9,

Tech Report. September 9, Rendering courtesy of the S L A M Collaborative Tech Report I Part I Elizabeth Kimble Lighting/Electrical Option Dr. Houser University Research Building Northeast United States September 9, 2013 Executive

More information

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN This Emergency Plan has been developed following fire risk assessments of the relevant building. The purpose of the Plan is to ensure the

More information

CIRCA Ceiling Range. Ceiling products designed to meet a wide range of applications and compliment any ceiling décor

CIRCA Ceiling Range. Ceiling products designed to meet a wide range of applications and compliment any ceiling décor CIRCA Ceiling Range Product Guide Simple, speedy installation Pendant sets for maximum convenience Lamp activated range Litesaver BC3 low energy range Ceiling products designed to meet a wide range of

More information

FHHT 18 3 PHASE /32A / 400V ELECTRIC HEATER PRODUCT MANUAL P

FHHT 18 3 PHASE /32A / 400V ELECTRIC HEATER PRODUCT MANUAL P FHHT 18 3 PHASE /32A / 400V ELECTRIC HEATER PRODUCT MANUAL P 1 of 13 These instructions should be read by: The specifying engineer. The installation engineer. The user. The service engineer. WARNINGS Failure

More information

LUCE 1 TL. specifications: internal. specifications: external. ordering logic. builder. Job/Location:

LUCE 1 TL. specifications: internal. specifications: external. ordering logic. builder. Job/Location: LUCE 1 TL indoor / damp Job/Location: Contractor: Prepared By: Job Type: Date: The LUCE-1TL thinline emergency ballast is designed to provide emergency illumination to existing or new fluorescent luminaires.

More information

GEM-C Wireless User & Installation Manual. Revision October Apollo Solar Electric Limited. Documentation

GEM-C Wireless User & Installation Manual. Revision October Apollo Solar Electric Limited. Documentation Documentation GEM-C Wireless User & Installation Manual Revision October 2014 Apollo Solar Electric Limited Contents GEM-C Wireless User Manual 3 Important Safety Information 3 Introduction 4 The GEM-C

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

Element C3.5 Means of Escape

Element C3.5 Means of Escape .5 Means of Escape RRFSO Article 14 Legal Factors Responsible person must ensure routes to emergency exits and exits themselves are kept clear at all times Exits must directly lead to place of safety Safe

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61892-2 First edition 2005-03 Mobile and fixed offshore units Electrical installations Part 2: System design IEC 2005 Copyright - all rights reserved No part of this publication

More information

Sigma. K1000 Series 1, 2, 4 & 6 Zone Fire Control Panels. Operation and Maintenance Manual. Man-1048 Issue 05 October 2009

Sigma. K1000 Series 1, 2, 4 & 6 Zone Fire Control Panels. Operation and Maintenance Manual. Man-1048 Issue 05 October 2009 Sigma K1000 Series 1, 2, 4 & 6 Zone Fire Control Panels Operation and Maintenance Manual Man-1048 Issue 05 October 2009 CONTENTS Contents... Page Safety & Installation...2 Installation - continued...3

More information

Residual Current Devices

Residual Current Devices Residual devices F200 Series UL 1053 Residual devices F200 Series Residual Current Devices Description The F200 Series residual devices offer a wide range of product for all of your fault protection needs.

More information

A guide to consumer unit and wiring accessory solutions to meet the demands of general housing installations.

A guide to consumer unit and wiring accessory solutions to meet the demands of general housing installations. MEM Memera Consumer Units and Wiring Accessories Specification for general housing installations A guide to consumer unit and wiring accessory solutions to meet the demands of general housing installations.

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60364-4-41 Fifth edition 2005-12 GROUP SAFETY PUBLICATION Low-voltage electrical installations Part 4-41: Protection for safety This English-language version is derived from

More information

(1) ... (2) Each strip has a negative charge. The cloth is left with a... charge. This is because particles called... have been transferred

(1) ... (2) Each strip has a negative charge. The cloth is left with a... charge. This is because particles called... have been transferred Q1. A student did an experiment with two strips of polythene. She held the strips together at one end. She rubbed down one strip with a dry cloth. Then she rubbed down the other strip with the dry cloth.

More information

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

INDIAN INSTITUTE OF TECHNOLOGY KANPUR INDIAN INSTITUTE OF TECHNOLOGY KANPUR Tender tice. 119/IWD/ED/644 SCHEDULE OF QUANTITY Name of work: Electrical work for: Part-A: Rewinding, overhauling and repairing of ceiling fan and exhaust fan installed

More information

MD and Its Impact on Lab Facilities

MD and Its Impact on Lab Facilities MD 15128 and Its Impact on Lab Facilities RPIC / SLCan Sustainable Laboratories Regional Workshop September 5, 2013 Timothy Ma, P. Eng., M. Eng., PMP Senior Mechanical Engineer Mechanical and Laboratory

More information

Amendment Number 3 of BS how it might affect you

Amendment Number 3 of BS how it might affect you Amendment Number 3 of BS7671 2008 - how it might affect you Geoff Cronshaw provides us with a look ahead at the proposals of Amendment 3 to BS 7671:2008 IET Wiring Regulations and the resulting changes

More information

Equipment Information

Equipment Information ST12 Equipment Information INDEX: DESCRIPTION AND KEY FEATURES LAYOUT NOMINAL TECHNICAL DATA CONFIGURATION Sealed Air Ltd. Clifton House, 1 Marston Road St. Neots GB-Cambridgeshire PE19 2HN United Kingdom

More information