City of Ingleside Avenue B Outfall Project

Size: px
Start display at page:

Download "City of Ingleside Avenue B Outfall Project"

Transcription

1 City of Ingleside Avenue B Outfall Project June 15, 2017 Dennis Knippa Council Member Place 1 Bill Underbrink Council Member Place 2 Ronnie Parker Council Member Place 3 Luis Lamas Mayor Ben Tucker Council Member Place 4 Oscar Adame Council Member Place 5/Mayor Pro-Tem John F. Schack Council Member Place 6 City of Ingleside Avenue B Outfall Project June 15, 2017 Agenda Introductions Mayor Luis Lamas Project Team and Project Overview City Manager Melissa Byrne Vossmer Project Description Hanson Professional Services Inc. Review of Stormwater Management Master Planning Effort City of Ingleside Hydrology Historical Flood Pictures and Data Proposed Improvements Construction Activities, Traffic Control, and Timeline Opinion of Probable Construction Costs Questions and Comments 1

2 Project Team Melissa Byrne Vossmer City Manager Donald Paty Director of Public Works Hanson Professional Services John Michael, P.E. Craig Thompson, P.E. Javier Davila, P.E. City of Ingleside Planning Map 1960 s 2

3 City of Ingleside Planning Map 1979 City of Ingleside Major Drainage Systems 3

4 City of Ingleside Contour Map City of Ingleside Planning Map

5 May 16, 2016 Rain Event May 16, 2016 Rain Event 2.17 in 7.97 in 9.21 in in 8.67 in 8.67 in in in 2.27 in in in in in 5

6 Mustang Drive Looking East at San Angelo Mustang Drive Looking East at San Angelo 6

7 Mustang Drive Looking towards City Hall Mustang Drive Looking towards City Hall 7

8 San Angelo Street Looking East from City Hall San Angelo Street Looking East from City Hall 8

9 Waco Street Looking South towards softball field Waco Street Looking South towards softball field 9

10 Waco Street Looking West from El Paso Ave Intersection Waco Street Looking West from El Paso Ave Intersection 10

11 Avenue B Looking South at Crossing 2 Avenue B Looking South at Crossing 2 11

12 Drainage Sub-Basins Avenue B Outfall Hydrology Hydraulics Ave B 1 Crossing/Driveway 12

13 Hydraulics Profile 25-Year Existing and Proposed Water Surface 5-Year Existing and Proposed Water Surface Proposed Profile (Bottom) Existing Channel Profile (Bottom) Ave B Proposed Improvements Culvert (Add Alt No. 4) Under Mustang Regrade Channel (Add. Alt. No. 3) 6 x3 Underground Culvert Ave B (Add. Alt. No. 1) 5 (Add. Alt. No. 2) 1 Crossing/Driveway 13

14 Proposed Improvements Regrade Channel (Add. Alt. No. 3) Culvert (Add Alt No. 4) Under Mustang 6 x3 Underground Culvert 2,3 1 (Add. Alt. No. 1) (Add. Alt. No. 2) Avenue B Crossing 1 Looking East At Outfall (3) 48 Reinforced Concrete Pipe (RCP) Under Avenue B 14

15 Avenue B Crossing Looking North Existing Conditions 2 (3) 48 RCP Under Avenue B Avenue B Crossing Looking North Proposed Improvements 2 Concrete Channel (Base Bid) (2) 10 x6 Reinforced Concrete Box Culvert Under Avenue B 15

16 Avenue B Channel Looking North Existing Conditions 3 Underground 72 corrugated metal pipe to be removed Concrete junction box to be removed Avenue B Channel Looking North Proposed Improvements 3 16

17 Proposed Improvements Along Avenue B 2 20 TYP 3 Metal beam guard fence Seal Coat Avenue B Centerline Avenue B Existing fences to be replaced Concrete Plating Full depth pavement spot repairs in rutted areas along edge TYPICAL SECTION ALONG AVENUE B Proposed Improvements Regrade Channel (Add. Alt. No. 3) Culvert (Add Alt No. 4) Under Mustang 6 x3 Underground Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) 17

18 Avenue B Channel Looking North Near Crossing 2 Existing Conditions 5 x7 box culvert to be removed 72 corrugated metal pipe to be removed Avenue B Channel Looking North Near Crossing 2 Proposed Conditions 10 x5 Reinforced Concrete Box Culvert Under New Driveway 10 x6 Reinforced Concrete Box Culvert Under New Driveway 18

19 Proposed Improvements Regrade Channel (Add. Alt. No. 3) Culvert (Add Alt No. 4) Under Mustang 6 x3 Underground Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) Avenue B Channel Looking North Near 8th Street Existing Conditions 5 x7 box culvert to be removed 19

20 Avenue B Channel Looking North Near 8 th Street Proposed Conditions Trees and shrubs to be removed 10 x5 Reinforced Concrete Box Culvert Under New Driveway Avenue B Channel Looking North Near 8 th Street Proposed Conditions 10 x5 Reinforced Concrete Box Culvert Under New Driveway (Add. Alt. No. 1) 20

21 Proposed Improvements Regrade Channel (Add. Alt. No. 3) Culvert (Add Alt No. 4) Under Mustang 6 x3 Underground Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) Avenue B Channel Looking West Near AEP Substation Existing Conditions/Proposed Conditions Trees and shrubs to be removed (Add. Alt. No. 2) 21

22 Proposed Improvements Culvert (Add Alt No. 4) Under Mustang Regrade Channel (Add. Alt. No. 3) Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) Channel Regrading Looking South from Texas Avenue Existing Conditions/Proposed Conditions Regrade Channel (Add. Alt. No. 3) 22

23 Proposed Improvements Culvert (Add Alt No. 4) Under Mustang Regrade Channel (Add. Alt. No. 3) Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) Underground Drainage Looking North from Texas Avenue Existing Conditions/Proposed Conditions Culvert 23

24 Proposed Improvements Culvert (Add Alt No. 4) Under Mustang Regrade Channel (Add. Alt. No. 3) Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) Underground Drainage Looking North from Texas Avenue Existing Conditions/Proposed Conditions Culvert (Add Alt No. 4) Under Mustang 24

25 Traffic Control/Access South of 8th Street EMAS Marine Base Residential Property Private Driveways Heavy Road Access to S. Main (FM 1069) American Tower Corporation Koch Pipeline Driveway City Yard Avenue B Access Traffic Control/Access South of 8th Street EMAS Marine Base Residential Property Private Driveways Heavy Road Access to S. Main (FM 1069) Koch Pipeline Driveway 1-Lane, 2-Way Traffic (Flaggers) 25

26 Traffic Control/Access South of 8th Street Temporary Construction Easement EMAS Marine Base Avenue B Buffer Channel Residential Improvements Property Private Driveways Heavy Road Access to S. Main (FM 1069) TYPICAL SECTION 10 1-Lane, 2-Way Traffic (Flaggers) Koch Pipeline Driveway 1-Lane, 2-Way Traffic (Flaggers) WORKING HOURS (8 am to 5 pm typically) SOUTH OF 8TH STREET Traffic Control/Access South of 8th Street Temporary Construction Easement EMAS Marine Base Channel Residential Improvements Property Private Driveways 10 Koch Pipeline Driveway 10 2-Lane 2-Way Traffic 1-Lane, 2-Way Traffic NON-WORKING (Flaggers) HOURS SOUTH OF 8TH STREET (EDGE CONDITIONS PERMITTING) Heavy Road Access to S. TYPICAL SECTION Main (FM 1069) 26

27 Traffic Control/Access North of 8 th Street AEP Driveways Residential Driveways Traffic Control/Access North of 8 th Street 1-Way Only Traffic 27

28 Traffic Control/Access North of 8th Street Temporary Construction Easement EMAS Marine Base Avenue B Buffer Channel Residential Improvements Property Private Driveways Heavy Road Access to S. Main (FM 1069) Koch Pipeline Driveway 10 1-Way Only Traffic 1-Lane, 2-Way Traffic (Flaggers) TYPICAL SECTION ALL HOURS NORTH OF 8TH STREET Traffic Control/Access Oklahoma Alley Limited Access from Avenue B 28

29 Traffic Control/Access San Angelo Alley Alley to Be Closed Temporary Street Parking Costs and Timeframe Culvert (Add Alt No. 4) Under Mustang Timeframe: 6 to 9 Months Opinion of Probable Construction Costs Regrade Channel (Add. Alt. No. 3) $ 2,969, Base Bid: Add Alt. No. 1: $ 518, Add Alt. No. 2: $ 28, Add Alt. No. 3: $ 34, Add Alt. No. 4: $118, TOTAL: $ 3,669, Construction Budget: $ 3,712, Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) 29

30 Culvert (Add Alt No. 4) Under Mustang Questions and Comments Regrade Channel (Add. Alt. No. 3) Culvert (Add. Alt. No. 1) (Add. Alt. No. 2) 30

NAPA COUNTY PUBLIC WORKS Standards & Specifications

NAPA COUNTY PUBLIC WORKS Standards & Specifications Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

March 15, 2017 Project:

March 15, 2017 Project: March 15, 2017 Project: 161.06121 Maureen O Meara, Town of Cape Elizabeth 320 Ocean House Road P.O. Box 6260 Cape Elizabeth, Maine 04107 SUBJECT: Maxwell Woods Condominium Development Major Subdivision

More information

A G E N D A Council Update Training Room September 26, :45 p.m.

A G E N D A Council Update Training Room September 26, :45 p.m. CITY OF THORNTON CITY MANAGER S OFFICE A G E N D A Council Update Training Room September 26, 2017 5:45 p.m. A. Boards and Committees Reports (Estimated 20 Minutes) 1. Rangeview Library District Meeting

More information

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015 RFP 2018-02 DRAINAGE OUTFALL DESIGN AND PERMITTING Mandatory Meeting for Proposers August 15, 2015 IMPORTANT DATES August 15 th, 2:00pm August 17 th, 5:00pm August 22 nd, 5:00pm September 5 th, 2:00pm

More information

Blake C. Kronkosky, PE, Ph.D.

Blake C. Kronkosky, PE, Ph.D. Blake C. Kronkosky, PE, Ph.D. Blake.Kronkosky@statetecheng.com, CELL (512) 663-1954 Education Ph.D., Civil Engineering, Texas Tech University, May 2018: An Engineer's Guide for Estimating 1-Day, 100-Year

More information

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC STAFF S ANALYSIS AND RECOMMENDATION Planning Commission (CPC) Public Hearing Date: MAY 17, 2016 CPC Time Remaining: 100 DAYS Applicant s Agent: DANIEL L. CASKIE (804-569-7060) Applicant s Contact: MICHAEL

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 Problem: Anecdotal evidence suggests a natural spring exists in the backyard

More information

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Turgay Dabak, Joni Calmbacher, Sara DeGroot, Andrea Ryon Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Presentation Outline Project Background Project Overview BMPs Evaluated

More information

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012 David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012 The City of Indianapolis is undergoing the completion of RebuildIndy projects. Through Mayor Ballard s RebuildIndy initiative, investments

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: July 20, 2016 DRCC #: 16-4803 Latest Submission Received: June 13, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road, 2

More information

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations & Considerations Morse Study Area Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations Development Considerations Floodplain

More information

Washington County, Maryland Division of Public Works Policy Manual

Washington County, Maryland Division of Public Works Policy Manual Washington County, Maryland Division of Public Works Policy Manual Subject: Downstream Drainage Easement Category: Land Development Engineering Number: 7-4.1 Date: June 1, 2009 (effective) PURPOSE: The

More information

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL Agenda Design Concept Report Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Questions Design Concept Report

More information

Town of West Point Plan of Development

Town of West Point Plan of Development Town of West Point Plan of Development Plan Submission In accordance with Section 70-51(b) of the Town Code, the Zoning Administrator shall establish a written policy for the form, format, content and

More information

Title 11 Streets and Sidewalks

Title 11 Streets and Sidewalks Chapter 11.01 - Definitions Title 11 Streets and Sidewalks Low Impact Development (LID) - A stormwater and land use management strategy that strives to mimic predisturbance hydrologic processes of infiltration,

More information

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT 7 August 13, 2009 TO: FROM: Mayor and Council City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT The Director of Public Works and his fine staff prepared and submitted to you a good overview

More information

SITE IMPROVEMENTS TO UAS AREA CP1512R

SITE IMPROVEMENTS TO UAS AREA CP1512R RANGE ROAD SITE IMPROVEMENTS TO UAS AREA CP1512R ROOSEVELT BLVD ACCESS ROAD DUFFY ROAD MARINE CORPS AIR STATION CHERRY POINT, NORTH CAROLINA INDEX OF DRAWINGS 748 LORD DUNMORE DRIVE, SUITE 101 RW 14L RW

More information

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m. Welcome Public Information Centre No.2 City of Burlington, City of Hamilton, Region of Halton Waterdown Road Widening Detailed Design Craven Avenue to Mountain Brow Road Date: Thursday March 2, 2017 Time:

More information

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DESIGN PUBLIC HEARING MAY 10, 2018 AT GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED Reconstruction of Granby Road/West State Street (Route

More information

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater Post Construction BMP Inspection Scott Taylor, P.E. Learning Objectives To Understand: Types of post construction BMPs Typical construction process of BMPs Construction errors that impact BMP operation

More information

183

183 182 183 184 185 186 187 188 189 190 LEFTHAND CANYON DR. DRIVE ROWAY PHASING PLAN PHASE 1 PHASE 2 PHASE 3 CONSTRUCT RETAINING WALLS 8 AND 100, INCLUDING SHORING, EXCAVATION, WALL AND BACKFILL. UTILIZE FLAGGING

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. June 18, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion: 3.0 SURVEY 3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects A. Prior to construction: 1. Public survey records are to be researched for the location of all possible survey

More information

DEPARTMENT OF PUBLIC WORKS & UTILITIES

DEPARTMENT OF PUBLIC WORKS & UTILITIES CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS & UTILITIES URBAN SERVICES STANDARDS AND GUIDELINES January 2017 Craig Fulton, P.E., Director TABLE OF CONTENTS "URBAN SERVICES STANDARDS AND GUIDELINES"

More information

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me

More information

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS

More information

Victoria Bridge Municipal Class EA Civic Works Committee

Victoria Bridge Municipal Class EA Civic Works Committee Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction

More information

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water C. WATER 1. Surface Water Runoff See Section C.3, Flood Hazard/Mudflow Hazard, page 67. 2. Ground Water Determined not significant by the October 1984 and January 1999 Initial Studies conducted by the

More information

PLAN SUBMITTER'S CHECKLIST

PLAN SUBMITTER'S CHECKLIST Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

Level 1 Downstream Analysis

Level 1 Downstream Analysis Level 1 Downstream Analysis Newcastle Way Apartments Newcastle, Washington King County April 14, 2014 Revised July 10, 2014 Prepared by: Dean A. Furr, P.E. Reviewed by: Donald Scarberry, P.E. Coffman Engineering,

More information

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing

More information

South Bismarck Watershed Model Update and Stormwater Improvement Project

South Bismarck Watershed Model Update and Stormwater Improvement Project Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046 1.0 Executive Summary The focus of

More information

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017 Monroe Street Reconstruction Final Corridor Design Presentation & Open House August 16, 2017 Thank you to Wingra School! Tonight s Agenda 1. Project Overview 2. Design Proposal & Preparing for Reconstruction

More information

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET 7th Avenue Creek Master Plan Development Project MARKET City of St. Charles, IL IAFSM CONFERENCE March 14, 2018 7 TH AVENUE CREEK PROJECT AREA 2 2008 RAIN EVENT 3 RESIDENTIAL STRUCTURE FLOODING COMMERCIAL

More information

Portland International Airport Storm Water Master Plan April 6, 2016

Portland International Airport Storm Water Master Plan April 6, 2016 Portland International Airport Storm Water Master Plan April 6, 2016 Susan Aha Senior Manager, Water Resources Brian Freeman Manager, Civil Engineering 1 Presentation Overview Why is storm water important

More information

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design

More information

Concreteville, CT. March 10, 2004

Concreteville, CT. March 10, 2004 Concreteville, CT March 10, 2004 Reducing Runoff is the most topically direct follow up to Linking Land Use to Water Quality (Basic NEMO). There is a good deal of overlap, but the major differences is

More information

PLANNING COMMISSION Work Session Meeting Agenda

PLANNING COMMISSION Work Session Meeting Agenda PLANNING COMMISSION Work Session Meeting Agenda 5200 85TH AVENUE NORTH BROOKLYN PARK MN 55443 PHONE (763) 424-8000 FAX (763) 493-8391 Wednesday, September 27, 2017-7:00 P.M. Brooklyn Township Room If due

More information

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield Design Considerations for Open Channel and Detention Pond Design Howard Redfearn, City of Mansfield Previous Experience/Criteria/Maintenance Issues New Criteria Discussion Overview Where is Mansfield?

More information

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting 1. Call To Order 2. Roll Call of Members 3. Chairman's Comments PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Joint Planning and Zoning Meeting January 11, 2017 6:00 PM Courthouse

More information

County of El Dorado Standard Plans

County of El Dorado Standard Plans County of El Dorado Standard Plans Table of Contents Section 1 General Standards GS-01 General Legend and Abbreviations Section 2 Roads and Streets RS-01 RS-02 RS-03 RS-04 RS-05 RS-06 RS-07 RS-08 RS-20

More information

Plan Review Checklist

Plan Review Checklist Plan Review Checklist FOR EROSION AND SEDIMENT CONTROL PLANS _ Minimum Standards - All applicable Minimum Standards must be addressed. All minimum Standards must be adhered to during the entire project

More information

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B

More information

Reconnecting New Haven: Downtown Crossing

Reconnecting New Haven: Downtown Crossing Reconnecting New Haven: Downtown Crossing Phase 2 Update Introduction to Phase 3 November 16, 2017 City of New Haven, Connecticut Toni N. Harp, Mayor Reconnecting New Haven Introduction Project Overview

More information

Sewer & Storm Drain Systems

Sewer & Storm Drain Systems Sewer & Storm Drain Systems Institute for Facilities Management Sewer & Storm Drain Systems Jay W Becker, PE 1 Course Overview Campus Sewer and Drainage o Sanitary Sewer System o Storm Drain System o Understanding

More information

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1" = 600'

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1 = 600' LOCATED IN THE SOHWEST QUARTER OF SECTION, TOWNSHIP SOH, Case # Z 6 - Legal Description Tract G, H and J of the Villages at Riverdale Filing No., a part of the Southwest quarter of Section, Township South,

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Problem: Stormwater collected from the neighborhood upstream is released at 9 Muirfield Lane and flows west toward

More information

Agenda. Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity ( )

Agenda. Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity ( ) October 5, 2017 Agenda Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity (2005-2017) Existing Conditions Alternatives Public Engagement

More information

STANDARD DETAILS QUICK REFERENCE

STANDARD DETAILS QUICK REFERENCE STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)

More information

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION 7:00 P.M. TO 8:30 P.M. NOVEMBER 21 st, 2017 PENETANGUISHENE MEMORIAL COMMUNITY CENTRE BRIAN ORSER HALL (61 Maria Street) 1.

More information

Town Council Agenda Packet

Town Council Agenda Packet Town Council Agenda Packet The agenda and backup items follow in one continuous document. To view agenda items individually, click on the bookmark tab at the left of the screen. A list of the agenda items

More information

Project Descriptions for FY 15

Project Descriptions for FY 15 Department of Transportation and Stormwater Services Stormwater Engineering and Design Division Project Descriptions for FY 15 43 rd Street Outfall PH II Pond Regional Drainage Improvement Flooding Relief

More information

City of Los Angeles Department of Public Works

City of Los Angeles Department of Public Works City of Los Angeles Department of Public Works Environmental Scoping Meeting for the Proposed Sixth Street Park, Arts, River & Connectivity Improvements (PARC) Project May 3, 2017 1 Agenda Introductions

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

University Park Subdivision Street Assessment Report

University Park Subdivision Street Assessment Report University Park Subdivision Street Assessment Report Prepared for: University Park Subdivision TABLE OF CONTENTS Introduction... 3 Existing Conditions Analysis... 4 Street Improvements... 5 Existing:...

More information

The Benefits and Challenges Associated with Green Infrastructure Practices

The Benefits and Challenges Associated with Green Infrastructure Practices The Benefits and Challenges Associated with Green Infrastructure Practices Thomas M. Evans ASLA, LEED AP Regional Green Infrastructure Design Services Director OWEA Technical Conference, June 20, 2013

More information

City of Richmond. Engineering Design Specifications

City of Richmond. Engineering Design Specifications City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS

More information

2 ALTERNATIVES AND OPTIONS

2 ALTERNATIVES AND OPTIONS 2 ALTERNATIVES AND OPTIONS This chapter documents the process used to develop improvement concepts for Oregon Avenue and describes the resulting project alternatives and options, which were developed in

More information

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION LITTLE ELM 2009-2014 CAPTIAL IMPROVEMENT BOND STREET PRESENTATION Denton Frisco Little Elm Lewisville Legacy Southlake Grapevine Addison DENTON COUNTY & LEWISVILLE LAKE MATCHING FUNDS DENTON COUNTY BOND

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE SFMTA Municipal Transportation Agency Image: a bus in front of the Palace of the Legion of honor SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN AVENUE @ OCEAN AVENUE Community Meeting May 23, 2012 San Francisco,

More information

Alternatives Analysis Summary Memorandum

Alternatives Analysis Summary Memorandum F 16253 Swingley Ridge Rd, Suite 100, St. Louis, MO 63017 636-777-3000 P 314.432.5812 F Alternatives Analysis Summary Memorandum To: City of Creve Coeur, Missouri By: Mark Meyer, PE Date: 09-25-2013 Re:

More information

INDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES

INDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES INDEX EXECUTIVE SUMMARY...1 INTRODUCTION...2 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS... 4-5 EXISTING UTILITIES... 6-7 MEDIAN BREAKS AND TURN LANE STORAGE REQUIREMENTS...8 PRELIMINARY DESIGN

More information

JOB CREATION PROJECTS

JOB CREATION PROJECTS SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct

More information

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water? District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: DC Clean Rivers Project - Green Infrastructure Program Briefing for: ACEC What s New at DC Water? April 7,

More information

STORMWATER - GENERAL NOTES

STORMWATER - GENERAL NOTES STORM DRAINAGE CONSTRUCTION NOTES. All storm sewer pipe shall be reinforced concrete. 2. Storm drainage pipes shall be a minimum of fifteen (5) inch diameter (5" for short lateral runs only - up to 75

More information

2016 WORKSHOP LVR Field Trip

2016 WORKSHOP LVR Field Trip 2016 WORKSHOP LVR Field Trip ***Note*** Many of the sites on this tour were NOT related to, or funded by, the DGLVR program. They are being shown to encourage discussion about the kinds of projects that

More information

North Street Reconstruction & Integrated Stormwater Management System

North Street Reconstruction & Integrated Stormwater Management System OWEA Watershed Workshop-October 30 th, 2014 North Street Reconstruction & Integrated Stormwater Management System Ted Blahnik, PE Principal-Williams Creek Consulting North Street: A Case Study for Integrated

More information

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table Public Open House Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table The Grand Avenue Extension Location and Environmental Study will determine the location of the extension of

More information

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time. AGENDA ITEM H-7 continued from 4/18 Public Works STAFF REPORT City Council Meeting Date: 4/18/2017 Staff Report Number: 17-081-CC Informational Item: Update on the Bayfront Canal Bypass Project Recommendation

More information

Planning and Development Services Public Works. Design and Construction Standards

Planning and Development Services Public Works. Design and Construction Standards Planning and Development Services Public Works 2017 Design and Construction Standards Section I - General Requirements A. Authority B. Variances C. Adoption of Standards Section II Design Criteria TABLE

More information

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 TABLE OF CONTENTS Sheet Number Title Revision Date I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 STREETS ST-1 LOCAL STREETS 03/17/08 ST-1A LOCAL STREETS, 2015 GENERAL PLAN 11/15/04 ST-2 COLLECTOR AND ARTERIAL

More information

Brigitte A. Berger, Director of Engineering

Brigitte A. Berger, Director of Engineering Brigitte A. Berger, Director of Engineering Wilmette s Sewer System Overview of Wilmette s Sewer System Green vs. Gray? Stormwater Action Plan Regulatory Compliance Why Homes Flood What can

More information

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010 MOBILE CITY PLANNING COMMISSION LETTER OF DECISION Archbishop of Mobile 400 Government St. Mobile, AL 36602 Re: Case #SUB2010-00075 (Subdivision) 3650 Springhill Avenue (Northwest corner of Springhill

More information

5-Year Street Reconstruction Plan ( )

5-Year Street Reconstruction Plan ( ) 5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek

More information

City of Redlands East Valley Corridor Specific Plan. City Council

City of Redlands East Valley Corridor Specific Plan. City Council City of Redlands East Valley Corridor Specific Plan City Council Susan Peppler, Mayor Gilbert Gil, Mayor Pro Tem Gary George, Councilmember Patricia Gilbreath, Councilmember Jon Harrison, Councilmember

More information

Prince William Street Project (Grant Avenue to Wellington Road)

Prince William Street Project (Grant Avenue to Wellington Road) Prince William Street Project (Grant Avenue to Wellington Road) 1 Goals Improve pedestrian and bike traffic safety Improve street drainage with curb & gutter Upsize water mains Enhance overall street appearance

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

TENTATIVE MAP CHECKLIST

TENTATIVE MAP CHECKLIST Business License 707.648.4357 www.cityofvallejo.net Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Building 707.648.4374 Planning 707.648.4326 TENTATIVE MAP CHECKLIST Public Works/Engineering

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. December 21, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION Stephen Crawford, P.E., CFM Romin Khavari, P.E., CFM NCTCOG Public Works Roundup MAY 23, 2018 Today s Agenda Urbanized Stream Erosion Solving

More information

Appendix B Utilities Figures

Appendix B Utilities Figures Appendix B Utilities Figures Master Plan Update B.0 Appendix B Utilities Figures The following figures describe the existing utility facilities located in the Study area. Refer to Section 1.2.16 Utilities

More information

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission Clay Curtin, Management Analyst (I the same walls at a maximum of 1 foot tall. Section 7.36.150 of the Municipal Code permits BY: Eric Haaland, Associate Planner right-of-way) between walkways leading

More information

Chapter 6. Green Streets

Chapter 6. Green Streets Chapter 6. Green Streets Description Green streets are designed in a holistic manner that minimizes impervious surfaces, emphasizes landscaped elements, includes measures for enhancing water quality, while

More information

Third Ave CSO Integrated Green Infrastructure

Third Ave CSO Integrated Green Infrastructure Third Ave CSO Integrated Green Infrastructure Neil Myers Williams Creek Consulting OWEA Annual Conference June 2013 For growing municipalities to be perceived as world class communities, each must move

More information

Response to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo)

Response to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo) Environmental Science & Assessment, LLC MEMORANDUM DATE: August 13, 2010 TO: Oregon City Planning CC: Jill Long Lane Powell FROM: RE: Jack Dalton Response to Comments (July 28, 2010 Oregon City Determination

More information

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS Caldwell County Pathways along with our co-partners City of Lenoir, Town of Gamewell,

More information

Construction and Landscaping on Public Property

Construction and Landscaping on Public Property Construction and Landscaping on Public Property City of Manhattan Beach Community Development Department 1400 Highland Avenue 310-802-5504 www.citymb.info January, 2004 Construction and Landscaping on

More information

THE LAUREL STREET GRADE SEPARATION PROJECT IN COLTON, CA: DRAINAGE CHALLENGES AND SOLUTIONS

THE LAUREL STREET GRADE SEPARATION PROJECT IN COLTON, CA: DRAINAGE CHALLENGES AND SOLUTIONS ABSTRACT THE LAUREL STREET GRADE SEPARATION PROJECT IN COLTON, CA: DRAINAGE CHALLENGES AND SOLUTIONS Joseph Sawtelle, PE Project Engineer TranSystems 6 Hutton Centre, Suite 1250 Santa Ana, CA 92707 714-708-6881

More information