2 STORM SEWER TELEVISING REPORT FOR HARRIS COUNTY WATER CONTROL AND IMPROVEMENT DISTRICT NO. 50 HARRIS COUNTY, TEXAS TABLE OF CONTENTS 1.0 SUMMARY 2.0 ATTACHMENTS 2.1 Storm Sewer Televising 2018 Exhibit 2.2 Pipe Breaks and Partial Collapses Location and Recommendations 2.3 Pipe Breaks and Partial Collapses Overall Map 2.4 Debris Removal Locations and Recommendations 2.5 Debris Removal Overall Map P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Televising Report.docx Page 1 of 2
3 1.0 SUMMARY In November 2017, Harris County Water Control and Improvement District No. 50 (the District ) Board of Directors authorized the televising of portions of the District s storm sewer system by AAA Flexible Pipe Cleaning Co., Inc (the Contractor ). The Contractor televised a total of 18,835 feet (5,741 meters) of various storm sewer lines within the District (See Attachment 2.1) and submitted the televising videos and associated data to A&S Engineers, Inc. ( A&S ) with the last video being submitted in early March The District Board of Directors authorized A&S to review all televising videos and associated data to evaluate the existing condition of the District s storm sewer lines for possible breaks, collapses, material deterioration, debris, and joint offsets that may hydraulically limit storm water flow through the storm sewer system. After review of all videos and associated data, only 150 feet (46 meters) out of the total of 18,835 feet (5,741 meters) inspected, about 0.8%, were found to be in need of either a point repair or have minor debris removed that would otherwise not be normally washed out with a higher flow event. In addition, we concluded that none of the conditions found would hydraulically limit storm water flow through the storm sewer system during a severe rain event; nonetheless, repair or debris removal is recommended to maintain and ensure structural integrity of the storm sewer pipe and road foundation above it. It should be noted though that the extent of repairs will encompass lengths greater than the 150 feet (46 meters) due to construction techniques and methods that would include pavement repairs. There are approximately nine (9) locations with storm sewer pipe breaks or partial collapses recommended for repair (See Attachment 2.2 and 2.3) and 29 locations recommended for minor debris removal (See Attachment 2.4 and 2.5). 2.0 ATTACHMENTS Attachment 2.1 shows the original exhibit for the Storm Sewer Televising project. Attachment 2.2 contains photos and the repair specifics for the nine (9) storm sewer pipe breaks and partial collapses recommended for repair. Attachment 2.3 shows the approximate locations on an overall District storm sewer map of the storm sewer pipe breaks and partial collapses specified in Attachment 2.2. Attachment 2.4 contains photos of the locations recommended for debris removal. Attachment 2.5 shows the approximate debris removal locations on an overall District storm sewer map specified in Attachment 2.4. Note: The distorted format of the imagery contained herein is that provided by the Contractor s equipment. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Televising Report.docx Page 2 of 2
4 ATTACHMENT 2.1 STORM SEWER TELEVISING EXHIBIT
5
6 ATTACHMENT 2.2 BREAKS AND COLLAPSES LOCATIONS AND RECOMMENDATION
7 CO#1 INLET #1C MH #1 Location: 2.60 LF from INLET #1C 12 Concrete Pipe Approximately two linear feet (2 ) centered on the Damage Location to be Removed and Replaced. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.2.docx Page 1 of 9
8 CO#2 MH #1 INLET #1C Location: LF from MH #1 12 Concrete Pipe Approximately two linear feet (2 ) centered on the Damage Location to be Removed and Replaced. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.2.docx Page 2 of 9
9 BR#1 MH #2 Inlet #2B Location: Near Inlet #2B 12 Concrete Pipe From INLET #2B for approximately three linear feet (3 ) to be Removed and Replaced. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.2.docx Page 3 of 9
10 BR#2 MH #7 INLET #7B Location: FT from MH #7 12 PVC From INLET #7B for approximately two linear feet (2 ) to be Removed and Replaced. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.2.docx Page 4 of 9
11 BR#3 INLET #5B INLET #4C Location: LF from INLET #5B 18 Reinforced Concrete Pipe Approximately two linear feet (2 ) centered on the Damage Location to be Removed and Replaced. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.2.docx Page 5 of 9
12 BR#4 INLET #10A Inlet #11A Location: FT from INLET #10A 12 Concrete Pipe Approximately three linear feet (3 ) centered on the Damage Location to be Removed and Replaced. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.2.docx Page 6 of 9
13 CO#2 INLET #10C INLET #10B Location: LF LF from INLET #10C 12 Concrete Pipe Approximately nine linear feet (9 ) from the location LF from INLET #10C to the location LF FROM INLET #10C to be Removed and Replaced. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.2.docx Page 7 of 9
14 BR#5 MH #43 MH #42 Location: LF from MH #43 24 HDPE Approximately three linear feet (3 ) centered on the Damage Location to be Removed and Replaced. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.2.docx Page 8 of 9
15 BR#6 INLET #41A MH #41 Location: 2.80 LF from INLET #41A 18 HDPE Approximately five linear feet (5 ) from INLET #41A to MH #41 to be Removed and Replaced. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.2.docx Page 9 of 9
16 ATTACHMENT 2.3 BREAKS AND PARTIAL COLLAPSES OVERALL MAP
17
18 ATTACHMENT 2.4 DEBRIS REMOVAL LOCATIONS AND RECOMMENDATIONS
19 INLET #1C MH #1 12 Concrete Pipe Recommend Cleaning, Debris Removal 92.1 ft. from Manhole #1 P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 1 of 18
20 MH #2 MH#1 18 RCP Recommend Cleaning, Debris Removal 60.4 ft. from Manhole #2. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 2 of 18
21 INLET #5B INLET #4C 18 Reinforced Concrete Pipe Recommend Cleaning, Debris Removal 80.8 ft. from Inlet #5B P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 3 of 18
22 INLET #10A Inlet #11A 12 CP Recommend Cleaning, Debris Removal at distances ft., ft., and ft., ft., ft., ft., and ft., from Inlet #10A. P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 4 of 18
23 P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 5 of 18
24 P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 6 of 18
25 INLET #11A MH#12 18 RCP Recommend Cleaning, Debris Removal at distances 11.4 ft., 13.5 ft., ft., and ft. from Inlet #11A P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 7 of 18
26 P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 8 of 18
27 P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 9 of 18
28 MH#12 MH#8 30 HDPE Recommend Cleaning through Full Length of Pipe from Manhole to Manhole P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 10 of 18
29 MH#20 MH#21 24 RCP Recommend Cleaning, Debris Removal at distances 22.7 ft.,141.1 ft., and ft. from Manhole #20 P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 11 of 18
30 MH#22 MH#23 30 RCP Recommend Cleaning through Full Length of Pipe from Manhole to Manhole P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 12 of 18
31 MH#33 MH#34 24 RCP Recommend Cleaning through Full Length of Pipe from Manhole to Manhole P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 13 of 18
32 MH#53 MH#54 24 HDPE Recommend Cleaning through Full Length of Pipe from Manhole to Manhole P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 14 of 18
33 P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 15 of 18
34 MH#57 MH#50 30 RCP Recommend Cleaning through Full Length of Pipe from Manhole to Manhole P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 16 of 18
35 MH#50 MH#36 36 RCP Recommend Cleaning through Full Length of Pipe from Manhole to Manhole P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 17 of 18
36 MH#36 MH#23 36 HDPE Recommend Cleaning through Full Length of Pipe from Manhole to Manhole P:\HC WCID 50\ Storm Sewer Televising \Construction\Televising Report\Attachments\Attachment 2.4.docx Page 18 of 18
37 ATTACHMENT 2.5 DEBRIS REMOVAL OVERALL MAP
38
White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015
White Street Area Sewer Separation, Project ID 11240090 Date Issued: June 8, 2015 ADDENDUM NO. 3 This addendum will only be distributed via e-mail, but will remain available for viewing on the MSDGC website
More informationSPECIAL SPECIFICATION 3687 Impermeable Liner
1993 Specifications CSJ s 0569-01-043 & 0945-04-025 SPECIAL SPECIFICATION 3687 Impermeable Liner 1. Description. This Item shall govern for the furnishing and installation of the impermeable liner (geomembrane)
More informationVillage of Sloan Smoke Testing September 2017
Village of Sloan Smoke Testing September 2017 What is Smoke Testing? Smoke testing is used to detect any water other than wastewater entering the sanitary sewer system. This water could be coming from
More informationINFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities
7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure
More informationBrigitte A. Berger, Director of Engineering
Brigitte A. Berger, Director of Engineering Wilmette s Sewer System Overview of Wilmette s Sewer System Green vs. Gray? Stormwater Action Plan Regulatory Compliance Why Homes Flood What can
More information511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511
511 - - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511 511.1 GENERAL 511.1.1 Rip Rap 511.1.2 Rock Protection Excavation for placing Rip Rap, Rock Protection and Gravel
More informationPhoto 1: Upper Rock Creek Trash, east of Ogontz Ave. Map 1: Map of Upper Rock Creek with photos of conduit openings
Philadelphia and Cheltenham Litter Polluting Upper Rock Creek Kelly O Day Litter from the Wadsworth shopping area, Cheltenham Avenue, Limekiln Pike, Ogontz Avenue and the 3 large Cheltenham shopping malls
More information1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Impermeable Liner
1993 Specifications CSJ 0128-01-085 SPECIAL SPECIFICATION ITEM 5327 Impermeable Liner 1. Description. This Item shall govern for the furnishing and installation of the impermeable liner (geomembrane) shown
More informationCITY OF PORTSMOUTH PLANNING DEPARTMENT. MEMORANDUM To: From:
CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM To: From: Subject: Date: Planning Board Juliet T.H. Walker, Planning Director Jillian Harris, Planner 1 Staff Recommendations for the August 23, 2018 Planning
More informationCity of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014
City of Elmhurst City of Elmhurst Comprehensive Flood Plan City Council Meeting September 15, 2014 City of Elmhurst Presentation Overview Study Background Study Methodology Analysis of Three Additional
More informationCHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment
CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design
More information4. Contractor (and subcontractors if applicable) certification statement(s)
CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of
More informationB511 - RIP-RAP, ROCK PROTECTION AND GRANULAR SHEETING - OPSS 511
B511 - - OPSS 511 511.1 GENERAL 511.1.1 Rip-Rap Excavation for placing rip-rap, rock protection, and granular sheeting is part of each individual tender item. Rip-rap is a special application of rock protection.
More informationSITE PLAN REVIEW APPLICATION AND CHECKLIST
SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description
More informationTABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08
TABLE OF CONTENTS Sheet Number Title Revision Date I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 STREETS ST-1 LOCAL STREETS 03/17/08 ST-1A LOCAL STREETS, 2015 GENERAL PLAN 11/15/04 ST-2 COLLECTOR AND ARTERIAL
More informationCP1-C5 COMPACTOR SPECS 2009
SECTION 11172 / 14560 TRASH COMPACTOR This section is based on a system produced by: Architectural Refuse Solutions, LLC 525 Kennedy Road Akron, Ohio 44305 Part 1 GENERAL 1.1 RELATED DOCUMENTS A. The general
More informationGuidelines for the Sanitary Sewer Evaluation Survey (SSES) Report PLAN A
Guidelines for the Sanitary Sewer Evaluation Survey (SSES) Report PLAN A 2 nd Cycle Report Due November 12, 2012 Revision 11/05/2015 wps-pa Report Cover Letter Requirements - Sample SSES PLAN A 2nd CYCLE
More informationALDI STORE #17 EXPANSION LAND DEVELOPMENT PLAN
STORE #17 EXPANSION LAND DEVELOPMENT PLAN 190 W. LINCOLN HIGHWAY, WEST WHITELAND TOWNSHIP COUNTY OF CHESTER, PENNSYLVANIA PROJECT CONTACTS GOVERNMENTAL APPROVAL AGENCIES TOWNSHIP OF WEST WHITELAND 101
More informationA. ASHRAE Handbook HVAC Applications, Snow Melting and Freeze Protection
PAGE 238318-1 SECTION 238318 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationDESIGN CRITERIA PACKAGE
RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA
More informationSITE IMPROVEMENTS TO UAS AREA CP1512R
RANGE ROAD SITE IMPROVEMENTS TO UAS AREA CP1512R ROOSEVELT BLVD ACCESS ROAD DUFFY ROAD MARINE CORPS AIR STATION CHERRY POINT, NORTH CAROLINA INDEX OF DRAWINGS 748 LORD DUNMORE DRIVE, SUITE 101 RW 14L RW
More informationSolutions Library Solution 5: Rain Harvesting Cisterns
Solutions Library Solution 5: Rain Harvesting Cisterns "By harvesting nature, we can create a natural beauty all of our own." -Kylin Fulton Tahoma School District Student Rain Harvesting Cisterns 70 Cistern:
More informationFor the purposes of this chapter, the words and terms used herein are defined as follows:
City of Visalia Street Tree Ordinance 12.20.010 Purpose. The purpose of this chapter is to promote and regulate the planting, long term care, maintenance, and protection of street trees within the city.
More informationSolutions Library Solution 5: Rain Harvesting Cisterns
SOILS TREES RAINGARDENS PERMEABLE PAVEMENT Solutions Library Solution 5: "By harvesting nature, we can create a natural beauty all of our own." -Kylin Fulton Tahoma School District Student 69 70 How a
More informationPlanning & Zoning Commission Planning & Development Department February 17, 2014
Request Applicant Owner Zoning Location Attachments Subdivision of 2.79 acres of currently vacant property to create 27 town home lots and 6 restricted reserves for the use of HOA Parks. John English;
More informationCITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS
SECTION 10 STREETS CITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS 10.1 INTRODUCTION The criteria presented in this section shall be used in the evaluation of the allowable
More informationCIVIL ENGINEERING PERMIT APPLICATION
CIVIL ENGINEERING PERMIT APPLICATION OFFICIAL USE ONLY Engineering Permit # Date: Received By: Staff Contact: FOR STAFF USE ONLY: OFD RSH LOTT Stormwater Planning Water Shop PLEASE SUBMIT TWO (2) SETS
More informationBUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT
For meeting of: BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT TO: FROM: Honorable Chair and Planning Commissioners Jill Ekas, Community Development Director Brittney Cozzolino,
More informationExample Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA
Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA January 2017 XYZ Corporation Jane Jones, 805-555-1212 This example prepared by Dan Cloak Environmental Consulting for
More informationW E A V E R C R O S S I N G Concept Plan
W E A V E R C R O S S I N G Concept Plan February 19, 2014 APPLICANT: Contact: Scott Murray 2522139501 EUBANKS ROAD RAMP NC 86 MLK JR. BLVD. INTERSTATE 40 Vicinity Map DEVELOPER: Mangement Co. Inc. Contact:
More informationC. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009.
SECTION 235100 - BREECHINGS, CHIMNEYS, AND STACKS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fabricated breechings. B. Manufactured chimneys for gas fired equipment. C. Manufactured double wall chimneys for
More informationANTEC SUSTAINABILITY OF PVC (VINYL) PIPE: A COMPREHENSIVE ENVIRONMENTAL REVIEW. May 9, 2017
SUSTAINABILITY OF PVC (VINYL) PIPE: A COMPREHENSIVE ENVIRONMENTAL REVIEW ANTEC May 9, 2017 PRESENTED BY: Randel Dobbs, P.E., R.P.L.S. Regional Engineer SPE ANTEC Anaheim 2017 / 2556 THE PURPOSE OF THE
More informationBEACON HILL INTERNATIONAL SCHOOL
CONTENTS Stormwater in the Schoolyard Lesson 3 BEACON HILL INTERNATIONAL SCHOOL Teacher Guide Local Stormwater Systems Lesson 5 Stormwater in Our Community Lesson 6 How to Use This Guide This guide supports
More informationDon t Flood The Rodeo! Preparing for Fort Worth s New Arena
Don t Flood The Rodeo! Preparing for Fort Worth s New Arena T F M A S P R I N G C O N F E R E N C E APRI L 27 2017 Scott Hubley, P.E., CFM Justin Oswald, P.E., CFM Christopher Johnson, P.E., CFM PHOTO
More informationSpreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev
Spreadsheet Report Page 1 Phase I Wickenburg, AZ SD Estimate Rev 0 9-29-11 Project name Estimator Labor rate table Equipment rate table Job size Duration Wickenburg AZ Hal White Denver Denver 121 ac 9
More informationWHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area
City/CCSD 28E Agreement February 14, 2017 Page 1 28E Agreement Between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) Regarding the construction of a roundabout at the
More informationAttachment 5 -- PowerPoint. Item 6C- Attach 5- PPT Presentation Page 1 of 15
Attachment 5 -- PowerPoint Page 1 of 15 Sausalito Dunphy Park Status Update and Authorize Consulting Contract Amendments March 27, 2018 Page 2 of 15 Summary Current Status October 2017 bidders thanked,
More informationINTENSIVE SMOKE TESTING SPECIFICATIONS & PROCEDURES
INTENSIVE SMOKE TESTING SPECIFICATIONS & PROCEDURES 1.0 OVERVIEW AND RATIONALE 1.1 Basic Smoke Testing Smoke testing is an efficient and effective technique that can conclusively reveal the existence of
More informationExisting Infrastructure Baseline Data (Task 1.5)
Existing Infrastructure Baseline Data (Task 1.5) Hemet, California Downtown Hemet Specific Plan Prepared by John M. Cruikshank, PE July 10, 2015 (Rev. May 24, 2016) John M. Cruikshank Consultants, Inc.
More informationFOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE
AFTER FEBRUARY 1, 2010 ITEM 709 TRIANGULAR FILTER FABRIC FENCE 709.1 Description. This work shall consist of furnishing, installing, and removing temporary erosion protection and sediment control triangular
More informationPublic Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment
November 26, 2014 Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment Study Area & Drainage System Legend Coronation Project Park
More information2.6 Pawtucket. Pawtucket Impervious Cover Map (61.4% Impervious)
2.6 Pawtucket Pawtucket Impervious Cover Map (61.4% Impervious) The City of Pawtucket is approximately 8.7 square miles and is heavily residential with some commercial and industrial land. Table 2.14 below
More informationCASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC
STAFF S ANALYSIS AND RECOMMENDATION Planning Commission (CPC) Public Hearing Date: MAY 17, 2016 CPC Time Remaining: 100 DAYS Applicant s Agent: DANIEL L. CASKIE (804-569-7060) Applicant s Contact: MICHAEL
More informationROGUE VALLEY SEWER SERVICES STORMWATER MANAGEMENT PROGRAM (SWMP)
ROGUE VALLEY SEWER SERVICES STORMWATER MANAGEMENT PROGRAM (SWMP) 1.0 INTRODUCTION This Stormwater Management Program (SWMP) for Rogue Valley Sewer Services (RVS) has been developed to meet the Municipal
More informationRainwater Management Landscape-Based Solutions. The Corporation of Delta Showcasing Innovation Series September 21, 2007
Rainwater Management Landscape-Based Solutions The Corporation of Delta Showcasing Innovation Series September 21, 2007 Municipal Rain Water Management Objectives To increase permeable surfaces throughout
More informationPlanning & Zoning Commission Meeting Date: June 04, 2012
Meeting Date: June 04, 2012 Request Applicant Owner Zoning Preliminary/Final Plat of 24.114 acres of unplatted property into one lot with one reserve for landscape/open space. Extension of infrastructure
More informationCITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS
CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS 2010 EDITION CITY OF OZARK, MISSOURI REVISIONS TO THE 2009 EDITION The following revisions have been made to the 2009 edition of the city
More informationNAPA COUNTY PUBLIC WORKS Standards & Specifications
Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6
More informationDRIVEWAY APRON REPLACEMENT WITH STREET RECONSTRUCTION
DATE: APRIL 18, 2014 TO: FROM: CC: RE: CHATEAULIN/PARKWOOD SOUTH AREA RESIDENT BRIAN CONNOLLY, CONSTRUCTION COORDINATOR RYAN PETERSON, CITY ENGINEER DRIVEWAY APRON REPLACEMENT WITH STREET RECONSTRUCTION
More informationFunding is available to applicants on a first come, first served basis, and applications will be considered in the order they are received.
Program Conditions and Instructions The City of Westwood Hills is partnering with the Johnson County Program to provide $5,000.00 for a stormwater management cost-share program. The program is intended
More informationSOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL
Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing
More informationAppendix G. Detailed Design
Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information
More informationFederal Project No.: OC-095-1(365), OC-095-1(367)
Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-964-415, C501 Federal Project : OC-095-1(365), OC-095-1(367) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING CONSTRUCTION
More informationINFILTRATION TRENCH - LEAKY PIPE
INFILTRATION TRENCH - LEAKY PIPE FLOW PERFORATED CMP OR RCP WITH PULLED JOINTS OVERSIZED PIPE (INLINE DETENTION) PERFORATED CMP OR RCP WITH PULLED JOINTS EXFILTRATE TRENCH VOLUME EXFILTRATE SEDIMENT SUMP
More informationFigure 1 Cypress Street Study Area Location Map
July 20, 2016 TO: FROM: Jim Massarelli Director of Engineering Jeff Julkowski, PE Michael Burke, PE SUBJECT: Cypress Street Study Area Stormwater Analysis (CBBEL Project No. 16-0058) At the request of
More informationResidential Stormwater Credit Application
Residential Stormwater Credit Application Who can apply? Residential and non-residential property owners can apply for stormwater credits. Residential: Use the residential application if you own the following
More informationMunicipal Stormwater Management: Does Your Town Need More than the Minimum?
Municipal Stormwater Management: Does Your Town Need More than the Minimum? ANJEC Congress Friday, October 9, 2015 www.anjec.org 973 539 7547 The existence of a regulation indicates a failure of design.
More information6.2 Flow-Through Planter
SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.2 Flow-Through Planter Figure 6-8: At-grade flow-through planter. Source: City of Emeryville Best uses Treating roof runoff Next to buildings Dense
More informationCity of Ingleside Avenue B Outfall Project
City of Ingleside Avenue B Outfall Project June 15, 2017 Dennis Knippa Council Member Place 1 Bill Underbrink Council Member Place 2 Ronnie Parker Council Member Place 3 Luis Lamas Mayor Ben Tucker Council
More informationCITY OF VALPARAISO STORMWATER MASTER PLAN
CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August
More information4 September 14, 2011 Public Hearing APPLICANT:
4 September 14, 2011 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: KHJ, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (motor vehicle rental, automotive service, and automotive/bulk
More informationMonitoring and Documenting Green Stormwater Best Management Practices
Monitoring and Documenting Green Stormwater Best Management Practices Steve Wise - Natural Resources Program Manager Bill Eyring - Senior Engineer Illinois Sustainable Technology Center April 6, 2010 The
More informationBRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT
BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT PRELIMINARY STORM DRAIN CALCULATIONS ASSOCIATED WITH BRISBANE BAYLANDS REDEVELOPMENT BRISBANE, CALIFORNIA Prepared by BKF Engineers
More informationDESIGN OF PERMEABLE PAVERS FOR STORM WATER RUNOFF SOLUTIONS
DESIGN OF PERMEABLE PAVERS FOR STORM WATER RUNOFF SOLUTIONS Yogita Asawale, Krushna Borhade, Niteen Chavan, Suraj Hadawale Yogita Asawale, Department,VPSCOE Lonavala, Maharashtra, India Krushna Borhade,
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES
01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2
More informationPhiladelphia Creek Trash Assessment (PCTA) Methodology Mill Run Creek Test Case
Philadelphia Creek Trash Assessment (PCTA) Methodology Mill Run Creek Test Case Mill Run Creek emerges from a covered creek in Philadelphia to an open creek in Cheltenham. The Creek has extensive trash
More informationCity of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010
City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationC.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook
C.3 STORMWATER TECHNICAL GUIDANCE Table of Contents Glossary... viii Chapter 1 Introduction/How to Use this Handbook... 1-1 1.1 Purpose of this Handbook... 1-1 1.2 What is the Countywide Program?... 1-2
More informationCharles W Earle Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGlencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street
Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street Project Summary Project Type: Technologies: Institutional parking lot retrofit demonstration project Vegetated infiltration swale with
More informationART AND ARCHITECTURAL REVIEW BOARD (AARB) Project Data Sheet Revised 2014 (Due two weeks before meeting to:
Date Submitted: July 21, 2017 ART AND ARCHITECTURAL REVIEW BOARD (AARB) Project Data Sheet Revised 2014 (Due two weeks before meeting to: AARB@dgs.virginia.gov) Agency Name: George Mason University (Fairfax
More informationExample Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018
Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA February 21, 2018 XYZ Corporation Jane Jones, 925-555-1212 This example prepared by Dan Cloak Environmental
More information5-Year Street Reconstruction Plan ( )
5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek
More informationSECTION PLUMBING EQUIPMENT Piping (Plumbing). 2. Division 16 - Electrical Wiring and Connections.
SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15410 - Piping (Plumbing). 2. Division 16 - Electrical Wiring and Connections. 1.02 SUBMITTALS A. Submit properly identified
More informationPERFORMANCE SPECIFICATION GUIDELINE SMOKE TESTING
PERFORMANCE SPECIFICATION GUIDELINE FOR SANITARY SEWER SMOKE TESTING December 2010 Prepared by James H. Forbes, Jr., P.E. (Chairman) Peer Review Committee Jim Harris, P.E. - TFE Resources, Inc. Bryan Ballard
More informationCITY of RIDGEFIELD TYPE I DECISION SITE PLAN REVIEW (SPR 99-10) PDM MOLDING INC. PHASE II EXPANSION
Page 1 CITY of RIDGEFIELD TYPE I DECISION SITE PLAN REVIEW (SPR 99-10) PDM MOLDING INC. PHASE II EXPANSION TO: Mayor, and Members of the Ridgefield City Council and Planning Commission FROM: Eric Eisemann
More informationGreen Infrastructure Implementation Planning for Multiple Objectives
Green Infrastructure Implementation Planning for Multiple Objectives Hazem Gheith, ARCADIS September 10, 2014 Imagine the result Integrated Plan for Stormwater Control Integrated Plan Objective Sanitary
More informationOPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES
OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES THE CARMONY BUILDING PARAGON REALTY NORTH GREEN STREET BROWNSBURG, HENDRICKS COUNTY INDIANA 8365 Keystone Crossing, Suite 201 Indianapolis,
More informationLID IN REGION 6 HOUSTON AREA FOCUS. Steve Albert, P.E., CFM Senior Project Manager Sherwood Design Engineers
LOW IMPACT DEVELOPMENT Introduction Robert Adair, HLWSF The Harris County Story Alisa Max, PE, Harris County PID Nick Russo, Harris County PID Justin Taack, TCEQ Houston Area Focus Charlie Penland, PE,
More informationWashington Irving Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationStormwater Program Robert Patterson (919) 807-6369 E-mail: robert.patterson@ncdenr.gov Division of Energy, Mining, and land Resources Stormwater Permitting Unit 1612 Mail Service Center Raleigh NC 27699-1612
More informationFLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio
FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION Thomas M. Evans, AECOM Cleveland, Ohio INTRODUCTION As part of the Northeast Ohio Regional Sewer District s (Sewer District) Green Infrastructure
More informationMEADOWVIEW HOMEOWNERS ASSOCIATION
MEADOWVIEW HOMEOWNERS ASSOCIATION November 2, 2016 Mr. Justin V. Yaich, Township Manager West Bradford Township 1385 Campus Drive Downingtown, PA 19335 RE: Meadowview Development Home Owner s Association
More information1 LIST OF POTENTIAL PCB SOURCES
Ms. Mary Vanderlaan Supervisor, Lansing District Michigan Department of Environmental Quality Water Resources Division P. O. Box 30242 Lansing, MI 48909 Subject: NPDES Permit No. MI0001597 2017 Annual
More informationDowntown Redevelopment Project Update
Downtown Redevelopment Project Update The redevelopment project will begin the week of September 4, 2017. It is anticipated that construction will be approximately 565 days, depending on weather. 7-6-18
More informationSTORMWATER - GENERAL NOTES
STORM DRAINAGE CONSTRUCTION NOTES. All storm sewer pipe shall be reinforced concrete. 2. Storm drainage pipes shall be a minimum of fifteen (5) inch diameter (5" for short lateral runs only - up to 75
More informationJosefa Ortiz De Dominguez Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationREQUEST FOR PROPOSAL. Grounds Maintenance
REQUEST FOR PROPOSAL Grounds Maintenance March 1, 2019 Invitation Syracuse City invites contractors to submit a bid to perform grounds maintenance of Syracuse City Hall, Police Station, and Museum. Bid
More informationAgenda Item. Applicant Logan Virginia Properties, LLC Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch
Applicant Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch Public Hearing March 14, 2018 City Council Election District Kempsville Agenda Item 6 Request Conditional Rezoning (B-2 Community
More informationSTAFF REPORT ACTION REQUIRED
STAFF REPORT ACTION REQUIRED Residential Demolition Application 595 Vaughan Road Date: December 15, 2011 To: From: Wards: Reference Numbers: North York Community Council Director and Deputy Chief Building
More informationUNIVERSITY OF NORTHERN IOWA
UNIVERSITY OF NORTHERN IOWA Municipal Separate Storm Sewer System September 2008 Report Permit Number 07-09-0-04 August 2008 Prepared by: University of Northern Iowa Environmental Health and Safety Office
More information14 October 10, 2012 Public Hearing APPLICANT: MPB, INC
14 October 10, 2012 Public Hearing APPLICANT: MPB, INC PROPERTY OWNER: MUNDEN & ASSOCIATES, LP STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-1 & AG-2 to Conditional O-2) ADDRESS
More informationExample Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA
Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA December 2, 2015 XYZ Corporation Jane Jones, 707-555-1212 This example prepared by Dan Cloak Environmental
More informationSouth Bismarck Watershed Model Update and Stormwater Improvement Project
Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046 1.0 Executive Summary The focus of
More informationPLAN SUBMITTER'S CHECKLIST
Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write
More information3 November 10, 2010 Public Hearing APPLICANT AND PROPERTY OWNER :
3 November 10, 2010 Public Hearing APPLICANT AND PROPERTY OWNER : TRUSTEES OF ST. ANDREWS UNITED METHODIST CHURCH STAFF PLANNER: Faith Christie REQUEST: Modification of a Conditional Use Permit for a church
More informationCITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA PROCEDURES RELATIVE TO CITY COUNCIL PUBLIC HEARINGS
Ordinance Amendment Storm Water / Urban Runoff and Low Impact Development CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA90755-3799 PROCEDURES RELATIVE TO CITY COUNCIL PUBLIC HEARINGS 1. At the
More informationELECTRICAL SAFETY INSPECTION REPORT ANLIMA TEXTILE LTD, DHAKA, BANGLADESH
ELECTRICAL SAFETY INSPECTION REPORT ANLIMA TEXTILE LTD, DHAKA, BANGLADESH January 14, 2014 Anlima Textile Ltd. PAGE 1 SUMMARY The Anlima compound located in Dhaka, Bangladesh was surveyed for Electrical
More informationURBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION
URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION Stephen Crawford, P.E., CFM Romin Khavari, P.E., CFM NCTCOG Public Works Roundup MAY 23, 2018 Today s Agenda Urbanized Stream Erosion Solving
More information