1 ELECTRICAL ENGINEERING SERVICES SPECIFICATION Standard Material & Workmanship Clauses WESTWOOD PRIMARY SCHOOL Maple Grove, March Cambridgeshire, PE15 8JT May 2017 Issue Date : May /1

2 INDEX 1 CONTENTS ELECTRICAL SERVICES Introduction... 3 General Design... 3 Engineering Philosophy ELECTRICAL ENGINEERING SERVICES... 8 SECTION 2: STANDARD MATERIAL & WORKMANSHIP CLAUSES LIGHTING LEVELS IN SCHOOL AREAS ADDENDUM STANDARD SYMBOLS & NOTATIONS FOR ELECTRICAL ENGINEERING SERVICES Issue Date : May /2

3 ELECTRICAL SERVICES 2 INTRODUCTION General The building services shall be designed to: Provide all materials and works in accordance with the current Building Regulations, Building Bulletins, British Standards and Codes of Practice. Ensure all equipment and systems are designed and installed in accordance with the relevant standards and that operational compatibility exists between the systems and any other system installed at the same location. Supply plant and equipment to achieve the specified design conditions and to provide stable control. Comply with the requirements of the local Building Control office. Allow easy access for maintenance of the equipment. Minimise health and safety risks to maintenance operatives and others. 3 DESIGN Engineering Philosophy The engineering services design approach shall focus on a number of key design goals. These have been identified and summarised below (although are not limited to). These design goals shall be used during the design development in order to provide a building that can: Meet the current and future functional needs of the building and its occupants Offer a high quality internal environment Considers the school s teaching needs Be safe and secure Be flexible in its usage and operation Respond to future change (e.g. teaching, operational, layout and technological change etc.) Make creative and maximum use of natural light Minimise energy usage Maximise use of passive environmental control (daylight, natural ventilation, good thermal insulation etc.) Minimise maintenance requirements and costs Offer value for money Issue Date : May /3

4 The design of the engineering services will be in accordance with the client brief and associated technical design guidance notes (e.g. DFES Building Bulletins). Issue Date : May /4

5 1.1.1 Incoming LV Service The existing incoming low voltage electrical supply to the school is provided by UK Power Networks. The threephase and neutral (TPN) service head and supplier s metering equipment are located in the existing main electrical switch-room, adjacent to the stage. The existing main electrical supply cable to the school is in poor condition, with its insulation deteriorating, and needs to be replaced and the electrical service to the school needs to be upgraded to support the anticipated additional electrical load required. The existing maximum demand of the school has been recorded on the supplier s bills as being 67kVA, against the available service capacity of 75kVA, over the peak months October to March. Preliminary calculations indicate the additional maximum demand on the electrical load of the building as a result of this project will be approximately 35-50kVA, i.e. the load additional to the existing maximum demand. This additional load does not allow for any further spare capacity to accommodate future expansion of the school beyond that envisaged by this project and additional capacity will be required on the incoming LV electrical service to such future expansion. An upgraded LV supply is required and new incoming electrical service cable will be derived from the local Regional Electricity Company s LV network and will be a 3-phase, 4-wire, 400V/230Vac and provided by an underground cable LV Distribution The existing main electrical LV distribution switchgear to the school is located in the main electrical intake-room, adjacent to the stage. LV distribution around the site is currently provided by moulded case circuit breaker (MCCB) distribution panels. There are insufficient spare ways on the existing MCCB panels for the new circuits required. Therefore, a new TPN MCCB distribution panel will be required for new sub-main distribution. New distribution boards will be provided for final circuit distribution to new extension areas and the upgraded kitchen. Due to the proposed layout some existing circuits to areas outside of project scope will require extending to new distribution board positions and some circuits will need to be reconnected to the existing board. New MCB distribution boards will be surface mounted, with steel casings and hinged lockable covers. All new distribution boards shall come complete with their own integral isolator, integral electric meter and will be installed in new extension corridor area to provide reasonable, quick and adequate access for maintenance, inspection and testing purposes.. New distribution boards shall be provided with a spare capacity of 20-25% for future additional circuits. To comply with Part L Building Regulations all distribution boards shall be metered to monitor lighting and small power usage. Ideally with two separate integral meters in one distribution board for separate metering of lighting and small power usage. All outgoing supplies from the MCCB panel will be metered either integrally to the distribution board or within the MCCB panel. All meters will be digital using standard pulse outputs to connect to any future building management system. All final circuits will be installed with MCB s and residual current devices via single-pole RCBOs Small Power General power is to be provided throughout the new areas of the building to meet the need for small power in each of the proposed teaching areas. Socket outlets and accessories are to be provided for ICT use, general purpose use, cleaning purposes, specialist equipment and machinery (if any). Electrical accessories are to be installed flush, in conduit, DADO trunking, surface mounted or incorporated into fixed furniture dependant on client requirements. Accessories within general teaching areas are to be white plastic pattern type finish. Issue Date : May /5

6 Emergency power off buttons are to be provided to the kitchen. Provision is to be made for the installation of interactive whiteboards in teaching areas, to include sockets, switched at low level, for the installation of a projection unit. Power supplies are to be provided for miscellaneous mechanical equipment, hand dryers in toilet areas, urinal systemiser flush units and any other fixed electrical appliances required. In areas of refurbishment the existing small power installation is to be modified or replaced with new to suit the proposed layouts. The number of socket outlets and dedicated power supplies to be provided in each area are indicated by the room data sheets Lighting Change of use and layout requires that new lighting installations are to be provided in all areas of the refurbishment. Lighting is to be provided to the new and refurbished areas of school by energy efficient LED panels (600mm x 600mm) to fit seamlessly into the new ceiling grid. As LED lighting produces high current jump during switching consideration should be given during design stage to the number of panels installed on each circuit, to avoid nuisance tripping as lights are switched. The new LED lamp sources are to generally be of a colour temperature of 4000 K from colour rendering range. LEDs in general teaching areas will be compliant to CIBSE Code of Lighting Part 2 and Building Bulletin 90. All new lighting is to be controlled by an absence detection lighting control system and photocell daylight sensors are to be included such that lighting remains off when there is sufficient natural light to achieve the design illumination levels, which are indicated by the room data sheets Emergency Lighting Emergency lighting is to be provided to required areas of school to comply with BS: Generally non-maintained emergency lighting is to be provided by battery packs fitted integrally to general lighting luminaires and non-maintained, self contained, miniature luminaires utilising white high efficiency 3W LED lamps. The emergency lighting luminaires are to operate in event of power failure to relevant lighting circuit and batteries are to provide power to emergency lamps for a minimum duration of three hours.. Emergency lighting is to incorporate self-testing fittings. Within school buildings, the emergency lighting system will provide a minimum of 1 lux at floor level for the following: - escape routes, including changes of direction and external exits from the building - fire-fighting equipment points - fire alarm call points - directional or other emergency signage - any generally unoccupied area without natural daylight, including plant and switch rooms - Toilets exceeding 8sqm. Issue Date : May /6

7 1.1.6 External Lighting External lighting will be provided to standards specified by CIBSE Lighting Guide to illuminate the new building entrance canopy, extended building perimeter and any areas where illumination may be required for security and safety. New external lighting will be provided by wall mounted LED lamp sources, controlled by photocell daylight sensor units to prevent external lighting from operating during daylight. The sensors will in turn be controlled by a seven-day programmable time clock with an integral override switch Data and Telecommunications New data points are to be provided throughout the new areas as indicated by the room data sheets. It is anticipated that new data cabinet(s) will be required to serve the extension and refurbished areas, which are to be linked to existing network via a new fibre optic cable. The existing telephone system will be extended throughout the new areas to serve telephony to be provided as indicated by the room data sheets Fire Alarm System The existing fire alarm system installed to the school is an analogue addressable system and is to be extended to serve the new and remodelled areas of the building. The extension of the existing system requires that the number of fire zones will increase and a new fire alarm panel is required to accommodate a minimum of 8 fire zones. All existing circuits, some of which may need to be expanded, are to be reconnected to the new panel. The new installation shall conform to British Standard BS5839 Part 1, P2/L2 standard. Additions to the fire alarm system will consist of manual call points to all new exits from the building, automatic smoke and heat detection devices, electronic sounders and visual indicators. Interface units are to be provided to control mechanical plant, door retaining devices, gas valves as required. Automatic fire detection is to generally be provided by combined optical/heat type detectors to suit the differing types of area. Visual alarms (beacons) are to be provided to toilet areas and any other areas where the hearing impaired may be alone Security The existing site wide intruder detection system (IDS) is controlled by a control panel located in the reception office within existing building. The IDS is to be extended throughout the new and remodelled areas of the building. Social areas, kitchen areas and exit routes are to be zoned to allow the IDS to be controlled at different settings in different areas to suit the requirements of the school s activities. The existing keypad, located in the school reception area, and all existing system devices are to be retained except in areas of demolition, where devices are to be disconnected from system prior to demolition works commencing. New intruder alarm devices, connected to the existing system, are to be provided as necessary to protect all points of access to the new building and other high risk areas within the new building (to be agreed with the school). Issue Date : May /7

8 New system devices are to consist of expansion panels, keypads for zones to be set/unset, proximity detectors of the dual technology type, door contacts and internal alarm sounders. Alarms will generally operate as a sequentially confirmed alarm by operation of two or more alarm devices to conform to BS EN The existing CCTV system is to be upgraded and extended with new cameras are to be installed into extension areas, including additional cameras to cover areas of potential bullying or conflict (to be agreed with the school). 4 ELECTRICAL ENGINEERING SERVICES SECTION 2: STANDARD MATERIAL & WORKMANSHIP CLAUSES 2.01 GENERAL The Electrical Engineering Services Standard Material & Workmanship Clauses shall be applicable to all electrical engineering works, unless otherwise stated in the Particular Specification, or on the drawings. It shall be read in conjunction with any preliminary clauses, any Particular Specification and/or drawings applicable to the works. Where discrepancies arise between these documents the order of precedence shall be as follows: Drawings. Particular Specification. Standard Material & Workmanship Clauses. The symbols used on drawings shall be in accordance with those appended to this specification COMPLIANCE WITH REGULATIONS & CODES OF PRACTICE The works shall be carried out in accordance with all relevant statutory requirements, the current edition of BS 7671: Requirements for Electrical Installations (complete with Amendments and Guidance Notes), the requirements of the Regional Electricity Company, British Standard Codes of Practice, Approved Documents of the Building Regulations and recognised trade association and professional institution practices. BS 7671 shall henceforth be referred to as the Wiring Regulations. All regulations, standards etc., referred to shall be deemed to incorporate all current amendments and guidance notes in force. Where applicable, the recommendations of the Building Services Research and Information Association (BSRIA) shall be complied with. Where an interpretation or a recommendation concerning any of these requirements has been published by the National Inspection Council for Electrical Installation Contracting (NICEIC) this shall be taken as the definitive version MATERIALS & WORKMANSHIP All materials used shall be new and unused, and shall both before installation and on completion, be free from rust, scale, deformation or discolouration and be of the type and manufacture specified. They shall conform to the requirements of any appropriate British Standard Specification and be CE marked. All materials shall be selected to withstand the external influences they will be subjected to, be compatible with their surroundings and be capable of being maintained. No materials generally known to be deleterious shall be used. Any materials which show deterioration due to neglect in storage or installation will not be accepted. Issue Date : May /8

9 The specific instructions of original equipment manufacturers shall be adhered to in every respect. Workmanship shall conform to the standard of first class engineering practice. Equipment shall be erected plumb and true with fixings capable of sustaining a minimum weight of 40kg or three times the weight of the item, whichever is the greater. No item shall rely on one fixing only. The work area shall be kept clean and tidy with all rubbish etc. removed upon completion of the task TENDER DOCUMENTATION The contract documents shall be deemed to include those drawings and specifications on which the contract for the works is based. Drawings may include Sketch Drawings, Schematic Drawings or Detailed Design Drawings. The determination of unspecified parameters may form part of the works. This could include the production of Co-ordination Drawings and Schedules where these are not included as part of the Tender Documentation or stated as to be produced during the Production Information Stage. The Particulars of Contract shall state whether the Construction (Design and Management) Regulations (CDM) apply in full. In such instances the Planning Supervisor's pre-contract Health and Safety plan will accompany the tender documents. Where a tender summary and schedule of rates are included in the Particular Specification these shall be completed fully and submitted with the tender to be used for pricing any variations, additions, omissions etc., 2.05 INSTALLATION DRAWINGS & BUILDERS WORK DETAILS Installation Drawings, Shop Drawings, and Builders Work Details shall be produced by the Contractor as required for the construction of the works, and/or if called for in the Particular Specification. These shall be submitted for examination prior to any installation and/or manufacture taking place. Two sets of drawings shall be required showing details of plant rooms, general arrangements of the installation, wiring diagrams for control circuits, layouts of panels etc., 2.06 HANDOVER INFORMATION Record Drawings Prior to Practical Completion a complete set of drawings showing the installation as installed shall be provided. They shall beforehand be submitted for comment for suitability of purpose (but not accuracy) and shall include all of the requirements detailed in BSRIA Technical Note 15/95. The drawings shall initially be prints for inclusion in the O & M Manual (inserted into clear PVC envelopes). Subsequently a set of CAD Drawings to BS EN ISO 7519: 1997 on disc shall be submitted within four weeks of Practical Completion Operating and Maintenance (O&M) Manuals Two copies of an Operating & Maintenance Manual shall be provided 14 days prior to Practical Completion as part of the works. It shall include all the information necessary to provide for the safe and efficient operation and maintenance of the engineering services which comprise these works. The manual shall meet the requirements of the following: BS EN BS 4940 AG1/87.1 BSRIA TN15/95 Specification for Technical Manuals Recommendations for the presentation of Technical Information etc. Applications Guide. Operating and Maintenance Manuals for Building Services Installations. Technical Note. Handover Information for Building Services. Issue Date : May /9

10 Health and Safety at Work Act 1974 (HSWA) Construction (Design and Management) Regulations 2007 (CDM) Control of Substances Hazardous to Health Regulations 2002 (COSHH) Any other relevant legislation. Manuals shall be either Class B or Class D as described in BSRIA AG1/87.1. The appropriate type of manual shall be specified in the Particular Specification or on the drawings. Where not so specified the manual shall be Class B. Class B manuals shall generally comprise: Record drawings and drawing symbols. Manufacturer's operating and maintenance instructions. Test and commissioning certificates. Warranties. Equipment inventories with manufacturers names and addresses. A Class B manual may be prepared by the Contractor. Class D manuals shall comprise the contents detailed in BSRIA TN 15/95, which shall generally be as follows: Record drawings, symbols, charts and schedules How to use the manual Emergency information Contractual and legal information Systems description and design intent Asset list/equipment schedule Parts identification and recommended spares Spares policy Commissioning data Operation Maintenance recommendations and records to date Fault finding Lubrication Modification information Disposal instructions Names and addresses of manufacturers Index of plans and drawings Manufacturer's literature A Class D manual shall be prepared by a specialist author as recommended by BSRIA or as approved by the Contract Administrator. Both classes of O & M manual shall clearly describe isolation procedures, and appropriate locations shall be marked on the record drawings. Copies of the distribution schedules shall be included within each class of manual. Manuals shall comprise loose-leaf A4 pages on good quality paper suitable for heavy usage, inserted in four-ring PVC covered hardback binders having stepped overlapping card dividers between sections. An information sheet shall be provided in the front of the manual listing the names and addresses of the installation, the author, the consulting engineer (KIER Services) & the installation Contractor. Manual details and the relevant information shall be provided on the front cover and the spine. The client shall have sole copyright. Practical Completion may be withheld until the O & M manual has been substantially provided Maintenance All systems shall be properly maintained in accordance with the manufacturer's requirements, and relevant British Standards etc., and trade practices to the date of Practical Completion (unless ongoing maintenance comprises part of the specified works). As part of the O & M manual, comprehensive maintenance recommendations and records of maintenance to date shall be provided. From the date of Issue Date : May /10

11 Practical Completion the client will assume the responsibility for maintenance (unless maintenance is part of the works). Where the O & M manual, record drawing or any other relevant maintenance information is not handed over prior to Practical Completion, the Contractor shall be responsible for the cost of maintenance and the consequences of a lack of proper maintenance during the period between Practical Completion and approval of the relevant documents, as detailed in BSRIA TN 15/ Health & Safety File The O & M manual inclusive of all record drawings shall comprise an integral part of the Health and Safety file as defined by the Construction (Design and Management) Regulations (CDM) irrespective of whether these regulations apply in full to the works. Where the CDM Regulations apply in full to the works, the CDM Co-ordinator shall approve the Health and Safety File and may not approve Practical Completion until such time as a suitable file is prepared Log Books Fire Alarm, Emergency Lighting and Lightning Protection systems where forming part of the works, shall be provided complete with a log book as detailed in the appropriate British Standard. Where any other system is supplied with a log book then this shall be provided. Log books shall accompany (but not form part of) the O&M Manual, and instructions on their use shall be contained in the O&M Manual DEMONSTRATION & INSTRUCTION At Practical Completion the building occupier shall have the whole of the works described and demonstrated to them. This shall include instruction in the use of all plant, operation of all equipment, systems, controls, isolation and minor maintenance procedures, etc., all as is necessary to enable the systems to be fully understood and correctly operated. It should be noted that the Instruction cannot properly take place until the Operation and Maintenance Manual has been provided and that the said Instruction is subject to those Health and Safety Implications detailed for O & M Manuals VISITS TO SITE Where the work involves the alteration, extension or modification of an existing installation in an existing building, the Contractor is advised to visit the site prior to submitting a tender in order to ascertain the full extent of the work. No claims for additional work, which should have been identified by a site visit, will be considered ASBESTOS OR OTHER SUBSTANCES HAZARDOUS TO HEALTH IN EXISTING BUILDINGS The Contract Administrator shall inform the Contractor where asbestos or other substances which are hazardous to health are known to exist. The Contractor shall inspect the premises' Health and Safety File for records of asbestos or other substances prior to commencing the works. The employer may have records additional to those in the Health and Safety File. Where the Health and Safety File is not present or in the opinion of the Contractor is not complete, the Contractor shall request additional records from the employer, and such records shall not unreasonably be withheld. Attention is drawn to the fact that works may be required in the vicinity of asbestos of one form or another. The Contractor will be required to inspect the Property Asbestos Log Book (for buildings where they exist) prior to carrying out any works on existing buildings, and must sign in the appropriate column to confirm he has done this. He will be required to follow the procedures set out in the Log Book. If the Log Book indicates that the area of works will disturb asbestos, the Contractor must inform the Contract Administrator and await instructions. If asbestos is specifically mentioned in the Particular Specification, then the specified instructions shall be executed. Where during the course of the works, asbestos or other substances are found, which in the opinion of the Contractor are hazardous to health, any work which involves the disturbance of such a substance shall be immediately stopped. If working within a ceiling void or duct, close the access covers, or if working in a boiler or plant room, close the door and put up a notice "NO ENTRY". Inform the Contract Administrator immediately and await further instructions. Issue Date : May /11

12 If an accident occurs whereby asbestos or other substances are inadvertently disturbed in no circumstances attempt to sweep up or dispose of it but report to the Contract Administrator after complying with the above requirements ELECTRICITY SUPPLY & METERING EQUIPMENT Where the provision of an electricity supply cable from the UK Power Networks is required, this shall be separately detailed elsewhere. The application for the provision of metering equipment (other than for a Contractor s temporary supply) shall be carried out by the Client. The prospective short circuit current and the external earth loop impedance shall be stated in the Particular Specification where known EARTHING ARRANGEMENTS Unless otherwise detailed the provision of an earthing terminal will be by the Regional Electricity Company, and connected to a Protective Multiple Earthed (PME) network. The earthing arrangements shall comprise the TN-C-S/TN-S system, & protection against indirect contact shall be by earthed equipotential bonding & automatic disconnection of supply unless an alternative system is detailed. Circuit protective conductors (CPC) shall comprise those contained within (or the sheath of) composite cables unless otherwise detailed. Where separate or supplementary protective conductors are required these will be detailed in the particular documents. Where required by the Wiring Regulations main equipotential bonding conductors shall be installed connecting the main earthing terminal to extraneous conductive parts. These parts include gas, water or any other service or part that may be specified in the Particular Specification or on the drawings. Where main equipotential bonding conductors are connected to a main earthing terminal they shall be fitted with a label designating their function. Equipotential bonding conductors shall be connected to localised extraneous conductive parts. Such parts shall be deemed to include the peripheral grids of suspended ceilings. Local supplementary bonding connections shall be installed where required by the Wiring Regulations, and additionally between exposed conductive parts having a resistance in excess of 0.05 ohm MOUNTING HEIGHTS Equipment shall be mounted at the following heights above finished floor level (AFL) to the centre of the item unless otherwise detailed in the particular documents. ITEM LOCATION HEIGHT (mm) Lighting Switches 200mm to any adjacent door 1100 Socket Outlets Generally 450 Socket Outlets Above working plane 150 over working plane TV Points Generally 450 Telephone Points Generally 450 Telephone Points Wall Telephone 1400 Fire Alarm Contacts 1100 Fire Alarm Bells 2200 Thermostats 1500 Control Devices & Switchgear Indicators Where items of equipment are to be installed immediately adjacent to each other, but detailed to be at different mounting heights as indicated in the above table, then the Contract Administrator shall be consulted to facilitate an aesthetic solution Switches, outlets & controls (Extract from Building regulations Part-M) Design considerations The key factors that affect the use of switches, outlets and controls are ease of operation, visibility, height and freedom from obstruction. However, there will be exceptions to height requirements for some outlets, e.g. those set into the floor in open plan offices. Issue Date : May /12

13 2.14 A consistent relationship with doorways and corners will further reinforce the ease with which people manipulate switches and controls All users should be able to locate a control, know which setting it is on and use it without inadvertently changing its setting Controls that contrast visually with their surroundings are more convenient for visually impaired people, as are light switches that are activated by a large push pad. The colours red and green should not be used in combination as indicators of on and off for switches and controls. It may be useful to use text or a pictogram to clarify the purpose and status of multiple switches & controls It is also an advantage if individual switches on panels and on multiple socket outlets are well separated, or in the form of large touch plates, to avoid the inadvertent selection of an adjacent control by visually impaired people and people with limited dexterity. Provisions 2.18 Switches, outlets and controls will satisfy Requirement M1 if: a. wall-mounted socket outlets, telephone points and TV sockets are located between 400mm and 1000mm above the floor, with a preference for the lower end of the range; b. switches for permanently wired appliances are located between 400mm & 1200mm above the floor, unless needed at a higher level for particular appliances; c. all switches and controls that require precise hand movements are located between 750mm and 1200mm above the floor; d. simple push button controls that require limited dexterity are not more than 1200mm above the floor; e. pull cords for emergency alarm systems are coloured red, located as close to a wall as possible and have two red 50mm diameter bangles, one set at 100mm and the other set between 800mm and 1000mm above the floor; Issue Date : May /13

14 f. controls that need close vision are located between 1200mm & 1400mm above the floor so that readings may be taken by a person sitting or standing (with thermostats at the top of the range); g. socket outlets are located consistently in relation to doorways and room corners, but in any case no nearer than 350mm from room corners; h. light switches for use by the general public have large push pads and align horizontally with door handles within the range 900 to 1100mm, for ease of location when entering a room; i. where switches described in 4.30(h) cannot be provided, lighting pull cords are set between 900mm & 1100mm above floor level, & fitted with a 50mm diameter bangle visually contrasting with its background & distinguishable visually from any emergency assistance pull cord; j the operation of switches, outlets & controls does not require the simultaneous use of both hands, except where this mode of operation is necessary for safety reasons; k. switched socket outlets indicate whether they are on ; l. mains and circuit isolator switches clearly indicate that they are on or off; m. front plates contrast visually with their backgrounds IDENTIFICATION LABELS & NOTICES Each item of switchgear (including MCCBs), control gear, distribution equipment and joints shall be labelled or engraved unless there is no possible confusion over its purpose. Where specialist labelling or engraving is required this will be detailed in the particular documents. Unless otherwise detailed labels shall be traffolyte with black lettering on a white ground, of a size appropriate and proportional to their application. Labels shall generally be screw fixed unless adhesive fixing is agreed with the Contract Administrator. Every item of equipment or enclosure within which 400V exists shall have a black on yellow label (to BS 5378) label reading "DANGER volts". Where separate enclosures (within 2m of each other) house terminations having 400V between them, each item shall have a black on yellow label affixed internally reading "DANGER volts between adjacent equipment". Each distribution board shall have its protective devices sequentially numbered. Single phase boards shall be numbered commencing at 1. Three phase boards shall be numbered using the notation 1/L1, 1/L2, 1/L3, 2/L1, 2/L2 etc. Distribution equipment shall be equipped with a typewritten distribution schedule installed within a clear PVC pocket fitted to the inside of the hinged lid. Where there is insufficient space inside the equipment, or where there is no hinged lid, then the schedule shall be mounted within a glazed frame screw fixed adjacent to the equipment. The schedule shall identify the utilisation, area served, current rating, and size of conductors for each protective device. (Note that copies of these schedules are required for the O&M Manuals). At the origin of very installation a periodic inspection and test notice as prescribed in the Wiring Regulations shall be affixed. Note shall be taken that it may not be deemed safe to authorise Practical Completion without the proper identification notices and labels MAIN SWITCHGEAR Issue Date : May /14

15 Main switchgear shall generally comprise either HRC fusegear or moulded case circuit breaker panels mounted directly on to brick or block walls, and interconnected with steel cable trunking. All switchgear shall be complete with locking-off facilities to enable secure isolation. An installation drawing of the switchgear shall be submitted to the Contract Administrator, or alternatively the equipment shall be laid out on site for approval before erection commences. A suitable chart giving instructions for dealing with electric shock shall be installed adjacent to each switchboard. The chart shall be a waterproof type as provided by Electrical Review, the British Safety Council or similar DISTRIBUTION BOARDS Distribution boards shall be installed at heights agreed on site, and connected to suitable steel cable trunking to house outgoing cables. The distribution boards shall be fitted with the rating and types of protective devices detailed, blank covers or fuse bridges for spare ways, adequate earthing terminals, hinged lids and locking off facilities. Where RCBOs or RCDs are specified these shall be 30mA unless otherwise detailed. 1 dolly locking device shall be provided with each MCB distribution board. Distribution schedules shall be fitted as previously detailed CABLES Generally The types of cables to be installed shall be detailed in the particular documents. Cables shall not be installed under tension, they shall be installed parallel or at right angles to walls and floors, under no circumstances shall diagonal runs be permitted. The fixing centres, bending radii and identification of conductors shall accord with the Wiring Regulations. Proprietary fixing clips shall be used. Cables with reduced neutrals shall not be installed unless detailed elsewhere. Cables shall not be installed when the ambient temperature is below 0 o C. Joints shall not be permitted unless by prior agreement with the Contract Administrator. Unless otherwise stated the minimum size of cable used shall be 1.5mm 2 In all cases cables shall have BASEC approval, unless an approval system is not in force for the particular cable type. Cables and their enclosures passing through fire barriers (i.e. Walls and floors) shall be internally and externally sealed against the propagation of fire. Small holes shall be sealed with a PVE foam aerosol, larger holes and trunking etc. shall be sealed with proprietary intumescent blanket material Electromagnetic Compatibility (EMC) Low voltage cable installations shall not cause damage, interference or malfunctions of other systems. To reduce electromagnetic interference (EMI), mains voltage and signal cables following parallel routes shall have minimum separation as detailed in the following table unless otherwise specified. MINIMUM SEPARATIONS IN mm FOR ALL TYPES OF INTERFERENCE SIGNAL CABLES (RECEPTOR) Twin & Earth MAINS VOLTAGE CABLES (SOURCE) Earthed Earthed Steel Wire Conduit Trunking Armoured MICC Twin PVC Sheathed Unscreened Twisted Pair Screened Twisted Pair Aluminium Foil Screened Issue Date : May /15

16 Steel Wire Armoured MICC Coaxial Acknowledgement is made to the ECA for the use of the above table. Unless specifically stated single core cables shall not be installed (with the one exception of short 'tails' at meter connections). Lighting circuits shall employ 2 and 3 core cables using the '3 plate' method. Where single and 3 phase circuits installed in conduit or trunking comprise separate unsheathed cables, the cables for each separate circuit shall be taped together to minimise EMI. Where screened cable is specified, unless otherwise detailed, its screen shall be earthed at the supply end only and insulated at the remote end Underground Cables Underground cables or ducts shall be installed at a minimum depth of 450mm, on a bed, and with a cover, of sifted soil or sand. A continuous length of proprietary yellow marker tape labelled "CAUTION ELECTRIC CABLE BELOW" shall be installed over the complete length of the cable at 400mm below ground level. Where ducts are specified they shall be from the 'Rigiduct' range of twin walled, high density polyethylene ducting, as manufactured by B&H (Leics) Limited. Underground ducting shall be in accordance with the National Colour Coding System for buried services as follows: Colour Black Red Blue Yellow Grey/White Green Service LV Electricity HV Electricity Water Gas Communication and Alarms Cable and Closed Circuit Television Where underground cables surface they shall be in an area where damage is unlikely, or they shall be enclosed in conduit, or covered with capping for a height of 1.8m. Cable ducts terminating in a building shall be sealed to prevent entry of vermin etc. As an alternative to excavation, and where specified, ducts may be installed by the thrust-boring technique. In this case the ducts shall have the words "DANGER ELECTRICITY CABLE" printed on them. Underground cables shall be installed segregated by a minimum horizontal distance of 400mm from other services. Where cables cross other services they shall be installed within ducts. Where supplementary protective conductors are specified they shall be installed immediately BELOW the main cable. Reinstatement shall be equal to the existing surrounds and shall include re-tarmacing or re-turfing Multicore Armoured Cables Unless otherwise detailed these cables shall comprise:- 1. PVC insulation, Single Wire Armour and PVC sheath (PVC/SWA/LS0H) to BS for conductors up to 10mm 2 2. Thermosetting insulation (XLPE), Single Wire Armour and LS0H sheath to BS 5467, for conductors of 16mm 2 and above or 3. XLPE insulated, Single Wire Armoured, Low Smoke and Zero Halogen (LS0H) sheathed to BS 6724 and 4. Conductors shall be copper (cu) unless aluminium (al) is specified. The cables shall be 600/1000V grade, with the armouring used for earthing purposes unless otherwise detailed. The termination of the armouring shall generally be by a mechanical cable gland to BS 6121, a proprietary earth tag washer (fixed with brass nut and bolt), and a PVC or LS0H shroud. Issue Date : May /16

17 The gland shall be either dry indoor, weatherproof or flameproof as required for the environment. If armoured cables are recessed into wet plastered walls termination shall be made without using a cable gland, the armouring being terminated directly onto an earth terminal. Alternatively an additional cable core shall be used for the protective conductor. In non-industrial interiors where groups of wiring cables enter distribution boards in cable trunking, the armoured cables shall take the same route. The armour shall be terminated with an earthing clamp to BS 951, and connected to an equivalent size copper tail. Terminations for copper conductors connecting to stud terminals shall be with crimped lug terminations. Terminations for aluminium conductors shall be crimped, lug type for stud terminals, and pin type for tunnel terminals, or alternatively aluminium to copper tail connectors shall be used. The 'swaging' method of termination shall NOT be used. All crimping shall be with proprietary crimping tools and dies. The treatment of aluminium conductors and armouring shall be as follows. Mating surfaces shall be cleaned bright with wire wool then coated with a proprietary jointing compound. This shall be carried out immediately prior to crimping to prevent surface oxidisation Mineral Insulated Cables Mineral Insulated cables (MI) shall be to BS They shall have copper conductors and sheath, be light or heavy duty, with or without PVC or LS0H oversheath as specified. Fittings shall be to BS Cables shall be installed exactly in accordance with the manufacturer s instructions using proprietary tools. The cable shall generally be terminated using an earth tail seal and gland. Where termination boxes will not accept a male gland and locknut, a female pattern gland and male bush shall be used (steel conduit couplers shall not be permitted). Where proprietary MICC cable wiring accessories are specified, glands shall not be installed, and earth tail pots are not essential. For flameproof applications cables shall be heavy duty and BASEEFA approved flameproof glands and 'increased safety' seals shall be used. Cable cores shall have identification ferrules affixed PVC Insulated & Sheathed (Non-Armoured) Cables Unless otherwise detailed these cables shall comprise: 1. Flat 2 or 3 core cables with circuit protective conductor to BS 6004 Table 5. (6242Y or 6243Y). 2. Flat 2 core cables (with or without CPC) 1.5 or 2.5 mm 2 with stranded conductors to BS 6004 Table 6. (6242Y) 3. Single core, flat 2 or 3 core cables without CPC to BS 6004 Table 4. (6181Y, 6192Y or 6193Y). 4. Circular twin, 3 or 4 core cables to BS 6004 Table 3 (6182Y, 6183Y or 6184Y). 5. Circular twin, 3 or 4 core cables with CPC and heavy duty sheath (e.g. 'Hituf'). All cables shall be 300/500V grade with copper conductors. Unless otherwise stated all cables shall be multicore and complete with an integral circuit protective conductor. Single core cables shall NOT be in general use. Due to EMI problems, they shall be restricted to short lengths used for interconnecting switchgear and metering equipment. These cables shall not be installed surface clipped unless otherwise detailed. They shall be installed within cavities of ceilings, floors and partitions (but not in the cavities of external walls). Where cables drop from the ceiling (or rise form the floor) to wall mounted points, or are cast into concrete, they shall be completely enclosed within conduit or trunking. The conduit (or trunking) may be surface or recessed as specified in the particular document, and shall comply with the respective standard clauses. For cables installed in accordance with these methods glands/clamps are not generally required Fire Resistant Silicone Rubber Insulated Aluminium Foil & LS0H Sheathed Cable complete with CPC Fire Resistant Cables shall comply with BS 6387 and BS 7629, and have a BASEC Certificate of Approval. They shall be multicore cables having copper conductors. Issue Date : May /17

18 The methods of installation shall be exactly in accordance with the requirements for non-armoured PVC insulated and sheathed cables. For the prevention of mutual detrimental influence these cables shall be regarded (i.e. segregated) in accordance with the requirements for mineral insulated cables, for EMC separation the table in this specification is applicable. Cables shall be installed exactly in accordance with the manufacturer s requirements. For terminations where space is limited, such as a circular conduit box, the conduit box shall be fitted with an extension ring sufficiently deep to avoid the cores being forced against the box. Cable glands shall be installed in all cases other than where cables are enclosed within conduit or trunking. Where the cable is reliant on its clipping to retain its integrity in the event of a fire, fire resisting (i.e. metallic) clips shall be used Special Cables for Extra-Low Voltage Applications These cables shall include telecommunication, bell, call, sound distribution, data transmission, alarm, radio and television cables. The cable shall be as specified in the Particular Specification. The methods of installation shall be exactly in accordance with the requirements for non-armoured PVC insulated and sheathed cables, unless otherwise detailed. In some cases these cables will be installed by others (e.g. British Telecom). Conduits provided for these cables shall be left with a draw wire installed Single Core PVC & LS0H Insulated Cables These cables shall be 300/500V grade, have solid or stranded copper conductors and be in accordance with BS 6004 Table 1(a), (6491X and 6491B). They shall be installed completely enclosed within conduit and/or trunking which shall comply with the relevant sections of this specification. The type of conduit or trunking shall be specified in the Particular Specification. All wiring systems comprising single core PVC insulated cables shall have a separate circuit protective conductor installed unless otherwise specified. The size of the CPC shall be specified within the particular documents, and installed irrespective of the type of conduit systems. If not so specified the CPC shall comply with table 54G of the Wiring Regulations. The spacing factor shall be in accordance with the Wiring Regulations CONDUIT, CABLE TRUNKING & CABLE TRAY SYSTEMS Generally The types of conduit or cable trunking to be installed shall be detailed in the particular documents, installed surface or recessed as specified. Conduit and trunking shall be installed vertical or horizontal and parallel to walls. Diagonal runs may be permitted in floors, ceilings and in some special circumstances such as a cooker final connection, subject to the approval of the Contract Administrator and where steel conduit is used. Recessed conduit shall not be installed in walls less than 100mm thick without prior instructions from the Contract Administrator. The fixing centres for conduits and cable trunking shall not exceed HALF the distances tabulated in the Wiring Regulations. Each conduit/accessory box shall be fixed independently of the conduit system. Bending radii of conduit shall be not less than the values stipulated in the Wiring Regulations. Conduit and trunking systems shall be either continuous, for the installation of unsheathed cables, or isolated sections for the protection and enclosure of sheathed or armoured cables. In both instances metallic conduit/trunking shall be bonded to the earthing terminal, but shall not in itself be used as a protective conductor, a separate CPC shall be installed. This requirement shall not apply to isolated lengths of conduit used as communication and data wireways etc. The use of inspection pattern conduit fittings shall not be permitted, all fittings shall comprise circular, square or rectangular boxes. Where groups of cables enter distribution boards, or to alleviate multiple conduit runs, trunking shall be installed, steel or PVC, to be compatible with the wiring system in use. Where surface conduit or trunking is installed, all the installation components shall be suitable for the type of wiring, including the provision of surface patresses where these are required Circular Steel Conduit Steel conduit shall be of metric dimensions to BS The sizes used shall be 20, 25 and 32mm. Steel conduit shall be heavy gauge welded, generally finished stove enamelled black (Class 2). Issue Date : May /18

19 For external applications, within boiler rooms, ducts and other damp situations, conduit shall be hot dipped galvanised (Class 4). For flameproof applications solid drawn conduit shall be installed. All conduit accessories shall match the type of conduit used. Where steel conduit is installed surface mounted, screwed accessories shall be used, any exposed thread lengths shall be treated with a compatible paint. Where steel conduit is recessed, 'pinch-grip' accessories may be used. Fixing of surface steel conduit shall be with distance saddles, and recessed conduit with pipe hooks (crampets). No other methods shall be used unless with the prior consent of the Contract Administrator. The terminations of steel conduit into enclosures and boxes not fitted with spouts shall be with a coupler & male bush Circular PVC Conduit PVC conduit shall be to BS 4607 and BS The size used shall be 20mm and 25mm, and the conduit shall be of the super high impact heavy gauge grade. The colour shall generally be white, unless black is specified, and all accessories shall match the conduit. The fixing of surface PVC conduit shall generally be by spacer bar saddles, recessed conduit shall be secured with pipe hooks (crampets), and connections made with proprietary solvent cement. Where bends are required proprietary bending springs shall be used. In straight runs exceeding 6m an expansion coupling shall be installed Steel Cable Trunking Steel cable trunking shall be to BS 4678 where applicable. It may comprise square, rectangular, floor, skirting or bench trunking as specified. It shall generally comprise standard gauge finished stove enamelled dark grey, but for installations within boiler rooms and other damp situations trunking shall be hot dip galvanised pattern. For each change of direction, and at every joint or 'T', the trunking manufacturers accessories shall be used unless by prior arrangement with the Contract Administrator. Unless otherwise detailed bends and 'T's shall be radius pattern, and any reducers bellmouth pattern PVC or GRP Trunking PVC cable trunking shall be to BS 4678 where applicable. It may comprise square, rectangular, mini, cornice, architrave, dado, skirting, floor or bench trunking as specified. The finish shall generally be white. For each change of direction and at each joint or 'T' the respective trunking manufacturer s accessories shall be installed. Where situations require butt or mitre joints the prior approval of the Contract Administrator shall be obtained PVC Screeded Floor Ducting This shall be as specified complete with the manufacturer s proprietary accessories and installed exactly in accordance with the manufacturers requirements. Each length of trunking shall be covered with an overlapping (100mm each side) expanded metal mesh prior to screeding. This metal mesh shall be earthed to an adjacent service box by a fixed earth terminal (brass nut and bolt), and a similar nut and bolt fixed through the metal mesh. The precise location of outlets shall be confirmed with the Contract Administrator prior to screeding Cable Tray or Basket Unless detailed otherwise, internal cable tray shall be heavy duty return flange pattern of 1.5mm gauge minimum. It shall be hot dip galvanised steel to BS 729, and installed complete with the manufacturer s accessories. Cable basket shall be installed complete with the manufacturer s accessories and installed exactly in accordance with the manufacturer s requirements Cable Ladder This shall be alloy or GRP as specified, complete with the manufacturer s accessories and installed exactly in accordance with manufacturers requirements FLEXIBLE TERMINATIONS Flexible terminations shall be as detailed in the Particular Specification and shall generally be one of the following methods. Issue Date : May /19

Project Briefing Document. Section 3 Electrical Services design guide and specifications

Project Briefing Document. Section 3 Electrical Services design guide and specifications ESTATES SUPPORT SERVICE Project Briefing Document Section 3 Electrical Services design guide and specifications Issue 1.1 June 2014 Project Ref. Project Name Project Manager Date issued... Consultant/Contractor...

More information

Requirements for Electrical Installations

Requirements for Electrical Installations BRITISH STANDARD BS 7671:2018 Corrigendum (December 2018) Requirements for Electrical Installations IET Wiring Regulations Eighteenth Edition The Institution of Engineering and Technology and BSI NO COPYING

More information

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department SOUTH DUBLIN COUNTY COUNCIL Roads (Traffic and Transportation) Department TECHNICAL SPECIFICATION 4 SDCC-TS-04 SIGNAL INSTALLATION REQUIREMENTS REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF TRAFFIC CONTROL

More information

The extent of liability of the signatory/signatories is limited to the work described above as the subject of this certificate.

The extent of liability of the signatory/signatories is limited to the work described above as the subject of this certificate. This safety certificate is an important and valuable document which should be retained for future reference DETAILS OF THE CLIENT Client / DETAILS OF THE INSTALLATION Extent of the installation covered

More information

Guide to: 17 th Edition Consumer Units

Guide to: 17 th Edition Consumer Units Guide to: 17 th Edition Consumer Units Introduction For well over one hundred years the Wiring Regulations have provided the rules which must be followed to make sure that electrical installations are

More information

Contents The IET Regulations, BS 7671, and this Guide 1.1 The need for this Electrician s Guide 1.2 The IET Regulations BS 7671

Contents The IET Regulations, BS 7671, and this Guide 1.1 The need for this Electrician s Guide 1.2 The IET Regulations BS 7671 Contents 1 The IET Regulations, BS 7671, and this Guide 1 1.1 The need for this Electrician s Guide 1 1.2 The IET Regulations BS 7671 2 1.2.1 International basis 2 1.2.2 The Seventeenth Edition 3 1.2.3

More information

User Information Sheet 008 : 2010

User Information Sheet 008 : 2010 User Information Sheet 008 : 2010 Formerly UIS008, July 2009 ELECTRICAL INSTALLATIONS ASSOCIATED WITH BULK LPG INSTALLATIONS 1. Introduction This Information Sheet describes some of the principles and

More information

Fire detection and alarm

Fire detection and alarm Fire detection and alarm Aesthetic Install all cabling and cable containment neatly and unobtrusively, meeting the highest electrical industry installation standards. Neatly lay and securely fix cables.

More information

DCP3/ DETAILS OF THE CLIENT ADDRESS OF THE INSTALLATION

DCP3/ DETAILS OF THE CLIENT ADDRESS OF THE INSTALLATION Issued in accordance with British Standard 7671 - Requirements for Electrical Installationsby a Domestic Installer enrolled with NICEIC, Warwick House, Houghton Hall Park, Houghton Regis, Dunstable LU5

More information

Emergency Voice Communication System (EVCS) Consu ltant s Specific atio n CONTENTS

Emergency Voice Communication System (EVCS) Consu ltant s Specific atio n CONTENTS CONTENTS 100 PERFORMANCE OBJECTIVES 200 DESIGN PARAMETERS 300 SYSTEM DESIGN 310 Design Guidance 320 Outstation Choice 330 Outstation Position 340 Documentation 400 SYSTEM COMPONENTS 410 Master Handsets

More information

Level 3 NVQ Diploma in Domestic Plumbing and Heating ( /025)

Level 3 NVQ Diploma in Domestic Plumbing and Heating ( /025) City & Guilds Tutor Training Guidance Level 3 6189 NVQ Unit 305/025 Understand and carry out electrical work on domestic plumbing and heating systems and components April 2013 This document is for tutors

More information

UEE30811 Q-Tracker Work Tasks

UEE30811 Q-Tracker Work Tasks UEE30811 Q-Tracker Work Tasks UEENEEC020B Participate in electrical work and competency development activities Q-Tracker requirements: 40 hours of practical training. 1. Comply with electrical industry/enterprise

More information

Special Provision No. 683S28 December 2017

Special Provision No. 683S28 December 2017 FIBRE OPTIC COMMUNICATION CABLES, AERIAL ON MESSENGER CABLE - Item No. FIBRE OPTIC COMMUNICATION CABLES, AERIAL ON MESSENGER CABLE (TEMPORARY) - Item No. Special Provision No. 683S28 December 2017 1. SCOPE

More information

NPS/003/030 Technical Specification for Transformer and Switchgear Cable Boxes and their associated Bushing Assemblies

NPS/003/030 Technical Specification for Transformer and Switchgear Cable Boxes and their associated Bushing Assemblies Version:- 2.0 Date of Issue:- May 2015 Page 1 of 17 NPS/003/030 Technical Specification for Transformer and Switchgear Cable Boxes and their associated Bushing Assemblies 1. Purpose The purpose of this

More information

SUMET09 Maintain electrical systems and equipment (SQA Unit Code- H956 04)

SUMET09 Maintain electrical systems and equipment (SQA Unit Code- H956 04) Overview This standard is for people who maintain electrical systems and equipment The person carrying out this work must be able to carry out maintenance activities in accordance with procedures and the

More information

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Pocket guide to. Fire Alarm Systems Design BS Standard

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Pocket guide to. Fire Alarm Systems Design BS Standard Pocket guide to Fire Alarm Systems Design BS 5839-1 Standard AVAILABLE TO DOWNLOAD ON THE APOLLO APP The Regulatory Reform (Fire Safety) Order (FSO) became law on 1 October 2006 Legally you must comply!

More information

Total Fire Solutions. Includes BS 8519 and the updated BS :

Total Fire Solutions. Includes BS 8519 and the updated BS : Total Fire Solutions Includes BS 8519 and the updated BS 5266-1:2011 www.aeicables.co.uk Introduction: Total Fire Solutions Power and control cable systems for life safety and fire-fighting applications

More information

(date) except for the departures, if any, detailed as follows: Name (CAPITALS) N/A. Name (CAPITALS) N/A

(date) except for the departures, if any, detailed as follows: Name (CAPITALS) N/A. Name (CAPITALS) N/A Electrical Installation & Test Engineers DETAILS OF THE CLIENT Client / Freshco Food Stores, Kiln Park Business Estate, Milton Keynes, MK3 5FS ELECTRICAL INSTALLATION CERTIFICATE Issued in accordance with

More information

Replacing a consumer unit in domestic premises where lighting circuits have no protective conductor

Replacing a consumer unit in domestic premises where lighting circuits have no protective conductor Replacing a in domestic premises where lighting circuits have no protective conductor This is one of a series of Best Practice Guides produced by the Electrical Safety Council* in association with leading

More information

Amendment Number 3 of BS how it might affect you

Amendment Number 3 of BS how it might affect you Amendment Number 3 of BS7671 2008 - how it might affect you Geoff Cronshaw provides us with a look ahead at the proposals of Amendment 3 to BS 7671:2008 IET Wiring Regulations and the resulting changes

More information

EDS SUBSTATION ELECTRICAL SERVICES

EDS SUBSTATION ELECTRICAL SERVICES Document Number: EDS 07-1119 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 07-1119 SUBSTATION ELECTRICAL SERVICES EPN, LPN, SPN This standard specifies the electrical services requirements including

More information

The works comprise the complete supply and installation of new Electrical Engineering Services to the site comprising:-

The works comprise the complete supply and installation of new Electrical Engineering Services to the site comprising:- 3.0 ELECTRICAL SPECIFICATION 3.1 SCHEDULE OF WORKS 3.1.1 Introduction The works comprise the supply and installation of new Electrical Services within the refurbishment of an existing warehouse to form

More information

Allianz Engineering Inspection Services Ltd. Electrical Services. Product Information

Allianz Engineering Inspection Services Ltd. Electrical Services. Product Information Allianz Engineering Inspection Services Ltd Electrical Services Product Information Electrical Testing and Inspection Services The Electricity at Work Regulations (EaWR) states that all electrical systems

More information

GI/GN7520. Guidance on Lighting of Railway Premises. Railway Group Guidance Note

GI/GN7520. Guidance on Lighting of Railway Premises. Railway Group Guidance Note GN Published by Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2007 Rail Safety and Standards Board Limited GI/GN7520 Issue 1 December 2007 Railway Group Guidance

More information

SEMPEO SQA Unit Code H02H 04 Wiring electrical equipment and circuits

SEMPEO SQA Unit Code H02H 04 Wiring electrical equipment and circuits Overview This standard covers a range of basic competences that you need to wire up electrical equipment and circuits. It will prepare you for entry into the engineering or manufacturing sectors, creating

More information

Fire Alarm Systems Design. incorporating Amendment No.2. a guide to BS5839. Part1:2002

Fire Alarm Systems Design. incorporating Amendment No.2. a guide to BS5839. Part1:2002 a guide to Fire Alarm Systems Design BS5839 Part1:2002 incorporating Amendment No.2 The Regulatory Reform (Fire Safety) Order (RRO) became law on 1 October 2006 Legally you must comply! What is the RRO?

More information

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES Mandatory Fire Safety Instruction UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES Principal Contractor fire safety considerations in shared occupancy project or refurbishments

More information

Dear Customer. Section Old F8 January 2017 Amendment 4. Replace with new title page and document history pages 1 2B

Dear Customer. Section Old F8 January 2017 Amendment 4. Replace with new title page and document history pages 1 2B Dear Customer Please find enclosed Amendment 4, effective 14 February 2014, to the Acceptable Solution and Verification Method for Clause F8 Signs of the New Zealand Building Code. THe previous amendment

More information

Instructions for Robust Fiber Appendix 4 Robust sites and nodes. Ver 1.2

Instructions for Robust Fiber Appendix 4 Robust sites and nodes. Ver 1.2 Instructions for Robust Fiber Appendix 4 Robust sites and nodes Ver 1.2 2 CONTENTS 1. Introduction 3 2. Sites and nodes 4 2.1 Classification of sites and nodes 4 2.2 Establishing sites and nodes 5 2.2.1

More information

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes WARM WATER UNDERFLOOR HEATING SYSTEMS Guidance Notes 02 WARM WATER UNDERFLOOR HEATING SYSTEMS Introduction Underfloor heating systems consist of a series of pipes which are integrated into the floor structure

More information

GUARDIANTM QUALITY APPROVED CABLES. Cables Limited MADE IN IRELAND SINCE 1934 IDH CABLES LIMITED MECHANICALLY PROTECTED CABLES

GUARDIANTM QUALITY APPROVED CABLES. Cables Limited MADE IN IRELAND SINCE 1934 IDH CABLES LIMITED MECHANICALLY PROTECTED CABLES Cables Limited MADE IN IRELAND SINCE 1934 QUALITY APPROVED CABLES IDH CABLES LIMITED GUARDIANTM MECHANICALLY PROTECTED CABLES The original BS-8436, IS-273 multifunctional, easy to install, connect-and-protect

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW) SECTION 26 05 21 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of the low voltage power and lighting wiring. 1.2 RELATED WORK A. Excavation and backfill

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

ANALOGUE ADDRESSABLE FIRE DETECTION

ANALOGUE ADDRESSABLE FIRE DETECTION Notes to Installer EMC Compliance and LVD Compliance Cables ANALOGUE ADDRESSABLE FIRE DETECTION AND ALARM SYSTEM Loop Circuit Connections Standalone System Installation Installation Manual Version 3.3X

More information

AFUMEX LSX LOW SMOKE ZERO HALOGEN SCREENED WIRING CABLES BS8436 PRODUCT DATASHEET & APPLICATIONS GUIDE KEY BENEFITS:

AFUMEX LSX LOW SMOKE ZERO HALOGEN SCREENED WIRING CABLES BS8436 PRODUCT DATASHEET & APPLICATIONS GUIDE KEY BENEFITS: PRODUCT DATASHEET & APPLICATIONS GUIDE LOW SMOKE ZERO HALOGEN SCREENED WIRING CABLES BS8436 KEY BENEFITS: BASEC approved for the full size range of BS8436 (1.0mm 2 to 2.5mm 2 ) Additionally tested for

More information

Telecity. Table of Contents. Page. Section 3.2

Telecity. Table of Contents. Page. Section 3.2 1 3.2 System Descriptions Table of Contents 3.2 SYSTEM DESCRIPTIONS... 3 3.2.1 General Notes... 3 3.3 Power Distribution MV... 4 3.3.1 Incoming Supply... 4 3.3.2 MV Switch room... 4 3.4 Power Distribution

More information

- CONSTRUCTION FIRE SAFETY STANDARDS

- CONSTRUCTION FIRE SAFETY STANDARDS SGG15 - CONSTRUCTION FIRE SAFETY STANDARDS 1) Construction Planning All construction sites shall plan and sequence their construction activities to ensure the early installation and operation of permanent

More information

3 o/c2 The symbol used to show that a BS 88 device has a motor circuit application is a gg b gm c l z d I 2.

3 o/c2 The symbol used to show that a BS 88 device has a motor circuit application is a gg b gm c l z d I 2. Sample Questions - C&G 2382 17th Edition PaperB 1 o/c1 Electrical installation design shall take into account a electromagnetic disturbances b direct lightning strikes c current world copper prices d local

More information

AFUMEX LSX BASEC APPROVED LOW SMOKE ZERO HALOGEN SCREENED WIRING CABLES BS8436 PRODUCT DATASHEET & APPLICATIONS GUIDE KEY BENEFITS:

AFUMEX LSX BASEC APPROVED LOW SMOKE ZERO HALOGEN SCREENED WIRING CABLES BS8436 PRODUCT DATASHEET & APPLICATIONS GUIDE KEY BENEFITS: PRODUCT DATASHEET & APPLICATIONS GUIDE BASEC APPROVED LOW SMOKE ZERO HALOGEN SCREENED WIRING CABLES BS8436 KEY BENEFITS: BASEC approved for the full size range of BS8436 (1.0mm 2 to 2.5mm 2 ) Additionally

More information

Mini Tender Section 1.1 External Wall Insulation, Mechanical and Electrical Installation

Mini Tender Section 1.1 External Wall Insulation, Mechanical and Electrical Installation Mini Tender Section 1.1 External Wall Insulation, Mechanical and Electrical Installation BOILER ONLY INSTALLATION ALL ITEMS BLEOW SHOULD BE INCLUDED WITHIN TENDER COST OR CONSIDER WITHIN BIDDERS SUBMISSION

More information

REPUBLIC OF KENYA MINISTRY OF HEALTH BIDDING DOCUMENT VOL 3.1 GENERAL ELECTRICAL INSTALLATIONS (ALL RATES EXCLUSIVE OF TAXES)

REPUBLIC OF KENYA MINISTRY OF HEALTH BIDDING DOCUMENT VOL 3.1 GENERAL ELECTRICAL INSTALLATIONS (ALL RATES EXCLUSIVE OF TAXES) REPUBLIC OF KENYA MINISTRY OF HEALTH EAST AFRICA S CENTERS OF EXCELLENCE FOR SKILLS AND TERTIARY EDUCATION IN BIOMEDICAL SCIENCES PROPOSED CONSTRUCTION OF EAST AFRICA S KIDNEY INSTITUTE COMPLEX AT KENYATTA

More information

Policy and Specification for the Interface with Independent Distribution Network Operators Installations

Policy and Specification for the Interface with Independent Distribution Network Operators Installations 1. SCOPE This document details SPEN technical requirements for the interface with Independent Distribution Network Operators (IDNO s) up to and including 11kV. 2. ISSUE RECORD This is a Controlled document.

More information

Fill Point, Level Gauges, and Control Range

Fill Point, Level Gauges, and Control Range Fill Point, Level Gauges, and Control Range Page 1 Contents Fill Points, Level Gauges, and Control Equipment... 3 Fill Point Cabinets... 4 Single Tank Cabinet... 5 Twin Tank Cabinet... 6 Three Tank Cabinet...

More information

Oakdale Primary School Expansion Project Appendix C Elec Equipment Schedule

Oakdale Primary School Expansion Project Appendix C Elec Equipment Schedule Oakdale Primary School Expansion Project Appendix C Elec Equipment Schedule HBS-SH-MEP-803 May 2017 For Peterborough City Council ver. author date checked comment P1 DH 19-05-17 TJC TENDER ISSUE 1 Ref

More information

Hydrosense. Vimpex Limited. Star Lane. Great Wakering. Essex SS3 0PJ. Tel: +44 (0) Fax +44 (0)

Hydrosense. Vimpex Limited. Star Lane. Great Wakering. Essex SS3 0PJ. Tel: +44 (0) Fax +44 (0) Overview of the Water Detection System 2 Components of a System 4 Design & Planning 5 System Installation Notes 7 Control Panel Installation - HSCPI-K3000 8 Control Panel Commissioning HSCPC-K3000 11 Front

More information

FIRE ALARM CONTROL EQUIPMENT. Addendum October 2006 Instructions for new style EN54-4 Power supply unit module

FIRE ALARM CONTROL EQUIPMENT. Addendum October 2006 Instructions for new style EN54-4 Power supply unit module FIRE ALARM CONTROL EQUIPMENT Addendum October 2006 Instructions for new style EN54-4 Power supply unit module MXLK-05 Issue 2.0 June 2007 INSTALLATION Safety Suppliers of articles for use at work are required

More information

Special Types of Installation

Special Types of Installation Chapter 7 Special Types of Installation Certain types of installation demand special consideration when designing and installing the electrical equipment. Part 7 of the 17th edition of the IEE Wiring Regulations

More information

Danfoss Self-limiting Heating Cables SLPG-10/26/33, SLPG-18, SLHW-55/70, SLPH-10

Danfoss Self-limiting Heating Cables SLPG-10/26/33, SLPG-18, SLHW-55/70, SLPH-10 MAKING MODERN LIVING POSSIBLE Installation Guide SLPG-10/26/33, SLPG-18, SLHW-55/70, SLPH-10 www.eh.danfoss.com Table of Contents 1 Introduction............................................. 3 1.1 Self-limiting

More information

Document Information Cover Sheet

Document Information Cover Sheet Document Information Cover Sheet Asite/Document Reference Number: LOR-CO-SW-RP-0015 Document Title: Equipment Interface Document Revision: F02 Publisher: Laing O Rourke Published: 23/04/2013 Outline Description/Comments

More information

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems BAFE Scheme: SP203-1 Version 5: May 2011 Fire Protection Industry Scheme, Reference SP203 Part 1 For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems British

More information

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

PERIODIC ELECTRICAL TESTING POLICY

PERIODIC ELECTRICAL TESTING POLICY PERIODIC ELECTRICAL TESTING POLICY Originator: Policy and Strategy Team Approval date: 19 July 2016 Review date: d July 2017 1 Introduction 1.1 1.2 Pine Court Housing Association (PCHA) treats the health

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

ITU-T L.63. Safety practice for outdoor installations

ITU-T L.63. Safety practice for outdoor installations International Telecommunication Union ITU-T L.63 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (10/2004) SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF CABLES AND OTHER ELEMENTS OF OUTSIDE PLANT

More information

Alan Wells Technical and Standards Director Certsure LLP trading as NICEIC

Alan Wells Technical and Standards Director Certsure LLP trading as NICEIC Introduction Alan Wells Technical and Standards Director Certsure LLP trading as NICEIC Who are Certsure? Where do we come from? 1923 - A National Register created 1956 - NICEIC established as a Charity

More information

Consumer unit replacement in domestic and similar premises

Consumer unit replacement in domestic and similar premises Consumer unit replacement in domestic and similar premises 6 Issue 2 The Electrical Safety Council is indebted to the following organisations for their contribution and/or support to the development of

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Updated section on Manufacturers 3 1. 6/15/16 Updated division section from 16120 to 26 05 00, - mgl44

More information

(Notices) EUROPEAN COMMISSION

(Notices) EUROPEAN COMMISSION 14.8.2012 Official Journal of the European Union C 245/1 IV (Notices) NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION Commission communication in the framework

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

PANELBOARDS & BUILDING DISTRIBUTION

PANELBOARDS & BUILDING DISTRIBUTION 262416 PANELBOARDS & BUILDING DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Distribution panelboards 2. Power panelboards B. Related Sections: 1.02 POLICY 1. CU Standard 260500, Basic

More information

AS/NZS :2003 Luminaires - Part 1: General requirements and tests

AS/NZS :2003 Luminaires - Part 1: General requirements and tests Menu Home About this portal Latest updates Print Save Email Resource detail Citations AS/NZS 60598.1:2003 Luminaires - Part 1: General requirements and tests Table of Contents View on Information Provider

More information

Electrical Management

Electrical Management 5 WHS PROCEDURE P23-01 Page 1 of 9 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment within the mission

More information

An overview of the main proposals in BS th Edition. Electrical Contractors Association

An overview of the main proposals in BS th Edition. Electrical Contractors Association An overview of the main proposals in BS 7671 17 th Edition Electrical Contractors Association Why have Regulations Behold the electrician standing there. Soot, soil & verdigris defile his greasy hair.

More information

Installation Operation Maintenance. Ductable water unit FWD FWD-SVX01D-E4

Installation Operation Maintenance. Ductable water unit FWD FWD-SVX01D-E4 Installation Operation Maintenance Ductable water unit FWD 08-12 - 20-30 - 45 General Information Foreword These installation, operation and maintenance instructions are given as a guide to good practice

More information

SUMET05 Install and connect electrical cables, conductors, wiring systems and equipment

SUMET05 Install and connect electrical cables, conductors, wiring systems and equipment Overview This standard is for people who install and connect electrical cables, conductors, wiring systems, equipment, accessories and components. The person carrying out this work must be able to comply

More information

GOLDFIELDS PRIMARY SCHOOL. TENDER SPECIFICATION For ELECTRICAL SERVICES MECHANICAL ENGINEER:

GOLDFIELDS PRIMARY SCHOOL. TENDER SPECIFICATION For ELECTRICAL SERVICES MECHANICAL ENGINEER: GOLDFIELDS PRIMARY SCHOOL TENDER SPECIFICATION For ELECTRICAL SERVICES PROJECT MANAGER: School Support Dunedin ARCHITECTURAL DESIGNER: Katipo Design ELECTRICAL ENGINEER: Pedersen Read Dunedin MECHANICAL

More information

Control Panel User Guide

Control Panel User Guide Fire Detection & Alarm System Control Panel V4.14 Control Panel User Guide (TO BE RETAINED BY USER) 26-0397 Issue 6 Fike s policy is one of continual improvement and the right to change a specification

More information

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA Tel: TENDER NO: TTU/T/01A/

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA   Tel: TENDER NO: TTU/T/01A/ TAITA TAVETA UNIVERSITY P.O.BOX 635-80300, VOI, KENYA EMAIL: procurement@ttu.ac.ke; Tel: 020 8150257 TENDER NO: TTU/T/01A/2017-2018 CONSTRUCTION OF PROPOSED ADMINISTRATION BLOCK- TAITA TAVETA UNIVERSITY

More information

Guide to the Specification and Installation of Pyro Mi Wiring Cables

Guide to the Specification and Installation of Pyro Mi Wiring Cables Guide to the Specification and Installation of Pyro Mi Wiring Cables The ultimate fire survival cable system Preface This guide has been prepared in response to many requests for a comprehensive aide memoire

More information

Guide to Gate Safety Legislation & the Machinery Directive. In Association with:

Guide to Gate Safety Legislation & the Machinery Directive. In Association with: Guide to Gate Safety Legislation & the Machinery Directive In Association with: Tel: 0845 054 5070 asosafety@egduk.com Guide to Gate Safety Legislation & Machinery Directive Gate Safety in the UK market

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK ISO/IEC 17065:2012 to provide product conformity certification Presley Way Crownhill Milton Keynes MK8 0ES Contact: Tracie Hunter Tel: +44 (0)1908 267300 Fax: +44 (0)1908 267255 E-Mail: mail@basec.org.uk

More information

Design Guidelines Fire Safety in New and Refurbished Buildings

Design Guidelines Fire Safety in New and Refurbished Buildings Design Guidelines Fire Safety in New and Refurbished Buildings Introduction All major new or refurbishment projects must comply with the Technical Standards (Scotland) Regulations as a matter of course.

More information

CoziMat. 1. Introduction and Brief Description COZIMAT INSTALLATION INSTRUCTIONS & SAFETY REQUIREMENTS

CoziMat. 1. Introduction and Brief Description COZIMAT INSTALLATION INSTRUCTIONS & SAFETY REQUIREMENTS CoziMat 1. Introduction and Brief Description The CoziMat underfloor heating mat is designed for underfloor heating of rooms where the floor thickness needs to be kept to a minimum. CoziMat underfloor

More information

LIFETIME. INSTALLATION MANUAL emat Pro 100w/150w/200w WARRANTY

LIFETIME. INSTALLATION MANUAL emat Pro 100w/150w/200w WARRANTY INSTALLATION MANUAL emat Pro 100w/150w/200w LIFETIME WARRANTY Before you begin installing, read through these instructions carefully and check that you have all the components required. 01473 276677 www.elementsunderfloorheating.co.uk

More information

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Rancho Cucamonga Fire Protection District Prevention Bureau Standard Rancho Cucamonga Fire Protection District Prevention Bureau Standard Title: Fire Alarm and Monitoring Systems Standard # 9-3 Effective: May 2002 Number of Pages: 7 Updated: December 2016 for consistency

More information

Overhead Line Insulators

Overhead Line Insulators Electricity Specification 400I4 Issue 4 January 2016 Overhead Line Insulators Contents 1 Introduction 2 Scope 3 Definitions 4 General Requirements for Approvals and Testing 5 Requirements for Type and

More information

Guide to Gate Safety Legislation & the Machinery Directive

Guide to Gate Safety Legislation & the Machinery Directive Guide to Gate Safety Legislation & the Machinery Directive Guide to Gate Safety Legislation & Machinery Directive Gate Safety in the UK market In June 2010 the tragic deaths of 2 young children in separate

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

A guide. Part 1: Code of practice for system design, installation, commissioning and maintenance. by T.L. Journeaux

A guide. Part 1: Code of practice for system design, installation, commissioning and maintenance. by T.L. Journeaux A guide to the selection of cable type for particular building applications in accordance with BS5839-1:2002 Fire detection and fire alarm systems for buildings Part 1: Code of practice for system design,

More information

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500 Unvented Calorifier Range. Operating and Maintenance Manual. For Models 125 300 & 500 Telephone 08456 448802 Fax 08456 448803 Emial info@mhgheating.co.uk Web www.mhgheating.co.uk TABLE OF CONTENTS. Section

More information

EMERGENCY LIGHTING COMPLETION CERTIFICATE For small installations and verification of existing installations

EMERGENCY LIGHTING COMPLETION CERTIFICATE For small installations and verification of existing installations A DETAILS OF THE CLIENT Client/ B DETAILS OF THE EMERGENCY LIGHTING INSTALLATION Extent of the installation covered by this certificate The Owner 19 Walker Grove, Hatfield, Hertfordshire 19 Walker Grove,

More information

Underfloor Heating Inscreed Cable System

Underfloor Heating Inscreed Cable System The world s best-selling floor heating brand Installation Manual: Underfloor Heating Inscreed Cable System TECHNICAL HELPLINE 085 5 2288 IMPORTANT Read this manual before attempting to install your inscreed

More information

FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS - Item No. FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS (TEMPORARY) - Item No.

FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS - Item No. FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS (TEMPORARY) - Item No. FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS - Item No. FIBRE OPTIC COMMUNICATION CABLES, IN DUCTS (TEMPORARY) - Item No. Special Provision No. 683S01 December 2017 1. SCOPE This Special Provision covers

More information

NZQA unit standard version 1 Page 1 of 6. Install, maintain and repair of telecommunications optical fibre network infrastructure

NZQA unit standard version 1 Page 1 of 6. Install, maintain and repair of telecommunications optical fibre network infrastructure Page 1 of 6 Title Install, maintain and repair of telecommunications optical fibre network infrastructure Level 3 Credits 25 Purpose This unit standard covers installation, maintenance and repair of telecommunications

More information

1970s building housing main school reception and support offices. Well managed buildings with no significant risk of a fire occurring.

1970s building housing main school reception and support offices. Well managed buildings with no significant risk of a fire occurring. Record of significant findings Risk assessment for : Assessment undertaken by : 71a The Close Nigel Billing CMIOSH Date: 21/3/17 Overview of Premises: 1970s building housing main school reception and support

More information

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers. September 2012, rev. 00 26 2416 Panelboards PART 1. GENERAL 1.01 Summary A. Section includes: 1.02 Definitions 1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load

More information

Lloyd s Register Type Approval System Test Specification Number 3

Lloyd s Register Type Approval System Test Specification Number 3 Working together for a safer world Lloyd s Register Type Approval System Test Specification Number 3 July 2015 Performance Test Specification for Equipment to be used in Marine Applications: Electric Cables

More information

Introduction. Please read the following instructions carefully before commencing installation.

Introduction. Please read the following instructions carefully before commencing installation. Introduction Please read the following instructions carefully before commencing installation. Installation involves simple processes. These are explained step by step in the following pages. Should you

More information

FIRE RESISTANT CABLES FP400

FIRE RESISTANT CABLES FP400 FIRE RESISTANT CABLES FP400 FIRE RESISTANT CABLES FP400 BS7846-F2 CABLE CHARACTERISTICS FP400 APPROVALS INSTALLATION Certificate No 077b Certificate No 517b > Prysmian FP400 is the original fire resistant

More information

A Guide To BS Understanding the selection, spacing and siting of detectors

A Guide To BS Understanding the selection, spacing and siting of detectors World Class Leaders in Fire Detection Since 1918 A Guide To BS5839-12017 Understanding the selection, spacing and siting of detectors Welcome to A Guide to BS5839 Part 1 : 2017 from HOCHIKI EUROPE (UK)

More information

Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London

Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London Scope of document General This document sets out the procedure for the management and control

More information

ANCILLARY LIGHT CURRENT EQUIPMENT

ANCILLARY LIGHT CURRENT EQUIPMENT ANCILLARY LIGHT CURRENT EQUIPMENT This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

OAKTHORPE PRIMARY SCHOOL FIRE RISK ASSESSMENT POLICY NOVEMBER 2016

OAKTHORPE PRIMARY SCHOOL FIRE RISK ASSESSMENT POLICY NOVEMBER 2016 OAKTHORPE PRIMARY SCHOOL FIRE RISK ASSESSMENT POLICY NOVEMBER 2016 1 CONTENTS 1. School arrangements and organisation 2. Hazardous materials identification 2.1 Electrical 2.2 Chemical 2.3 Gas 2.4 Furniture

More information

Substation Signage. Document Number: 1-11-FR-12

Substation Signage. Document Number: 1-11-FR-12 Substation Signage Document Number: 1-11-FR-12 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-12 Substation Signage Asset Class Strategy Intellectual

More information

Guided Learning Hours (GLH) 8 Invigilated Assessment Hours (IA) 2 Total Qualification Time (TQT) 10

Guided Learning Hours (GLH) 8 Invigilated Assessment Hours (IA) 2 Total Qualification Time (TQT) 10 Qualification: Date Completed: 02 Feb 17 Unit: FIA AO Level 3 Fire Detection and Alarm Advanced Installer Development Group: FD&A Development Group Guided Learning Hours (GLH) 8 Invigilated Assessment

More information

Installation Operation Maintenance

Installation Operation Maintenance Installation Operation Maintenance DUCTABLE WATER UNIT FWD 08-12 - 20-30 - 45 General Information Foreword These installation, operation and maintenance instructions are given as a guide to good practice

More information

Carbon Film Installation Instructions

Carbon Film Installation Instructions Contents Page 2 Page 3 Page 4 Page 5 Page 8 Product Overview Pre-Installation & Electrical Provision Depron Underlay Installation Carbon Film Installation - Under Wood/Laminate Flooring Notes & Trouble

More information

SECTION 1.02 DETAILED SCOPE OF WORK

SECTION 1.02 DETAILED SCOPE OF WORK SECTION 1.02 DETAILED SCOPE OF WORK 1.02.1 General 1.02.1.1 Introduction... 3 1.02.1.2 General description of the works... 4 1.02.1.3 Design criteria... 5 1.02.2 Public Health Services 1.02.2.1 Mains cold

More information

INSTRUCTION MANUAL (English version) Water still

INSTRUCTION MANUAL (English version) Water still INSTRUCTION MANUAL (English version) Water still Model : Brand : W4000 Merit Merit Water Still W4000 & W4000/EURO Cooling water inlet Condenser Constant level control Boiler Thermostat reset buttons To

More information