1 University Park Subdivision Street Assessment Report Prepared for: University Park Subdivision

2 TABLE OF CONTENTS Introduction... 3 Existing Conditions Analysis... 4 Street Improvements... 5 Existing:... 5 Recommendations:... 5 Prioritization:... 6 Existing Street Photos:... 7 Intersection Curb Ramp Improvements Existing: Recommendations: Cost: Existing Intersection Curb Ramp Photos: Conclusion Typical Section Sheet Prioritization of Streets Sheet Block by Block Cost Estimate Cost Estimate by Pavement Rating Cost Estimate Unit Costs Intersection Curb Ramp Cost Estimate

3 Introduction The Trustees of University Park Subdivision selected Horner & Shifrin, Inc. to conduct an assessment and review of certain elements of the infrastructure within the University Park Subdivision. University Park Subdivision is a private development located within University City, MO. The subdivision boundaries include Vanderbilt Ave. to the west, Amherst Ave. (West of Midland Blvd.) & Dartmouth Ave. (East of Midland Blvd.) to the north, up to Pennsylvania Ave. to the east, and Princeton Ave. to the south. Pennsylvania Ave. and Midland Blvd. are not included in the subdivision s limits. The scope of the infrastructure assessment conducted by Horner & Shifrin included the following items listed below: 1. Assess street conditions and pavement surface to determine a logical prioritization 2. Provide improvement options with associated recommendations for repair. 3. Prepare block by block cost estimates to address deteriorated infrastructure. 4. Evaluate storm drainage channelization to existing infrastructure. 5. Evaluate existing curb ramps for ADA compatibility. The project area, hachured in the figure below, is the University Park Subdivision in University City, MO. Location Map 3

4 University Park Subdivision Existing Conditions Analysis The first step for the infrastructure assessment was to conduct a geotechnical investigation to evaluate the existing pavement and subgrade condition. The geotechnical investigation consisted of subsurface exploration, field and laboratory testing, and analysis of the collected samples. Borings at 15 locations within University Park Subdivision were chosen and samples were analyzed. The geotechnical investigations were completed by Shannon and Wilson, Inc. The existing asphalt surface of the streets within the project area range from 1 inch to 2 inches of asphalt wearing surface. Generally, it was found that the subbase for the streets on the west side of Midland Blvd. consisted of deteriorated concrete ranging in thickness from 5.5 inches to 7.5 inches. The East side of Midland Blvd. however, consisted of subbase composed of poorly graded gravel intermixed with cobbles. A full geotechnical engineering report was formalized and dated January 21, 2015 and is available separately for review. 4

5 Street Improvements Existing: In 2003 the University Park Subdivision began a project that includes constructing new 6 vertical curb and gutter on all the streets throughout the subdivision. These curbs will improve the drainage throughout the corridor by providing stormwater channelization to inlets. Generally the existing pavement section on University Park Subdivision streets consists of a Asphalt wearing surface on top of poorly graded gravel intermixed with cobbles. The base rock appears to have previously been a cobble street that was deteriorated prior to receiving an asphalt overlay. Typical University Park Subdivision Street Subbase Many of the streets have extensive asphalt patching with varied degrees of settling throughout the corridor. When driven at normal speeds, many of the streets experience waviness due to asphalt rutting. Alligator cracking is also evident in many portions of the subdivision s roadways. Photos of typical existing street sections are provided on Page 7. Recommendations: Several options were investigated to improve University Park Subdivision Streets such as Full Reconstruction and Mill & Overlay. See the Typical Section Sheet listed on page 18 of the report for additional information on the pavement selection options. Full Reconstruction of roadway may be necessary in failed pavement areas. Full Reconstruction options were based on St. Louis County typical street standard drawings which consists of either 6 of concrete on 4 of Aggregate Base or 9 of asphalt on 4 Aggregate Base. In both options the existing asphalt wearing surface and cobblestone base will be removed to the required depth of the new pavement section. The existing 6 vertical curb and gutter shall remain in place and will be flush with the new pavement section. 5

6 A Mill and Overlay option should be sufficient to improve the majority of the streets within the University Park Subdivision. Two mill and overlay options were investigated. The first includes milling down approximately 1.5 to the cobblestone base and replacing with new 1.5 asphalt overlay wearing surface. The second includes the same 1.5 milling but the new asphalt overlay will be increased to 3.5 at the centerline of the roadway and transition down to the 1.5 at the face of the existing gutter pan. The increase in asphalt depth along the most heavily used portion of the road will add lifespan to the project. Both mill and overlay options will tie flush into the existing curb and gutter without any asphalt overlay on top of the gutter pan. Thus, the project will not adversely affect any driveways or drainage along the project corridor. Another option that was investigated that could add lifespan to the asphalt overlay is an engineered paving mat. Typically these mats are laid on a clean asphalt base course or a fine aggregate leveling course. Because the existing subbase of the University Park Subdivision Streets is mostly cobblestones, a fine aggregate leveling course would need to be placed on top of the existing cobblestone base to reap the benefits of this product. Unfortunately with only a 1.5 thick existing asphalt surface on most of the streets, there is insufficient depth to use the mat. It is possible to remove some of the cobblestone base to provide sufficient depth to use a paving mat, but it may prove difficult for the contractor to construct. This may drive the price of the paving mat above the typical cost of approximately $4 per square yard. Therefore, a paving mat is not recommended for the street repair. Pavement Patch was added to the cost estimates for the Mill & Overlay options. The Pavement Patch would be used after milling operations occur and soft areas still remain after compaction. Some of the boring test locations indicated that the predominant soil classification was a high plastic, soft clay. These soft areas would then be identified and a new aggregate subbase with full depth asphalt would replace the unsuitable existing base. The streets in the vast majority of University Park Subdivision have adequate drainage along the existing vertical curb and gutter section. This is due to the curb and gutter replacement project the subdivision has been working on over the past decade. The newly constructed 6 vertical curb and gutter have sufficient gutter capacity for storm drainage. Both Mill & Overlay options suggested in this report will tie into the existing gutter pan as to not negatively affect the storm drainage conveyance. Also the existing street cross slopes are of sufficient grade to direct the storm water flow to the gutters. The variable depth overlay option will increase cross slope slightly improving the storm water conveyance, while the Mill & overlay option will match the existing cross slope and storm water conveyance effectiveness. Prioritization: A University Park Subdivision Map has been prepared that indicates the pavement ratings of the streets. Pavement Ratings were determined using a system similar to PASER (Pavement Surface Evaluation and Rating) system. The PASER system is a comprehensive pavement management system that involves collecting data and assessing several road characteristics: roughness (ride), surface distress (condition), surface skid characteristics, and structure (pavement strength and deflection). The streets varied from a good pavement rating to failed. Generally over time streets deteriorate through phases as indicated in the chart on page 7. The time is takes to go from Good to Failed depends largely on the traffic loading and quality of construction. 6

7 Existing Street Photos: Very Poor Section of Amherst Avenue - East of Purdue Ave. 7

8 Very Poor Section of Colgate Avenue West of Purdue Ave. Failed Section of Cornell Avenue East of Midland Blvd. 8

9 Failed Section of Dartmouth Avenue East of Midland Blvd. Failed Section of Stanford Avenue West of Purdue Ave. 9

10 Fair Section of Tulane Avenue East of Midland Blvd. Good Section of Vassar Avenue 10

11 Good Section of Vanderbilt Avenue Poor Section of Princeton Avenue East of Midland Blvd. 11

12 Good Section of Princeton Avenue West of Purdue Ave. Very Poor Section of Cambridge Avenue East of Midland Blvd 12

13 Intersection Curb Ramp Improvements Existing: The North-South streets of Vanderbilt Avenue, Purdue Avenue, and Vassar Avenue all have either non-ada compliant ramps or no ramps at all at their intersections. See the existing intersection curb ramp photos beginning on page 14. Recommendations: All intersections should be improved to provide pedestrian access to meet ADA guidelines. St. Louis County standard plans should be used for design and construction of curb ramps at all intersections within the subdivision. Two standard curb ramp types have been identified which will address most of the intersection configurations; special details will be developed for any non-standard intersections. The Subdivision Trustees have mentioned their preference of Blended Transition Curb Ramps over Directional Ramps with raised curb island between the ramps. See the blended transition curb ramp detail below. Proper construction of the curb ramps will require that sidewalk in the vicinity of the curb ramps be replaced to maintain appropriate grades for the ramps. Detectable warning panels will be installed at all street crossings. Cost: Typical Blended Transition with grass buffer curb ramp configuration Page 23 shows a summary of the estimated construction costs for the intersection curb ramp improvements. The construction costs are based on a blended transition curb ramp configuration with an estimated cost of $4,000 per each ramp. The total number of ramps to be constructed is 36 within the University Park Subdivision Limits resulting in an estimated total construction cost of $144,

14 Existing Intersection Curb Ramp Photos: Intersection of Princeton Avenue and Purdue Avenue Intersection of Princeton Avenue and Purdue Avenue 14

15 Intersection of Purdue Avenue and Cornell Avenue Non-Compliant Ramp at Intersection of Purdue Avenue and Colgate Avenue 15

16 Intersection of Purdue Avenue and Amherst Avenue Intersection of Vanderbilt Avenue and Cornell Avenue 16

17 Conclusion Cost estimates have been prepared to help the University Park Subdivision Trustees financially plan for improving the infrastructure within the subdivision. These estimates were developed using bid tabs of projects similar in type and scale. It should be noted that depending on the amount of the streets that will be upgraded at one time, the unit costs may be affected. Generally, the more streets that will be addressed at once the cheaper the unit costs. Also a 15% contingency is included in each option. This will cover adjusting of manholes, water valves, unknowns, and other miscellaneous items. The pavement patch listed in the estimate will be utilized if the contractor uncovers any unsuitable or unusable base material after milling. In these areas full depth pavement with new base will be used. The goal of the street improvements is to maximize the life of the new pavement while considering the impacts to the subdivision s budget. With these concerns in mind, Horner and Shifrin recommends only replacing the Failed pavement areas listed in the prioritization sheet with a full depth pavement. The variable depth overlay option should provide the best value in improving the streets with the most immediate need, such as Very Poor and Poor areas. The Good and Fair areas can continue to be monitored and as they deteriorate can be scheduled for maintenance. 17

18 CURB & GUTTER CURB & GUTTER LANE LANE CURB & GUTTER CURB & GUTTER LANE LANE DATE PREPARED 6/15/2015 ROUTE STATE EX. CURB & GUTTER MO DISTRICT SHEET NO. 2% 2% 2% 2% 18 COUNTY JOB NO. CONTRACT ID. TYPICAL SECTION TYPICAL SECTION 2" ASPHALT WEARING CONCRETE RECONSTRUCTION OPTION 1 - FULL RECONSTRUCTION ASPHALT RECONSTRUCTION SURFACE 6" CONCRETE 7" ASPHALT BASE 1. FULL PAVEMENT RECONSTRUCTION WITH EITHER; 4" AGGREGATE BASE 6" CONCRETE ON 4" OF AGG. BASE OR 4" AGGREGATE BASE EX. CURB & GUTTER 2" ASPHALT WEARING SURFACE ON 7" ASPHALT BASE ON 4" AGG. BASE FEDERAL PROJECT NO. OPTION 2 - MILL AND OVERLAY 1. MILL TO EXISTING DETORIATED BASE, APPROX. 1.5" 2. LAY 1.5" ASPHALT OVERLAY CURB & GUTTER LANE LANE CURB & GUTTER DESCRIPTION MATCH EXISTING MATCH EXISTING DATE OPTION 3 - MILL AND VARIABLE DEPTH OVERLAY 1.5" MILL AND 1.5" OVERLAY CURB & GUTTER LANE TYPICAL SECTION 1.5" MILL & 1.5" OVERLAY LANE CURB & GUTTER EX. CURB & GUTTER THE POW ER HOUSE AT UNION STATION 401 S. 18th St., Ste. 400 ST. LOUIS, MO FAX: Certificate of Authority: Expiration Date: December 31, MILL TO EXISTING DETORIATED BASE, APPROX. 1.5" 2. LAY VARIABLE DEPTH OVERLAY (3.5" ASPHALT OVERLAY AT CENTERLINE TO 1.5" OVERLAY AT GUTTER PAN) 1.5" OVERLAY VARIES 3.5" OVERLAY TYPICAL SECTION 1.5" MILL & VARIABLE DEPTH OVERLAY (3.5" OVERLAY AT CENTERLINE TO 1.5" OVERLAY AT GUTTER PAN) VARIES 1.5" OVERLAY EX. CURB & GUTTER UNIVERSITY PARK SU BDIVISIO N TYPICAL SECTIONS JUNE 15, 2015 SHEET 1 OF 1 REV....\002_Typicals-Revised Options.dgn 1:35:29 PM 6/15/2015

19 DATE PREPARED 6/15/2015 ROUTE STATE MO VERNON DISTRICT SHEET NO. 19 COUNTY JOB NO. CONTRACT ID. FEDERAL PROJECT NO. DARTMOUTH AMHERST TULANE AMHERST COLGATE 7300 COLGATE 7100 AMHERST PENNSYLVANIA DESCRIPTION STANFORD 7200 STANFORD 7000 LEGEND VANDERBILT CORNELL PRINCETON PURDUE STANFORD CORNELL CAMBRIDGE M IDLAND BLVD CAMBRIDGE PRINCETON PRINCETON 7100 CORNELL VASSAR DATE THE POW ER HOUSE AT UNION STATION 401 S. 18th St., Ste. 400 ST. LOUIS, MO FAX: Certificate of Authority: Expiration Date: December 31, 2016 GOOD CONDITION PAVEMENT FAIR CONDITION PAVEMENT POOR CONDITION PAVEMENT VERY POOR CONDITION PAVEMENT DELMAR BLVD SCALE UNIVERSITY PARK SU BDIVISIO N PAVEM ENT RATING ASSESSM ENT FAILED PAVEMENT REV....\Cad\T\Exhibits\Plansheet.dgn 1:36:27 PM 6/15/2015

20 20 PAVEMENT RATING UNIVERSITY PARK STREET REPAIR COST BREAKDOWN (BLOCK BY BLOCK) STREET FROM TO BLOCK AREA (sy) Concrete Reconstruction Asphalt Reconstruction Mill & Variable Depth Overlay VERY POOR AMHERST AVENUE VANDERBILT AVE. PURDUE AVE ,800 $91,000 $77,000 VERY POOR AMHERST AVENUE PURDUE AVE. MIDLAND BLVD ,500 $81,000 $69,000 POOR AMHERST AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,800 $188,000 $159,000 Mill & Overlay VERY POOR COLGATE AVENUE VANDERBILT AVE. PURDUE AVE ,800 $91,000 $77,000 FAIR COLGATE AVENUE PURDUE AVE. MIDLAND BLVD ,800 $91,000 $77,000 VERY POOR STANFORD AVENUE VANDERBILT AVE. PURDUE AVE ,200 $39,000 $33,000 FAILED STANFORD AVENUE VANDERBILT AVE. PURDUE AVE ,600 $148,000 $128,000 FAIR STANFORD AVENUE PURDUE AVE. MIDLAND BLVD ,000 $97,000 $82,000 POOR STANFORD AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,500 $146,000 $123,000 POOR CORNELL AVENUE VANDERBILT AVE. PURDUE AVE ,600 $84,000 $71,000 GOOD CORNELL AVENUE PURDUE AVE. MIDLAND BLVD $23,000 $20,000 FAIR CORNELL AVENUE PURDUE AVE. MIDLAND BLVD ,700 $88,000 $74,000 FAIR CORNELL AVENUE MIDLAND BLVD. PENNSYLVANIA AVE ,000 $33,000 $28,000 VERY POOR CORNELL AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,800 $59,000 $50,000 FAILED CORNELL AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,200 $111,000 $96,000 GOOD PRINCETON AVENUE VANDERBILT AVE. PURDUE AVE ,100 $101,000 $85,000 GOOD PRINCETON AVENUE PURDUE AVE. MIDLAND BLVD ,600 $149,000 $126,000 FAIR PRINCETON AVENUE MIDLAND BLVD. VASSAR AVE ,100 $36,000 $31,000 POOR PRINCETON AVENUE MIDLAND BLVD. VASSAR AVE ,400 $46,000 $39,000 VERY POOR PRINCETON AVENUE MIDLAND BLVD. VASSAR AVE $20,000 $17,000 FAIR DARTMOUTH AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,100 $68,000 $58,000 POOR DARTMOUTH AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,600 $52,000 $44,000 FAILED DARTMOUTH AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,000 $92,000 $80,000 FAIR TULANE AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,800 $156,000 $132,000 FAIR CAMBRIDGE AVENUE PRINCETON AVE. MIDLAND BLVD ,700 $55,000 $47,000 VERY POOR CAMBRIDGE AVENUE MIDLAND BLVD. VASSAR AVE ,100 $68,000 $58,000 FAILED CAMBRIDGE AVENUE MIDLAND BLVD. VASSAR AVE ,000 $92,000 $80,000 GOOD VANDERBILT AVENUE DELMAR BLVD. AMHERST AVE. 3,900 $126,000 $107,000 FAIR PURDUE AVENUE DELMAR BLVD. AMHERST AVE. 4,200 $136,000 $115,000 GOOD VASSAR AVENUE DELMAR BLVD. PENNSYLVANIA AVE. 3,000 $97,000 $82,000 TOTALS 73,200 $443,000 $384,000 $2,221,000 $1,881,000

21 21 PAVEMENT RATING UNIVERSITY PARK STREET REPAIR COST BREAKDOWN (BY PAVEMENT RATING) STREET FROM TO BLOCK AREA (sf) AREA (sy) Concrete Reconstruction Asphalt Reconstruction FAILED STANFORD AVENUE VANDERBILT AVE. PURDUE AVE ,600 $148,000 $128,000 FAILED CORNELL AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,200 $111,000 $96,000 FAILED DARTMOUTH AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,000 $92,000 $80,000 FAILED CAMBRIDGE AVENUE MIDLAND BLVD. VASSAR AVE ,000 $92,000 $80,000 SUBTOTAL 4,800 $443,000 $384,000 Mill & Variable Depth Overlay Mill & Overlay VERY POOR AMHERST AVENUE VANDERBILT AVE. PURDUE AVE ,800 $91,000 $77,000 VERY POOR AMHERST AVENUE PURDUE AVE. MIDLAND BLVD ,500 $81,000 $69,000 VERY POOR COLGATE AVENUE VANDERBILT AVE. PURDUE AVE ,800 $91,000 $77,000 VERY POOR STANFORD AVENUE VANDERBILT AVE. PURDUE AVE ,200 $39,000 $33,000 VERY POOR CORNELL AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,800 $59,000 $50,000 VERY POOR PRINCETON AVENUE MIDLAND BLVD. VASSAR AVE $20,000 $17,000 VERY POOR CAMBRIDGE AVENUE MIDLAND BLVD. VASSAR AVE ,100 $68,000 $58,000 SUBTOTAL 13,800 $449,000 $381,000 POOR AMHERST AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,800 $188,000 $159,000 POOR STANFORD AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,500 $146,000 $123,000 POOR CORNELL AVENUE VANDERBILT AVE. PURDUE AVE ,600 $84,000 $71,000 POOR PRINCETON AVENUE MIDLAND BLVD. VASSAR AVE ,400 $46,000 $39,000 POOR DARTMOUTH AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,600 $52,000 $44,000 SUBTOTAL 15,900 $516,000 $436,000 FAIR COLGATE AVENUE PURDUE AVE. MIDLAND BLVD ,800 $91,000 $77,000 FAIR STANFORD AVENUE PURDUE AVE. MIDLAND BLVD ,000 $97,000 $82,000 FAIR CORNELL AVENUE PURDUE AVE. MIDLAND BLVD ,700 $88,000 $74,000 FAIR CORNELL AVENUE MIDLAND BLVD. PENNSYLVANIA AVE ,000 $33,000 $28,000 FAIR PRINCETON AVENUE MIDLAND BLVD. VASSAR AVE ,100 $36,000 $31,000 FAIR DARTMOUTH AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,100 $68,000 $58,000 FAIR TULANE AVENUE MIDLAND BLVD. PENNSYLVANIA AVE & ,800 $156,000 $132,000 FAIR CAMBRIDGE AVENUE PRINCETON AVE. MIDLAND BLVD ,700 $55,000 $47,000 FAIR PURDUE AVENUE DELMAR BLVD. AMHERST AVE ,200 $136,000 $115,000 SUBTOTAL 23,400 $760,000 $644,000 GOOD CORNELL AVENUE PURDUE AVE. MIDLAND BLVD $23,000 $20,000 GOOD PRINCETON AVENUE VANDERBILT AVE. PURDUE AVE ,100 $101,000 $85,000 GOOD PRINCETON AVENUE PURDUE AVE. MIDLAND BLVD ,600 $149,000 $126,000 GOOD VASSAR AVENUE DELMAR BLVD. PENNSYLVANIA AVE ,000 $97,000 $82,000 GOOD VANDERBILT AVENUE DELMAR BLVD. AMHERST AVE ,900 $126,000 $107,000 SUBTOTAL 15,300 $496,000 $420,000 TOTALS 73,200 $443,000 $384,000 $2,221,000 $1,881,000

22 22 ENGINEER'S CONCEPTUAL ESTIMATE OF STREET REPAIR COST ITEM DESCRIPTION UNIT UNIT COST FULL RECONSTRUCTION - CONCRETE OPTION Removals SY $15 Concrete Pavement, 6" Thick SY $50 Type 5 Aggregate for Base, 4" Thick SY $7 Mobilization (10%) SY $8 Contingency (15%) SY Unit Cost Subtotal $12 $92 FULL RECONSTRUCTION - ASPHALT OPTION Removals SY $15 Asphalt Pavement, 9" Thick SY $40 Type 5 Aggregate for Base, 4" Thick SY $7 Mobilization (10%) SY $7 Contingency (15%) SY Unit Cost Subtotal $11 $80 1.5" MILL & VARIABLE DEPTH OVERLAY Milling, 1.5" SY $3 Asphalt Pavement, Varible Depth (1.5"-3.5") SY $12 Pavement Patch (15% Area) SY $9 Mobilization (10%) SY $3 Contingency (15%) SY Unit Cost Subtotal $5 $32 1.5" MILL & 1.5" OVERLAY Milling, 1.5" SY $3 Asphalt Pavement, 1.5" SY $8 Pavement Patch (15% Area) SY $9 Mobilization (10%) SY $3 Contingency (15%) SY Unit Cost Subtotal $4 $27 Assumes $80/Ton for Asphalt UNIVERSITY PARK SUBDIVISION UNIVERSITY CITY, MISSOURI JUNE 15, 2015

23 23 ENGINEER'S CONCEPTUAL ESTIMATE OF CURB RAMP UPGRADE COST UNIVERSITY PARK SUBDIVISION UNIVERSITY CITY, MISSOURI JUNE 15, 2015 ITEM DESCRIPTION UNIT UNIT COST QUANTITY TOTAL BLENDED TRANSITION RAMP 7" Concrete Curb Ramp SY $85 12 $1,020 4" Concrete Sidewalk SY $60 12 $720 Type "S" Concrete Curb LF $25 65 $1,625 Detectable Warning Panel SF $30 20 $600 TOTAL PER RAMP USE VANDERBILT AVENUE (10 RAMPS) PURDUE AVENUE (20 RAMPS) VASSAR AVENUE (6 RAMPS) UNIVERSITY PARK SUBDIVISION CURB RAMP UPGRADE TOTAL $3,965 $4,000 $40,000 $80,000 $24,000 $144,000

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project PennDOT Public Meeting S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project Mt Lebanon Township, Allegheny County Mt Lebanon Township Municipal Building November 6, 2014 1 Project

More information

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project What is the Main Street Project? The Main Street Project is a roadway project that addresses pavement, infrastructure and safety issues

More information

SMSHE Southeastern Michigan Society for Healthcare Engineering

SMSHE Southeastern Michigan Society for Healthcare Engineering SMSHE Southeastern Michigan Society for Healthcare Engineering Presentation on: Pavement Management and Preservation: The Right Fix at the Right Time PRESENTATION OVERVIEW Asset Evaluation (Management)

More information

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Project will Replace: Utilities Curb Pavement Lighting. City of Madison Project will Replace: Utilities Curb Pavement Lighting Replace sanitary sewer main & laterals Winnebago: Existing 8 main, 1905 Linden: Existing 6 main, 1915, upsize to 8 main Atwood: Existing 12 main,

More information

Woodbridge Addition Driveway Separation

Woodbridge Addition Driveway Separation City of Dilworth, Minnesota Woodbridge Addition Driveway Separation Study and Report mooreengineeringinc.com August 2014 Project No.18099 August 13, 2014 City of Dilworth Attn: Peyton Mastera 2 1 st Ave

More information

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area City/CCSD 28E Agreement February 14, 2017 Page 1 28E Agreement Between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) Regarding the construction of a roundabout at the

More information

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014 Introduction / Written Statement McDonald s Restaurant - Purcellville McDonald s Corporation is proposing to redevelop the existing McDonald s eating establishment with a drive-through located at 121 N

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

JOB CREATION PROJECTS

JOB CREATION PROJECTS SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each

More information

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS

More information

CRESCENT RESOURCES INC.

CRESCENT RESOURCES INC. CRESCENT RESOURCES INC. Due Diligence Checklist Project Name: Client: Project No. Date: 1 Survey Review survey for compliance with Crescent Resources, Inc. s Instructions to Surveyors (see below): All

More information

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals Purpose: The Midlothian Road entrance to Mundelein Park & Recreation District s (MPRD s) Keith Mione (Community) Park would

More information

Const. ROADS - Description

Const. ROADS - Description Road Projects make up the bulk of the capital expenditures for the township. For the term of this CIP, road projects total $9,843,000 or 72.0% of the total capital expenditures for all capital projects

More information

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change* 12/6/2017 3012115-03 Northwood Dr NE, Glass to s/o Brookland $980,000.00 J. 4/16/2018 12/13/2017 3012121-02 O Ave NW, 16th to Ellis $4,065,000.00 Tippe; Lee J. 3/19/2018 Collins Rd NE from E of Northland

More information

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...

More information

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: September 2, 2015 # 9 SUBJECT: ELECTION DISTRICT: Identification of Funds for the Traffic Signal at the Intersection of Northstar Boulevard

More information

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 INTRODUCTION The City of Cedar Falls and the Iowa Department of Transportation are conducting a Public Informational

More information

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015 GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin

More information

John Portman Boulevard Corridor

John Portman Boulevard Corridor Corridor Multi-use Path + Streetscape Improvements February 8, 13 SOUTH SIDE BLOCK IMPROVEMENT NOTES: Consolidation of Utility/Sign Locations Remove Existing Trees Centennial Olympic Park Drive Planter

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT CITY OF VANCOUVER ADMINISTRATIVE REPORT Date: October 20, 2004 Author: David Desrochers Phone No.: 604.873.7893 RTS No.: 4716 CC File No.: 5802 Meeting Date: December 14, 2004 TO: FROM: SUBJECT: Vancouver

More information

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. Numerous ecosystem-based functional stormwater quantity and quality design alternatives are possible within the street ROW. Several

More information

City of Richmond. Engineering Design Specifications

City of Richmond. Engineering Design Specifications City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS

More information

COMPLETE GREEN STREET CHECKLIST

COMPLETE GREEN STREET CHECKLIST COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015 AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department

More information

North Street Reconstruction & Integrated Stormwater Management System

North Street Reconstruction & Integrated Stormwater Management System OWEA Watershed Workshop-October 30 th, 2014 North Street Reconstruction & Integrated Stormwater Management System Ted Blahnik, PE Principal-Williams Creek Consulting North Street: A Case Study for Integrated

More information

DESIGN SCENE SUBJECT INDEX

DESIGN SCENE SUBJECT INDEX DESIGN SCENE SUBJECT INDEX CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY BRIDGE & APPROACH PLANS CONSTRUCTION PLAN FOR EXCEPTIONS EXCEPTION CLARIFICATION GOVERNING SPECIFICATIONS

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that

More information

Chapter 6. Green Streets

Chapter 6. Green Streets Chapter 6. Green Streets Description Green streets are designed in a holistic manner that minimizes impervious surfaces, emphasizes landscaped elements, includes measures for enhancing water quality, while

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

23 EA , , , , , , , LF , , ,596.

23 EA , , , , , , , LF , , ,596. Mast Arm Traffic Signals at Central Ave. 5th, 6th, 8th & 31st St. Engineering & Capital Improvements Department, City of St. Petersburg, FL Project No.: 11027-112 Bid date: January 10, 2012 Item Description

More information

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B

More information

Section 11 Grading and Drainage Standards

Section 11 Grading and Drainage Standards Section 11 Grading and Drainage Standards 11.1 INTRODUCTION The proper grading, conveyance, storage and release of storm water is critical to maintain the integrity of the Property. Drainage facilities,

More information

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT 7 August 13, 2009 TO: FROM: Mayor and Council City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT The Director of Public Works and his fine staff prepared and submitted to you a good overview

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville

More information

North Loop Paving. December 18th, Street Reconstruction Project. Forrest Hardy, Transportation Planner Minneapolis Public Works

North Loop Paving. December 18th, Street Reconstruction Project. Forrest Hardy, Transportation Planner Minneapolis Public Works CITY OF MINNEAPOLIS Street Reconstruction Project December 18th, 2017 Forrest Hardy, Transportation Planner Minneapolis Public Works Forrest.Hardy@MinneapolisMN.Gov (612) 673-5951 Adam Hayow, Project Engineer

More information

CHURCH STREET MAIN STREET CHURCH STREET

CHURCH STREET MAIN STREET CHURCH STREET CHURCH STREET NOTES:. See Civil Sheets for Roadway, Crosswalks, Utilities, Lighting, and Maintenance of Traffic. 2. Refer to this sheet for brick and concrete unit paver laying patterns. See detail sheets

More information

City of Ketchum P.O. Box East Ave. N. Ketchum, ID 83340

City of Ketchum P.O. Box East Ave. N. Ketchum, ID 83340 City of Ketchum P.O. Box 2315 480 East Ave. N. Ketchum, ID 83340 June 10, 2015 Mayor Jonas and City Councilors City of Ketchum Ketchum, Idaho Mayor Jonas and City Councilors: Sidewalk Discussion Introduction/History

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar

More information

Cottage Grove Road Reconstruction. City of Madison Engineering

Cottage Grove Road Reconstruction. City of Madison Engineering Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580

More information

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015 Rt. 29 Solutions Project Delivery Advisory Panel December 3, 2015 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Nov

More information

CLAY BRICK PERVIOUS PAVEMENT CASE STUDY CITY OF NEW ALBANY

CLAY BRICK PERVIOUS PAVEMENT CASE STUDY CITY OF NEW ALBANY OWEA COLLECTIONS CONFERENCE 2012 CLAY BRICK PERVIOUS PAVEMENT CASE STUDY CITY OF NEW ALBANY May 10, 2012 Travis Eifert, PE, LEED AP Doug Turney, PE, CFM, LEED AP EMH&T STORMWATER MASTER PLAN VILLAGE CENTER

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 Problem: Anecdotal evidence suggests a natural spring exists in the backyard

More information

Below the trestle lie artifacts of past industry along the Cobbossee Stream. South end of the trestle, at the proposed trailhead area.

Below the trestle lie artifacts of past industry along the Cobbossee Stream. South end of the trestle, at the proposed trailhead area. The existing railroad trestle, when refitted as a pedestrian walkway, could be an important, eye-catching, scenic component to the Cobbossee Stream Trail. South end of the trestle, at the proposed trailhead

More information

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

PROJECTS UNDER CONSTRUCTION

PROJECTS UNDER CONSTRUCTION Project Name Project Status Project Funding Project Manager PJ 2144 Clayton Rd-Treat Blvd Intersection Improvements Widen the Clayton Road/Treat Blvd intersection and upgrade the traffic signal. Construction

More information

Colerain Township report to. Hamilton County Regional Planning Commission. December 2, 2010, 1:00PM. t a f f r e p o r t

Colerain Township report to. Hamilton County Regional Planning Commission. December 2, 2010, 1:00PM. t a f f r e p o r t Colerain Township report to Hamilton County Regional Planning Commission December 2, 2010, 1:00PM Preliminary Plan: Case No.: ZA2001-04, Forevergreen Prepared By: Amy Bancroft, Land Use Planner t a f f

More information

Please replace and add the following pages (described below and attached) within the bid documents.

Please replace and add the following pages (described below and attached) within the bid documents. To: Bidders From: City of Dundee Greg Reid, City Engineer Date: 7/20/2016 Re: 2016 Street and Water Improvements - Addendum 3 Please replace and add the following pages (described below and attached) within

More information

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure Civil Engineering Landscape Architecture Environmental Restoration Planning Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure Peg Staeheli, ASLA, LEED AP March

More information

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By: S WOLFE ST N CASTLE ST N WASHINGTON ST S WASHINGTON ST S CHAPEL ST S DURHAM ST S DUNCAN ST N MADEIRA ST N MONTFORD AVE Butchers Hill Greening Feasibility N DUNCAN ST MULLIKIN ST N PORT ST N WOLFE ST E

More information

Roads Plan

Roads Plan Roads Plan 2019-2023 Background Road conditions have been a problem for Painesville City over the past decade. Between 2009 and 2013, the city was only able to dedicate $1.9 million in total road repairs

More information

foi"#'.w County Road Needs Report i*"-i"s;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7

foi#'.w County Road Needs Report i*-is;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7 FLOOD PLAIN SERVICES County Road Needs Report County udges' Association of Arkansas 20L7 Annual Winter Meeting Thomas F. Black, P.E., CFM shsl201-7 i*"-i"s;a,i=?;;,#'1 tta le0isrtnet foi"#'.w Flood Plain

More information

CITY OF VALPARAISO STORMWATER MASTER PLAN

CITY OF VALPARAISO STORMWATER MASTER PLAN CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August

More information

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

Response to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo)

Response to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo) Environmental Science & Assessment, LLC MEMORANDUM DATE: August 13, 2010 TO: Oregon City Planning CC: Jill Long Lane Powell FROM: RE: Jack Dalton Response to Comments (July 28, 2010 Oregon City Determination

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 & PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA December 2, 2015 XYZ Corporation Jane Jones, 707-555-1212 This example prepared by Dan Cloak Environmental

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY SEPTEMBER 2016 Introduction The Platteview Road Corridor Study was led by the Metropolitan Area Planning Agency (MAPA) with assistance from

More information

APPENDIX G: TOWN ORDINANCE REVIEW

APPENDIX G: TOWN ORDINANCE REVIEW APPENDIX G: TOWN ORDINANCE REVIEW TYLin (225740) Woodard & Curran SWMP January 2013 Stormwater LID strategies, ranked for Zoning Bylaw and Site Plan Review Standards Dimensional Requirements Permit the

More information

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street Project Summary Project Type: Technologies: Institutional parking lot retrofit demonstration project Vegetated infiltration swale with

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting Road Reconstruction Elements Grant Background What is a

More information

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013 SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013 APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION S. E. Cemeteries of AL

More information

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission Clay Curtin, Management Analyst (I the same walls at a maximum of 1 foot tall. Section 7.36.150 of the Municipal Code permits BY: Eric Haaland, Associate Planner right-of-way) between walkways leading

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 355 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS TABLE OF CONTENTS 355.01 SCOPE 355.02 REFERENCES

More information

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving 4.2-i PAVING PARKING AREAS AND ROADS Alternate Names: Pavement Practices, Impervious Paving DESCRIPTION All roads, driveways, and parking lots proposed for year-round use shall be paved with a hard plowable

More information

Report or technical documentations of the target areas in Siauliai

Report or technical documentations of the target areas in Siauliai WP 4 Energy Supply Report or technical documentations of the target areas in Siauliai 2011.10.27 Summary of the draft version of technical documentation for two target areas Lieporiai park 1.1. Works basis

More information

5-Year Street Reconstruction Plan ( )

5-Year Street Reconstruction Plan ( ) 5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

Request for Approval of Design Modification

Request for Approval of Design Modification March 7, 2017 Piper Peterson U. S. Environmental Protection Agency 1200 Sixth Avenue, ECL-122, Suite 900 Seattle, Washington 98101 Subject: Request for Approval of Design Modification T-117 Early Action

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

Advance Engineering & Surveying PLLC

Advance Engineering & Surveying PLLC Advance Engineering & Surveying, PLLC Consulting in: Civil & Environmental Engineering Land Surveying Land Development 11 Herbert Drive Phone: (518) 698-3772 Latham, N.Y. 12110 Email:ncostape@gmail.com

More information

ASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON

ASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON ASPEN GROVE D-1 DETAIL STANDARD NOTES ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: THE LOCATION AND INFORMATION FOR PROPOSED NEW TREES, IN THE PUBLIC RIGHT OF WAY OR ON PUBLIC LANDS

More information

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS 56TH STREET AND 17TH AVENUE IMPROVEMENTS FUNDING: Bonded ESTIMATED COST: $3,885,000 COMPLETION DATE: Fall 2018 SCOPE OF PROJECT: Widening of 56th Street from 6th Avenue to 19th Avenue, and widening 17th

More information

4/8/2015 Item #10D Page 1

4/8/2015 Item #10D Page 1 MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE

More information

Topics. Grid Lattice Paving Systems. Gravelpave, Grasspave and Grassy Pavers. Applications, Materials and Construction

Topics. Grid Lattice Paving Systems. Gravelpave, Grasspave and Grassy Pavers. Applications, Materials and Construction Grid Lattice Paving Systems Topics Gravelpave, Grasspave and Grassy Pavers Applications, Materials and Construction Curtis Hinman WSU Extension Faculty, Watershed Ecologist chinman@wsu.edu Andy Gersen

More information

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts 02111 617-451-2770 fax 614-482-7185 www.mapc.org Serving the 101 Cities and Towns in the Metropolitan Boston Region MEMORANDUM

More information

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev Spreadsheet Report Page 1 Phase I Wickenburg, AZ SD Estimate Rev 0 9-29-11 Project name Estimator Labor rate table Equipment rate table Job size Duration Wickenburg AZ Hal White Denver Denver 121 ac 9

More information

4/23/2012. Topics. Flexible Pervious Gravel Pavers. Flexible Pervious Gravel Pavers. Grid Lattice Paving Systems

4/23/2012. Topics. Flexible Pervious Gravel Pavers. Flexible Pervious Gravel Pavers. Grid Lattice Paving Systems Grid Lattice Paving Systems Topics Gravelpave, Grasspave and Grassy Pavers Applications, Materials and Construction Curtis Hinman WSU Extension Faculty, Watershed Ecologist chinman@wsu.edu Andy Gersen

More information

Carolina North Individual Permit Application September 2010 Draft

Carolina North Individual Permit Application September 2010 Draft Carolina North Individual Permit Application September 2010 Draft Appendix C Jurisdictional Streams, Wetlands, and Buffer Impacts Figures (C- 1 through C-17) C-1 Sheet Index: Impacts within and Outside

More information

Construction and Landscaping on Public Property

Construction and Landscaping on Public Property Construction and Landscaping on Public Property City of Manhattan Beach Community Development Department 1400 Highland Avenue 310-802-5504 www.citymb.info January, 2004 Construction and Landscaping on

More information

Project Overview & Summary of Existing Conditions

Project Overview & Summary of Existing Conditions Project Overview & Summary of Existing Conditions 1 Project Overview Project Goals, History, Scope 2 Timeline / Process Overall Process & Where We Are Task Force Process & Role of Task Force Existing Conditions

More information

Project Descriptions for FY 15

Project Descriptions for FY 15 Department of Transportation and Stormwater Services Stormwater Engineering and Design Division Project Descriptions for FY 15 43 rd Street Outfall PH II Pond Regional Drainage Improvement Flooding Relief

More information

Welcome to the. Open House

Welcome to the. Open House Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect

More information

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code Directors Rules for Seattle Municipal Code, Chapters 22.800 22.808 Stormwater Code Requirements for Green Stormwater Infrastructure to the Maximum Extent Feasible for Single-Family Residential and Parcel-Based

More information

Preliminary Regulatory and Engineering

Preliminary Regulatory and Engineering Preliminary Regulatory and Engineering Overview For the Isle of Palms, South Carolina Prepared by: Applied Technology & Management, Inc. 941 Houston Northcutt Boulevard, Suite 201 Mount Pleasant, South

More information

C-10. Disconnected Impervious Surface

C-10. Disconnected Impervious Surface C-10. Disconnected Impervious Surface Design Objective Disconnected Impervious Surface (DIS) is the practice of directing stormwater runoff from built-upon areas to properly sized, sloped and vegetated

More information

Installation Manual May 9/14 No revision

Installation Manual May 9/14 No revision 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Manual May 9/14 No revision Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles

More information

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION

More information

Building Great Neighbourhoods LAURIER HEIGHTS

Building Great Neighbourhoods LAURIER HEIGHTS Building Great Neighbourhoods LAURIER HEIGHTS Building Great Neighbourhoods Building Great Neighbourhoods (BGN) is a longterm framework that coordinates and integrates the efforts of three City of Edmonton

More information